Shared tower node selection method for power distribution network

By constructing a node network model, power flow calculation, and weight matrix, the importance of nodes is quantified, and nodes with lower out-degree centrality are prioritized for installing 5G base station equipment. This solves the problem of unreasonable resource allocation in the distribution network and improves the stability and resource utilization efficiency of the system.

CN118944098AActive Publication Date: 2024-11-12ECONOMIC & TECH RES INST OF STATE GRID HEILONGJIANG ELECTRIC POWER CO LTD +1
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202410984162.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2024-11-12
Estimated Expiration
2044-07-22

AI Technical Summary

Technical Problem

In existing technologies, the installation of 5G base station equipment in power distribution networks lacks a scientific and systematic decision-making basis, resulting in unreasonable resource allocation, affecting the stability and operational reliability of the power distribution network, and neglecting the importance classification and impact assessment of nodes.

Method used

By collecting the location, connection relationship and electrical parameters of distribution network nodes, a node network model is constructed, power flow calculation and normalization are performed, a weight matrix is ​​established, and the importance of nodes is quantified using the concept centrality index. Nodes with lower out-degree centrality are prioritized for the installation of 5G base station equipment.

Benefits of technology

It improves the operational reliability and stability of the distribution network, optimizes resource allocation, reduces system voltage fluctuations and energy losses, improves calculation efficiency and accuracy, and adapts to distribution network systems of different sizes and structures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118944098A_ABST
    Figure CN118944098A_ABST
Patent Text Reader

Abstract

The invention relates to the crossing field of a power system and a communication technology, and discloses a shared tower node selection method for a power distribution network, which comprises the following steps: S1, collecting the position, the connection relationship and the node type of each node in the power distribution network and the electrical parameter of each node; s2, a node network model of the power distribution network is constructed, nodes represent basic units of the power grid, and edges represent physical connection between the nodes; s3, performing load flow calculation on the power distribution network, acquiring voltage data of each node at different time points, and performing normalization processing on the voltage data; and S4, based on the normalized voltage data, establishing a weight matrix, and calculating the influence degree of each node on other parts of the system. The importance of the nodes of the power distribution network is quantified, and the nodes which have small influence on the system are preferentially selected to install 5G base station equipment, so that the operation stability and the resource configuration efficiency of the power distribution network are improved, the voltage fluctuation and the energy loss are reduced, and the calculation accuracy and efficiency are improved by adopting an optimization method.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the intersection of power systems and communication technologies, and in particular to a shared tower node selection method for a distribution network. Background Art

[0002] With the development and application of 5G communication technology, the demand for the installation of 5G base station equipment is increasing. However, the installation of 5G base station equipment requires a lot of physical space and infrastructure resources, and the existing distribution network towers can provide convenient installation locations for this. Therefore, how to select tower nodes suitable for installing 5G base station equipment in the distribution network has become an important research topic.

[0003] Traditional 5G base station equipment installation methods mainly rely on manual work and experience judgment, lacking a scientific and systematic decision-making basis. This method is not only inefficient, but also easily leads to the misuse of key nodes, which in turn affects the stability and operational reliability of the distribution network. In addition, existing methods often ignore the importance classification and impact assessment of distribution network nodes, resulting in unreasonable resource allocation and increasing the system's operational risks and maintenance costs.

[0004] In the distribution network, different nodes have different roles and influences in the system. Critical nodes are crucial to the operation of the system. Once disturbed, they may cause instability in the entire distribution network; while non-critical nodes have less impact on the system as a whole and are more suitable for installing additional equipment. Therefore, it is of great practical significance to scientifically and rationally select the node locations for installing 5G base station equipment to ensure that the existing distribution network tower resources are fully utilized without affecting the normal operation of the distribution network. To this end, the present invention proposes a shared tower node selection method for distribution networks. Summary of the invention

[0005] In view of the shortcomings of the prior art, the present invention provides a shared pole tower node selection method for a distribution network, which solves the problem of how to scientifically and reasonably select distribution network pole tower nodes to install 5G base station equipment.

[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions: A method for selecting a shared tower node for a distribution network, comprising the following steps:

[0007] S1. Collect the location, connection relationship, node type and electrical parameters of each node in the distribution network;

[0008] S2. Construct a node network model of the distribution network, where nodes represent the basic units of the power grid and edges represent the physical connections between nodes;

[0009] S3, perform power flow calculation on the distribution network, obtain voltage data of each node at different time points, and normalize the voltage data;

[0010] S4. Based on the normalized voltage data, a weight matrix is ​​established to calculate the influence of each node on other parts of the system;

[0011] S5. Use the concept centrality index to quantify the importance of each node, and evaluate the influence of the node on the system by calculating the out-degree centrality of each node;

[0012] S6. According to the out-degree centrality of the nodes, sort the nodes from large to small in terms of influence, and give priority to installing 5G base station equipment on node towers with lower out-degree centrality.

[0013] Preferably, the step S1 specifically includes the following steps:

[0014] S1.1. Collect the location of each node in the distribution network, including geographical coordinates and physical location;

[0015] S1.2. Determine the connection relationship between nodes, including the connection mode of transmission lines, feeders and branches;

[0016] S1.3. Classify the node types in the distribution network, such as power generation equipment, load nodes and substations;

[0017] S1.4. Collect the electrical parameters of each node, including voltage, active power and reactive power.

[0018] Preferably, the step S2 specifically includes the following steps:

[0019] S2.1. Taking nodes as basic units, construct a node network model of the distribution network;

[0020] S2.2, The edges in the node network model represent the physical connections between nodes, such as transmission lines;

[0021] S2.3. Ensure that the model accurately reflects the actual topology of the distribution network.

[0022] Preferably, the step S3 specifically includes the following steps:

[0023] S3.1. Perform power flow calculation on the distribution network and obtain voltage data of each node at different time points:

[0024] Use Newton-Raphson method for power flow calculation;

[0025] Considering the time-varying characteristics of the load in the distribution network, a typical load curve is selected for simulation;

[0026] S3.2, normalize the acquired voltage data.

[0027] Preferably, the step S4 specifically includes the following steps:

[0028] S4.1. Based on the normalized voltage data, a weight matrix of the distribution network node network is established;

[0029] S4.2, calculate the influence of each node on other parts of the system through the weight matrix;

[0030] S4.3. Convert the weight matrix learning problem into a constrained least squares problem and use convex optimization method to solve the optimal weight matrix.

[0031] Preferably, the step S5 specifically includes the following steps:

[0032] S5.1. Use the concept centrality index to quantify the importance of each node:

[0033] Concept centrality includes in-degree centrality and out-degree centrality;

[0034] In-degree centrality measures the degree to which a node is influenced by other nodes in the network;

[0035] Out-degree centrality measures the degree of influence of a node on other nodes;

[0036] S5.2. Calculate the out-degree centrality of each node and evaluate the influence of the node on the system.

[0037] Preferably, the step S6 specifically includes the following steps:

[0038] S6.1. Sort the nodes by their influence from largest to smallest according to their out-degree centrality.

[0039] S6.2. Prioritize the installation of 5G base station equipment on node towers with lower out-degree centrality;

[0040] S6.3. Install 5G base stations at selected nodes and monitor voltage fluctuations and energy losses in the distribution network after installation;

[0041] S6.4. Further optimize the node selection strategy based on actual operation data.

[0042] Preferably, the normalization formula involved in step S3.2 is: where u * is the normalized state value.

[0043] Preferably, in step S5.1, the calculation formula of the concept centrality of the concept node is:

[0044] Γ(C i )=Γ - (Ci )+Γ - (C i ), in

[0045] Γ - (C i ) is the in-degree centrality of the node, Γ + (C i ) is the out-degree centrality of the node, w ij It is a concept node C i C i the extent of the impact;

[0046] In step S5.2, node C i The definition formula of the impact degree on the distribution network is as follows:

[0047] where w ij is the node C in the weight matrix i C j The impact value.

[0048] The present invention provides a method for selecting shared tower nodes for a distribution network, which has the following beneficial effects:

[0049] 1. The present invention identifies and classifies the distribution network nodes, quantifies the importance of each node, and ensures that when installing 5G base station equipment, node towers with less impact on the overall distribution network are given priority, thereby reducing the potential impact on the operation of the distribution network and improving the operational reliability and stability of the distribution network.

[0050] 2. The present invention determines the importance of each node in the distribution network by calculating the out-degree centrality of the node, which helps to make more reasonable resource allocation when installing 5G base station equipment, avoid unnecessary equipment installation at key nodes, and optimize resource utilization efficiency.

[0051] 3. Before installing the 5G base station equipment, the present invention quantifies the influence of each node on the system voltage through power flow calculation and the establishment of a weight matrix, and gives priority to installing nodes that have less impact on the system, which can effectively reduce the voltage fluctuation and energy loss of the system and improve the overall performance of the distribution network.

[0052] 4. The present invention adopts the least squares problem with constraints to solve the weight matrix, and uses the convex optimization method to improve the calculation efficiency and accuracy, making the importance evaluation of distribution network nodes more reliable, helping to accurately identify unimportant node towers and ensure the safe operation of the distribution network. BRIEF DESCRIPTION OF THE DRAWINGS

[0053] Figure 1 is a flow chart of the present invention;

[0054] Figure 2 A flow chart of repeated power flow calculation for the power distribution network of the present invention;

[0055] Figure 3 It is a schematic diagram of the centrality of the concept of the present invention;

[0056] Figure 4 It is the 24-hour total load curve diagram of the IEEE-33 node distribution network of the present invention;

[0057] Figure 5 It is a 24-hour voltage curve diagram of the IEEE-33 node distribution network of the present invention;

[0058] Figure 6 This is a diagram showing the degree of influence of the IEEE-33 node distribution network node on the system in the present invention. DETAILED DESCRIPTION

[0059] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0060] Example:

[0061] Please refer to the attached Figure 1 -Attached Figure 3 The embodiment of the present invention provides a method for selecting a shared tower node for a distribution network, comprising the following steps:

[0062] S1. Collect the location, connection relationship, node type and electrical parameters of each node in the distribution network;

[0063] S2. Construct a node network model of the distribution network, where nodes represent the basic units of the power grid and edges represent the physical connections between nodes;

[0064] S3, perform power flow calculation on the distribution network, obtain voltage data of each node at different time points, and normalize the voltage data;

[0065] S4. Based on the normalized voltage data, a weight matrix is ​​established to calculate the influence of each node on other parts of the system;

[0066] S5. Use the concept centrality index to quantify the importance of each node, and evaluate the influence of the node on the system by calculating the out-degree centrality of each node;

[0067] S6. According to the out-degree centrality of the nodes, sort the nodes from large to small in terms of influence, and give priority to installing 5G base station equipment on node towers with lower out-degree centrality.

[0068] Specifically, the method solves many problems in the prior art by systematically identifying and classifying nodes in the distribution network, quantifying the importance of each node, and preferentially selecting unimportant node towers to install 5G base station equipment, as follows:

[0069] 1. Improve the operational reliability and stability of the distribution network

[0070] By identifying and classifying the nodes in the distribution network, it is ensured that when installing 5G base station equipment, no unnecessary interference will be caused to the key nodes of the distribution network, thus maintaining the stable operation of the system.

[0071] This solves the problem in the existing technology that the installation of 5G base station equipment often ignores the impact on key nodes of the distribution network, which may lead to system instability.

[0072] Specifically, S1 collects the location, connection relationship, node type and electrical parameters of each node in the distribution network, fully understands the structure and characteristics of the distribution network, and builds a complete node network model (S2) to ensure the accuracy of node selection.

[0073] 2. Optimize resource allocation

[0074] Rationally configure 5G base station equipment to avoid unnecessary equipment installation at key nodes, thereby optimizing resource utilization efficiency.

[0075] It solves the problem that traditional methods lack a systematic resource allocation strategy, which may lead to resource waste or uneven distribution.

[0076] Specifically, S4 establishes a weight matrix to calculate the influence of each node on other parts of the system. S5 uses the concept centrality index to quantify the importance of each node to ensure that resources are allocated preferentially to nodes that have less impact on the system.

[0077] 3. Reduce system voltage fluctuation and energy loss

[0078] By selecting nodes that have less impact on the system to install 5G base station equipment, the system's voltage fluctuations and energy losses can be effectively reduced, and the overall performance of the distribution network can be improved.

[0079] The problem that the voltage fluctuation and energy loss are not fully considered in the prior art and may lead to a decrease in system efficiency is solved.

[0080] Specifically, in S3, the voltage data of each node at different time points is obtained through power flow calculation, and the voltage data is normalized to ensure the consistency and comparability of the data, so that the importance of the node can be accurately evaluated in subsequent steps.

[0081] 4. Improve calculation efficiency and accuracy

[0082] By using the constrained least squares problem and convex optimization method, the computational efficiency and accuracy of the weight matrix are improved, making the importance assessment of distribution network nodes more reliable.

[0083] It solves the problem that traditional methods have high computational complexity and low accuracy when calculating node weights, making them difficult to apply in actual operations.

[0084] Specifically, in step S4, the normalized voltage data is used to establish a weight matrix, and the learning problem of the weight matrix is ​​transformed into a constrained least squares problem. The convex optimization method is used to solve the optimal weight matrix to ensure the accuracy and reliability of the calculation results.

[0085] 5. Flexibility and scalability

[0086] The method of the present invention has high flexibility and scalability, can adapt to power distribution network systems of different sizes and structures, and can perform dynamic optimization according to actual operation data.

[0087] The problem that the existing methods have poor versatility and adaptability and are difficult to cope with changes and upgrades in the distribution network system is solved.

[0088] Specifically, through the node selection strategy in S6, combined with actual monitoring data, the node selection scheme is dynamically optimized to ensure that the method can flexibly adapt to the needs of different distribution network systems.

[0089] The S1 step specifically includes the following steps:

[0090] S1.1. Collect the location of each node in the distribution network, including geographical coordinates and physical location;

[0091] S1.2. Determine the connection relationship between nodes, including the connection mode of transmission lines, feeders and branches;

[0092] S1.3. Classify the node types in the distribution network, such as power generation equipment, load nodes and substations;

[0093] S1.4. Collect the electrical parameters of each node, including voltage, active power and reactive power.

[0094] Specifically, step S1 of the present invention collects and organizes node information in the distribution network through a systematic method to ensure the comprehensiveness and accuracy of the data, thereby providing a solid foundation for subsequent node analysis and selection.

[0095] S1.1. Collect the locations of each node in the distribution network, including geographic coordinates and physical locations:

[0096] Accurately collecting the location data of each node, including geographic coordinates and physical location, can ensure the accuracy of subsequent modeling and analysis. This provides a reliable geographic reference for building an accurate node network model.

[0097] With accurate location data, the actual geographical distribution of the distribution network can be better simulated, ensuring the authenticity and effectiveness of the network model.

[0098] The problem in the prior art that the node network model does not match the actual distribution network due to inaccurate location data is solved, thereby ensuring the reliability of subsequent analysis.

[0099] Specifically, high-precision geographic information system (GIS) tools are used to collect the geographic coordinates and physical location of each node to ensure the accuracy and completeness of the data.

[0100] S1.2. Determine the connection relationship between nodes, including the connection mode of transmission lines, feeders and branches:

[0101] Accurately determining the connection relationship between nodes can truly reflect the topological structure of the distribution network and provide reliable topological data for subsequent power flow calculations and node importance analysis.

[0102] Through clear connection relationships, an accurate node network model can be constructed to simulate the flow of electric energy in the distribution network and ensure the reliability of the analysis results.

[0103] It solves the problem in traditional methods that the node connection relationship is unclear or there are errors, resulting in inaccurate modeling and affecting power flow calculation and node analysis.

[0104] Specifically, through field surveys and dispatching system data, the connection methods of each transmission line, feeder and branch are recorded in detail to ensure the accuracy and completeness of the node connection relationship.

[0105] S1.3. Classify the node types in the distribution network, such as power generation equipment, load nodes and substations:

[0106] Classifying nodes in the distribution network helps to clarify the functional attributes of each node, so that more targeted processing can be carried out during the analysis and decision-making process.

[0107] Through classification, different types of nodes can be distinguished during modeling and analysis, their roles and functions in the distribution network can be clarified, and the accuracy of the analysis can be improved.

[0108] The problem that the node type classification is unclear in the prior art and the functions of different nodes cannot be distinguished during the analysis process is solved, thereby ensuring the reliability of the analysis results.

[0109] Nodes are classified into power generation equipment, load nodes, substations, etc. according to their functional attributes, and clearly marked in the model to ensure the accuracy and consistency of the classification.

[0110] S1.4. Collect the electrical parameters of each node, including voltage, active power and reactive power:

[0111] Comprehensively collect the electrical parameters of each node to provide necessary data support for power flow calculation and establishment of weight matrix, ensuring the accuracy and reliability of subsequent calculations.

[0112] Through electrical parameter data, accurate power flow calculations can be performed to evaluate the impact of each node on the distribution network, providing a scientific basis for node importance analysis.

[0113] It solves the problem of incomplete or inaccurate collection of electrical parameter data in traditional methods, which leads to unreliable power flow calculation results, and ensures the accuracy of node analysis.

[0114] Specifically, voltage, active power and reactive power data are obtained from the distribution network monitoring system and on-site measurements to ensure the comprehensiveness and accuracy of the data. The normalization formula is as follows:

[0115] where u * is the normalized state value.

[0116] After being processed by the normalization formula, the values ​​of the initial data are compressed to the range [0,1].

[0117] The normalized time series U will be used to learn the FCM weight matrix later. U can be expressed as:

[0118]

[0119] The time series U obtained after normalization of the original voltage data is U = [U1, U2, ..., U m ] T , U i =[U i1 , U i2 , …, U in ], i=1,2,…m; let Z=[U1, U2,…,U m-1 ] T , Z and Y i Substituting into the equation, we get: j =ZW j, where Z and Y i It can be seen that as the independent variable and dependent variable of historical data, the learning problem of the weight matrix can be transformed into a constrained least squares problem, and its objective function is expressed as:

[0120] argmin:||ZW j -Y j ||2+α||W j ||1

[0121] st||W j || ∞ ≤1

[0122] where ||ZW j -Y j ||2 is the least squares error between the predicted value and the observed value, α||W j ||1 is a penalty function used to prevent overfitting. Minimizing the objective function can obtain W j A reasonable approximate solution of . Its restriction condition ||W j || ∞ ≤1 comes from the definition of the weight matrix. The values ​​of all elements of the weight matrix should be in the interval [-1,1].

[0123] Summary:

[0124] Through the detailed implementation of step S1, the present invention effectively solves the problem of incomplete and inaccurate data in the prior art, ensures the accuracy and reliability of the node network model, and lays a solid foundation for subsequent power flow calculation, weight matrix establishment and node importance analysis. The refinement and accurate execution of each sub-step ensures the comprehensiveness, accuracy and consistency of the data, thereby achieving more efficient and accurate distribution network analysis and 5G base station installation node selection.

[0125] The S2 step specifically includes the following steps:

[0126] S2.1. Taking nodes as basic units, construct a node network model of the distribution network;

[0127] S2.2, The edges in the node network model represent the physical connections between nodes, such as transmission lines;

[0128] S2.3. Ensure that the model accurately reflects the actual topology of the distribution network.

[0129] Specifically, step S2 of the present invention accurately constructs a node network model of the distribution network to ensure that the model accurately reflects the actual topological structure of the distribution network, thereby providing a reliable basis for subsequent power flow calculations and node importance assessments.

[0130] S2.1. Taking nodes as basic units, construct the node network model of distribution network:

[0131] By constructing a network model with nodes as the basic unit, the position and role of each node in the distribution network can be clarified, providing a clear structural framework for subsequent analysis.

[0132] An accurate node network model can accurately represent the actual structure of the distribution network, enabling more realistic results to be obtained when performing power flow calculations and impact assessments.

[0133] The present invention solves the problem in the prior art that the node network model is not constructed accurately enough, the node information is incomplete or the location is inaccurate, which leads to the deviation between the model and the actual distribution network.

[0134] By collecting detailed information of each node (location, connection relationship, type, electrical parameters, etc.), a network model is constructed with each node as the basic unit to ensure that the position and function of each node in the model are consistent with the actual situation.

[0135] S2.2. The edges in the node network model represent the physical connections between nodes, such as transmission lines:

[0136] By clarifying the physical connections between nodes in the model, the model can not only represent the location of the nodes, but also the flow path of electric energy in the distribution network, providing the necessary topological information for power flow calculation.

[0137] Through clear physical connection relationships, the model can accurately simulate the transmission of electric energy in the distribution network and ensure the accuracy of power flow calculations.

[0138] This solves the problem in traditional methods that the connection relationship between nodes is not clearly described and the model lacks accurate representation of physical connections, which leads to large deviations in power flow calculation results.

[0139] Specifically, when constructing the network model, the physical connections such as transmission lines, feeders and branches between each node are recorded in detail, and these connections are accurately represented in the model to ensure that the physical connection relationship of the model is consistent with the actual distribution network.

[0140] S2.3. Ensure that the model accurately reflects the actual topology of the distribution network:

[0141] By ensuring that the model accurately reflects the actual topological structure of the distribution network, the model can truly simulate the operation of the distribution network and provide a reliable data basis for subsequent calculations and analysis.

[0142] An accurate topological structure model can fully reflect the complexity and operating characteristics of the distribution network, ensure that the results of subsequent analysis can truly reflect the actual situation, and provide reliable decision support.

[0143] The problem in the prior art that the model does not match the actual topological structure, resulting in a large difference between the analysis result and the actual situation, is solved.

[0144] Specifically, by collecting and analyzing detailed data in the distribution network, we ensure that each node and connection relationship in the model accurately reflects the actual situation. We use power system simulation tools to verify and adjust the model to ensure that the model's topology is consistent with the actual distribution network.

[0145] Summary:

[0146] Through the detailed implementation of step S2, the present invention effectively solves the problems of inaccurate models, unclear connection relationships, and inconsistent topological structures in the prior art, ensuring the accuracy and reliability of the node network model. The comprehensiveness, accuracy, and consistency of the model are ensured, thereby achieving more efficient and accurate distribution network analysis and 5G base station installation node selection.

[0147] The S3 step specifically includes the following steps:

[0148] S3.1. Perform power flow calculation on the distribution network and obtain voltage data of each node at different time points:

[0149] Use Newton-Raphson method for power flow calculation;

[0150] Considering the time-varying characteristics of the load in the distribution network, a typical load curve is selected for simulation;

[0151] S3.2, normalize the acquired voltage data.

[0152] Specifically, step S3 of the present invention ensures the accuracy and consistency of data through detailed power flow calculation and voltage data normalization processing, and provides a reliable data basis for subsequent node importance analysis.

[0153] S3.1. Perform power flow calculation on the distribution network and obtain voltage data of each node at different time points:

[0154] Through power flow calculation, the voltage data of the distribution network at different time points can be obtained. These data are an important basis for analyzing the importance of nodes and ensuring the accuracy and reliability of subsequent analysis.

[0155] Accurate voltage data can reflect the operating status of the distribution network under different load conditions and provide a scientific basis for node importance analysis.

[0156] The present invention solves the problem that the current flow calculation is not accurate enough and cannot fully reflect the operation status of the distribution network under different load conditions in the prior art.

[0157] Specific solution:

[0158] The Newton-Raphson method is used for power flow calculation. The specific process is as follows. Figure 2 As shown, when the results converge, the voltage data of the distribution network nodes can be obtained, and the voltage data X of the time series can be expressed as:

[0159]

[0160] Consider the time-varying characteristics of the load in the distribution network and select a typical load curve for simulation: In the power flow calculation, the time-varying characteristics of the load are introduced, and a typical load curve is selected for simulation to make the calculation results closer to the actual operation. The load curve can be determined based on historical data and typical daily load change patterns to ensure the representativeness and accuracy of the simulation results.

[0161] S3.2 Normalize the acquired voltage data

[0162] By normalizing the voltage data, the differences between voltage data at different nodes are eliminated, ensuring that the data are compared and analyzed at the same scale, thereby enhancing the stability and consistency of subsequent calculations.

[0163] Normalization processing can make the voltage data of different nodes within the same range, which is convenient for the subsequent calculation of the weight matrix and the quantitative analysis of the importance of the nodes, and improves the accuracy and reliability of the calculation results.

[0164] The present invention solves the problem in the prior art that unprocessed voltage data is directly used for analysis and is easily affected by data differences.

[0165] Specific solution:

[0166] Normalization formula: Use the normalization formula to normalize the voltage data as a column vector to ensure data consistency. The specific formula is:

[0167] where u * is the normalized state value. After being processed by this formula, the value of the initial data is compressed to the range [0,1].

[0168] Summary

[0169] Through the detailed implementation of step S3, the present invention effectively solves the problems of inaccurate power flow calculation and inconsistent data in the prior art, ensuring the comprehensiveness, accuracy and consistency of voltage data. It ensures the reliability and comparability of data, thereby achieving more efficient and accurate distribution network analysis and node importance assessment.

[0170] The S4 step specifically includes the following steps:

[0171] S4.1. Based on the normalized voltage data, a weight matrix of the distribution network node network is established;

[0172] S4.2, calculate the influence of each node on other parts of the system through the weight matrix;

[0173] S4.3. Convert the weight matrix learning problem into a constrained least squares problem and use convex optimization method to solve the optimal weight matrix.

[0174] Specifically, step S4 of the present invention quantitatively evaluates the impact of distribution network nodes on the system by constructing and optimizing a weight matrix, thereby ensuring the scientificity and accuracy of the analysis.

[0175] S4.1. Based on the normalized voltage data, establish the weight matrix of the distribution network node network:

[0176] By establishing a weight matrix, the mutual influence relationship between nodes can be quantified, providing basic data for subsequent node importance evaluation.

[0177] The weight matrix can reflect the causal relationship and influence intensity between nodes, clarify the role of nodes in the distribution network, and provide a basis for scientific decision-making.

[0178] The problem in the prior art that there is a lack of effective methods to quantify the mutual influence between nodes, resulting in inaccurate node importance assessment, is solved.

[0179] Specific solution:

[0180] Based on normalized voltage data: Using normalized voltage data eliminates data differences, making the calculation of the weight matrix more accurate and consistent.

[0181] Establish weight matrix: According to the normalized voltage data, construct the weight matrix W, where W ij is the weight matrix node C i C j The weight matrix can quantitatively reflect the relationship and influence between nodes.

[0182] S4.2. Calculate the influence of each node on other parts of the system through the weight matrix:

[0183] By calculating the weight matrix, we can quantitatively evaluate the impact of each node on other parts of the system and clarify the importance of the node.

[0184] The values ​​in the weight matrix directly reflect the influence between nodes, help identify key nodes and non-key nodes, and provide a basis for optimizing decisions.

[0185] It solves the problem that traditional methods cannot accurately evaluate the overall impact of nodes on the system, resulting in inaccurate identification of key nodes.

[0186] Specific solution:

[0187] Compute node impact:

[0188] Node C i The definition formula of the impact degree on the distribution network is as follows:

[0189] where w ij is the node C in the weight matrix i C j The impact value.

[0190] S4.3. Convert the weight matrix learning problem into a constrained least squares problem and use the convex optimization method to solve the optimal weight matrix:

[0191] By converting the weight matrix learning problem into a constrained least squares problem and solving it using a convex optimization method, the computational efficiency and accuracy of the results can be improved.

[0192] The least squares method and convex optimization technology can effectively handle complex matrix calculation problems and ensure the accuracy and stability of the weight matrix solution.

[0193] The problem that the existing methods have high computational complexity and are prone to errors when calculating the weight matrix, making them difficult to apply to actual large-scale distribution network systems is solved.

[0194] Specific solution:

[0195] Convert to a constrained least squares problem: Convert the weight matrix learning problem to a constrained least squares problem. The objective function is expressed as:

[0196] argmin:||ZW j -Y j ||2+α||W j ||1

[0197] st||W j || ∞ ≤1

[0198] where ||ZW j -Y j ||2 is the least squares error between the predicted value and the observed value, α||W j ||1 is a penalty function used to prevent overfitting. Minimizing the objective function can obtain W j A reasonable approximate solution of . Its restriction condition ||W j || ∞ ≤1 comes from the definition of the weight matrix. The values ​​of all elements of the weight matrix should be in the interval [-1,1].

[0199] Use convex optimization method to solve: Use convex optimization method to solve the least squares problem above, find the optimal weight matrix, and ensure the accuracy of the results and computational efficiency. Convex optimization method can effectively handle optimization problems with constraints, ensuring the stability of the calculation process and the reliability of the results.

[0200] Summary:

[0201] Through the detailed implementation of step S4, the present invention effectively solves the problems of inaccurate quantification of the influence relationship between nodes and high computational complexity in the prior art, ensuring the accuracy and reliability of the construction and optimization of the weight matrix. It ensures the scientificity and effectiveness of the node importance evaluation, thereby achieving more efficient and accurate distribution network analysis and 5G base station installation node selection.

[0202] Step S5 specifically includes the following steps:

[0203] S5.1. Use the concept centrality index to quantify the importance of each node:

[0204] Concept centrality includes in-degree centrality and out-degree centrality;

[0205] In-degree centrality measures the degree to which a node is influenced by other nodes in the network;

[0206] Out-degree centrality measures the degree of influence of a node on other nodes;

[0207] S5.2. Calculate the out-degree centrality of each node and evaluate the influence of the node on the system.

[0208] Specifically, step S5 of the present invention quantifies the importance of each node by using the concept centrality index, clarifies the influence of each node in the distribution network, and provides a scientific basis for optimizing the installation location of 5G base station equipment.

[0209] S5.1. Use the concept centrality index to quantify the importance of each node:

[0210] By using the concept centrality index, we can systematically quantify the importance of each node in the distribution network, clarify the relative influence between nodes, and provide a quantitative basis for node selection.

[0211] The concept centrality index can comprehensively evaluate the importance of nodes in the network, help identify key nodes and non-key nodes, and ensure the scientificity and reliability of optimization decisions.

[0212] The problem in the prior art that there is a lack of effective methods to quantify the importance of nodes, resulting in inaccurate identification of key nodes, is solved.

[0213] Specific solution:

[0214] Concept centrality includes in-degree centrality and out-degree centrality: by calculating in-degree centrality and out-degree centrality respectively, the importance of nodes in the network is comprehensively evaluated.

[0215] In-degree centrality: measures the degree to which a node is influenced by other nodes in the network. The formula is:

[0216] where Γ - (C i ) is node C i The in-degree centrality, w ij It is a concept node C i C j In-degree centrality measures the total degree to which a node is influenced by other nodes in the network.

[0217] Out-degree centrality: measures the influence of a node on other nodes. The formula is:

[0218] Among them, Γ + (C i ) is node C i The out-degree centrality, w ij It is a concept node C i C j The out-degree centrality measures the total influence of a node on other nodes.

[0219] S5.2. Calculate the out-degree centrality of each node and evaluate the influence of the node on the system:

[0220] By calculating the degree centrality, we can clarify the degree of influence of each node on other parts of the system, identify key nodes and non-key nodes, and provide a scientific basis for optimizing the installation location of 5G base station equipment.

[0221] The out-degree centrality index can quantitatively evaluate the influence of nodes in the distribution network and help identify which nodes are critical to the operation of the system, thereby avoiding unnecessary interference on these key nodes and ensuring the stability and reliability of the system.

[0222] It solves the problem that traditional methods cannot accurately evaluate the overall impact of nodes on the system, resulting in inaccurate identification of key nodes.

[0223] Specific solution:

[0224] Calculate the out-degree centrality of each node. The in-degree centrality is defined as the sum of the absolute values ​​of the weights of the incoming edges of the analyzed node. The in-degree centrality measures the degree to which the node is influenced by other nodes in the network. The out-degree centrality is defined as the sum of the absolute values ​​of the weights of the outgoing edges of the analyzed node. The out-degree centrality measures the degree of influence of the node on other concept nodes.

[0225] Evaluate the impact of nodes on the system: Use the out-degree centrality index to identify nodes that have a greater impact on the system and avoid installing 5G base station equipment on these key nodes, thereby reducing the potential impact on system operation.

[0226] Summary:

[0227] Through the detailed implementation of step S5, the present invention effectively solves the problem of inaccurate quantification of node importance in the prior art and ensures the scientific identification of key nodes and non-key nodes. The refinement and accurate execution of each sub-step ensures the scientificity and effectiveness of node importance evaluation, thereby achieving more efficient and accurate distribution network analysis and 5G base station installation node selection.

[0228] Step S6 specifically includes the following steps:

[0229] S6.1. Sort the nodes by their influence from largest to smallest according to their out-degree centrality.

[0230] S6.2. Prioritize the installation of 5G base station equipment on node towers with lower out-degree centrality;

[0231] S6.3. Install 5G base stations at selected nodes and monitor voltage fluctuations and energy losses in the distribution network after installation;

[0232] S6.4. Further optimize the node selection strategy based on actual operation data.

[0233] Specifically, step S6 of the present invention sorts and selects nodes based on the out-degree centrality index to ensure that 5G base station equipment is installed on nodes that have the least impact on the distribution network, thereby optimizing the operation and maintenance of the distribution network.

[0234] S6.1. Sort the nodes by influence from largest to smallest according to their out-degree centrality:

[0235] By sorting the nodes according to their out-degree centrality, we can clarify the degree of influence of each node on the system and provide a basis for scientific selection of nodes.

[0236] This sorting method can identify which nodes have a greater impact on the system and which nodes have a smaller impact, helping to optimize the installation location of 5G base station equipment and ensure the stability of the system.

[0237] This solves the problem in traditional methods that there is a lack of effective means to rank the influence of nodes, resulting in unscientific node selection.

[0238] S6.2. Prioritize the installation of 5G base station equipment on node towers with lower out-degree centrality:

[0239] By giving priority to nodes with lower out-degree centrality, 5G base station equipment can be installed in places with the least impact on the system, reducing potential interference with the operation of the distribution network.

[0240] This selection strategy can effectively reduce system operation risks, ensure the stability and reliability of the distribution network, and improve the scientificity and rationality of 5G base station equipment installation.

[0241] The present invention solves the problem in the prior art that node selection lacks scientific basis, which easily leads to misuse of key nodes and increases system risks.

[0242] Specific solution:

[0243] Selection basis: Based on the sorting results, nodes with lower out-degree centrality are selected first for the installation of 5G base station equipment. This ensures that the selected nodes have less impact on the overall system and avoids interfering with the stable operation of the system.

[0244] S6.3. Install 5G base stations at selected nodes and monitor the voltage fluctuation and energy loss of the distribution network after installation:

[0245] By installing 5G base station equipment on selected nodes and monitoring their operation, the impact of the equipment on the distribution network can be understood in real time to ensure the effectiveness and safety of the installation strategy.

[0246] Real-time monitoring can promptly detect and handle problems that arise during the installation process, ensure the stable operation of the system, and provide data support for further optimization.

[0247] This solves the problem in traditional methods that there is a lack of effective monitoring of the operation of equipment after installation, which easily leads to problems not being discovered and handled in a timely manner.

[0248] Specific solution:

[0249] Monitoring content: After installing the 5G base station equipment on the selected nodes, continuously monitor the voltage fluctuation and energy loss of the distribution network. Monitoring indicators include node voltage changes, system total energy loss, etc., to ensure the stability of the system after the equipment is installed.

[0250] S6.4. Further optimize the node selection strategy based on actual operation data:

[0251] By analyzing actual operating data, the node selection strategy can be continuously optimized to ensure the optimal operating status of the distribution network and 5G base station equipment.

[0252] Dynamic optimization strategies can adapt to changes in the distribution network operating environment, improve the overall performance and reliability of the system, and ensure long-term stable operation.

[0253] The problem that the node selection strategy in the prior art lacks a dynamic adjustment mechanism and cannot adapt to changes in actual operating conditions is solved.

[0254] Specific solution:

[0255] Optimization method: Based on the monitored voltage fluctuation and energy loss data, analyze the actual impact of 5G base station equipment on the distribution network and further optimize the node selection strategy. Through continuous adjustment and improvement, ensure that the selection strategy can adapt to the actual operation of the distribution network and improve the overall efficiency and stability of the system.

[0256] Summary:

[0257] Through the detailed implementation of step S6, the present invention effectively solves the problems of unscientific node selection, lack of monitoring and optimization in the prior art, ensures that 5G base station equipment is installed on nodes with the least impact on the distribution network, and optimizes the operation and maintenance of the distribution network.

[0258] The normalization formula involved in step S3.2 is:

[0259] where u * is the normalized state value.

[0260] In step S5.1, the calculation formula of the concept centrality of the concept node is:

[0261] Γ(C i )=Γ - (C i )+Γ - (C i ), where Γ - (C i ) is the in-degree centrality of the node, Γ + (C i ) is the out-degree centrality of the node, w ij It is a concept node C i C i the extent of the impact;

[0262] In step S5.2, node C i The definition formula of the impact degree on the distribution network is as follows:

[0263] where w ij is the node C in the weight matrix i C j The impact value.

[0264] Please refer to the attached Figure 4 -Attached Figure 6In order to verify the effectiveness of the method proposed in this invention, the following test experiment was designed. Two IEEE standard node systems were selected as the test. The distributed photovoltaic access strategy was determined by solving the influence of each node on the system after the distribution network modeling. The voltage fluctuation and energy loss of the system before and after the distributed photovoltaic access with different penetration rates were compared to verify the effectiveness of the method. The experimental contents are as follows:

[0265] Purpose:

[0266] The effectiveness of the proposed shared tower node selection method is verified, and the optimal access strategy for distributed photovoltaics is determined through IEEE standard node system testing. The voltage fluctuation and energy loss of the system under different photovoltaic penetration rates are experimentally evaluated to verify the impact of this method on the performance of the distribution network.

[0267] Experimental procedures

[0268] Experimental preparation:

[0269] The IEEE-33 node standard test system was selected for the experiment.

[0270] Collect the parameters of the distribution network system, including the number of nodes, the number of branches, the system first section voltage, the system maximum load and the system daily loss.

[0271] Table 1: Test system parameters:

[0272] Test system Number of nodes Number of branches System first section voltage Maximum system load System daily loss IEEE-33 33 37 12.66kV 3384kVA 2530kW

[0273] Power flow calculation:

[0274] There are 33 nodes and 32 branches in the IEEE-33 node system, of which node 1 is an external power node and the remaining load nodes are PQ nodes. The load in the system follows several typical daily load curves selected from the experimental data set. Figure 4 The total load curve of the system is shown in Figure 2. The maximum load of the system used is about 3384 kVA. After the system flow calculation, the voltage value of all nodes in the system is obtained in 24 hours, and the total line loss of the system in 24 hours is 2530 kW. Figure 5 It is the node voltage curve of the system in 24 hours.

[0275] Node influence calculation:

[0276] The influence index of the node in the IEEE-33 node distribution network system is calculated by learning the weight matrix of the designed network. The more influential the point is, the greater the impact it has on other nodes in the power grid. Therefore, it is necessary to avoid connecting distributed power sources to these nodes to maintain the stability of the system voltage. The influence index of the entire distribution network is shown in Figure 6The results of the top 10 nodes ranked in descending order according to the node influence values ​​are shown in Table 2. According to the results in Table 2, the distributed access strategy is selected. In order to compare the impact of different access strategies on the distribution network, the distribution network is studied in two ways: key node access and non-key node access, and various indicators of the distribution network are calculated under different penetration rates.

[0277] Table 2 Results of node influence degree

[0278] Sorting Node Number Node impact 1 19 27.9412 2 25 24.4944 3 18 21.2698 4 22 14.8447 5 20 13.0183 6 2 12.6885 7 21 4.9181 8 17 3.3985 9 29 3.0037 10 24 2.1864

[0279] Distributed photovoltaic access strategy:

[0280] According to the node influence ranking results, the distributed photovoltaic access strategy is determined to avoid connecting photovoltaics to nodes with higher influence to maintain the stability of system voltage.

[0281] Two modes of key node access and non-key node access are simulated respectively, and various indicators of the distribution network under different penetration rates are calculated, including the voltage fluctuation index and the power loss index.

[0282]

[0283] The voltage fluctuation index is used to study the impact of the access of distributed power sources on the voltage of the distribution network. This experiment proposes a voltage fluctuation index to express the average fluctuation of the voltage distribution of the distribution network over a period of time. The overall voltage fluctuation index of the distribution network is the average value of the sum of the voltage deviation rates of all nodes at all times. By comparing the voltage fluctuations under different access conditions of distributed power sources, the impact of the access of distributed power sources to the key nodes on the system is studied.

[0284] Voltage fluctuation index formula:

[0285]

[0286] Where VF is the voltage fluctuation index, V i (t) is the actual voltage value of node i at time t, T is the time length, n is the total number of distribution network nodes, and V0 is the standard voltage of the distribution network. The smaller the value of the voltage fluctuation index, the more stable the voltage curve of the system is after the distributed power source is connected.

[0287] In a given distribution network system, the line loss of the system is obtained through power flow calculation.

[0288] Power loss index formula:

[0289]

[0290] TPL0 represents the total loss value of the distribution network line when there is no photovoltaic access, and TPLpv It represents the total loss value of the distribution network line when photovoltaic is connected. According to the formula of power loss index, when K loss The larger the value, the greater the reduction in distribution network losses after photovoltaic access, which means the better the effect of photovoltaic access.

[0291] Result analysis and verification:

[0292] The voltage fluctuation and energy loss of the system under different photovoltaic penetration rates are compared to verify the effectiveness of the method.

[0293] Experimental summary:

[0294] Through experimental verification, the proposed shared tower node selection method effectively identifies and classifies nodes in the distribution network and accurately evaluates the degree of influence of nodes on the system. The experimental results show that the priority selection of nodes with lower influence to install 5G base station equipment can significantly reduce system voltage fluctuations and energy losses, and improve the stability and operation efficiency of the distribution network. The experimental data supports the effectiveness and practicality of this method, and provides a scientific basis for practical application.

[0295] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A method for selecting a shared tower node for a distribution network, characterized in that: The following steps are involved: S1. Collect the location, connection relationship, node type and electrical parameters of each node in the distribution network; S2. Construct a node network model of the distribution network, where nodes represent the basic units of the power grid and edges represent the physical connections between nodes; S3, perform power flow calculation on the distribution network, obtain voltage data of each node at different time points, and normalize the voltage data; S4. Based on the normalized voltage data, a weight matrix is ​​established to calculate the influence of each node on other parts of the system; S5. Use the concept centrality index to quantify the importance of each node, and evaluate the influence of the node on the system by calculating the out-degree centrality of each node; S6. According to the out-degree centrality of the nodes, sort the nodes from large to small in terms of influence, and give priority to installing 5G base station equipment on node towers with lower out-degree centrality.

2. A method for selecting a shared tower node for a distribution network according to claim 1, characterized in that: The S1 step specifically includes the following steps: S1.

1. Collect the location of each node in the distribution network, including geographical coordinates and physical location; S1.

2. Determine the connection relationship between nodes, including the connection mode of transmission lines, feeders and branches; S1.

3. Classify the node types in the distribution network, such as power generation equipment, load nodes and substations; S1.

4. Collect the electrical parameters of each node, including voltage, active power and reactive power.

3. A method for selecting a shared tower node for a distribution network according to claim 1, characterized in that: The S2 step specifically includes the following steps: S2.

1. Taking nodes as basic units, construct a node network model of the distribution network; S2.2, The edges in the node network model represent the physical connections between nodes, such as transmission lines; S2.

3. Ensure that the model accurately reflects the actual topology of the distribution network.

4. A method for selecting a shared tower node for a distribution network according to claim 1, characterized in that: The S3 step specifically includes the following steps: S3.

1. Perform power flow calculation on the distribution network and obtain voltage data of each node at different time points: Use Newton-Raphson method for power flow calculation; Considering the time-varying characteristics of the load in the distribution network, a typical load curve is selected for simulation; S3.2, normalize the acquired voltage data.

5. A method for selecting a shared tower node for a distribution network according to claim 1, characterized in that: The S4 step specifically includes the following steps: S4.

1. Based on the normalized voltage data, a weight matrix of the distribution network node network is established; S4.2, calculate the influence of each node on other parts of the system through the weight matrix; S4.

3. Convert the weight matrix learning problem into a constrained least squares problem and use convex optimization method to solve the optimal weight matrix.

6. A method for selecting a shared tower node for a distribution network according to claim 1, characterized in that: The step S5 specifically includes the following steps: S5.

1. Use the concept centrality index to quantify the importance of each node: Concept centrality includes in-degree centrality and out-degree centrality; In-degree centrality measures the degree to which a node is influenced by other nodes in the network; Out-degree centrality measures the degree of influence of a node on other nodes; S5.

2. Calculate the out-degree centrality of each node and evaluate the influence of the node on the system.

7. A method for selecting a shared tower node for a distribution network according to claim 1, characterized in that: The step S6 specifically includes the following steps: S6.

1. Sort the nodes by their influence from largest to smallest according to their out-degree centrality. S6.

2. Prioritize the installation of 5G base station equipment on node towers with lower out-degree centrality; S6.

3. Install 5G base stations at selected nodes and monitor voltage fluctuations and energy losses in the distribution network after installation; S6.

4. Further optimize the node selection strategy based on actual operation data.

8. A method for selecting a shared tower node for a distribution network according to claim 4, characterized in that: The normalization formula involved in step S3.2 is: where u * is the normalized state value.

9. A method for selecting a shared tower node for a distribution network according to claim 6, characterized in that: In step S5.1, the calculation formula of the concept centrality of the concept node is: C(C i )=C - (C i )+C - (C i ), among them Γ - (C i ) is the in-degree centrality of the node, Γ + (C i ) is the out-degree centrality of the node, w ij It is a concept node C i C i the extent of the impact; In step S5.2, node C i The definition formula of the impact degree on the distribution network is as follows: where w ij is the node C in the weight matrix i C j The impact value.

Citation Information

Patent Citations

  • Power grid planning coordination evaluation method and system

    CN111160693A

  • Power distribution network topology identification method of SVM (Support Vector Machine) based on particle swarm optimization optimization

    CN113901624A

  • Electric power facility shared base station construction method and device

    CN114004417A

  • Electric vehicle access power distribution network risk assessment method based on probability stochastic power flow

    CN115423342A

  • Power distribution network distributed energy storage locating and sizing double-layer optimization method based on cluster division

    CN115577852A