Energy storage scheduling method for shared energy storage participating in frequency modulation auxiliary service market

By sharing energy storage to participate in the frequency modulation auxiliary service market, and using game theory models to optimize energy storage scheduling, the problem of low energy storage utilization rate is solved, the grid frequency modulation pressure is alleviated and the energy storage utilization efficiency is improved.

CN118944149AActive Publication Date: 2024-11-12NORTH CHINA ELECTRIC POWER UNIV

Patent Information

Application Number
CN202411074371.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2024-06-27
Filing Date
2024-08-06
Publication Date
2024-11-12
Estimated Expiration
2044-08-06

AI Technical Summary

Technical Problem

In the prior art, the utilization rate of energy storage is low, resulting in an increase in frequency regulation pressure of the power grid and serious waste of energy storage resources.

Method used

A method of energy storage scheduling for sharing energy storage participating in the frequency modulation auxiliary service market is proposed. By aggregating multiple energy storage clusters on the power supply, power grid and user side, the master-slave game model and internal cooperative game model are built, and the energy storage scheduling is optimized and the energy storage scheduling is improved. Energy storage utilization and frequency modulation performance.

Benefits of technology

It effectively alleviates the frequency regulation pressure of the power grid, improves the utilization rate of energy storage, fully utilizes the frequency regulation performance of energy storage, and achieves the optimized allocation of energy storage resources and the profit growth of new energy stations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118944149A_ABST
    Figure CN118944149A_ABST
Patent Text Reader

Abstract

The invention relates to the field of power systems, and particularly discloses an energy storage scheduling method for sharing energy storage to participate in a frequency modulation auxiliary service market. The shared energy storage is an energy storage cluster aggregating a plurality of energy storage units on at least one side of a power supply, a power grid and a load, and participates in frequency modulation as an independent market main body, and the frequency modulation market main body comprises a power dispatching center and a plurality of shared energy storage and thermal power generating units. The method comprises the following steps: constructing a shared energy storage day-ahead frequency modulation master-slave game model taking a power dispatching center as a main part and shared energy storage and thermal power generating units as slave parts, and solving to obtain the bid winning amount and clearing price of each time period of each shared energy storage and thermal power generating unit; constructing an internal cooperative game model of day-ahead frequency modulation of each shared energy storage by taking the minimum total frequency modulation cost and maximum total frequency modulation performance of each aggregated energy storage as targets; and for each shared energy storage, solving the internal cooperative game model according to the scalar and the clearing price in the shared energy storage to obtain a scheduling result. The energy storage utilization rate can be improved, and the power grid frequency modulation pressure is relieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of power systems, and in particular to an energy storage dispatching method for sharing energy storage to participate in a frequency regulation auxiliary service market. Background Art

[0002] As energy transformation continues to deepen in countries around the world, the proportion of renewable energy generation in the power grid continues to increase. However, the output of renewable energy such as wind power and photovoltaic power is random and volatile. Therefore, the increase in the proportion of new energy access in the power grid will have a certain impact on the frequency stability of the power grid. In addition, with the increase in user electricity demand, the power load changes frequently, and the frequency regulation pressure of the power grid will also increase sharply. Based on this, how to effectively utilize existing frequency regulation resources has become a key issue in alleviating the frequency regulation pressure of the power system.

[0003] Among them, energy storage has significant advantages in power frequency regulation resources due to its fast response speed, high accuracy and two-way regulation capabilities. However, at present, various new energy stations, independent energy storage and user-side energy storage have the problem of low actual utilization of energy storage, resulting in a huge waste of energy storage resources. Summary of the invention

[0004] To this end, the present invention provides an energy storage scheduling method for shared energy storage to participate in the frequency regulation auxiliary service market, in an effort to solve or at least alleviate the above problems.

[0005] According to one aspect of the present invention, there is provided a method for dispatching energy storage for shared energy storage to participate in the frequency regulation auxiliary service market. The shared energy storage is an energy storage cluster that aggregates multiple energy storages on at least one side of a power source, a power grid, and a user, and participates in the frequency regulation auxiliary service market as an independent market entity. The market entities in the frequency regulation auxiliary service market include a power dispatching center and a number of shared energy storages and thermal power units. The method includes: obtaining basic parameters, the basic parameters include the available capacity, available mileage, capacity quotation, mileage quotation of each shared energy storage and thermal power unit, and the capacity demand, mileage demand, capacity quotation interval, and mileage quotation interval of the power dispatching center; taking the minimum total frequency regulation dispatching cost of the power dispatching center on the day before as the upper level target, and taking the maximum frequency regulation benefit of each shared energy storage and thermal power unit on the day before as the lower level target, constructing a frequency regulation auxiliary service market. A master-slave game model for day-ahead frequency regulation of shared energy storage is established with the power dispatching center as the main body and shared energy storage and thermal power units as the slaves; basic parameters are input into the master-slave game model for solution, and the capacity winning bids, mileage winning bids and clearing prices of each shared energy storage and thermal power unit in each time period in the day-ahead frequency regulation market are obtained; an internal cooperation game model for day-ahead frequency regulation of each shared energy storage is established with the goal of minimizing the total frequency regulation cost and maximizing the total frequency regulation performance of each aggregated energy storage; for each shared energy storage, according to its capacity winning bids, mileage winning bids and clearing prices in each time period in the day-ahead frequency regulation market, the internal cooperation game model of the shared energy storage is solved, and the dispatch results of each energy storage aggregated by the shared energy storage are obtained, and the dispatch results include the capacity output and mileage output of each energy storage in each time period in the day-ahead frequency regulation market.

[0006] According to another aspect of the present invention, there is provided a computing device, comprising: at least one processor; and a memory storing program instructions, wherein the program instructions are configured to be suitable for execution by the at least one processor, and the program instructions include instructions for executing the energy storage dispatching method for shared energy storage to participate in the frequency regulation ancillary service market according to the present invention.

[0007] According to another aspect of the present invention, a readable storage medium storing program instructions is provided. When the program instructions are read and executed by a computing device, the computing device executes the energy storage scheduling method for shared energy storage to participate in the frequency regulation auxiliary service market according to the present invention.

[0008] In summary, the present invention proposes an operating mode of shared energy storage frequency regulation. Specifically, shared energy storage effectively aggregates idle energy storage distributed at different locations on the power supply side, the grid side, and the load side, and participates in the frequency regulation market as an independent energy storage. This can not only alleviate the frequency regulation pressure of the grid, but also improve the utilization efficiency of idle energy storage distributed at different locations of the source, grid, and load, giving full play to the superior frequency regulation performance of energy storage. In addition, based on game theory, the present invention constructs a bidding and clearing master-slave game model for shared energy storage frequency regulation and a cooperative game model for each energy storage within a shared energy storage cluster. By simultaneously applying cooperative game and non-cooperative game methods to shared energy storage, it is possible to achieve optimal scheduling of each energy storage and ensure the timeliness and accuracy of energy storage frequency regulation scheduling. BRIEF DESCRIPTION OF THE DRAWINGS

[0009] To achieve the above and related purposes, certain illustrative aspects are described herein in conjunction with the following description and accompanying drawings, which indicate various ways in which the principles disclosed herein can be practiced, and all aspects and their equivalents are intended to fall within the scope of the claimed subject matter. The above and other purposes, features and advantages of the present disclosure will become more apparent by reading the following detailed description in conjunction with the accompanying drawings. Throughout the present disclosure, the same reference numerals generally refer to the same parts or elements.

[0010] Figure 1 A structural block diagram of a computing device 100 according to an embodiment of the present invention is shown;

[0011] Figure 2 A flow chart of an energy storage dispatching method 200 for shared energy storage to participate in a frequency regulation auxiliary service market according to an embodiment of the present invention is shown;

[0012] Figure 3 A schematic diagram showing an operation mode of shared energy storage according to an embodiment of the present invention is shown;

[0013] Figure 4 A schematic diagram showing a market entity operation mode of shared energy storage frequency regulation according to an embodiment of the present invention is shown;

[0014] Figure 5 A schematic diagram showing a master-slave game model solution framework diagram for shared energy storage day-ahead frequency regulation according to an embodiment of the present invention is shown;

[0015] Figure 6 A schematic diagram showing a solution framework diagram of an internal cooperative game model of shared energy storage according to an embodiment of the present invention;

[0016] Figure 7 A schematic diagram showing system prediction data and time-of-use electricity prices according to an embodiment of the present invention is shown;

[0017] Figure 8A schematic diagram showing the winning capacity and winning mileage of energy storage and thermal power generation units in the day-ahead frequency regulation market according to an embodiment of the present invention is shown;

[0018] Fig. 9 A schematic diagram showing the capacity output and mileage output of each energy storage in a shared energy storage according to an embodiment of the present invention is shown;

[0019] Fig.10 A schematic diagram showing the total capacity output and total mileage output of each energy storage according to an embodiment of the present invention is shown;

[0020] Fig.11 A schematic diagram showing a comparative analysis diagram of the benefits of various energy storages before and after improvement according to an embodiment of the present invention is shown. DETAILED DESCRIPTION

[0021] The exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided to enable a more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art.

[0022] Considering the low utilization rate of energy storage at present, the present invention proposes an operation mode of shared energy storage participating in the frequency regulation auxiliary service market, and provides an energy storage scheduling method for shared energy storage participating in the frequency regulation auxiliary service market. Specifically, idle energy storage scattered in different locations such as source, network, and load are aggregated into shared energy storage, which participates in the frequency regulation bidding as an independent market entity, and the scheduling strategy is used to optimize the scheduling of energy storage within the cluster, which can not only improve the utilization rate of energy storage, but also alleviate the frequency regulation pressure of the power grid.

[0023] The energy storage dispatching method for shared energy storage participating in the frequency regulation auxiliary service market of the present invention can be executed in a computing device. Figure 1 A block diagram of the physical components (i.e., hardware) of a computing device 100 is shown. In a basic configuration, the computing device 100 includes at least one processing unit 102 and a system memory 104. According to one aspect, depending on the configuration and type of the computing device, the processing unit 102 can be implemented as a processor. The system memory 104 includes, but is not limited to, volatile storage (e.g., random access memory), non-volatile storage (e.g., read-only memory), flash memory, or any combination of such memories. According to one aspect, the system memory 104 includes an operating system 105 and a program module 106, and the program module 106 includes an energy storage scheduling module 120, and the energy storage scheduling module 120 is configured to execute the energy storage scheduling method 200 of the present invention for shared energy storage to participate in the frequency regulation auxiliary service market.

[0024] According to one aspect, operating system 105 is suitable for controlling the operation of computing device 100, for example. Furthermore, examples are practiced in conjunction with graphics libraries, other operating systems, or any other application programs, and are not limited to any particular application or system. Figure 1 This basic configuration is illustrated in FIG. 1 by those components within dashed line 108. According to one aspect, computing device 100 has additional features or functionality. For example, according to one aspect, computing device 100 includes additional data storage devices (removable and / or non-removable), such as magnetic disks, optical disks, or tapes. Such additional storage Figure 1 1 is illustrated by removable storage 109 and non-removable storage 110.

[0025] As stated above, according to one aspect, program modules are stored in the system memory 104. According to one aspect, the program modules may include one or more application programs, and the present invention does not limit the type of application programs, for example, the application programs may include: email and contact applications, word processing applications, spreadsheet applications, database applications, slide show applications, drawing or computer-aided applications, web browser applications, etc.

[0026] According to one aspect, the examples may be practiced on a circuit comprising discrete electronic components, a packaged or integrated electronic chip containing logic gates, a circuit utilizing a microprocessor, or a single chip containing electronic components or a microprocessor. Figure 1 Each or many components shown in can be integrated into a system on a chip (SOC) on a single integrated circuit to practice examples. According to one aspect, such a SOC device may include one or more processing units, a graphics unit, a communication unit, a system virtualization unit, and various application functions, all of which are integrated (or "burned") into a chip substrate as a single integrated circuit. When operated via SOC, the functions described in this article can be operated via a dedicated logic integrated with other components of the computing device 100 on a single integrated circuit (chip). Embodiments of the present invention can also be practiced using other technologies capable of performing logical operations (such as AND, OR, and NOT), including but not limited to mechanical, optical, fluid, and quantum technologies. In addition, embodiments of the present invention can be practiced in a general-purpose computer or in any other circuit or system.

[0027] According to one aspect, the computing device 100 may also have one or more input devices 112, such as a keyboard, a mouse, a pen, a voice input device, a touch input device, etc. Output devices 114 may also be included, such as a display, a speaker, a printer, etc. The aforementioned devices are examples and other devices may also be used. The computing device 100 may include one or more communication connections 116 that allow communication with other computing devices 118. Examples of suitable communication connections 116 include, but are not limited to: RF transmitter, receiver and / or transceiver circuits; Universal Serial Bus (USB), parallel and / or serial ports.

[0028] The term computer-readable medium as used herein includes computer storage media. Computer storage media may include volatile and non-volatile, removable and non-removable media implemented in any method or technology for storing information (e.g., computer-readable instructions, data structures, or program modules). System memory 104, removable storage 109, and non-removable storage 110 are all examples of computer storage media (i.e., memory storage). Computer storage media may include random access memory (RAM), read-only memory (ROM), electrically erasable read-only memory (EEPROM), flash memory or other memory technology, CD-ROM, digital versatile disk (DVD) or other optical storage, cassettes, tapes, disk storage or other magnetic storage devices, or any other products that can be used to store information and can be accessed by computer device 100. According to one aspect, any such computer storage medium can be a part of computing device 100. Computer storage media do not include carrier waves or other propagated data signals.

[0029] According to one aspect, communication media is implemented by computer readable instructions, data structures, program modules, or other data in a modulated data signal (e.g., a carrier wave or other transport mechanism), and includes any information delivery media. According to one aspect, the term "modulated data signal" describes a signal that has one or more characteristics set or changed in a manner that encodes information in the signal. By way of example and not limitation, communication media includes wired media such as a wired network or direct-wired connection, and wireless media such as acoustic, radio frequency (RF), infrared, and other wireless media.

[0030] Figure 2 A flowchart of a method 200 for scheduling energy storage for participating in a frequency regulation auxiliary service market for shared energy storage according to an embodiment of the present invention is shown. The method 200 is suitable for scheduling energy storage for participating in a frequency regulation auxiliary service market on a computing device (e.g. Figure 1 Executed in the computing device 100 shown.

[0031] Here, a few points of explanation are given first. First, shared energy storage is an energy storage cluster that aggregates multiple energy storages on at least one side of the power supply, power grid, and load. For example, in some embodiments, shared energy storage can be an energy storage cluster aggregated from idle energy storage distributed on the power supply side, power grid side, and load side (or user side). Furthermore, the energy storage on the power supply side, power grid side, and load side can be pumped storage, compressed air energy storage, flywheel energy storage, flow battery, lithium-ion battery, sodium-sulfur battery, and lead-acid battery. In other words, shared energy storage can be composed of one or more of pumped storage, compressed air energy storage, flywheel energy storage, flow battery, lithium-ion battery, sodium-sulfur battery, and lead-acid battery.

[0032] Specifically, shared energy storage refers to large-scale energy storage power stations invested and constructed by a third party. These power stations can not only meet their own energy storage needs, but also provide the required energy storage services to other new energy sites. Shared energy storage uses the power grid as a link and advanced intelligent control technology to centrally control idle energy storage (such as pumped storage, compressed air energy storage, flywheel energy storage, flow batteries, lithium-ion batteries, sodium-sulfur batteries, lead-acid batteries, etc.) scattered in different locations of source, network, and load, breaking the original 1-to-1 relationship between energy storage and new energy sites and turning it to a 1-to-N relationship. In this way, the optimal configuration of energy storage resources across the entire network can be achieved, which can not only meet the requirements of mandatory storage allocation for new energy sites, but also create new profit channels for energy storage and improve the utilization rate of energy storage.

[0033] Secondly, after the shared energy storage centrally manages a variety of decentralized energy storage devices, it participates in the frequency regulation auxiliary service market as an independent market entity (i.e., a whole). Specifically, in some embodiments, each energy storage owner connects its own energy storage device to the shared energy storage, which can be uniformly dispatched by the shared energy storage operator. Figure 3 , which shows the operation mode of shared energy storage according to an embodiment of the present invention. The power grid will effectively aggregate the idle energy storage resources and independent energy storage distributed on the power supply side, the grid side and the user side to achieve unified scheduling. Shared energy storage operators can conduct electricity transactions through bilateral negotiation, bidding or unilateral calling, or they can obtain leasing fees by leasing energy storage equipment to new energy stations, users and conventional units. At the same time, shared energy storage can also participate in the electricity market as an independent market entity to obtain benefits. For new energy stations, leasing shared energy storage can reduce the construction and operation and maintenance costs of mandatory storage for new energy stations, thereby not only improving the utilization rate of renewable energy, but also enabling new energy stations to obtain more electricity revenue after being connected to the grid; for users, by leasing shared energy storage, they can make full use of the price difference of the power grid to achieve peak-valley arbitrage.

[0034] Next, the market entity operation mode of shared energy storage frequency regulation is explained. Figure 4, which shows the market subject operation mode of shared energy storage frequency regulation according to an embodiment of the present invention. Among them, the market transaction subjects when shared energy storage participates in frequency regulation can include power generation companies such as thermal power and gas turbines, as well as third-party institutions such as energy storage power stations and integrated energy suppliers; market operation subjects include power dispatching institutions (i.e., power dispatching centers) and power trading institutions.

[0035] The power dispatching agency and the power trading agency are the core departments of the frequency regulation market, which are responsible for collecting and publishing all relevant information of the frequency regulation market. The main responsibilities of the power dispatching center include: daily operation of the power frequency regulation auxiliary service market; organizing transactions according to established market rules and calling electricity according to transaction results; publishing market information and providing the power trading center with the results of market transactions and calls; evaluating the operating status of the power frequency regulation auxiliary service market; and implementing power dispatching. The main tasks of the power trading center include: managing the registration affairs of trading entities; providing settlement basis and corresponding services for power market transactions; and being responsible for disclosing relevant market information.

[0036] When shared energy storage participates in the frequency regulation market bidding and clearing, the power dispatching agency predicts and analyzes the day-ahead frequency regulation demand based on the expected power generation and load demand of each power generation entity, and publishes information such as frequency regulation demand and quotation range in the frequency regulation market. Each market entity declares frequency regulation capacity, frequency regulation mileage, capacity price and mileage price in the frequency regulation market according to its own available frequency regulation capacity and the technical characteristics of the unit. The power dispatching agency sorts the mileage quotations declared by each unit from low to high, and clears them in sequence until the clearing volume meets the day-ahead frequency regulation demand, and uses the mileage quotation of the last cleared unit as the unified clearing price to pre-clear each unit on the day-ahead. After the clearing is completed, the power dispatching center evaluates the actual frequency regulation of each unit, calculates the comprehensive frequency regulation performance of each unit from three aspects: regulation rate, regulation accuracy and response time, and settles the clearing volume of each unit based on the calculation results.

[0037] Within the shared energy storage, the shared energy storage supplier uses advanced intelligent system control technology to optimize the scheduling of each energy storage. Shared energy storage operators can use intelligent communication technology to achieve coordinated control of pumped storage, compressed air energy storage, flywheel energy storage and various electrochemical energy storage. Shared energy storage operators obtain the idle capacity of each energy storage unit that can be used for frequency regulation in advance, as well as the cost and unit parameters of each unit, and summarize and analyze this information to calculate the declared capacity and declared price of the shared energy storage cluster in the day-ahead frequency regulation market. After the day-ahead bidding for shared energy storage is completed and the winning bid is determined, the shared energy storage operator optimizes the scheduling of each energy storage within the cluster according to the day-ahead frequency regulation winning bid. When the shared energy storage operator directly purchases the idle capacity of each energy storage unit, the income obtained by the shared energy storage in the frequency regulation market directly belongs to the shared energy storage operator; when the shared energy storage operator cooperates with each energy storage owner by signing a medium- and long-term contract, the income obtained by the shared energy storage operator in the frequency regulation market must be fairly distributed according to the actual output of each energy storage.

[0038] Among them, according to an embodiment of the present invention, the market entities of the frequency regulation auxiliary service market include the power dispatching center and several shared energy storage and thermal power units. That is, the market transaction entities participating in the frequency regulation auxiliary service market include several (one or more) shared energy storage and several thermal power units. Further, in this embodiment, the market transaction entities participating in the day-ahead frequency regulation market include at least one shared energy storage and at least one thermal power unit.

[0039] Finally, the operating status of energy storage, the unit frequency regulation cost of energy storage, and the comprehensive frequency regulation performance indicators are explained.

[0040] 1) Operation status of energy storage

[0041] The SOC (State of Charge) of energy storage indicates the state of charge of energy storage, also known as the remaining capacity. It indicates the ratio of the remaining capacity of energy storage after a period of use or long-term unused to its rated capacity. It is usually expressed as a percentage, and its value range is 0 to 1. When SOC = 0, it means that the energy storage has no available capacity, and when SOC = 1, it means that the energy storage is fully charged. In short, SOC is used to reflect the remaining capacity of energy storage. In some embodiments, it can be calculated by the following formula.

[0042]

[0043] In the formula, SOC i , t represents the state of charge (%) of energy storage i (or energy storage unit i, representing any energy storage) in time period t, represents the remaining capacity of energy storage i in the period (t-1) (MW), represents the frequency regulation capacity of energy storage i in period t (MWh), Respectively represent the charging efficiency and discharging efficiency of energy storage i (%), It represents the rated capacity (MWh) of the energy storage i when fully charged at its current lifespan.

[0044] The SOH (State of Health) of energy storage refers to the health status of energy storage. It indicates the ratio of the storage capacity of the energy storage in the fully charged state to the storage capacity of the energy storage in the brand new state. This value can be defined and calculated from multiple perspectives, such as battery capacity, power, internal resistance, etc. When the SOH of energy storage drops to a certain level, it can be considered that the energy storage has aged to a certain extent and may be approaching the end of its life (EOL). Therefore, SOH is an indicator that describes the current health status of energy storage and can be used to predict the time when the energy storage reaches EOL so as to carry out corresponding maintenance and management.

[0045] The calculation methods of electrochemical energy storage SOH include energy accumulation method, internal resistance measurement method, open circuit voltage method and capacity measurement method. Among them, this embodiment uses the energy accumulation method for calculation and analysis. The energy accumulation method calculates SOH by recording the total energy transmitted by the energy storage during the charging and discharging process, and compares the current full charge capacity of the energy storage with its initial rated capacity to obtain the percentage of SOH. It should be noted that this method is based on the condition that the degree of capacity attenuation of the battery is proportional to the total energy transmitted. Specifically, in some embodiments, SOH can be calculated by the following formula.

[0046]

[0047] In the formula, SOH i,t represents the health status of energy storage i in period t, represents the rated capacity of energy storage i in a new state (MWh), ε i It represents the decay rate (%) of energy storage i with output capacity.

[0048] 2) Unit frequency regulation cost of energy storage

[0049] Since energy storage frequency regulation focuses on the change of unit power, this embodiment uses the unit mileage cost of energy storage unit frequency regulation to represent the unit cost of energy storage frequency regulation. The unit fixed cost of energy storage frequency regulation is calculated by calculating the full life cycle cost of energy storage and the total frequency regulation mileage of the full life cycle. The unit variable cost of energy storage frequency regulation is calculated based on the cost during the actual operation of energy storage. The sum of the two is the unit mileage cost of energy storage frequency regulation, as shown below.

[0050] Unit fixed cost:

[0051] The full life cycle cost of energy storage includes the initial investment cost of energy storage during project construction, annual operation and maintenance costs and replacement costs during actual operation, and the recovery cost at the end of the project life. In some embodiments, the time when the energy storage power station is put into operation can be used as the starting point for conversion, and Y is the full life cycle. The total fixed cost during the full life cycle is It can be expressed as the following formula.

[0052]

[0053] In the formula, represents the total fixed cost of energy storage (any energy storage) over its entire life cycle, C inv represents the initial investment cost of energy storage, including the total cost of design, hardware, software, engineering, procurement, construction, etc. (10,000 yuan), C OM represents the annual operation and maintenance cost of energy storage (10,000 yuan), C R represents the annual replacement cost of energy storage (10,000 yuan), C Rec represents the recovery cost of energy storage (10,000 yuan), r represents the interest rate (%, or discount rate), and y represents the useful life of the energy storage.

[0054] The unit mileage cost of energy storage frequency regulation can be calculated by averaging the full life cycle cost of energy storage to the total frequency regulation mileage of the energy storage full life cycle, that is, the ratio of the total investment of the energy storage power station to the total frequency regulation mileage of the energy storage power station. The specific cost can be seen in the following formula.

[0055]

[0056] In the formula, C D represents the unit fixed cost of energy storage (i.e. any energy storage) (yuan / MW), S sum Represents the total frequency regulation mileage (MW) of the energy storage power station (i.e. energy storage) over its entire life cycle, N c Indicates the number of effective frequency regulation responses in the entire life cycle of energy storage, S mil represents the average frequency regulation mileage (MW) of a frequency regulation, α represents the effective AGC frequency regulation response coefficient of the energy storage power station, and α≤1, where α is related to the frequency regulation type actually participated in by the energy storage and the proportion of the energy storage dispatch. Ideally, α approaches 1. c It can be calculated by the following formula.

[0057]

[0058] Where, ψ represents the annual operation ratio of the energy storage power station (%); t eff Indicates the duration of the effective frequency regulation response of the energy storage power station (min), t eff The value depends on the application scenario. AGC auxiliary frequency modulation is generally between 0.5 and 3 minutes. intIt represents the interval time (min) of the effective frequency regulation response of the energy storage, which is generally tens of seconds to several minutes; Y represents the life of the energy storage system (years), where Y is related to the discharge depth (DOD) of the energy storage frequency regulation system during operation and the duration of the effective frequency regulation response of the energy storage system t eff Regarding frequency modulation, energy storage participates in short-term, high-frequency, and low-depth charging and discharging, and the system cycle life is much longer than its service life in a fully charged and discharged state.

[0059] Unit variable cost:

[0060] The variable cost of energy storage in actual operation when participating in frequency regulation includes charging cost, wear cost of mechanical equipment or cycle life attenuation cost of electrochemical energy storage (determined by energy storage type). Specifically, in some embodiments, the total variable cost of frequency regulation for a storage period t is It can be expressed as the following formula.

[0061]

[0062] In the formula, C C,t represents the charging cost of energy storage during period t (10,000 yuan), C Mn,t It represents the wear cost of energy storage in period t (10,000 yuan), which needs to be differentiated according to the specific energy storage type.

[0063] Based on this, the unit variable cost C of a storage period t is v It can be expressed as the following formula.

[0064]

[0065] Where P t It represents the actual frequency regulation output mileage of energy storage in period t.

[0066] In summary, based on the unit fixed cost and unit variable cost of energy storage frequency regulation, the unit cost mc of energy storage frequency regulation can be obtained, as shown in the following formula.

[0067] mc=C D +C v

[0068] 3) Comprehensive frequency regulation performance indicators of energy storage

[0069] The comprehensive frequency regulation performance index covers multiple aspects of the energy storage system, such as response speed, regulation accuracy, duration, and energy conversion efficiency. These indicators can not only reflect the capabilities of energy storage frequency regulation technology, but also are an important basis for evaluating whether it can meet the frequency regulation needs of the power system. According to one embodiment of the present invention, the comprehensive frequency regulation performance index of energy storage can be calculated by the three indicators of response speed, regulation accuracy, and response time in the actual frequency regulation process of energy storage. For details, please refer to the following formula, where when the calculated values ​​of K1, K2, and K3 are less than 0.1, they are all taken as 0.1.

[0070] K p =K1×K2×K3

[0071] In the formula, K p It represents the comprehensive frequency regulation performance index of energy storage, K1 represents the regulation rate index, K2 represents the regulation accuracy index, and K3 represents the response time index.

[0072] The adjustment rate, adjustment accuracy and response time are explained below in turn.

[0073] The regulation rate refers to the rate at which the unit responds to the set point command, which can be divided into rising rate and falling rate. The specific calculation process is as follows.

[0074] Among them, the actual adjustment rate calculation can be seen from the following formula.

[0075]

[0076] In the formula, v i,j represents the j-th regulation rate of energy storage unit i (MW / min), represents the output (MW) of energy storage unit i when the jth frequency modulation response process ends, P Si,j It represents the output (MW) of energy storage unit i when the jth frequency modulation starts. represents the time when the jth frequency regulation of energy storage unit i ends, T Si,j represents the time when the jth frequency modulation of unit i starts, P di,j represents the critical power of the start-stop grinding of unit i for the jth time (MW), T di,j It indicates the actual time consumed by the jth adjustment and start-up and stop of the grinding mill of unit i (min).

[0077] It can be seen that when the unit does not meet the typical frequency regulation set point control process (fails to enter the target dead zone), the regulation rate is the unit output at the end of the instruction minus the active change of the output at the time of crossing the dead zone divided by the required time.

[0078] After obtaining the actual regulation rate, the regulation rate adjustment index can be calculated by the following formula:

[0079]

[0080] In the formula, represents the j-th regulation rate assessment index of energy storage unit i, v N,i represents the standard regulation rate of unit i (MW / min), where If the calculated value is less than 0.1, take 0.1.

[0081] In addition, if the unit enters a deep regulation condition below 50% of the rated output, the frequency regulation rate is required to be 80% of the normal regulation.

[0082] Regulation accuracy refers to the difference between the actual output and the set point output after the unit response is stable. The absolute value of the difference between the actual output and the command is integrated, and then the integral is divided by the integration time to obtain the regulation deviation for that period. For details, see the following formula.

[0083]

[0084] Where ΔP i,j represents the adjustment deviation of the jth frequency regulation of energy storage unit i, P i,j (t) represents the actual output (MW) during period t, P i,j Indicates the set point command value for this period, T Ei,j represents the end point of the jth frequency regulation period of energy storage unit i, T Si,j Indicates the starting point of the j-th frequency regulation period of energy storage unit i.

[0085] If the unit fails to enter the target dead zone, the adjustment accuracy is the minimum deviation between the actual output and the target output in the time period from stepping out of the dead zone in the same direction to the end of the instruction. The calculation formula is shown in the following formula.

[0086]

[0087] In the formula, It indicates the jth frequency regulation accuracy index of energy storage unit i, δ indicates the allowable deviation of regulation (%), which is 1% of the rated active power of the unit. When the unit enters the deep regulation condition below 50% of the rated output, the frequency regulation accuracy requirement is 125% of the conventional regulation.

[0088] The response time refers to the time taken by the unit to reliably step out of the frequency regulation dead zone consistent with the regulation direction at the original output point after the EMS system issues a command. In some embodiments, the time difference between upward and downward regulation, and the unit response time can be calculated by the following formulas.

[0089]

[0090]

[0091]

[0092] In the formula, It represents the response time index of the jth frequency modulation of the energy storage unit i. T0 and T1 represent the start reaction time before the upward frequency modulation output and the end reaction start output time respectively. T5 and T6 represent the start reaction time before the downward frequency modulation output and the end reaction start output time respectively. It represents the reaction time of the jth upward frequency modulation of unit i, represents the reaction time of unit i for the jth frequency downward modulation, t i,j represents the response time of the jth frequency modulation of unit i, t s Indicates the standard response time. In addition, the frequency modulation response time of thermal power units should be less than 1 minute. When the unit enters the deep adjustment condition below 50% of the rated output, the frequency modulation response time is 125% of the conventional unit.

[0093] At this point, we have a clear understanding of the operation mode of shared energy storage, the market players when shared energy storage participates in the frequency regulation market, the unit cost of energy storage frequency regulation, and the comprehensive frequency regulation performance indicators of energy storage. Next, the energy storage scheduling method 200 of the present invention for shared energy storage participating in the frequency regulation auxiliary service market is described. Among them, in this embodiment, the frequency regulation auxiliary service market is further referred to as the day-ahead frequency regulation market. Figure 2 As shown, the method 200 starts at 210. At 210, basic parameters are obtained.

[0094] Among them, according to one embodiment of the present invention, the basic parameters include the available capacity, available mileage, capacity quotation, mileage quotation of each shared energy storage, the available capacity, available mileage, capacity quotation, mileage quotation of each thermal power unit, the capacity demand, mileage demand, capacity quotation interval, mileage quotation interval of the power dispatching center, and the basic information of each thermal power unit and each energy storage unit. Of course, if other market entities are also included, the basic parameters should also include the available capacity, available mileage, capacity quotation, mileage quotation of the entity, such as gas turbines, integrated energy suppliers, etc.

[0095] Then, enter 220, with the minimum total dispatching cost of the day-ahead frequency regulation of the power dispatching center as the upper level goal, and the maximum day-ahead frequency regulation benefits of each shared energy storage and thermal power unit as the lower level goal, to construct a master-slave game model of shared energy storage day-ahead frequency regulation with the power dispatching center as the main body and shared energy storage and thermal power units as the slaves. Among them, the Stackelberg master-slave game method can be used to construct an external master-slave game model of shared energy storage participating in the day-ahead frequency regulation market with one master and multiple slaves, with the power dispatching and trading center as the leader and shared energy storage and conventional thermal power units as followers. It should be noted that if other market entities are also included in some embodiments, such as gas turbines, integrated energy suppliers, etc., the lower level goal should also include maximizing the day-ahead frequency regulation benefits of the entity.

[0096] Specifically, according to an embodiment of the present invention, a master-slave game model for day-ahead frequency regulation of shared energy storage may be constructed in the following manner.

[0097] Firstly, according to the winning capacity and mileage of each shared energy storage and thermal power unit in each period of the day-ahead frequency regulation market, as well as the capacity clearing price and mileage clearing price in each period of the day-ahead frequency regulation market, the total day-ahead dispatching cost of the power dispatching center is determined, and the minimization of the total day-ahead dispatching cost is taken as the first objective function to construct the day-ahead frequency regulation cost model of the dispatching center.

[0098] The total day-ahead dispatching cost of the power dispatching center includes the cost of purchasing frequency regulation capacity and the cost of purchasing frequency regulation mileage. Based on this, in some embodiments, the first objective function can be specifically expressed as follows:

[0099]

[0100] Among them, F L represents the total day-ahead dispatching cost of the power dispatching center, represents the capacity clearing price of each bidding entity in the frequency regulation market during period t the day before (yuan / MWh), represents the mileage clearing price of each bidding entity in the day-ahead frequency modulation market during period t (yuan / MW), represents the winning bid capacity (MWh) of shared energy storage m in the day-ahead frequency regulation market during period t, represents the winning bid mileage (MW) of shared energy storage m in the day-ahead frequency regulation market during period t, represents the winning bid capacity (MWh) of thermal power unit n in the day-ahead frequency regulation market during period t, It represents the winning mileage (MW) of thermal power unit n in the day-ahead frequency regulation market during period t. M represents the number of shared energy storage participating in the day-ahead frequency regulation market, that is, there are M energy storage clusters participating in the day-ahead frequency regulation market. N represents the number of thermal power units participating in the day-ahead frequency regulation market, that is, there are N thermal power units participating in the day-ahead frequency regulation market. T represents the total number of time periods, that is, a day is divided into T time periods.

[0101] Furthermore, in order to construct the day-ahead frequency regulation cost model of the dispatching center, it is also necessary to constrain the supply and demand of the units and the dispatching center and the output of each unit, including: the capacity constraint and mileage constraint of each shared energy storage, the capacity constraint and mileage constraint of each thermal power unit, and the frequency regulation supply and demand balance constraint between the power dispatching center and the shared energy storage and thermal power units. For the convenience of description, the above constraints are referred to as the first constraint conditions. The constraints in the first constraint conditions are explained below.

[0102] Frequency regulation supply and demand balance constraint: This constraint indicates that the total capacity bid of all energy storage clusters and thermal power units in period t is consistent with the total capacity demand of the dispatch center in period t. The same is true for the mileage balance constraint. The capacity balance constraint and mileage balance constraint are as follows.

[0103]

[0104]

[0105] In the formula, represents the total capacity demand of the system in period t (MWh), Represents the total mileage demand of the system in period t (MW).

[0106] Capacity and mileage constraints of shared energy storage: This constraint indicates that the capacity and mileage bids of shared energy storage cannot exceed the required range of shared energy storage, as follows.

[0107]

[0108]

[0109] In the formula, represents the maximum capacity output (MWh) of energy storage cluster m (i.e. shared energy storage m), represents the historical frequency regulation mileage calling coefficient (frequency regulation mileage multiplier) of energy storage cluster m, Indicates the maximum frequency regulation mileage (MW) that can be called by the energy storage cluster m.

[0110] Capacity constraint and mileage constraint of thermal power units: This constraint indicates that the capacity and mileage of the thermal power unit’s bid cannot exceed the required range of the unit, as follows.

[0111]

[0112]

[0113] In the formula, represents the maximum capacity output of thermal power unit n, represents the frequency regulation mileage multiplier of thermal power unit n, It indicates the maximum frequency regulation mileage that can be called by thermal power unit n.

[0114] So far, the first objective function and the first constraint condition constitute the day-ahead frequency regulation cost model of the dispatching center.

[0115] Then, according to the total revenue obtained by each thermal power unit in the day-ahead frequency regulation market as well as its frequency regulation cost and start-up and shutdown cost, the day-ahead frequency regulation revenue of each thermal power unit is determined, and the scheduling and operation model of each thermal power unit is constructed with the maximum day-ahead frequency regulation revenue of each thermal power unit as the second objective function.

[0116] Among them, the day-ahead frequency regulation revenue of thermal power units is the net revenue (or frequency regulation compensation revenue) obtained by thermal power units in the day-ahead frequency regulation market, which is composed of the frequency regulation auxiliary service market revenue f G , frequency modulation cost and start-stop costs Based on this, in some embodiments, the second objective function can be specifically the following formula:

[0117]

[0118]

[0119]

[0120] Among them, F G represents the day-ahead frequency regulation benefit of a thermal power unit (i.e. any thermal power unit), f G represents the total revenue obtained by thermal power units in the day-ahead frequency regulation market, n G It represents the comprehensive frequency regulation performance index of thermal power units. represents the frequency regulation cost of thermal power units, represents the start-up and shutdown cost of thermal power units, represents the clearing capacity of thermal power units in the day-ahead frequency regulation market during period t (MWh), represents the clearing mileage of thermal power units in the day-ahead frequency regulation market during period t (MW), represents the capacity clearing price of thermal power units in the day-ahead frequency regulation market during period t (yuan / MWh), represents the mileage clearing price of the thermal power unit in the day-ahead frequency regulation market during period t (yuan / MW), and MC′ represents the unit frequency regulation cost of the thermal power unit.

[0121] Furthermore, in order to construct the dispatching and operation model of thermal power units, it is also necessary to constrain the scope of their quotations, the declared capacity, mileage, and the power change per unit time, including: the frequency regulation declared quantity constraint, frequency regulation declared price constraint, and ramp constraint of thermal power units. Among them, for the convenience of description, the above constraints are referred to as the second constraint conditions. The following is an explanation of each constraint in the second constraint condition.

[0122] Constraints on the frequency regulation declaration quantity of thermal power units: When thermal power units declare capacity and mileage in the frequency regulation market, they cannot exceed the maximum value that can be declared. Specifically, the capacity declaration quantity constraints and mileage declaration quantity constraints can be seen in the following formula.

[0123]

[0124]

[0125] In the formula, represents the frequency regulation capacity (MWh) declared by the thermal power unit in period t, represents the frequency regulation mileage (MW) declared by the thermal power unit in period t, Indicates the maximum frequency regulation capacity declared by thermal power units (MWh), s G represents the frequency regulation mileage multiplier of thermal power units, It indicates the maximum adjustable frequency mileage of thermal power units (MW).

[0126] Constraints on the price declared for frequency regulation of thermal power units: Thermal power units quote prices based on their own power generation costs, but their declared prices cannot exceed the declared price range published by the dispatching and trading center, as follows.

[0127]

[0128]

[0129] In the formula, represents the capacity quotation of thermal power units in period t (yuan / MWh), represents the mileage quotation of the thermal power unit in period t (yuan / MW), They represent the lower and upper limits of the capacity quotation range published by the dispatching and trading center (yuan / MWh), They respectively represent the lower and upper limits of the mileage quotation range published by the dispatching and trading center (yuan / MW).

[0130] The ramp constraint of a thermal power unit is a restriction on the amount of power change of the unit per unit time, usually expressed as a constraint on the rate at which the unit increases or decreases its output. Specifically, the ramp constraint specifies the maximum power value that a thermal power unit can increase or decrease per unit time (such as per minute, per hour). This restriction ensures that the power output of the unit does not change too drastically when responding to changes in the load of the power system, thereby helping to maintain the stability and reliability of the power system. The specific ramp constraint of a thermal power unit can be seen in the following formula.

[0131]

[0132] In the formula, ΔP u It indicates the maximum output change allowed for a thermal power unit in a frequency regulation period (MW). It represents the clearing mileage (MW) of thermal power units in the day-ahead frequency regulation market (t-1) period.

[0133] At this point, the second objective function and the second constraint condition constitute the dispatching and operation model of the thermal power unit.

[0134] Next, according to the total revenue obtained by each shared energy storage in the day-ahead frequency regulation market and its frequency regulation cost, the day-ahead frequency regulation revenue of each shared energy storage is determined, and the scheduling and operation model of each shared energy storage is constructed with the maximum day-ahead frequency regulation revenue of each shared energy storage as the third objective function.

[0135] The day-ahead frequency regulation revenue of shared energy storage is the net revenue obtained by shared energy storage in the day-ahead frequency regulation market, which is composed of the frequency regulation ancillary service market revenue f ES and the cost of providing frequency modulation services C ES The frequency modulation auxiliary service market revenue includes capacity revenue and mileage revenue. Based on this, in some embodiments, the third objective function can be specifically as follows:

[0136] maxF ES =f ES ·n ES -C ES

[0137]

[0138]

[0139] Among them, F ES represents the day-ahead frequency regulation benefit of shared energy storage, f ES is the total revenue obtained by shared energy storage in the day-ahead frequency regulation market, n ES represents the comprehensive frequency regulation performance index of shared energy storage, C ES represents the frequency regulation cost of shared energy storage, represents the capacity clearing price of the day-ahead frequency regulation market during period t (yuan / MWh), represents the mileage clearing price of the day-ahead frequency regulation market in period t (yuan / MW), represents the winning bid capacity (MWh) of shared energy storage in the day-ahead frequency regulation market during period t, represents the winning bid mileage (MW) of shared energy storage in the day-ahead frequency regulation market during period t, and MC″ represents the unit frequency regulation cost of shared energy storage (yuan / MW).

[0140] Furthermore, in order to construct a dispatching and operating model for shared energy storage, it is also necessary to constrain the bids, bid amounts, and charging and discharging powers of energy storage clusters when participating in the frequency regulation market, including constraints on the frequency regulation bid amount, frequency regulation bid price, and charging and discharging power of shared energy storage. For ease of description, the above constraints are referred to as the third constraint condition. The following is an explanation of each constraint in the third constraint condition.

[0141] Frequency regulation price constraints for shared energy storage: The capacity and mileage quotations for shared energy storage must comply with the quotation range requirements published by the dispatching and trading center. Specifically, the quotation ranges for capacity and mileage can be seen in the following formula.

[0142]

[0143]

[0144] In the formula, Respectively represent the upper and lower limits of energy storage capacity quotation (yuan / MWh), represents the capacity quotation of the energy storage cluster in period t (yuan / MWh), They represent the upper and lower limits of the energy storage mileage quotation (yuan / MW), Represents the mileage quotation of the energy storage cluster in period t (yuan / MW).

[0145] Constraints on the frequency regulation capacity reported by shared energy storage: The frequency regulation capacity and mileage reported by the energy storage cluster in each time period must be within the range of its actual available capacity and mileage, as follows.

[0146]

[0147]

[0148] In the formula, represents the frequency regulation capacity (MWh) reported by the energy storage cluster during period t, represents the frequency regulation mileage (MW) declared by the energy storage cluster during period t, Indicates the maximum available capacity of the energy storage cluster for frequency regulation (MWh), s ES represents the frequency regulation mileage multiplier of the energy storage cluster, Indicates the maximum frequency regulation mileage (MW) that can be called upon by the energy storage cluster.

[0149] Charging and discharging power constraints: The charging and discharging power of energy storage when participating in frequency modulation cannot exceed its maximum system power, and the energy storage unit cannot charge and discharge at the same time. Specifically, the charging and discharging power constraints can be seen in the following formula.

[0150]

[0151]

[0152] In the formula, u t A 0 / 1 variable indicating the energy storage charging and discharging state. When ut=1, it means that the energy storage is in the charging state. t = 0 means the shared energy storage is in the discharging state, R ch,max , R dis,max Respectively represent the maximum charging power and discharging power of energy storage (MW), They represent the charging power and discharging power of the shared energy storage at time t respectively.

[0153] At this point, the third objective function and the third constraint condition constitute the scheduling and operation model of shared energy storage.

[0154] Finally, a master-slave game model of shared energy storage day-ahead frequency regulation is constructed, with the dispatching center's day-ahead frequency regulation cost model as the upper model, and the dispatching operation models of each thermal power unit and each shared energy storage as the lower models.

[0155] At this point, the construction of the master-slave game model of the shared energy storage day-ahead frequency regulation has been completed. Then, enter 230, input the obtained basic parameters into the constructed master-slave game model for solution, and obtain the capacity winning amount, mileage winning amount and clearing price of each shared energy storage and thermal power unit in each time period in the day-ahead frequency regulation market. Similarly, it should be noted that if other market entities are also included in some embodiments, such as gas turbines, integrated energy suppliers, etc., the solution result also includes the capacity winning amount, mileage winning amount, clearing price and revenue value of the entity in each time period in the day-ahead frequency regulation market.

[0156] Among them, considering that the upper and lower objective functions in the master-slave game model of shared energy storage day-ahead frequency regulation have different solution directions, and each objective function has its corresponding constraints, the solution is relatively complicated. In some embodiments, when solving the constructed master-slave game model, the duality theory can be used to construct a Lagrangian function to transform the lower-level maximization problem into a single-objective problem of minimization, so that the solution direction of the lower model and the upper model can be unified; then, the transformed lower-level objective function is added to the upper-level objective function, so that the original multi-objective optimization problem can be transformed into a single-objective solution problem; then, based on the complementary relaxation theory of KKT, the constraints of the lower layer are transformed into constraints of a single-objective problem; finally, the Gurobi toolbox in Python is used to solve the problem, and the capacity and mileage of each unit in the day-ahead frequency regulation market, the income of each unit, and the clearing price are obtained. Among them, the solution process of the master-slave game model of shared energy storage day-ahead frequency regulation can be found in Figure 5 In addition, the use of duality theory to construct Lagrangian functions to transform the function solution direction, and the use of KKT complementary relaxation theory to transform the constraints of some objective functions in the model into the constraints of the overall objective problem are relatively mature technologies in this field and will not be elaborated here.

[0157] It can be seen that this embodiment selects shared energy storage and thermal power units as the main body of frequency regulation bidding, and constructs an external game model for shared energy storage to participate in day-ahead frequency regulation. Among them, considering that the market entities when shared energy storage participates in external games include power dispatching and trading centers, thermal power units, and energy storage, this embodiment uses the Stackelberg master-slave game method, takes the power dispatching center as the upper leader, and constructs the upper model with the goal of minimizing the total dispatching cost of the power dispatching center's day-ahead frequency regulation; takes energy storage and thermal power units as followers, and constructs the lower model with the goal of maximizing the benefits of participating in the frequency regulation market. When solving, based on the KKT condition and duality theory, the lower objective function is converted into a single objective function for maximization, and the lower problem is converted into the constraint of the upper problem by constructing the Lagrangian function of the lower model, and the adjusted objective function is linearly transformed using Big-M, and the Gurobi optimization software in Python is used to solve it, and finally the capacity and mileage winning bids, clearing prices and benefits of each unit in the day-ahead frequency regulation market are calculated.

[0158] After obtaining the capacity winning bids, mileage winning bids, clearing prices and benefits of shared energy storage in each period in the day-ahead frequency regulation market, the shared energy storage centralized control platform needs to reasonably allocate the frequency regulation winning bids according to the characteristics of each energy storage, so as to ensure that the cluster and internal energy storage can achieve high-quality completion of the frequency regulation task of the power grid under the premise of maximizing benefits. Based on this, in some embodiments, the cooperative game method can be used to achieve the optimal scheduling of each energy storage within the shared energy storage cluster, so as to match the most appropriate energy storage scheduling set for different frequency regulation periods, as follows.

[0159] In 240, an internal cooperative game model for the day-ahead frequency regulation of each shared energy storage is constructed with the goal of minimizing the total frequency regulation cost of each aggregated energy storage and optimizing the total frequency regulation performance. Specifically, it can be constructed in the following manner.

[0160] For each shared energy storage, the total frequency regulation cost of each energy storage aggregated by the shared energy storage is determined according to the scalar amount of the aggregated energy storage in each time period and the unit mileage price of each energy storage frequency regulation, and the fourth objective function is to minimize the total frequency regulation cost. The total frequency regulation cost refers to the total frequency regulation cost of all energy storage in the shared energy storage in all frequency regulation periods. Based on this, in some embodiments, the fourth objective function can be specifically as follows:

[0161]

[0162] In the formula, C FM represents the total frequency regulation cost (yuan) of a shared energy storage system on the day before, i.e., the total frequency regulation cost of all energy storage systems aggregated by the shared energy storage system. T represents the division of a day into T frequency regulation time points. I represents the number of energy storage systems aggregated in the shared energy storage system, i.e., there are I energy storage systems in the energy storage system cluster. represents the scalar quantity (MW) of the energy storage i in period t, It indicates the price per mileage when energy storage i is used for frequency modulation (yuan / MW).

[0163] Next, according to the mileage scalar of each energy storage in each time period and the historical comprehensive frequency regulation performance index of each energy storage, the total frequency regulation performance of each energy storage aggregated by the shared energy storage is determined, and the maximum total frequency regulation performance is used as the fifth objective function.

[0164] Among them, when allocating frequency regulation capacity within the shared energy storage, it is necessary to comprehensively consider the comprehensive frequency regulation performance indicators such as the regulation rate, regulation accuracy and response time of each energy storage. The regulation rate reflects the speed of the energy storage system's response to the frequency regulation command, which is crucial to ensuring the frequency stability of the power system. The regulation accuracy measures the degree of deviation between the actual output of the energy storage system and the output required by the frequency regulation command, which is directly related to the quality of the frequency regulation effect. The response time is the time from receiving the frequency regulation command to starting to actually adjust the output. This indicator determines how quickly the energy storage system can respond to changes in the demand of the power system. Therefore, when allocating the frequency regulation amount, it is necessary to comprehensively consider these indicators to ensure that each energy storage system can obtain a reasonable frequency regulation amount allocation according to its performance characteristics, so as to achieve stable and efficient operation of the power system. This allocation method can not only give full play to the advantages of each energy storage system, but also improve the frequency regulation capability of the entire power system, providing a strong guarantee for the stable operation of the power market.

[0165] In this embodiment, the product of the historical comprehensive frequency regulation performance parameter of the energy storage and its scalar in each time period is used as the comprehensive frequency regulation performance of the energy storage participating in the day-ahead frequency regulation. Therefore, the fifth objective function can be specifically expressed as the following formula.

[0166]

[0167] In the formula, K FM It represents the comprehensive frequency regulation performance of all energy storage systems on the day before, that is, the total frequency regulation performance of all energy storage systems aggregated by the shared energy storage. represents the scalar quantity of mileage frequency modulation of energy storage i in period t (MW), K i It represents the historical comprehensive frequency regulation performance index of energy storage i. In a specific embodiment, the comprehensive frequency regulation performance index of a typical day of energy storage i can be selected as the historical comprehensive frequency regulation performance index of energy storage i, or the daily average value of the comprehensive frequency regulation performance index of energy storage i for one month can be selected as the historical comprehensive frequency regulation performance index of energy storage i. Of course, this is only an example, and the present invention does not make specific limitations on this.

[0168] Finally, the fourth objective function and the fifth objective function are combined, and constraints are imposed on the capacity output, mileage output, charging and discharging power, state of charge, health status, and capacity supply and demand balance and mileage supply and demand balance of each energy storage aggregated by the shared energy storage, to construct an internal cooperative game model of shared energy storage.

[0169] Supply and demand balance constraint: The frequency regulation capacity and mileage of all energy storage entities in period t are equal to the winning capacity and mileage of the energy storage cluster in that period, respectively. Specifically, the capacity balance constraint and mileage balance constraint of energy storage can be seen in the following formula.

[0170]

[0171]

[0172] In the formula, represents the capacity output of energy storage unit i in period t (MWh), represents the mileage output of energy storage unit i in period t (MW), They respectively represent the capacity and mileage of the shared energy storage winning bid in period t of the day-ahead frequency regulation market.

[0173] Energy storage output constraint: The capacity output and mileage output of energy storage entity i in time period t cannot exceed the maximum limit of energy storage output. Specifically, the capacity output constraint and mileage output constraint of energy storage unit can be seen in the following formula.

[0174]

[0175]

[0176] In the formula, represents the maximum frequency regulation capacity output of energy storage i (MWh), represents the frequency modulation mileage multiplier of energy storage i, It represents the maximum frequency regulation mileage of energy storage i (MW).

[0177] Charging and discharging power constraints: The charging and discharging power of each energy storage unit cannot exceed its system power limit. At the same time, energy storage can only be charged or discharged at the same time. Therefore, the charging and discharging power constraints of energy storage can be seen in the following formula.

[0178]

[0179] In the formula, They represent the discharge power and charging power of energy storage i in period t (MW); are 0-1 variables representing the charging and discharging of energy storage, respectively, indicating the charging and discharging state of energy storage i in time period t, Taking 1 means that the energy storage i is in the discharge state during the period t, Taking 0 means that the energy storage i is not in the discharge state during the period t. Taking 1 means that the energy storage i is in the charging state during the period t, Taking 0 means that the energy storage i is not in the charging state during the period t; P i cap,dis,max , They represent the maximum discharge and charge power allowed by energy storage i (MW).

[0180] SOC constraint: When energy storage participates in frequency regulation, the available capacity of the unit in the next period can be determined according to the unit's state of charge. When the state of charge of the energy storage exceeds the system limit of the unit, the unit can no longer be used. Specifically, the state of charge constraint of the energy storage unit can be seen in the following formula.

[0181] SOC min,i ≤SOC i,t ≤SOC max,i

[0182] In the formula, SOC i,t represents the SOC of energy storage i in period t, SOC max,i , SOC min,i They represent the upper and lower limits of the SOC of energy storage i respectively.

[0183] SOH constraint: The SOH of energy storage is the ratio of the capacity of the battery from full state to discharge at a certain rate to its rated capacity (actual initial capacity) under standard conditions. This ratio reflects the health status of the battery. When the health status of the energy storage unit exceeds or falls below the system limit, the unit can no longer be called. Specifically, the health status constraint of energy storage can be seen in the following formula.

[0184] SOH min,i ≤SOH i,t ≤SOH max,i

[0185] In the formula, SOH i,t represents the SOH of energy storage i in period t, SOH min,i , SOH max,i They represent the lower and upper limits of the SOH of energy storage i respectively.

[0186] So far, the above constraints, the fourth objective function, and the fifth objective function constitute the internal cooperative game model of shared energy storage. Next, enter 250, for each shared energy storage, according to its capacity winning bid, mileage winning bid, and clearing price in each time period in the day-ahead frequency regulation market, solve the internal cooperative game model of the shared energy storage to obtain the dispatch results of each energy storage aggregated by the shared energy storage. Specifically, the dispatch results include the capacity output and mileage output of each energy storage in each time period in the day-ahead frequency regulation market.

[0187] Among them, considering that the internal cooperative game model of shared energy storage constructed belongs to a linear dual-objective optimization scheduling problem, the priority and weight of the two objectives can be established according to the importance of cost and frequency regulation performance when solving the problem. The hierarchical sequence method is used to solve the above dual-objective planning problem. Specifically, the Gurobi toolbox in Python can be used for solving the problem. The solution process can be seen in Figure 6In addition, the use of hierarchical sequence method to solve the dual-objective problem is a relatively mature technology in this field, which will not be described in detail here.

[0188] Furthermore, after obtaining the dispatch results of each energy storage aggregated by the shared energy storage, according to an embodiment of the present invention, the improved Shapley value method (Shapely value method) can be used to distribute the benefits of each energy storage in the shared energy storage.

[0189] Here, we will first explain the prerequisites of Shapley cooperative game and the traditional Shapley value calculation method. First, the prerequisites of Shapley cooperative game. For an alliance consisting of n members N = {1, 2, 3, ... n}, S is a subset of it, representing a combination method. Assume that the cost of member i in the alliance is R i , R(S) is the cost of combination S, R({i}) is the individual cost of member i when it does not cooperate, and R(N) is the cost of combination N, that is, the cost of alliance N. Generally speaking, a coalition that can maintain cooperation needs to meet three conditions: (1) individual rationality conditions; (2) overall superadditivity conditions; (3) overall constraints. The three conditions meet the three requirements of reducing individual costs, reducing overall costs, and keeping the total cost unchanged before and after allocation. For details, please refer to the following formulas.

[0190] R i ≤R({i})

[0191]

[0192]

[0193] Secondly, regarding the traditional Shapley value calculation method. In the Shapley value method, the contribution of each participant is measured by comparing the difference in the total cost of cooperation when the participant participates in the cooperation and when the participant does not participate in the cooperation. Specifically, for each possible combination of participants, the total cost of cooperation under the combination must be calculated, and the marginal contribution of each participant to the combination cost must be determined. Then, based on the probability of each participant appearing in all possible combinations and its corresponding marginal contribution, the Shapley value of each participant, that is, the cost to be shared, is calculated.

[0194] According to Shapley’s calculation method, we first construct a cooperative game alliance N that includes all energy storage systems. According to Shapely’s cooperative game theory, this alliance can be formed randomly (2 n-1) combinations, v represents the characteristic function, and v(Φ) = 0. Let S be the alliances other than the empty set, then v(S) is the total cost of the participants in alliance S after cooperative operation. The specific calculation method of Shapley value can be seen in the following formula.

[0195]

[0196] In the formula, represents the cost sharing value of the ith entity, |S i | represents the number of entities in the alliance S, n represents the number of entities participating in the alliance, v(S) represents the total cost of the alliance S, and v(S\{i}) represents the cost of the alliance S after removing i. Represents the probability of coalition S occurring, also known as the weighting factor.

[0197] It can be seen that the traditional Shapley value method only considers the marginal contribution of each subject under different combination states, but does not take into account the total capacity output and mileage output of each subject. Based on this, the present invention proposes to apply the traditional Shapley value method to apportion the cost of each energy storage unit. At the same time, the actual capacity output contribution and mileage output contribution of each unit are comprehensively considered, and the original cost allocation factor is improved from the capacity contribution and mileage contribution. Then, the improved allocation factor is used to distribute the benefits of shared energy storage participating in the day-ahead frequency regulation market. Among them, according to one embodiment of the present invention, the improved profit distribution factor of each energy storage unit in any shared energy storage can be calculated by the following formula.

[0198]

[0199] In the formula, R' d represents the profit distribution factor vector {R'1, R'2, R'3…R' d}, ω1, ω2, ω3 represent the improved weight coefficients of capacity output contribution, mileage output contribution and original cost allocation factor, respectively, and ω1+ω2+ω3=1, represents the capacity output contribution vector composed of the capacity output contribution of d energy storages aggregated by the shared energy storage τ d represents the mileage output contribution vector {τ1, τ2, τ3…τ d}, R d represents the original cost allocation factor vector {R1, R2, R3…R d}, specifically, R'1, R'2, R'3...R' dThey represent the improved profit distribution factors of energy storage 1, 2, 3…d, respectively. Respectively represent the capacity output contribution of energy storage 1, 2, 3…d, τ1, τ2, τ3…τ d Respectively represent the mileage output contribution of energy storage 1, 2, 3…d, R1, R2, R3…R d They represent the original cost sharing factors of energy storage 1, 2, 3…d respectively.

[0200] Based on this, according to an embodiment of the present invention, when using the improved Shapely value method to distribute the benefits of each energy storage in the shared energy storage, for each shared energy storage, the above formula can be used to obtain the improved profit distribution factor of each energy storage according to the capacity output contribution, mileage output contribution and original cost allocation factor of each energy storage, and then the improved profit distribution factor is used to distribute the benefits of each energy storage in the shared energy storage. Specifically, in some embodiments, for each energy storage, the product of its improved profit distribution factor and the total benefit of the shared energy storage can be calculated, and this product is used as the benefit of the energy storage.

[0201] Among them, regarding the capacity output contribution and mileage output contribution of each energy storage in the shared energy storage, according to an embodiment of the present invention, it can be obtained in the following manner. Specifically, for each energy storage in the shared energy storage: the ratio of the total capacity output of the energy storage (i.e., the sum of the capacity output of each time period) to the total capacity output of the shared energy storage (i.e., the sum of the capacity output of each time period, or the sum of the standard quantity of the capacity in each time period) is used as the capacity output contribution of the energy storage; the ratio of the total mileage output of the energy storage (i.e., the sum of the mileage output of each time period) to the total mileage output of the shared energy storage (i.e., the sum of the mileage output of each time period, or the sum of the standard quantity of the mileage in each time period) is used as the mileage output contribution of the energy storage. Of course, this is only an example, and it can also be obtained in other ways, which is not limited by the present invention. Regarding the original cost allocation factor, it can be obtained based on the capacity output and mileage output of each energy storage in each time period in the day-ahead frequency regulation market obtained above, using the traditional Shapley value method. Among them, using the Shapley value method to calculate the cost allocation factor is a relatively mature technology in this field and will not be described in detail here.

[0202] At this point, the optimization scheduling and benefit distribution of each energy storage within the shared energy storage cluster have been completed. In addition, in order to verify the effectiveness of the proposed energy storage scheduling method for shared energy storage to participate in the frequency regulation auxiliary service market, the present invention also gives a specific example using Mengxi as an example, which is described in detail below.

[0203] 1) Basic parameters

[0204] In the master-slave game part of the shared energy storage participating in the frequency regulation market, in order to verify the effectiveness and rationality of the constructed two-layer optimization model, the present invention uses 3 groups of thermal power units with different specifications and 2 groups of energy storage clusters with different specifications to participate in the day-ahead frequency regulation market for simulation verification. Specifically, with 1h as a single scheduling period and a scheduling cycle of 24h, the frequency regulation mileage quotation range of the frequency regulation unit is 6-15 yuan / MW, the frequency regulation capacity compensation price is 60 yuan / MW, and under normal circumstances, the declared capacity of each unit in the frequency regulation market does not exceed 15% of the rated capacity of the unit. Among them, the relevant parameters and quotations of the thermal power unit are shown in Table 1 below, and the relevant parameters and quotations of the energy storage unit are shown in Table 2 below.

[0205] Table 1

[0206]

[0207] Table 2

[0208]

[0209] When analyzing the cooperative game model of each energy storage in the shared energy storage, this embodiment selects a group of pumped storage, compressed air storage, flywheel storage, lithium-ion battery storage, lead-acid battery storage, sodium-sulfur battery storage and flow battery storage as the participants of the cooperative game. The number and technical parameters of each energy storage are shown in Table 3 below.

[0210] Table 3

[0211]

[0212] The system's frequency regulation demand capacity is generally 5% of the day-ahead forecast load. At the same time, the system's frequency regulation capacity-mileage ratio is generally 7 to 10. In addition, when calculating the unit frequency regulation cost of each energy storage, the charging price uses the time-of-use electricity price in the area as an input parameter. Among them, the system forecast load and frequency regulation capacity demand, mileage demand and time-of-use electricity price randomly generated based on historical data can be found in Figure 7 .

[0213] 2) Unit frequency regulation cost parameter setting for different types of energy storage

[0214] According to the above-constructed unit frequency regulation cost model of energy storage, the unit fixed cost, unit variable cost and total unit frequency regulation cost of each energy storage are calculated. The specific calculation results are shown in Table 4 below.

[0215] Table 4

[0216]

[0217] It can be seen that the unit fixed cost and marginal cost of the three mechanical energy storages are significantly higher than those of the electrochemical energy storages. This is because the initial investment cost and operation and maintenance cost of pumped storage and compressed air energy storage are much higher than those of electrochemical energy storage. Since only the charging cost and equipment wear cost or life decay cost are considered when calculating the unit variable cost, the charging unit price of each energy storage is unified, and the equipment wear cost and life decay cost account for a small proportion, so the unit variable cost of each energy storage is not much different.

[0218] Among the three types of mechanical energy storage, compressed air energy storage has the lowest charging and discharging efficiency and high operation and maintenance costs. Therefore, compressed air energy storage is higher than the other two types of energy storage in terms of unit fixed cost, unit variable cost and marginal cost. Flywheel energy storage has a lower unit cost than the other two types of mechanical energy storage, but its self-discharge rate is the highest. Flywheel energy storage is more suitable for short-term large-scale frequency regulation work. Pumped storage is currently the most widely used and mature mechanical energy storage. Relying on its large capacity and stable performance, it has advantages in both the energy market and the auxiliary service market. Its unit frequency regulation cost in the frequency regulation market is relatively high, so pumped storage is more used as a peak-shaving resource in the auxiliary service market.

[0219] The overall unit frequency regulation cost of electrochemical energy storage is lower than that of mechanical energy storage. At the same time, electrochemical energy storage has better frequency regulation performance in the frequency regulation market and is more widely used. Among the four types of electrochemical energy storage, the marginal cost of lithium-ion batteries is lower than the other three. This is because lithium-ion batteries have a larger market share in battery energy storage, their application technology is more mature and safe, and their energy conversion efficiency is also higher. Compared with other energy storage, they have achieved the effect of reducing costs and increasing efficiency. The initial investment cost of lead-acid batteries is also relatively low, so their unit fixed cost is low; sodium-sulfur batteries have higher energy conversion efficiency and lower unit variable costs, but sodium-sulfur batteries have higher initial investment costs, there are safety hazards in high temperature environments, and the operation and maintenance costs are also high, so their unit fixed costs are higher. Liquid flow batteries have a longer service life and high power capacity, and are mostly used as backup power supplies and renewable energy storage. The marginal cost of each energy storage is only a winning factor in its participation in the frequency regulation market. Its use cannot be reduced due to high costs. The frequency regulation of energy storage should be allocated by comprehensively considering the multi-party performance of each energy storage.

[0220] 3) Analysis of frequency regulation example of master-slave game of shared energy storage

[0221] Analysis of the winning bids of each unit: The winning capacity and mileage of energy storage and thermal power units in the day-ahead frequency regulation market can be found in Figure 8. As can be seen from the figure, the two groups of energy storage occupy the vast majority of the frequency regulation volume in the frequency regulation market. Among them, the first group of energy storage occupies 39.92% of the frequency regulation capacity and 35.32% of the frequency regulation mileage, and the second group of energy storage occupies 28.77% of the frequency regulation capacity and 33.08% of the frequency regulation mileage. This is because although the price of energy storage in the frequency regulation market is higher than that of thermal power units, the participation of thermal power units in frequency regulation causes greater wear and tear on the operation of the units, and they are more inclined to participate in the energy market to obtain more benefits. Therefore, the available frequency regulation capacity reported by thermal power units in the frequency regulation market is relatively small. Energy storage does not have this problem. The available frequency regulation capacity provided by energy storage is higher, so its bid probability and bid amount are also relatively high. The larger the winning capacity of energy storage, the smaller the total number of units dispatched by the dispatching center, and the simpler the operation. At the same time, energy storage relies on its own performance to occupy an absolute frequency regulation technology advantage in the frequency regulation market. Its historical comprehensive frequency regulation performance indicators are higher than those of thermal power. In order to meet the frequency regulation needs to the greatest extent and reduce intraday frequency regulation deviations, the dispatching center is also more inclined to dispatch units with good frequency regulation performance and lower costs.

[0222] Furthermore, the winning capacity of Energy Storage 1 (C1) is significantly higher than that of Energy Storage 2 (C2). This is because the unit frequency regulation cost of Energy Storage 1 is lower than that of Energy Storage 2 and the historical comprehensive frequency regulation performance index of the first group is higher than that of the second group. However, the frequency regulation mileage multiplier of Energy Storage 2 is 15, while the frequency regulation mileage multiplier of Energy Storage 1 is 13. Therefore, the mileage winning capacity of Energy Storage 2 has obviously surpassed that of Energy Storage 1. In addition, the winning capacity of G1 in the first 15 hours was higher than that of G2 and G3. From 16:00, the winning capacity of G2 surpassed that of G1. At the same time, the winning capacity of G3 also showed an upward trend, but it did not exceed G1 and G2 as a whole. The winning mileage of G1 is higher than that of G2 and G3 in most periods of time. G1 occupies more frequency regulation capacity in thermal power units by virtue of its advantage of lower frequency regulation cost. The frequency regulation costs of the three groups of thermal power units are G1<G2<G3 from low to high. Although the historical comprehensive frequency regulation performance of G1 is slightly lower than that of the other two groups, after the algorithm is solved, the dispatch center still gives priority to dispatching the first group of thermal power with lower costs, and then calls G2 and G3 again after the declared quantity of thermal power 1 is cleared. Compared with the other two groups, G3 has a lower ramp rate and a higher unit frequency regulation cost, so its dispatch ranking is lower.

[0223] Analysis of the revenue of each unit: According to the capacity compensation price of the frequency regulation market in the region, each unit is compensated for capacity at 60 yuan / MW. The frequency regulation mileage bids of each unit are G3<G<G1<C2<C1 from low to high. Since there are winning bids for both energy storage units in each period, this frequency regulation will be uniformly pre-cleared according to the mileage bid of energy storage C1 with a higher bid. The capacity revenue, mileage revenue and total revenue of each unit in the day-ahead frequency regulation market are shown in Table 5 below.

[0224] Table 5

[0225]

[0226] It can be seen that the capacity benefit of each unit is significantly higher than the mileage benefit. This is because although the winning capacity value of each unit is much lower than the winning mileage, the capacity compensation price currently set by the region to encourage each unit to actively participate in the frequency regulation market is much higher than that of other provinces. The ratios of capacity benefit and mileage benefit of each unit are 10.5, 8.08, 8.78, 9.04 and 11.07, respectively. Among them, the ratios of capacity benefit and mileage benefit of C1 and G3 are particularly prominent. Therefore, these two units can actively reserve frequency regulation capacity to participate in the frequency regulation market. The larger the bid capacity, the higher the benefit. At the same time, it can be seen from the table that the two groups of energy storage units have the highest winning bids in capacity and mileage, so their benefits are also much higher than those of other units. Figure 8 It can be seen that the mileage winning bids of the two energy storage groups are not much different, but because the winning capacity of energy storage C1 is significantly higher than that of C2, the overall benefit of C1 is significantly higher than that of C2. Similarly, although the winning mileage of thermal power unit G2 is lower than that of G1 in most periods, its overall winning capacity is basically the same as that of G1. Therefore, the total benefits of G1 and G2 are not much different. Finally, since G3's winning bids for capacity and mileage are lower than those of other units, its overall benefit is also relatively low, but its capacity and mileage benefit ratio is the largest. G3 can actively participate in the frequency regulation market by reducing the unit's operating costs and improving frequency regulation performance. It has great potential to obtain higher benefits in the frequency regulation market.

[0227] 4) Analysis of internal cooperative game examples in energy storage clusters

[0228] Comparative analysis of schemes: This embodiment takes into account both the cost and comprehensive frequency regulation performance of shared energy storage frequency regulation. Therefore, in order to verify the effectiveness of the constructed dual-objective optimization model, this embodiment designs three sets of comparative schemes. The specific schemes are shown in Table 6 below. The total benefits and overall performance of energy storage cluster frequency regulation under the three comparative schemes are shown in Table 7 below.

[0229] Table 6

[0230]

[0231] Table 7

[0232]

[0233] From the operation results of the three schemes, it can be seen that when only a single objective is considered, the operation cost of Scheme 1 is 25,828.86 yuan lower than that of Scheme 2, and the frequency regulation performance of Scheme 2 is 326.8 higher than that of Scheme 1; when Scheme 3 considers two objectives comprehensively, its frequency regulation cost is slightly higher than that of Scheme 1, but much lower than that of Scheme 2; at the same time, the frequency regulation performance of Scheme 3 is 125.69 lower than that of Scheme 2, but 201.11 higher than that of Scheme 1. Scheme 3 is close to the optimal value of the above single-objective scheme in terms of both cost and frequency regulation performance. Therefore, the operation results of Scheme 3 are feasible when considering dual-objective scheduling planning.

[0234] Analysis of the winning bids for each energy storage: The capacity output and mileage output of each energy storage in the shared energy storage are as follows: Fig. 9 As shown. Fig. 9 It can be seen that the energy storage resources within the energy storage cluster have been fully mobilized. X5 has a dispatch volume at almost every time point. X6 is actively mobilized from the 2nd to the 4th period; X4 is actively dispatched from the 5th to the 13th period; and X7 is dispatched more frequently from the 17th to the 20th period. At each time point, the capacity output and mileage output of each unit account for roughly the same proportion, and the mileage output of units with a large frequency regulation mileage multiplier accounts for a relatively higher proportion.

[0235] Further, Fig.10 The total capacity output and total mileage output of each energy storage are shown. As can be seen from the figure, since the unit frequency regulation cost of electrochemical energy storage is lower than that of mechanical energy storage, and the historical frequency regulation performance of electrochemical energy storage is relatively high, the capacity and mileage dispatching of the four electrochemical energy storages are much higher than those of the three mechanical energy storages. The capacity output of the four electrochemical energy storages accounts for 75.17% of the capacity output of each unit, and the mileage output accounts for 83.43% of the total mileage output of each unit.

[0236] Among the four types of electrochemical energy storage, lithium-ion batteries and lead-acid batteries have the highest dispatch rates, with their capacity output accounting for 21.59% and 24.75% of the total capacity output, and their mileage output accounting for 24.27% and 27.38% of the total mileage output, respectively. This is because among the four types of electrochemical energy storage, the unit frequency regulation cost of lead-acid batteries is lower. Although the unit frequency regulation cost of lithium-ion batteries is not much different from that of sodium-sulfur batteries, the historical frequency regulation performance of lithium-ion batteries is better than that of sodium-sulfur batteries. Therefore, the capacity and mileage dispatch of lithium-ion batteries are higher than those of sodium-sulfur batteries. Since the unit frequency regulation cost of sodium-sulfur batteries is higher than that of flow batteries, but the historical frequency regulation performance of flow batteries is higher than that of sodium-sulfur batteries, the overall dispatch capacity of these two groups of energy storage is not much different.

[0237] Among the three groups of mechanical energy storage, flywheel energy storage has the lowest unit frequency regulation cost and the best frequency regulation performance, so its dispatch volume is relatively higher. The frequency regulation mileage multiplier of flywheel energy storage is relatively high, so its mileage dispatch ratio is also higher, and its capacity dispatch volume accounts for 13.83% of the total capacity, and the mileage dispatch volume accounts for 10.17% of the total mileage demand. Pumped storage and compressed air energy storage are next. Compressed air energy storage has a relatively higher unit frequency regulation cost due to its low charging and discharging efficiency, resulting in less total capacity and total mileage dispatch volume in 24 hours. Although the unit frequency regulation cost of pumped storage is not much different from that of flywheel energy storage, its historical frequency regulation performance is relatively low, so its capacity and mileage dispatch volume are lower than flywheel energy storage.

[0238] From the above dispatch results, it can be seen that electrochemical energy storage has an absolute advantage in the frequency modulation market, among which lead-acid batteries and lithium-ion batteries are particularly prominent. Liquid flow batteries and sodium-sulfur batteries can obtain more market share in the frequency modulation market by reducing unit frequency modulation costs through large-scale application or improving technical means. The three types of mechanical energy storage have also played a positive role in the frequency modulation market, but the overall frequency modulation performance of mechanical energy storage is slightly inferior to that of electrochemical energy storage. Therefore, mechanical energy storage can continuously improve its frequency modulation performance through technological research and development, or it can obtain more benefits by participating in other auxiliary services such as peak regulation.

[0239] 5) Improved Shapley value benefit distribution analysis

[0240] Shared energy storage centrally manages and efficiently uses a variety of decentralized energy storage devices, allowing them to participate in the electricity market as a whole. Each energy storage owner connects his or her own energy storage device to the shared energy storage, which is uniformly dispatched by the shared energy storage operator. However, due to differences in performance, capacity, service life, etc. of different energy storage devices, as well as different needs and contributions of different users to energy storage services, a fair and reasonable profit distribution mechanism is needed to ensure the stable operation and sustainable development of the cluster. The Shapley value method has unique advantages as a profit distribution and cost sharing method in cooperative game theory. It can allocate costs and benefits according to the contribution of each participant in the cooperation, ensuring that each participant can obtain a share of the benefits that matches his or her contribution. This distribution method not only reflects fairness, but also encourages participants to actively participate in cooperation and improve the overall benefits of the cluster.

[0241] This embodiment calculates the cost allocation factor and cost allocation amount of each energy storage unit within the shared energy storage based on the traditional Shapley value method. Since the traditional Shapley value only considers the marginal contribution of the cost of each energy storage unit in different combination states, and does not take into account the total capacity output and mileage output of each energy storage, this embodiment improves the original cost allocation factor from the capacity contribution and mileage contribution, and uses the improved contribution factor to allocate the total revenue obtained by the shared energy storage participating in the day-ahead frequency regulation market. The weighted average method is used to set the weights of the capacity contribution and mileage contribution to 0.25, and the weight of the original cost allocation factor is set to 0.5. The cost allocated to each unit before and after the improvement and the revenue obtained are shown in Table 8 below.

[0242] Table 8

[0243]

[0244] From the calculation results in Table 8, it can be seen that it is reasonable for each energy storage to obtain the cost sharing value according to its marginal contribution to reducing the combined cost in different combination states. The cost-based allocation factor is improved in terms of capacity contribution and mileage contribution, making the allocation result more fair and reasonable. Since the capacity and mileage contributions of X4 and X5 are more prominent than those of other units, their improved profit allocation factors are increased by 0.3 respectively compared with the previous ones. For x1 and x2 with less total output, their improved allocation factors are reduced by 0.3 and 0.4 respectively, resulting in a decrease in the benefits obtained from their allocation.

[0245] Further, Fig.11 The comparison of the benefits of each energy storage in the shared energy storage before and after the improvement is shown. From the comparison results, it can be seen that the benefits of the three mechanical energy storages after the improvement have increased compared with before the improvement, and their benefits after the improvement have increased by 2809.38 yuan, 3745.39 yuan, and 401.27 yuan respectively, among which the benefits of pumped storage and compressed air energy storage have increased more significantly; while the benefits of lithium-ion batteries, lead-acid batteries, and flow batteries have all decreased after the improvement, and their benefits have decreased by 2829.92 yuan, 3052.1 yuan, and 1112.22 yuan respectively, among which the benefits of lead-acid batteries and lithium-ion batteries have decreased more significantly. This is because pumped storage and compressed air energy storage have higher unit frequency regulation costs than electrochemical energy storage. Therefore, when using Shapley cooperation game to calculate their marginal contributions under different combination states with the goal of minimizing total cost, their contribution factors are lower, but ultimately their capacity output and mileage output account for a higher proportion than their total cost contribution weight. Therefore, after comprehensively considering the marginal contribution of each energy storage in terms of cost and the actual capacity and mileage output, the original allocation weights are improved. After the improvement, the benefits of pumped storage and compressed air energy storage are improved, while the benefits of lithium-ion and lead-acid batteries are slightly reduced.

[0246] In summary, the present invention proposes an operating mode of shared energy storage frequency regulation. Specifically, shared energy storage effectively aggregates idle energy storage distributed at different locations on the power supply side, the grid side and the load side, and participates in the frequency regulation market as an independent energy storage. This can not only alleviate the frequency regulation pressure of the power grid, but also improve the utilization efficiency of idle energy storage distributed at different locations of the source, grid and load, and give full play to the superior frequency regulation performance of energy storage. In addition, based on game theory, the present invention constructs a bidding and clearing master-slave game model for shared energy storage frequency regulation and a cooperative game model for each energy storage within a shared energy storage cluster. By simultaneously applying cooperative game and non-cooperative game methods to shared energy storage, the optimal scheduling of each energy storage can be achieved, ensuring the timeliness and accuracy of energy storage frequency regulation scheduling. In addition, the improved Shapley method is used to distribute the benefits of each energy storage entity in the cluster, which can ensure fairness, thereby ensuring the stable operation and sustainable development of shared energy storage, while also encouraging participants to actively participate in cooperation and improve the overall benefits of the cluster.

[0247] The various techniques described herein may be implemented in combination with hardware or software, or a combination thereof. Thus, the method and apparatus of the present invention, or some aspects or parts of the method and apparatus of the present invention may be in the form of program codes (i.e., instructions) embedded in a tangible medium, such as a removable hard disk, a USB flash drive, a floppy disk, a CD-ROM, or any other machine-readable storage medium, wherein when the program is loaded into a machine such as a computer and executed by the machine, the machine becomes a device for practicing the present invention.

[0248] In the description provided herein, a large number of specific details are described. However, it is understood that embodiments of the present invention can be practiced without these specific details. In some instances, well-known methods, structures and techniques are not shown in detail so as not to obscure the understanding of this description.

[0249] It should be understood that in order to streamline the present disclosure and aid in understanding one or more of the various inventive aspects, in the above description of exemplary embodiments of the present invention, various features of the present invention are sometimes grouped together into a single embodiment, figure, or description thereof. However, this method of disclosure should not be interpreted as reflecting an intention that the claimed invention requires more features than are expressly recited in each claim.

[0250] In addition, unless otherwise specified, the use of ordinal numbers "first", "second", "third", etc. to describe common objects merely indicates that different instances of similar objects are involved, and is not intended to imply that the objects so described must have a given order in time, space, ranking or in any other manner.

[0251] Although the present invention has been described according to a limited number of embodiments, it will be apparent to those skilled in the art, with the benefit of the above description, that other embodiments may be envisioned within the scope of the invention thus described. In addition, it should be noted that the language used in this specification is selected primarily for readability and teaching purposes, rather than for explaining or defining the subject matter of the present invention. Therefore, many modifications and variations will be apparent to those skilled in the art without departing from the scope and spirit of the appended claims. The disclosure of the present invention is illustrative, not restrictive, with respect to the scope of the present invention, which is defined by the appended claims.

Claims

1. A method for dispatching shared energy storage to participate in a frequency regulation auxiliary service market, wherein the shared energy storage is an energy storage cluster that aggregates multiple energy storages on at least one side of a power source, a power grid, and a load, and participates in the frequency regulation auxiliary service market as an independent market entity, wherein the market entities in the frequency regulation auxiliary service market include a power dispatching center and a number of shared energy storages and thermal power units, and the method comprises: Obtaining basic parameters, including available capacity, available mileage, capacity quotation, mileage quotation of each shared energy storage and thermal power unit, as well as capacity demand, mileage demand, capacity quotation range, and mileage quotation range of the power dispatching center; Taking the minimization of the total dispatching cost of the day-ahead frequency regulation of the power dispatching center as the upper-level goal and the maximization of the day-ahead frequency regulation benefits of each shared energy storage and thermal power unit as the lower-level goal, a master-slave game model of shared energy storage day-ahead frequency regulation is constructed with the power dispatching center as the master and shared energy storage and thermal power units as the slaves. Input the basic parameters into the master-slave game model for solution, and obtain the capacity winning amount, mileage winning amount and clearing price of each shared energy storage and thermal power unit in each period in the day-ahead frequency regulation market; An internal cooperative game model for the day-ahead frequency regulation of each shared energy storage is constructed with the goal of minimizing the total frequency regulation cost of each aggregated energy storage and optimizing the total frequency regulation performance. For each shared energy storage, the internal cooperation game model of the shared energy storage is solved according to its capacity winning bid, mileage winning bid and clearing price in each time period in the day-ahead frequency regulation market, and the dispatch results of each energy storage aggregated by the shared energy storage are obtained. The dispatch results include the capacity output and mileage output of each energy storage in each time period in the day-ahead frequency regulation market.

2. The method of claim 1, wherein: The energy storage aggregated by the shared energy storage includes one or more of the following energy storage: pumped storage, compressed air energy storage, flywheel energy storage, lead-acid battery energy storage, flow battery energy storage, sodium-sulfur battery energy storage and lithium-ion battery energy storage.

3. The method according to claim 1 or 2, further comprising using an improved Shapley value method to distribute benefits to each energy storage in the shared energy storage, and using an improved Shapley value method to distribute benefits to each energy storage in the shared energy storage, comprising: For each shared energy storage, the improved profit allocation factor of each energy storage is obtained according to the capacity output contribution, mileage output contribution and original cost allocation factor of each energy storage; The improved profit distribution factor is used to distribute the benefits to each energy storage in the shared energy storage.

4. The method of claim 3, wherein: For each shared energy storage, the improved profit distribution factor of each aggregated energy storage is obtained by the following formula: Among them, R' d represents the profit distribution factor vector composed of the improved profit distribution factors of d energy storage aggregated by the shared energy storage, ω1, ω2, ω3 represent the improved weight coefficients of capacity output contribution, mileage output contribution and original cost allocation factor respectively, and ω1+ω2+ω3=1, represents the capacity output contribution vector composed of the capacity output contributions of d energy storages aggregated by the shared energy storage, τ d represents the mileage output contribution vector composed of the mileage output contributions of d energy storages aggregated by the shared energy storage, R d Represents the original cost allocation factor vector composed of the original cost allocation factors of d energy storages aggregated by the shared energy storage.

5. The method according to claim 1 or 2, wherein: Taking the minimum total dispatching cost of the day-ahead frequency regulation of the power dispatching center as the upper-level goal and the maximum day-ahead frequency regulation benefits of each shared energy storage and thermal power unit as the lower-level goal, a master-slave game model of the day-ahead frequency regulation of shared energy storage is constructed, including: According to the winning capacity and mileage of each shared energy storage and thermal power unit in each period of the day-ahead frequency regulation market, as well as the capacity clearing price and mileage clearing price of each period of the day-ahead frequency regulation market, the total day-ahead dispatching cost of the power dispatching center is determined, and the minimum day-ahead dispatching total cost is taken as the first objective function to construct the day-ahead frequency regulation cost model of the dispatching center; According to the total revenue of each thermal power unit in the day-ahead frequency regulation market, its frequency regulation cost, and start-up and shutdown cost, the day-ahead frequency regulation revenue of each thermal power unit is determined, and the scheduling and operation model of each thermal power unit is constructed with the maximum day-ahead frequency regulation revenue of each thermal power unit as the second objective function; According to the total revenue obtained by each shared energy storage in the day-ahead frequency regulation market and its frequency regulation cost, the day-ahead frequency regulation revenue of each shared energy storage is determined, and the scheduling and operation model of each shared energy storage is constructed with the maximum day-ahead frequency regulation revenue of each shared energy storage as the third objective function; The master-slave game model is constructed by taking the day-ahead frequency regulation cost model of the dispatching center as the upper model, and taking the dispatching operation model of each thermal power unit and the dispatching operation model of each shared energy storage as the lower model.

6. The method of claim 5, wherein: The master-slave game model further includes a first constraint condition, a second constraint condition, and a third constraint condition corresponding to the first objective function, the second objective function, and the third objective function respectively; The first constraint conditions include the capacity constraint and mileage constraint of each shared energy storage, the capacity constraint and mileage constraint of each thermal power unit, and the frequency regulation supply and demand balance constraint between the power dispatching center and the shared energy storage and thermal power units; The second constraint condition includes the frequency regulation declared quantity constraint, frequency regulation declared price constraint and ramp constraint of thermal power units; The third constraint condition includes the frequency regulation declared quantity constraint, the frequency regulation declared price constraint and the charging and discharging power constraint of the shared energy storage.

7. The method of claim 5, wherein: The first objective function includes: Among them, F L represents the total day-ahead dispatching cost of the power dispatching center, represents the capacity clearing price of the day-ahead frequency regulation market during period t, represents the mileage clearing price of the day-ahead frequency modulation market during period t, represents the winning bid capacity of shared energy storage m in the day-ahead frequency regulation market during period t, represents the winning mileage of shared energy storage m in the day-ahead frequency regulation market during period t, represents the winning bid capacity of thermal power unit n in the day-ahead frequency regulation market during period t, represents the winning mileage of thermal power unit n in the day-ahead frequency regulation market during period t, M represents the number of shared energy storage participating in the day-ahead frequency regulation market, N represents the number of thermal power units participating in the day-ahead frequency regulation market, and T represents the total number of time periods; The second objective function includes: Among them, F G represents the day-ahead frequency regulation benefit of thermal power units, f G represents the total revenue obtained by thermal power units in the day-ahead frequency regulation market, n G Indicates the comprehensive frequency regulation performance of thermal power units. represents the frequency regulation cost of thermal power units, represents the start-up and shutdown cost of thermal power units, represents the clearing capacity of thermal power units in the day-ahead frequency regulation market during period t, represents the clearing mileage of thermal power units in the day-ahead frequency regulation market during period t, represents the capacity clearing price of the day-ahead frequency regulation market during period t, represents the mileage clearing price of the day-ahead frequency regulation market in period t, MC′ represents the unit frequency regulation cost of the thermal power unit; The third objective function includes: Among them, F ES represents the day-ahead frequency regulation benefit of shared energy storage, f ES is the total revenue obtained by shared energy storage in the day-ahead frequency regulation market, n ES represents the comprehensive frequency regulation performance of shared energy storage, C ES represents the frequency regulation cost of shared energy storage, represents the capacity clearing price of the day-ahead frequency regulation market during period t, represents the mileage clearing price of the day-ahead frequency modulation market during period t, represents the winning bid capacity of shared energy storage in the day-ahead frequency regulation market during period t, represents the winning mileage of shared energy storage in the day-ahead frequency regulation market during period t, and MC″ represents the unit frequency regulation cost of shared energy storage.

8. The method according to claim 1 or 2, wherein: The internal cooperation game model of the day-ahead frequency regulation of each shared energy storage is constructed with the goal of minimizing the total frequency regulation cost of each aggregated energy storage and optimizing the total frequency regulation performance, including: For each shared energy storage, according to the scalar amount of the mileage of each energy storage aggregated by it in each time period and the unit mileage price of each energy storage frequency regulation, the total frequency regulation cost of each energy storage aggregated by the shared energy storage is determined, and the minimum total frequency regulation cost is taken as the fourth objective function; Determine the total frequency regulation performance of each energy storage aggregated by the shared energy storage according to the mileage scalar of each energy storage in each time period and the historical comprehensive frequency regulation performance index of each energy storage, and take the maximum total frequency regulation performance as the fifth objective function; In combination with the fourth objective function and the fifth objective function, and by constraining the capacity output, mileage output, charging and discharging power, state of charge, health state of each energy storage aggregated by the shared energy storage, as well as the capacity supply and demand balance and mileage supply and demand balance of the shared energy storage, an internal cooperative game model of the shared energy storage is constructed.

9. A computing device comprising: at least one processor; as well as A memory storing program instructions, wherein the program instructions are configured to be executed by the at least one processor, and the program instructions include instructions for executing the method according to any one of claims 1 to 8.

10. A readable storage medium storing program instructions, when the program instructions are read and executed by a computing device, the computing device executes the method according to any one of claims 1 to 8.

Citation Information

Patent Citations

  • Power distribution network day-ahead market transaction method under marketization initial multi-interest subject participation based on NASH-Q method

    CN114865718A

  • Power system energy storage scheme optimization method, medium and system

    CN115907371A

  • Self-adaptive frequency modulation auxiliary service method for participation of energy storage in novel electricity market

    CN116760068A

  • Fire storage combined frequency modulation energy storage capacity optimal configuration method and system

    CN117220302A

  • Shared energy storage energy management and control method and device considering multiple mixed games, and readable storage medium

    CN117541002A

Cited By

  • Method for evaluating capability of energy storage participating in frequency modulation auxiliary service of power system