Distributed energy network energy storage battery management method and system
By collecting and analyzing the feature information of energy storage batteries in real-time, the problem of inaccurate feature acquisition in energy storage battery management is solved, and efficient energy supply scheduling and battery life extension are achieved.
Patent Information
- Application Number
- CN202411045095.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-11-12
AI Technical Summary
The existing energy storage battery management technology is difficult to accurately collect energy storage battery characteristics in real time, resulting in inaccurate prediction of battery status and performance attenuation, which in turn affects the balance of energy supply scheduling.
By collecting and analyzing real-time energy supply task feature information, battery feature information and environmental feature information, collecting accuracy analysis and transmission delay analysis, combining constraint adjustment and correction, energy supply scheduling is optimized, and performance attenuation is predicted.
It realizes efficient and accurate management of energy storage batteries, improves the optimization of energy supply scheduling and extends battery life.
Smart Images

Figure CN118944160A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field related to energy storage batteries, and specifically to a method and system for managing energy storage batteries in a distributed energy network. Background Art
[0002] In the energy field, with the rapid development of smart grid and distributed energy technology, the management of distributed energy network energy storage batteries has become an increasingly important research topic. With the widespread application of renewable energy such as solar energy and wind energy, distributed energy systems have gradually occupied an important position in power supply. However, the intermittent and instability of these new energy sources have brought challenges to the stable operation of the power system. How to efficiently and accurately manage the energy storage batteries in the distributed energy network to cope with complex energy supply tasks has become an urgent problem to be solved. Traditional energy storage battery management is difficult to achieve real-time monitoring, accurate analysis and optimal scheduling of the energy storage battery status. The data acquisition and transmission process is affected by many factors, such as equipment accuracy, environmental factors, transmission interference, etc., which may lead to errors and transmission delays in the data. In addition, the performance of the energy storage battery will gradually decay during use, affecting the energy storage effect and energy supply stability.
[0003] Therefore, in the current energy storage battery management related technologies, there are technical problems such as difficulty in real-time and accurate collection of energy storage battery characteristics in the face of complex energy supply tasks, which leads to inaccurate predictions of battery status and performance degradation and unbalanced energy supply scheduling. Summary of the invention
[0004] The present application provides a distributed energy network energy storage battery management method and system, and adopts technical means such as collection accuracy analysis, transmission delay analysis, and performance degradation prediction to solve the technical problems existing in the existing energy storage battery management, such as difficulty in real-time and accurate collection of energy storage battery characteristics in the face of complex energy supply tasks, which leads to inaccurate prediction of battery status and performance degradation and unbalanced energy supply scheduling, thereby achieving efficient and accurate management of energy storage batteries, and achieving the technical effect of improving energy storage battery management, optimizing energy supply scheduling, and extending the life of energy storage batteries.
[0005] The present application provides a distributed energy network energy storage battery management method, the method comprising: collecting feature information of real-time energy supply tasks to obtain energy supply task feature information; obtaining a real-time battery feature information array and an environmental feature information array collected and transmitted by an energy storage battery array in the distributed energy network at a management center; performing a battery feature collection accuracy analysis based on the battery feature information array to obtain a first collection accuracy parameter array; performing a transmission delay analysis and a battery feature collection accuracy analysis based on the environmental feature information array to obtain a transmission delay parameter array and a second collection accuracy parameter array, and combining the first collection accuracy parameter array to obtain a collection accuracy parameter array; obtaining neighboring collection error constraints and neighboring transmission error constraints; obtaining a first collection accuracy parameter array; obtaining a second ... Delay constraint, constraining and adjusting the acquisition accuracy parameter array and the transmission delay parameter array until the constraint requirements are met, and obtaining the adjusted acquisition accuracy parameter array and the adjusted transmission delay parameter array; correcting the real-time battery characteristic information array according to the adjusted acquisition accuracy parameter array and the adjusted transmission delay parameter array, and obtaining the corrected battery characteristic information array; obtaining the performance attenuation parameter array of the energy storage battery array in the management center, and optimizing the energy supply scheduling according to the corrected battery characteristic information array and the energy supply task characteristic information, and obtaining the optimal energy supply scheduling plan, wherein, during the optimization process, performance attenuation prediction is performed according to the corrected battery characteristic information array and the energy supply task characteristic information.
[0006] In a possible implementation, a real-time battery characteristic information array and an environmental characteristic information array collected and transmitted by an energy storage battery array in a distributed energy network are obtained at a management center, and the following processing is performed: in the management center, multiple SOC information and multiple energy storage power information collected and transmitted by an energy storage battery array in the distributed energy network are obtained to construct a real-time battery characteristic information array; multiple environmental characteristic information collected and transmitted by the energy storage battery array are obtained to construct an environmental characteristic information array, wherein each environmental characteristic information includes temperature, humidity, and dust concentration.
[0007] In a possible implementation, according to the battery feature information array, a battery feature collection accuracy analysis is performed to obtain a first collection accuracy parameter array; according to the environmental feature information array, a transmission delay analysis and a battery feature collection accuracy analysis are performed to obtain a transmission delay parameter array and a second collection accuracy parameter array; and in combination with the first collection accuracy parameter array, the collection accuracy parameter array is processed to obtain the collection accuracy parameter array, and the following processing is performed: according to the feature information collection record of the energy storage battery, a sample battery feature information set is obtained, and sample collection accuracy parameters when different sample battery feature information are collected are obtained as a sample first collection accuracy parameter set; the sample battery feature information set and the sample first collection accuracy parameter set are used to train a first collection accuracy analysis path, which is configured in the management center; the battery feature information array is input into the first collection accuracy analysis path, and a plurality of first collection accuracy parameters are obtained by analysis, and the first collection accuracy parameter array is constructed to obtain; according to the environmental feature information array, a transmission delay analysis and a battery feature collection accuracy analysis are performed to obtain a transmission delay parameter array and a second collection accuracy parameter array; the first collection accuracy parameter array and the second collection accuracy parameter array are weightedly fused to obtain a collection accuracy parameter array.
[0008] In a possible implementation, transmission delay analysis and battery feature acquisition accuracy analysis are performed based on the environmental feature information array, and the following processing is also performed: based on the test data of environmental impact data acquisition and transmission delay, a sample environmental feature information set is collected, and a sample transmission delay parameter set and a sample second acquisition accuracy parameter set are collected; the sample environmental feature information set is used as a training input, and the sample transmission delay parameter set and the sample second acquisition accuracy parameter set are used as training supervision respectively, and the second acquisition accuracy analysis path and the transmission delay analysis path are trained, and are configured in the management center; multiple environmental feature information in the environmental feature information array are input into the second acquisition accuracy analysis path and the transmission delay analysis path, and the transmission delay parameter array and the second acquisition accuracy parameter array are obtained by analysis.
[0009] In a possible implementation, a neighboring acquisition error constraint and a neighboring transmission delay constraint are obtained, and the acquisition accuracy parameter array and the transmission delay parameter array are constrained and adjusted until the constraint requirements are met, and an adjusted acquisition accuracy parameter array and an adjusted transmission delay parameter array are obtained. The following processing is also performed: according to the data acquisition test history of the energy storage battery array, an average neighboring acquisition error change and an average neighboring transmission delay change are calculated and obtained; and the acquisition accuracy parameter difference and the transmission delay parameter difference of the adjacent energy storage batteries are not greater than the average neighboring acquisition error change and the average neighboring transmission delay change, as the neighboring acquisition error constraint and Adjacent transmission delay constraint; randomly selecting a starting energy storage battery in the energy storage battery array, and judging whether the acquisition accuracy parameter changes and transmission delay parameter changes of the starting energy storage battery and the adjacent energy storage batteries in the acquisition accuracy parameter array and the transmission delay parameter array meet the adjacent acquisition error constraint and the adjacent transmission delay constraint; if so, no adjustment is made and the judgment is continued; if not, the acquisition accuracy parameters and transmission delay parameters of the adjacent energy storage batteries are adjusted until the acquisition accuracy parameter array and the transmission delay parameter array meet the constraints, and an adjusted acquisition accuracy parameter array and an adjusted transmission delay parameter array are obtained.
[0010] In a possible implementation, the real-time battery characteristic information array is corrected according to the adjusted acquisition accuracy parameter array and the adjusted transmission delay parameter array, and the following processing is also performed: according to the adjusted acquisition accuracy parameter array, the real-time battery characteristic information array is corrected to obtain an error-corrected battery characteristic information array; according to the adjusted transmission delay parameter array, the SOC information in the error-corrected battery characteristic information array is corrected for SOC delay variation prediction to obtain the corrected battery characteristic information array.
[0011] In a possible implementation, an array of performance attenuation parameters of the energy storage battery array in the management center is obtained, and energy supply scheduling optimization is performed according to the correction battery characteristic information array and in combination with the energy supply task characteristic information to obtain an optimal energy supply scheduling scheme. The following processing is also performed: an array of performance attenuation parameters of the energy storage battery array in the management center is obtained; an energy supply scheduling space is constructed, wherein the energy supply scheduling space includes multiple energy supply scheduling schemes for performing the energy supply task on one or more energy storage batteries in the energy storage battery array according to a random energy supply ratio; a first energy supply scheduling scheme is obtained by randomly selecting in the energy supply scheduling space, and the first energy supply scheduling scheme The scheme includes at least one first energy supply battery and at least one first energy supply ratio; combining the first energy supply scheduling scheme, the correction battery characteristic information array and the energy supply task characteristic information, the battery performance attenuation prediction is performed to obtain a first performance attenuation information set, wherein the first performance attenuation information set includes the first performance attenuation information of at least one first energy supply battery; the first performance attenuation information set is superimposed on the performance attenuation parameter array to obtain a first updated performance attenuation parameter array, and a first performance attenuation balance parameter is calculated; the optimization is continued until convergence, and the energy supply scheduling scheme with the largest performance attenuation balance parameter is output to obtain the optimal energy supply scheduling scheme.
[0012] This application also provides a distributed energy network energy storage battery management system, including:
[0013] The energy supply task characteristic information acquisition module is used to collect the characteristic information of the real-time energy supply task and obtain the energy supply task characteristic information; the characteristic information array acquisition module is used to obtain the real-time battery characteristic information array and the environmental characteristic information array collected and transmitted by the energy storage battery array in the distributed energy network at the management center; the acquisition accuracy parameter array acquisition module is used to perform battery characteristic acquisition accuracy analysis based on the battery characteristic information array to obtain the first acquisition accuracy parameter array, perform transmission delay analysis and battery characteristic acquisition accuracy analysis based on the environmental characteristic information array, obtain the transmission delay parameter array and the second acquisition accuracy parameter array, and combine the first acquisition accuracy parameter array to obtain the acquisition accuracy parameter array; the parameter array constraint adjustment module is used to obtain the adjacent acquisition error constraint and the adjacent transmission delay constraint. Constraints are set to adjust the acquisition accuracy parameter array and the transmission delay parameter array until the constraint requirements are met, and obtain the adjusted acquisition accuracy parameter array and the adjusted transmission delay parameter array; a correction battery characteristic information array acquisition module is used to correct the real-time battery characteristic information array according to the adjusted acquisition accuracy parameter array and the adjusted transmission delay parameter array, and obtain the corrected battery characteristic information array; an optimal energy supply scheduling scheme acquisition module is used to obtain the performance attenuation parameter array of the energy storage battery array in the management center, and according to the corrected battery characteristic information array, combined with the energy supply task characteristic information, perform energy supply scheduling optimization to obtain the optimal energy supply scheduling scheme, wherein, during the optimization process, performance attenuation prediction is performed according to the corrected battery characteristic information array and the energy supply task characteristic information.
[0014] The distributed energy network energy storage battery management method and system proposed in this application is intended to collect the characteristic information of real-time energy supply tasks and obtain the characteristic information of energy supply tasks; obtain the real-time battery characteristic information array and environmental characteristic information array collected and transmitted by the energy storage battery array in the distributed energy network; process and obtain the acquisition accuracy parameter array; obtain the acquisition accuracy adjustment parameter array and the transmission delay adjustment parameter array; obtain the correction battery characteristic information array; and obtain the optimal energy supply scheduling plan. It solves the technical problems of existing energy storage battery management, such as the difficulty in real-time and accurate collection of energy storage battery characteristics in the face of complex energy supply tasks, which leads to inaccurate prediction of battery status and performance degradation and unbalanced energy supply scheduling, realizes efficient and accurate management of energy storage batteries, and achieves the technical effect of improving energy storage battery management, optimizing energy supply scheduling, and extending the life of energy storage batteries. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the technical solution of the embodiment of the present disclosure, the accompanying drawings of the embodiment of the present disclosure will be briefly introduced below. A flow chart is used in the present application to illustrate the operations performed by the system according to the embodiment of the present application. It should be understood that the preceding or following operations are not necessarily performed accurately in order. On the contrary, various steps can be processed in reverse order or simultaneously as needed. At the same time, other operations can also be added to these processes, or one or more operations can be removed from these processes.
[0016] Figure 1 A schematic diagram of a distributed energy network energy storage battery management method provided in an embodiment of the present application;
[0017] Figure 2 A schematic diagram of the structure of a distributed energy network energy storage battery management system provided in an embodiment of the present application.
[0018] Explanation of the reference numerals: energy supply task characteristic information acquisition module 10, characteristic information array acquisition module 20, acquisition accuracy parameter array acquisition module 30, parameter array constraint adjustment module 40, correction battery characteristic information array acquisition module 50, optimal energy supply scheduling solution acquisition module 60. DETAILED DESCRIPTION
[0019] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below.
[0020] In order to make the purpose, technical solutions and advantages of the present application clearer, the present application will be further described in detail below in conjunction with the accompanying drawings. The described embodiments should not be regarded as limiting the present application. All other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of this application.
[0021] In the following description, reference is made to "some embodiments", which describe a subset of all possible embodiments, but it is understood that "some embodiments" may be the same subset or different subsets of all possible embodiments, and may be combined with each other without conflict, and the terms "first\second" involved are merely to distinguish similar objects and do not represent a specific ordering of objects. The terms "including" and "having" and any variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product, or server that includes a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or modules that are not clearly listed or inherent to these processes, methods, products, or devices. Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those generally understood by technicians in the technical field of this application. The terms used herein are for the purpose of describing the embodiments of the present application only.
[0022] The present application embodiment provides a distributed energy network energy storage battery management method, such as Figure 1 As shown, the method includes:
[0023] Step S100, collect characteristic information of real-time energy supply tasks to obtain energy supply task characteristic information. Collect the specific requirements and parameters of the current energy supply task as functional task characteristic information. For example, for a distributed energy storage battery array in a remote factory, collect the energy supply power, energy supply amount, energy supply period and other energy supply related parameters (voltage, current, frequency and other power parameters as well as the user's power usage habits and patterns, etc.) required by its energy supply task. Specifically, the energy supply power refers to the power output power required for the current energy supply task, which is determined comprehensively based on factors such as the user's actual power demand, the load of the power grid and the power generation capacity of the distributed energy system. The energy supply power is an important basis for formulating energy supply scheduling plans, and determines the amount of electric energy that the energy storage battery needs to release or store; Energy refers to the total energy required for the energy supply task within a specific time period, which is usually determined based on factors such as the user's electricity consumption plan, electricity consumption pattern, and power generation forecast of the distributed energy system. The supply amount reflects the user's long-term demand for electricity and is of great significance to the charging and discharging management and energy balance of energy storage batteries. The energy supply period refers to the specific time range of the energy supply task, including the start time and end time, which helps the energy storage battery management system to more accurately predict and schedule the charging and discharging process of the energy storage battery to meet the user's electricity demand. In some cases, different energy supply tasks may have different priorities, and energy supply tasks with high priority need to be met first.
[0024] Step S200, the management center obtains the real-time battery characteristic information array and environmental characteristic information array collected and transmitted by the energy storage battery array in the distributed energy network. The collected information stored in the management center is obtained, including the real-time battery characteristic information array and the environmental characteristic information array. This information is collected in real time by a variety of sensors installed on the energy storage battery array in the distributed energy network, and transmitted to the management center through data communication technology (such as wireless communication, wired network, etc.). The management center realizes remote monitoring of the energy storage battery array. Specifically, the battery characteristic information array refers to a plurality of data sets directly related to battery performance collected and transmitted in real time by each battery unit or module in the energy storage battery array. It is very important for evaluating the state of the energy storage battery, predicting performance degradation, optimizing energy supply scheduling, etc., including the state of charge (SOC) and energy storage power. The state of charge refers to the ratio of the remaining capacity of the battery to its capacity in the fully charged state, usually expressed as a percentage, which is used to measure the remaining power of the battery, which helps to predict the battery usage time and arrange charging. Real-time state of charge monitoring can help the management center understand the current energy reserve of the energy storage battery array, so as to reasonably arrange power output or charging operations; energy storage power refers to the electric power that the energy storage battery array can provide or absorb at the current moment, reflecting the instantaneous energy conversion capability of the energy storage battery array. Real-time energy storage power monitoring helps the management center adjust the charging and discharging strategy of the energy storage battery array according to the changes in grid load and user needs, so as to ensure the stability and reliability of power supply; environmental characteristic information includes temperature, humidity, dust concentration, etc. Too high or too low temperature may cause battery performance degradation, shorten life and even cause safety accidents. Real-time temperature monitoring can ensure that the energy storage battery array operates within an appropriate temperature range; too high humidity may cause corrosion and short circuit of internal battery components; dust concentration reflects the cleanliness of the environment in which the energy storage battery array is located.
[0025] In a possible implementation, step S200 further includes step S210, in which multiple SOC information and multiple energy storage power information collected and transmitted by the energy storage battery array in the distributed energy network are obtained in the management center, and a real-time battery characteristic information array is constructed. Multiple SOC information and multiple energy storage power information collected and transmitted by the energy storage battery array in the distributed energy network received by the management center are obtained, and these real-time collected SOC information and energy storage power information are sorted according to a certain format and time sequence to construct a real-time battery characteristic information array, and each element in the array corresponds to the SOC value and energy storage power value of a battery or battery group at a specific time point or time period.
[0026] It also includes step S220, obtaining multiple environmental characteristic information collected and transmitted by the energy storage battery array, and constructing an environmental characteristic information array, wherein each environmental characteristic information includes temperature, humidity, and dust concentration. Acquire multiple environmental characteristic information collected by environmental monitoring equipment in the distributed energy network received by the management center. These environmental equipment are usually deployed near the energy storage battery array for real-time monitoring of environmental conditions. These real-time collected environmental characteristic information (including temperature, humidity, and dust concentration) are sorted according to a certain format and time sequence to construct an environmental characteristic information array. Each element in the array corresponds to the temperature, humidity, and dust concentration value of a certain environmental monitoring point at a specific time point or time period.
[0027] Step S300, performing battery feature acquisition accuracy analysis based on the battery feature information array to obtain a first acquisition accuracy parameter array, performing transmission delay analysis and battery feature acquisition accuracy analysis based on the environmental feature information array to obtain a transmission delay parameter array and a second acquisition accuracy parameter array, and combining the first acquisition accuracy parameter array to obtain an acquisition accuracy parameter array. Battery feature acquisition accuracy analysis refers to the evaluation of the acquisition accuracy of battery feature information (such as state of charge, energy storage power, voltage, current, etc.). Since there are errors when the sensor collects data, the battery temperature and electromagnetic interference generated under different feature information are different, and the acquisition accuracy parameters are also different. Therefore, the acquisition accuracy analysis is performed to obtain the first acquisition accuracy parameter array. Specifically, the management center first receives the real-time battery feature information array transmitted from the energy storage battery array, and performs an accuracy evaluation on the received battery feature information, such as comparing the currently collected data with historical data or the expected range, identifying abnormal values and errors, and generating the first acquisition accuracy parameter array based on the evaluation results, which includes the collection accuracy evaluation results of each battery feature information (such as error range, confidence, etc.); transmission delay analysis refers to the evaluation of the delay in the process of collecting data transmission. Specifically, the sending timestamp is marked at the sending end of the data packet (i.e., the sensor of the energy storage battery array). When the data packet arrives at the receiving end of the management center, the receiving timestamp is recorded again to analyze the environmental feature information (such as temperature, humidity, dust concentration, etc.) Whether the performance of data transmission equipment (such as wireless communication equipment, wired network equipment, etc.) is affected, thereby causing additional delays. For example, high humidity may cause signal attenuation and increase transmission delay. According to the analysis results, a transmission delay parameter array is generated, which records the data transmission delay in different time periods or under different environmental conditions; combined with environmental characteristic information, battery feature acquisition accuracy analysis, specifically, first, analyze the potential relationship between environmental characteristic information (such as temperature, humidity, dust concentration, etc.) and battery feature information acquisition accuracy. After considering environmental factors, the actual collected battery feature information is evaluated. For example, if it is known that high temperature will cause the battery voltage reading to be high, then the voltage data collected in a high temperature environment needs to be corrected accordingly. By comparing the corrected data with the expected value or theoretical value, the impact of environmental factors on acquisition accuracy is quantified, and an error index is generated. According to the analysis results, a second acquisition accuracy parameter array is generated, which includes the battery feature information acquisition accuracy evaluation results (such as error range, confidence, etc.), and also emphasizes the impact of environmental factors.Finally, the first acquisition accuracy parameter array, the second acquisition accuracy parameter array, and the transmission delay parameter array are integrated, that is, the first acquisition accuracy parameter array, the second acquisition accuracy parameter array, and the transmission delay parameter array are fused using a fusion algorithm to generate the final acquisition accuracy parameter array, which comprehensively reflects the acquisition accuracy of the battery characteristic information, the transmission delay, and the comprehensive influence of environmental factors, ensuring the accuracy and reliability of the final result.
[0028] In a possible implementation, step S300 further includes step S310, obtaining a sample battery characteristic information set according to the characteristic information collection record of the energy storage battery, and obtaining the sample collection accuracy parameters when collecting different sample battery characteristic information as the sample first collection accuracy parameter set. From the characteristic information collection record of the energy storage battery, a portion of representative data is selected as a sample, which can cover different battery states (such as charging, discharging, and standing), environmental conditions (such as temperature, humidity, etc.) and time ranges to ensure the diversity and representativeness of the samples as the sample battery characteristic information set; at the same time, the collection accuracy parameters corresponding to each sample battery characteristic information are obtained as the sample first collection accuracy parameter set, and each element in the set corresponds to a collection accuracy parameter of a sample data, which is used to describe the error or uncertainty in the sample data collection process, such as the influence of sensor accuracy, signal interference, equipment failure, etc.
[0029] The method further includes step S320, wherein the sample battery feature information set and the sample first acquisition accuracy parameter set are used to train a first acquisition accuracy analysis path, which is configured in the management center. An analysis model is constructed based on a machine learning model (such as a neural network, a decision tree, etc.), and the sample battery feature information set and the sample first acquisition accuracy parameter set are used as input data and output data, respectively, to train the analysis model, obtain a first acquisition accuracy analysis path, and configure it in the management center.
[0030] The method further includes step S330, inputting the battery characteristic information array into the first acquisition accuracy analysis path, analyzing and obtaining a plurality of first acquisition accuracy parameters, and constructing and obtaining the first acquisition accuracy parameter array. The battery characteristic information array collected in real time is input into the first acquisition accuracy analysis path, analyzing the acquisition accuracy of the battery characteristic information at each time point or time period, obtaining a plurality of first acquisition accuracy parameters, arranging these first acquisition accuracy parameters in chronological order or other logical order, and constructing a first acquisition accuracy parameter array.
[0031] The method further includes step S340, in which a transmission delay analysis and a battery characteristic acquisition accuracy analysis are performed according to the environmental characteristic information array to obtain a transmission delay parameter array and a second acquisition accuracy parameter array. The environmental characteristic information array (such as temperature, humidity, dust concentration, etc.) is used to analyze the delay during data transmission in combination with network conditions and device performance, and the impact of environmental conditions on battery characteristic information acquisition devices (such as sensors) is evaluated based on the environmental characteristic information, such as temperature fluctuations may affect the sensitivity of the sensor, and excessive humidity may cause the sensor to short-circuit, etc. The above analysis results are organized into a transmission delay parameter array and a second acquisition accuracy parameter array.
[0032] The method further includes step S350, in which the first acquisition accuracy parameter array and the second acquisition accuracy parameter array are subjected to weighted fusion processing to obtain an acquisition accuracy parameter array. The first acquisition accuracy parameter array and the second acquisition accuracy parameter array are subjected to weighted fusion processing. Specifically, the weight distribution can be adjusted according to the actual situation. For example, if it is believed that the transmission delay has little impact on the acquisition accuracy, a lower weight can be given; and if the environmental conditions have a greater impact on the acquisition equipment, a higher weight can be given. Through the weighted fusion processing, an acquisition accuracy parameter array that comprehensively considers multiple factors is obtained, which comprehensively reflects the accuracy and reliability of the battery characteristic information acquisition.
[0033] In a possible implementation, step S340 further includes step S341, collecting a sample environmental characteristic information set, a sample transmission delay parameter set and a sample second acquisition accuracy parameter set according to the test data of the environmental impact on data acquisition and transmission delay. A series of environmental characteristic information is collected from the test environment, and the environmental characteristic information refers to those environmental conditions or parameters that may affect data acquisition and transmission performance, such as temperature, humidity, dust concentration, etc. At the same time, the changes in the test data transmission delay under different environmental conditions are collected, that is, the sample transmission delay parameters are collected as the sample transmission delay parameter set, and the accuracy parameters of data acquisition under specific environmental conditions are obtained to form the sample second acquisition accuracy parameter set.
[0034] The method further includes step S342, wherein the sample environment feature information set is used as a training input, the sample transmission delay parameter set and the sample second acquisition accuracy parameter set are used as training supervision, the second acquisition accuracy analysis path and the transmission delay analysis path are trained, and the paths are configured in the management center. An analysis model is constructed based on a neural network, a random forest, etc., the sample environment feature information set is used as a training input, the sample transmission delay parameter set and the sample second acquisition accuracy parameter set are used as training supervision, the analysis model is supervised and trained, and the second acquisition accuracy analysis path and the transmission delay analysis path are obtained, and the paths are configured in the management center.
[0035] The method further includes step S343, wherein the plurality of environmental feature information in the environmental feature information array is input into the second acquisition accuracy analysis path and the transmission delay analysis path, and the transmission delay parameter array and the second acquisition accuracy parameter array are obtained through analysis. The plurality of environmental feature information in the environmental feature information array is input into the second acquisition accuracy analysis path and the transmission delay analysis path, and the transmission delay parameter array (including a plurality of delay parameters, each of which corresponds to the predicted delay when one or more data points in the environmental feature information array are transmitted) and the second acquisition accuracy parameter array (including a plurality of accuracy parameters, each of which corresponds to the acquisition accuracy evaluation results of one or more data points in the environmental feature information array) are obtained through analysis.
[0036] Step S400, obtain the neighboring acquisition error constraint and the neighboring transmission delay constraint, and adjust the acquisition accuracy parameter array and the transmission delay parameter array until the constraint requirements are met, and obtain the adjusted acquisition accuracy parameter array and the adjusted transmission delay parameter array. The characteristics (energy storage characteristic information, environmental characteristics) of similar batteries in the distributed energy network energy storage battery array are similar, so the error of their acquisition data and the transmission delay are also similar. Based on historical data, set the neighboring acquisition error constraint and the neighboring transmission delay constraint, wherein the neighboring acquisition error constraint refers to the system's tolerance range for the accuracy of battery characteristic information acquisition, for example, the error of voltage acquisition does not exceed ±0.5%, or the estimated error of the state of charge (SOC) is within a specific range; the neighboring transmission delay constraint refers to the upper limit of the tolerance for data transmission delay, which depends on the real-time requirements of the system and the timeliness of data processing. For example, in a system that requires a fast response, the data transmission delay may be required to be no more than 100 milliseconds. The acquisition accuracy parameter array and the transmission delay parameter array are constrained and adjusted. Specifically, the actual situation of the current acquisition accuracy parameter array and the transmission delay parameter array is analyzed, the parameters that do not meet the constraint requirements are determined and the reasons are analyzed, such as sensor performance, data acquisition algorithm, network status, environmental factors and other factors. According to the results of the cause analysis, a targeted adjustment strategy is formulated, and the system is adjusted accordingly according to the adjustment strategy. After the adjustment is completed, the acquisition accuracy parameter array and the transmission delay parameter array are re-evaluated to ensure that the constraint requirements are met, and finally the acquisition accuracy parameter array and the transmission delay parameter array that meet the adjacent acquisition error constraint and the adjacent transmission delay constraint are obtained.
[0037] In a possible implementation, step S400 further includes step S410, calculating and obtaining an average neighboring acquisition error change and an average neighboring transmission delay change according to the data acquisition test history of the energy storage battery array. According to the data acquisition test history of the energy storage battery array, the acquisition error data between each energy storage battery and its adjacent batteries in each test are collected. The acquisition error refers to the deviation between the collected data and the standard value. For each pair of adjacent energy storage batteries, the difference between their acquisition accuracy parameters (such as error rate, deviation, etc.) is calculated, which represents the change or difference in the acquisition accuracy of this pair of adjacent batteries. The acquisition error differences of all adjacent battery pairs are counted, and their average value is calculated, which is the average adjacent acquisition error change, reflecting the average change in the acquisition accuracy between adjacent batteries in the entire battery array; the delay data when each energy storage battery transmits data to the adjacent battery or data center in each test is collected. For each pair of adjacent energy storage batteries (or the connection between the battery and the data center), the difference between their transmission delay parameters is calculated, which represents the change or difference in the transmission performance of this pair of adjacent batteries (or connections). The transmission delay differences of all adjacent battery pairs (or connections) are counted, and their average value is calculated, which is the average adjacent transmission delay change, reflecting the average change in data transmission delay between adjacent batteries (or connections) in the entire battery array.
[0038] The method further includes step S420, wherein the acquisition accuracy parameter difference and the transmission delay parameter difference of adjacent energy storage batteries are not greater than the average adjacent acquisition error change and the average adjacent transmission delay change, as adjacent acquisition error constraints and adjacent transmission delay constraints. The acquisition accuracy parameter difference and the transmission delay parameter difference of adjacent energy storage batteries are not greater than the average adjacent acquisition error change and the average adjacent transmission delay change, as constraints, to construct adjacent acquisition error constraints and adjacent transmission delay constraints.
[0039] The method further includes step S430, randomly selecting a starting energy storage battery in the energy storage battery array, and determining whether the acquisition accuracy parameter changes and transmission delay parameter changes of the starting energy storage battery and the adjacent energy storage batteries in the acquisition accuracy parameter array and the transmission delay parameter array meet the adjacent acquisition error constraint and the adjacent transmission delay constraint. In the energy storage battery array, a storage battery is selected as a starting point by random number generation, and the adjacent batteries of the starting energy storage battery are determined according to the layout logic of the energy storage battery array. The corresponding acquisition accuracy parameters and transmission delay parameters of the starting energy storage battery and the adjacent energy storage batteries are respectively extracted from the acquisition accuracy parameter array and the transmission delay parameter array, and the parameter differences of the adjacent energy storage batteries are calculated, and compared with the adjacent acquisition error constraint and the adjacent transmission delay constraint respectively.
[0040] It also includes step S440, if yes, no adjustment is made, and the discrimination is continued; if no, the acquisition accuracy parameters and transmission delay parameters of the adjacent energy storage batteries are adjusted until the acquisition accuracy parameter array and the transmission delay parameter array meet the constraints, and the adjusted acquisition accuracy parameter array and the adjusted transmission delay parameter array are obtained. If the discrimination result shows that the starting energy storage battery and its adjacent energy storage batteries meet the set constraints in acquisition accuracy and transmission delay, it means that the performance difference between these batteries is within an acceptable range and no additional adjustment is required, and another energy storage battery is selected as a new starting point, and the above discrimination process is repeated until the entire battery array is traversed; if the discrimination result shows that there is a situation where the constraints are not met, that is, the change in the acquisition accuracy parameter or the change in the transmission delay parameter between the starting energy storage battery and one or some adjacent energy storage batteries exceeds the constraints, the acquisition accuracy parameters and the transmission delay parameters of these adjacent batteries are adjusted to obtain the adjusted acquisition accuracy parameter array and the adjusted transmission delay parameter array.
[0041] Step S500, according to the adjusted acquisition accuracy parameter array and the adjusted transmission delay parameter array, the real-time battery characteristic information array is corrected to obtain a corrected battery characteristic information array. Based on the adjusted acquisition accuracy parameters, the collected battery characteristic information is corrected. Specifically, according to the adjusted transmission delay parameter array, the data in the real-time battery characteristic information array is synchronously processed, including adjusting the timestamp to ensure that all data are compared and analyzed on the same time basis. Then, each data point in the real-time battery characteristic information array is corrected using the error correction value or adjustment factor in the adjusted acquisition accuracy parameter array to eliminate or reduce the deviation caused by the acquisition system error. Then, the data transmission time is obtained according to the transmission delay, and the SOC and energy storage power of the battery array after the current transmission is completed are obtained according to the energy storage power in the battery characteristic information. As a corrected battery characteristic information array, the actual state and performance of the energy storage battery array are more accurately reflected.
[0042] In a possible implementation, step S500 further includes step S510, in which the real-time battery characteristic information array is corrected according to the adjusted acquisition accuracy parameter array to obtain an error-corrected battery characteristic information array. Each acquisition accuracy parameter in the adjusted acquisition accuracy parameter array is matched with a corresponding battery or data acquisition point in the real-time battery characteristic information array, and each acquisition accuracy parameter is applied to its corresponding battery characteristic information to eliminate or reduce measurement errors, and the corresponding data in the real-time battery characteristic information array is updated to obtain an error-corrected battery characteristic information array, in which the characteristic information in the array removes most of the errors in the acquisition process and is closer to the actual state of the battery.
[0043] The method further includes step S520, wherein the SOC information in the error correction battery characteristic information array is predicted and corrected for SOC delay variation according to the adjustment transmission delay parameter array to obtain the correction battery characteristic information array. Each delay parameter in the adjustment transmission delay parameter array is matched with the corresponding data transmission in the error correction battery characteristic information array to analyze the influence of the transmission delay on the SOC information. Since the SOC varies with time and data transmission requires a certain time, when the SOC information reaches the data processing center, the actual SOC of the battery may have changed. This change depends on the battery charge and discharge rate, time interval and the length of the transmission delay. Then, according to the transmission delay and the battery charge and discharge characteristics (such as charge and discharge rate, battery capacity, etc.), the change amount of the SOC during the transmission delay is predicted, and the predicted change amount is applied to the error-corrected SOC information to obtain a SOC value closer to the actual situation. Finally, the SOC information after the SOC delay variation prediction correction is updated to the error correction battery characteristic information array to obtain the correction battery characteristic information array.
[0044] Step S600, obtain the performance attenuation parameter array of the energy storage battery array in the management center, optimize the energy supply scheduling according to the corrected battery characteristic information array and the energy supply task characteristic information, and obtain the optimal energy supply scheduling plan, wherein, during the optimization process, a performance attenuation prediction is performed according to the corrected battery characteristic information array and the energy supply task characteristic information. The performance attenuation parameter array refers to a set of parameters that reflect the performance decline of each battery cell or module in the energy storage battery array over time or the number of charge and discharge cycles, which may include battery capacity attenuation rate, internal resistance increase, voltage change, etc., which are directly related to the battery's state of health (SOH) and remaining service life. Specifically, the performance attenuation prediction is performed according to the corrected battery characteristic information array and the energy supply task characteristic information, aiming to evaluate the performance change trend of the battery in the future. For example, historical data and current data are used to establish a prediction model through machine learning to predict the future performance attenuation of the battery; a mathematical model is established based on the electrochemical reaction mechanism and internal physical process of the battery to predict the performance attenuation of the battery; after obtaining the performance attenuation prediction result, the management center will conclude Combined with the characteristic information of energy supply tasks, energy supply scheduling optimization is carried out to obtain the optimal energy supply scheduling plan, ensuring that the energy storage battery array can meet the energy supply task requirements while maximizing the battery life and reducing the operating cost. For example, according to the battery performance degradation prediction results and energy supply task requirements, a reasonable charging and discharging strategy is formulated to reduce the battery's over-charging and deep discharge, thereby extending the battery life; reasonably allocate power among multiple battery cells or modules to balance the battery's load and performance degradation, and improve the efficiency and stability of the overall system; according to the performance degradation prediction results, early warning of possible failures or performance degradation is given, and corresponding response measures are formulated to reduce the impact of failures on energy supply tasks and achieve efficient and stable operation of distributed energy networks.
[0045] In a possible implementation, step S600 further includes step S610, obtaining a performance attenuation parameter array of the energy storage battery array in the management center. The performance attenuation parameter array of the energy storage battery array collected by real-time monitoring data monitored by a battery management system (BMS) or regular battery performance tests (such as capacity tests, internal resistance tests, etc.) is obtained from the management center, including battery capacity attenuation rate, internal resistance increase, voltage change, etc., reflecting the performance degradation of the battery during use.
[0046] The method further includes step S620, constructing an energy supply scheduling space, wherein the energy supply scheduling space includes multiple energy supply scheduling schemes for performing the energy supply task according to a random energy supply ratio for one or more energy storage batteries in the energy storage battery array. Determine the characteristic information of the energy supply task, including the total amount of energy required, energy supply time, energy supply stability requirements, etc., and randomly generate multiple energy supply scheduling schemes according to the actual conditions of the energy storage battery array (such as battery capacity, performance attenuation, etc.), and construct an energy supply scheduling space, each of which should include at least one energy supply battery and a corresponding energy supply ratio.
[0047] It also includes step S630, randomly selecting and obtaining a first energy supply scheduling scheme in the energy supply scheduling space, wherein the first energy supply scheduling scheme includes at least one first energy supply battery and at least one first energy supply ratio. It also includes step S640, combining the first energy supply scheduling scheme, the correction battery characteristic information array and the energy supply task characteristic information, performing battery performance attenuation prediction, and obtaining a first performance attenuation information set, wherein the first performance attenuation information set includes first performance attenuation information of at least one first energy supply battery. According to the first energy supply scheduling scheme, characteristic information of batteries participating in the energy supply task is extracted from the correction battery characteristic information array, and a battery performance attenuation prediction model is used to comprehensively consider the current characteristic information of the battery and the characteristic information of the energy supply task to predict the performance attenuation of the battery in the future. For each first energy supply battery, the model will output the performance attenuation information of the energy supply task, and the performance attenuation information of all first energy supply batteries is summarized to form a first performance attenuation information set for evaluating the impact of the current energy supply scheduling scheme on battery performance.
[0048] It also includes step S640, superimposing the first performance decay information set into the performance decay parameter array to obtain a first updated performance decay parameter array, and calculating a first performance decay balance parameter. The performance decay information (such as battery capacity decay, internal resistance increase, etc.) of each battery in the first performance decay information set is correspondingly superimposed on the performance decay parameter of the corresponding battery in the performance decay parameter array. After the superposition is completed, the performance decay parameter array is updated to the first updated performance decay parameter array, which reflects the predicted performance decay of each battery in the energy storage battery array after the energy supply task under the first energy supply scheduling scheme, and calculates the variance of the battery. The smaller the variance, the closer the performance decay between the batteries, and the better the balance, and the first performance decay balance parameter is obtained. The performance decay balance parameter is used to evaluate the degree of balance of performance decay of each battery in the energy storage battery array.
[0049] It also includes step S650, continuing to optimize until convergence, outputting the energy supply scheduling scheme with the largest performance decay balance parameter, and obtaining the optimal energy supply scheduling scheme. Continue to randomly select energy supply scheduling schemes in the energy supply scheduling space, perform performance decay prediction, and update the performance decay parameter array. After each update, new performance decay balance parameters are calculated and compared with the previous results. Through iterative optimization, the energy supply scheduling scheme with the largest performance decay balance parameter is gradually approached. When the preset number of iterations is reached, the energy supply scheduling scheme with the largest performance decay balance parameter is converged and output as the optimal energy supply scheduling scheme. While meeting the energy supply task requirements, the performance decay imbalance between batteries in the battery array is minimized, thereby extending the overall service life of the battery array.
[0050] In the above, refer to Figure 1 The distributed energy network energy storage battery management method according to the embodiment of the present invention is described in detail. Figure 2 A distributed energy network energy storage battery management system according to an embodiment of the present invention is described.
[0051] The distributed energy network energy storage battery management system according to the embodiment of the present invention is used to solve the technical problems existing in the existing energy storage battery management, such as the difficulty in real-time and accurate collection of energy storage battery characteristics in the face of complex energy supply tasks, which leads to inaccurate prediction of battery status and performance degradation and unbalanced energy supply scheduling, and realizes efficient and accurate management of energy storage batteries, achieving the technical effect of improving energy storage battery management, optimizing energy supply scheduling and extending the life of energy storage batteries. The distributed energy network energy storage battery management system includes: an energy supply task characteristic information acquisition module 10, a characteristic information array acquisition module 20, an acquisition module for acquisition accuracy parameter array 30, a parameter array constraint adjustment module 40, a correction battery characteristic information array acquisition module 50, and an optimal energy supply scheduling scheme acquisition module 60.
[0052] The energy supply task characteristic information acquisition module 10 is used to collect the characteristic information of the real-time energy supply task and obtain the energy supply task characteristic information;
[0053] The characteristic information array acquisition module 20 is used to acquire the real-time battery characteristic information array and environmental characteristic information array collected and transmitted by the energy storage battery array in the distributed energy network at the management center;
[0054] The acquisition accuracy parameter array acquisition module 30 is used to perform battery feature acquisition accuracy analysis according to the battery feature information array to obtain a first acquisition accuracy parameter array, perform transmission delay analysis and battery feature acquisition accuracy analysis according to the environment feature information array to obtain a transmission delay parameter array and a second acquisition accuracy parameter array, and combine the first acquisition accuracy parameter array to obtain an acquisition accuracy parameter array;
[0055] The parameter array constraint adjustment module 40 is used to obtain the adjacent acquisition error constraint and the adjacent transmission delay constraint, and to perform constraint adjustment on the acquisition accuracy parameter array and the transmission delay parameter array until the constraint requirements are met, thereby obtaining an adjusted acquisition accuracy parameter array and an adjusted transmission delay parameter array;
[0056] A correction battery characteristic information array obtaining module 50 is used to correct the real-time battery characteristic information array according to the adjustment acquisition accuracy parameter array and the adjustment transmission delay parameter array to obtain a correction battery characteristic information array;
[0057] The optimal energy supply scheduling scheme acquisition module 60 is used to obtain the performance attenuation parameter array of the energy storage battery array in the management center, and optimize the energy supply scheduling according to the correction battery characteristic information array and the energy supply task characteristic information to obtain the optimal energy supply scheduling scheme, wherein, during the optimization process, performance attenuation prediction is performed according to the correction battery characteristic information array and the energy supply task characteristic information.
[0058] The specific configuration of the characteristic information array acquisition module 20 will be described in detail below. The characteristic information array acquisition module 20 further includes: in the management center, acquiring multiple SOC information and multiple energy storage power information collected and transmitted by the energy storage battery array in the distributed energy network, and constructing a real-time battery characteristic information array; acquiring multiple environmental characteristic information collected and transmitted by the energy storage battery array, and constructing an environmental characteristic information array, wherein each environmental characteristic information includes temperature, humidity, and dust concentration.
[0059] The specific configuration of the acquisition accuracy parameter array acquisition module 30 will be described in detail below. The acquisition accuracy parameter array acquisition module 30 may further include: obtaining a sample battery feature information set according to the feature information acquisition record of the energy storage battery, and obtaining the sample acquisition accuracy parameters when different sample battery feature information is collected as a sample first acquisition accuracy parameter set; using the sample battery feature information set and the sample first acquisition accuracy parameter set to train a first acquisition accuracy analysis path, and configure it in the management center; inputting the battery feature information array into the first acquisition accuracy analysis path, analyzing and obtaining multiple first acquisition accuracy parameters, and constructing the first acquisition accuracy parameter array; performing transmission delay analysis and battery feature acquisition accuracy analysis according to the environmental feature information array to obtain a transmission delay parameter array and a second acquisition accuracy parameter array; performing weighted fusion processing on the first acquisition accuracy parameter array and the second acquisition accuracy parameter array to obtain an acquisition accuracy parameter array.
[0060] The specific configuration of the acquisition accuracy parameter array acquisition module 30 will be described in detail below. The acquisition accuracy parameter array acquisition module 30 may further include: collecting a sample environmental feature information set according to the test data of environmental impact data acquisition and transmission delay, and collecting a sample transmission delay parameter set and a sample second acquisition accuracy parameter set; using the sample environmental feature information set as training input, using the sample transmission delay parameter set and the sample second acquisition accuracy parameter set as training supervision, respectively, training the second acquisition accuracy analysis path and the transmission delay analysis path, and configuring them in the management center; inputting multiple environmental feature information in the environmental feature information array into the second acquisition accuracy analysis path and the transmission delay analysis path, and analyzing to obtain the transmission delay parameter array and the second acquisition accuracy parameter array.
[0061] The specific configuration of the parameter array constraint adjustment module 40 will be described in detail below. The parameter array constraint adjustment module 40 further includes: calculating and obtaining the average neighboring acquisition error change and the average neighboring transmission delay change according to the data acquisition test history of the energy storage battery array; taking the acquisition accuracy parameter difference and the transmission delay parameter difference of the adjacent energy storage batteries not greater than the average neighboring acquisition error change and the average neighboring transmission delay change as the neighboring acquisition error constraint and the neighboring transmission delay constraint; randomly selecting a starting energy storage battery in the energy storage battery array, and judging whether the acquisition accuracy parameter change and the transmission delay parameter change of the starting energy storage battery and the adjacent energy storage batteries in the acquisition accuracy parameter array and the transmission delay parameter array meet the neighboring acquisition error constraint and the neighboring transmission delay constraint; if so, no adjustment is made and the judgment is continued; if not, the acquisition accuracy parameter and the transmission delay parameter of the adjacent energy storage battery are adjusted until the acquisition accuracy parameter array and the transmission delay parameter array meet the constraints, and the adjusted acquisition accuracy parameter array and the adjusted transmission delay parameter array are obtained.
[0062] The specific configuration of the correction battery characteristic information array acquisition module 50 will be described in detail below. The correction battery characteristic information array acquisition module 50 further includes: correcting the real-time battery characteristic information array according to the adjustment acquisition accuracy parameter array to obtain the error correction battery characteristic information array; performing SOC delay change prediction correction on the SOC information in the error correction battery characteristic information array according to the adjustment transmission delay parameter array to obtain the correction battery characteristic information array.
[0063] The specific configuration of the optimal energy supply scheduling scheme acquisition module 60 will be described in detail below. The optimal energy supply scheduling scheme acquisition module 60 may further include: obtaining the performance attenuation parameter array of the energy storage battery array in the management center; constructing an energy supply scheduling space, wherein the energy supply scheduling space includes multiple energy supply scheduling schemes for performing the energy supply task according to a random energy supply ratio on one or more energy storage batteries in the energy storage battery array; randomly selecting a first energy supply scheduling scheme in the energy supply scheduling space, wherein the first energy supply scheduling scheme includes at least one first energy supply battery and at least one first energy supply ratio; combining the first energy supply scheduling scheme, the correction battery feature information array and the energy supply task feature information, predicting battery performance attenuation, and obtaining a first performance attenuation information set, wherein the first performance attenuation information set includes first performance attenuation information of at least one first energy supply battery; superimposing the first performance attenuation information set to the performance attenuation parameter array, obtaining a first updated performance attenuation parameter array, and calculating a first performance attenuation balance parameter; continuing to optimize until convergence, outputting an energy supply scheduling scheme with the largest performance attenuation balance parameter, and obtaining the optimal energy supply scheduling scheme.
[0064] The distributed energy network energy storage battery management system provided in the embodiment of the present invention can execute the distributed energy network energy storage battery management method provided in any embodiment of the present invention, and has the corresponding functional modules and beneficial effects of the execution method.
[0065] Although the present application makes various references to certain modules in the system according to the embodiments of the present application, any number of different modules may be used and run on the user terminal and / or server, and the various units and modules included are only divided according to functional logic, but are not limited to the above division, as long as the corresponding functions can be achieved; in addition, the specific names of the functional units are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of the present invention.
[0066] The above specific implementations do not constitute a limitation on the protection scope of this application. It should be understood by those skilled in the art that various modifications, combinations and substitutions can be made according to design requirements and other factors. Any modifications, equivalent substitutions and improvements made within the spirit and principles of this application should be included in the protection scope of this application.
Claims
1. A distributed energy network energy storage battery management method, characterized in that: The method comprises: Collecting real-time characteristic information of energy supply tasks to obtain characteristic information of energy supply tasks; Obtaining the real-time battery characteristic information array and environmental characteristic information array collected and transmitted by the energy storage battery array in the distributed energy network at the management center; According to the battery characteristic information array, a battery characteristic acquisition accuracy analysis is performed to obtain a first acquisition accuracy parameter array; according to the environment characteristic information array, a transmission delay analysis and a battery characteristic acquisition accuracy analysis are performed to obtain a transmission delay parameter array and a second acquisition accuracy parameter array; and the first acquisition accuracy parameter array is combined to obtain an acquisition accuracy parameter array; Obtaining adjacent acquisition error constraints and adjacent transmission delay constraints, and performing constraint adjustments on the acquisition accuracy parameter array and the transmission delay parameter array until the constraint requirements are met, thereby obtaining an adjusted acquisition accuracy parameter array and an adjusted transmission delay parameter array; Correcting the real-time battery characteristic information array according to the adjustment acquisition accuracy parameter array and the adjustment transmission delay parameter array to obtain a corrected battery characteristic information array; Acquire the performance attenuation parameter array of the energy storage battery array in the management center, optimize the energy supply scheduling according to the correction battery characteristic information array and the energy supply task characteristic information, and obtain the optimal energy supply scheduling plan, wherein, during the optimization process, performance attenuation prediction is performed according to the correction battery characteristic information array and the energy supply task characteristic information.
2. The distributed energy network energy storage battery management method according to claim 1, characterized in that: The management center obtains the real-time battery characteristic information array and environmental characteristic information array collected and transmitted by the energy storage battery array in the distributed energy network, including: In the management center, multiple SOC information and multiple energy storage power information collected and transmitted by the energy storage battery array in the distributed energy network are obtained to construct a real-time battery characteristic information array; Acquire multiple environmental characteristic information collected and transmitted by the energy storage battery array, and construct an environmental characteristic information array, wherein each environmental characteristic information includes temperature, humidity, and dust concentration.
3. The distributed energy network energy storage battery management method according to claim 1, characterized in that: According to the battery characteristic information array, a battery characteristic acquisition accuracy analysis is performed to obtain a first acquisition accuracy parameter array; according to the environment characteristic information array, a transmission delay analysis and a battery characteristic acquisition accuracy analysis are performed to obtain a transmission delay parameter array and a second acquisition accuracy parameter array; and in combination with the first acquisition accuracy parameter array, processing is performed to obtain an acquisition accuracy parameter array, including: According to the characteristic information collection record of the energy storage battery, a sample battery characteristic information set is obtained, and sample collection accuracy parameters when different sample battery characteristic information are collected are obtained as a sample first collection accuracy parameter set; Using the sample battery feature information set and the sample first acquisition accuracy parameter set, training a first acquisition accuracy analysis path, and configuring it in the management center; Inputting the battery characteristic information array into the first acquisition accuracy analysis path, analyzing and obtaining a plurality of first acquisition accuracy parameters, and constructing and obtaining the first acquisition accuracy parameter array; According to the environmental characteristic information array, a transmission delay analysis and a battery characteristic acquisition accuracy analysis are performed to obtain a transmission delay parameter array and a second acquisition accuracy parameter array; A weighted fusion process is performed on the first acquisition accuracy parameter array and the second acquisition accuracy parameter array to obtain an acquisition accuracy parameter array.
4. The distributed energy network energy storage battery management method according to claim 3 is characterized in that: According to the environmental characteristic information array, transmission delay analysis and battery characteristic collection accuracy analysis are performed, including: According to the test data of environmental impact data collection and transmission delay, a sample environmental feature information set is collected, and a sample transmission delay parameter set and a sample second collection accuracy parameter set are collected; The sample environment feature information set is used as training input, the sample transmission delay parameter set and the sample second acquisition accuracy parameter set are used as training supervision, and the second acquisition accuracy analysis path and the transmission delay analysis path are trained, which are configured in the management center; The multiple environmental feature information in the environmental feature information array are input into the second acquisition accuracy analysis path and the transmission delay analysis path, and the transmission delay parameter array and the second acquisition accuracy parameter array are obtained by analysis.
5. The distributed energy network energy storage battery management method according to claim 1, characterized in that: Acquiring adjacent acquisition error constraints and adjacent transmission delay constraints, performing constraint adjustments on the acquisition accuracy parameter array and the transmission delay parameter array until the constraint requirements are met, and obtaining an adjusted acquisition accuracy parameter array and an adjusted transmission delay parameter array, including: According to the data acquisition test history of the energy storage battery array, calculate and obtain the average adjacent acquisition error change and the average adjacent transmission delay change; The acquisition accuracy parameter difference and transmission delay parameter difference of adjacent energy storage batteries are not greater than the average adjacent acquisition error change and the average adjacent transmission delay change, as the adjacent acquisition error constraint and the adjacent transmission delay constraint; Randomly select a starting energy storage battery in the energy storage battery array, and determine whether the acquisition accuracy parameter changes and transmission delay parameter changes of the starting energy storage battery and adjacent energy storage batteries in the acquisition accuracy parameter array and transmission delay parameter array meet the adjacent acquisition error constraint and adjacent transmission delay constraint; If so, no adjustment is made and the judgment continues. If not, the acquisition accuracy parameters and transmission delay parameters of the adjacent energy storage batteries are adjusted until the acquisition accuracy parameter array and the transmission delay parameter array meet the constraints, and the adjusted acquisition accuracy parameter array and the adjusted transmission delay parameter array are obtained.
6. The distributed energy network energy storage battery management method according to claim 1, characterized in that: The real-time battery characteristic information array is corrected according to the acquisition accuracy adjustment parameter array and the transmission delay adjustment parameter array, including: Correcting the real-time battery characteristic information array according to the adjustment acquisition accuracy parameter array to obtain an error-corrected battery characteristic information array; According to the adjusted transmission delay parameter array, the SOC information in the error correction battery characteristic information array is subjected to SOC delay variation prediction correction to obtain the corrected battery characteristic information array.
7. The distributed energy network energy storage battery management method according to claim 1, characterized in that: Acquiring the performance attenuation parameter array of the energy storage battery array in the management center, optimizing the energy supply scheduling according to the correction battery characteristic information array and combining the energy supply task characteristic information, and obtaining the optimal energy supply scheduling scheme, including: Obtaining a performance attenuation parameter array of the energy storage battery array in the management center; Constructing an energy supply scheduling space, wherein the energy supply scheduling space includes multiple energy supply scheduling schemes for performing the energy supply task according to a random energy supply ratio for one or more energy storage batteries in the energy storage battery array; Randomly selecting a first energy supply scheduling scheme in the energy supply scheduling space, wherein the first energy supply scheduling scheme includes at least one first energy supply battery and at least one first energy supply ratio; Combine the first energy supply scheduling scheme, the corrected battery characteristic information array and the energy supply task characteristic information to predict battery performance degradation and obtain a first performance degradation information set, wherein the first performance degradation information set includes first performance degradation information of at least one first energy supply battery; Superimposing the first performance decay information set into the performance decay parameter array to obtain a first updated performance decay parameter array, and calculating to obtain a first performance decay balance parameter; Continue to optimize until convergence, output the energy supply scheduling plan with the largest performance attenuation balance parameter, and obtain the optimal energy supply scheduling plan.
8. Distributed energy network energy storage battery management system, characterized in that: The system is used to implement the distributed energy network energy storage battery management method according to any one of claims 1 to 7, and the system includes: The energy supply task characteristic information acquisition module is used to collect the characteristic information of the real-time energy supply task and obtain the energy supply task characteristic information; A characteristic information array acquisition module is used to acquire the real-time battery characteristic information array and environmental characteristic information array collected and transmitted by the energy storage battery array in the distributed energy network at the management center; The acquisition accuracy parameter array acquisition module is used to perform battery feature acquisition accuracy analysis according to the battery feature information array to obtain a first acquisition accuracy parameter array, perform transmission delay analysis and battery feature acquisition accuracy analysis according to the environment feature information array to obtain a transmission delay parameter array and a second acquisition accuracy parameter array, and combine the first acquisition accuracy parameter array to obtain an acquisition accuracy parameter array; A parameter array constraint adjustment module is used to obtain a neighboring acquisition error constraint and a neighboring transmission delay constraint, and to perform constraint adjustment on the acquisition accuracy parameter array and the transmission delay parameter array until the constraint requirements are met, thereby obtaining an adjusted acquisition accuracy parameter array and an adjusted transmission delay parameter array; A correction battery characteristic information array acquisition module, used to correct the real-time battery characteristic information array according to the adjustment acquisition accuracy parameter array and the adjustment transmission delay parameter array to obtain a correction battery characteristic information array; The optimal energy supply scheduling scheme acquisition module is used to obtain the performance attenuation parameter array of the energy storage battery array in the management center, and optimize the energy supply scheduling according to the correction battery characteristic information array and the energy supply task characteristic information to obtain the optimal energy supply scheduling scheme, wherein, during the optimization process, performance attenuation prediction is performed according to the correction battery characteristic information array and the energy supply task characteristic information.
