Energy system low-carbon scheduling method for coal-fired coupling power generation and flexible resource reserve
By transforming the thermal power unit into a biomass mixed-burning carbon capture power plant in an integrated energy system, combining flexible resources and diversified utilization of hydrogen energy, a two-stage random optimization scheduling model is adopted, and the coal-fired coupled power generation and carbon capture technology is solved. Application issues in low-carbon scheduling have improved system flexibility and wind power consumption capabilities, and reduced carbon emissions and operating costs.
Patent Information
- Application Number
- CN202410988902.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-23
- Publication Date
- 2024-11-12
AI Technical Summary
The existing technology has not effectively combined the low-carbon scheduling method of coal-fired coupled power generation and carbon capture technology in integrated energy systems, and has not fully utilized flexible resources to improve system flexibility, especially in the face of uncertainty in new energy. In case.
A low-carbon scheduling method for coal-fired power generation and flexible resource backup was constructed, including transforming the thermal power unit into a biomass mixed-burning carbon capture power plant, combining energy storage devices and hydrogen energy multi-utilization units, and scheduling is optimized through two-stage random The model optimizes the system operation and introduces step-by-step carbon trading to reflect cleaning characteristics.
The low-carbon and flexible transformation of thermal power units has been realized, the system flexibility and wind power consumption capacity have been improved, the system carbon emissions and operating costs have been reduced, and the effectiveness of this method has been verified through examples.
Smart Images

Figure CN118944194A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of low-carbon dispatching of power systems, and in particular relates to a low-carbon dispatching method for an energy system of coal-fired coupled power generation and flexible resource backup. Background Art
[0002] At present, there are two main problems in the integrated energy system (IES). On the one hand, as an important power source to ensure the safety and stability of the system, traditional thermal power units have high pollution and high carbon emissions, and it is urgent to promote coal consumption substitution and transformation and upgrading. On the other hand, as the main power source of the future power grid, wind power has the randomness and volatility that make the system insufficiently flexible, the wind power absorption capacity is limited, and the system scheduling is more difficult. Limited by the accuracy of wind power prediction, a high proportion of wind power grid connection requires the system to reserve more spare capacity, and the system flexibility is further reduced. In this regard, how to promote the low-carbon transformation of thermal power units and improve the system flexibility under a high proportion of new energy is crucial.
[0003] Coal-fired coupled power generation is an important means of low-carbon transformation and upgrading and flexibility transformation of thermal power units. It can be mixed with clean energy to reduce carbon emissions of units. Biomass energy has the advantages of being renewable and environmentally friendly. Its co-combustion with coal is the best use of renewable energy and fossil energy, and is the best choice for achieving low-carbon development of coal-fired units. Carbon capture technology is an effective method for reducing carbon emissions in thermal power units. It can be used in conjunction with coal-fired coupled power generation to synergistically reduce carbon emissions in thermal power units.
[0004] In terms of flexibility, the multi-energy coupling of electricity, heat and gas in the integrated energy system (IES) can realize the sharing of flexible resources, promote the consumption of new energy and improve the flexibility of the system. At the same time, IES can tap the backup characteristics of flexible resources and jointly undertake the system backup needs through flexible resources and thermal power units. In addition, there is uncertainty in new energy, which may cause power abandonment and increase operating costs. Common processing methods include stochastic optimization and robust optimization. After considering uncertainty, IES can further improve system flexibility and ensure safe and stable operation of the system through the backup of multiple flexible resources.
[0005] At present, there are the following technical problems in the research on IES: Coal-fired coupled power generation and carbon capture technology is an important method for the low-carbon transformation of thermal power, but the current IES low-carbon scheduling research does not comprehensively consider its effect on the system; the current research on IES flexibility resources does not consider the improvement of system flexibility through the coordinated participation of IES flexibility resources in reserve; the uncertainty of new energy requires more flexible resources to cope with the uncertainty of new energy, and the current research on reserve optimization of new energy and the optimization problem of reserve undertaken by flexible resources in multi-energy systems are more complicated. Summary of the invention
[0006] The technical problem to be solved by the present invention is: to provide a low-carbon scheduling method for an energy system of coal-fired coupled power generation and flexible resource backup to solve the technical problems existing in the research of the above-mentioned IES.
[0007] The low-carbon dispatch method of the energy system of coal-fired coupled power generation and flexible resource reserve includes the following steps:
[0008] Step 1: Construct an IES operation model for an integrated energy system with coupled coal-fired and biomass power generation
[0009] 1) Energy flow relationship of integrated energy system
[0010] IES energy flow diagram Figure 1 As shown. The largest thermal power unit in the integrated energy system IES is transformed into a biomass co-combustion carbon capture power plant (BCCPP). IES realizes multi-energy system coupling through combined heat and power (CHP), gas boiler (GB), electric boiler (EB) and hydrogen energy multi-utilization unit. The energy storage device includes heat storage tank (HST) and hydrogen storage tank.
[0011] 2) Analysis of flexible operation of biomass co-firing and carbon capture power plants
[0012] Biomass energy has low-carbon and environmentally friendly characteristics and can be mixed with coal for combustion, promoting the low-carbon development of IES. The current coal-fired unit biomass coupling power generation technology mainly includes direct co-combustion, indirect co-combustion and parallel co-combustion. Among them, biomass direct co-combustion technology has low investment cost, little impact on the original unit, and high power generation efficiency. Biomass direct coupling power generation technology such as Figure 2 shown.
[0013] Biomass direct co-combustion technology can be combined with carbon capture, utilization and storage technology to build a coupled technology of biomass energy utilization and carbon capture, utilization and storage. In this regard, the present invention installs a carbon capture system on the basis of biomass co-combustion to build a biomass co-combustion carbon capture power plant. Its operating principle and power flow are as follows Figure 3 shown.
[0014] The total power of the biomass co-combustion and carbon capture power plant (BCCPP) is composed of the co-combustion of biomass and coal, including net output power, fixed energy consumption and carbon capture energy consumption.
[0015]
[0016] Where: PBP (t) is the total output power of BCCPP during period t; P B (t), P C (t) are the biomass and coal outputs in period t respectively; P N (t), P D (t), P CCS (t) are the net output power, fixed energy consumption and carbon capture energy consumption in period t respectively.
[0017] In the research of biomass direct coupling power generation technology, in order to ensure the safe and economical operation of thermal power units and reduce the cost of unit transformation, the biomass co-combustion ratio, that is, the ratio of biomass mass to total input mass, should not exceed 20%.
[0018]
[0019] Where: κ(t) is the biomass co-combustion ratio during period t; Q B , Q C , Q m They are the calorific value of biomass, the calorific value of coal and the calorific value of the mixed combustion of the two.
[0020] The mathematical model of BCCPP under the comprehensive flexible operation mode is as follows:
[0021]
[0022] Where: E CO2 (t), E SBP (t), E BP (t) are the mass of CO2 captured by the power plant during period t, the mass of CO2 to be captured provided by the solution storage during period t, and the total amount of CO2 generated by the power plant during period t; β, ζ, and η are the carbon capture efficiency, the energy consumption per unit CO2 captured, and the maximum operating coefficient of the regeneration tower and compressor, respectively; λ BP and ω represent the carbon emission intensity and flue gas diversion ratio of the power plant respectively; P BPmax Indicates the maximum output power of the power plant.
[0023] 3) Analysis and modeling of CHP electric heating operation characteristics
[0024] CHP units are divided into two categories: back pressure type and extraction type. Back pressure units have the constraint of "heat determines electricity" and are generally used in situations where the heat load is relatively stable. The operation mode of extraction units is relatively flexible, and any operating state can be represented by a point in the feasible domain composed of the ABCD area. Therefore, the operation mode of the extraction unit is used for modeling.
[0025]
[0026] Where: P CHP,e (t), P CHP,h(t) are the output electrical and thermal power in period t respectively; f CHP (t) is the fuel cost of period t; υ represents the vertex set of the operation domain; α i (t) is the coefficient of each vertex in time period t; P CHPe,i (t), P CHPh,i (t) are the electrical and thermal power of each vertex in period t; f CHP,i (t) represents the fuel cost of each vertex in period t.
[0027] The electric-heat operation relationship of CHP can be decoupled through HST and EB. HST has the characteristics of energy time shifting, and electric boilers can absorb surplus wind power resources. The two can improve the flexibility of CHP. When HST and EB are introduced, the integrated CHP has a larger feasible domain, and its electric-heat operation characteristics are as follows: Figure 4 shown.
[0028] After the introduction of HST, HST changes the system thermal output by storing and releasing heat while keeping the electrical output unchanged. Its operating area changes to AA'B'C1'C2'D'. The HST model is as follows:
[0029]
[0030] Where: are the charging and discharging powers of HST in period t respectively; is the efficiency of charging and discharging heat; HST (t), ΔP HST (t) is the HST capacity and thermal power during period t.
[0031] After IES introduces EB, EB can coordinate heating with HST while promoting wind power consumption, further expanding the CHP operation domain.
[0032]
[0033] Where: P EB (t), P EB,h (t) are the electrical power consumed and thermal power generated by EB during period t; η EB is the efficiency of EB; P EB,min , P EB,max is the minimum and maximum power of EB.
[0034] 4) Hydrogen energy multi-utilization unit operation framework
[0035] The hydrogen energy multiple utilization unit consists of an electrolyzer, a hydrogen fuel cell, a hydrogen storage tank, and a methane reactor. The BCCPP and hydrogen energy multiple utilization unit operation framework is as follows Figure 5 shown.
[0036] The electrolyzer can convert electrical energy into hydrogen energy, promoting the consumption of wind power. The electrolyzer model is as follows:
[0037] P EL (t) = η EL P ELin (t) (7);
[0038] Where: P ELin (t), P EL (t) are the input and output power of the electrolyzer during period t; η EL is the electrolyzer efficiency.
[0039] Hydrogen fuel cells can provide combined heat and power, converting hydrogen energy into electrical energy and thermal energy, as shown below:
[0040]
[0041] Where: P HFC (t) is the hydrogen fuel cell input power during period t; P HFCe (t), P HFCh (t) are the electrical and thermal power output of the hydrogen fuel cell during period t; η HFC,e , η HFC,h Respectively represent the electrical and thermal conversion efficiency of hydrogen fuel cells.
[0042] Considering the carbon-hydrogen coupling process, the CO2 captured by the carbon capture equipment is mixed with hydrogen to produce natural gas through a methane reactor.
[0043] P MR (t) = η MR P MRin (t) (9);
[0044] Where: P MRin (t), P MR (t) are the input and output power of the methane reactor during period t; η MR is the methane reactor efficiency.
[0045] The hydrogen storage tank can realize energy time shifting, which is modeled as follows:
[0046]
[0047] Where: is the hydrogen storage tank capacity, are the hydrogen storage and use power in period t respectively; η c , η d For the efficiency of hydrogen storage and use; They are the minimum and maximum capacities of the hydrogen storage tank respectively.
[0048] Step 2: Consider flexible resource standby equipment model
[0049] 1) IES scheduling framework considering flexible resource reserve
[0050] The two-stage random optimization scheduling scheme considering flexible resource backup is as follows: Figure 6 As shown in the figure. In the second stage, an adjustment strategy for dealing with wind power uncertainty is formulated based on the decision made in the first stage. In the second stage, the power balance in each wind power scenario is ensured through the adjustment of flexibility resources. The reserve deployment represents the reserve capacity value actually provided by the flexibility resources. The flexibility requirements of different systems are met by the energy adjustment of flexibility resources based on the energy coupling relationship of other energy systems.
[0051] 2) Thermal power and BCCPP reserve modeling
[0052] IES usually uses thermal power units to provide backup capacity to ensure safe and stable operation of the system. The backup model of thermal power units is as follows:
[0053]
[0054] Where: are the upper and lower spinning reserves of thermal power unit i in period t; P Gimax , P Gimin are the maximum and minimum power of thermal power unit i respectively; U Gi (t), P Gi (t) are the start / stop variables and output of thermal power unit i in period t; R Gi is the climbing power of thermal power unit i.
[0055] The BCCPP spinning reserve capacity of low-carbon flexible transformation needs to consider the net output power under the carbon capture energy consumption while considering the conventional thermal power reserve model. The reserve model is as follows:
[0056]
[0057] Where: They are the upper and lower reserve capacities of conventional thermal power in period t and considering the energy consumption of carbon capture; are the upper and lower spinning reserves of BCCPP in period t respectively; P BCmax , P BCmin are the maximum and minimum power of BCCPP respectively; R G is the climbing power of the thermal power unit; P N (t) is the net output power of BCCPP; U G (t) is the BCCPP start-stop variable; P Gmin , P Gmax They are the minimum and maximum output power of thermal power units respectively.
[0058] The above is the deterministic dispatch reserve capacity modeling. After considering the uncertainty of wind power, it is necessary to consider the relationship between the actual reserve capacity, that is, the second-stage reserve deployment, and the reserved reserve capacity. The second-stage reserve deployment modeling is as follows:
[0059]
[0060] Where: s represents the value of the variable in different scenarios; They are the upper and lower reserve deployment values of conventional thermal power in period t respectively; are the upper and lower backup deployment values of BCCPP in period t, respectively.
[0061] 3) Standby modeling considering CHP electric heating operation characteristics
[0062] CHP has electric-thermal operation characteristics, and the electric and thermal output power in its operation domain is closely related to the reserve capacity. The reserve model of CHP units is as follows:
[0063]
[0064] Where: are the upper and lower reserve capacities of CHP in period t respectively; U C (t) is the CHP start-stop variable during period t; R C is the CHP climbing power; P Cmax , P Cmin are the maximum and minimum output power of CHP respectively; P CHP,e (t) is the CHP electrical output power.
[0065] After determining the CHP reserve capacity in the first phase, the second phase determines the upper and lower reserve deployment and thermal adjustment size of the CHP under different scenarios. The CHP vertex coefficients are modeled as follows:
[0066]
[0067] Where: They are the vertex coefficient adjustment values of the upper and lower standby deployment processes in period t. The upper and lower standby deployment and thermal adjustment size of CHP are as follows:
[0068]
[0069] Where: are the upper and lower standby deployment values of CHP in period t, respectively; are the thermal regulation caused by the adjustment of the CHP vertex coefficient during period t; P CHPe,i (t), P CHPh,i (t) is the electrical and thermal power of each vertex in time period t.
[0070] 4) Flexible standby modeling of hydrogen energy multiple utilization units
[0071] Electrolyzers and hydrogen fuel cells are flexible resources that have the characteristics of rapidly changing energy consumption and can provide spinning reserve for the system.
[0072] The electrolyzer can convert wind power into hydrogen energy, which can be regarded as system load. When the energy consumption of the electrolyzer increases, it provides lower spinning reserve, and when the energy consumption decreases, it provides upper spinning reserve. Its reserve model is as follows:
[0073]
[0074] Where: are the upper and lower spare capacities of the electrolytic cell during period t; P ELmax , P ELmin are the maximum and minimum output power of the electrolyzer during period t; R EL is the climbing power of the electrolyzer.
[0075] The hydrogen energy produced by the electrolyzer will be stored in the hydrogen storage tank, and its backup capacity must take into account the impact of the hydrogen storage tank. Therefore, the backup model changes based on the above formula as follows:
[0076]
[0077] Where: It is the actual and spare capacity of the electrolyzer during period t.
[0078] The electrolyzer backup deployment is as follows:
[0079]
[0080] Where: They are the upper and lower standby deployment values of the electrolytic cell in period t respectively.
[0081] The hydrogen fuel cell backup model is shown below:
[0082]
[0083] Where: are the upper and lower reserve capacities of the hydrogen fuel cell during period t; P HFCmax , P HFCmin are the maximum and minimum output power of hydrogen fuel cells respectively; R HFC is the climbing power of hydrogen fuel cell; P HFCe (t) is the electrical power output of the hydrogen fuel cell during period t.
[0084] Hydrogen fuel cells can consume hydrogen energy in hydrogen storage tanks and convert it into electricity and heat energy. The backup model and the second-stage backup deployment model are as follows:
[0085]
[0086] Where: They are the actual and lower reserve capacities of the hydrogen fuel cell during period t respectively; are the upper and lower standby deployment values of the hydrogen fuel cell during period t; η cha is the hydrogen storage efficiency of the hydrogen storage tank.
[0087] Step 3: IES two-stage stochastic optimization scheduling model
[0088] 1) Objective function
[0089] The scheduling model takes the minimization of IES operating cost as the objective function, including two-stage operating costs, system carbon trading costs and carbon sequestration costs.
[0090]
[0091] Where: C is the total cost of operation within the IES scheduling cycle; S is the total number of scenarios; C1, C 2,s , C C , C F Respectively represent the total cost of the first stage, the adjustment cost under scenario s in the second stage, and the carbon trading and carbon storage costs; ρ s is the probability under different scenarios s.
[0092] ① First phase operating costs
[0093] The first stage cost C1 includes the operating cost of thermal power units C G 、CHP unit operating cost C CHP , Wind curtailment cost C W and gas purchase cost C Q .
[0094] C1=C G +C CHP +C W +C Q (25).
[0095] The costs of thermal power units, CHP units and other units are as follows:
[0096]
[0097] Where: T is the scheduling period; C GH , C CH are the coal consumption costs of thermal power and CHP respectively; C GR , C CR are thermal power and CHP reserve costs respectively; C GD is the sum of solvent loss and depreciation cost; C Gj They are respectively the BCCPP biomass energy purchase cost; They are the total upper and lower reserve capacity values of conventional thermal power in period t respectively; are the upper and lower reserve cost coefficients of thermal power, respectively; are the upper and lower reserve cost coefficients of CHP respectively; λ is the unit mass cost of biomass; m jg (t) is the quality of biomass purchased energy during period t; ω w ,ω g are the unit wind curtailment and gas purchase cost coefficients respectively; ΔP W (t), Q gas (t) are the abandoned air volume and purchased air volume in period t respectively.
[0098] ② Second stage adjustment costs
[0099] The second-stage cost is the flexibility resource adjustment cost taking into account the uncertainty of wind power, including the standby deployment cost, wind abandonment cost, gas purchase cost and load shedding cost under various scenarios.
[0100]
[0101] Where: C G,s , C CHP,s , C W,s , C Q,s , C load,s They are the total cost of thermal power units, total cost of CHP units, wind curtailment cost, gas purchase cost, and load shedding cost under scenario s; They are the total upper and lower standby deployments of conventional thermal power units in time period t under scenario s, respectively; are the upper and lower standby deployment cost coefficients of thermal power units respectively; are the upper and lower standby deployment cost coefficients of CHP respectively; ΔP W,s (t), ΔQ gas,s (t) are the wind curtailment and gas purchase regulation in period t under scenario s; ω d is the load shedding cost coefficient; ΔP load,s (t) is the load shedding amount in period t under scenario s.
[0102] ③Carbon trading costs
[0103] After the introduction of BCCPP, due to the existence of carbon cycle process in biomass, in order to reflect the low-carbon attribute of biomass energy, improve the clean alternative mechanism of biomass co-combustion power generation, and reduce system carbon emissions, the present invention introduces a step-by-step carbon trading and adopts a free allocation method to allocate the initial carbon quota. The carbon emission quota model is as follows:
[0104]
[0105] Where: E IES E is the carbon emission quota;G 、E CHP 、E GB They are the carbon emission quotas for thermal power, CHP and GB respectively; They are the standby deployment of thermal power, BCCPP and CHP in time period t under different weighted scenarios; They are the reserve deployment values of thermal power, BCCPP and CHP in time period t under different scenarios weights; are the upper and lower thermal regulation of CHP in different scenarios under different weights during period t; G , C , h are the carbon emission quotas per unit power of thermal power, CHP and gas boiler respectively; σ is the CHP thermal power conversion coefficient; ΔP GBh (t) is the weighted thermal regulation value of the GB scenario during period t.
[0106] Considering the low-carbon characteristics of biomass power generation and reducing pollution to the environment, the actual carbon quota model is as follows:
[0107]
[0108] Where: E IESa is the actual carbon emission quota; E Ga 、E CHPa 、E GBa are the actual carbon emissions of thermal power, CHP and GB respectively; δ G , δ C , δ h are the actual carbon emission coefficients per unit power of thermal power, CHP and gas boiler respectively; ψ(t) is the proportion of BCCPP coal-fired power output in period t.
[0109] Considering the amount of CO2 captured by carbon capture equipment, the actual amount of carbon trading that IES participates in is:
[0110]
[0111] Where: E C The carbon emissions involved in carbon trading.
[0112] The cost is calculated through tiered carbon trading. The tiered carbon trading model is as follows:
[0113]
[0114] In the formula: α is the price growth rate; l is the length of the carbon emission interval; λ is the carbon trading base price.
[0115] ④ Carbon storage costs
[0116] The amount of carbon stored is the amount of CO2 captured by the carbon capture equipment minus the amount of CO2 used in power-to-gas conversion. The cost of carbon storage is as follows:
[0117]
[0118] Where: ε is the unit CO2 price for storage; κ is the hydrogen-carbon conversion coefficient; ΔP MRin (t) is the weighted methane reactor adjustment value during period t.
[0119] 2) Constraints
[0120] ①First stage constraints
[0121] P e,load (t) = P GG (t)+P N (t)+(P W (t)-ΔP W (t))+P CHP,e (t)-P EB (t)-P ELin (t) (33);
[0122]
[0123] P g,load (t) = P g,buy (t)-P GB (t)+P MR (t) (35);
[0124]
[0125] Where: P e,load (t), P h,load1 (t), P g,load (t) are the electricity, heat and gas load values in period t respectively; P GG (t) is the total output of conventional thermal power in period t; P W (t) is the wind power output during period t; P GB (t), P GB,h (t) are the gas consumption and heat output of GB in period t.
[0126] For the heat network, there is a heat loss process, so its heat output and heat exchange are as follows:
[0127]
[0128] Where: P h,load (t) is the actual heat load value during period t; C W is the specific heat capacity of water; m he (t), m h(t) are the mass flow rates of the heat exchange station and the heat source during period t, respectively; are the supply water and return water temperatures of node n in period t respectively.
[0129] ②Second stage constraints
[0130] In the second phase, the uncertainty of wind power is balanced by the standby deployment of flexible resources. At the same time, flexible resources coordinate heat, gas and hydrogen regulation to ensure the power balance of different energy systems.
[0131]
[0132] ΔP GB,s (t) = ΔP gbuy,s (t)+ΔP MR,s (t) (40);
[0133]
[0134] Where: are the total upper and lower standby deployment values of conventional units in time period t under scenario s; P W,s (t), ΔP EB,s (t) are wind power output and electric boiler standby deployment value in period t under scenario s; P h,load,s (t) is the load value of period t under scenario s; ΔP EBh,s (t), ΔP GBh,s (t) are the thermal regulation values of the electric boiler EB and the gas boiler GB in the time period t under scenario s; ΔP GB,s (t), ΔP gbuy,s (t), ΔP MR,s (t), ΔP MRin,s (t) are respectively the gas consumption adjustment amount, gas purchase adjustment amount, methane reactor gas production adjustment amount and hydrogen consumption of the gas boiler GB in period t under scenario s; are the energy storage charging and discharging power of the heat storage tank HST in period t under scenario s, respectively; are respectively the energy storage charging and discharging power of the hydrogen storage tank in period t under scenario s;
[0135] The heat network constraints in uncertain scenarios are as follows:
[0136]
[0137] Where: are the supply water and return water temperatures of node n in period t under scenario s.
[0138] The energy storage constraints in the uncertain scenario are the same as those in the deterministic scenario. The constraints on thermal power units, wind power output, gas boilers, electric boilers, hydrogen energy multiple utilization units, and electricity, heat, and gas network constraints add changes in standby deployment or adjustment quantities based on the deterministic scenario.
[0139] Step 4: Complete the two-stage stochastic optimization scheduling of IES with the goal of minimizing IES operating costs, and complete the low-carbon scheduling of the energy system with coal-fired coupled power generation and flexible resource backup.
[0140] Through the above design scheme, the present invention can bring the following beneficial effects:
[0141] The present invention first introduces coal-fired coupled biomass power generation and carbon capture technology from the perspective of carbon substitution and carbon removal to achieve low-carbon and flexible transformation of thermal power units. Secondly, considering the uncertainty of wind power and the coupling relationship of electricity, heat, gas and hydrogen, a two-stage stochastic optimization scheduling model with flexible resource reserves is constructed to improve system flexibility. Finally, a step-by-step carbon trading is introduced to reflect the clean characteristics of "coal-fired +" coupled power generation, and the optimal output and spare capacity are obtained with the goal of minimizing the total system cost. The effectiveness of the proposed strategy is verified through case analysis.
[0142] Among them, after the thermal power units were transformed into biomass co-firing and carbon capture power plants, IES carbon emissions decreased by 710.12 tons, or 7.23%, and the total system cost decreased by 16,600 yuan, or 0.78%, promoting the low-carbon economic operation of the system; compared with the standby of thermal power units, considering a variety of flexibility resources to provide standby capacity can promote wind power consumption and reduce system operating costs, and its effectiveness has been verified through examples; IES coordinates a variety of flexibility resources through two-stage random optimization to obtain the optimal standby capacity. This method promotes wind power consumption while increasing its upper and lower standby capacities by 17.91% and 206.28% respectively, thereby improving system flexibility. BRIEF DESCRIPTION OF THE DRAWINGS
[0143] The present invention is further described below with reference to the accompanying drawings and specific embodiments:
[0144] Figure 1 It is an energy flow diagram of the comprehensive energy system in the low-carbon dispatching method of the energy system of coal-fired coupled power generation and flexible resource standby of the present invention;
[0145] Figure 2 This is a diagram of the direct biomass blending technology of the present invention;
[0146] Figure 3 This is a technical diagram of biomass co-combustion and carbon capture, utilization and storage coupling in the present invention;
[0147] Figure 4 This is a graph showing the electric heating operation characteristics after the CHP unit is integrated in the present invention;
[0148] Figure 5 This is the operating framework diagram of the BCCPP-hydrogen energy multiple utilization unit in the present invention;
[0149] Figure 6 This is a diagram of the IES scheduling architecture that takes into account flexible resource backup in the present invention;
[0150] Figure 7 is a structural diagram of an IES system in an embodiment of the present invention;
[0151] Figure 8 This is a diagram showing the operation results of a biomass co-firing carbon capture power plant in an embodiment of the present invention;
[0152] Fig. 9 It is an upward and downward standby deployment diagram for scenario 1 and scenario 2 in the embodiment of the present invention;
[0153] Fig.10 This is a diagram of upward and downward standby deployment for scenario 3 in an embodiment of the present invention;
[0154] Fig.11 This is an upward and downward standby deployment diagram for scenario 4 in an embodiment of the present invention;
[0155] Fig.12 This is an upward and downward standby deployment diagram for scenario 5 in an embodiment of the present invention;
[0156] Fig.13 It is the upper and lower standby deployment diagram of scenario 1 and scenario 5 in the embodiment of the present invention;
[0157] Fig.14 This is an output analysis diagram of a low-carbon and flexible thermal power unit in an embodiment of the present invention. DETAILED DESCRIPTION
[0158] Example:
[0159] This paper uses an improved IEEE-30-node power grid, a 6-node heat network, and a 6-node gas network for example analysis to verify the effectiveness of the proposed low-carbon scheduling strategy. Figure 7 As shown, the G1 unit was transformed into a BCCPP, and the rest are traditional thermal power units.
[0160] Wind power provides energy for IES, but its randomness and volatility bring great challenges to the system. The present invention generates 1,000 wind power output original scenario sets through Latin hypercube sampling, and then reduces the original scenario sets through the synchronous back-substitution reduction method based on probability distance, and finally obtains 5 wind power output scenarios and corresponding probabilities. After establishing the wind power uncertainty model, the impact of uncertainty on the system is balanced through the deployment of IES internal flexible resource backup.
[0161] Set up the following scenario for comparative analysis:
[0162] In scenario 1, thermal power units are the only resource to balance the uncertainty of wind power.
[0163] Scenario 2: The thermal power units are transformed into BCCPPs, which together with traditional thermal power units are resources for balancing the uncertainty of wind power.
[0164] Scenario 3: Based on Scenario 2, CHP and HST are used as additional backup resources and thermal regulation resources.
[0165] Scenario 4, based on Scenario 2, considers integrating CHP, EB and HST to provide backup resources and thermal regulation resources.
[0166] Scenario 5, based on Scenario 4, considers that the hydrogen energy multiple utilization unit and GB provide backup resources and thermal regulation resources, and the hydrogen storage tank serves as a hydrogen regulation resource.
[0167] Five scenarios are simulated and the cost comparison is shown in Table 1.
[0168] Table 1 Scheduling results under different scenarios
[0169]
[0170] Figure 8 The results of BCCPP operation show that after G1 is converted into BCCPP, the unit output consists of coal-fired power generation and biomass power generation, and the output includes net output and carbon capture energy consumption. Scenario 2 has the cost of transformation, which leads to an increase in thermal power costs, but due to the low-carbon characteristics of biomass power generation and carbon capture equipment, the system carbon emissions decreased by 701.12 tons, the carbon trading cost decreased, and the total cost decreased by 16,600 yuan compared with Scenario 1.
[0171] The expected values of upward and downward reserve deployment in all wind power scenarios in scenarios 1 and 2 are as follows: Fig. 9 As shown. The upper reserve deployment capacity of scenarios 1 and 2 is the same. In scenario 1, the upper spinning reserve is provided by G1, G2 and G3. In scenario 2, G1 is transformed into a biomass co-firing carbon capture power plant, which increases flexibility. The net output of G1 is reduced, and the output of traditional thermal power units is increased. In scenario 2, all the upper spinning reserves are provided by G1. Compared with G2 and G3 providing upper spinning reserves, part of G1's output is biomass power generation, which has a lower carbon characteristic.
[0172] In terms of downward reserve deployment, due to the decrease in net output after the transformation of G1, it is impossible to provide downward spinning reserve. The remaining traditional thermal power units increase their own output to ensure power balance, which can provide an increase in downward spinning reserve capacity. Therefore, scenario 2 provides an increase in downward spinning reserve capacity, which increases the reserve capacity by 36.2% compared to scenario 1, and reduces the wind curtailment cost by 19%, proving that after the transformation of G1, the system can provide more reserve capacity while having better low-carbon characteristics.
[0173] Scenario 3 takes into account the reserve characteristics of CHP and HST on the basis of Scenario 2. The expected value of reserve deployment is as follows: Fig.10 As shown in the figure. By exploiting the thermal regulation characteristics of HST, CHP can provide more backup capacity while ensuring thermal balance with HST through thermal regulation. Therefore, in scenario 3, CHP has a certain backup capacity in both upward and downward backup.
[0174] In terms of upper reserve deployment, due to the low-carbon transformation of G1, the traditional thermal power has reached the output limit, and the upper reserve is shared by G1 and CHP. In terms of lower reserve deployment, CHP, G2 and G3 jointly provide reserve deployment, and the available reserves in the 5-20 period have been greatly improved. Its reserve deployment has increased by 51.54% compared with scenario 1, the wind curtailment cost has decreased by 27.03% compared with scenario 1, and the total cost has decreased by 1.47% compared with scenario 1, making the system more flexible.
[0175] After the electric boiler is introduced in scenario 4, the upper and lower standby deployment is as follows: Fig.11 As shown, the system flexibility is improved and the system backup capacity is increased. Compared with scenario 3, the upward backup deployment in scenario 4 is jointly undertaken by G1, CHP and electric boilers, and the upward backup deployment is increased by 3.68%. In terms of downward backup deployment, it is jointly undertaken by electric boilers and CHP. Electric boilers have good flexibility and low backup deployment costs, so they are the main undertakers of downward backup deployment. The backup deployment in scenario 4 is increased by 42.05% compared with scenario 3. After the introduction of electric boilers, their total cost decreased by 6.36% and 4.96% compared with scenarios 1 and 3, respectively, and the wind abandonment cost decreased by 55.49% and 39% compared with scenarios 1 and 3, respectively, further improving the flexibility of the system.
[0176] Scenario 5 considers the hydrogen energy multiple utilization unit to provide system backup capacity, and adjusts hydrogen through hydrogen storage tanks, so that the system's available reserves are further increased. Fig.12 As shown in the figure, due to the good flexibility of electrolyzers and fuel cells, they bear more backup tasks in the upper and lower backup. CHP bears less backup capacity, and thermal power units do not need to provide backup capacity, which relieves the backup pressure of the two and improves the output range of the units.
[0177] After considering the backup capacity provided by multiple flexible resources, scenario 5 reduces carbon emissions by 1010.06 tons, or 10.29%, compared with scenario 1, and has the lowest total cost and wind curtailment cost. The total cost and wind curtailment cost are reduced by 11.32% and 84.04% respectively compared with scenario 1.
[0178] Fig.13The expected values of upward and downward reserve deployment for scenarios 1 and 5 under all wind power scenarios are shown. Compared with scenario 1, scenario 5 has a huge improvement in reserve capacity after considering the reserve of multiple flexible resources. The upper reserve is increased by 17.91% compared with scenario 1, and the lower reserve is increased by 206.28% compared with scenario 1, proving that considering the reserve of multiple flexible resources can further improve system flexibility and promote wind power consumption.
[0179] Analysis of the impact of synergistic carbon reduction of biomass energy and carbon capture:
[0180] Taking scenario 2 as an example, the synergistic carbon reduction of biomass energy utilization and carbon capture, utilization and storage is verified. The thermal power units with only carbon capture transformation are compared with BCCPP. Fig.14 It can be seen that the output of thermal power units is the same under the two transformation models, and BCCPP does not reduce the role of carbon capture. At the same time, due to the existence of biomass power generation in BCCPP, the clean characteristics of biomass energy are considered in the actual carbon quota model. Therefore, BCCPP has better low-carbon characteristics than carbon capture power plants. In the comparison of the two cases, the carbon emissions of the BCCPP system decreased by 206.86 tons compared with the former, proving that the "coal-fired +" coupled power generation and carbon capture technology can achieve synergistic carbon reduction of thermal power units.
[0181] The above-mentioned calculation example verification is an illustrative demonstration of the proposed patent, and is not a limitation of the proposed scheduling method. The low-carbon scheduling method of the integrated energy system considering "coal-fired +" coupled power generation and flexible resource reserve proposed in the present invention has a relatively wide applicability. For ordinary technicians in the field of power systems, other different forms of changes or modifications can be made on the basis of the above description, and the changes or modifications derived therefrom are still within the scope of protection of the invention.
Claims
1. A low-carbon dispatching method for an energy system of coal-fired coupled power generation and flexible resource standby, wherein the energy system of coal-fired coupled power generation and flexible resource standby is to transform the largest capacity thermal power unit in the traditional integrated energy system IES into a biomass co-combustion carbon capture power plant BCCPP, so that the IES is formed to achieve multi-energy system coupling through cogeneration CHP, gas boiler GB, electric boiler EB and hydrogen energy multi-utilization unit, the energy storage device of IES includes a heat storage tank HST and a hydrogen storage tank; the hydrogen energy multi-utilization unit is composed of an electrolyzer, a hydrogen fuel cell, a hydrogen storage tank and a methane reactor; the biomass co-combustion in the biomass co-combustion carbon capture power plant BCCPP adopts a direct biomass co-combustion method, and a carbon capture system is installed on the basis of the biomass co-combustion and coupled with the storage technology; its characteristics are: The process includes the following steps, which are performed in sequence: Step 1: Construct an integrated energy system operation model including coal-fired and biomass-coupled power generation 1) Construct a mathematical model of BCCPP under comprehensive and flexible operation mode; 2) Analyze and model the CHP electric heating operation characteristics; 3) Construct the operation model of BCCPP and hydrogen energy multi-utilization unit; Step 2: Build a device model that takes flexible resources into consideration The equipment model considering flexible resource flexible reserve includes two stages of modeling. The first stage is to model the deterministic dispatch reserve capacity. The second stage is to build various reserve deployment models based on the first stage to cope with wind power uncertainty. 1) Modeling of thermal power unit reserve model and BCCPP reserve capacity ①IES usually uses thermal power units to provide backup capacity to ensure safe and stable operation of the system. The backup model of thermal power units is as follows: Where: are the upper spinning reserve and lower spinning reserve of thermal power unit i in period t respectively; P Gimax , P Gimin are the maximum power and minimum power of thermal power unit i respectively; U Gi (t), P Gi (t) are the start / stop variables and output of thermal power unit i in period t; R Gi is the climbing power of thermal power unit i; ② The BCCPP spinning reserve capacity needs to consider the net output power under the carbon capture energy consumption while considering the conventional thermal power reserve model. The BCCPP reserve model is as follows: Where: They are the upper reserve capacity and lower reserve capacity of conventional thermal power in period t and considering the energy consumption of carbon capture, respectively; are the upper spinning reserve and lower spinning reserve of BCCPP in period t respectively; P BCmax , P BCmin are the maximum power and minimum power of BCCPP respectively; R G is the climbing power of the thermal power unit; P N (t) is the net output power of BCCPP; U G (t) is the BCCPP start-stop variable; P Gmin , P Gmax are the minimum and maximum output power of thermal power units respectively; 2) The backup deployment modeling of BCCPP is as follows: Where: s represents the value of the variable in different scenarios; They are the upper and lower reserve deployment values of conventional thermal power in period t respectively; are the upper and lower reserve deployment values of BCCPP in period t, respectively; 3) Standby modeling considering CHP electric heating operation characteristics CHP has electric-thermal operation characteristics. According to the relationship between the electric and thermal output power and the reserve capacity in its operation domain, the CHP unit reserve model is established as follows: Where: are the upper and lower reserve capacities of CHP in period t respectively; U C (t) is the CHP start-stop variable during period t; R C is the CHP climbing power; P Cmax , P Cmin are the maximum output power and minimum output power of CHP respectively; P CHP,e (t) is the CHP electrical output power; The CHP vertex coefficients are modeled as follows: Where: are the vertex coefficient adjustment values of the upper and lower standby deployment processes in period t, respectively; The upper and lower standby deployments and thermal adjustment sizes of CHP are as follows: Where: are the upper and lower standby deployment values of CHP in period t, respectively; are the thermal regulation caused by the adjustment of the CHP vertex coefficient during period t; P CHPe,i (t), P CHPh,i (t) are the electrical and thermal power of each vertex in period t; 4) Flexible standby modeling of hydrogen energy multiple utilization units When the energy consumption of the electrolyzer increases, a lower rotating reserve is provided, and when the energy consumption decreases, an upper rotating reserve is provided. The hydrogen energy produced by the electrolyzer will be stored in the hydrogen storage tank. Its reserve capacity must take into account the influence of the hydrogen storage tank. Therefore, the electrolyzer reserve model is as follows: Where: They are the actual and lower reserve capacities of the electrolyzer during period t respectively; are the upper and lower spare capacities of the electrolytic cell during period t; η d The hydrogen discharge efficiency of the hydrogen storage tank; The electrolyzer backup deployment is as follows: Where: are the upper and lower standby deployment values of the electrolyzer in period t, respectively; The hydrogen fuel cell backup model is shown below: Where: are the upper and lower reserve capacities of the hydrogen fuel cell during period t; P HFCmax , P HFCmin are the maximum and minimum output power of hydrogen fuel cells; R HFC is the climbing power of hydrogen fuel cell; P HFCe (t) is the output power of the hydrogen fuel cell during period t; Hydrogen fuel cells consume hydrogen energy in hydrogen storage tanks and convert it into electricity and heat energy. The backup model and the second-stage backup deployment model are as follows: Where: They are the actual and lower reserve capacities of the hydrogen fuel cell during period t respectively; are the upper and lower standby deployment values of the hydrogen fuel cell during period t; η cha The hydrogen storage efficiency of the hydrogen storage tank; Step 3: Construct IES two-stage stochastic optimization scheduling model 1) Objective function The IES two-stage stochastic optimization scheduling model takes the minimum IES operating cost as the objective function, including the two-stage operating cost, system carbon trading cost and carbon sequestration cost; Where: C is the total cost of operation within the IES scheduling cycle; S is the total number of scenarios; C1 represents the total cost of the first stage, C 2,s is the adjustment cost in the second stage scenario s; C C is the carbon trading cost; C F is the carbon sequestration cost; ρ s is the probability under different scenarios s; ① First phase operating costs The first stage cost C1 includes the operating cost of thermal power units C G 、CHP unit operating cost C CHP , Wind curtailment cost C W and gas purchase cost C Q ; C1=C G +C CHP +C W +C Q ; in, Where: T is the scheduling period; C GH is the coal consumption cost of thermal power units; C CH is the coal consumption cost of CHP unit; C GR is the standby cost of thermal power units, C CR is the standby cost of CHP unit; C GD is the sum of solvent loss and depreciation cost; C Gj The cost of purchasing energy from biomass for BCCPP; They are the total upper and lower reserve capacity values of conventional thermal power units in period t respectively; are the upper and lower standby cost coefficients of thermal power units respectively; are the upper and lower standby cost coefficients of CHP units respectively; λ is the unit mass cost of biomass; m jg (t) is the quality of biomass purchased energy during period t; ω w ,ω g are the unit wind abandonment cost coefficient and the unit gas purchase cost coefficient respectively; ΔP W (t), Q gas (t) are the abandoned air volume and purchased air volume in period t respectively; ② Second stage adjustment costs The second stage cost is the flexibility resource adjustment cost considering the uncertainty of wind power, including the standby deployment cost, wind abandonment cost, gas purchase cost and load shedding cost in each scenario, which is expressed as follows: Where: C G,s , C CHP,s , C W,s , C Q,s , C load,s They are the total cost of thermal power units, total cost of CHP units, wind curtailment cost, gas purchase cost, and load shedding cost under scenario s; They are the total upper and lower standby deployments of conventional thermal power units in time period t under scenario s, respectively; are the upper and lower standby deployment cost coefficients of thermal power units respectively; are the upper and lower standby deployment cost coefficients of CHP respectively; ΔP W,s (t), ΔQ gas,s (t) are the wind curtailment and gas purchase regulation in period t under scenario s; ω d is the load shedding cost coefficient; ΔP load,s (t) is the load shedding amount in period t under scenario s; ③Carbon trading costs Introducing tiered carbon trading, taking into account the low-carbon characteristics of biomass power generation and reducing environmental pollution, the actual carbon quota model is as follows: Where: E IESa is the actual carbon emission quota; E Ga 、E CHPa 、E GBa are the actual carbon emissions of thermal power units, CHP units and gas boilers GB respectively; They are the reserve deployment of thermal power, BCCPP and CHP in time period t under different weighted scenarios; They are the reserve deployment values of thermal power, BCCPP and CHP in time period t under different scenarios weights; are the upper and lower thermal regulation of CHP in different scenarios under different weights during period t; δ G , δ C , δ h are the actual carbon emission coefficients per unit power of thermal power, CHP and gas boiler respectively; ψ(t) is the proportion of BCCPP coal power output in period t; Considering the amount of CO2 captured by carbon capture equipment, the actual amount of carbon trading that IES participates in is: Where: E C E is the carbon emissions involved in carbon trading; IES For carbon emission quotas; The cost is calculated through tiered carbon trading. The tiered carbon trading model is as follows: In the formula: α is the price growth rate; l is the length of the carbon emission interval; λ is the carbon trading base price; ④ Carbon storage costs The amount of carbon stored is the amount of CO2 captured by the carbon capture equipment minus the amount of CO2 used in power-to-gas conversion. The cost of carbon storage is as follows: Where: ε is the unit CO2 price for storage; κ is the hydrogen-carbon conversion coefficient; ΔP MRin (t) is the weighted methane reactor adjustment value during period t; 2) Constraints ①First stage constraints: P e,load (t)=P GG (t)+P N (t)+(P W (t)-ΔP W (t))+P CHP,e (t)-P EB (t)-P ELin (t); P g,load (t)=P g,buy (t)-P GB (t)+P MR (t); Where: P e,load (t), P h,load1 (t), P g,load (t) are the electricity, heat and gas load values in period t respectively; P GG (t) is the total output of conventional thermal power in period t; P W (t) is the wind power output during period t; P GB (t), P GB,h (t) are the gas consumption and heat output of the gas boiler GB during period t; For the heat network, there is a heat loss process, so its heat output and heat exchange are as follows: Where: P h,load (t) is the actual heat load value during period t; C W is the specific heat capacity of water; m he (t), m h (t) are the mass flow rates of the heat exchange station and the heat source during period t; T n S (t), T n R (t) are the supply water and return water temperatures of node n in period t, respectively; ②Second stage constraints: In the second phase, the uncertainty of wind power is balanced by the standby deployment of flexible resources. At the same time, flexible resources coordinate heat, gas and hydrogen regulation to ensure the power balance of different energy systems: ΔP GB,s (t)=ΔP gbuy,s (t)+ΔP MR,s (t); Where: are the total upper and lower standby deployment values of conventional units in time period t under scenario s; P W,s (t), ΔP EB,s (t) are wind power output and electric boiler standby deployment value in period t under scenario s; P h,load,s (t) is the load value of period t under scenario s; ΔP EBh,s (t), ΔP GBh,s (t) are the thermal regulation values of the electric boiler EB and the gas boiler GB in the time period t under scenario s; ΔP GB,s (t), ΔP gbuy,s (t), ΔP MR,s (t), ΔP MRin,s (t) are respectively the gas consumption adjustment amount, gas purchase adjustment amount, methane reactor gas production adjustment amount and hydrogen consumption of the gas boiler GB in the t period under scenario s; are the energy storage charging and discharging power of the heat storage tank HST in period t under scenario s, respectively; are respectively the energy storage charging and discharging power of the hydrogen storage tank in period t under scenario s; In uncertain scenarios, the thermal network constraints are as follows: Where: are the supply water and return water temperatures of node n in time period t under scenario s, respectively; The energy storage constraints in the uncertain scenario are the same as those in the deterministic scenario. The thermal power unit constraints, wind power output constraints, gas boilers, electric boiler constraints, hydrogen energy multi-utilization unit constraints, and electricity, heat, and gas network constraints are based on the deterministic scenario and add changes in standby deployment or regulation. ③ Complete the two-stage random optimization scheduling of IES with the goal of minimizing IES operating costs, and complete the low-carbon scheduling of the energy system with coal-fired coupled power generation and flexible resource backup.
2. The method for installing and cleaning a home central fresh air system according to claim 1 is characterized by: In step 1, a BCCPP mathematical model under a comprehensive flexible operation mode is constructed, as follows: Where: E CO2 (t), E SBP (t), E BP (t) are the mass of CO2 captured by the power plant during period t, the mass of CO2 to be captured provided by the solution storage during period t, and the total amount of CO2 generated by the power plant during period t; β, ζ, and η are the carbon capture efficiency coefficient, the energy consumption coefficient of capturing unit CO2, and the maximum working coefficient of the regeneration tower and compressor, respectively; λ BP and ω represent the carbon emission intensity and flue gas diversion ratio of the power plant, respectively; P BPmax Indicates the maximum output power of the power plant; P BP (t) is the total output power of BCCPP during period t, P BP The formula for (t) is as follows: Where: P B (t), P C (t) are the biomass and coal outputs in period t respectively; P N (t), P D (t), P CCS (t) are the net output power, fixed energy consumption and carbon capture energy consumption in period t respectively; At the same time, in biomass direct coupled power generation, in order to ensure the safe and economical operation of thermal power units and reduce the cost of unit transformation, the biomass co-combustion ratio, that is, the ratio of biomass mass to total input mass, should not exceed 20%. BP (t) The following constraints must also be met: Where: κ(t) is the biomass co-combustion ratio during period t; Q B , Q C , Q m They are the calorific value of biomass, the calorific value of coal and the calorific value of the mixed combustion of the two.
3. The method for installing and cleaning a home central fresh air system according to claim 1 is characterized by: The specific method for analyzing and modeling the CHP electric heating operation characteristics in step 1 is as follows: CHP is characterized by an extraction unit, and its operating state is represented by a point in the feasible region composed of the ABCD area: Where: P CHP,e (t), P CHP,h (t) are the output electrical power and thermal power in period t respectively; f CHP (t) is the fuel cost of period t; υ represents the vertex set of the operation domain; α i (t) is the coefficient of each vertex in time period t; P CHPe,i (t), P CHPh,i (t) are the electric power and thermal power of each vertex in period t; f CHP,i (t) represents the fuel cost of each vertex in period t; The electric-thermal operation relationship of CHP is decoupled by introducing the heat storage tank HST and the electric boiler EB, thus expanding the CHP operation domain.
4. The method for installing and cleaning a home central fresh air system according to claim 1 is characterized by: The specific method for constructing the BCCPP and hydrogen energy multi-utilization unit operation model in step 1 is: ① The electrolytic cell model is as follows: P EL (t)=η EL P ELin (t); Where: P ELin (t), P EL (t) are the input and output power of the electrolyzer during period t; η EL is the electrolyzer efficiency; ② Hydrogen fuel cells provide combined heat and power, converting hydrogen energy into electrical energy and thermal energy. The expression is as follows: Where: P HFC (t) is the hydrogen fuel cell input power during period t; P HFCe (t), P HFCh (t) are the electrical power and thermal power output of the hydrogen fuel cell during period t; η HFC,e , η HFC,h They represent the electrical conversion efficiency and thermal conversion efficiency of hydrogen fuel cells respectively; ③ Considering the carbon-hydrogen coupling process, the CO2 captured by the carbon capture equipment and hydrogen are passed through a methane reactor to generate natural gas, which is expressed as follows: P MR (t)=η MR P MRin (t); Where: P MRin (t), P MR (t) are the input power and output power of the methane reactor in period t respectively; η MR is the methane reactor efficiency; ④ The hydrogen storage tank realizes energy time shift, and its modeling is as follows: Where: is the hydrogen storage tank capacity, are the hydrogen storage and use power in period t respectively; η c , η d For the efficiency of hydrogen storage and use; They are the minimum and maximum capacities of the hydrogen storage tank respectively.
Citation Information
Cited By
Collaborative optimization scheduling method and system considering energy storage frequency modulation reserve
CN120200259A
Optimized scheduling method and system for electric power system containing biomass blending combustion coal-fired unit
CN122092392A
Optimal dispatching method and system of power system with biomass blending combustion coal-fired unit
CN122092392B