Liquefied gas storage tank
By installing connecting paths and valve systems in the liquefied gas storage tank, the problem of excessive pressure rise in the space between the inner and outer tanks was solved, reliable connection control was achieved, and thermal insulation performance and safety were ensured.
Patent Information
- Application Number
- CN202280094347.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2022-04-13
- Publication Date
- 2024-11-12
AI Technical Summary
In double-shell tanks, excessive pressure rise in the space between the inner and outer tanks can cause gas condensation, affecting insulation performance. Existing technologies cannot reliably cut off the connection between the inner tank space and the space between the inner and outer tanks.
A connecting passage is installed in the liquefied gas storage tank, equipped with a first valve and a second valve. The first valve opens when the pressure in the space between the inner and outer tanks drops to a specified value, and the second valve is used to close the connecting passage in time when the first valve cannot be closed to prevent excessive pressure rise.
It effectively prevents excessive pressure rise in the space between the inner and outer tanks, avoids gas condensation, ensures thermal insulation performance and safety, and improves the stability of liquefied gas storage.
Smart Images

Figure CN118946499A_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to a liquefied gas storage tank. Background Art
[0002] In the past, as a tank for storing liquefied gas (for example, extremely low-temperature liquefied hydrogen), it has been proposed to use a double-shell tank having an inner tank and an outer tank. In a double-shell tank, high thermal insulation can be achieved by providing a space (space between the inner and outer tanks) outside the inner tank for storing the liquefied gas. Usually, the space between the inner and outer tanks is made into a vacuum layer, but in the case of a vacuum layer, it is difficult to manage in actual operation, such as maintaining the vacuum degree during long-term storage of liquefied gas, and the strength level required for the outer tank becomes higher. Therefore, a scheme has been proposed to introduce the gasified gas of the liquefied gas into the space between the inner and outer tanks by connecting the space inside the inner tank with the space between the inner and outer tanks (for example, refer to Patent Document 1).
[0003] Prior art literature
[0004] Patent Literature
[0005] Patent Document 1: International Publication No. 2020 / 202578 Summary of the invention
[0006] Problems to be solved by the invention
[0007] However, when the vaporized gas is introduced into the space between the inner and outer tanks, there is a possibility that the pressure in the space between the inner and outer tanks will rise excessively and become higher than the saturated vapor pressure at the temperature of the space inside the inner tank, thereby causing gas condensation near the inner tank wall surface. In order to prevent this, it is necessary to prevent the vaporized gas from excessively flowing from the space inside the inner tank into the space between the inner and outer tanks.
[0008] In order to solve the above-mentioned problems, an object of the present disclosure is to reliably cut off the communication between the space inside the inner tank and the space between the inner and outer tanks as required in a liquefied gas storage tank having a double structure.
[0009] Means for solving problems
[0010] In order to achieve the above-mentioned object, the liquefied gas storage tank of the present invention is a tank for storing liquefied gas, wherein the liquefied gas storage tank comprises: a tank body, which has an inner tank and an outer tank, the inner tank forming a storage space for the liquefied gas on the inner side, the outer tank covering the inner tank, and forming a space filled with gas after gasification of the liquefied gas between the outer tank and the inner tank; a connecting passage, which connects the space in the inner tank with the space between the inner and outer tanks; a first valve, which is provided in the connecting passage and is set to open when the pressure in the space between the inner and outer tanks decreases to a specified value or when the difference between the pressure in the space between the inner and outer tanks and the pressure in the space in the inner tank decreases to a specified value; and a second valve, which is provided in series with the first valve in the connecting passage and is configured to be able to open and close the connecting passage.
[0011] The present disclosure also includes any combination of at least two configurations disclosed in the claims and / or the specification and / or the drawings. In particular, any combination of more than two of the claims of the claims is included in the present disclosure. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] The present disclosure can be more clearly understood from the following description of preferred embodiments with reference to the accompanying drawings. However, the embodiments and the accompanying drawings are for illustration and description only and are not intended to determine the scope of the present disclosure. The scope of the present disclosure is determined by the appended claims. In the drawings, the same reference numerals in multiple drawings represent the same or equivalent parts.
[0013] Figure 1 This is a schematic diagram showing an example of a liquefied gas storage tank according to an embodiment of the present disclosure.
[0014] Figure 2A Yes Figure 1 A schematic diagram of a portion of a liquefied gas storage tank is enlarged to show one usage of the tank.
[0015] Figure 2B Yes Figure 1 A schematic diagram showing an enlarged portion of a liquefied gas storage tank to illustrate another usage of the tank. DETAILED DESCRIPTION
[0016] Hereinafter, preferred embodiments of the present disclosure will be described with reference to the accompanying drawings. Figure 1 A liquefied gas storage tank (hereinafter, simply referred to as a "tank") 1 according to one embodiment of the present disclosure is shown. The tank 1 includes a tank body 3 as a portion storing liquefied gas LG, a communication path 5 described later, a first valve 7, and a second valve 9.
[0017] In the example shown in the figure, the tank 1 is installed on a ship S such as a liquefied gas storage ship. In addition, in this specification, a "liquefied gas storage ship" refers to a ship having a function of storing liquefied gas LG. The liquefied gas storage ship in this embodiment is a liquefied gas transport ship. In addition to liquefied gas transport ships, liquefied gas storage ships also include, for example, liquefied gas fuel ships, refueling ships that supply liquefied gas to other ships, etc. However, the tank 1 disclosed in the present invention can also be installed in liquefied gas storage equipment other than ships, such as liquefied gas storage equipment on land and equipment using liquefied gas.
[0018] The liquefied gas LG stored in the tank 1 is, for example, liquefied ammonia (LNH3, about -33°C), liquefied petroleum gas (LPG, about -45°C), liquefied ethylene gas (LEG, about -100°C), liquefied natural gas (LNG, about -160°C), liquefied hydrogen (LH2, about -250°C), and liquefied helium (LHe, about -270°C). In the present embodiment, liquefied hydrogen is stored in the tank 1.
[0019] The tank 1 is configured as a double-shell tank having an inner tank 11 and an outer tank 13. Specifically, the tank body 3 has: the inner tank 11, which forms a storage space 15 for the liquefied gas LG on the inner side (hereinafter referred to as "the inner tank inner space"); and the outer tank 13, which covers the inner tank 11 and forms a space filled with the gasified gas of the liquefied gas LG between the outer tank 13 and the inner tank 11 (hereinafter referred to as "the inner and outer tank space") 17. The outer peripheral surfaces of the inner tank 11 and the outer tank 13 can be covered with a heat-proof layer. The tank 1 is stably operated in a state where the gasified gas of the liquefied gas is sealed in the inner and outer tank space 17 as a heat-insulating layer.
[0020] In this embodiment, the tank body 3 includes a main body 3a as a portion for storing liquefied gas LG and a dome portion 3b protruding upward from the main body 3a. In this example, the main body 3a is covered by a tank cover 23 as a portion of the hull 21 of the ship S. An opening is formed on the top wall of the tank cover 23, through which the dome portion 3b is inserted. The dome portion 3b protrudes upward from the opening of the tank cover 23, that is, is exposed.
[0021] The dome portion 3b has a cylindrical side wall 25 extending substantially in the vertical direction and a substantially hemispherical cover 27 that closes the upper opening of the side wall 25. Various pipes such as a plurality of delivery pipes 29 for delivering (unloading) the liquefied gas LG to the tank 1 are installed on the dome portion 3b. In addition, in this figure, only one delivery pipe 29 is shown for simplicity. In this embodiment, the delivery pipe 29 penetrates the cover 27 of the dome portion 3b substantially in the vertical direction.
[0022] In addition, in this figure, the above-mentioned delivery pipe 29 is shown as an example of a pipe extending to the outside of the tank 1 through the dome portion 3b, and such a pipe includes various pipes such as a delivery pipe for vaporized gas.
[0023] In the present embodiment, a connecting passage 5 is provided to connect the inner tank space 15 with the inner and outer tank space 17. The gasified gas BG of the liquefied gas LG generated in the inner tank space 15 is introduced into the inner and outer tank space 17 at an appropriate timing via the connecting passage 5. In addition, although not shown in the figure, a gas introduction passage for introducing the gasified gas BG from an external liquefied gas source into the inner and outer tank space 17 may be connected to the connecting passage 5, or may be provided independently of the connecting passage 5.
[0024] In the present embodiment, a first valve 7 is provided on the communication passage 5, and the first valve 7 is set to open when the pressure of the space 17 between the inner and outer tanks is reduced to a specified value (hereinafter referred to as the "first specified pressure value"), or when the difference between the pressure of the space 17 between the inner and outer tanks and the pressure of the inner tank space 15 is reduced to a specified value (hereinafter referred to as the "first specified pressure difference"). Specifically, in the example shown in the figure, as the first valve 7, a safety valve is used which is set to automatically open when the pressure difference is greater than the first specified pressure difference. The first valve 7 is configured to close when the pressure of the space 17 between the inner and outer tanks rises to a specified pressure difference relative to the pressure of the inner tank space 15 (hereinafter referred to as the "second specified pressure difference") or less.
[0025] In the present embodiment, a second valve 9 different from the first valve 7 is further provided in series with the first valve 7 on the communication passage 5. The second valve 9 is configured as a valve capable of opening and closing the communication passage 5. The second valve 9 is provided for the following purpose: after the first valve 7 is opened, when the pressure of the space 15 in the inner tank relative to the pressure of the space 17 between the inner and outer tanks decreases to a second predetermined pressure difference or less but the first valve 7 is not closed, the communication passage 5 is closed.
[0026] Specifically, in the present embodiment, the second valve 9 is configured as a remote-operated valve. The remote-operated valve may be any valve as long as it is a valve that is electrically opened and closed according to a control signal, such as an electric valve, a solenoid valve, or a diaphragm-operated valve. By using a remote-operated valve as the second valve 9, the second valve 9 can be closed in a short time after detecting that the first valve 7 is not closed when it should be closed. However, the second valve 9 may not be a remote-operated valve. That is, the second valve 9 may also be a valve that can be closed by direct operation.
[0027] In this example, the second valve 9 is provided on the primary side of the first valve 7. By configuring in this way, the second valve 9 is closed on the upstream side of the first valve 7, so that the communication between the inner tank space 15 and the inner and outer tank space 17 can be more reliably cut off. However, the second valve 9 may be provided on the secondary side of the first valve 7. In addition, in the example shown in the figure, only one second valve 9 is provided, but a plurality of second valves 9 may be provided. In this case, the second valve 9 may be provided on the primary side and the secondary side of the first valve 7, respectively. In addition, a plurality of the communication passage 5 and the first valve 7 may be provided.
[0028] In the present embodiment, a gas discharge path 31 is provided to discharge the gas in the space 17 between the inner and outer tanks to the outside of the tank 1. A third valve 33 set to open at a predetermined pressure or above is provided on the gas discharge path 31. The third valve 33 is configured as a safety valve that automatically opens at a predetermined pressure or above. By providing the third valve 33 on the gas discharge path 31, it is possible to prevent the pressure in the space 17 between the inner and outer tanks from becoming excessively high. However, the third valve 33 may be omitted.
[0029] In addition, if Figure 1 As shown, in this embodiment, the tank 1 has: an inner tank space pressure detection device 35 for detecting the pressure of the inner tank space 15; an inner tank space pressure detection device 37 for detecting the pressure of the inner tank space 17; an inner tank space temperature detection device 39 for detecting the temperature of the inner tank space 15; and an inner tank space temperature detection device 41 for detecting the temperature of the inner tank space 17. These detection devices include: a sensor element that detects the physical quantity (pressure, temperature) of the detection object; various circuits that perform necessary processing such as signal conversion processing and calculation processing on the acquired detection quantity; a memory for storing information required for these processing; a power supply circuit for receiving power supply from a power supply element such as a battery or the outside; and a transmission circuit for transmitting an output signal to the outside in a wired or wireless manner; etc. In addition, in addition to these detection devices, various detection devices required for the operation of the tank 1 can be provided in the tank 1. In addition, the detection devices 35, 37, 39, and 41 illustrated above are not necessarily provided, and only the devices required for the operation of the tank 1 can be provided among these detection devices.
[0030] By setting the second valve 9, as Figure 2A As shown in FIG. 1 , after the first valve 7 is opened, the gasified gas BG in the inner tank space 15 flows into the inner and outer tank space 17, and the pressure of the inner and outer tank space 17 rises to less than the second predetermined pressure difference relative to the pressure of the inner tank space 15, and the first valve 7 cannot be closed even if it is closed manually, and the communication path 5 is still open. Figure 2B As shown, by closing the communication passage 5 using the second valve 9, it is possible to prevent the pressure in the space 17 between the inner and outer tanks from exceeding a predetermined operating pressure and rising excessively.
[0031] When the pressure in the space 17 between the inner and outer tanks rises excessively, there is a possibility that the pressure in the space 17 between the inner and outer tanks becomes higher than the saturated vapor pressure at the temperature of the inner tank space 15, and gas condensation may occur near the wall surface of the inner tank 11 in the space 17 between the inner and outer tanks. In this case, there is a concern that the heat insulation performance of the space 17 between the inner and outer tanks may be reduced, and the temperature of the outer tank 13 may be reduced, resulting in condensation of gas around the outer tank 13. In addition, when the third valve 33 is provided on the gas exhaust path 31 of the space 17 between the inner and outer tanks as in the present embodiment, as shown in FIG. Figure 2A As shown, if the communication passage 5 is kept open, there is a possibility that the pressure of the space 17 between the inner and outer tanks reaches the working pressure of the third valve 33 and the gasified gas BG is continuously released to the outside through the third valve 33. By closing the communication passage 5 with the second valve 9, as shown in FIG. Figure 2B As shown, such a situation can be avoided.
[0032] In this embodiment, the first valve 7 and the second valve 9 are located above the base end 3ba of the dome portion 3b, that is, the boundary between the main body 3a and the dome portion 3b. More specifically, in this embodiment, the first valve 7 and the second valve 9 are located on the side of the dome portion 3b.
[0033] Specifically, in this example, a part of the communication pipe forming the communication passage 5 is exposed to the outside of the dome portion 3b from the side wall 25 of the portion of the dome portion 3b protruding upward from the tank cover 23. The first valve 7 and the second valve 9 are provided on the exposed portion of the communication passage 5 located on the side of the dome portion 3b. As described above, the delivery pipe 29 of the liquefied gas LG passes upward from the cover 27 of the dome portion 3b. This is because it is preferable to efficiently arrange the pipes and the pipe accessories such as various valves in the limited space of the dome portion 3b, arrange the pipes having the necessary diameters for transferring the liquefied gas LG as the cargo of the tank 1 within the required loading and unloading time, and simplify the structure of the pipes as much as possible. In this case, by arranging the communication passage 5 and the various valves provided in the communication passage 5 on the side of the dome portion 3b, the pipes on the upper part of the tank 1 can be efficiently arranged. Although it is not necessary to arrange the first valve 7 and the second valve 9 in this way, it is preferable that at least one of the first valve 7 and the second valve 9 is located on the side of the dome portion 3b.
[0034] The positions of the first valve 7 and the second valve 9 are not limited to the above-described examples. For example, one or both of the first valve 7 and the second valve 9 may be located above the dome portion 3b or below the base end 3ba of the dome portion 3b.
[0035] In the present embodiment, the third valve 33 is also located above the base end 3ba of the dome portion 3b of the tank 1, specifically, located on the side of the dome portion 3b. However, the arrangement of the third valve 33 is not limited to this example. In addition, the arrangement of the delivery pipe 29 is not limited to the example shown in the figure. In addition, it is not essential to provide the dome portion 3b on the tank 1.
[0036] In the method of using the tank 1 of the present embodiment described above, when the first valve 7 is open, the second valve 9 is closed according to the pressure or temperature of at least one of the inner tank space 15 and the inner and outer tank space 17. Figure 1 The first valve 7 is judged not to be closed as set by the pressure value detected by any one or both of the inner tank space pressure detection device 35 and the inner and outer tank space pressure detection device 37, and the second valve 9 is closed. Alternatively, or in addition to the pressure detection, the first valve 7 is judged not to be closed by the temperature value detected by any one or both of the inner tank space temperature detection device 39 and the inner and outer tank space temperature detection device 41, and the second valve 9 is closed. In this way, by making a judgment based on at least one of the pressure and temperature of the inner tank space 15 and / or the inner and outer tank space 17, the second valve can be closed at an appropriate time.
[0037] In addition, Figure 1 In the figure, as an example of the tank 1, an independent double-shell tank 1 formed independently from the hull 21 is shown, but the structure of the tank 1 is not limited to this example, and any type of multi-layer heat-resistant structure tank 1 can be used. For example, the tank 1 can be a type of tank 1 formed integrally with the hull 21. In addition, the multi-layer heat-resistant structure of the tank 1 can be a structure with three or more layers.
[0038] According to the liquefied gas storage tank 1 of the present embodiment described above, in addition to the first valve 7, the second valve 9 capable of closing when the first valve 7 cannot be closed is provided on the communication path 5. Therefore, after the first valve 7 is opened, when the pressure of the space 17 between the inner and outer tanks rises to a second predetermined pressure difference or less relative to the pressure of the space 15 in the inner tank and the first valve 7 cannot be closed even if it is closed manually, and the communication path 5 is still open, the second valve 9 can be used to close the communication path 5, thereby preventing the pressure of the space 17 between the inner and outer tanks from exceeding the predetermined operating pressure and rising excessively.
[0039] In the liquefied gas storage tank 1 of the present embodiment, the second valve 9 may be a remote-operated valve. According to this configuration, the second valve 9 can be closed in a short time after detecting that the first valve 7 is not closed when it should be closed.
[0040] In the liquefied gas storage tank 1 of this embodiment, the second valve 9 may be provided on the primary side of the first valve 7. With this structure, the second valve 9 is closed on the upstream side of the first valve 7, so that the communication between the inner tank space 15 and the inner and outer tank space 17 can be more reliably cut off.
[0041] In the liquefied gas storage tank 1 of the present embodiment, the tank body 3 may include a main body 3a as a portion for storing the liquefied gas LG and a dome portion 3b protruding upward from the main body 3a, and the first valve 7 and the second valve 9 may be located above the base end 3ba of the dome portion 3b. Furthermore, at least one of the first valve 7 and the second valve 9 may be located to the side of the dome portion 3b. According to this structure, including the arrangement of other piping such as piping for gas transportation provided in the tank 1, the space around the tank 1 can be efficiently utilized.
[0042] The liquefied gas storage tank 1 of the present embodiment may also include: a gas discharge path 31 for discharging the gas in the inner and outer tank space 17 to the outside; and a third valve 33 provided on the gas discharge path 31 and opened when the pressure in the inner and outer tank space 17 becomes equal to or higher than a predetermined value. According to this structure, it is possible to more reliably prevent the pressure in the inner and outer tank space 17 from becoming excessive.
[0043] The method of using the liquefied gas storage tank 1 of the present embodiment is a method of using the above-mentioned liquefied gas storage tank 1, including the following actions: when the first valve 7 is opened, the second valve 9 is closed based on at least one of the pressure and temperature of at least one of the space in the inner tank 15 and the space between the inner and outer tanks 17. According to this structure, by making a judgment based on at least one of the pressure and temperature of the space in the inner tank 15 and / or the space between the inner and outer tanks 17, the second valve can be closed at an appropriate time.
[0044] As described above, the preferred embodiments of the present disclosure have been described with reference to the drawings, but various additions, changes, or deletions can be made without departing from the gist of the present disclosure. Therefore, such structures are also included in the scope of the present disclosure.
[0045] Description of symbols
[0046] 1: liquefied gas storage tank; 3: tank body; 3a: main body; 3b: dome; 3ba: base end of dome; 5: connecting passage; 7: first valve; 9: second valve; 11: inner tank; 13: outer tank; 15: space inside inner tank; 17: space between inner and outer tanks; BG: gasified gas; LG: liquefied gas.
Claims
1. A liquefied gas storage tank, which is a tank for storing liquefied gas, in, The liquefied gas storage tank has: a tank body having an inner tank and an outer tank, wherein the inner tank forms a storage space for the liquefied gas inside, and the outer tank covers the inner tank, and a space filled with gas after liquefied gas is formed between the outer tank and the inner tank; A connecting passage, which connects the space inside the inner tank with the space between the inner and outer tanks; a first valve provided in the communication passage and set to open when the pressure of the space between the inner and outer tanks drops to a predetermined value or when the difference between the pressure of the space between the inner and outer tanks and the pressure of the space in the inner tank drops to a predetermined value; as well as The second valve is provided in series with the first valve in the communication passage and is configured to be able to open and close the communication passage.
2. The liquefied gas storage tank according to claim 1, in, The second valve is a remotely operated valve.
3. The liquefied gas storage tank according to claim 1 or 2, in, The second valve is disposed on the primary side of the first valve.
4. The liquefied gas storage tank according to any one of claims 1 to 3, in, The tank body includes a main body portion as a portion for storing the liquefied gas and a dome portion protruding upward from the main body portion. The first valve and the second valve are located above the base end of the dome.
5. The liquefied gas storage tank according to claim 4, in, At least one of the first valve and the second valve is located on a side of the dome.
6. The liquefied gas storage tank according to any one of claims 1 to 5, in, The liquefied gas storage tank also has: a gas exhaust passage for exhausting the gas in the space between the inner and outer grooves to the outside; and The third valve is provided in the gas exhaust passage and is set to open when the pressure of the space between the inner and outer tanks reaches a predetermined value or more.
7. A method for using a liquefied gas storage tank, comprising using the liquefied gas storage tank according to any one of claims 1 to 6, in, The operating method of the liquefied gas storage tank includes the following steps: when the first valve is open, closing the second valve based on at least one of the pressure and temperature of at least one of the space inside the inner tank and the space between the inner and outer tanks.