Road and bridge construction measuring system and method

By designing a road bridge construction measurement system, the motor-driven cleaner and vacuum cleaner automatically cleans the impurities in the connecting holes of the bridge pier and the support platform, solving the problem of low manual cleaning efficiency in the existing technology, and achieving automated hole cleaning and depth Measurement improves construction efficiency and quality.

CN118950542AInactive Publication Date: 2024-11-15WUHAN CANGQIONG ELECTRONICS INSTR
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411443274.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-16
Publication Date
2024-11-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the prior art, the process of tearing and cleaning the connecting holes between the bridge pier and the support table by manually using tools is poor, and it is necessary to manually measure the hole depth, resulting in large workload and low efficiency.

Method used

A road bridge construction measurement system is designed, including prefabricated piers, bottom frames, lift plates, cleaners and control mechanisms. The cleaner is driven by a motor and the counterweight and vacuum cleaner are used to automatically clean impurities in the hole to achieve hole depth measurement.

Benefits of technology

It improves cleaning efficiency and accuracy, reduces manual operation, realizes automated impurity cleaning and depth measurement in holes, and improves construction efficiency and quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118950542A_ABST
    Figure CN118950542A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of measurement, particularly relates to a road bridge construction measurement system and method, and aims to solve the problems that the cleaning effect is poor when a tool is manually used for bridge chiseling in the prior art and the workload is large and the efficiency is low when the depths of holes are manually measured one by one. The device comprises a prefabricated bridge pier and a bottom frame arranged on the prefabricated bridge pier, a positioning groove matched with the prefabricated bridge pier is formed in the bottom frame, and a plurality of first guide rods are arranged at the top of the bottom frame in a penetrating and sliding mode. In addition, the first guide rod can be fixed to the bottom frame, so that measurement and cleaning are more stable, a corresponding cleaner can be automatically controlled to rotate through a normally-closed switch on a balancing weight for cleaning, use is more convenient, and meanwhile it can be judged that the depth of a hole is qualified according to start and stop of the cleaner.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of measurement technology, and in particular to a road and bridge construction measurement system and method. Background Art

[0002] At present, prefabricated piers and abutments of bridge structures are usually connected in the following ways: one is the through-hole connection type, that is, metal sleeves and steel bars are reserved at the bottom of the prefabricated pier and the top of the abutment respectively. After the steel bars and the metal sleeves are accurately positioned and sleeved, grouting is injected into the metal sleeves to form a whole; the other is the cast-in-place type, that is, connecting steel bars are reserved at the bottom of the prefabricated pier and the top of the abutment respectively. After the pier body is hoisted into place, the connecting steel bars of the two are tied or welded on site, and then the connecting part is formworked and concrete is poured in situ to form the pier and the abutment as a whole.

[0003] For the through-hole connection method between prefabricated bridge piers and caps, the steel bars and metal sleeves need to be precisely aligned, which requires high construction technology, such as the position and depth of the holes. In addition, during the pouring process, the inner wall will be bonded with concrete, which will affect the installation efficiency and quality.

[0004] The existing cleaning method is to chisel manually using tools, which has a poor cleaning effect. After cleaning, impurities in the hole need to be cleaned, and after cleaning, the depth of the hole needs to be measured manually one by one, which not only has a large workload but also has low efficiency. Summary of the invention

[0005] The purpose of the present invention is to solve the problems in the prior art that the cleaning effect is poor by manually using tools to chisel, and impurities in the hole need to be cleaned after cleaning. After cleaning, the depth of the hole needs to be measured manually one by one, which not only has a large workload but also has low efficiency. A road and bridge construction measurement system and method are proposed.

[0006] In order to achieve the above object, the present invention adopts the following technical solutions: A road bridge construction measurement system, comprising a prefabricated bridge pier and a bottom frame arranged on the prefabricated bridge pier, wherein the bottom frame is provided with a positioning groove adapted to the prefabricated bridge pier, a plurality of first guide rods are slidably provided through the top of the bottom frame, a same lifting plate is fixedly provided on the top of the plurality of first guide rods, a cleaner corresponding to the mounting hole on the prefabricated bridge pier is provided through the lifting plate, a motor is provided on the lifting plate, and the output end of the motor is transmission-connected with the cleaner to provide rotational power for the cleaner; A second guide rod corresponding to the cleaner is fixedly provided on the top of the lifting plate, and a plurality of the second guide rods are fixedly provided with a same lifting plate on the top for hanging on the lifting equipment. A counterweight block is provided on the sliding sleeve of the outer wall of the second guide rod, and the cleaner is rotatably provided on the corresponding counterweight block to increase the descending power of the cleaner; A control mechanism is arranged on the lifting plate and connected to the output end of the motor, and is used to automatically drive the cleaner to rotate to clean the mounting hole and measure the hole depth according to the situation in the mounting hole; The fixing mechanism is arranged in the bottom frame and is used in conjunction with the first guide rod. During the measurement process, the bottom frame is automatically fixed to the prefabricated bridge pier, and the first guide rod is fixed to the bottom frame at the same time.

[0007] In a possible design, the control mechanism includes a mounting seat fixed on the top of the lifting plate, an electromagnetic clutch corresponding to the cleaner is fixedly provided through the top of the mounting seat, the output end of the motor is transmission-connected to the input ends of multiple electromagnetic clutches, the outer wall sliding sleeve of the cleaner is provided with a third rotating ring, the third rotating ring is rotatably provided on the lifting plate, a travel switch used in conjunction with the lifting plate is provided at the bottom of the counterweight block, the travel switch is connected to the electromagnetic clutch through a wire, and is used to control the start and stop of the electromagnetic clutch, and the travel switch is in a disconnected state after the counterweight block contacts the lifting plate, and is in an open state when the counterweight block does not contact the lifting plate.

[0008] In a possible design, the input end of the electromagnetic clutch and the output end of the motor are both fixedly sleeved with sprockets, the outer walls of the multiple sprockets are transmission-connected with the same chain, the output end of the electromagnetic clutch is fixedly sleeved with a first gear, and the outer wall of the counterweight block is fixedly sleeved with a second gear meshing with the first gear.

[0009] In a possible design, the cleaner includes a second rotating ring that is rotatably arranged in the counterweight block, a sleeve is fixedly arranged in the second rotating ring, a groove is formed on the outer wall of the sleeve, a first rotating ring is rotatably arranged in the groove, a plurality of cleaning blocks corresponding to the grooves on the outer side of the mounting hole are fixedly arranged on the outer wall of the first rotating ring, a diamond ring for grinding impurities is fixedly arranged on the outer wall of the bottom end of the sleeve, and the bottom of the cleaning block is flush with the diamond ring, and a third spring is arranged on the outer wall of the counterweight block, and the two ends of the third spring respectively contact the mutually close sides of the lifting plate and the second rotating ring.

[0010] In a possible design, a second magnet is embedded in the outer end of the cleaning block, and a first magnet used in conjunction with the second magnet is embedded in the inner walls on both sides of the bottom frame.

[0011] In a possible design, the fixing mechanism includes two rectangular holes opened on one side of the bottom frame, two fixing rods are fixedly provided in the rectangular holes, the outer walls of the two fixing rods are slidingly sleeved with the same sliding plate, a plurality of abutment rods are fixedly provided on one side of the sliding plate, and the plurality of abutment rods all penetrate the inner side of the bottom frame, a wedge bar used in conjunction with the sliding plate is fixedly provided on the outer wall of the first guide rod, and during the process of the wedge bar descending, the abutment rod on the sliding plate is driven to approach the prefabricated bridge pier, thereby fixing the bottom frame on the prefabricated bridge pier, and a first spring is sleeved on the outer wall of the fixing rod, and the two ends of the first spring are respectively fixedly connected to the rectangular hole and the side of the sliding plate close to each other.

[0012] In a possible design, fixed seats are fixed on both sides of the bottom frame, fixed blocks are fixed in the fixed seats, the same pin is slidably provided through the fixed block and one side of the bottom frame, the outer wall fixing sleeve of the pin is provided with a limiting ring for limiting the pin, the outer wall sleeve of the pin is provided with a second spring, the two ends of the second spring are respectively fixedly connected to the limiting ring and the side of the fixed block close to each other, and a positioning hole used in conjunction with the pin is opened on one side of the wedge strip for fixing the lifting plate after it is lowered into place.

[0013] In a possible design, a guide wheel is rotatably provided on the inner wall of the fixing seat, and a same pull rope is provided between the two guide wheels on the same side and the fixing seat. The two ends of the pull rope are respectively fixedly connected to two pins for pulling the pins to release the fixation of the lifting plate.

[0014] In a possible design, a first connecting head is rotatably provided on the top of multiple sleeves on the same side, a second connecting head is rotatably provided on the top of the sleeve on one side, two vacuum cleaners are fixedly provided on the top of the lifting plate, and the second connecting head and the first connecting head, the cleaning block and the first connecting head, and the first connecting head and the vacuum cleaner are all connected by a telescopic tube for cleaning out impurities in the mounting hole.

[0015] A method for using a road and bridge construction measurement system comprises the following steps: S1. First, lift the device with a lifting device and place the bottom frame on the prefabricated bridge pier until the positioning groove contacts the prefabricated bridge pier, and then continue to lower it; S2. During the downward lowering process, the wedge bar moves downward to drive the support rod to approach the prefabricated bridge pier to clamp the prefabricated bridge pier; S3. When there is a foreign object in the hole, the cleaner will be driven to move upwards during the downward placement process, which can drive the counterweight block away from the lifting plate, and at the same time start the motor and the electromagnetic clutch, the motor can drive the output end of the electromagnetic clutch to rotate, and the output end of the electromagnetic clutch drives the cleaner to rotate through the first gear and the second gear to grind the foreign object in the hole, and the cleaning block can punch and clean the long strip holes on the side; S4. During the grinding process, start the vacuum cleaner to suck out the foreign matter in the hole; S5. After the cleaning is completed, the counterweight block contacts the lifting plate, and the corresponding electromagnetic clutch is automatically controlled to be powered off. At this time, the depth measurement of the hole is completed; S6. When the depth of the hole is not up to standard, the counterweight block does not contact the lifting plate, and the corresponding electromagnetic clutch is always started to drive the cleaner to rotate.

[0016] In the present application, first, the lifting ring on the lifting plate is hung on the lifting device, and the device is lifted by the lifting device, and the bottom frame is placed on the prefabricated bridge pier to be inspected until the positioning groove contacts the prefabricated bridge pier, and then the bottom frame is further lowered; During the downward lowering process, the lifting plate will move downward under the action of gravity, driving the first guide rod to slide downward in the bottom frame, and the wedge strip can be driven downward during the sliding process. During the downward movement of the wedge strip, the sliding plate can be driven to move on the fixed rod through the inclined surface, and the pin column can be squeezed to move outward. The movement of the sliding plate can drive the multiple resisting rods to move, so that the multiple resisting rods on both sides are close to the prefabricated bridge pier to clamp the prefabricated bridge pier. At the same time, during the downward movement, the position of the cleaning block can be adjusted through the first magnet in the bottom frame and the second magnet in the cleaning block, so that the cleaning block corresponds to the corresponding hole to be detected; When there is a foreign object in the hole, it will interfere with the cleaner during the downward placement process, and the lifting plate continues to move downward, causing the cleaner to move upward in the lifting plate, which can drive the counterweight block away from the lifting plate. At this time, the travel switch on the counterweight block is turned on, so that the corresponding electromagnetic clutch is energized and the motor is started. The motor can drive the output ends of multiple electromagnetic clutches to rotate through the sprocket and the chain. The output end of the electromagnetic clutch drives the third rotating ring to rotate through the first gear and the second gear. The rotation of the third rotating ring can drive the sleeve to rotate. The rotation of the sleeve can grind the foreign object in the hole, and the cleaning block can clean the long strip holes on the side. When it drops to the lowest point, the pin corresponds to the positioning hole on the wedge strip. At this time, the pin can be reset and moved under the action of the second spring and inserted into the corresponding positioning hole to limit the wedge strip. During the grinding process, start the vacuum cleaner to suck out the foreign matter in the hole and store it temporarily in the vacuum cleaner; After cleaning, the counterweight block contacts the lifting plate, the travel switch on the counterweight block is closed, and the corresponding electromagnetic clutch is automatically controlled to cut off the power. At this time, the depth measurement of the hole is completed, which means it is qualified; When the depth of the hole is not up to standard, the counterweight block does not contact the lifting plate, the travel switch on the counterweight block is always open, and the electromagnetic clutch will continue to drive the cleaner to rotate; After the measurement is completed, pulling the ropes on both sides outward can drive the two pins on the same side to move outward and disengage them from the corresponding positioning holes, and the lifting plate can be driven upward by the lifting equipment. The upward movement of the lifting plate can drive the lifting plate upward, so that the cleaner is away from the detection hole. At this time, all the counterweights are in contact with the lifting plate, and the corresponding electromagnetic clutch is powered off. When the wedge bar is away from the sliding plate, the sliding plate can reset and move under the action of the first spring, driving the push rod away from the prefabricated pier, and continuing to start the lifting equipment to drive the bottom frame away from the prefabricated pier.

[0017] Beneficial effects: In the present invention, the road and bridge construction measurement system can fix the bottom frame on the prefabricated bridge pier during the inspection process by arranging a sliding plate used in conjunction with a wedge strip in the bottom frame, and can also limit the height of the lifting plate through the positioning holes and pins on the wedge strip after it is lowered into place, so that the cleaner will not move up and down when cleaning the hole wall, and can effectively clean the hole; In the present invention, the road and bridge construction measurement system is provided with a travel switch used in conjunction with a lifting plate on the counterweight block, so that when there are impurities in the hole, the corresponding electromagnetic clutch is automatically started to drive the cleaner to rotate, so as to clean the hole wall, and the cleaned impurities can also be sucked out by a vacuum cleaner, which is faster and cleaner than manual cleaning. In the present invention, the road and bridge construction measurement system is provided with a cleaning block on the sleeve so that the side hole wall can be cleaned during the descent process, thereby further improving the cleaning effect. A diamond ring is provided on the sleeve so that impurities can be ground and easily sucked out by a vacuum cleaner. In the present invention, by hoisting the device on the prefabricated bridge pier, during the placement process, not only the bottom frame can be fixed on the prefabricated bridge pier, but also the first guide rod can be fixed on the bottom frame, so that measurement and cleaning are more stable, and the travel switch on the counterweight block can automatically control the corresponding cleaner to rotate for cleaning, which is more convenient to use. At the same time, it can be judged whether the depth of the hole is qualified according to the start and stop of the cleaner. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 A schematic diagram of the three-dimensional structure of a road and bridge construction measurement system proposed by the present invention; Figure 2 A schematic diagram of the lifting plate structure of a road and bridge construction measurement system proposed by the present invention; Figure 3 A schematic diagram of the lifting plate structure of a road and bridge construction measurement system proposed by the present invention with the lifting plate removed; Figure 4 This is a schematic diagram of the cross-sectional structure of a bottom frame of a road and bridge construction measurement system proposed by the present invention; Figure 5 A schematic diagram of the pin column installation structure of a road and bridge construction measurement system proposed by the present invention; Figure 6 A schematic diagram of the structure of a cleaner for a road and bridge construction measurement system proposed by the present invention; Figure 7 This is a schematic diagram of the partial cross-sectional structure of a cleaner of a road and bridge construction measurement system proposed by the present invention.

[0019] In the figure: 1, prefabricated bridge pier; 2, bottom frame; 3, first guide rod; 4, lifting plate; 5, second guide rod; 6, lifting plate; 7, cleaner; 8, pull rope; 9, vacuum cleaner; 10, counterweight; 11, wedge; 12, mounting seat; 13, electromagnetic clutch; 14, motor; 15, sprocket; 16, chain; 17, first gear; 18, second gear; 19, positioning groove; 20, rectangular hole; 21, fixing rod; 22, sliding plate; 2 3. First spring; 24. Push rod; 25. First magnet; 26. Fixed seat; 27. Fixed block; 28. Pin; 29. ​​Limiting ring; 30. Second spring; 31. Guide wheel; 32. Sleeve; 33. Cleaning block; 34. First connector; 35. Second connector; 36. Telescopic tube; 37. First rotating ring; 38. Second magnet; 39. Emery ring; 40. Third spring; 41. Second rotating ring; 42. Third rotating ring. DETAILED DESCRIPTION

[0020] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0021] Example 1: Reference Figure 1-Figure 7 A measuring system comprises: a prefabricated bridge pier 1 and a bottom frame 2 arranged on the prefabricated bridge pier 1, a positioning groove 19 adapted to the prefabricated bridge pier 1 is arranged in the bottom frame 2, a plurality of first guide rods 3 are slidably provided through the top of the bottom frame 2, a same lifting plate 4 is fixedly provided on the top of the plurality of first guide rods 3, a cleaner 7 corresponding to the mounting hole on the prefabricated bridge pier 1 is penetrated through the lifting plate 4, a motor 14 is arranged on the lifting plate 4, and the output end of the motor 14 is transmission-connected with the cleaner 7 to provide rotational power for the cleaner 7; A second guide rod 5 corresponding to the cleaner 7 is fixedly provided on the top of the lifting plate 4, and a same lifting plate 6 is fixedly provided on the top of the plurality of second guide rods 5 for hanging on the lifting equipment. A counterweight block 10 is slidingly sleeved on the outer wall of the second guide rod 5, and the cleaner 7 is rotatably provided on the corresponding counterweight block 10 to increase the descending power of the cleaner 7; The control mechanism is arranged on the lifting plate 4 and connected to the output end of the motor 14, and is used to automatically drive the cleaner 7 to rotate to clean the mounting hole and measure the hole depth according to the situation in the mounting hole; The fixing mechanism is arranged in the bottom frame 2 and is used in conjunction with the first guide rod 3. During the measurement process, the bottom frame 2 is automatically fixed to the prefabricated pier 1, and the first guide rod 3 is fixed to the bottom frame 2. The bottom frame 2 is placed on the prefabricated pier 1 by driving the lifting plate 6 through the lifting equipment until the prefabricated pier 1 contacts the positioning groove 19, and then continues to be placed downward. During the placement process, the first guide rod 3 can drive the fixing mechanism to fix the bottom frame 2 on the prefabricated pier 1, and the first guide rod 3 is fixed to the bottom frame 2. During the placement process, the control mechanism can automatically control the motor 14 to drive the corresponding cleaner 7 to rotate and clean according to the situation in the installation hole, and the hole depth can be detected, which is more convenient to use.

[0022] The control mechanism includes a mounting seat 12 fixed on the top of the lifting plate 4, an electromagnetic clutch 13 corresponding to the cleaner 7 is fixedly provided on the top of the mounting seat 12, the output end of the motor 14 is transmission-connected with the input end of multiple electromagnetic clutches 13, the outer wall sliding sleeve of the cleaner 7 is provided with a third rotating ring 42, the third rotating ring 42 is rotatably provided on the lifting plate 4, and a travel switch used in conjunction with the lifting plate 4 is provided at the bottom of the counterweight 10. The travel switch is connected to the electromagnetic clutch 13 through a wire and is used to control the start and stop of the electromagnetic clutch 13. After the counterweight 10 contacts the lifting plate 4, the travel switch is in a disconnected state, and when the counterweight 10 does not contact the lifting plate 4, the travel switch is in an open state. In the process of placing the lifting plate 4 by the hoisting equipment, the cleaner 7 can be driven to move downward. When there are many impurities in the hole , the lifting plate 4 continues to move downward, while the cleaner 7 does not move downward, and can drive the counterweight 10 away from the lifting plate 4. At this time, the travel switch on the counterweight 10 is turned on, and the corresponding electromagnetic clutch 13 is controlled to be attracted, and the rotation of the motor 14 can drive the electromagnetic clutch 13 to rotate. The rotation of the electromagnetic clutch 13 can drive the corresponding third rotating ring 42 to rotate through the output end. The rotation of the third rotating ring 42 can drive the cleaner 7 to rotate to clean the impurities in the hole, and after the cleaning is completed, the cleaner 7 is completely located in the hole. At this time, the counterweight 10 contacts with the lifting plate 4, and the corresponding cleaner 7 is automatically controlled to stop rotating. When the depth of the hole is unqualified, the counterweight 10 will not contact with the lifting plate 4, and the cleaner 7 continues to rotate. According to the rotation of the cleaner 7, it can be judged whether the depth of the hole is qualified or unqualified.

[0023] The fixing mechanism includes two rectangular holes 20 opened on one side of the bottom frame 2, two fixing rods 21 are fixed in the rectangular holes 20, the outer walls of the two fixing rods 21 are slidably sleeved with the same sliding plate 22, a plurality of stop rods 24 are fixed on one side of the sliding plate 22, and the plurality of stop rods 24 all penetrate the inner side of the bottom frame 2, a wedge strip 11 used in conjunction with the sliding plate 22 is fixed on the outer wall of the first guide rod 3, and the stop rod 24 on the sliding plate 22 is driven to approach the prefabricated bridge pier 1 during the descending process of the wedge strip 11, so as to fix the bottom frame 2 on the prefabricated bridge pier 1, and the outer wall of the fixing rod 21 A first spring 23 is sleeved, and both ends of the first spring 23 are fixedly connected to the rectangular hole 20 and the side of the sliding plate 22 that are close to each other. When the lifting plate 4 moves downward, the first guide rod 3 can be driven to move downward. The downward movement of the first guide rod 3 can drive the wedge bar 11 to move downward. When the wedge bar 11 contacts the sliding plate 22, it will drive the sliding plate 22 to move on the fixed rod 21, and can simultaneously drive multiple support rods 24 on both sides to approach the prefabricated pier 1, so that the bottom frame 2 can be fixed on the prefabricated pier 1, and shaking can be avoided during the cleaning process.

[0024] The bottom frame 2 is fixed with a fixing seat 26 on both sides, and a fixing block 27 is fixed in the fixing seat 26. The fixing block 27 and one side of the bottom frame 2 are slidably provided with a same pin 28. The outer wall fixing sleeve of the pin 28 is provided with a limiting ring 29 for limiting the pin 28. The outer wall sleeve of the pin 28 is provided with a second spring 30. The two ends of the second spring 30 are respectively fixedly connected to the limiting ring 29 and the side close to each other of the fixing block 27. One side of the wedge strip 11 is provided with a positioning hole used in conjunction with the pin 28 for fixing the lifting plate 4 after it is lowered into place. During the downward movement of the wedge strip 11, the pin 28 can be driven to move outward and squeeze the second spring 30 through the limiting ring 29. When the lifting plate 4 is lowered into place, the positioning hole on the wedge strip 11 corresponds to the pin 28. At this time, the pin 28 can be reset and moved under the action of the second spring 30 and inserted into the corresponding positioning hole, so that the lifting plate 4 can be fixed after it is lowered into place.

[0025] A first connecting head 34 is rotatably provided on the top of multiple sleeves 32 on the same side, a second connecting head 35 is rotatably provided on the top of the sleeve 32 on one side, and two vacuum cleaners 9 are fixedly provided on the top of the lifting plate 4. The second connecting head 35 and the first connecting head 34, the cleaning block 33 and the first connecting head 34, and the first connecting head 34 and the vacuum cleaner 9 are all connected by a telescopic tube 36, which is used to clean out impurities in the mounting hole. By starting the vacuum cleaner 9, the cleaned impurities in the mounting hole can be sucked out, so that manual cleaning is not required, and the use is more convenient.

[0026] The present application can be used in the measurement field, and can also be used in other fields applicable to the present application.

[0027] Example 2: Reference Figure 1-Figure 7 , improved on the basis of Example 1: a road and bridge construction measurement system, which is applied to the field of bridge construction, the input end of the electromagnetic clutch 13 and the output end of the motor 14 are fixedly sleeved with a sprocket 15, the outer walls of multiple sprockets 15 are transmission-connected with the same chain 16, the output end of the electromagnetic clutch 13 is fixedly sleeved with a first gear 17, and the outer wall of the counterweight block 10 is fixedly sleeved with a second gear 18 meshing with the first gear 17. When the motor 14 is started, it can drive the input ends of multiple electromagnetic clutches 13 to rotate through the sprocket 15 and the chain 16. When the electromagnetic clutch 13 is started, the input end will drive the output end, and drive the corresponding counterweight block 10 to rotate through the first gear 17 and the second gear 18, and the cleaner 7 is slidably arranged in the counterweight block 10, so that the cleaner 7 can be driven to rotate through the counterweight block 10.

[0028] The cleaner 7 includes a second rotating ring 41 that is rotatably arranged in the counterweight 10, a sleeve 32 is fixedly arranged in the second rotating ring 41, a groove is provided on the outer wall of the sleeve 32, a first rotating ring 37 is rotatably arranged in the groove, a plurality of cleaning blocks 33 corresponding to the grooves outside the mounting hole are fixedly arranged on the outer wall of the first rotating ring 37, a diamond ring 39 for grinding impurities is fixedly sleeved on the outer wall of the bottom end of the sleeve 32, and the bottom of the cleaning block 33 is flush with the diamond ring 39, and a third spring 40 is sleeved on the outer wall of the counterweight 10, and the two ends of the third spring 40 are respectively connected to the lifting plate 4 and the second rotating ring 41, which are close to each other. The third rotating ring 42 can drive the sleeve 32 to rotate during rotation, and the rotation of the sleeve 32 can drive the emery ring 39 to rotate. During the rotation of the emery ring 39, impurities in the mounting hole can be polished, and the emery ring 39 can move downward under the gravity of the counterweight 10, and can resist the counterweight 10 through the third spring 40, so that the cleaner 7 is more stable during rotation, and can drive the cleaning block 33 to clean in the corresponding side mounting hole during downward movement, making the cleaning cleaner, and the sleeve 32 and the emery ring 39 can be used separately for cleaning and measuring of circular mounting holes.

[0029] A second magnet 38 is embedded in the outer end of the cleaning block 33, and a first magnet 25 used in conjunction with the second magnet 38 is embedded in the inner walls of both sides of the bottom frame 2. When the cleaning block 33 moves downward, the position of the cleaning block 33 can be controlled by the magnetic force between the first magnet 25 and the second magnet 38, thereby preventing the cleaning block 33 from being misaligned with the side mounting holes during the descent.

[0030] A guide wheel 31 is rotatably provided on the inner wall of the fixing seat 26, and a pull rope 8 is provided between the two guide wheels 31 and the fixing seat 26 on the same side. The two ends of the pull rope 8 are respectively fixedly connected to two pins 28 for pulling the pins 28 to release the fixation of the lifting plate 4. By pulling the pull rope 8 outward, the two pins 28 on one side can be driven to move outward at the same time, so that the pins 28 are away from the positioning holes on the wedge bar 11, and the fixation of the wedge bar 11 is released. At this time, the electromagnetic clutch 13 can slide on the bottom frame 2.

[0031] A method for using a road and bridge construction measurement system comprises the following steps: S1. First, lift the device by hoisting equipment, and place the bottom frame 2 on the prefabricated bridge pier 1 until the positioning groove 19 contacts the prefabricated bridge pier 1, and then continue to lower it; S2, during the downward lowering process, the wedge strip 11 moves downward to drive the support rod 24 to approach the prefabricated bridge pier 1 to clamp the prefabricated bridge pier 1; S3, when there is a foreign object in the hole, the cleaner 7 will be driven to move upward during the downward placement process, which can drive the counterweight block 10 away from the lifting plate 4, and at the same time start the motor 14 and the electromagnetic clutch 13, the motor 14 can drive the output end of the electromagnetic clutch 13 to rotate, and the output end of the electromagnetic clutch 13 drives the cleaner 7 to rotate through the first gear 17 and the second gear 18 to grind the foreign object in the hole, and the cleaning block 33 can punch and clean the long strip hole on the side; S4, during the grinding process, the vacuum cleaner 9 is started to suck out the foreign matter in the hole; S5, after the cleaning is completed, the counterweight block 10 contacts the lifting plate 4, and the corresponding electromagnetic clutch 13 is automatically controlled to be powered off, and the depth measurement of the hole is completed; S6. When the depth of the hole is unqualified, the counterweight 10 does not contact the lifting plate 4, and the corresponding electromagnetic clutch 13 is always started to drive the cleaner 7 to rotate.

[0032] However, as is well known to those skilled in the art, the working principles and wiring methods of the vacuum cleaner 9, electromagnetic clutch 13 and motor 14 are commonplace, and are conventional means or common knowledge, and will not be elaborated here. Those skilled in the art can make any optional selections according to their needs or convenience.

[0033] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A road and bridge construction measurement system, characterized in that: The invention comprises a bottom frame (2) arranged on a prefabricated bridge pier (1), wherein a positioning groove (19) adapted to the prefabricated bridge pier (1) is arranged in the bottom frame (2), a plurality of first guide rods (3) are slidably provided through the top of the bottom frame (2), a same lifting plate (4) is fixedly provided on the top of the plurality of first guide rods (3), a cleaner (7) corresponding to the mounting hole on the prefabricated bridge pier (1) is penetrated through the lifting plate (4), a motor (14) is arranged on the lifting plate (4), and the output end of the motor (14) is connected to the cleaner (7) in a transmission manner to provide a rotational power for the cleaner (7); A second guide rod (5) corresponding to the cleaner (7) is fixedly provided on the top of the lifting plate (4); a plurality of second guide rods (5) are fixedly provided with a same lifting plate (6) on the top for hanging on a lifting device; a counterweight block (10) is slidingly sleeved on the outer wall of the second guide rod (5); the cleaner (7) is rotatably provided on the corresponding counterweight block (10) to increase the descending power of the cleaner (7); A control mechanism is disposed on the lifting plate (4) and connected to the output end of the motor (14), and is used to automatically drive the cleaner (7) to rotate to clean the mounting hole and measure the hole depth according to the situation in the mounting hole; The fixing mechanism is arranged in the bottom frame (2) and is used in conjunction with the first guide rod (3) to automatically fix the bottom frame (2) to the prefabricated bridge pier (1) during the measurement process, and simultaneously fix the first guide rod (3) to the bottom frame (2).

2. A road and bridge construction measurement system according to claim 1, characterized in that: The control mechanism comprises a mounting seat (12) fixedly arranged on the top of the lifting plate (4); an electromagnetic clutch (13) corresponding to the cleaner (7) is fixedly arranged through the top of the mounting seat (12); the output end of the motor (14) is transmission-connected with the input ends of the plurality of electromagnetic clutches (13); a third rotating ring (42) is provided on the outer wall sliding sleeve of the cleaner (7); the third rotating ring (42) is rotationally arranged on the lifting plate (4); a travel switch for use with the lifting plate (4) is provided at the bottom of the counterweight (10); the travel switch is connected to the electromagnetic clutch (13) through a wire and is used to control the start and stop of the electromagnetic clutch (13); the travel switch is in an off state after the counterweight (10) contacts the lifting plate (4); and the travel switch is in an on state when the counterweight (10) does not contact the lifting plate (4).

3. A road and bridge construction measurement system according to claim 2, characterized in that: The input end of the electromagnetic clutch (13) and the output end of the motor (14) are both fixedly sleeved with sprockets (15); the outer walls of the plurality of sprockets (15) are transmission-connected with a same chain (16); the output end of the electromagnetic clutch (13) is fixedly sleeved with a first gear (17); and the outer wall of the counterweight (10) is fixedly sleeved with a second gear (18) meshing with the first gear (17).

4. A road and bridge construction measurement system according to claim 1, characterized in that: The cleaner (7) comprises a second rotating ring (41) which is rotatably arranged in the counterweight (10), a sleeve (32) being fixedly arranged in the second rotating ring (41), an outer wall of the sleeve (32) being provided with a groove, a first rotating ring (37) being rotatably arranged in the groove, a plurality of cleaning blocks (33) corresponding to the grooves outside the mounting hole being fixedly arranged on the outer wall of the first rotating ring (37), a diamond ring (39) for grinding impurities being fixedly sleeved on the outer wall of the bottom end of the sleeve (32), and the bottom of the cleaning block (33) is flush with the diamond ring (39), and a third spring (40) is sleeved on the outer wall of the counterweight (10), and two ends of the third spring (40) respectively abut against the mutually adjacent sides of the lifting plate (4) and the second rotating ring (41).

5. A road and bridge construction measurement system according to claim 4, characterized in that: A second magnet (38) is embedded at the outer end of the cleaning block (33), and first magnets (25) for use with the second magnet (38) are embedded on the inner walls on both sides of the bottom frame (2).

6. A road and bridge construction measurement system according to claim 1, characterized in that: The fixing mechanism comprises two rectangular holes (20) opened on one side of the bottom frame (2), two fixing rods (21) are fixedly arranged in the rectangular holes (20), the outer walls of the two fixing rods (21) are slidingly sleeved with the same sliding plate (22), a plurality of stop rods (24) are fixedly arranged on one side of the sliding plate (22), the plurality of stop rods (24) all penetrate the inner side of the bottom frame (2), a wedge strip (11) used in conjunction with the sliding plate (22) is fixedly arranged on the outer wall of the first guide rod (3), and the stop rods (24) on the sliding plate (22) are driven to approach the prefabricated bridge pier (1) during the process of the wedge strip (11) descending, thereby fixing the bottom frame (2) on the prefabricated bridge pier (1), and a first spring (23) is sleeved on the outer wall of the fixing rod (21), and the two ends of the first spring (23) are respectively fixedly connected to the rectangular hole (20) and the sliding plate (22) on the side close to each other.

7. A road and bridge construction measurement system according to claim 6, characterized in that: A fixing seat (26) is fixedly provided on both sides of the bottom frame (2), a fixing block (27) is fixedly provided inside the fixing seat (26), a same pin (28) is slidably provided through the fixing block (27) and one side of the bottom frame (2), a limiting ring (29) for limiting the position of the pin (28) is provided on the outer wall fixing sleeve of the pin (28), a second spring (30) is provided on the outer wall sleeve of the pin (28), two ends of the second spring (30) are respectively fixedly connected to the limiting ring (29) and the side of the fixing block (27) close to each other, and a positioning hole for use with the pin (28) is provided on one side of the wedge strip (11), so as to fix the lifting plate (4) after it is lowered into place.

8. A road and bridge construction measurement system according to claim 7, characterized in that: A guide wheel (31) is rotatably provided on the inner wall of the fixing seat (26), and a pull rope (8) is provided between the two guide wheels (31) and the fixing seat (26) on the same side. The two ends of the pull rope (8) are respectively fixedly connected to two pins (28) for pulling the pins (28) to release the fixing of the lifting plate (4).

9. A road and bridge construction measurement system according to claim 4, characterized in that: A first connecting head (34) is rotatably provided on the tops of a plurality of sleeves (32) on the same side, a second connecting head (35) is rotatably provided on the top of the sleeve (32) on one side, two vacuum cleaners (9) are fixedly provided on the top of the lifting plate (4), and the second connecting head (35) and the first connecting head (34), the cleaning block (33) and the first connecting head (34), and the first connecting head (34) and the vacuum cleaner (9) are all connected via telescopic tubes (36) for cleaning out impurities in the mounting hole.

10. A method for using a road and bridge construction measurement system according to any one of claims 1 to 9, characterized in that: The following steps are involved: S1. First, the device is lifted by a lifting device, and the bottom frame (2) is placed on the prefabricated bridge pier (1) until the positioning groove (19) contacts the prefabricated bridge pier (1), and then the bottom frame (2) is lowered; S2, during the downward lowering process, the wedge strip (11) moves downward to drive the support rod (24) to approach the prefabricated bridge pier (1) and clamp the prefabricated bridge pier (1); S3, when there is a foreign object in the hole, the cleaner (7) is driven to move upwards during the downward placement process, which can drive the counterweight (10) away from the lifting plate (4), and at the same time start the motor (14) and the electromagnetic clutch (13), the motor (14) can drive the output end of the electromagnetic clutch (13) to rotate, and the output end of the electromagnetic clutch (13) drives the cleaner (7) to rotate through the first gear (17) and the second gear (18), so as to grind the foreign object in the hole, and the cleaning block (33) can punch and clean the long strip hole on the side; S4, during the grinding process, the vacuum cleaner (9) is started to suck out foreign matter in the hole; S5, after the cleaning is completed, the counterweight (10) contacts the lifting plate (4), automatically controlling the corresponding electromagnetic clutch (13) to be powered off, and the depth measurement of the hole is now completed; S6. When the depth of the hole is unqualified, the counterweight (10) does not contact the lifting plate (4), and the corresponding electromagnetic clutch (13) is always activated to drive the cleaner (7) to rotate.

Citation Information

Patent Citations

  • Bridge gas residue removing device with dust collecting device and using method of device

    CN104652325A

  • Polyurethane screen mold cleaner

    CN219357231U

  • Automatic cleaning device for valve hole of middle cover of lead-acid storage battery

    CN220635462U