T-shaped shear wall formwork and construction method of T-shaped shear wall

By designing a T-shaped shear wall mold with pre-buried steel bar groups and trusses, the problems of large amount of steel bar binding and material waste on site are solved, efficient production and material utilization are achieved, and building area and stiffness are improved.

CN118952446APending Publication Date: 2024-11-15GUANGDONG HAILONG CONSTR TECH CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411128525.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-16
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The existing prefabricated shear walls used in concrete modular buildings have the problem that steel bars require a large amount of on-site binding, and prefabricated wall forms are only used as formwork, which wastes materials and occupies indoor area.

Method used

A T-shaped shear wall wall mold is designed, including a relatively arranged first mold shell and a second mold shell. The internal structure is pre-buried with steel bar groups and trusses to form prefabricated components, and the production efficiency is improved through automated binding or welding. The first mold shell is made into a structural stress-bearing member.

Benefits of technology

The amount of on-site steel bar binding and welding is reduced, production efficiency and material utilization is improved, the available indoor area is increased, and the stiffness and assembly efficiency of the mold shell are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118952446A_ABST
    Figure CN118952446A_ABST
Patent Text Reader

Abstract

The invention provides a T-shaped shear wall formwork and a T-shaped shear wall construction method. The T-shaped shear wall formwork comprises a first formwork shell, a second formwork shell, a first steel bar set, a second steel bar set and an internal steel bar set, wherein the first formwork shell and the second formwork shell are oppositely arranged, and the first steel bar set, the second steel bar set and the internal steel bar set are contained between the first formwork shell and the second formwork shell. The internal steel bar set comprises a truss, a first steel bar mesh and a second steel bar mesh, the first steel bar set and the second steel bar set are fixedly arranged at the first end and the second end of the first formwork correspondingly, and the two ends of the first steel bar mesh and the two ends of the second steel bar mesh are fixedly connected with the first steel bar set and the second steel bar set correspondingly. The first end of the truss is fixedly connected with the first reinforcing mesh and the first formwork, so that the first reinforcing mesh is flatly laid on the first formwork, and a first prefabricated assembly is formed; the second formwork itself forms a second prefabricated component. The technical problems that a large number of steel bars of a shear wall need to be bound on site, and a prefabricated wall formwork is only used as a formwork are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of shear wall structures, and in particular to a T-shaped shear wall formwork for modular buildings and a construction method of the T-shaped shear wall. Background Art

[0002] Prefabricated shear wall is a new type of shear wall that is produced in the factory using advanced processes and technologies, and then transported to the site for installation. Compared with traditional cast-in-place concrete shear walls, prefabricated shear walls have the advantages of short manufacturing cycle, controllable quality, fast construction speed, energy saving and environmental protection.

[0003] Existing assembled shear walls for concrete modular buildings usually use prefabricated wall molds integrated into concrete modules as templates for pouring concrete, and have the following disadvantages: 1. The steel bars of the shear wall need to be tied on site in large quantities, which limits production efficiency; 2. The prefabricated wall molds are only used as templates and do not participate in the structural stress of the shear wall, which wastes materials and makes the shear wall thicker, encroaching on the indoor usable area.

[0004] The prefabricated shear walls used for concrete modular buildings include T-shaped shear walls, which are set at the connection between adjacent modular buildings as structural supports for connecting adjacent modular buildings to ensure that the connection between modules has sufficient stability and safety under the action of external forces.

[0005] For this reason, there is an urgent need for an improved T-shaped shear wall formwork and a construction method of the T-shaped shear wall for modular buildings. Summary of the invention

[0006] 1. Technical issues to be resolved

[0007] In view of the problems existing in the above technologies, the present invention solves them at least to a certain extent. To this end, the present invention provides a T-shaped shear wall formwork for modular buildings, which solves the technical problem that a large number of steel bars of the shear wall need to be tied on site and the prefabricated wall formwork is only used as a template.

[0008] (II) Technical solution

[0009] In order to achieve the above object, the main technical solutions adopted by the present invention include:

[0010] In a first aspect, the present invention provides a T-shaped shear wall formwork, comprising a first formwork shell and a second formwork shell arranged opposite to each other, wherein a first steel bar group, a second steel bar group and an internal steel bar group are accommodated in a flat cavity between the first formwork shell and the second formwork shell;

[0011] The internal steel bar group includes a truss, a first steel bar mesh and a second steel bar mesh. The truss extends along the height direction of the shear wall, and has a first end and a second end opposite to each other in the direction from the first formwork to the second formwork; the first steel bar group and the second steel bar group are respectively fixedly arranged at the first end and the second end of the first formwork, and the two ends of the first steel bar mesh are respectively fixedly connected to the first steel bar group and the second steel bar group, and the two ends of the second steel bar mesh are respectively fixedly connected to the first steel bar group and the second steel bar group, and the first end of the truss is fixedly connected to the first steel bar mesh, and the first end of the truss is buried in the first formwork, so that the first steel bar mesh is laid flat on the first formwork to form a first prefabricated component; the second formwork itself forms a second prefabricated component.

[0012] Optionally, the T-type shear wall formwork also includes a third form shell and a fourth form shell; the first form shell, the second form shell, the third form shell and the fourth form shell are all straight, the first end of the second form shell corresponds to the first end position of the first form shell, the second end of the second form shell corresponds to the second end position of the first form shell, the first end of the third form shell is fixedly connected to the second end of the first form shell to form an L shape, the first end of the fourth form shell is fixedly connected to the second end of the second form shell to form an L shape, and the first form shell, the second form shell, the third form shell and the fourth form shell form a T shape as a whole.

[0013] Optionally, the T-type shear wall formwork also includes a third steel bar group and a fourth steel bar group; the third steel bar group is fixedly arranged on the third formwork to form a third prefabricated component; the fourth steel bar group is fixedly arranged on the fourth formwork to form a fourth prefabricated component; the second steel bar group has an extension extending from the second end of the first formwork; in the T-type shear wall formwork, the third steel bar group, the extension and the fourth steel bar group are arranged in sequence along the direction from the first formwork to the second formwork.

[0014] Optionally, the T-type shear wall formwork also includes a fifth steel bar group; the fifth steel bar group includes a first end, a connecting portion and a second end connected in sequence, the first end of the fifth steel bar group is used to be staggered and overlapped with the end of the third steel bar group toward the fourth steel bar group to form a first overlapping portion, the connecting portion of the fifth steel bar group is used to be staggered and overlapped with the protruding portion of the second steel bar group to form a second overlapping portion, and the second end of the fifth steel bar group is used to be staggered and overlapped with the end of the fourth steel bar group toward the third steel bar group to form a third overlapping portion.

[0015] Optionally, the rear-installed wall longitudinal reinforcement extending along the height direction of the shear wall is inserted into the first overlapping portion, and the third steel bar group and the fifth steel bar group are fixedly connected to the rear-installed wall longitudinal reinforcement; the rear-installed wall longitudinal reinforcement extending along the height direction of the shear wall is inserted into the second overlapping portion, and the second steel bar group and the fifth steel bar group are fixedly connected to the rear-installed wall longitudinal reinforcement; the rear-installed wall longitudinal reinforcement extending along the height direction of the shear wall is inserted into the third overlapping portion, and the fourth steel bar group and the fifth steel bar group are fixedly connected to the rear-installed wall longitudinal reinforcement.

[0016] Optionally, the first steel mesh includes a plurality of first horizontal bars extending in the horizontal direction, the truss includes a first plane steel bar, a second plane steel bar, a first truss vertical bar, a second truss vertical bar and a third truss vertical bar extending in the height direction of the shear wall, the first plane steel bar and the second plane steel bar are both formed by continuously bending a steel bar to form a triangular waveform, and the first plane steel bar and the second plane steel bar have opposite first and second ends in the direction from the first formwork to the second formwork;

[0017] The angle between the first plane steel bar and the first steel mesh is a right angle, and the angle between the second plane steel bar and the first steel mesh is an acute angle; the first end of the first plane steel bar is fixedly connected to the first end of the second plane steel bar through the first truss vertical bar, the second end of the first plane steel bar is fixedly connected to the first horizontal bar through the second truss vertical bar, the second end of the first plane steel bar is bent and inserted into the first mold shell, the second end of the second plane steel bar is fixedly connected to the first horizontal bar through the third truss vertical bar, and the second end of the second plane steel bar is bent and inserted into the first mold shell.

[0018] Optionally, the second steel mesh includes multiple second horizontal bars extending in the horizontal direction and multiple structural vertical bars extending in the height direction of the shear wall. The second horizontal bars and the structural vertical bars are perpendicular to each other and fixedly connected to form the second steel mesh; the structural vertical bars are located between two adjacent trusses; the first horizontal bars, the second horizontal bars, the first truss vertical bars and the second truss vertical bars are all force-bearing steel bars, and the third truss vertical bars and the structural vertical bars are structural steel bars.

[0019] Optionally, the T-shaped shear wall formwork also includes a T-shaped stud and a mounting nut, and a nut mounting groove and a through hole connected in sequence from the outside to the inside are opened on the second formwork; the mounting nut is welded and fixed to the first plane steel bar, and the T-shaped stud extends in the direction from the first formwork to the second formwork, and the first end of the T-shaped stud is fixedly connected to the nut, and the second end of the T-shaped stud is used to pass through the through hole and be located in the mounting groove of the second formwork, so that the T-shaped end cap of the T-shaped stud is accommodated in the mounting groove of the second formwork.

[0020] In a second aspect, the present invention provides an on-site construction method of a T-shaped shear wall, which is implemented based on the T-shaped shear wall formwork as described above, and comprises the following steps:

[0021] A1. Align and connect the first prefabricated component and the second prefabricated component;

[0022] A2. Add formwork so that the formwork, the first form shell and the second form shell together form a T-shaped cavity, pour concrete into the T-shaped cavity, and obtain a T-shaped shear wall after curing and removing the formwork.

[0023] Optionally, A1 includes: connecting the first prefabricated component and the second prefabricated component by T-shaped studs and installation nuts, aligning and connecting the third prefabricated component and the fourth prefabricated component; installing the fifth steel bar group, so that the first end of the fifth steel bar group and the end of the third steel bar group toward the fourth steel bar group are staggered and overlapped to form a first overlapping portion, the connecting portion of the fifth steel bar group and the extended portion of the second steel bar group are staggered and overlapped to form a second overlapping portion, and the second end of the fifth steel bar group and the end of the fourth steel bar group toward the third steel bar group are staggered and overlapped to form a third overlapping portion; inserting the rear wall longitudinal reinforcement into the first overlapping portion, connecting the third steel bar group and the fifth steel bar group to the rear wall longitudinal reinforcement; inserting the rear wall longitudinal reinforcement into the second overlapping portion, connecting the second steel bar group and the fifth steel bar group to the rear wall longitudinal reinforcement; inserting the rear wall longitudinal reinforcement into the third overlapping portion, connecting the fourth steel bar group and the fifth steel bar group to the rear wall longitudinal reinforcement;

[0024] A2 includes: installing a template so that the template, the first mold shell, the second mold shell, the third mold shell and the fourth mold shell together surround and form a T-shaped cavity.

[0025] (III) Beneficial effects

[0026] The beneficial effects of the present invention are:

[0027] The T-shaped shear wall formwork provided by the present invention is suitable for the connection of the steel bars in the internal structure to be automatically tied or welded, thereby improving production efficiency; by pre-embedding the internal structure in the first formwork to form the first prefabricated component, the steel bar connection of the internal structure is generated in the wall formwork prefabrication link, which greatly reduces the amount of steel bar tying and steel bar welding in on-site construction, thereby greatly improving production efficiency; through the truss, the first formwork can be effectively overlapped with the concrete poured in the wall formwork, and jointly participate in the structural force, so that the first formwork becomes a part of the shear wall, that is, the first formwork also becomes a force-bearing component, rather than just being used as a temporary formwork, thereby improving the material utilization rate, increasing the indoor available building area, and greatly improving the rigidity of the first formwork, thereby reducing the cracks that may occur in the formwork during transportation and installation. In addition, since the first steel bar group, the second steel bar group and the internal structure are pre-embedded in the first formwork as a whole, the inner surface of the second formwork is flat and free of pre-embedded steel bars. In the process of assembling the T-shaped shear wall formwork according to the prefabricated components during construction, there is no problem of collision between the steel bars on the first formwork and the steel bars on the second formwork, thereby hindering assembly, thereby improving construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] The present invention is described with the aid of the following drawings:

[0029] Figure 1 This is a schematic structural diagram of a T-shaped shear wall formwork according to Embodiment 1 of the present invention;

[0030] Figure 2for Figure 1 The enlarged schematic diagram of point A in the middle;

[0031] Figure 3 is a schematic structural diagram of a first prefabricated component according to Embodiment 1 of the present invention;

[0032] Figure 4 is a schematic structural diagram of a second prefabricated component according to Embodiment 1 of the present invention;

[0033] Figure 5 is a schematic structural diagram of a third prefabricated component according to Embodiment 1 of the present invention;

[0034] Figure 6 is a schematic structural diagram of a fourth prefabricated component according to Embodiment 1 of the present invention;

[0035] Figure 7 Schematic diagram of the structure of the fifth steel bar group according to Example 1 of the present invention.

[0036] [Description of Reference Numerals]

[0037] 11: first formwork; 12: truss; 13: first steel mesh; 14: first steel bar group; 15: second steel bar group;

[0038] 111: raised portion; 112: first connecting steel plate;

[0039] 121: first plane reinforcement; 122: second plane reinforcement; 123: first truss vertical reinforcement; 124: second truss vertical reinforcement;

[0040] 131: first horizontal rib;

[0041] 21: second formwork; 23: second steel mesh;

[0042] 231: second horizontal rib;

[0043] 31: third formwork; 32: third steel bar group; 33: fifth steel bar group;

[0044] 311: second connecting steel plate;

[0045] 41: fourth formwork; 42: fourth reinforcement group; 43: rear-installed wall longitudinal reinforcement;

[0046] 51: T-type stud; 52: mounting nut;

[0047] 62: Second structural column; 63: Third structural column;

[0048] 611: first half; 612: second half. DETAILED DESCRIPTION

[0049] Example 1

[0050] like Figures 1 to 7 As shown, this embodiment provides a T-shaped shear wall formwork for modular buildings. The T-shaped shear wall formwork is described in detail below.

[0051] like Figure 1 As shown, the T-type shear wall formwork includes a first formwork 11 and a second formwork 21 that are relatively arranged. The first formwork 11 and the second formwork 21 are respectively located on two adjacent modular buildings, and a straight cavity is formed between the first formwork 11 and the second formwork 21. A steel cage is accommodated in the straight cavity. The steel cage includes a steel bar group and an internal steel bar group for connecting two adjacent steel bar groups. The steel bar group refers to a cage-shaped structure made of steel bars used to construct edge hidden columns, edge end columns, and edge corner walls in a concrete structure.

[0052] The steel bar group includes a first steel bar group 14 and a second steel bar group 15. The internal steel bar group includes a truss 12, and a first steel bar mesh 13 and a second steel bar mesh 23 arranged in sequence along the direction from the first formwork 11 to the second formwork 21; the truss 12 extends along the height direction of the shear wall, and the truss 12 has a first end and a second end opposite to each other in the direction from the first formwork 11 to the second formwork 21. The first steel bar group 14 is fixedly arranged at the first end of the first formwork 11, the second steel bar group 15 is fixedly arranged at the second end of the first formwork 11, the two ends of the first steel bar mesh 13 are fixedly connected to the first steel bar group 14 and the second steel bar group 15, the two ends of the second steel bar mesh 23 are fixedly connected to the first steel bar group 14 and the second steel bar group 15, the first end of the truss 12 is fixedly connected to the first steel bar mesh 13, and the first end of the truss 12 is buried in the first formwork 11, so that the first steel bar mesh 13 is laid flat on the first formwork 11 to form a first prefabricated component. The second formwork 21 itself forms a second prefabricated component.

[0053] The T-shaped shear wall formwork set up as above is suitable for the connection of the steel bars in the internal structure by automated binding or welding, thereby improving production efficiency; by pre-embedding the internal structure in the first formwork 11 to form a first prefabricated component, the steel bar connection of the internal structure is produced in the wall formwork prefabrication link, which greatly reduces the amount of steel bar binding and steel bar welding in on-site construction, thereby greatly improving production efficiency; through the truss 12, the first formwork 11 can be effectively overlapped with the concrete poured in the wall formwork, and jointly participate in the structural force, so that the first formwork 11 becomes a part of the shear wall, that is, the first formwork 11 also becomes a load-bearing component, rather than just being used as a temporary formwork, thereby improving material utilization, increasing the available indoor building area, and greatly improving the rigidity of the first formwork 11, thereby reducing cracks that may occur in the formwork during transportation and installation. In addition, since the first steel bar group 14, the second steel bar group 15 and the internal structure are pre-embedded in the first mold shell 11, the inner surface of the second mold shell 12 is smooth and has no pre-embedded steel bars. During the construction, when the T-shaped shear wall mold is assembled according to the prefabricated components, there is no problem of collision and obstruction of assembly between the steel bars on the first mold shell 11 and the steel bars on the second mold shell 12, thereby improving construction efficiency.

[0054] It should be noted that the fixed connection between the steel bars involved in this embodiment is binding or welding.

[0055] Preferably, if Figure 1 , Figures 3 to 6 As shown, the T-type shear wall formwork also includes a third formwork shell 31 and a fourth formwork shell 41; the first formwork shell 11, the second formwork shell 21, the third formwork shell 31 and the fourth formwork shell 41 are all straight, the first end of the second formwork shell 21 corresponds to the first end position of the first formwork shell 21, the second end of the second formwork shell 21 corresponds to the second end position of the first formwork shell 21, the first end of the third formwork shell 31 is fixedly connected to the second end of the first formwork shell 11 to form an L-shape, the first end of the fourth formwork shell 41 is fixedly connected to the second end of the second formwork shell 21 to form an L-shape, and the first formwork shell 11, the second formwork shell 21, the third formwork shell 31 and the fourth formwork shell 41 form a T-shape as a whole.

[0056] Further preferably, the T-type shear wall formwork also includes a third steel bar group 32 and a fourth steel bar group 42; the third steel bar group 32 is fixedly arranged on the third form shell 31 to form a third prefabricated component; the fourth steel bar group 42 is fixedly arranged on the fourth form shell 41 to form a fourth prefabricated component; the second steel bar group 15 has an extension extending from the second end of the first form shell 11; in the T-type shear wall formwork, the third steel bar group 32, the extension and the fourth steel bar group 42 are arranged in sequence along the direction from the first form shell 11 to the second form shell 12. In this way, in the process of assembling the T-type shear wall formwork according to the prefabricated components during construction, there is no problem of the third steel bar group 32, the extension and the fourth steel bar group 42 colliding with each other and hindering the assembly; and the steel bar connection of the third steel bar group 32 and the fourth steel bar group 42 is generated in the wall form prefabrication link.

[0057] Preferably, the T-type shear wall formwork also includes a fifth steel bar group 33; the fifth steel bar group 33 includes a first end, a connecting portion and a second end connected in sequence, the first end of the fifth steel bar group 33 is used to be staggered and overlapped with the end of the third steel bar group 32 toward the fourth steel bar group 42 to form a first overlapping portion, the connecting portion of the fifth steel bar group 33 is used to be staggered and overlapped with the protruding portion of the second steel bar group 15 to form a second overlapping portion, and the second end of the fifth steel bar group 33 is used to be staggered and overlapped with the end of the fourth steel bar group 42 toward the third steel bar group 32 to form a third overlapping portion.

[0058] Further preferably, the rear-installed wall longitudinal reinforcement 43 extending along the height direction of the shear wall is inserted into the first overlapping portion, and the third steel bar group 32 and the fifth steel bar group 33 are both fixedly connected to the rear-installed wall longitudinal reinforcement 43; the rear-installed wall longitudinal reinforcement 43 extending along the height direction of the shear wall is inserted into the second overlapping portion, and the second steel bar group 15 and the fifth steel bar group 33 are both fixedly connected to the rear-installed wall longitudinal reinforcement 43; the rear-installed wall longitudinal reinforcement 43 extending along the height direction of the shear wall is inserted into the third overlapping portion, and the fourth steel bar group 42 and the fifth steel bar group 33 are both fixedly connected to the rear-installed wall longitudinal reinforcement 43.

[0059] Furthermore, the projection of the first overlapping portion on the horizontal plane is a rectangle, four rear-mounted wall longitudinal bars 43 are inserted in the first overlapping portion and are respectively located at the four corners of the first overlapping portion, and the third steel bar group 32 and the fifth steel bar group 33 are fixedly connected to each rear-mounted wall longitudinal bar 43; the projection of the second overlapping portion on the horizontal plane is a rectangle, four rear-mounted wall longitudinal bars 43 are inserted in the second overlapping portion and are respectively located at the four corners of the second overlapping portion, and the second steel bar group 15 and the fifth steel bar group 33 are fixedly connected to each rear-mounted wall longitudinal bar 43; the projection of the third overlapping portion on the horizontal plane is a rectangle, four rear-mounted wall longitudinal bars 43 are inserted in the third overlapping portion and are respectively located at the four corners of the third overlapping portion, and the fourth steel bar group 42 and the fifth steel bar group 33 are fixedly connected to each rear-mounted wall longitudinal bar 43.

[0060] It should be noted that the first steel bar group 14, the second steel bar group 15, the third steel bar group 32, the fourth steel bar group 43 and the fifth steel bar group 33 are all structures in which stirrups are added to the periphery of the vertical bars; the first steel bar group 14 also has a first tension bar fixedly connected to the vertical bars, and the portion of the first tension bar extending out of the stirrup is buried in the first mold shell 11, so that the first steel bar group 14 is fixedly set on the first mold shell 11; the second steel bar group 14 also has a second tension bar fixedly connected to the vertical bars, and the portion of the second tension bar extending out of the stirrup is buried in the first mold shell 11, so that the second steel bar group 15 is fixedly set on the first mold shell 11; the third steel bar group 32 also has a third tension bar fixedly connected to the vertical bars, and the portion of the third tension bar extending out of the stirrup is buried in the third mold shell 31, so that the third steel bar group 32 is fixedly set on the third mold shell 31; the fourth steel bar group 42 also has a fourth tension bar fixedly connected to the vertical bars, and the portion of the fourth tension bar extending out of the stirrup is buried in the fourth mold shell 41, so that the fourth steel bar group 42 is fixedly set on the fourth mold shell 41.

[0061] Preferably, if Figure 3 As shown, the first steel mesh 13 includes a plurality of first horizontal bars 131 extending in the horizontal direction, the truss 12 includes a first plane steel bar 121, a second plane steel bar 122, a first truss vertical bar 123, a second truss vertical bar 124 and a third truss vertical bar extending in the height direction of the shear wall, the first plane steel bar 121 and the second plane steel bar 122 are both formed by continuously bending a steel bar to form a triangular waveform, and the first plane steel bar 121 and the second plane steel bar 122 have opposite first and second ends in the direction from the first formwork 11 to the second formwork 21; the angle between the first plane steel bar 121 and the first steel mesh 13 is a right angle. Angle, the angle between the second plane steel bar 122 and the first steel mesh 13 is an acute angle; the first end of the first plane steel bar 121 is fixedly connected to the first end of the second plane steel bar 122 through the first truss vertical bar 123, the second end of the first plane steel bar 121 is fixedly connected to the first horizontal bar 131 through the second truss vertical bar 124, the second end of the first plane steel bar 121 is bent and inserted into the first mold shell 11, the second end of the second plane steel bar 122 is fixedly connected to the first horizontal bar 131 through the third truss vertical bar, and the second end of the second plane steel bar 122 is bent and inserted into the first mold shell 11.

[0062] Furthermore, the first truss vertical ribs 123 are fixedly connected to the second steel mesh 23 .

[0063] Further preferably, the second steel mesh 23 includes a plurality of second horizontal bars 231 extending in the horizontal direction and a plurality of structural vertical bars extending in the direction of the height of the shear wall. The second horizontal bars 231 and the structural vertical bars are perpendicular to each other and fixedly connected to form the second steel mesh 23; the structural vertical bars are located between two adjacent trusses 12; the first horizontal bars 131, the second horizontal bars 231, the first truss vertical bars 123 and the second truss vertical bars 124 are all stress-bearing steel bars, and the third truss vertical bars and the structural vertical bars are structural steel bars. Furthermore, the diameter of the stress-bearing steel bars is 10 to 16 mm, and the diameter of the structural steel bars is 6 to 8 mm. In this way, a double-layer bidirectional (horizontal direction and shear wall height direction) stress-bearing steel cage is formed, which saves steel material and amount while ensuring the stability of the steel cage structure and reduces costs.

[0064] Preferably, the T-shaped shear wall formwork also includes a T-shaped stud 51 and a mounting nut 52. The second formwork 21 is provided with a nut mounting groove and a through hole that are sequentially connected from the outside to the inside; the mounting nut 52 is welded and fixed to the first plane steel bar 121, the T-shaped stud 51 extends in the direction from the first formwork 11 to the second formwork 21, the first end of the T-shaped stud 51 is fixedly connected to the nut 52, the second end of the T-shaped stud 51 is used to pass through the through hole and be located in the mounting groove of the second formwork 21, and the T-shaped end cap of the T-shaped stud 51 is accommodated in the mounting groove of the second formwork 21. Connecting the first prefabricated component and the second prefabricated component in this way can form lateral stress between the first formwork 11 and the second formwork 21, and prevent the formwork from being deformed or cracked during the subsequent pouring of concrete.

[0065] Further preferably, a protrusion 111 protruding toward the first mold shell 11 is provided on the inner surface of the second mold shell 21 at a position corresponding to the mounting groove, and a through hole is provided through the protrusion 111. In this way, the structural strength of the second mold shell 21 is improved, and the connection between the mounting nut 52 and the T-shaped stud 51 is stabilized.

[0066] Preferably, if Figure 1 and Figure 2 As shown, the inner surface of the second end of the first mold shell 11 is clamped with a first connecting steel plate 112, and the inner surface of the third mold shell 31 is clamped with a second connecting steel plate 311, the first connecting steel plate 112 has a first connecting portion extending out of the first mold shell 11, the second connecting steel plate 311 has a second connecting portion extending out of the third mold shell 31, and the first connecting portion and the second connecting portion abut to form a first welding position; the inner surface of the second end of the second mold shell 21 is clamped with a third connecting steel plate, and the inner surface of the fourth mold shell 41 is clamped with a fourth connecting steel plate, the third connecting steel plate has a third connecting portion extending out of the second mold shell 11, the fourth connecting steel plate has a fourth connecting portion extending out of the fourth mold shell 41, and the third connecting portion and the fourth connecting portion abut to form a second welding position.

[0067] Preferably, the T-shaped shear wall formwork further includes a first half 611 of a first structural column, a second half 612 of a second structural column, a second structural column 62, and a third structural column 63; the first half 611 is connected to the first end of the first formwork 11, the second half 612 is connected to the first end of the second formwork 21, and after the first prefabricated component and the second prefabricated component are connected, the first half 611 and the second half 612 are connected to form a first structural column; the second structural column 62 is connected to an end of the third formwork 31 away from the first formwork 11, and the third structural column 63 is connected to an end of the fourth formwork 41 away from the second formwork 21. In this way, the connection between the shear wall and the decorative wall is facilitated by the first structural column, the second structural column 62, and the third structural column 63.

[0068] In this embodiment, the first steel mesh 13, the second steel mesh 23, the truss 12, the first steel bar group 14, the second steel bar group 15, the third steel bar group 32, the fourth steel bar group 33 and the fifth steel bar group 42 are all welded by an automated welding machine.

[0069] Example 2

[0070] Based on the T-shaped shear wall formwork provided in Example 1, this embodiment provides a prefabrication method of a T-shaped shear wall formwork, comprising the following steps:

[0071] S1. Connect the truss and the first steel mesh, connect the first steel bar group and the second steel bar group to the two ends of the first steel mesh respectively, connect the first steel bar group and the second steel bar group to the two ends of the second steel mesh respectively, and pour concrete into the first formwork and the second formwork respectively.

[0072] S2. Before the concrete in the first formwork is solidified, the first end of the truss is pressed into the concrete, and after curing and demoulding, a first prefabricated component is formed; and after curing and demoulding, the concrete in the second formwork is formed into a second prefabricated component.

[0073] Furthermore, S1 also includes: pouring concrete into the third mold platform and the fourth mold platform respectively; S2 also includes: before the concrete in the third mold platform is solidified, pressing the reinforcement of the third steel bar group into the concrete, and forming a third prefabricated component after curing and demolding; before the concrete in the fourth mold platform is solidified, pressing the reinforcement of the fourth steel bar group into the concrete, and forming a fourth prefabricated component after curing and demolding.

[0074] Furthermore, the prefabrication method of the T-shaped shear wall formwork also includes: S3, connecting the first prefabricated component and the third prefabricated component to form an L shape, and connecting the second prefabricated component and the fourth prefabricated component to form an L shape.

[0075] Example 3

[0076] Based on the T-shaped shear wall formwork provided in Example 1, this embodiment provides an on-site construction method of a T-shaped shear wall, comprising the following steps:

[0077] A1. Align and connect the first prefabricated component and the second prefabricated component.

[0078] A2. Add formwork so that the formwork, the first form shell and the second form shell together form a T-shaped cavity, pour concrete into the T-shaped cavity, and obtain a T-shaped shear wall after curing and removing the formwork.

[0079] Furthermore, A1 also includes: aligning and connecting the third prefabricated component and the fourth prefabricated component.

[0080] Furthermore, in A1, the first prefabricated component and the second prefabricated component are aligned and connected, and the third prefabricated component and the fourth prefabricated component are aligned and connected by connecting through T-shaped studs and mounting nuts.

[0081] Furthermore, A1 also includes: installing the fifth steel bar group so that the first end of the fifth steel bar group and the end of the third steel bar group toward the fourth steel bar group are staggered and overlapped to form a first overlapping portion, the connecting portion of the fifth steel bar group and the protruding portion of the second steel bar group are staggered and overlapped to form a second overlapping portion, and the second end of the fifth steel bar group and the end of the fourth steel bar group toward the third steel bar group are staggered and overlapped to form a third overlapping portion; inserting the rear-installed wall longitudinal reinforcement into the first overlapping portion, connecting the third steel bar group and the fifth steel bar group to the rear-installed wall longitudinal reinforcement; inserting the rear-installed wall longitudinal reinforcement into the second overlapping portion, connecting the second steel bar group and the fifth steel bar group to the rear-installed wall longitudinal reinforcement; inserting the rear-installed wall longitudinal reinforcement into the third overlapping portion, connecting the fourth steel bar group and the fifth steel bar group to the rear-installed wall longitudinal reinforcement.

[0082] Furthermore, in A2, a template is added so that the template, the first mold shell, the second mold shell, the third mold shell and the fourth mold shell together surround and form a T-shaped cavity.

[0083] In the description of the present invention, it should be understood that the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0084] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0085] In the present invention, unless otherwise clearly specified and limited, when a first feature is “on” or “below” a second feature, it may be that the first and second features are in direct contact, or that the first and second features are in indirect contact through an intermediate medium. Moreover, when a first feature is “above”, “above” or “above” a second feature, it may be that the first feature is directly above or obliquely above the second feature, or it may simply mean that the first feature is higher in level than the second feature. When a first feature is “below”, “below” or “below” a second feature, it may be that the first feature is directly below or obliquely below the second feature, or it may simply mean that the first feature is lower in level than the second feature.

[0086] In the description of this specification, the description of the terms "one embodiment", "some embodiments", "embodiment", "example", "specific example" or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, unless they are contradictory.

[0087] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may alter, modify, replace and modify the above embodiments within the scope of the present invention.

Claims

1. A T-shaped shear wall formwork, characterized in that: It comprises a first mold shell (11) and a second mold shell (21) arranged opposite to each other, wherein a first steel bar group (14), a second steel bar group (15) and an internal steel bar group are accommodated in a flat cavity between the first mold shell (11) and the second mold shell (21); The internal steel bar group comprises a truss (12), a first steel bar mesh (13) and a second steel bar mesh (23); the truss (12) extends in the direction of the height of the shear wall; the truss (12) has a first end and a second end opposite to each other in the direction from the first formwork (11) to the second formwork (21); the first steel bar group (14) and the second steel bar group (15) are respectively fixedly arranged at the first end and the second end of the first formwork (11); the two ends of the first steel bar mesh (13) are respectively fixedly connected to the first steel bar group (14) and the second steel bar group (15); the two ends of the second steel bar mesh (23) are respectively fixedly connected to the first steel bar group (14) and the second steel bar group (15); the first end of the truss (12) is fixedly connected to the first steel bar mesh (13); and the first end of the truss (12) is embedded in the first formwork (11), so that the first steel bar mesh (13) is laid flat on the first formwork (11) to form a first prefabricated component; The second formwork (21) itself forms a second prefabricated component.

2. The T-shaped shear wall formwork according to claim 1, characterized in that: Also includes a third mold shell (31) and a fourth mold shell (41); The first mold shell (11), the second mold shell (21), the third mold shell (31) and the fourth mold shell (41) are all straight in shape; the first end of the second mold shell (21) corresponds to the first end of the first mold shell (11); the second end of the second mold shell (21) corresponds to the second end of the first mold shell (11); the first end of the third mold shell (31) is fixedly connected to the second end of the first mold shell (11) to form an L shape; the first end of the fourth mold shell (41) is fixedly connected to the second end of the second mold shell (21) to form an L shape; the first mold shell (11), the second mold shell (21), the third mold shell (31) and the fourth mold shell (41) form a T shape as a whole.

3. The T-shaped shear wall formwork according to claim 2 is characterized in that: Also includes a third steel bar group (32) and a fourth steel bar group (42); The third steel bar group (32) is fixedly arranged on the third mold shell (31) to form a third prefabricated component; The fourth steel bar group (42) is fixedly arranged on the fourth formwork (41) to form a fourth prefabricated component; the second steel bar group (15) has an extension portion extending out of the second end portion of the first formwork (11); in the T-shaped shear wall formwork, the third steel bar group (32), the extension portion and the fourth steel bar group (42) are arranged in sequence along a direction from the first formwork (11) to the second formwork (12).

4. The T-shaped shear wall formwork according to claim 3 is characterized in that: Also comprising a fifth steel bar group (33); The fifth steel bar group (33) comprises a first end, a connecting portion and a second end connected in sequence, the first end of the fifth steel bar group (33) being used to overlap with the end of the third steel bar group (32) toward the fourth steel bar group (42) to form a first overlapping portion, the connecting portion of the fifth steel bar group (33) being used to overlap with the protruding portion of the second steel bar group (15) to form a second overlapping portion, and the second end of the fifth steel bar group (33) being used to overlap with the end of the fourth steel bar group (42) toward the third steel bar group (32) to form a third overlapping portion.

5. The T-shaped shear wall formwork according to claim 4, characterized in that: The rear-mounted wall longitudinal reinforcement (43) extending in the height direction of the shear wall is inserted into the first overlapped portion, and the third reinforcement group (32) and the fifth reinforcement group (33) are both fixedly connected to the rear-mounted wall longitudinal reinforcement (43); the rear-mounted wall longitudinal reinforcement (43) extending in the height direction of the shear wall is inserted into the second overlapped portion, and the second reinforcement group (15) and the fifth reinforcement group (33) are both fixedly connected to the rear-mounted wall longitudinal reinforcement (43); the rear-mounted wall longitudinal reinforcement (43) extending in the height direction of the shear wall is inserted into the third overlapped portion, and the fourth reinforcement group (42) and the fifth reinforcement group (33) are both fixedly connected to the rear-mounted wall longitudinal reinforcement (43).

6. The T-shaped shear wall formwork according to claim 1, characterized in that: The first steel mesh (13) comprises a plurality of first horizontal bars (131) extending in a horizontal direction, the truss (12) comprises a first plane steel bar (121), a second plane steel bar (122), a first truss vertical bar (123), a second truss vertical bar (124) and a third truss vertical bar extending in a height direction of the shear wall, the first plane steel bar (121) and the second plane steel bar (122) are both formed by continuously bending a steel bar to form a triangular waveform, and the first plane steel bar (121) and the second plane steel bar (122) have opposite first and second ends in a direction from the first formwork (11) to the second formwork (21); The angle between the first plane steel bar (121) and the first steel mesh (13) is a right angle, and the angle between the second plane steel bar (122) and the first steel mesh (13) is an acute angle; the first end of the first plane steel bar (121) is fixedly connected to the first end of the second plane steel bar (122) via the first truss vertical bar (123), the second end of the first plane steel bar (121) is fixedly connected to the first horizontal bar (131) via the second truss vertical bar (124), the second end of the first plane steel bar (121) is bent and inserted into the first formwork (11), the second end of the second plane steel bar (122) is fixedly connected to the first horizontal bar (131) via the third truss vertical bar, and the second end of the second plane steel bar (122) is bent and inserted into the first formwork (11).

7. The T-shaped shear wall formwork according to claim 6, characterized in that: The second steel mesh (23) comprises a plurality of second horizontal bars (231) extending in the horizontal direction and a plurality of structural vertical bars extending in the height direction of the shear wall, wherein the second horizontal bars (231) and the structural vertical bars are perpendicular to each other and fixedly connected to form the second steel mesh (23); The structural vertical reinforcement is located between two adjacent trusses (12); the first horizontal reinforcement (131), the second horizontal reinforcement (231), the first truss vertical reinforcement (123) and the second truss vertical reinforcement (124) are all stress-bearing reinforcements, and the third truss vertical reinforcement and the structural vertical reinforcement are structural reinforcements.

8. The T-shaped shear wall formwork according to claim 6, characterized in that: It also includes a T-shaped stud (51) and a mounting nut (52), and the second mold shell (21) is provided with a nut mounting groove and a through hole which are sequentially connected from the outside to the inside; The mounting nut (52) is welded and fixed on the first plane steel bar (121), the T-shaped stud (51) extends in a direction from the first mold shell (11) to the second mold shell (21), the first end of the T-shaped stud (51) is fixedly connected to the nut (52), the second end of the T-shaped stud (51) is used to pass through the through hole and be located in the mounting groove of the second mold shell (21), and the T-shaped end cap of the T-shaped stud (51) is accommodated in the mounting groove of the second mold shell (21).

9. A method for on-site construction of a T-shaped shear wall, characterized in that: The T-shaped shear wall formwork according to any one of claims 1 to 8 is implemented, comprising the following steps: A1. Align and connect the first prefabricated component and the second prefabricated component; A2. Add formwork so that the formwork, the first form shell and the second form shell together form a T-shaped cavity, pour concrete into the T-shaped cavity, and obtain a T-shaped shear wall after curing and removing the formwork.

10. The on-site construction method of a T-shaped shear wall according to claim 9, characterized in that: A1 includes: connecting the first prefabricated component and the second prefabricated component by T-shaped studs and installation nuts, aligning and connecting the third prefabricated component and the fourth prefabricated component; installing the fifth steel bar group, so that the first end of the fifth steel bar group and the end of the third steel bar group facing the fourth steel bar group are staggered and overlapped to form a first overlapped portion, the connecting portion of the fifth steel bar group and the extended portion of the second steel bar group are staggered and overlapped to form a second overlapped portion, and the second end of the fifth steel bar group and the end of the fourth steel bar group facing the third steel bar group are staggered and overlapped to form a third overlapped portion; inserting the rear wall longitudinal reinforcement into the first overlapped portion, connecting the third steel bar group and the fifth steel bar group to the rear wall longitudinal reinforcement; inserting the rear wall longitudinal reinforcement into the second overlapped portion, connecting the second steel bar group and the fifth steel bar group to the rear wall longitudinal reinforcement; inserting the rear wall longitudinal reinforcement into the third overlapped portion, connecting the fourth steel bar group and the fifth steel bar group to the rear wall longitudinal reinforcement; A2 includes: installing a template so that the template, the first mold shell, the second mold shell, the third mold shell and the fourth mold shell together surround and form a T-shaped cavity.