Multifunctional jack device for temporary hanging bracket system

By designing a multi-functional heart-wrenching jack device for temporary hanging system, the steel strand and elastic clamping ring structure replace the threaded connection, combined with hydraulic control of fixed plate and scale mark, the hydraulic jack is solved during the replacement of the arch bridge boom. The problems of operation difficulty and unsafe construction have achieved a more efficient and safe boom replacement process.

CN118958178APending Publication Date: 2024-11-15WUXI MUNICIPAL FACILITIES CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411210649.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-30
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

When using hydraulic jacks during the replacement of early arch bridge booms, the operation was difficult and the construction was unsafe, especially because the hydraulic jack was placed on the upper reaction beam, resulting in complex operation and safety hazards.

Method used

A multi-functional heart-piercing jack device for temporary hanging frame systems was designed, using steel stranded wire and elastic clamping ring structure to replace the traditional threaded connection, combining fixed plates, limit plates, slide rods and scale marks to realize hydraulic pressure The precise control of the cavity and the rapid fixation of the steel strands simplify the operation process through temporary slings and reaction beam structures.

Benefits of technology

It improves the convenience and safety of operation, reduces the hidden dangers caused by threaded connections, realizes more accurate hydraulic control and cable force conversion during boom replacement, and improves construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958178A_ABST
    Figure CN118958178A_ABST
Patent Text Reader

Abstract

The invention discloses a multifunctional jack device for a temporary hanging bracket system, and belongs to the technical field of bridge construction. According to the multifunctional jack device for the temporary hanging bracket system, a specific center hole jack is used, inner cavities of a first fixing sleeve and a second fixing sleeve and the outer walls of a first clamping ring and a second clamping ring are all of a conical structure, and when the multifunctional jack device is in a tension state, the second clamping ring enters the second fixing sleeve to be extruded and shrunk; in the jacking state, the first clamping ring enters the first fixing sleeve to be extruded and shrunk under the action of the second piston body, the steel strand is clamped and fixed, and inconvenience caused by threaded connection is avoided. And by arranging the fixing plate, the limiting plate, the sliding rod, the indicator and the scale marks, the oil conveying amount of the oil inlet pipe can be accurately controlled conveniently, and therefore the tension distance can be conveniently controlled.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a multifunctional jack device for a temporary hanger system and belongs to the technical field of bridge construction. Background Art

[0002] With the wave of infrastructure construction, many arch bridges have been built in transportation construction. Due to their strong bearing capacity, they are often used in the design of large-span bridges. They play their own roles in urban transportation and crossing rivers. In order to meet their own bearing capacity requirements, the early arch bridge suspenders often need to be replaced.

[0003] Hydraulic jacks are jacks that use plungers or hydraulic cylinders as rigid lifting parts. They have the characteristics of compact structure, stable operation, strong lifting force, and self-locking. Hydraulic jacks have strong lifting capacity, and heavy-duty hydraulic jacks have a lifting force of more than 100t. Hydraulic jacks are often used in bridge construction.

[0004] Chinese patent CN111119075A discloses a method for replacing the hanger rod of a particularly large mid-span arch bridge, which mentions the use of a hydraulic jack in the system for replacing the hanger rod. However, since the hydraulic jack is placed on the upper reaction beam, the operation is difficult and the construction is unsafe. Summary of the invention

[0005] In order to solve the above problems, the present invention provides a multifunctional jack device for a temporary hanger system.

[0006] The first object of the present invention is to provide a multifunctional jack device for a temporary hanger system, comprising a temporary hanger device and a through-type jack; the through-type jack comprises an outer cylinder sleeve and a wall, a first hydraulic chamber and a through hole are arranged inside the outer cylinder sleeve, and the first hydraulic chamber is located on the outside of the through hole, a steel strand is arranged inside the through hole, and the steel strand is fixed inside the wall, a first piston body is arranged inside the first hydraulic chamber, a fixed cylinder is fixedly connected to the right end of the first piston body, and the fixed cylinder is located on the outside of the outer cylinder sleeve, a second hydraulic chamber is arranged inside the first piston body, and a second piston body is arranged inside the second hydraulic chamber, and a top block is fixedly connected to one end of the second piston body located at the fixed cylinder, a return spring is sleeved on the outer wall of the second piston body, an oil inlet is arranged at the top of the second hydraulic chamber, and the oil inlet is located on the left side of the second piston body, an oil inlet pipe and an oil return pipe are arranged at the top of the first hydraulic chamber, and the oil inlet pipe and the oil return pipe are respectively arranged on the left and right sides of the outer cylinder sleeve; the through-type jack and the temporary hanger device are connected by a temporary sling.

[0007] In one embodiment, the left side wall of the outer cylinder sleeve is fixedly connected with a second fixing sleeve, the left side wall of the wall is fixedly connected with a first fixing sleeve, the outer wall of the steel strand is sleeved with a second clamping ring and a first clamping ring, the first clamping ring is arranged correspondingly to the first fixing sleeve, and the second clamping ring is arranged correspondingly to the second fixing sleeve. This facilitates the rapid clamping and fixing of the steel strand and avoids the hidden dangers caused by the use of threaded connection.

[0008] In one embodiment, a fixing plate is fixedly connected to the outer wall of the first piston body, and the fixing plate is located outside the outer cylinder sleeve, a limiting plate is fixedly connected to the outer wall of the outer cylinder sleeve, a sliding rod is fixedly connected to the interior of the fixing plate, and the sliding rod is slidably connected to the limiting plate, an indicator mark is fixedly connected to one end of the sliding rod away from the fixing plate, and a scale mark is provided on the outer wall of the outer cylinder sleeve, and the scale mark is located above the limiting plate. It is convenient to accurately control the oil delivery of the oil inlet pipe, thereby conveniently controlling the tensioning distance.

[0009] In one embodiment, there are two limit plates, and the indicator mark is a diamond shape.

[0010] In one embodiment, the second hydraulic chamber is connected to the first hydraulic chamber through an oil inlet hole, and the fixing cylinder is fitted with the first fixing sleeve through a fixing member.

[0011] In one embodiment, the steel strand is slidably connected to the top block, and the return spring is located inside the second hydraulic chamber.

[0012] In one embodiment, the inner cavity of the first fixing sleeve and the outer wall of the first clamping ring are both conical, and the inner cavity of the second fixing sleeve and the outer wall of the second clamping ring are both conical.

[0013] In one embodiment, the first clamping ring and the second clamping ring are both elastic rings, and the inner walls of the first clamping ring and the second clamping ring are both provided with anti-slip patterns, so that the first clamping ring and the second clamping ring can clamp and fix the steel strands.

[0014] In one embodiment, the central axes of the second fixing sleeve, the through hole, the top block and the first fixing sleeve are located on the same straight line, thereby preventing damage to internal parts during operation.

[0015] In one embodiment, the temporary hanger device includes an upper reaction beam, a positioning beam, a pull rod, a temporary sling, and a lower reaction beam; the upper reaction beam and the lower reaction beam are both double-piece I-beam structures, the positioning beam is a double-piece channel steel structure, there are two pull rods, which are fine-rolled threaded steel structures, and there are four temporary slings, made of steel strands; the upper reaction beam is pressed on top of the arch rib, the positioning beam is clamped on both sides of the arch rib, the pull rod presses the arch rib from bottom to top, the upper reaction beam and the lower reaction beam are connected by four temporary slings, and the lower reaction beam is placed under the bridge crossbeam; wherein, four wedge-shaped leveling blocks are installed at the upper reaction beam to adapt to the angles at different positions of the arch rib so that the upper reaction beam can be close to the arch rib, and four jacks are installed at the lower reaction beam; the lower end of the temporary sling passes through the jack, the lower reaction beam, the bridge deck, the arch rib, and the upper reaction beam in sequence from bottom to top.

[0016] In one embodiment, the function of the jack is to drive the jack to tighten the temporary sling to ensure that the upper reaction beam and the top of the arch rib are in close contact, and the lower reaction beam and the bottom of the bridge beam are in close contact, so that the original old hanger force system is converted to the temporary hanger device, thereby realizing the cable force conversion during the hanger replacement process.

[0017] In one embodiment, the pull rod and the positioning beam are connected via an adjustable screw rod, which can adapt to different positions of the arch rib.

[0018] In one embodiment, the positioning beam and the upper reaction beam are connected via roller sliding, so that the positioning beam can move horizontally on the upper reaction beam.

[0019] The beneficial effects of the present invention are:

[0020] The multifunctional jack device for a temporary hanger system of the present invention uses a specific through-type jack, wherein the inner cavities of the first fixed sleeve and the second fixed sleeve and the outer walls of the first clamping ring and the second clamping ring are all conical structures. When in the tensioning state, the second clamping ring enters the interior of the second fixed sleeve and squeezes and contracts, and clamps the steel strand and moves with the outer cylinder sleeve. When in the tightening state, the first clamping ring enters the interior of the first fixed sleeve under the action of the second piston body and squeezes and contracts, and clamps and fixes the steel strand, avoiding the inconvenience caused by using threaded connections; by arranging a fixed plate, a limit plate, a sliding rod, an indicator mark and a scale mark, it is convenient to accurately control the oil delivery volume of the oil inlet pipe, thereby facilitating the control of the tensioning distance. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0022] Figure 1 It is a structural schematic diagram of a multifunctional jack device for a temporary hanger system of the present invention;

[0023] Figure 2 It is a structural schematic diagram of the through-type jack of the present invention;

[0024] In the figure, 1 is a through-type jack, 2 is a temporary hanger device, 11 is a reset spring, 12 is a fixing cylinder, 13 is a first clamping ring, 14 is a bridge body, 15 is a first fixing sleeve, 16 is a second fixing sleeve, 17 is a second clamping ring, 21 is an upper reaction beam, 22 is a temporary sling, and 23 is a lower reaction beam. DETAILED DESCRIPTION

[0025] In order to make the objectives, technical solutions and advantages of the present invention more clear, the embodiments of the present invention will be further described in detail below with reference to the accompanying drawings.

[0026] Embodiment 1:

[0027] This embodiment provides a multifunctional jack device for a temporary hanger system, such as Figure 1-2 shown.

[0028] A multifunctional jack device for a temporary hanger system, comprising a temporary hanger device 2 and a through-type jack 1; wherein the through-type jack 1, the through-type jack 1 is provided with a first hydraulic chamber and a through hole, and the first hydraulic chamber is located outside the through hole, a steel strand is provided inside the through hole, and the steel strand is fixed inside a bridge body 14, a first piston body is provided inside the first hydraulic chamber, a fixing cylinder 12 is fixedly connected to the right end of the first piston body, and the fixing cylinder 12 is located outside the through-type jack 1, and the fixing cylinder 12 is used for limiting the first clamping ring 13, so that the first clamping ring 13 accurately enters the inside of a first fixing sleeve 15, A second hydraulic chamber is provided inside the first piston body, and a second piston body is provided inside the second hydraulic chamber. A top block is fixedly connected to one end of the second piston body located at the fixed cylinder 12. When the second piston body moves, the top block pushes the first clamping ring 13 into the first fixed sleeve 15 and clamps the steel strand. A return spring 11 is sleeved on the outer wall of the second piston body to facilitate the reflux of the hydraulic oil inside the second hydraulic chamber. An oil inlet is provided on the top of the second hydraulic chamber, and the oil inlet is located on the left side of the second piston body. An oil inlet pipe and an oil return pipe are provided on the top of the first hydraulic chamber, and the oil inlet pipe and the oil return pipe are respectively provided on the left and right sides of the through-type jack 1;

[0029] A second fixing sleeve 16 is fixedly connected to the left side wall of the through-type jack 1. The second fixing sleeve 16 is used together with the second clamping ring 17 to clamp and fix the steel strand and cooperate with the through-type jack 1 for tensioning. A first fixing sleeve 15 is fixedly connected to the left side wall of the bridge body 14. A second clamping ring 17 and a first clamping ring 13 are provided on the outer wall of the steel strand. The first clamping ring 13 is arranged corresponding to the first fixing sleeve 15, and the second clamping ring 17 is arranged corresponding to the second fixing sleeve 16.

[0030] A fixing plate is fixedly connected to the outer wall of the first piston body, and the fixing plate is located on the outside of the through-type jack 1, a limiting plate is fixedly connected to the outer wall of the through-type jack 1, a sliding rod is fixedly connected to the inside of the fixing plate, and the sliding rod is slidably connected to the limiting plate, an indicator mark is fixedly connected to the end of the sliding rod away from the fixing plate, a scale mark is provided on the outer wall of the through-type jack 1, and the scale mark is located above the limiting plate, there are two limiting plates, and the indicator mark is diamond-shaped. By arranging the sliding rod, the indicator mark and the scale mark, it is convenient to accurately control the oil delivery of the oil inlet pipe, thereby facilitating the control of the tensioning distance.

[0031] The second hydraulic chamber is connected to the first hydraulic chamber through the oil inlet hole, the fixed cylinder 12 is fitted with the first fixed sleeve 15 through the fixing piece, the steel strand is slidably connected to the top block, the reset spring 11 is located inside the second hydraulic chamber, the inner cavity of the first fixed sleeve 15 and the outer wall of the first clamping ring 13 are both conical, the inner cavity of the second fixed sleeve 16 and the outer wall of the second clamping ring 17 are both conical, the first clamping ring 13 and the second clamping ring 17 are both elastic rings, and the inner walls of the first clamping ring 13 and the second clamping ring 17 are both provided with anti-slip patterns, which are convenient for clamping and fixing the steel strand, the central axis of the second fixed sleeve 16, the through hole, the top block and the first fixed sleeve 15 are located on the same straight line to avoid damage to internal parts during operation.

[0032] The temporary hanger device 2 includes an upper reaction beam 21, a positioning beam, a pull rod, a temporary sling 22, and a lower reaction beam 23; the upper reaction beam 21 and the lower reaction beam 23 are both double-jointed I-beam structures, the positioning beam is a double-jointed channel steel structure, the pull rod is a fine-rolled threaded steel structure, and there are four temporary slings 22 made of steel strands; the upper reaction beam 21 is pressed above the arch rib, the positioning beam is clamped on both sides of the arch rib, the pull rod presses the arch rib from bottom to top, and the upper reaction beam 21 It is connected to the lower reaction beam 23 through four temporary slings 22, and the lower reaction beam 23 is placed under the bridge crossbeam; wherein, the upper reaction beam 21 is equipped with four wedge-shaped leveling blocks to adapt to the angles at different positions of the arch rib, so that the upper reaction beam 21 can be tightly attached to the arch rib, and the lower reaction beam 23 is equipped with four jacks 1; the lower end of the temporary sling 22 passes through the jack 1, the lower reaction beam 23, the bridge deck, the arch rib, and the upper reaction beam 21 from bottom to top.

[0033] The matters not described in detail in the present invention are all known technologies to those skilled in the art.

[0034] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A multifunctional jack device for a temporary hanger system, characterized in that: The device comprises a through-type jack (1) and a temporary hanger device (2); wherein the through-type jack (1) is provided with a first hydraulic chamber and a through hole inside the through-type jack (1), and the first hydraulic chamber is located outside the through hole, a steel strand is provided inside the through hole, and the steel strand is fixed inside the bridge body (14), a first piston body is provided inside the first hydraulic chamber, a fixing cylinder (12) is fixedly connected to the right end of the first piston body, and the fixing cylinder (12) is located outside the through-type jack (1), and the fixing cylinder (12) is used for limiting the first clamping ring (13), so that the first clamping ring (13) accurately enters the inside of the first fixing sleeve (15), and the first A second hydraulic chamber is arranged inside a piston body, and a second piston body is arranged inside the second hydraulic chamber. The second piston body is located at one end of a fixed cylinder (12) and is fixedly connected to a top block. When the second piston body moves, the top block pushes the first clamping ring (13) into the first fixed sleeve (15) and clamps the steel strand. A return spring (11) is sleeved on the outer wall of the second piston body to facilitate the return of hydraulic oil in the second hydraulic chamber. An oil inlet is arranged at the top of the second hydraulic chamber, and the oil inlet is located on the left side of the second piston body. An oil inlet pipe and an oil return pipe are arranged at the top of the first hydraulic chamber, and the oil inlet pipe and the oil return pipe are respectively arranged on the left and right sides of the through-type jack (1).

2. The multifunctional jack device for a temporary hanger system according to claim 1, characterized in that: The left side wall of the through-type jack (1) is fixedly connected to a second fixing sleeve (16), and the second fixing sleeve (16) is used together with a second clamping ring (17) to facilitate clamping and fixing the steel strand and to cooperate with the through-type jack (1) for tensioning. The left side wall of the bridge body (14) is fixedly connected to a first fixing sleeve (15), and the outer wall of the steel strand is provided with a second clamping ring (17) and a first clamping ring (13), the first clamping ring (13) and the first fixing sleeve (15) are arranged correspondingly, and the second clamping ring (17) and the second fixing sleeve (16) are arranged correspondingly.

3. The multifunctional jack device for the temporary hanger system according to claim 2, characterized in that: A fixing plate is fixedly connected to the outer wall of the first piston body, and the fixing plate is located on the outside of the through-type jack (1). A limit plate is fixedly connected to the outer wall of the through-type jack (1). A sliding rod is fixedly connected to the inside of the fixing plate, and the sliding rod is slidably connected to the limit plate. An indicator mark is fixedly connected to the end of the sliding rod away from the fixing plate. A scale mark is provided on the outer wall of the through-type jack (1), and the scale mark is located above the limit plate. There are two limit plates, and the indicator mark is diamond-shaped. By providing the sliding rod, the indicator mark and the scale mark, it is convenient to accurately control the oil delivery of the oil inlet pipe, thereby facilitating the control of the tensioning distance.

4. The multifunctional jack device for a temporary hanger system according to claim 2, characterized in that: The second hydraulic chamber is connected to the first hydraulic chamber through an oil inlet hole, the fixing cylinder (12) is fitted with the first fixing sleeve (15) through a fixing piece, the steel strand is slidably connected to the top block, the reset spring (11) is located inside the second hydraulic chamber, the inner cavity of the first fixing sleeve (15) and the outer wall of the first clamping ring (13) are both conical, the inner cavity of the second fixing sleeve (16) and the outer wall of the second clamping ring (17) are both conical, the first clamping ring (13) and the second clamping ring (17) are both elastic rings, and the inner walls of the first clamping ring (13) and the second clamping ring (17) are both provided with anti-slip patterns, so as to facilitate clamping and fixing the steel strand, the central axis of the second fixing sleeve (16), the through hole, the top block and the first fixing sleeve (15) are located on the same straight line, so as to avoid damage to internal parts during operation.

5. The multifunctional jack device for a temporary hanger system according to claim 1, characterized in that: The temporary hanger device (2) comprises an upper reaction beam (21), a positioning beam, a pull rod, a temporary sling (22), and a lower reaction beam (23); the upper reaction beam (21) and the lower reaction beam (23) are both double-jointed I-beam structures, the positioning beam is a double-jointed channel steel structure, the pull rod is a fine-rolled threaded steel structure, and there are four temporary slings (22) made of steel strands; the upper reaction beam (21) is pressed on the top of the arch rib, the positioning beam is clamped on both sides of the arch rib, the pull rod presses the arch rib from bottom to top, and the upper reaction beam (21) and the lower reaction beam (23) are both double-jointed I-beam structures, the positioning beam is a double-jointed channel steel structure, the pull rod is a fine-rolled threaded steel structure, and the temporary sling (22) has four strands made of steel strands; the upper reaction beam (21) is pressed on the top of the arch rib, the positioning beam is clamped on both sides of the arch rib, the pull rod presses the arch rib from bottom to top, and the upper reaction beam (21) and the lower The reaction beam (23) is connected by four temporary slings (22), and the lower reaction beam (23) is placed under the bridge crossbeam; wherein, the upper reaction beam (21) is equipped with four wedge-shaped leveling blocks to adapt to the angles at different positions of the arch rib, so that the upper reaction beam (21) can be closely attached to the arch rib, and the lower reaction beam (23) is equipped with four jacks (1); the lower end of the temporary sling (22) passes through the jacks (1), the lower reaction beam (23), the bridge deck, the arch rib, and the upper reaction beam (21) in sequence from bottom to top.