Foundation detection method for mill

By installing a vibrator on the mill equipment to detect the displacement value, determine the bending stiffness of the mill foundation and increase the shear wall, the safety hazards caused by disturbed power during the mill operation are solved, and the safety and stability of the mill is achieved run.

CN118958392APending Publication Date: 2024-11-15HENAN XINLIANXIN FERTILIZER
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411051213.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-01
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

During operation, the rotary coupling vibration caused by the superposition of radial disturbance, axial disturbance and axial disturbance during the mill causes safety hazards, which are difficult to effectively detect and solve in the prior art.

Method used

Axial multi-channel vibrator and radial multi-channel vibrator are used to detect the displacement value under normal load of the mill equipment. The displacement value is used to determine whether the bending stiffness of the mill foundation exceeds the load. If it exceeds the load, the shear wall will be increased. Improve the overall bending stiffness of the foundation and ensure safe operation.

Benefits of technology

By detecting displacement values, determine the bending stiffness of the mill foundation, increase the shear wall to improve the stiffness, reduce resonance phenomena, and ensure the long-term safe and stable operation of the mill.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958392A_ABST
    Figure CN118958392A_ABST
Patent Text Reader

Abstract

The invention belongs to a basic detection method for a mill. Comprising the following steps: step 1, mounting an axial multi-channel vibration meter measuring point and a radial multi-channel vibration meter measuring point on the basis of mill equipment; 2, running the mill equipment under a normal load, and recording an axial displacement value detected by the axial multi-channel vibration meter and a radial displacement value detected by the radial multi-channel vibration meter; 3, when the axial displacement value in the step 2 is smaller than the radial displacement value and the displacement value is smaller than the limit value 0.25 mm, the operation state is normal; 4, when the axial displacement value in the step 2 is not smaller than the radial displacement value or the displacement value is not smaller than the limit value 0.25 mm, it is indicated that the axial foundation rigidity of the mill equipment is small, the bending rigidity of the foundation is small, and a shear wall needs to be additionally arranged. Potential safety hazards are found by means of actual detection, and the potential safety hazards are eliminated by adding the shear wall, so that the characteristic of long-time safe and stable operation of the mill is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of mills, in particular to a basic detection method for mills. Background Art

[0002] Mill foundations are large in size, and are generally designed with wall panels for economical and practical purposes. However, in applications, mills exceed the standard due to equipment parameters, installation, inadequate design, and foundation environment. In particular, large mills are affected by radial disturbance forces, axial disturbance forces, and the overall superposition of rotary coupling vibrations generated by axial disturbance forces in radial positions during operation, which poses a huge safety hazard. Summary of the invention

[0003] The object of the present invention is to provide a grinding mill foundation detection method to solve the problems raised in the above background technology.

[0004] A grinding mill basic detection method, the detection method comprises the following steps:

[0005] Step 1: Install axial multi-channel vibration meter measuring points and radial multi-channel vibration meter measuring points on the grinding mill equipment foundation;

[0006] Step 2: Run the mill equipment under normal load, and record the axial displacement value detected by the axial multi-channel vibration meter and the radial displacement value detected by the radial multi-channel vibration meter;

[0007] Step 3: When the axial displacement value in step 2 is smaller than the radial displacement value, and the displacement value is smaller than the limit value of 0.25 mm, it is a normal operating state;

[0008] Step 4: When the axial displacement value in step 2 is not less than the radial displacement value or the displacement value is not less than the limit value of 0.25 mm, it means that the axial foundation stiffness of the grinding mill equipment is too small and the bending stiffness of the foundation is small, and a shear wall needs to be added.

[0009] The beneficial effects of the present invention are as follows: the present invention uses an axial multi-channel vibration meter and a radial multi-channel vibration meter to detect the foundation of the mill equipment under the premise that the mill equipment operates under normal load, and determines whether the overall bending stiffness of the mill foundation exceeds the load by detecting the displacement value; if overload occurs, the overall bending stiffness of the foundation can be increased by adding shear walls to achieve the characteristics of safe operation of the mill.

[0010] Preferably, the two measuring points of the axial multi-channel vibration meter are respectively arranged at two ends of the grinding mill equipment foundation.

[0011] Preferably, the two measuring points of the radial multi-channel vibration meter are respectively arranged on both sides of the grinding mill equipment foundation.

[0012] Preferably, the method for adding a shear wall comprises the following steps:

[0013] Step 1: implant steel bars at the location where the shear wall is to be added, with the bottom end of the steel bars implanted in the original foundation raft 1 and the top end of the steel bars implanted in the top plate;

[0014] Step 2: Roughen the contact area between the original wall panel and the newly built shear wall to increase the shear strength of the concrete;

[0015] Step 3: Tie up the steel cage and assemble the tied steel cage with the steel formwork. The lower part of the steel formwork is the primary pouring space, and the upper part of the steel formwork is the secondary pouring space.

[0016] Step 4: Slowly pour the premixed concrete into the primary pouring space through the reserved secondary pouring space of the steel formwork to ensure that the internal gas and residual slurry are discharged;

[0017] Step 5: After the pouring and vibrating of the primary pouring space is completed, stop for a period of time, and assemble the exterior of the secondary pouring space with wooden formwork; the wooden formworks on both sides of the secondary pouring space are provided with a feed port and an air outlet and residual slurry discharge port, a feed pipe is provided on the feed port, and an outlet pipe is provided on the air outlet and residual slurry discharge port;

[0018] Step 6: Slowly pour non-shrinkage concrete or non-shrinkage grouting material through the feed pipe. During the above process, the gas in the secondary pouring space is discharged through the outlet pipe;

[0019] Step 7: Continue pouring non-shrinkage concrete or non-shrinkage grouting material into the secondary pouring space until the non-shrinkage concrete or non-shrinkage grouting material overflows from the outlet pipe, and then stop pouring;

[0020] Step 8: After the strength reaches 1.2Mpa, remove the steel formwork and wooden formwork, and water to maintain moisture retention;

[0021] Step 9: After the maintenance is completed, the above-mentioned detection method is used for detection. It is sufficient when the axial displacement value is less than the radial displacement and the limit value.

[0022] Preferably, the original wall panels include original gravity wall panels on both sides, the bottom of the original gravity wall panels is a foundation raft, the top of the original gravity wall panels is a top plate, the top of the top plate is provided with a mill base bracket, and the two ends of the original gravity wall panels on both sides are original openings; the added shear wall at least includes an intermediate shear wall arranged between the original gravity wall panels on both sides.

[0023] Preferably, two side shear walls are respectively provided on the two inner sides of the original opening, and the tops of the two side shear walls and the top of the middle shear wall are an integrated structure.

[0024] Preferably, the thickness of the newly-built shear wall in step 1 is 600-1000 mm, and the anchoring length of the concrete is greater than 15 d and is embedded in the original foundation raft and top slab.

[0025] Preferably, the secondary pouring space in step 3 has a height of 250 to 350 mm; and the static stop period in step 5 is 30 to 60 minutes.

[0026] Preferably, in step 5, the height of the feed end of the feed pipe is 450 to 500 mm higher than the bottom of the top plate, and the height of the outlet end of the outlet pipe is not lower than the height of the top plate.

[0027] Preferably, in step 6, the feed end of the feed pipe is connected to a pump to pour non-shrinkage concrete or non-shrinkage grouting material into the secondary pouring space.

[0028] According to a method for detecting a mill foundation of the above technical scheme, an axial multi-channel vibration meter and a radial multi-channel vibration meter are used to detect the foundation of the mill equipment under the premise that the mill equipment is running under normal load, and the displacement value is detected to determine whether the overall bending stiffness of the mill foundation exceeds the load; when it does not exceed the predetermined load, it proves that the mill is in a safe operating state, and when it exceeds the predetermined load, it is necessary to increase the overall bending stiffness of the mill foundation to ensure the stable operation of the mill; but when it exceeds the predetermined load, since the original foundation has not been established, the foundation is reinforced by reverse pouring concrete, so as to ensure that the upper concrete is dense and high-strength and rigidly connected to the upper top plate, thereby enhancing the stiffness of the mill foundation and changing the natural frequency of the mill foundation to reduce the resonance phenomenon, thereby ensuring the long-term safe and stable operation of the mill. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 It is a structural diagram of the original wall panel;

[0030] Figure 2 It is a schematic diagram of the position relationship between the original wall panel and the added shear wall;

[0031] Figure 3 It is to add the schematic diagram of shear wall construction;

[0032] Figure 4 It is a schematic diagram of the positional relationship between the original opening and the shear walls on both sides and the middle shear wall.

[0033] In the figure: 1. Foundation raft; 2. Top plate; 3. Additional shear wall; 31. Middle shear wall; 32. Shear walls on both sides; 4. Original wall panel; 41. Original gravity wall panel; 5. Feed pipe; 6. Outlet pipe; 7. Mill base bracket; 8. Original opening. DETAILED DESCRIPTION

[0034] The following is a further detailed description of the embodiments of the present invention in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention but are not intended to limit the scope of the present invention.

[0035] like Figure 1-4 As shown, the present invention provides a grinding mill basic detection method, which comprises the following steps:

[0036] Step 1: Install axial multi-channel vibration meter measuring points and radial multi-channel vibration meter measuring points on the grinding mill equipment foundation;

[0037] Step 2: Run the mill equipment under normal load, and record the axial displacement value detected by the axial multi-channel vibration meter and the radial displacement value detected by the radial multi-channel vibration meter;

[0038] Step 3: When the axial displacement value in step 2 is smaller than the radial displacement value, and the displacement value is smaller than the limit value of 0.25 mm, it is a normal operating state;

[0039] Step 4: When the axial displacement value in step 2 is not less than the radial displacement value or the displacement value is not less than the limit value of 0.25 mm, it means that the axial foundation stiffness of the grinding mill equipment is too small and the bending stiffness of the foundation is small, and a shear wall needs to be added.

[0040] The present invention mainly detects the existing mill foundation stiffness and bending stiffness. When the mill foundation stiffness and bending stiffness are normal, the normal operation requirements of the mill can be met. When the mill foundation stiffness and bending stiffness are small, there are great safety hazards. Further, when there are safety hazards, the purpose of improving the axial foundation stiffness and foundation bending stiffness is achieved by adding shear walls. Thereby, the mill foundation after construction (including during use) is reinforced to ensure its safe operation. In the traditional technology, at the initial stage of mill construction, the mill foundation is designed by investigating and comprehensively considering the foundation compressive stiffness coefficient and the relevant parameters of the mill. However, in the actual operation process, due to equipment parameter reasons, installation reasons, inadequate design considerations and foundation environment reasons, it will lead to overload operation. The essence of the present invention is to discover safety hazards through actual detection means, and eliminate safety hazards by adding shear walls, so as to achieve the purpose of long-term safe and stable operation of the mill.

[0041] Furthermore, the two measuring points of the axial multi-channel vibration meter are respectively set at the two ends of the mill equipment foundation. By setting two measuring points, and setting the two measuring points at the two ends of the mill equipment foundation respectively, the detection result is accurate and the error problem is avoided. In the present invention, it is preferred to set at least two measuring points in the axial direction.

[0042] Furthermore, the two measuring points of the radial multi-channel vibration meter are respectively set on both sides of the mill equipment foundation. By setting two measuring points, and setting the two measuring points on both sides of the mill equipment foundation respectively, the detection result is accurate and the error problem is avoided. In the present invention, it is preferred to set at least two measuring points in the longitudinal direction.

[0043] A method for detecting a mill foundation, wherein the method for adding a shear wall comprises the following steps:

[0044] Step 1: implant steel bars at the location where the shear wall 3 is to be added, with the bottom end of the steel bars implanted in the original foundation raft 1 and the top end of the steel bars implanted in the top plate 2;

[0045] Step 2: roughen the contact area between the original wall panel 4 and the newly built shear wall 3 to increase the shear strength of the concrete;

[0046] Step 3: Tie up the steel cage and assemble the tied steel cage with the steel formwork. The lower part of the steel formwork is the primary pouring space, and the upper part of the steel formwork is the secondary pouring space.

[0047] Step 4: Slowly pour the premixed concrete into the primary pouring space through the reserved secondary pouring space of the steel formwork to ensure that the internal gas and residual slurry are discharged;

[0048] Step 5: After the pouring and vibrating of the primary pouring space is completed, it is stopped for a period of time, and the exterior of the secondary pouring space is assembled with wooden templates; a feed port and an air outlet and residual slurry discharge port are provided on the wooden templates on both sides of the secondary pouring space, a feed pipe 5 is provided on the feed port, and an outlet pipe 6 is provided on the air outlet and residual slurry discharge port;

[0049] Step 6: Slowly pour non-shrinkage concrete or non-shrinkage grouting material through the feed pipe 5. During the above process, the gas in the secondary pouring space is discharged through the outlet pipe 6;

[0050] Step 7: Continue pouring non-shrinkage concrete or non-shrinkage grouting material into the secondary pouring space until the non-shrinkage concrete or non-shrinkage grouting material overflows from the outlet pipe 6, and then stop pouring;

[0051] Step 8: After the strength reaches 1.2Mpa, remove the steel formwork and wooden formwork, and water to maintain moisture retention;

[0052] Step 9: After the maintenance is completed, the above-mentioned detection method is used for detection. It is sufficient when the axial displacement value is less than the radial displacement and the limit value.

[0053] As is known to all, the pouring of large-volume concrete is done from bottom to top, and the excess gas and residual slurry inside are discharged by its own gravity and then solidified; however, since the present invention adds a new shear wall on the basis of the original mill, if the traditional concrete pouring process is used, not only the construction is inconvenient, but also the rooting and rigid connection with the top plate cannot be achieved, and further the purpose of improving the axial foundation stiffness and the foundation bending stiffness cannot be achieved; based on the above problems, the present invention adopts a reverse pouring concrete method, which divides the traditional pouring method into a two-stage pouring form, first pouring a pouring space, which is convenient for one-time pouring The pouring of the construction space and the discharge of excess gas and slurry are carried out, and on this basis, vibration is carried out to ensure that the concrete is dense and high-strength; further, the secondary pouring space is fed by feeding non-shrinkage concrete or non-shrinkage grouting material in the feeding pipe 5 (small diameter compared to traditional technology), and exhaust and slurry are discharged through the outlet pipe 6 on the other side, and the top plate 2 is further used to make the non-shrinkage concrete or non-shrinkage grouting material in close contact with it, so as to achieve the purpose of discharging excess gas and excess slurry inside, ensuring that the upper concrete is dense and high-strength, and achieving the purpose of rigid connection between the newly built shear wall 3 and the upper top plate 2. The detection method described in step 9 of the present invention can be the detection method described in the present invention, or the method proposed in GB 50040-2020 Power Machinery Foundation Design Standard, such as referring to the vibration calculation of reciprocating machine foundation in Part 5,

[0054]

[0055] By substituting relevant data, the theoretical vibration displacement value can be calculated. When the theoretical vibration displacement value conforms to the data in the previous detection method, it can be determined that the mill foundation is in a safe and stable state. Furthermore, when designing the shear wall, the vibration displacement value can be set so that it is within the normal operating range of the mill. The bending stiffness that the mill foundation should have can be obtained, thereby comprehensively designing the shear wall.

[0056] Further, the original wall panels 4 include original gravity wall panels 41 on both sides, the bottom of the original gravity wall panels 41 is a foundation raft 1, the top of the original gravity wall panels 41 is a top plate 2, the top of the top plate 2 is provided with a mill base bracket 7, and the two ends of the original gravity wall panels 41 on both sides are original openings 8; the added shear wall 3 at least includes an intermediate shear wall 31 arranged between the original gravity wall panels 41 on both sides. The added shear wall 3 of the present invention at least includes the intermediate shear wall 31, which can achieve the characteristics of improving the rigidity and bending strength of the mill foundation.

[0057] Furthermore, two side shear walls 32 are respectively arranged on the two inner sides of the original opening 8, and the tops of the two side shear walls 32 are an integral structure with the top of the middle shear wall 31. The above arrangement enables the entire newly built shear wall to be an integral structure, so as to achieve the purpose of improving the bending strength.

[0058] Furthermore, in step 1, the thickness of the newly built shear wall 3 is 600-1000 mm, and the anchoring length of the concrete is greater than 15 d and is implanted into the original foundation raft 1 and the top plate 2. The above arrangement enables the newly built shear wall 3 to form an integrated structure with the original foundation raft 1 and the top plate 2, so as to achieve the purpose of improving the bending strength.

[0059] Furthermore, the secondary pouring space in step 3 has a height of 250 to 350 mm; and the static stop period in step 5 is 30 to 60 minutes.

[0060] Furthermore, in step 5, the height of the feed end of the feed pipe 5 is 450 to 500 mm higher than the bottom of the top plate 2, and the height of the outlet end of the outlet pipe 6 is not lower than the height of the top plate 2. By setting the height of the feed end of the feed pipe 5, it can be achieved

[0061] Furthermore, in step 6, the feed end of the feed pipe 5 is connected to a pump to pour non-shrinkage concrete or non-shrinkage grouting material into the secondary pouring space. A pump may be provided outside the feed pipe 5 in the present invention to pour non-shrinkage concrete or non-shrinkage grouting material into the secondary pouring space by pressurizing the pump, thereby further improving the characteristics of the concrete being dense and high-strength.

[0062] The present invention is further described in detail by examples.

[0063] Example 1

[0064] A grinding mill basic detection method, the detection method comprises the following steps:

[0065] Step 1: Install axial multi-channel vibration meter measuring points and radial multi-channel vibration meter measuring points on the grinding mill equipment foundation;

[0066] Step 2: Run the mill equipment under normal load, and record the axial displacement value detected by the axial multi-channel vibration meter and the radial displacement value detected by the radial multi-channel vibration meter;

[0067] Step 3: When the axial displacement value in step 2 is smaller than the radial displacement value, and the displacement value is smaller than the limit value of 0.25 mm, it is a normal operating state; there is no need to add a shear wall.

[0068] The two measuring points of the axial multi-channel vibration meter are respectively arranged at the two ends of the mill equipment foundation. The two measuring points of the radial multi-channel vibration meter are respectively arranged at the two sides of the mill equipment foundation.

[0069] Example 2

[0070] A grinding mill basic detection method, the detection method comprises the following steps:

[0071] Step 1: Install axial multi-channel vibration meter measuring points and radial multi-channel vibration meter measuring points on the grinding mill equipment foundation;

[0072] Step 2: Run the mill equipment under normal load, and record the axial displacement value detected by the axial multi-channel vibration meter and the radial displacement value detected by the radial multi-channel vibration meter;

[0073] Step 3: When the axial displacement value in step 2 is not less than the radial displacement value or , it means that the axial foundation stiffness of the mill equipment is too small and the bending stiffness of the foundation is small, and a shear wall needs to be added.

[0074] The two measuring points of the axial multi-channel vibration meter are respectively arranged at the two ends of the mill equipment foundation. The two measuring points of the radial multi-channel vibration meter are respectively arranged at the two sides of the mill equipment foundation.

[0075] The method for adding a shear wall comprises the following steps:

[0076] Step 1: implant steel bars at the location where the shear wall 3 is to be added, with the bottom end of the steel bars implanted in the original foundation raft 1 and the top end of the steel bars implanted in the top plate 2;

[0077] Step 2: roughen the contact area between the original wall panel 4 and the newly built shear wall 3 to increase the shear strength of the concrete;

[0078] Step 3: Tie up the steel cage and assemble the tied steel cage with the steel formwork. The lower part of the steel formwork is the primary pouring space, and the upper part of the steel formwork is the secondary pouring space.

[0079] Step 4: Slowly pour the premixed concrete into the primary pouring space through the reserved secondary pouring space of the steel formwork to ensure that the internal gas and residual slurry are discharged;

[0080] Step 5: After the pouring and vibrating of the primary pouring space is completed, it is stopped for a period of time, and the exterior of the secondary pouring space is assembled with wooden templates; a feed port and an air outlet and residual slurry discharge port are provided on the wooden templates on both sides of the secondary pouring space, a feed pipe 5 is provided on the feed port, and an outlet pipe 6 is provided on the air outlet and residual slurry discharge port;

[0081] Step 6: Slowly pour non-shrinkage concrete or non-shrinkage grouting material through the feed pipe 5. During the above process, the gas in the secondary pouring space is discharged through the outlet pipe 6;

[0082] Step 7: Continue pouring non-shrinkage concrete or non-shrinkage grouting material into the secondary pouring space until the non-shrinkage concrete or non-shrinkage grouting material overflows from the outlet pipe 6, and then stop pouring;

[0083] Step 8: After the strength reaches 1.2Mpa, remove the steel formwork and wooden formwork, and water to maintain moisture retention;

[0084] Step 9: After the maintenance is completed, the above-mentioned detection method is used for detection. It is sufficient when the axial displacement value is less than the radial displacement and the limit value.

[0085] The original wall panels 4 include original gravity wall panels 41 on both sides, the bottom of the original gravity wall panels 41 is a foundation raft 1, the top of the original gravity wall panels 41 is a top plate 2, the top of the top plate 2 is provided with a mill base bracket 7, and the two ends of the original gravity wall panels 41 on both sides are original openings 8; the added shear wall 3 at least includes an intermediate shear wall 31 arranged between the original gravity wall panels 41 on both sides. The thickness of the newly built shear wall 3 in step 1 is 600-1000mm, and the concrete anchoring length is greater than 15d and implanted into the original foundation raft 1 and top plate 2. The secondary pouring space in step 3 is 250-350mm in height; the static stop period in step 5 is 30-60min. In step 5, the height of the feed end of the feed pipe 5 is 450-500mm higher than the bottom of the top plate 2, and the height of the outlet end of the outlet pipe 6 is not lower than the height of the top plate 2. In step 6, the feed end of the feed pipe 5 is connected to a pump to pour non-shrinkage concrete or non-shrinkage grouting material into the secondary pouring space.

[0086] Example 3

[0087] A grinding mill basic detection method, the detection method comprises the following steps:

[0088] Step 1: Install axial multi-channel vibration meter measuring points and radial multi-channel vibration meter measuring points on the grinding mill equipment foundation;

[0089] Step 2: Run the mill equipment under normal load, and record the axial displacement value detected by the axial multi-channel vibration meter and the radial displacement value detected by the radial multi-channel vibration meter;

[0090] Step 3: When the displacement value in step 2 is equal to the limit value of 0.25 mm, it means that the axial foundation stiffness of the grinding mill equipment is too small and the bending stiffness of the foundation is small, and a shear wall needs to be added.

[0091] The two measuring points of the axial multi-channel vibration meter are respectively arranged at the two ends of the mill equipment foundation. The two measuring points of the radial multi-channel vibration meter are respectively arranged at the two sides of the mill equipment foundation.

[0092] The method for adding a shear wall comprises the following steps:

[0093] Step 1: implant steel bars at the location where the shear wall 3 is to be added, with the bottom end of the steel bars implanted in the original foundation raft 1 and the top end of the steel bars implanted in the top plate 2;

[0094] Step 2: roughen the contact area between the original wall panel 4 and the newly built shear wall 3 to increase the shear strength of the concrete;

[0095] Step 3: Tie up the steel cage and assemble the tied steel cage with the steel formwork. The lower part of the steel formwork is the primary pouring space, and the upper part of the steel formwork is the secondary pouring space.

[0096] Step 4: Slowly pour the premixed concrete into the primary pouring space through the reserved secondary pouring space of the steel formwork to ensure that the internal gas and residual slurry are discharged;

[0097] Step 5: After the pouring and vibrating of the primary pouring space is completed, it is stopped for a period of time, and the exterior of the secondary pouring space is assembled with wooden templates; a feed port and an air outlet and residual slurry discharge port are provided on the wooden templates on both sides of the secondary pouring space, a feed pipe 5 is provided on the feed port, and an outlet pipe 6 is provided on the air outlet and residual slurry discharge port;

[0098] Step 6: Slowly pour non-shrinkage concrete or non-shrinkage grouting material through the feed pipe 5. During the above process, the gas in the secondary pouring space is discharged through the outlet pipe 6;

[0099] Step 7: Continue pouring non-shrinkage concrete or non-shrinkage grouting material into the secondary pouring space until the non-shrinkage concrete or non-shrinkage grouting material overflows from the outlet pipe 6, and then stop pouring;

[0100] Step 8: After the strength reaches 1.2Mpa, remove the steel formwork and wooden formwork, and water to maintain moisture retention;

[0101] Step 9: After the maintenance is completed, the above-mentioned detection method is used for detection. It is sufficient when the axial displacement value is less than the radial displacement and the limit value.

[0102] The original wall panels 4 include the original gravity wall panels 41 on both sides, the bottom of the original gravity wall panels 41 is a foundation raft 1, the top of the original gravity wall panels 41 is a top plate 2, the top of the top plate 2 is provided with a mill base bracket 7, and the two ends of the original gravity wall panels 41 on both sides are original openings 8; the added shear wall 3 at least includes an intermediate shear wall 31 arranged between the original gravity wall panels 41 on both sides. The two inner sides of the original opening 8 are respectively provided with two side shear walls 32, and the top of the two side shear walls 32 and the top of the intermediate shear wall 31 are an integral structure. The thickness of the newly built shear wall 3 in step 1 is 600-1000mm, and the anchoring length of the concrete is greater than 15d and implanted into the original foundation raft 1 and top plate 2. The secondary pouring space in step 3 is 250-350mm in height; the static stop period in step 5 is 30-60min. In step 5, the height of the feed end of the feed pipe 5 is 450-500 mm higher than the bottom of the top plate 2, and the height of the outlet end of the outlet pipe 6 is not lower than the height of the top plate 2. In step 6, the feed end of the feed pipe 5 is connected to a pump to pour non-shrinkage concrete or non-shrinkage grouting material into the secondary pouring space.

[0103] Example 4

[0104] A grinding mill basic detection method, the detection method comprises the following steps:

[0105] Step 1: Install axial multi-channel vibration meter measuring points and radial multi-channel vibration meter measuring points on the grinding mill equipment foundation;

[0106] Step 2: Run the mill equipment under normal load, and record the axial displacement value detected by the axial multi-channel vibration meter and the radial displacement value detected by the radial multi-channel vibration meter;

[0107] Step 3: When the displacement value in step 2 is equal to 0.3 mm, it means that the axial foundation stiffness of the grinding mill equipment is too small and the bending stiffness of the foundation is small, and a shear wall needs to be added.

[0108] The two measuring points of the axial multi-channel vibration meter are respectively arranged at the two ends of the mill equipment foundation. The two measuring points of the radial multi-channel vibration meter are respectively arranged at the two sides of the mill equipment foundation.

[0109] The method for adding a shear wall comprises the following steps:

[0110] Step 1: implant steel bars at the location where the shear wall 3 is to be added, with the bottom end of the steel bars implanted in the original foundation raft 1 and the top end of the steel bars implanted in the top plate 2;

[0111] Step 2: roughen the contact area between the original wall panel 4 and the newly built shear wall 3 to increase the shear strength of the concrete;

[0112] Step 3: Tie up the steel cage and assemble the tied steel cage with the steel formwork. The lower part of the steel formwork is the primary pouring space, and the upper part of the steel formwork is the secondary pouring space.

[0113] Step 4: Slowly pour the premixed concrete into the primary pouring space through the reserved secondary pouring space of the steel formwork to ensure that the internal gas and residual slurry are discharged;

[0114] Step 5: After the pouring and vibrating of the primary pouring space is completed, it is stopped for a period of time, and the exterior of the secondary pouring space is assembled with wooden templates; a feed port and an air outlet and residual slurry discharge port are provided on the wooden templates on both sides of the secondary pouring space, a feed pipe 5 is provided on the feed port, and an outlet pipe 6 is provided on the air outlet and residual slurry discharge port;

[0115] Step 6: Slowly pour non-shrinkage concrete or non-shrinkage grouting material through the feed pipe 5. During the above process, the gas in the secondary pouring space is discharged through the outlet pipe 6;

[0116] Step 7: Continue pouring non-shrinkage concrete or non-shrinkage grouting material into the secondary pouring space until the non-shrinkage concrete or non-shrinkage grouting material overflows from the outlet pipe 6, and then stop pouring;

[0117] Step 8: After the strength reaches 1.2Mpa, remove the steel formwork and wooden formwork, and water to maintain moisture retention;

[0118] Step 9: After the maintenance is completed, the above-mentioned detection method is used for detection. It is sufficient when the axial displacement value is less than the radial displacement and the limit value.

[0119] The original wall panels 4 include the original gravity wall panels 41 on both sides, the bottom of the original gravity wall panels 41 is a foundation raft 1, the top of the original gravity wall panels 41 is a top plate 2, the top of the top plate 2 is provided with a mill base bracket 7, and the two ends of the original gravity wall panels 41 on both sides are original openings 8; the added shear wall 3 at least includes an intermediate shear wall 31 arranged between the original gravity wall panels 41 on both sides. The two inner sides of the original opening 8 are respectively provided with two side shear walls 32, and the top of the two side shear walls 32 and the top of the intermediate shear wall 31 are an integral structure. The thickness of the newly built shear wall 3 in step 1 is 600-1000mm, and the anchoring length of the concrete is greater than 15d and implanted into the original foundation raft 1 and top plate 2. The secondary pouring space in step 3 is 250-350mm in height; the static stop period in step 5 is 30-60min. In step 5, the height of the feed end of the feed pipe 5 is 450-500 mm higher than the bottom of the top plate 2, and the height of the outlet end of the outlet pipe 6 is not lower than the height of the top plate 2. In step 6, the feed end of the feed pipe 5 is connected to a pump to pour non-shrinkage concrete or non-shrinkage grouting material into the secondary pouring space.

[0120] The embodiments of the present invention are provided for the purpose of illustration and description. Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations of the present invention. Ordinary technicians in this field can change, modify, replace and modify the above embodiments within the scope of the present invention.

Claims

1. A grinding mill basic detection method, Features: The detection method comprises the following steps: Step 1: Install axial multi-channel vibration meter measuring points and radial multi-channel vibration meter measuring points on the grinding mill equipment foundation; Step 2: Run the mill equipment under normal load, and record the axial displacement value detected by the axial multi-channel vibration meter and the radial displacement value detected by the radial multi-channel vibration meter; Step 3: When the axial displacement value in step 2 is smaller than the radial displacement value, and the displacement value is smaller than the limit value of 0.25 mm, it is a normal operating state; Step 4: When the axial displacement value in step 2 is not less than the radial displacement value or the displacement value is not less than the limit value of 0.25 mm, it means that the axial foundation stiffness of the grinding mill equipment is too small and the bending stiffness of the foundation is small, and a shear wall needs to be added.

2. According to the grinding mill foundation detection method of claim 1, Features: The two measuring points of the axial multi-channel vibration meter are respectively arranged at two ends of the grinding mill equipment foundation.

3. According to the grinding mill foundation detection method of claim 1, Features: The two measuring points of the radial multi-channel vibration meter are respectively arranged on the two sides of the grinding mill equipment foundation.

4. A grinding mill basic detection method according to any one of claims 1 to 3, Features: The method for adding a shear wall comprises the following steps: Step 1: implanting steel bars at the location where the shear wall (3) is to be added, with the bottom end of the steel bars implanted in the original foundation raft (1) and the top end of the steel bars implanted in the top plate (2); Step 2: roughening the contact area between the original wall panel (4) and the newly built shear wall (3) to increase the shear strength of the concrete; Step 3: Tie up the steel cage and assemble the tied steel cage with the steel formwork. The lower part of the steel formwork is the primary pouring space, and the upper part of the steel formwork is the secondary pouring space. Step 4: Slowly pour the premixed concrete into the primary pouring space through the reserved secondary pouring space of the steel formwork to ensure that the internal gas and residual slurry are discharged; Step 5: After the pouring and vibrating of the primary pouring space is completed, the pouring space is left to stand for a period of time, and the exterior of the secondary pouring space is assembled with wooden templates; a feed port and an air outlet and residual slurry discharge port are provided on the wooden templates on both sides of the secondary pouring space, a feed pipe (5) is provided on the feed port, and an outlet pipe (6) is provided on the air outlet and residual slurry discharge port; Step 6: Slowly pouring non-shrinkage concrete or non-shrinkage grouting material through the feed pipe (5), during which the gas in the secondary pouring space is discharged through the outlet pipe (6); Step 7: Continue pouring non-shrinkage concrete or non-shrinkage grouting material into the secondary pouring space until the non-shrinkage concrete or non-shrinkage grouting material overflows from the outlet pipe (6), and then stop pouring; Step 8: After the strength reaches 1.2Mpa, remove the steel formwork and wooden formwork, and water to maintain moisture retention; Step 9: After the maintenance is completed, the above-mentioned detection method is used for detection. It is sufficient when the axial displacement value is less than the radial displacement and the limit value.

5. A grinding mill foundation detection method according to claim 4, Features: The original wall panels (4) include original gravity wall panels (41) on both sides, the bottom of the original gravity wall panels (41) is a foundation raft (1), the top of the original gravity wall panels (41) is a top panel (2), the top of the top panel (2) is provided with a mill base bracket (7), and the two ends of the original gravity wall panels (41) on both sides are original openings (8); the additional shear wall (3) includes at least an intermediate shear wall (31) arranged between the original gravity wall panels (41) on both sides.

6. A grinding mill foundation detection method according to claim 5, Features: Two side shear walls (32) are respectively arranged on the two inner sides of the original opening (8), and the tops of the two side shear walls (32) and the top of the middle shear wall (31) are an integrated structure.

7. A grinding mill foundation detection method according to claim 4, Features: The thickness of the newly constructed shear wall (3) in step 1 is 600-1000 mm, and the reinforcing bars are embedded in the original foundation raft (1) and the top plate (2) with a concrete anchoring length of more than 15 days.

8. A grinding mill foundation detection method according to claim 4, Features: The secondary pouring space in step 3 has a height of 250 to 350 mm; the static stop period in step 5 is 30 to 60 minutes.

9. A grinding mill foundation detection method according to claim 4, Features: In step 5, the height of the feed end of the feed pipe (5) is 450 to 500 mm higher than the bottom of the top plate (2), and the height of the outlet end of the outlet pipe (6) is not lower than the height of the top plate (2).

10. A grinding mill foundation detection method according to claim 4, Features: In step 6, the feed end of the feed pipe (5) is connected to a pump to pour non-shrinkage concrete or non-shrinkage grouting material into the secondary pouring space.