Design and construction method for vibration reduction cavity of non-middle-guide multi-arch tunnel
By designing the vibration damping cavity of arc-shaped plate structure and ribbed steel bars in an in-line guide arch tunnel, and adjusting the parameters using the Sadolphsky formula, the poor vibration damping effect of the traditional vibration damping layer after initial support deformation is solved. The problem of this paper achieves effective vibration reduction effect in the blasting construction of the rear hole, and avoids the cracks in the lining of the pioneer hole.
Patent Information
- Application Number
- CN202411033047.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2024-11-15
AI Technical Summary
After the initial support deformation of the traditional intermediate guide arch tunnel, the vibration damping effect cannot meet the requirements of pioneer hole lining, and cannot effectively reduce the impact of rear hole blasting on pioneer hole lining.
Design a vibration-absorbing cavity of an intermediate guide arch tunnel, adopting a ribbed steel bar arranged in a matrix, with a reserved grouting hole in the inner cavity, and a vibration-absorbing cavity is set up every 1m along the tunnel excavation direction. , and adjust the parameters through the Sadolphsky empirical formula to optimize the vibration damping effect.
After the initial support deformation, the vibration-absorbing layer still has a good vibration-absorbing effect, significantly reducing the impact of rear hole blasting on pioneer hole lining and avoiding cracks in pioneer hole lining.
Smart Images

Figure CN118959037A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnel engineering, and in particular to a design and construction method of a vibration reduction cavity for a non-central guide continuous arch tunnel. Background Art
[0002] As China's transportation infrastructure further develops in the southwestern mountainous areas, more and more multi-arch tunnels have emerged due to the restrictions on tunnel opening layout and land use conditions. Multi-arch tunnels without central guides have gradually become the main structural form of multi-arch tunnels due to their good structural integrity, simplified construction procedures and reduced surrounding rock disturbance.
[0003] Since the middle wall of the traditional arch tunnel is eliminated in the arch tunnel without the middle wall, the net distance between the leading tunnel and the trailing tunnel is reduced, and the lining of the leading tunnel is easily cracked when the trailing tunnel is blasted. Therefore, in the structural design and construction, a foam vibration reduction layer is usually arranged on the side of the hidden middle wall of the leading tunnel to reduce the impact of the trailing tunnel blasting on the leading tunnel lining. However, the vibration reduction foam layer arranged between the waterproof layer and the primary support is continuously compressed by the primary support during the gradual deformation of the primary support. During the blasting construction of the trailing tunnel, its vibration reduction performance has been greatly reduced, and it cannot effectively reduce the impact of the trailing tunnel blasting on the leading tunnel lining. Summary of the invention
[0004] Based on the existing problems, the present invention provides a design and construction method for a vibration reduction cavity in a non-central guide arch tunnel, which solves the problem that the vibration reduction effect of the traditional vibration reduction layer cannot meet the requirements of the lining of the pilot tunnel after the initial support is deformed.
[0005] The technical solution adopted by the present invention is:
[0006] A vibration-damping cavity for a non-central-guided multi-arch tunnel, which is an arc-shaped plate structure installed between the tunnel pilot hole lining and the initial support of the hidden central wall; an internal cavity is formed inside the arc-shaped plate structure, and a plurality of matrix-arranged ribbed steel bars are arranged in the internal cavity; the vibration-damping cavity for the non-central-guided multi-arch tunnel is provided with a reserved grouting hole connected to the internal cavity near the tunnel lining side.
[0007] Furthermore, the vibration-damping cavity of the non-central-guided arch tunnel includes a lining side steel plate that can be fitted with the lining side of the tunnel pilot tunnel, a bottom steel plate that can be fitted with the inner surface of the primary support of the hidden central wall of the tunnel pilot tunnel, and surrounding steel plates located on the surrounding sides between the lining side steel plate and the bottom steel plate; the surrounding steel plates are welded to the lining side steel plate and the bottom steel plate to form an overall vibration-damping cavity; reserved grouting holes are provided on the lining side steel plate; and the ribbed steel bars in the internal cavity are welded and fixed to the lining side steel plate and the bottom steel plate at both ends.
[0008] Furthermore, a vibration reduction cavity of the non-central guide continuous arch tunnel is arranged every 1 m along the tunnel excavation direction.
[0009] A construction method for a vibration reduction cavity of a non-central guide continuous arch tunnel, based on the above-mentioned vibration reduction cavity of a non-central guide continuous arch tunnel, comprises the following steps:
[0010] Step 1: During the construction of the pilot tunnel, a vibration reduction cavity of the non-central guide continuous arch tunnel is installed at intervals of 1m along the tunnel excavation direction;
[0011] Step 2, when each vibration reduction cavity of the non-central guide arch tunnel is installed, the bottom steel plate is fixed to the inner surface of the primary support of the hidden central wall with bolts, and then the surrounding steel plates and ribbed steel bars are welded to the bottom steel plate according to the predetermined position, and finally the top steel plate is welded to the surrounding steel plates to form a vibration reduction cavity of the non-central guide arch tunnel with an internal cavity;
[0012] Step 3, after the vibration reduction cavity of the non-central guide multi-arch tunnel is installed, the lining of the pilot hole is poured;
[0013] Step 4, blasting the rear tunnel. After the blasting of the rear tunnel is completed, grouting is injected into the internal cavity of the vibration reduction cavity of the non-central guide multi-arch tunnel through the reserved grouting holes to seal the internal cavity and ensure that no cavity appears behind the lining of the first tunnel;
[0014] Step 5, repeat steps 2 to 4 until all vibration reduction cavities of the non-central guide continuous arch tunnels are constructed.
[0015] Furthermore, during the construction process, the thickness and height of the internal cavity of the first non-central guide multi-arch tunnel vibration reduction cavity are preset based on existing engineering experience; after the internal cavity of corresponding thickness and height is arranged according to engineering experience, the pre-blasting construction starts from a smaller cycle footage;
[0016] During the construction process, the peak vibration velocity of the pilot tunnel lining measuring points is monitored, and the peak vibration velocity of the lining under the predetermined cycle advance is calculated in combination with the Sadovsky empirical formula; if the actual measured peak vibration velocity or the peak vibration velocity calculated according to the Sadovsky formula exceeds the safety limit, the internal cavity thickness and height of the next non-central guide continuous arch tunnel vibration reduction cavity need to be adjusted accordingly.
[0017] Furthermore, the Sadovsky empirical formula used to predict the attenuation law of blasting vibration is as follows:
[0018]
[0019] Where v is the peak velocity of particle vibration; K is the site coefficient; Q is the maximum charge in a single section; R is the distance from the explosion center; α is the attenuation exponent.
[0020] Furthermore, during the construction process, the peak vibration velocity of the pilot tunnel lining measuring point is monitored, and the peak lining velocity under the predetermined cycle footage is calculated in combination with Sadovsky's empirical formula, including the following steps:
[0021] According to the monitoring data of the peak vibration velocity at the measuring point, the maximum single-stage charge of the corresponding step of the pilot tunnel and the distance from the explosion center, the peak vibration velocity distribution and the Sadovsky fitting curve are drawn;
[0022] The site coefficient K and the attenuation index α are obtained by fitting the curve;
[0023] The maximum charge Q and the distance from the explosion center R in a single section are derived from the expected penetration length.
[0024] The peak vibration velocity caused by the corresponding step blasting is calculated using Sadovsky's empirical formula.
[0025] Furthermore, when the peak vibration velocities between the measuring points are greatly different and the peak vibration velocities at some measuring points do not exceed the safety limit standard, the layout height of the internal cavity of the vibration reduction cavity of the non-central guide arch tunnel should be increased; if the peak vibration velocities between the measuring points are small, the layout thickness of the internal cavity of the vibration reduction cavity of the non-central guide arch tunnel should be increased.
[0026] The beneficial effects of the present invention are:
[0027] The present invention replaces the traditional foam damping layer with a non-central guide continuous arch tunnel damping cavity to ensure that the damping layer still has a good damping effect after the initial support deformation. In the blasting construction of the rear tunnel, the parameters of the next cycle damping cavity of the non-central guide continuous arch tunnel are adjusted according to the measured data and the Sadovsky formula. Compared with the traditional damping structure, the present invention can greatly reduce the impact of the blasting vibration of the rear tunnel on the lining of the leading tunnel, and avoid cracks in the lining of the leading tunnel. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a schematic diagram of the installation position of the vibration reduction cavity of the non-central guide continuous arch tunnel of the present invention;
[0029] Figure 2 It is a schematic diagram of the structure of the vibration reduction cavity of the non-central guide multi-arch tunnel of the present invention;
[0030] Figure 3 It is a schematic diagram of the internal structure of the vibration reduction cavity of the non-central guide continuous arch tunnel of the present invention;
[0031] Figure 4 For the present invention Figure 3 A magnified schematic diagram of the local structure in FIG.
[0032] Figure 5 It is a flow chart of the design and construction method of the vibration reduction cavity of the non-central guide multi-arch tunnel of the present invention;
[0033] Figure 6 The detailed construction sequence diagram of the tunnel of the actual engineering verification example 1 of the present invention;
[0034] Figure 7This is the installation position diagram of the vibration reduction cavity of the non-central guide arch tunnel in the actual engineering verification example 1 of the present invention;
[0035] Figure 8 This is a cross-sectional arrangement diagram of vibration measurement points in the pilot tunnel of the actual engineering verification example 1 of the present invention;
[0036] Fig. 9 The peak velocity distribution and Sadovsky fitting curve of the actual engineering verification example 1 of the present invention;
[0037] Fig.10 The detailed construction sequence diagram of the tunnel of the actual engineering verification example 2 of the present invention;
[0038] Fig.11 This is a diagram showing the installation position of the vibration reduction cavity of the non-central guide multi-arch tunnel in the actual engineering verification example 2 of the present invention;
[0039] Fig.12 This is a cross-sectional arrangement diagram of vibration measurement points in the pilot tunnel of the actual engineering verification example 2 of the present invention;
[0040] Fig.13 The peak velocity distribution and Sadovsky fitting curve of the actual engineering verification example 2 of the present invention;
[0041] Figure 1 —13, 1—vibration reduction cavity of the tunnel without central guide arch, 2—lining side steel plate, 3—bottom steel plate, 4—surrounding steel plates, 5—reserved grouting holes, 6—ribbed steel bars, 7—internal cavity. DETAILED DESCRIPTION
[0042] The following will be combined with the accompanying drawings of the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0043] Example 1
[0044] This embodiment provides a vibration reduction cavity for a tunnel without a central guide arch, which aims to replace the traditional foam vibration reduction layer and ensure that the vibration reduction layer still has a good vibration reduction effect after the initial support deformation. Figure 1 As shown, the vibration reduction chamber 1 of the non-central guide continuous arch tunnel is installed between the lining of the tunnel pilot hole and the initial support of the hidden central wall. Figure 2 As shown, the vibration reduction cavity 1 of the non-central guide continuous arch tunnel is an arc-shaped plate structure; Figure 2 , Figure 3 and Figure 4As shown, the vibration reduction cavity 1 of the non-central guide arch tunnel includes a lining side steel plate 2 that can be fitted with the tunnel lining side, a bottom steel plate 3 that can be fitted with the inner surface of the primary support of the hidden central wall, and surrounding steel plates 4 located on the surrounding sides between the lining side steel plate 2 and the bottom steel plate 3. The surrounding steel plates 4 are welded with the lining side steel plate 2 and the bottom steel plate 3 to form the overall vibration reduction cavity 1 of the non-central guide arch tunnel; an internal cavity 7 is formed inside the vibration reduction cavity 1 of the non-central guide arch tunnel, and a plurality of matrix-arranged Φ16 ribbed steel bars 6 are arranged in the internal cavity 7; both ends of the ribbed steel bars 6 are welded and fixed to the lining side steel plate 2 and the bottom steel plate 3; in addition, a reserved grouting hole 5 communicating with the internal cavity 7 is provided near the tunnel lining side of the vibration reduction unit, and the reserved grouting hole 5 is located on the lining side steel plate 2.
[0045] Based on the above-mentioned vibration reduction cavity 1 of the non-central guide continuous arch tunnel, this embodiment also provides a design and construction method of the vibration reduction cavity of the non-central guide continuous arch tunnel, such as Figure 5 As shown, the specific steps include:
[0046] Step 1: During the construction of the pilot tunnel, a non-central guide continuous arch tunnel vibration reduction cavity 1 is installed every 1m along the tunnel excavation direction.
[0047] Step 2, when each vibration-damping cavity 1 of the non-central guide continuous arch tunnel is installed, the bottom steel plate 3 is fixed to the inner surface of the primary support of the hidden central wall with bolts, and then the surrounding steel plates 4 and the ribbed steel bars 6 are welded to the bottom steel plate 3 according to predetermined positions, and finally the top steel plate is welded to the surrounding steel plates 4 to form a vibration-damping cavity 1 of the non-central guide continuous arch tunnel with an internal cavity 7.
[0048] Step 3, after the vibration reduction cavity 1 of the non-central guide multi-arch tunnel is installed, the lining of the pilot hole is poured;
[0049] Step 4, carry out blasting construction of the rear tunnel. After the blasting construction of the rear tunnel is completed and no longer affects the safety of the lining of the first tunnel, grouting is injected into the internal cavity 7 of the vibration reduction cavity 1 of the non-central guide arch tunnel through the reserved grouting holes 5 to seal the internal cavity 7 and ensure that no cavity appears behind the lining of the first tunnel.
[0050] Step 5, repeat steps 2 to 4 until all vibration reduction cavities 1 of the non-central guide continuous arch tunnels are constructed.
[0051] During the construction process, the thickness and height of the internal cavity 7 of the first non-central guide multi-arch tunnel vibration reduction cavity 1 are preset based on existing engineering experience; the parameters of the non-central guide multi-arch tunnel vibration reduction cavity 1 need to be adjusted according to different surrounding rock conditions and different excavation sections. Taking the current design standard of the southwestern mountainous expressway as an example, it generally adopts a two-way 4-lane and a design vehicle speed of 80km / h as the technical standard. Under this technical standard, taking the V-level surrounding rock multi-arch tunnel as an example, the non-central guide multi-arch tunnel vibration reduction cavity 1 can be preset with a thickness of 3cm and an overall height of 7m.
[0052] During the construction process, after the internal cavity 7 of corresponding thickness and height is arranged according to engineering experience, a smaller cycle advance is used for the construction of the subsequent tunnel, that is, a smaller single-stage charge is used during the blasting operation; the main vibration frequency and vibration speed of the lining of the first tunnel are monitored during the blasting operation. After obtaining the monitoring results, it can be divided into two situations:
[0053] ① The blasting of the subsequent tunnel does not cause any damage to the lining of the leading tunnel, and the vibration velocity of the leading tunnel lining meets the safety control standard for blasting vibration velocity in traffic tunnels in the "Safety Regulations for Blasting" (GB6722-2014) (as shown in the table). The cycle footage can be gradually increased, and the vibration velocity of the leading tunnel lining can be monitored at the same time.
[0054] Master frequency f≤10Hz 10Hz<f≤50Hz f>50Hz Allowable vibration speed of particle (cm / s) 10~12 12~15 12~20
[0055] In engineering, the Sadovsky empirical formula is usually used to predict the attenuation law of blasting vibration. The formula is as follows:
[0056]
[0057] Where v is the peak velocity of particle vibration; K is the site coefficient; Q is the maximum charge in a single section; R is the distance from the explosion center; α is the attenuation exponent.
[0058] During the construction process, the peak vibration velocity of the pilot tunnel lining measuring point is monitored, and the peak lining velocity under the predetermined cycle footage is calculated in combination with Sadovsky's empirical formula. Specifically:
[0059] According to the monitoring data of the peak vibration velocity at the measuring point, the maximum single-stage charge of the corresponding step of the pilot tunnel and the distance from the explosion center, the peak vibration velocity distribution and the Sadovsky fitting curve are drawn;
[0060] The site coefficient K and the attenuation index α are obtained by fitting the curve;
[0061] The maximum charge Q and the distance from the explosion center R in a single section are derived from the expected penetration length.
[0062] The peak vibration velocity caused by the corresponding step blasting is calculated using Sadovsky's empirical formula.
[0063] Furthermore, the vibration velocity of the pilot tunnel lining under the expected footage length can be calculated based on the expected cycle footage length and the unit consumption value of explosives. If the vibration velocity exceeds the safety control standard, the layout parameters of the vibration reduction cavity 1 of the non-central guide multi-arch tunnel should be adjusted during the cycle construction of the non-central guide multi-arch tunnel vibration reduction cavity 1 under the pilot tunnel, that is, the layout height and layout thickness of the vibration reduction cavity 1 of the non-central guide multi-arch tunnel. If the peak vibration velocity under the expected footage length calculated by Sadovsky's formula does not exceed the safety control standard, the vibration reduction cavity can be arranged according to the original size specifications.
[0064] ② In the process of gradually increasing the cycle footage, if the vibration speed of the pilot tunnel lining exceeds the safety control standard, or the pilot tunnel lining has defects, the layout parameters of the vibration reduction cavity 1 of the non-central guide multi-arch tunnel should be adjusted in the next cycle construction, and the footage length should be gradually increased from the minimum cycle footage.
[0065] When adjusting the layout parameters of the vibration reduction cavity 1 of the non-central guide double arch tunnel, there are mainly two adjustment directions: thickening the layout thickness of the internal cavity 7 of the vibration reduction cavity 1 of the non-central guide double arch tunnel and increasing the layout height of the internal cavity 7 of the vibration reduction cavity 1 of the non-central guide double arch tunnel. When the peak vibration velocity difference between each measuring point is large, and the peak vibration velocity of some measuring points does not exceed the safety limit standard, the layout height of the internal cavity 7 of the vibration reduction cavity 1 of the non-central guide double arch tunnel should be increased; if the peak vibration velocity difference between each measuring point is small, the layout thickness of the internal cavity 7 of the vibration reduction cavity 1 of the non-central guide double arch tunnel should be increased.
[0066] In addition, the following actual engineering verifications were carried out on the vibration reduction cavity 1 of the non-central guide double-arch tunnel:
[0067] Actual engineering verification example 1:
[0068] For a bidirectional 4-lane non-central guide multi-arch tunnel, taking the IV-level surrounding rock section as an example, the left and right caverns of the tunnel were constructed using the two-step reserved core soil method and the three-step method respectively. The construction sequence diagram is as follows:
[0069] The detailed construction sequence of the tunnel is as follows: Figure 6 As shown in the figure, Ⅰ, Ⅱ, Ⅲ... represent the excavation sequence of the face, and the rear tunnel is excavated using the three-step method. Figure 7 As shown in the figure, during the construction of the pilot tunnel, a non-central guide multi-arch tunnel vibration reduction cavity 1 with a height of 5m, a thickness of 3cm, and an internal cavity 7 with a thickness of 2cm was laid out at the hidden middle wall. The section arrangement of vibration measurement points in the pilot tunnel is shown in the figure. Figure 8 As shown in the figure, during pre-blasting, the longitudinal arrangement spacing of the measuring points is consistent with the length of each pre-blasting footage.
[0070] Under eight short-footage pre-blasting conditions (footages of 0.4m to 1.1m respectively), the peak vibration velocity at measuring point 1 is significantly greater than that at measuring points 2 and 3. Based on the monitoring data of the peak vibration velocity at measuring point 1 under eight pre-blasting conditions, the maximum single-stage charge of the upper and middle steps and the distance from the explosion center, a scatter plot of the peak vibration velocity data and a fitted Sadovsky curve are drawn as shown in the figure. Fig. 9 shown.
[0071] The Sadovsky formula obtained by curve fitting is as follows:
[0072]
[0073] According to the fitted Sadovsky formula, the peak vibration velocity caused by the upper step blasting under the expected footage length (1.2m) is calculated as follows.
[0074]
[0075] Combined with the monitored main vibration frequency (f>50HZ), if the construction is carried out according to the expected cyclic advance, the peak vibration velocity of the pilot tunnel will exceed the requirements of the blasting safety regulations.
[0076] The peak vibration velocity at measuring point 1 is significantly higher than that at measuring points 2 and 3. The layout height of the vibration reduction cavity 1 of the non-central guide continuous arch tunnel is adjusted to 8m, and then the blasting footage is gradually increased from the shortest footage (0.4m) pre-blasting to the expected footage length (1.2m). The maximum peak vibration velocity among the measuring points is measured at measuring point 2, and the maximum peak vibration velocity is 10.7cm / s, which meets the requirements of the "Safety Regulations for Blasting".
[0077] Actual engineering verification example 2:
[0078] For a bidirectional 4-lane non-central guide multi-arch tunnel, taking the IV-level surrounding rock section as an example, the left and right caverns of the tunnel were constructed using the two-step reserved core soil method and the three-step method respectively. The construction steps are as follows:
[0079] The detailed construction sequence of the tunnel is as follows: Fig.10 As shown in the figure, Ⅰ, Ⅱ, Ⅲ... represent the excavation sequence of the face, and the rear tunnel is excavated using the three-step method. Fig.11 As shown in the figure, during the construction of the pilot tunnel, a non-central guide multi-arch tunnel vibration reduction cavity 1 with a height of 5m, a thickness of 3cm, and an internal cavity 7 with a thickness of 2cm was laid out at the hidden middle wall. The section arrangement of vibration measurement points in the pilot tunnel is shown in the figure. Fig.12 As shown, during pre-blasting, the longitudinal arrangement spacing of the monitoring points is consistent with the length of each pre-blasting footage.
[0080] Under eight short-footage pre-blasting conditions (footages of 0.4m to 1.1m respectively), the difference in peak vibration velocity at each measuring point is small, and the peak vibration velocity at measuring points 2 and 3 caused by the blasting of the middle and lower steps is relatively large. Based on the monitoring data of the peak vibration velocity at measuring points 2 and 3 under the eight pre-blasting conditions, the maximum single-stage charge amount and the distance from the explosion center of the middle and lower steps, the scatter plot of the peak vibration velocity data at measuring points 2 and 3 and the fitted Sadovsky curve are drawn as shown in the figure. Fig.13 shown.
[0081] The Sadovsky formula obtained by curve fitting is as follows
[0082]
[0083] According to the Sadovsky formula obtained by fitting, the peak vibration velocity caused by the blasting of the middle and lower steps under the expected footage length (1.2m) is calculated.
[0084]
[0085] Combined with the monitored main vibration frequency (f>50HZ), if the construction is carried out according to the expected cyclic advance, the peak vibration velocity of the pilot tunnel will exceed the requirements of the blasting safety regulations.
[0086] According to the monitoring results, the peak vibration velocity monitoring results of the three measuring points are relatively small. The layout thickness of the vibration reduction cavity 1 of the non-central guide continuous arch tunnel is adjusted to 4cm (the thickness of the internal cavity 7 is 2cm), and then the blasting footage is gradually increased from the shortest footage (0.4m) pre-blasting to the expected footage length (1.2m). The maximum peak vibration velocity among the measuring points is measured at measuring point 2, and the maximum peak vibration velocity is 14.5cm / s, which meets the requirements of the "Safety Regulations for Blasting".
[0087] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A vibration reduction cavity for a non-central guide multi-arch tunnel, characterized in that: The vibration reduction cavity of the non-central guide arch tunnel is an arc-shaped plate structure installed between the tunnel pilot hole lining and the initial support of the hidden central wall; an internal cavity is formed inside the arc-shaped plate structure, and a plurality of matrix-arranged ribbed steel bars are arranged in the internal cavity; the vibration reduction cavity of the non-central guide arch tunnel is provided with a reserved grouting hole connected to the internal cavity near the tunnel lining side.
2. The vibration reduction cavity of the non-central guide continuous arch tunnel according to claim 1 is characterized in that: The vibration reduction cavity of the non-central guide arch tunnel includes a lining side steel plate that can be fitted with the lining side of the tunnel pilot hole, a bottom steel plate that can be fitted with the inner surface of the primary support of the hidden central wall of the tunnel pilot hole, and surrounding steel plates located on the surrounding sides between the lining side steel plate and the bottom steel plate; the surrounding steel plates are welded with the lining side steel plate and the bottom steel plate to form an overall vibration reduction cavity; the lining side steel plate is provided with reserved grouting holes; the ribbed steel bars in the internal cavity are welded and fixed to the lining side steel plate and the bottom steel plate at both ends.
3. The vibration reduction chamber of the non-central guide continuous arch tunnel according to claim 1 is characterized in that: A vibration reduction cavity of the non-central guide continuous arch tunnel is arranged every 1m along the tunnel excavation direction.
4. A design and construction method for a vibration reduction cavity of a non-central guide continuous arch tunnel, the design and construction method is based on the vibration reduction cavity of a non-central guide continuous arch tunnel according to claim 1 or 2, characterized in that: The following steps are involved: Step 1: During the construction of the pilot tunnel, a vibration reduction cavity of the non-central guide continuous arch tunnel is installed at intervals of 1m along the tunnel excavation direction; Step 2, when each vibration reduction cavity of the non-central guide arch tunnel is installed, the bottom steel plate is fixed to the inner surface of the primary support of the hidden central wall with bolts, and then the surrounding steel plates and ribbed steel bars are welded to the bottom steel plate according to the predetermined position, and finally the top steel plate is welded to the surrounding steel plates to form a vibration reduction cavity of the non-central guide arch tunnel with an internal cavity; Step 3, after the vibration reduction cavity of the non-central guide multi-arch tunnel is installed, the lining of the pilot hole is poured; Step 4, blasting the rear tunnel. After the blasting of the rear tunnel is completed, grouting is injected into the internal cavity of the vibration reduction cavity of the non-central guide multi-arch tunnel through the reserved grouting holes to seal the internal cavity and ensure that no cavity appears behind the lining of the first tunnel; Step 5, repeat steps 2 to 4 until all vibration reduction cavities of the non-central guide continuous arch tunnels are constructed.
5. The design and construction method of the vibration reduction cavity of the non-central guide multi-arch tunnel according to claim 4 is characterized by: During the construction process, the thickness and height of the internal cavity of the first non-central guide multi-arch tunnel vibration reduction cavity were preset based on existing engineering experience; after the internal cavity of corresponding thickness and height was arranged according to engineering experience, the pre-blasting construction started from a smaller cycle footage; During the construction process, the peak vibration velocity of the pilot tunnel lining measuring points is monitored, and the peak vibration velocity of the lining under the predetermined cycle advance is calculated in combination with the Sadovsky empirical formula; if the actual measured peak vibration velocity or the peak vibration velocity calculated according to the Sadovsky formula exceeds the safety limit, the internal cavity thickness and height of the next non-central guide continuous arch tunnel vibration reduction cavity need to be adjusted accordingly.
6. The design and construction method of the vibration reduction cavity of the non-central guide double-arch tunnel according to claim 5 is characterized by: The Sadovsky empirical formula used to predict the attenuation law of blasting vibration is as follows: ; Where v is the peak velocity of particle vibration; K is the site coefficient; Q is the maximum charge in a single section; R is the distance from the explosion center; α is the attenuation exponent.
7. The design and construction method of the vibration reduction cavity of the non-central guide double-arch tunnel according to claim 6 is characterized by: During the construction process, the peak vibration velocity of the pilot tunnel lining measuring point is monitored, and the peak lining velocity under the predetermined cycle footage is calculated in combination with Sadovsky's empirical formula, including the following steps: According to the monitoring data of the peak vibration velocity at the measuring point, the maximum single-stage charge of the corresponding step of the pilot tunnel and the distance from the explosion center, the peak vibration velocity distribution and the Sadovsky fitting curve are drawn; The site coefficient K and the attenuation index α are obtained by fitting the curve; The maximum charge Q and the distance from the explosion center R in a single section are derived from the expected penetration length. The peak vibration velocity caused by the corresponding step blasting is calculated using Sadovsky's empirical formula.
8. The design and construction method of the vibration reduction cavity of the non-central guide double-arch tunnel according to claim 5 is characterized by: When the peak vibration velocities between measuring points differ greatly, and the peak vibration velocities at some measuring points do not exceed the safety limit standard, the layout height of the internal cavity of the vibration reduction cavity of the non-central guide arch tunnel should be increased; if the peak vibration velocities between measuring points differ slightly, the layout thickness of the internal cavity of the vibration reduction cavity of the non-central guide arch tunnel should be increased.
Citation Information
Cited By
Design method and construction method of transverse opposite-pulling system of triangular area of non-middle-guide multi-arch tunnel
CN120083543A
Damping device suitable for multi-arch tunnel
CN224017223U