Comprehensive prevention and control system for TBM tunneling rock burst

By designing a closed structure of the support frame and protective rod during the TBM tunnel excavation process, combined with real-time early warning of the microseismic monitoring system, the damage problem of rock bursts to staff is solved, and safe protection and efficient construction of the construction area are achieved.

CN118959088AActive Publication Date: 2024-11-15CENT SOUTH UNIV
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411190963.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2024-11-15
Estimated Expiration
2044-08-28

AI Technical Summary

Technical Problem

During the excavation of TBM tunnels, rock bursts caused serious damage to the staff, and the existing technology was difficult to effectively prevent and control, affecting construction efficiency and safety.

Method used

A comprehensive prevention and control system for rock bursts through the tunnel bore is designed, including support frames, protective poles, protective mechanisms and microseismic monitoring systems. By monitoring the stress changes of rock mass in real time, early warning and quickly seal the protective structure, blocking rock burst fragments, and Stay open in non-rock burst states to ensure clear vision in the construction area.

Benefits of technology

Effectively protect the safety of construction personnel, reduce the impact of rock bursts on tunnel construction, improve the accuracy and timeliness of early warning and protection, and ensure construction efficiency and accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118959088A_ABST
    Figure CN118959088A_ABST
Patent Text Reader

Abstract

The invention relates to a comprehensive prevention and control system for TBM tunneling rockburst, and the system comprises a supporting frame which is used for being detachably mounted to a segment assembly area of a tunneling machine; the protection rods are fixedly arranged on the supporting frame, the number of the protection rods is multiple, and every two protection rods form a group; the protection mechanism is arranged between the two protection rods in the same group and used for blocking a gap between the two protection rods in the same group and the side, away from the heading machine, of the supporting frame so as to block rock fragments generated by rock burst; the early warning mechanism is arranged on the heading machine; the micro-seismic monitoring system is connected to the protection mechanism and the early warning mechanism and used for collecting rockburst micro-seismic data in real time, and when rockburst happens to the rock mass, the micro-seismic monitoring system sends a control signal to the protection mechanism and the early warning mechanism so that the protection mechanism and the early warning mechanism can operate. According to the method, operators can be rapidly protected when rockburst occurs, the efficiency and safety of pipe piece installation operation of the workers in a rockburst dangerous area are improved, and safe and efficient tunneling of the TBM tunnel with the high rockburst tendency is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of tunnel rockburst prevention and control, and in particular to a comprehensive rockburst prevention and control system for TBM tunneling. Background Art

[0002] Rockburst is an unavoidable rock disaster in deep rock engineering and often occurs during the excavation of high-ground stress tunnels. When a rockburst occurs, the elastic deformation energy accumulated inside the rock mass is quickly released, resulting in the ejection of a large number of large-sized rock fragments, causing casualties and serious damage to tunneling machinery, which increases the construction period and costs. With the sharp increase in the frequency of use of TBM tunneling machines, the impact of rockburst disasters on TBM tunneling has become increasingly significant. For example, a severe rockburst disaster occurred in the drainage tunnel of the Jinping Second Power Station in Sichuan, causing damage to the TBM equipment and serious casualties.

[0003] At present, TBM (tunnel boring machine) usually includes propulsion system, cutting system, excavation system, segment assembly system, etc. The excavation and shaping of tunnels by TBM mainly include the following aspects: first, excavate foundation pits or build vertical shafts at the beginning and end of the tunnel, which are used as assembly and disassembly wells for shield machines and their equipment; then, the cutting device of the TBM excavates the soil in front of the tunnel, and the cut soil is transported out of the cave by the excavation machinery; the TBM is pushed forward by the propulsion system of the TBM, and the jack is used to pressurize the rear part to push forward, while the soil is excavated; while the TBM is advancing, the splicing machine is used to advance the soil; The precast concrete segments are assembled to form the tunnel lining structure to support the tunnel wall. After the segments are assembled, filling materials such as cement slurry are injected into the space behind the lining to fill the gaps and improve the stability of the lining. In the process of the tunnel boring machine assembling the precast concrete segments through the splicing machine to form the tunnel lining structure, the workers need to accurately operate the splicing machine to assemble the segments on the tunnel wall. However, the splicing machine is located at the tail of the tunnel boring machine, and one side of it is exposed to the outside of the tunnel boring machine shell. When a rock burst occurs, the rock fragments produced by the rock burst will cause serious harm to the workers in the segment assembly area. For this reason, it is urgent to develop a comprehensive rock burst prevention and control system for TBM tunneling to protect the workers working in the rock burst high-incidence area when a rock burst occurs, so as to improve the construction efficiency and segment assembly quality of the TBM tunnel segment assembly operation with high rock burst tendency. Summary of the invention

[0004] In order to enable the workers in the segment assembly area of ​​the tunnel boring machine to accurately observe the real-time assembly process of the splicing machine and to quickly protect the workers when a rock burst occurs, the present application provides a TBM tunnel boring rock burst comprehensive prevention and control system.

[0005] The present application provides a TBM tunneling rock burst comprehensive prevention and control system, which adopts the following technical solutions: A comprehensive rockburst prevention and control system for TBM tunneling, comprising: Support frame, used for detachable installation in the segment assembly area of ​​the tunnel boring machine; A protection rod is fixed to the support frame, and a plurality of protection rods are provided, and two of them form a group. The plurality of protection rods are parallel to each other, and a shell skeleton structure is formed between the plurality of protection rods and the support frame; A protection mechanism is provided between two protection bars in the same group, and is used to block the gap between the two protection bars in the same group and the side of the support frame away from the tunnel boring machine, so as to block rock fragments generated by rock burst; The early warning mechanism is installed on the tunnel boring machine to issue early warning information when a rock burst occurs to serve as a warning; The microseismic monitoring system is connected to the protection mechanism and the early warning mechanism and is used to collect rock burst microseismic data in real time. When a rock burst occurs in the rock mass, the microseismic monitoring system sends a control signal to the protection mechanism and the early warning mechanism to enable the protection mechanism and the early warning mechanism to operate.

[0006] By adopting the above technical solution, when the microseismic monitoring system detects a change in rock stress, indicating that a rock burst may be about to occur, it will immediately send a control signal to the protection mechanism. The protection mechanism responds to the signal and quickly forms a closed structure between the two protection rods in the same group, and at the same time blocks the gap on the side of the support frame away from the tunnel boring machine to block the rock fragments produced by the rock burst. Then, after receiving the control signal of the microseismic monitoring system, the early warning mechanism immediately issues an early warning message, such as an audible and visual alarm, to remind construction personnel that the risk of rock burst is high, ensuring that personnel can quickly evacuate to a safe area. When a rock burst occurs, the shell skeleton structure composed of the protection mechanism and the support frame can effectively absorb the impact of rock burst fragments. The impact force can protect the workers in the segment assembly area from being easily injured. After the rockburst, the protection mechanism is restored to its initial state under the control of the microseismic monitoring system to ensure a clear view of the operating area, which is convenient for construction personnel to carry out subsequent inspections and construction. Real-time monitoring and early warning, combined with the rapid response of the protection mechanism, can effectively protect the safety of construction personnel and reduce the impact of rockburst disasters on tunnel construction. The protection mechanism remains open in the non-rockburst state to ensure a clear view of the operating area without affecting construction efficiency. Through the coordination of the microseismic monitoring system, protection mechanism and early warning mechanism, the intelligent rockburst prevention and control is realized, and the accuracy and timeliness of early warning and protection are improved.

[0007] Optionally, one of the two protection rods in the same group is set as a winding rod, and the other protection rod is set as a stretching rod, and the protection rods are both rotatably connected to the support frame; The protection mechanism comprises: The protective net has one end fixedly wound around the reeling rod; A traction rope, one end of which is wound around the stretching rod and the other end is connected to one end of the protective net; A locking assembly is provided between the protective net and the stretching rod, and is used to fix the end of the protective net away from the winding rod to one side of the stretching rod; Wherein, the winding rod and the stretching rod are both provided with a self-locking rotating assembly for driving the winding rod and the stretching rod to rotate.

[0008] By adopting the above technical solution, in the non-rockburst warning state, the protective net is rolled up by the winding rod and is in a retracted state to maintain an unobstructed field of vision in the operating area. When the microseismic monitoring system detects a change in rock stress, indicating that a rockburst may be about to occur, a control signal is immediately sent to the protection mechanism. After the self-locking rotating assembly on the winding rod and the stretching rod receives the control signal, the winding rod begins to rotate in the opposite direction to unfold the protective net. At the same time, the stretching rod rotates forward, and the end of the protective net is pulled away from the winding rod by the traction rope until the protective net is fully unfolded and fixed to one side of the stretching rod. After the protective net is fully unfolded, the locking assembly fixes the end of the protective net away from the winding rod to the side of the stretching rod, ensuring that the protective net can be firmly secured when a rockburst occurs. The gap between two adjacent protective rods is blocked. When a rock burst occurs, the shell skeleton structure composed of the protective net and the support frame can effectively absorb the impact force of the rock burst fragments and protect the workers in the segment assembly area. After the rock burst, the self-locking rotating components on the reeling rod and the stretching rod receive the control signal again, the reeling rod rotates forward, and the stretching rod rotates reversely to reel the protective net back to the initial state and restore the field of vision in the operating area. Through the coordinated use of the self-locking rotating components, the locking components, the traction rope, etc., the protective net can be quickly deployed after the rock burst warning signal is issued, providing immediate protection for the construction personnel and equipment. In the non-rock burst warning state, the protective net is reeled in to keep the field of vision in the operating area clear, thereby improving the construction efficiency and accuracy.

[0009] Optionally, the self-locking rotating assembly includes: The worm gear is fixedly sleeved on the protection rod; A worm is rotatably connected to the support frame, and the worm wheel and the worm are meshed with each other; The driving motor is arranged at one end of the worm.

[0010] By adopting the above technical scheme, when the protective rod is driven to rotate by the self-locking rotating assembly, the driving motor is first started after receiving the control signal, driving the worm to rotate, and the worm drives the worm wheel to rotate, and then the worm wheel can drive the protective rod (winding rod or stretching rod) fixedly connected thereto to rotate; when the worm and worm assembly on the stretching rod drives the stretching rod to rotate forward, and the worm and worm assembly on the winding rod drives the winding rod to rotate reversely, the protective net can be pulled away from one end of the winding rod by the traction rope until the protective net is fully unfolded and fixed to one side of the stretching rod, and then the protective net can be unfolded; the worm and worm have a self-locking characteristic, which can ensure the stability of the protective rod when a rock burst occurs, prevent the protective net from being accidentally rolled up, and improve the stability of the protective structure.

[0011] Optionally, the locking assembly includes: A locking shell is arranged between the winding rod and the stretching rod, and is fixed to a side of the support frame close to the stretching rod, and the traction rope passes through the locking shell; There are two locking rods, which are symmetrically slidably connected to the inside of the locking housing; An electric telescopic rod, disposed between the locking rod and the locking housing; A locking block is fixedly arranged at the end of the protective net, the locking block is fixedly connected to the traction rope, and the locking block can be clamped between the two locking rods.

[0012] By adopting the above technical solution, in the non-rockburst warning state, the locking rod is in the initial position inside the locking shell, the locking block is not engaged with the locking rod, and the protective net remains in the retracted state; when the protective net is fully unfolded, the traction rope drives the locking block to move to the inside of the locking shell, and the electric telescopic rod drives the two locking rods to move toward the center until the two locking rods are engaged to both sides of the locking block, and the protective net is fixed to one side of the stretching rod; after the rockburst, the electric telescopic rod drives the two locking rods to move to both sides to release the engagement of the locking block; the locking assembly can be used to engage the end of the protective net, thereby firmly fixing the protective net to prevent the traction rope that plays a traction role from breaking, thereby improving the impact resistance of the protective net.

[0013] Optionally, a plurality of springs are provided between the locking rod and the locking housing, and the springs are always in a compressed state and exert a force to move the two locking rods closer to each other.

[0014] By adopting the above technical solution, when the locking block is clamped between the two locking rods, the spring always applies a thrust to the locking rod. The force applied by the spring enables the two locking rods to be more tightly clamped to the two sides of the locking block. Even under the strong impact caused by rock burst, the locking rod is not easily displaced, thereby improving the stability of the locking structure.

[0015] Optionally, a chamfer is provided on one side of the two locking rods that is close to each other and away from the stretching rod.

[0016] By adopting the above technical solution, the guide angle enables the locking block to enter between the two locking rods more smoothly without the need for additional drive of the electric telescopic rod, thereby improving the locking response speed and ensuring that the protective net can be quickly locked after the rock burst warning signal is issued.

[0017] Optionally, a protective gate is hinged on one side of the support frame close to the tunnel boring machine segment assembly area, and a driving device is provided between the protective gate and the support frame. The driving device is connected to the microseismic monitoring system and is used to close the protective gate after receiving a control signal.

[0018] By adopting the above technical solution, in the non-rockburst warning state, the protective gate is in the open state to ensure the normal construction and personnel entry and exit of the tunnel boring machine segment assembly area. When the microseismic monitoring system detects changes in rock stress and indicates that a rockburst may be about to occur, it will immediately send a control signal to the drive device. After receiving the control signal, the drive device drives the protective gate to close quickly to form a closed protective space. When a rockburst occurs, the protective gate can effectively block the lateral impact of rockburst fragments and protect the workers in the segment assembly area.

[0019] Optionally, a plurality of auxiliary struts are arranged between two protection rods in the same group, both ends of the auxiliary struts are fixedly connected to the support frame, and the plurality of auxiliary struts are evenly distributed along an arc.

[0020] By adopting the above technical solution, the auxiliary struts can enhance the connection strength between the protection rods and the support frame, improve the stability of the entire protection structure, and multiple auxiliary struts are evenly distributed along the arc, which can make the stress distribution of the protection structure more uniform and facilitate pressure relief when a rock burst occurs, avoiding structural damage caused by local stress concentration, and improving the overall bearing capacity and impact resistance of the protection structure.

[0021] Optionally, the number of the traction ropes is multiple, and the multiple traction ropes are evenly distributed along the length direction of the protection rod.

[0022] By adopting the above technical solution, multiple traction ropes are evenly distributed along the length of the protective rod, which can ensure that the force distribution of the protective net is more uniform when it is deployed and retracted, avoiding structural damage caused by excessive local force, and improving the stability and safety of the protective net. Even if a traction rope fails or is damaged, the other traction ropes can continue to play a role to ensure the normal operation of the protective net.

[0023] Optionally, the early warning agency includes: The sound and light alarm device is connected to the microseismic monitoring system and is used to issue sound and light warnings after receiving control signals; The communication device is connected to the tunnel boring machine control center and is used to exchange information with the control center.

[0024] By adopting the above technical solution, the microseismic monitoring system monitors the microseismic signals inside the rock mass in real time. Once a precursor to rock burst is detected, a control signal is immediately generated. After receiving the control signal from the microseismic monitoring system, the sound and light alarm device immediately activates the sound and light alarm and emits a strong sound and light warning to remind on-site workers to pay attention to the risk of rock burst. The communication device maintains a real-time connection with the tunnel boring machine control center for two-way information exchange. The control center adjusts the tunneling parameters or initiates protective measures based on the early warning information.

[0025] In summary, the present application includes at least one of the following beneficial technical effects: 1. Through real-time monitoring and early warning, combined with the rapid response of protection agencies, the safety of construction personnel can be effectively protected, and the impact of rock burst disasters on TBM tunnel construction can be reduced. In addition, the protection agencies remain open in the non-rock burst state to ensure a clear view of the operating area and not affect construction efficiency. Through the coordination of the microseismic monitoring system with the protection agencies and early warning agencies, the intelligentization of rock burst prevention and control can be achieved, and the accuracy and timeliness of early warning and protection can be improved; 2. Through the coordinated use of self-locking rotating components, locking components, traction ropes, etc., the protective net can be quickly deployed after the rock burst warning signal is issued, providing immediate protection for construction personnel and equipment. In the non-rock burst warning state, the protective net is rolled up to maintain a clear view of the operating area, thereby improving construction efficiency and construction accuracy; 3. The self-locking rotating assembly has a self-locking characteristic. When a rock burst occurs, it can ensure the stability of the protection rod, prevent the protection net from accidentally rolling up, and improve the stability of the protection structure; 4. The auxiliary struts can enhance the connection strength between the protection rod and the support frame, improve the stability of the entire protection structure, and multiple auxiliary struts are evenly distributed along the arc, which can make the stress distribution of the protection structure more uniform when a rock burst occurs, and facilitate pressure relief, avoid structural damage caused by local stress concentration, and improve the overall bearing capacity and impact resistance of the protection structure; 5. The locking assembly can be used to clamp the ends of the protective net, thereby firmly fixing the protective net to prevent the traction rope from breaking and improving the impact resistance of the protective net. When the locking block is clamped between the two locking rods, the spring always applies thrust to the locking rod. The force given by the spring enables the two locking rods to be more tightly clamped to the two sides of the locking block. Even under the strong impact caused by rock burst, the locking rod is not easily displaced, thereby improving the stability of the locking structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a structural schematic diagram of the comprehensive rock burst prevention and control system for TBM tunneling in this application; Figure 2 It is a schematic diagram of the partial structure of the comprehensive rockburst prevention and control system for TBM tunneling; Figure 3 It is a schematic diagram showing the partial structure of the protection mechanism; Figure 4 is a partial cross-sectional view showing the protective mechanism; Figure 5 It is a partial cross-sectional view showing the locking assembly.

[0027] Explanation of the reference numerals in the accompanying drawings: 1. Tunnel boring machine; 2. Support frame; 3. Protection rod; 31. Winding rod; 32. Stretching rod; 4. Protection mechanism; 41. Protection net; 42. Traction rope; 43. Locking assembly; 431. Locking shell; 432. Locking rod; 4321. Guide angle; 433. Electric telescopic rod; 434. Spring; 435. Locking block; 44. Self-locking rotating assembly; 441. Worm gear; 442. Worm; 443. Driving motor; 45. Auxiliary support rod; 46. Protection gate; 47. Driving device. DETAILED DESCRIPTION

[0028] The following is combined with Figure 1-Figure 5 This application is described in further detail.

[0029] The present application embodiment discloses a TBM tunneling rock burst comprehensive prevention and control system. Figure 1 and Figure 2 The TBM tunneling rockburst comprehensive prevention and control system includes a support frame 2 and a microseismic monitoring system for installation in the segment assembly area of ​​the tunnel boring machine 1. The support frame 2 can be detachably connected by bolts or other means. A plurality of protective rods 3 are fixed on the support frame 2. Two protective rods 3 are set as a group, and one of the two protective rods 3 in the same group is set as a winding rod 31, and the other protective rod 3 is set as a stretching rod 32. The protective rods 3 are rotatably connected to the support frame 2. The plurality of protective rods 3 are parallel to each other, and a shell skeleton structure is formed between the plurality of protective rods 3 and the support frame 2. A protective mechanism 4 is provided between the two protective rods 3 in the same group. The protective mechanism 4 is used to block the gap between the two protective rods 3 in the same group and to block the rock fragments generated by the rockburst. The tunnel boring machine 1 is also provided with an early warning mechanism, which is used to issue early warning information when a rockburst occurs to serve as a warning. The microseismic monitoring system is connected to the protection mechanism 4 and the early warning mechanism for real-time collection of rockburst microseismic data. When a rockburst occurs in the rock mass, the microseismic monitoring system sends a control signal to the protection mechanism 4 and the early warning mechanism to operate the protection mechanism 4 and the early warning mechanism.

[0030] When the microseismic monitoring system detects a change in rock stress, indicating that a rock burst may be about to occur, it will immediately send a control signal to the protection mechanism 4. The protection mechanism 4 responds to the signal and quickly forms a closed structure between the two protection rods 3 in the same group, while blocking the gap on the side of the support frame 2 away from the tunnel boring machine 1 to block the rock fragments produced by the rock burst. Then, after receiving the control signal from the microseismic monitoring system, the early warning mechanism immediately issues an early warning message, such as an audible and visual alarm, to remind construction personnel that the risk of rock burst is high and ensure that personnel can quickly evacuate to a safe area.

[0031] When a rock burst occurs, the shell skeleton structure composed of the protection mechanism 4 and the support frame 2 can effectively absorb the impact force of the rock burst fragments, protecting the workers in the segment assembly area from being easily injured. After the rock burst, the protection mechanism 4 is restored to its initial state under the control of the microseismic monitoring system, ensuring a clear view of the operating area, which is convenient for construction personnel to carry out subsequent inspections and construction.

[0032] In some embodiments, reference Figure 2 and Figure 3 The protection mechanism 4 includes a protection net 41 with one end fixedly wound on the winding rod 31 and a traction rope 42 with one end wound on the stretching rod 32 and the other end connected to one end of the protection net 41. The number of traction ropes 42 is set to be multiple, and the multiple traction ropes 42 are evenly distributed along the length direction of the protection rod 3. A locking assembly 43 is arranged between the protection net 41 and the stretching rod 32, and the locking assembly 43 is used to fix the end of the protection net 41 away from the winding rod 31 to the side of the stretching rod 32. The winding rod 31 and the stretching rod 32 are both provided with a self-locking rotating assembly 44 for driving the winding rod 31 and the stretching rod 32 to rotate. A plurality of auxiliary struts 45 are also arranged between the two protection rods 3 in the same group. The two ends of the auxiliary struts 45 are fixedly connected to the support frame 2, and the multiple auxiliary struts 45 are evenly distributed along the arc. The auxiliary struts 45 are used to enhance the connection strength between the protection rod 3 and the support frame 2, and the multiple auxiliary struts 45 are evenly distributed along the arc, which can make the stress distribution of the protection structure more uniform when a rock burst occurs, and facilitate pressure relief. A protective gate 46 is also hingedly connected to the support frame 2 near the segment assembly area of ​​the tunnel boring machine 1. A driving device 47 is provided between the protective gate 46 and the support frame 2. The driving device 47 is connected to the microseismic monitoring system and is used to close the protective gate 46 after receiving a control signal. For example, the driving device 47 can be a motor provided at one end of the hinge shaft of the protective gate 46.

[0033] In the non-rockburst warning state, the protective net 41 is rolled up by the winding rod 31 and is in a retracted state to maintain an unobstructed view of the operating area. When the microseismic monitoring system detects changes in rock stress and indicates that a rockburst may be about to occur, a control signal will be immediately sent to the protection mechanism 4. After the self-locking rotating assembly 44 on the winding rod 31 and the stretching rod 32 receives the control signal, the winding rod 31 starts to rotate in the opposite direction to unfold the protective net 41. At the same time, the stretching rod 32 rotates forward, and the end of the protective net 41 is pulled away from the winding rod 31 by the traction rope 42 until the protective net 41 is fully unfolded and fixed to one side of the stretching rod 32. After the protective net 41 is fully unfolded, the locking assembly 43 fixes the end of the protective net 41 away from the winding rod 31 to the side of the stretching rod 32 to ensure that the protective net 41 can firmly block the gap between the two adjacent protective rods 3 when a rockburst occurs.

[0034] When a rock burst occurs, the shell skeleton structure composed of the protection net 41 and the support frame 2 can effectively absorb the impact force of the rock burst fragments and protect the workers in the segment assembly area. After the rock burst, the self-locking rotating assembly 44 on the winding rod 31 and the stretching rod 32 receives the control signal again, the winding rod 31 rotates forward, and the stretching rod 32 rotates reversely to reel the protection net 41 back to the initial state and restore the field of vision in the operation area. At the same time, in the non-rock burst warning state, the protection gate 46 is in an open state to ensure the normal construction and personnel entry and exit of the segment assembly area of ​​the tunnel boring machine 1. When the microseismic monitoring system detects a change in rock stress and indicates that a rock burst may occur, it will immediately send a control signal to the drive device 47. After receiving the control signal, the drive device 47 drives the protection gate 46 to close quickly to form a closed protection space to block the lateral impact of rock burst fragments and protect the workers in the segment assembly area.

[0035] For example, refer to Figure 3 and Figure 4 The self-locking rotating assembly 44 includes a worm wheel 441 fixedly sleeved on the protection rod 3, a worm 442 rotatably connected to the support frame 2, and the worm wheel 441 and the worm 442 are meshed with each other. A driving motor 443 is provided at one end of the worm 442.

[0036] When the protective rod 3 is driven to rotate by the self-locking rotating component 44, the driving motor 443 is started after receiving the control signal, driving the worm 442 to rotate, and the worm 442 drives the worm wheel 441 to rotate, and then the worm wheel 441 can drive the protective rod 3 (winding rod 31 or stretching rod 32) fixedly connected thereto to rotate; when the worm wheel 441 and worm 442 assembly on the stretching rod 32 drives the stretching rod 32 to rotate forward, and the worm wheel 441 and worm 442 assembly on the winding rod 31 drives the winding rod 31 to rotate reversely, the protective net 41 can be pulled away from one end of the winding rod 31 by the traction rope 42 until the protective net 41 is fully unfolded and fixed to one side of the stretching rod 32, and the protective net 41 can be unfolded.

[0037] In some embodiments, reference Figure 4 and Figure 5The locking assembly 43 includes a locking housing 431 disposed between the winding rod 31 and the stretching rod 32 and fixedly disposed on a side of the support frame 2 close to the stretching rod 32, and the traction rope 42 passes through the locking housing 431. Two locking rods 432 are symmetrically slidably connected inside the locking housing 431, and an electric telescopic rod 433 is disposed between the locking rod 432 and the locking housing 431. A plurality of springs 434 are also disposed between the locking rod 432 and the locking housing 431, and the springs 434 are always in a compressed state and give the two locking rods 432 a force to approach each other. A guide angle 4321 is disposed on the side where the two locking rods 432 are close to each other and away from the stretching rod 32, and the guide angle 4321 is used to allow the locking block 435 to enter between the two locking rods 432 more smoothly. A locking block 435 is fixedly disposed at the end of the protective net 41, and the locking block 435 is fixedly connected to the traction rope 42, and the locking block 435 can be clamped between the two locking rods 432.

[0038] In the non-rockburst warning state, the locking rod 432 is in the initial position inside the locking shell 431, the locking block 435 is not engaged with the locking rod 432, and the protective net 41 remains in the retracted state; when the protective net 41 is fully unfolded, the traction rope 42 drives the locking block 435 to move to the inside of the locking shell 431, and the electric telescopic rod 433 drives the two locking rods 432 to move toward the center until the two locking rods 432 are engaged with the two sides of the locking block 435, and the protective net 41 is fixed to one side of the stretching rod 32.

[0039] After the rock burst, the electric telescopic rod 433 drives the two locking rods 432 to move to both sides, releasing the locking block 435. When the locking block 435 is clamped between the two locking rods 432, the spring 434 always applies a thrust to the locking rod 432. The force applied by the spring 434 enables the two locking rods 432 to be more tightly clamped to both sides of the locking block 435. Even under the strong impact caused by the rock burst, the locking rod 432 is not easily displaced, thereby improving the stability of the locking structure.

[0040] The early warning mechanism includes an audible and visual alarm device and a communication device. The audible and visual alarm device is connected to the microseismic monitoring system and is used to send out audible and visual warnings after receiving control signals. The communication device is connected to the control center of the tunnel boring machine 1 and is used to exchange information with the control center.

[0041] The microseismic monitoring system monitors the microseismic signals inside the rock mass in real time. Once a precursor to rock burst is detected, a control signal is immediately generated. After receiving the control signal from the microseismic monitoring system, the sound and light alarm device immediately activates the sound and light alarm and sends out a strong sound and light warning to remind on-site workers to pay attention to the risk of rock burst. The communication device maintains a real-time connection with the control center of the tunnel boring machine 1 for two-way information exchange. The control center adjusts the tunneling parameters or initiates protective measures based on the early warning information.

[0042] The implementation principle of a comprehensive rockburst prevention and control system for TBM tunneling in the embodiment of the present application is as follows: when the microseismic monitoring system detects a change in rock stress, indicating that a rockburst may be about to occur, a control signal will be immediately sent to the protection mechanism 4. The protection mechanism 4 responds to the signal and quickly forms a closed structure between the two protection rods 3 in the same group, while blocking the gap on the side of the support frame 2 away from the tunnel boring machine 1 to block the rock fragments produced by the rockburst. Then, after receiving the control signal of the microseismic monitoring system, the early warning mechanism immediately issues an early warning message, such as an audible and visual alarm, to remind construction personnel that the risk of rockburst is high, ensuring that personnel can quickly evacuate to a safe area. When a rockburst occurs, the shell skeleton structure composed of the protection mechanism 4 and the support frame 2 can It can effectively absorb the impact force of rock burst fragments and protect the workers in the segment assembly area from being easily injured. After the rock burst, the protection mechanism 4 is restored to its initial state under the control of the microseismic monitoring system to ensure a clear view of the operating area, which is convenient for construction personnel to carry out subsequent inspections and construction. Among them, through real-time monitoring and early warning, combined with the rapid response of the protection mechanism 4, the safety of construction personnel can be effectively protected, and the impact of rock burst disasters on tunnel construction can be reduced. The protection mechanism 4 remains open in the non-rock burst state to ensure a clear view of the operating area without affecting the construction efficiency. Through the coordination of the microseismic monitoring system, the protection mechanism 4 and the early warning mechanism, the intelligent rock burst prevention and control is realized, and the accuracy and timeliness of early warning and protection are improved.

[0043] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A TBM tunneling rock burst comprehensive prevention and control system, characterized in that: include: A support frame (2) is used for being detachably mounted on a segment assembly area of ​​a tunnel boring machine (1); A protection rod (3) is fixedly mounted on the support frame (2), and a plurality of protection rods (3) are provided, with two forming a group, and a shell skeleton structure is formed between the plurality of protection rods (3) and the support frame (2); A protection mechanism (4) is arranged between two protection bars (3) in the same group and is used to block the gap between the two protection bars (3) in the same group and to seal the support frame (2) away from the side of the tunnel boring machine (1) to block rock fragments generated by rock burst; An early warning mechanism is arranged on the tunnel boring machine (1) and is used to issue early warning information when a rock burst occurs to serve as a warning; The microseismic monitoring system is connected to the protection mechanism (4) and the early warning mechanism and is used to collect rock burst microseismic data in real time. When a rock burst occurs in the rock mass, the microseismic monitoring system sends a control signal to the protection mechanism (4) and the early warning mechanism to enable the protection mechanism (4) and the early warning mechanism to operate.

2. A TBM tunneling rockburst comprehensive prevention and control system according to claim 1, characterized in that: One of the two protection rods (3) in the same group is set as a winding rod (31), and the other protection rod (3) is set as a stretching rod (32), and the protection rods (3) are both rotatably connected to the support frame (2); The protection mechanism (4) comprises: A protective net (41) with one end fixedly wound around the reeling rod (31); A traction rope (42), one end of which is wound around the stretching rod (32) and the other end of which is connected to one end of the protection net (41); A locking assembly (43) is disposed between the protective net (41) and the stretching rod (32) and is used to fix one end of the protective net (41) away from the winding rod (31) to one side of the stretching rod (32); Wherein, the winding rod (31) and the stretching rod (32) are both provided with a self-locking rotating assembly (44) for driving the winding rod (31) and the stretching rod (32) to rotate.

3. A TBM tunneling rockburst comprehensive prevention and control system according to claim 2, characterized in that: The self-locking rotating assembly (44) comprises: A worm wheel (441) is fixedly sleeved on the protection rod (3); A worm (442) is rotatably connected to the support frame (2), and the worm wheel (441) and the worm (442) are meshed with each other; The driving motor (443) is arranged at one end of the worm (442).

4. A TBM tunneling rockburst comprehensive prevention and control system according to claim 2, characterized in that: The locking assembly (43) comprises: A locking shell (431) is arranged between the winding rod (31) and the stretching rod (32), and is fixed to a side of the support frame (2) close to the stretching rod (32), and the traction rope (42) passes through the locking shell (431); There are two locking rods (432), and the two locking rods (432) are symmetrically slidably connected to the inside of the locking housing (431); An electric telescopic rod (433) is arranged between the locking rod (432) and the locking housing (431); The locking block (435) is fixedly arranged at the end of the protective net (41); the locking block (435) is fixedly connected to the traction rope (42); and the locking block (435) can be clamped between the two locking rods (432).

5. A TBM tunneling rockburst comprehensive prevention and control system according to claim 4, characterized in that: A plurality of springs (434) are arranged between the locking rod (432) and the locking housing (431); the springs (434) are always in a compressed state and provide a force for the two locking rods (432) to approach each other.

6. A TBM tunneling rockburst comprehensive prevention and control system according to claim 4, characterized in that: A chamfer (4321) is provided on one side of the two locking rods (432) that is close to each other and away from the stretching rod (32).

7. A TBM tunneling rockburst comprehensive prevention and control system according to claim 2, characterized in that: A protective gate (46) is also hingedly connected to one side of the support frame (2) close to the segment assembly area of ​​the tunnel boring machine (1), and a driving device (47) is provided between the protective gate (46) and the support frame (2). The driving device (47) is connected to a microseismic monitoring system and is used to close the protective gate (46) after receiving a control signal.

8. A TBM tunneling rockburst comprehensive prevention and control system according to claim 2, characterized in that: A plurality of auxiliary support rods (45) are arranged between two protection rods (3) in the same group, both ends of the auxiliary support rods (45) are fixedly connected to the support frame (2), and the plurality of auxiliary support rods (45) are evenly distributed along an arc.

9. A TBM tunneling rockburst comprehensive prevention and control system according to claim 2, characterized in that: The number of the traction ropes (42) is multiple, and the multiple traction ropes (42) are evenly distributed along the length direction of the protection rod (3).

10. A TBM tunneling rockburst comprehensive prevention and control system according to any one of claims 1 to 9, characterized in that: The early warning agencies include: The sound and light alarm device is connected to the microseismic monitoring system and is used to issue sound and light warnings after receiving control signals; The communication device is connected to the control center of the tunnel boring machine (1) and is used for exchanging information with the control center.

Citation Information

Patent Citations

  • Rock burst protection device

    CN115387826A

  • Intelligent sensing early warning system and method and pretreatment tunneling method

    CN117514184A

  • Prevention and control structure for rockburst tunnel

    CN117536656A

  • Rock burst protection trolley

    CN209369809U

  • Protecting trolley and construction method of rock burst prewarning protection system in non-contact tunnel construction

    US20220136391A1