Enhanced vapor injection cascade type high-temperature heat pump system and capacity configuration method thereof

By adopting jet enthalpy composite design and heat pump circulation simulation model in the high-temperature air source heat pump system, the problem of reduced compressor efficiency in high-temperature or low-temperature environments is solved, the heating capacity and energy-saving effect of the system are improved, and the energy-saving effect is enhanced, and the Reliability in severe cold or hot areas.

CN118960238AActive Publication Date: 2024-11-15LIYANG RES INST OF SOUTHEAST UNIV +1

Patent Information

Application Number
CN202411275314.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-12
Publication Date
2024-11-15
Estimated Expiration
2044-09-12

AI Technical Summary

Technical Problem

The compression efficiency and reliability of the high-temperature air source heat pump technology in low temperature or high temperature environments reduce, resulting in uncomfortable, energy-saving and unreliable use of the system in severe cold or hot areas.

Method used

The jet enthalpy composite high-temperature heat pump system is adopted to separate the two-stage circulating refrigerants through low-temperature and high-temperature flashers respectively to increase the flow rate of gaseous refrigerants into the compressor, and the heat and mass transfer model is used to transfer the heat pump circulation simulation model and heat transfer model. Adjust the condensation pressure, evaporation pressure and gripping temperature to achieve increased heating capacity and system stability.

Benefits of technology

The performance coefficient of the jet enthalpy-increasing composite high-temperature heat pump system under low temperature conditions is improved, the heating capacity is enhanced, the compressor exhaust temperature is reduced, and significant energy-saving effect and system stability are achieved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118960238A_ABST
    Figure CN118960238A_ABST
Patent Text Reader

Abstract

The invention discloses an enhanced vapor injection cascade type high-temperature heat pump system and a capacity method thereof.The enhanced vapor injection cascade type high-temperature heat pump system conducts gas-liquid separation on two-stage circulating refrigerants through a low-temperature flash-tank and a high-temperature flash-tank correspondingly, and the gaseous refrigerants obtained through separation of the low-temperature flash-tank enter a gas supplementing opening of a compressor in low-temperature circulation; and a gaseous refrigerant separated by the high-temperature flash evaporator enters an air supply port of the compressor in the high-temperature circulation. According to the capacity method, thermodynamic parameters such as heating capacity, condenser outlet steam temperature and flow are calculated through a heat pump cycle simulation model and a heat and mass transfer model; and the required supercooling degree, superheat degree, intermediate temperature and high / low temperature flash tank outlet temperature are realized by adjusting the condensing pressure, the evaporating pressure and the pinch point temperatures of the condenser, the condensing evaporator and the evaporator. The flow of the gaseous refrigerant entering the compressor can be increased, the performance coefficient of the enhanced vapor injection cascade high-temperature heat pump system under the low-temperature working condition is improved, and meanwhile the complexity of the system is prevented from being increased.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of jet enthalpy-increasing heat pumps, and in particular to a jet enthalpy-increasing cascade high-temperature heat pump system and a capacity configuration method thereof. Background Art

[0002] As a high-energy consumption technology, high-temperature air source heat pump technology is currently widely used in various industries, including food, printing and dyeing, papermaking, chemical industry, drying, distillation and other industries. As the low-temperature operating environment temperature of the system further decreases, the working pressure ratio of the compressor increases significantly, the exhaust temperature rises sharply, and its compression efficiency and reliability will decrease significantly; in addition, as the high-temperature operating temperature of the system further increases, the working pressure difference and load of the compressor increase significantly, resulting in a decrease in the reliability and performance of the compressor. This greatly affects the comfort, energy saving and reliability of air source heat pump technology in more severe cold / hot areas. Summary of the invention

[0003] Purpose of the invention: The purpose of the present invention is to provide a jet enthalpy cascade high-temperature heat pump system and its capacity configuration method, which can effectively increase the heating capacity of the system, reduce the exhaust temperature of the compressor, and improve the performance coefficient of the jet enthalpy cascade high-temperature heat pump system under low temperature conditions.

[0004] Technical solution: A jet enthalpy increase cascade high-temperature heat pump system, comprising an evaporator, a low-temperature compressor, a condenser evaporator, a first low-temperature expansion valve, a low-temperature flasher, a second low-temperature expansion valve, a high-temperature compressor, a condenser, a first high-temperature expansion valve, a high-temperature flasher, a second high-temperature expansion valve and a water pump; wherein the low-temperature compressor, the first channel of the condenser evaporator, the first low-temperature expansion valve, the low-temperature flasher, the second low-temperature expansion valve and the first channel of the evaporator are sequentially connected through a refrigerant pipeline to form a low-temperature refrigerant circulation loop; the high-temperature compressor, the first channel of the condenser, the first high-temperature expansion valve, the high-temperature flasher, the second high-temperature expansion valve and the second channel of the condenser evaporator are sequentially connected through a refrigerant pipeline to form a high-temperature refrigerant circulation loop;

[0005] The water pump is connected with the condenser.

[0006] Further, in the low-temperature refrigerant circulation loop, the outlet of the low-temperature compressor is connected to the inlet of the first channel of the condenser evaporator through a refrigerant pipeline, the outlet of the first channel of the condenser evaporator is connected to the inlet of the first low-temperature expansion valve through a refrigerant pipeline, the outlet of the first low-temperature expansion valve is connected to the inlet of the low-temperature flasher through a refrigerant pipeline, the gas outlet of the low-temperature flasher is connected to the gas replenishment inlet of the low-temperature compressor through a refrigerant pipeline, the liquid outlet of the low-temperature flasher is connected to the inlet of the second low-temperature expansion valve through a refrigerant pipeline, the outlet of the second low-temperature expansion valve is connected to the inlet of the first channel of the evaporator through a refrigerant pipeline, and the outlet of the first channel of the evaporator is connected to the inlet of the low-temperature compressor through a refrigerant pipeline;

[0007] In the high-temperature refrigerant circulation loop, the outlet of the high-temperature compressor is connected to the inlet of the first channel of the condenser through the refrigerant pipeline, the outlet of the first channel of the condenser is connected to the inlet of the first high-temperature expansion valve through the refrigerant pipeline, the outlet of the first high-temperature expansion valve is connected to the inlet of the high-temperature flasher through the refrigerant pipeline, the gas outlet of the high-temperature flasher is connected to the air supply inlet of the high-temperature compressor through the refrigerant pipeline, the liquid outlet of the high-temperature flasher is connected to the inlet of the second high-temperature expansion valve through the refrigerant pipeline, the outlet of the second high-temperature expansion valve is connected to the inlet of the second channel of the condenser evaporator through the refrigerant pipeline, and the outlet of the second channel of the condenser evaporator is connected to the inlet of the high-temperature compressor through the refrigerant pipeline.

[0008] The capacity configuration method of any of the above-mentioned jet enthalpy-increasing cascade high-temperature heat pump systems comprises the following steps:

[0009] S1, determine the type of high / low temperature cycle refrigerant, the boundary and demand conditions of the input condenser outlet steam, the environmental conditions, and determine the geometric structure of the entire jet enthalpy increase cascade high temperature heat pump system;

[0010] S2, bringing the set conditions in step S1 into the heat pump cycle simulation model, and calculating the refrigerant thermodynamic parameters at the outlets of the compressor, condenser and evaporator of the heat pump system, the condenser heating capacity, the compressor power consumption, the refrigerant circulation flow rate and the COP;

[0011] If the system heating capacity does not meet the feedforward requirement, the condenser outlet steam flow rate is adjusted by feedback, increasing a step from the current value, and the operation continues;

[0012] If the system heating capacity meets the feedforward requirement, the size between the COP of the jet enthalpy increase cascade high-temperature heat pump system and the preset value A is determined. If the COP is greater than the preset value A, all current assumed thermodynamic parameters and thermodynamic calculation results are saved and output as the existing optimal value in the current operation stage; if the COP is less than or equal to the preset value A, the saving step is skipped and it is directly determined whether the condenser outlet steam temperature meets the requirement: if it does not meet the requirement, the condenser outlet refrigerant temperature is adjusted. If the condenser outlet steam temperature is too high, the condenser outlet refrigerant temperature is reduced. If the condenser outlet steam temperature is too low, the condenser outlet refrigerant temperature is increased, and then the COP is recalculated according to the design method;

[0013] If the condenser outlet steam temperature has reached the maximum value B, determine whether the outlet temperature of the second channel of the condenser evaporator has reached the maximum value C: if it has not reached the maximum value C, increase the outlet temperature of the second channel of the condenser evaporator by one step, and continue the calculation; if it has reached the maximum value C, determine whether the outlet temperature of the low-temperature flasher has reached the maximum value D; if it has not reached the maximum value D, increase the outlet temperature of the low-temperature flasher by one step, and continue the calculation; if it has reached the maximum value D, determine whether the outlet temperature of the high-temperature flasher has reached the maximum value E; if it has not reached the maximum value E, increase the outlet temperature of the high-temperature flasher inlet temperature, the increase value is one step length, and the calculation continues; if it has reached the maximum value E, it is determined whether the supercooling of the heat pump system has reached the maximum value F. If it has not reached the maximum value F, the condensing pressure is increased by one step length, and the calculation continues; if it has reached the maximum value F, it is determined whether the superheat of the heat pump system has reached the maximum value G. If it has not reached the maximum value G, the evaporation pressure is increased by one step length, and the calculation continues; if it has reached the maximum value G, the entire calculation process is terminated, and the final output result is the optimal operating state of the system and the capacity of each device corresponding to the highest COP in all iterative calculation steps.

[0014] Furthermore, after calculating the heating capacity, condenser outlet steam temperature and flow rate and other thermodynamic parameters through the heat pump cycle simulation model and the heat and mass transfer model, the required subcooling, superheating, intermediate temperature and high / low temperature flash outlet temperature are achieved by adjusting the condensing pressure, evaporation pressure and condenser, condenser evaporator and evaporator pinch point temperature; the heat pump cycle simulation model includes compressor model, condenser model, expansion valve model, evaporator model and flash model. The expressions of each model are as follows:

[0015] The power consumption of the compressor and the actual specific enthalpy at the outlet are:

[0016]

[0017] Where, h″ is the outlet specific enthalpy of the isentropic compression process, kJ / kg; h′ is the suction specific enthalpy, kJ / kg; η s is the isentropic efficiency of the compressor, P c is the power consumption of the compressor, kW; m c is the compressor flow rate, kg / s; h o ' ut is the actual specific enthalpy of the compressor outlet, kJ / kg;

[0018] In each area of ​​the evaporator and condenser, the heat exchange on the refrigerant side, wall side and air / water side satisfies the following formula:

[0019]

[0020] In the formula, Q r is the heat exchange of refrigerant, kW; Q w is the wall heat transfer, kW; Q a Heat exchange for air, kW; q mr ,q ma are the mass flow rates of refrigerant and air, kg / s, respectively; are the inlet and outlet specific enthalpies of the refrigerant, kJ / kg; are the air inlet and outlet specific enthalpies, kJ / kg; A w is the heat exchange area, m 2 ; ΔT is the heat exchange temperature difference, ℃; H a , H r are the convective heat transfer coefficients of air and refrigerant, kW / (m 2 .℃); R is the wall thermal resistance;

[0021] The relationship between the refrigerant enthalpy values ​​on both sides of the expansion valve is:

[0022]

[0023] In the formula, are the specific enthalpies of the expansion valve inlet and outlet, kJ / kg;

[0024] The relationship between the vapor phase fraction a and the inlet and outlet enthalpy of the flasher is:

[0025]

[0026] In the formula, and are the specific enthalpies of the flasher inlet, outlet liquid phase, and outlet vapor phase, respectively, in kJ / kg.

[0027] Furthermore, the initial step size of the flow rate is set to 5%-10% of the system rated flow rate, and gradually decreases to 1%-2% with iterations; the initial step sizes of the condenser, condenser evaporator, evaporator pinch point temperature and condenser outlet steam temperature are set to 1-2% of the current temperature, and gradually decrease to 0.5°C with iterations.

[0028] Compared with the prior art, the present invention has the following significant effects:

[0029] 1. The jet enthalpy-increasing cascade high-temperature heat pump system of the present invention performs gas-liquid separation on the two-stage circulating refrigerant through a low-temperature flasher and a high-temperature flasher respectively. The gaseous refrigerant separated by the low-temperature flasher enters the air supply port of the compressor in the low-temperature cycle, and the gaseous refrigerant separated by the high-temperature flasher enters the air supply port of the compressor in the high-temperature cycle, thereby increasing the flow rate of the gaseous refrigerant entering the compressor, improving the performance coefficient of the jet enthalpy-increasing cascade high-temperature heat pump system under low-temperature conditions, and avoiding the increase of system complexity, thereby improving the low-temperature heating capacity, enhancing the reliability of the system, and achieving significant energy-saving effects;

[0030] 2. The capacity configuration method of the present invention mainly calculates the heating capacity, condenser outlet steam temperature and flow rate and other thermodynamic parameters through the heat pump cycle simulation model and the heat and mass transfer model, and then adjusts the condensing pressure, evaporation pressure and the condenser, condenser evaporator, and evaporator pinch point temperature to achieve the required subcooling, superheating, intermediate temperature and high / low temperature flash outlet temperature; it significantly improves the heating capacity, broadens the temperature range of the system operation to adapt to a variety of environments and improves the system stability. At the same time, it optimizes the system performance, so that the system can consume less electricity to generate more heat during operation, and promotes the decarbonization process of the thermal system. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 It is a structural schematic diagram of the jet enthalpy-increasing cascade high-temperature heat pump system of the present invention;

[0032] Figure 2 It is a flow chart of the capacity configuration method of the jet enthalpy-increasing cascade high-temperature heat pump system of the present invention;

[0033] Figure 3 (a) is a schematic diagram of steam production by a conventional cascade heat pump system, (b) is a schematic diagram of steam production by a first jet enthalpy-increasing cascade heat pump system A, and (c) is a schematic diagram of steam production by a second jet enthalpy-increasing cascade heat pump system B;

[0034] Figure 4 It is a schematic diagram of the comparison results of COP of various cascade heat pump systems under standard conditions;

[0035] FIG5( a ) is a schematic diagram showing a comparison of compressor power consumption of various cascade heat pump systems at different heat source temperatures;

[0036] FIG5( b ) is a schematic diagram showing the comparison results of the COP of each cascade heat pump system at different heat source temperatures;

[0037] Reference numerals:

[0038] 1-evaporator, 2-low-temperature compressor, 3-condenser evaporator, 4-first low-temperature expansion valve, 5-low-temperature flasher, 6-second low-temperature expansion valve, 7-high-temperature compressor, 8-condenser, 9-first high-temperature expansion valve, 10-high-temperature flasher, 11-second high-temperature expansion valve, 12-water pump. DETAILED DESCRIPTION

[0039] The present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0040] Enhanced vapor injection (EVI) high-temperature heat pump technology has the advantages of high efficiency and energy saving, good low-temperature operation performance, environmental friendliness and high degree of automation. Common EVI high-temperature heat pump devices include compressors, condensers, evaporators, expansion valves and flash evaporators. When the EVI high-temperature heat pump system is working, the refrigerant at the outlet of the condenser enters the flash evaporator in a gas-liquid two-phase state after throttling. Due to the reduction in speed, the gas and liquid are separated, and the gas part is mixed with the refrigerant gas after initial compression and recompressed. The liquid part enters the evaporator for heat exchange after secondary throttling. The reduction in specific enthalpy at the inlet of the evaporator can effectively improve the heat absorption capacity of the evaporator, thereby improving the heating efficiency of the system.

[0041] like Figure 1 As shown, the jet enthalpy increase cascade high temperature heat pump system of the embodiment of the present invention comprises an evaporator 1, a low temperature compressor 2, a condenser evaporator 3, a first low temperature expansion valve 4, a low temperature flasher 5, a second low temperature expansion valve 6, a high temperature compressor 7, a condenser 8, a first high temperature expansion valve 9, a high temperature flasher 10, a second high temperature expansion valve 11 and a water pump 12. The evaporator 1, the condenser evaporator 3 and the condenser 8 each comprise two channels, wherein the low temperature compressor 2, the first channel of the condenser evaporator 3, the first low temperature expansion valve 4, the low temperature flasher 5, the second low temperature expansion valve 6 and the first channel of the evaporator 1 are sequentially connected through a refrigerant pipeline to form a low temperature refrigerant circulation loop. The high temperature compressor 7, the first channel of the condenser 8, the first high temperature expansion valve 9, the high temperature flasher 10, the second high temperature expansion valve 11 and the second channel of the condenser evaporator 3 are sequentially connected through a refrigerant pipeline to form a high temperature refrigerant circulation loop. The meanings represented by the lines in the figure are: the solid line represents the liquid pipeline, and the dotted line represents the gas pipeline.

[0042] In one embodiment of the present invention, the high-temperature expansion valve can realize the throttling function on the one hand, and on the other hand, it can also throttle the high-temperature and high-pressure liquid refrigerant into a low-temperature and low-pressure mist hydraulic refrigerant, creating conditions for the gas-liquid separation of the refrigerant.

[0043] Combine the following Figure 1 The illustrated embodiment illustrates the working principle of the jet enthalpy increase cascade high temperature heat pump system.

[0044] like Figure 1 As shown, in the low-temperature refrigerant circulation loop, the outlet of the low-temperature compressor 2 is connected to the inlet of the first channel of the condenser evaporator 3 through the refrigerant pipeline, the outlet of the first channel of the condenser evaporator 3 is connected to the inlet of the first low-temperature expansion valve 4 through the refrigerant pipeline, the outlet of the first low-temperature expansion valve 4 is connected to the inlet of the low-temperature flasher 5 through the refrigerant pipeline, the gas outlet of the low-temperature flasher 5 is connected to the gas replenishment inlet of the low-temperature compressor 2 through the refrigerant pipeline, the liquid outlet of the low-temperature flasher 5 is connected to the inlet of the second low-temperature expansion valve 6 through the refrigerant pipeline, the outlet of the second low-temperature expansion valve 6 is connected to the inlet of the first channel of the evaporator 1 through the refrigerant pipeline, and the outlet of the first channel of the evaporator 1 is connected to the inlet of the low-temperature compressor 2 through the refrigerant pipeline.

[0045] In the high-temperature refrigerant circulation loop, the outlet of the high-temperature compressor 7 is connected to the inlet of the first channel of the condenser 8 through a refrigerant pipeline, the outlet of the first channel of the condenser 8 is connected to the inlet of the first high-temperature expansion valve 9 through a refrigerant pipeline, the outlet of the first high-temperature expansion valve 9 is connected to the inlet of the high-temperature flasher 10 through a refrigerant pipeline, the gas outlet of the high-temperature flasher 10 is connected to the air replenishment inlet of the high-temperature compressor 7 through a refrigerant pipeline, the liquid outlet of the high-temperature flasher 10 is connected to the inlet of the second high-temperature expansion valve 11 through a refrigerant pipeline, the outlet of the second high-temperature expansion valve 11 is connected to the inlet of the second channel of the condenser evaporator 3 through a refrigerant pipeline, and the outlet of the second channel of the condenser evaporator 3 is connected to the inlet of the high-temperature compressor 7 through a refrigerant pipeline.

[0046] When the jet enthalpy-increasing cascade high-temperature heat pump system is working, the low-temperature refrigerant flows in the two-stage heat pump circulation loop. Figure 1As shown, the medium-temperature superheated refrigerant vapor compressed in the low-temperature compressor 2 flows out from the outlet of the compressor, enters the condenser evaporator 3 through the refrigerant pipeline for condensation and liquefaction, and the high-pressure medium-temperature liquid refrigerant output by the condenser evaporator 3 enters the first low-temperature expansion valve 4 through the refrigerant pipeline for throttling, cooling and decompression, and then enters the low-temperature flasher 5 through the refrigerant pipeline. The refrigerant undergoes gas-liquid separation in the low-temperature flasher 5, and the gaseous part is mixed with the refrigerant gas that has been compressed quasi-primary, and is compressed quasi-secondary in the low-temperature compressor 2. The liquid part at the outlet of the low-temperature flasher 5 is further cooled and decompressed through the second low-temperature expansion valve 6 until the refrigerant temperature reaches the required evaporation temperature, enters the evaporator 1 to absorb heat and become a gaseous refrigerant, and then is sucked into the low-temperature compressor 2 for quasi-primary compression, thereby realizing the circulation of the refrigerant in the low-temperature refrigerant circulation loop.

[0047] When the jet enthalpy-increasing cascade high-temperature heat pump system is working, the high-temperature refrigerant flows in the two-stage heat pump circulation loop. Figure 1 As shown, the high-temperature superheated refrigerant vapor compressed in the high-temperature compressor 7 flows out from the outlet of the compressor, enters the condenser 8 through the refrigerant pipeline for condensation and liquefaction, and the high-temperature and high-pressure liquid refrigerant output by the condenser 8 enters the second high-temperature expansion valve 9 through the refrigerant pipeline for throttling, cooling and decompression, and then enters the high-temperature flasher 10 through the refrigerant pipeline. The refrigerant undergoes gas-liquid separation in the high-temperature flasher 10, and the gaseous part is mixed with the refrigerant gas that has been compressed quasi-primary, and is compressed quasi-secondary in the high-temperature compressor 7. The liquid part at the outlet of the high-temperature flasher 10 is further cooled and decompressed through the second high-temperature expansion valve 11 until the refrigerant temperature reaches the required evaporation temperature, enters the condenser evaporator 3 to absorb heat and become a gaseous refrigerant, and then is sucked into the high-temperature compressor 7 for quasi-primary compression, thereby realizing the circulation of the refrigerant in the high-temperature refrigerant circulation loop.

[0048] Under the boundary and demand conditions determined by the high / low temperature refrigerant and the input condenser outlet steam, the environmental conditions and the system geometric structure characteristics, the flow chart of the capacity configuration method of each device of the jet enthalpy cascade high temperature heat pump system based on COP target optimization is as follows: Figure 2 As shown, the following steps are included:

[0049] Step 1: Determine the type of high / low temperature cycle refrigerant and input the boundary and demand conditions of the condenser outlet steam, and environmental conditions (air temperature, air flow, etc.); secondly, determine the geometric structure of the entire jet enthalpy increase cascade high temperature heat pump system (flash unit layout location and structural form, etc.), and then start the design work.

[0050] First, assume the condenser outlet steam flow rate (including flow lower limit, flow upper limit and adjustment step), then assume the condenser, condenser evaporator, evaporator pinch point temperature (including temperature lower limit, temperature upper limit and adjustment step), then assume the condenser outlet steam temperature, then assume the condenser evaporator second channel outlet temperature, then assume the low temperature flash outlet temperature (including temperature lower limit, temperature upper limit and adjustment step), then assume the high temperature flash outlet temperature (including temperature lower limit, temperature upper limit and adjustment step), then assume the heat pump system subcooling (including subcooling lower limit, subcooling upper limit and adjustment step), then assume the heat pump system superheat (including superheat lower limit, superheat upper limit and adjustment step), then assume the compressor isentropic efficiency and mechanical efficiency. Since the flow rate has a direct impact on the system performance, the initial step size is set to 5%-10% of the system rated flow rate, and gradually decreases to 1%-2% with iterations. Since the condenser, condenser evaporator, evaporator pinch point temperature and condenser outlet steam temperature have a significant impact on the system COP, the initial step size is set to 1-2℃ of the current temperature. Since the influence of subcooling and superheating is relatively small, the initial step sizes of evaporator superheat and condenser subcooling are set to 2-5°C, respectively, which can be appropriately reduced with iterations.

[0051] Step 2: Based on all the assumptions in step 1, the heat pump cycle simulation model can be used to calculate the refrigerant thermal parameters at the compressor, condenser and evaporator outlets of the heat pump system, the condenser heating capacity, the compressor power consumption, the refrigerant circulation flow rate and COP (Coefficient of Performance) and other parameters.

[0052] Determine whether the system heating capacity meets the feedforward requirements:

[0053] If the system heating capacity does not meet the feedforward requirement, the condenser outlet steam flow rate is adjusted by feedback, increasing a step from the current value, and the operation continues;

[0054] If the system heating capacity meets the feedforward requirement, the size between the COP of the jet enthalpy cascade high-temperature heat pump system and the preset value A is determined. If the COP is greater than the preset value A, all current assumed thermodynamic parameters and thermodynamic calculation results are saved and output as the existing optimal values ​​in the current operation stage; if the COP is less than or equal to the preset value A, the saving step is skipped and it is directly determined whether the condenser outlet steam temperature meets the requirement: if not, the condenser outlet refrigerant temperature is adjusted. If the condenser outlet steam temperature is too high, the condenser outlet refrigerant temperature is lowered. If the condenser outlet steam temperature is too low, the condenser outlet refrigerant temperature is increased, and then the COP is recalculated according to the design method.

[0055] If the condenser outlet steam temperature has reached the maximum value B, determine whether the outlet temperature of the second channel of the condenser evaporator has reached the maximum value C: if it has not reached the maximum value C, increase the outlet temperature of the second channel of the condenser evaporator by one step, and continue the calculation; if it has reached the maximum value C, determine whether the outlet temperature of the low-temperature flasher has reached the maximum value D; if it has not reached the maximum value D, increase the outlet temperature of the low-temperature flasher by one step, and continue the calculation; if it has reached the maximum value D, determine whether the outlet temperature of the high-temperature flasher has reached the maximum value E; if it has not reached the maximum value E, increase the outlet temperature of the high-temperature flasher inlet temperature, the increase value is one step length, and the calculation continues; if it has reached the maximum value E, it is determined whether the supercooling of the heat pump system has reached the maximum value F. If it has not reached the maximum value F, the condensing pressure is increased by one step length, and the calculation continues; if it has reached the maximum value F, it is determined whether the superheat of the heat pump system has reached the maximum value G. If it has not reached the maximum value G, the evaporation pressure is increased by one step length, and the calculation continues; if it has reached the maximum value G, the entire calculation process is terminated, and the final output result is the optimal operating state of the system and the capacity of each device corresponding to the highest COP in all iterative calculation steps.

[0056] In the embodiment of the present invention, after calculating the heating capacity, condenser outlet steam temperature and flow rate and other thermodynamic parameters mainly through the heat pump cycle simulation model and the heat and mass transfer model, the required subcooling, superheating, intermediate temperature and high / low temperature flasher outlet temperature are achieved by adjusting the condensing pressure, evaporation pressure and condenser, condenser evaporator and evaporator pinch point temperature. The heat pump cycle simulation model includes a compressor model, a condenser model, an expansion valve model, an evaporator model, a flasher model, etc.

[0057] The power consumption of the compressor and the actual specific enthalpy at the outlet are:

[0058]

[0059] Where, h″ is the outlet specific enthalpy of the isentropic compression process, kJ / kg; h′ is the suction specific enthalpy, kJ / kg; η s is the isentropic efficiency of the compressor, P c is the power consumption of the compressor, kW; m c is the compressor flow rate, kg / s; h o ' ut is the actual specific enthalpy at the compressor outlet, kJ / kg.

[0060] In each area of ​​the evaporator (or condenser), the heat exchange on the refrigerant side, the wall side and the air (water) side all satisfy equation (2).

[0061]

[0062] In the formula, Q r is the heat exchange of refrigerant, kW; Q w is the wall heat transfer, kW; Q a Heat exchange for air, kW; q mr and q ma is the mass flow rate of refrigerant and air, kg / s; and is the inlet and outlet specific enthalpy of the refrigerant, kJ / kg; and is the specific enthalpy of air inlet and outlet, kJ / kg; A w is the heat exchange area, m 2 ; ΔT is the heat exchange temperature difference, ℃; H a and H r is the convection heat transfer coefficient between air and refrigerant, kW / (m 2 .℃); R is the wall thermal resistance.

[0063] The relationship between the refrigerant enthalpy values ​​on both sides of the expansion valve is:

[0064]

[0065] In the formula, and are the specific enthalpies of the expansion valve inlet and outlet, kJ / kg, respectively.

[0066] The relationship between the vapor fraction a of the flash burner and the inlet and outlet enthalpy is:

[0067]

[0068] In the formula, and are the specific enthalpies of the flasher inlet, outlet liquid phase, and outlet gas phase, respectively, in kJ / kg.

[0069] like Figure 3 As shown, the purpose of the present invention to respectively set a low-temperature flasher 5 and a high-temperature flasher 10 in the high and low temperature cycle is: considering that the application form of ordinary multi-stage compression technology is more complicated than the refrigerant injection technology and is difficult to adapt to the low-temperature environment. By setting the low-temperature flasher 5 and the high-temperature flasher 10, the subcooling degree and the circulation flow rate can be increased, and the heating capacity of the system can be improved, and the operating temperature range of the system for heating at low ambient temperature can be widened. In addition, the jet enthalpy increase technology can effectively reduce the exhaust temperature of the compressor and greatly improve the energy efficiency of the entire jet enthalpy increase cascade high-temperature heat pump system.

[0070] Under the condition that the ambient temperature and the condenser outlet steam temperature are 25°C and 110°C respectively, the present invention carries out a calculation example, the high temperature circulating refrigerant is R1233zd(E), the low temperature circulating refrigerant is R1234yf, the second outlet temperature of the condenser evaporator 3 is 62°C, the outlet temperature of the low temperature flasher 5 is 39.9°C, the outlet temperature of the high temperature flasher 10 is 81.7°C, the superheat is 5°C, the subcooling is 3°C, and the following are respectively used: Figure 3 (a), (b), and (c) in the figure respectively show the conventional cascade heat pump system, the low-temperature jet enthalpy cascade heat pump system, and the high-temperature jet enthalpy cascade heat pump system for steam production; wherein, the conventional cascade heat pump system does not use the second high-temperature expansion valve 11, the high-temperature flash device 10, the second low-temperature expansion valve 6, and the low-temperature flash device 5, the low-temperature jet enthalpy cascade heat pump system does not use the second high-temperature expansion valve 11 and the high-temperature flash device 10, and the high-temperature jet enthalpy cascade heat pump system does not use the second low-temperature expansion valve 6 and the low-temperature flash device 5. By calculation, it is obtained as follows Figure 4 The COP comparison results of various cascade heat pump systems are shown in Figure 2. Figure 4 It can be found that compared with the conventional cascade heat pump system, the low-temperature jet enthalpy cascade heat pump system and the high-temperature jet enthalpy cascade heat pump system, the compressor power consumption of the jet enthalpy cascade heat pump system of the present invention is reduced by 1.90kW, 1.27kW and 1.51kW, respectively, with a reduction of 6.94%, 4.75% and 5.60%, respectively; the COP is increased by 0.16, 0.11 and 0.13, respectively, with an increase of 7.46%, 4.99% and 5.93%, respectively.

[0071] The thermal performance of a heat pump system is largely determined by its different structures. In order to explore the working characteristics of the jet reheat technology and its impact on the performance of the cascade heat pump system, a comparative analysis was conducted on three cascade heat pumps enhanced with jet reheat technology. The low-temperature-stage jet reheat cascade heat pump system only combines the low-temperature cycle with the jet reheat technology; the high-temperature-stage jet reheat cascade heat pump system only combines the high-temperature cycle with the jet reheat technology; the new jet reheat cascade heat pump system of the present invention combines the jet reheat technology with both the high-temperature cycle and the low-temperature cycle. In addition, a group of conventional cascade heat pump systems that do not use jet reheat technology in both the high-temperature and low-temperature cycles were taken as a reference group. By comparing the simulation results, the heating operation characteristics of the three jet reheat cascade heat pump systems and ordinary cascade heat pump systems at different evaporation temperatures were analyzed. The comparison results are shown in the figure. Figure 4 shown.

[0072] As can be seen from Figure 5(a), the compressor power consumption of the three jet enthalpy cascade heat pump systems is less than that of the conventional cascade heat pump system; Figure 5(b) shows that the COP is greater than that of the conventional cascade heat pump system. The effect of jet enthalpy on the characteristics of the cascade heat pump system is different in the high-temperature cycle and the low-temperature cycle. Since the jet enthalpy in the low-temperature cycle effectively increases the heat absorption of the refrigerant in the evaporator and the refrigerant flow in the condensing evaporator, the effect of the jet enthalpy in the low-temperature cycle on the system is more significant than that in the high-temperature cycle. In addition, among the three different jet enthalpy cascade heat pump systems, the COP of the new jet enthalpy cascade heat pump system of the present invention is the highest. This is because the new jet enthalpy cascade heat pump system of the present invention adds auxiliary circuits in both the high-temperature cycle and the low-temperature cycle, which can enhance the overall circulation flow of the refrigerant in the system at various evaporation temperatures and effectively reduce the exhaust steam temperature.

[0073] The jet enthalpy-increasing cascade high-temperature heat pump system of the present invention realizes air heat gradient recovery, self-adaptation of subcooling and superheat, and steam production by constructing a high-temperature refrigerant circulation loop and a low-temperature refrigerant circulation loop; by arranging a low-temperature flasher 5 and a high-temperature flasher 10 to perform two-stage throttling and intermediate air replenishment, the refrigerant enthalpy value at the inlet of the evaporator 1 is reduced, and the heat absorption of the refrigerant in the evaporator 1 is increased. At the same time, an air replenishment branch is added to increase the refrigerant flow in the condenser 8, and self-adaptation of subcooling and superheat is realized, thereby improving the energy efficiency and service life of the jet enthalpy-increasing cascade high-temperature heat pump system.

[0074] Under the conditions of the boundary and demand conditions, environmental conditions and structural characteristics of the determined high / low temperature refrigerants and target products, the present invention provides a design method for the capacity configuration of each device of a jet enthalpy cascade high-temperature heat pump system based on COP target optimization. The method can establish an effective thermodynamic model of the jet enthalpy cascade high-temperature heat pump system on the premise of determining the operating conditions, external requirements and structural dimensions, and quickly find the optimal operating state corresponding to the highest COP of the jet enthalpy cascade high-temperature heat pump system through several iterative calculations in the thermodynamic model, and output all thermodynamic parameters and the capacity of each device under the optimal state. The method can match the structural parameters and optimize the thermodynamic parameters of the heat pump system under the special requirements of steam production, and significantly reduce the operating energy consumption of the jet enthalpy cascade high-temperature heat pump system, making an important contribution to energy conservation and emission reduction in the field of steam production.

[0075] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0076] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0077] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, unless they are contradictory.

[0078] Although the embodiments of the present invention have been shown and described above, it is worth noting that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.

Claims

1. A jet enthalpy-increasing cascade high-temperature heat pump system, characterized in that: The invention comprises an evaporator (1), a low-temperature compressor (2), a condenser evaporator (3), a first low-temperature expansion valve (4), a low-temperature flash device (5), a second low-temperature expansion valve (6), a high-temperature compressor (7), a condenser (8), a first high-temperature expansion valve (9), a high-temperature flash device (10), a second high-temperature expansion valve (11) and a water pump (12); wherein the low-temperature compressor (2), the first channel of the condenser evaporator (3), the first low-temperature expansion valve (4), the low-temperature flash device (5), the second low-temperature expansion valve (6) and the first channel of the evaporator (1) are connected in sequence through a refrigerant pipeline to form a low-temperature refrigerant circulation loop; and the high-temperature compressor (7), the first channel of the condenser (8), the first high-temperature expansion valve (9), the high-temperature flash device (10), the second high-temperature expansion valve (11) and the second channel of the condenser evaporator (3) are connected in sequence through a refrigerant pipeline to form a high-temperature refrigerant circulation loop; The water pump (12) is connected to the condenser (8).

2. The jet enthalpy-increasing cascade high-temperature heat pump system according to claim 1, characterized in that: In a low-temperature refrigerant circulation loop, the outlet of the low-temperature compressor (2) is connected to the inlet of the first channel of the condenser evaporator (3) through a refrigerant pipeline, the outlet of the first channel of the condenser evaporator (3) is connected to the inlet of the first low-temperature expansion valve (4) through a refrigerant pipeline, the outlet of the first low-temperature expansion valve (4) is connected to the inlet of the low-temperature flasher (5) through a refrigerant pipeline, the gas outlet of the low-temperature flasher (5) is connected to the gas replenishment inlet of the low-temperature compressor (2) through a refrigerant pipeline, the liquid outlet of the low-temperature flasher (5) is connected to the inlet of the second low-temperature expansion valve (6) through a refrigerant pipeline, the outlet of the second low-temperature expansion valve (6) is connected to the inlet of the first channel of the evaporator (1) through a refrigerant pipeline, and the outlet of the first channel of the evaporator (1) is connected to the inlet of the low-temperature compressor (2) through a refrigerant pipeline; In the high-temperature refrigerant circulation loop, the outlet of the high-temperature compressor (7) is connected to the inlet of the first channel of the condenser (8) through a refrigerant pipeline, the outlet of the first channel of the condenser (8) is connected to the inlet of the first high-temperature expansion valve (9) through a refrigerant pipeline, the outlet of the first high-temperature expansion valve (9) is connected to the inlet of the high-temperature flasher (10) through a refrigerant pipeline, the gas outlet of the high-temperature flasher (10) is connected to the air supply inlet of the high-temperature compressor (7) through a refrigerant pipeline, the liquid outlet of the high-temperature flasher (10) is connected to the inlet of the second high-temperature expansion valve (11) through a refrigerant pipeline, the outlet of the second high-temperature expansion valve (11) is connected to the inlet of the second channel of the condenser evaporator (3) through a refrigerant pipeline, and the outlet of the second channel of the condenser evaporator (3) is connected to the inlet of the high-temperature compressor (7) through a refrigerant pipeline.

3. The capacity configuration method of the jet enthalpy increase cascade high temperature heat pump system according to any one of claims 1 to 2, characterized in that: The steps include: S1, determine the type of high / low temperature cycle refrigerant, the boundary and demand conditions of the input condenser outlet steam, the environmental conditions, and determine the geometric structure of the entire jet enthalpy increase cascade high temperature heat pump system; S2, bringing the set conditions in step S1 into the heat pump cycle simulation model, and calculating the refrigerant thermodynamic parameters at the outlets of the compressor, condenser and evaporator of the heat pump system, the condenser heating capacity, the compressor power consumption, the refrigerant circulation flow rate and the COP; If the system heating capacity does not meet the feedforward requirement, the condenser outlet steam flow rate is adjusted by feedback, increasing a step from the current value, and the operation continues; If the system heating capacity meets the feedforward requirement, the size between the COP of the jet enthalpy increase cascade high-temperature heat pump system and the preset value A is determined. If the COP is greater than the preset value A, all current assumed thermodynamic parameters and thermodynamic calculation results are saved and output as the existing optimal value in the current operation stage; if the COP is less than or equal to the preset value A, the saving step is skipped and it is directly determined whether the condenser outlet steam temperature meets the requirement: if it does not meet the requirement, the condenser outlet refrigerant temperature is adjusted. If the condenser outlet steam temperature is too high, the condenser outlet refrigerant temperature is reduced. If the condenser outlet steam temperature is too low, the condenser outlet refrigerant temperature is increased, and then the COP is recalculated according to the design method; If the condenser outlet steam temperature has reached the maximum value B, determine whether the outlet temperature of the second channel of the condenser evaporator has reached the maximum value C: if it has not reached the maximum value C, increase the outlet temperature of the second channel of the condenser evaporator by one step, and continue the calculation; if it has reached the maximum value C, determine whether the outlet temperature of the low-temperature flasher has reached the maximum value D; if it has not reached the maximum value D, increase the outlet temperature of the low-temperature flasher by one step, and continue the calculation; if it has reached the maximum value D, determine whether the outlet temperature of the high-temperature flasher has reached the maximum value E; if it has not reached the maximum value E, increase the outlet temperature of the high-temperature flasher inlet temperature, the increase value is one step length, and the calculation continues; if it has reached the maximum value E, it is determined whether the supercooling of the heat pump system has reached the maximum value F. If it has not reached the maximum value F, the condensing pressure is increased by one step length, and the calculation continues; if it has reached the maximum value F, it is determined whether the superheat of the heat pump system has reached the maximum value G. If it has not reached the maximum value G, the evaporation pressure is increased by one step length, and the calculation continues; if it has reached the maximum value G, the entire calculation process is terminated, and the final output result is the optimal operating state of the system and the capacity of each device corresponding to the highest COP in all iterative calculation steps.

4. The capacity configuration method of the jet enthalpy increase cascade high temperature heat pump system according to claim 3, characterized in that: After calculating the heating capacity, condenser outlet steam temperature and flow rate and other thermodynamic parameters through the heat pump cycle simulation model and heat and mass transfer model, the required subcooling, superheating, intermediate temperature and high / low temperature flash outlet temperature are achieved by adjusting the condensing pressure, evaporation pressure and condenser, condenser evaporator and evaporator pinch point temperature; the heat pump cycle simulation model includes compressor model, condenser model, expansion valve model, evaporator model and flash model. The expressions of each model are as follows: The power consumption of the compressor and the actual specific enthalpy at the outlet are: Where, h″ is the outlet specific enthalpy of the isentropic compression process, kJ / kg; h′ is the suction specific enthalpy, kJ / kg; η s is the isentropic efficiency of the compressor, P c is the power consumption of the compressor, kW; m c is the compressor flow rate, kg / s; h o ' ut is the actual specific enthalpy of the compressor outlet, kJ / kg; In each area of ​​the evaporator and condenser, the heat exchange on the refrigerant side, wall side and air / water side satisfies the following formula: In the formula, Q r is the heat exchange of refrigerant, kW; Q w is the wall heat transfer, kW; Q a Heat exchange for air, kW; q mr ,q ma are the mass flow rates of refrigerant and air, kg / s, respectively; are the inlet and outlet specific enthalpies of the refrigerant, kJ / kg; are the air inlet and outlet specific enthalpies, kJ / kg; A w is the heat exchange area, m 2 ; ΔT is the heat exchange temperature difference, ℃; H a , H r are the convective heat transfer coefficients of air and refrigerant, kW / (m 2 .℃); R is the wall thermal resistance; The relationship between the refrigerant enthalpy values ​​on both sides of the expansion valve is: In the formula, are the specific enthalpies of the expansion valve inlet and outlet, kJ / kg; The relationship between the vapor phase fraction a and the inlet and outlet enthalpy of the flasher is: In the formula, and are the specific enthalpies of the flasher inlet, outlet liquid phase, and outlet vapor phase, respectively, in kJ / kg.

5. The capacity configuration method of the jet enthalpy increase cascade high temperature heat pump system according to claim 3, characterized in that: The initial step size of the flow rate is set to 5%-10% of the system rated flow rate, and gradually decreases to 1%-2% with iterations; the initial step size of the condenser, condenser evaporator, evaporator pinch point temperature and condenser outlet steam temperature is set to 1-2% of the current temperature, and gradually decreases to 0.5℃ with iterations.

Citation Information

Patent Citations

  • Cascade refrigerating circulating system coupled with injector

    CN105650922A

  • Air source cascaded heat pump device

    CN108662811A

  • Debugging method of air-supplementing and enthalpy-increasing quasi two-stage compression air source heat pump water heater

    CN111059762A

  • System for preparing solid-gas flow state dry ice based on CO2 cascade refrigeration twice throttling

    CN111912130A

  • Circulating system applied to cascade refrigeration or heat pump system and supercooling method

    CN113776215A

Cited By

  • Compressor wet spraying control method, device and equipment and storage medium

    CN119393939A

  • Real-time energy efficiency control method for parking air conditioner of commercial vehicle

    CN120816864A

  • Self-adaptive intelligent control method for cascade high-temperature heat pump

    CN122429480A

  • A self-adaptive intelligent control method for a cascade high-temperature heat pump

    CN122429480B