Modular pressure testing method
By separating the hydrogen production separation device system into multiple modules and performing inflation and boosting inspections one by one, the problems of low detection efficiency and poor safety in the prior art are solved, and more efficient and safer pressure detection is achieved, covering the pipeline Leak detection between the equipment reduces the overall pressure test time and energy.
Patent Information
- Application Number
- CN202411076112.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2024-11-15
AI Technical Summary
In the prior art, the air pressure detection efficiency of the hydrogen production separation device is low and has poor safety, and it fails to effectively detect leakage problems between pipes and equipment. The overall pressure testing method leads to uneven stress on the equipment pipelines, which increases safety hazards.
Modular pressure testing method is adopted to separate the system into multiple independent system modules, and the inflatable and supercharged inspection is carried out through the booster pump one by one, and the gas is transferred to the low-pressure system module after the detection is completed, reducing the compression time and energy, and improving the Inspection efficiency and safety.
It improves detection efficiency, reduces detection time and danger, covers leakage detection in pipelines, equipment and connections, reduces repeated installation and disassembly of components, and reduces production costs.
Smart Images

Figure CN118961095A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of industrial pipeline air pressure detection, and in particular to a modular pressure testing method. Background Art
[0002] In the hydrogen production separation device, according to the industrial pipeline standards and hydrogen-oxygen related standards, an air pressure test is required. At present, the air pressure test method is to conduct air pressure tests on pipelines and equipment separately, and then install them into the entire skid after the pressure test is completed. The advantage of this is safety and convenience, because the space between a single device and pipeline is very small, the air pressure energy storage is limited, and the pipeline can be connected and pressure tested at will. However, the disadvantages are also obvious: First, only the leakage problems of the equipment and each pipeline are detected, and the leakage problems between pipelines and equipment after assembly are not considered, resulting in missed inspections. Second, the pipelines and equipment are carried out separately, and then assembled on the skid after the inspection is completed. This is equivalent to installing the module twice, which is time-consuming, and the equipment pipelines are unevenly stressed after assembly, which brings more hidden dangers to the normal operation in the later stage. In order to avoid the above problems, there is also a solution of using an overall module pressure test in the prior art, that is, the equipment pipeline is directly installed on the skid, and then pressure tested together. However, the space of the entire equipment and pipeline is greatly increased, so the pressure test time is very long, the detection efficiency is extremely low, and the gas pressure storage energy is very high. If there is a gas leak, it may cause a serious safety accident, which greatly increases the risk of detection. Therefore, how to efficiently and safely test the pressure of the hydrogen separation device is a problem that technicians in this field need to consider. Summary of the invention
[0003] The purpose of the present invention is to provide a modular pressure testing method to solve the problems of low pressure testing efficiency and poor safety in the prior art.
[0004] The technical solution of the present invention is: a modular pressure testing method, comprising the following steps:
[0005] S1, separating the system into a first system, a second system and a third system through a first valve, a second valve and a third valve in the pipeline, so that the first system is connected to the booster pump only through the first valve, the second system is connected to the booster pump only through the second valve, and the third system is connected to the booster pump only through the third valve, and at the same time, the first valve, the second valve and the third valve are connected to each other at one end connected to the booster pump;
[0006] S2, open the first valve, close the second valve and the third valve, inflate and pressurize the first system through the booster pump, and when the detection pressure value is reached, close the first valve and test the first system until the set maximum detection pressure is reached;
[0007] During each test of the first system, the second valve is opened, and the second system is inflated and pressurized by the booster pump. When the test pressure value is reached, the second valve is closed to test the second system;
[0008] S3, when the first system reaches the set maximum detection pressure and the detection is completed, and the second system is detecting, opening the third valve so that the gas of the first system is transferred to the third system;
[0009] S4, after the second system reaches the set maximum detection pressure and the detection is completed, open the second valve and the third valve so that the gas of the second system is transferred to the third system;
[0010] S5. Inflate and pressurize the third system by the booster pump until the third system reaches a maximum set pressure value.
[0011] Preferably, the detection of the first system, the second system and the third system is based on preset gradient pressure values, and each time a gradient detection pressure value is reached, the corresponding valve needs to be closed and detection is performed.
[0012] Preferably, in step S2, after each detection of the first system is completed, the second valve is closed and the first valve is opened to continue to inflate and pressurize the first system.
[0013] Preferably, in step S3, when the second system is inflated and pressurized by the boost pump, the first valve and the third valve are in a closed state.
[0014] Preferably, in step S4, before the detection of the second system is completed, the third system is inflated and pressurized by a booster pump.
[0015] Preferably, in steps S3 and S4, when the first system is connected to the third system or when the second system is connected to the third system, when the third system reaches a detection pressure value, the third valve is closed and the third system is detected.
[0016] Preferably, when the first system, the second system and the third system are being tested, if any abnormality occurs, the pressure needs to be released and adjusted before being re-pressurized.
[0017] Compared with the prior art, the advantages of the present invention are:
[0018] (1) Compared with the traditional method of testing the pressure of pipelines and equipment separately, the connections between pipelines are also tested, and the detection range basically covers all pipelines, equipment and connections; at the same time, it avoids the situation of uneven force on pipelines and equipment caused by repeated installation of components, and also reduces the time of repeated installation and disassembly of pipelines, thereby increasing detection efficiency;
[0019] Compared with the traditional overall pressure test method, it greatly reduces the pressure test time and improves the detection efficiency; at the same time, it also avoids the high energy during the overall pressure test and reduces the risk of detection;
[0020] In addition, the modular detection method not only shortens the detection time, but also reduces manpower and reduces production costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] The present invention will be further described below in conjunction with the accompanying drawings and embodiments:
[0022] Figure 1 This is a structural schematic diagram of the system module separation during the modular pressure test of the present invention;
[0023] Figure 2 This is a schematic diagram of the integral pressure test time and pressure trend in traditional technology;
[0024] Figure 3 A schematic diagram of the modular pressure test time and pressure trend according to the present invention;
[0025] Figure 4 It is a schematic diagram comparing time and pressure during the integral pressure test and modular pressure test according to the present invention.
[0026] Among them: a first valve 1, a second valve 2, a third valve 3, an inflation port 4, a first system 5, a second system 6, a third system 7, and a fourth valve 8. DETAILED DESCRIPTION
[0027] The present invention is further described in detail below in conjunction with specific embodiments:
[0028] like Figure 1 As shown, the present invention is applied to the air pressure test of the system composed of pipelines and equipment required to be sealed. The whole system is divided into multiple system modules, and each system module is subjected to a separate inflation and pressurization test. When one of the system modules is tested, it is in a high-pressure state and connected to other systems in a low-pressure state. The pressure of the system can be quickly transferred to the system module in the low-pressure state, which greatly increases the efficiency of pressure detection. At the same time, the energy of a single system module after inflation and pressurization is relatively small, which also reduces the danger during the detection process. Specifically, in this embodiment, with 1300Nm 3 / h alkali liquid electrolysis hydrogen production separation system as an example, wherein, according to the detection requirements, the preset gradient pressure values are 0.2MPa, 1.1MPa, 1.3MPa, 1.5MPa, 1.7MPa, 1.9MPa, and 2.1MPa. Each time the system reaches a corresponding gradient detection pressure value, the system needs to be sealed and tested. If there is a leak, the system is shut down and tightened. If the pressure needs to be relieved and reinstalled, it is re-pressurized. If there is no leak, continue to pressurize. When the pressure reaches 2.1MPa, it is tested after five minutes. If there is no abnormal sound, deformation, or leakage, it is qualified. The modular pressure detection method of the present invention is used below to specifically describe the alkali liquid electrolysis hydrogen production separation system, including the following steps:
[0029] First, the hydrogen production separation system is divided into the first system 5, the second system 6 and the third system 7 through the first valve 1, the second valve 2 and the third valve 3 in the pipeline, a total of three modules. Among them, during the test, the booster pump (not shown in the figure) is connected to the inflation port 4; the valves at O and H are isolated by a sealing plate, and they are always in the isolation state during the test. At the same time, the outlet connected to the outside world in the system is also set to the isolation sealing state, such as Figure 1 The pipe openings at M, N, D and C shown in the figure are always in a sealed state during the test. In addition, when dividing the system, it is necessary to ensure that all equipment and pipelines in each system are interconnected; in the three separated system modules, each system module has at least two pressure gauges or other pressure detection devices connected to it to provide feedback on the pressure of the corresponding system module during the test.
[0030] At this time, when the second valve 2 and the third valve 3 are closed, the first system 5 is connected to the boost pump through the first valve 1; when the first valve 1 and the third valve 3 are closed, the second system 6 is connected to the boost pump through the second valve 2; when the first valve 1 and the second valve 2 are closed, the third system 7 is connected to the boost pump through the third valve 3. At the same time, the first valve 1, the second valve 2 and the third valve 3 are interconnected at one end connected to the boost pump. It should be noted that in the subsequent steps, the first system and / or the second system are required to inflate and pressurize the third system. During the pressurization process, the boost pump can be used for pressurization at the same time. At this time, the two use the same channel to inflate and pressurize the third system. If the channel diameter is small, it may affect the efficiency of the air intake of the third system. Therefore, in other preferred embodiments, the connection between the third system and the boost pump can be set at an end away from the third valve, such as Figure 1 The fourth valve 8 in the pressure test chamber. That is, while the second system is pressurizing the third system, the booster pump connected to the fourth valve is simultaneously pressurizing and inflating the third system, further improving the efficiency of the pressure test.
[0031] During the test, first open the first valve 1, close the second valve 2 and the third valve 3, and inflate and pressurize the first system 5 through the booster pump. When the pressure in the first system 5 reaches 0.2MPa, close the first valve 1 for testing. Because the testing process requires a certain amount of time, open the second valve 2 at this time, and inflate and pressurize the second system 6 through the booster pump. After the first system 5 is tested at a pressure value of 0.2MPa, close the second valve 2, open the first valve 1, and continue to inflate and pressurize the first system 5. When the first system 5 reaches 1.1MPa, test the first system 5 again, and at the same time inflate and pressurize the second system 6 through the booster pump; next, repeat the above testing steps for each increase of 0.2MPa until the first system 5 reaches 2.1MPa.
[0032] In the above process, if the second system 6 reaches 0.2 MPa before the first system 5 reaches 2.1 MPa, the first test can be performed on the second system 6. Of course, if the second system 6 reaches a gradient pressure value such as 1.1 MPa, 1.3 MPa, etc., it is also necessary to perform a test.
[0033] After the first system 5 reaches the set maximum detection pressure of 2.1 MPa and the detection is completed, the second system 6 is continued to be inflated and pressurized by the booster pump. According to the set gradient pressure value, the second system 6 reaches 2.1 MPa and the detection is completed.
[0034] In the above process, that is, when the first system 5 passes the test and the second system 6 reaches a gradient pressure value and is tested, the second valve 2 is in a closed state, and the third valve 3 is opened, so that the gas of the first system 5 is transferred to the third system 7, and the first valve 1 is closed after the pressures of the two are close. In this embodiment, when the third system 7 reaches 1.6MPa, the pressure values of the first system 5 and the third system 7 are close. Among them, during the connection process between the first system 5 and the third system 7, when the third system 7 reaches the test values of 0.2MPa, 1.1MPa, 1.3MPa, and 1.5MPa, it is necessary to stop and perform a test.
[0035] After the second system 6 reaches the set maximum detection pressure value of 2.1MPa and the detection is completed, the first valve 1, the second valve 2 and the third valve 3 are opened to transfer the gas in the second system 6 to the third system 7. At this time, the pressure in the third system 7 can rise from 1.6MPa to about 1.9MPa. When the pressures of the two systems are close to each other at about 1.9MPa, the second valve 2 is closed. When the detection pressure values of 1.7MPa and 1.9MPa are reached, it is necessary to stop and perform the detection.
[0036] In this embodiment, when the first system inflates and pressurizes the third system or the second system inflates and pressurizes the third system, it takes a long time for the two to reach the same pressure and maintain balance. Therefore, when the pressures of the two are close, the inflation and pressurization process can be considered completed and subsequent operations can be performed. When the second system inflates and pressurizes the third system, the first valve 1, the second valve 2 and the third valve 3 are all in the open state, and the three systems are connected at this time; but the pressure value of the second system is the largest, and the pressure values of the third system and the first system are close, so the second system can inflate and pressurize the third system. In other preferred embodiments, it can be based on the actual pipeline connection conditions, as long as the second system and the third system are connected.
[0037] Finally, the first valve 1 and the second valve 2 are closed, the third valve 3 is opened, and the third system 7 is inflated and pressurized by the booster pump, so that the third system 7 is pressurized from about 1.9 MPa to 2.1 MPa, and the system is shut down for detection at 2.1 MPa.
[0038] The first system 5, the second system 6 and the third system 7 are all tested. After the gas transfer from the first system 5 to the third system 7 is completed, the interface connected to the outside world can be opened for slow pressure relief; after the gas transfer from the second system 6 to the third system 7 is completed, the interface connected to the outside world can be opened for slow pressure relief. It should be emphasized that when the booster pump is used for inflation and pressurization, only one of the systems is inflated and pressurized at a time to further improve the detection efficiency.
[0039] Through the above detection method, compared with the traditional integral pressure detection method, if there is no unqualified, the detection time is as short as Figure 4 As shown, it is reduced from about 15 hours to about 7 hours. When the overall energy is maximum, the pressure value of the first system 5 is about 1.6MPa, the pressure value of the second system 6 is about 1.9MPa, and the pressure value of the third system 7 is 2.1MPa. It can be seen that the volume of the first system 5 and the second system 6 is 5.1m 3 , the volume of the third system 7 is 1.4m 3 , it can be calculated that the overall energy is about 20.79MPa.m 3 ; Using the integrated pressure detection method, the maximum energy is calculated to be 24.36MPa.m 3 , the maximum energy ratio is about 0.85, a decrease of 15%, which greatly reduces the danger during detection.
[0040] It should be noted that the modular pressure testing method described in the present invention is not limited to the detection of the alkaline liquid electrolysis hydrogen production device in the above-mentioned embodiment. Systems formed by connecting multiple devices and multiple pipelines in other embodiments can all be tested by this method; in addition, it is not limited to dividing the entire system into three system modules, and can also be divided into four, five or other numbers of system modules according to actual needs. It can ensure that inflation and pressure are carried out in sequence, and the system module that completes the pressure detection first can inflate and pressurize other system modules.
[0041] The above embodiments are only for illustrating the technical concept and features of the present invention, and their purpose is to enable people familiar with this technology to understand the content of the present invention and implement it accordingly, and they cannot be used to limit the scope of protection of the present invention. For those skilled in the art, it is obvious that the present invention is not limited to the details of the above exemplary embodiments, and the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the present invention is limited by the attached claims rather than the above description, and it is intended to include all changes within the meaning and scope of the equivalent elements of the claims in the present invention.
Claims
1. A modular stress testing method, characterized in that: The following steps are involved: S1, separating the system into a first system, a second system and a third system through a first valve, a second valve and a third valve in the pipeline, so that the first system is connected to the booster pump only through the first valve, the second system is connected to the booster pump only through the second valve, and the third system is connected to the booster pump only through the third valve, and at the same time, the first valve, the second valve and the third valve are connected to each other at one end connected to the booster pump; S2, open the first valve, close the second valve and the third valve, inflate and pressurize the first system through the booster pump, and when the detection pressure value is reached, close the first valve and test the first system until the set maximum detection pressure is reached; During each test of the first system, the second valve is opened, and the second system is inflated and pressurized by the booster pump. When the test pressure value is reached, the second valve is closed to test the second system; S3, when the first system reaches the set maximum detection pressure and the detection is completed, and the second system is detecting, opening the third valve so that the gas of the first system is transferred to the third system; S4, after the second system reaches the set maximum detection pressure and the detection is completed, open the second valve and the third valve so that the gas of the second system is transferred to the third system; S5. Inflate and pressurize the third system by the booster pump until the third system reaches a maximum set pressure value.
2. A modular pressure testing method according to claim 1, characterized in that: The detection of the first system, the second system and the third system is based on preset gradient pressure values. Every time a gradient detection pressure value is reached, the corresponding valve needs to be closed and detection is performed.
3. A modular pressure testing method according to claim 2, characterized in that: In step S2, after each detection of the first system is completed, the second valve is closed and the first valve is opened to continue to inflate and pressurize the first system.
4. A modular pressure testing method according to claim 1, characterized in that: In step S3, when the second system is inflated and pressurized by the boost pump, the first valve and the third valve are in a closed state.
5. A modular pressure testing method according to claim 1, characterized in that: In step S4, before the second system detection is completed, the third system is inflated and pressurized by a boost pump.
6. A modular pressure testing method according to claim 1, characterized in that: In steps S3 and S4, when the first system is connected to the third system or when the second system is connected to the third system, when the third system reaches a detection pressure value, the third valve is closed and the third system is detected.
7. A modular pressure testing method according to claim 1, characterized in that: When the first system, the second system and the third system are being tested, if any abnormality is found, the pressure needs to be released and adjusted before being re-pressurized.
