Tunnel advanced geological forecast and safety monitoring method and device based on optical fiber sensing
By laying an optical fiber sensing system in the tunnel, building a three-dimensional geological model and real-time monitoring of rock and soil deformation, the problems of high cost and limited data range of traditional seismic wave perception systems are solved, and efficient tunnel advance geological forecasting and safety monitoring are achieved.
Patent Information
- Application Number
- CN202411016504.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-28
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-07-28
AI Technical Summary
Traditional seismic wave perception systems have high deployment and maintenance costs, limited data collection range, and difficult to achieve high-density real-time monitoring and early warning, and cannot effectively carry out tunnel advance geological forecasting and safety monitoring.
Using a system based on fiber-optic sensing, the sensor fiber is arranged on the side wall, bottom plate and palm surface of the tunnel, and the fiber integrated demodulator is used to obtain strain information and strain rate information, build an initial three-dimensional geological model, simulate surface wave propagation, and extract Vibration information is carried out iteratively optimized, advanced geological forecast reports are generated, and the stability and deformation of rock and soil during tunnel construction and use are monitored in real time.
It realizes high resolution, long sensing distance and good continuity of tunnel geological monitoring, reduces monitoring costs, is suitable for complex environments with long time and large range, and provides safety monitoring and early warning support for tunnel construction and use.
Smart Images

Figure CN118962783A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of tunnel advanced geological prediction and safety monitoring, and more specifically, to a tunnel advanced geological prediction and safety monitoring method and device based on optical fiber sensing. Background Art
[0002] Tunnel advanced geological prediction is to evaluate and predict the geological conditions of the rock and soil in front of and around the tunnel face during tunnel excavation. Through various tunnel advanced geological prediction methods, data is obtained to evaluate the structural characteristics, lithological characteristics, groundwater distribution and other geological conditions of the rock and soil in front of the tunnel, so as to predict and warn potential construction difficulties and geological problems in advance, provide a scientific basis for tunnel excavation, and thus ensure construction safety and engineering quality.
[0003] Commonly used tunnel advance geological prediction methods include advance drilling method, electrical method, electromagnetic method and seismic wave method. Among them, seismic wave advance prediction is one of the mainstream methods currently used. This method uses the propagation characteristics of seismic waves in underground rock and soil, and infers geological information such as lithology, soil properties, structural characteristics, development of cracks and caves, and groundwater distribution of the rock and soil by analyzing the propagation speed and attenuation of seismic waves. At present, the traditional seismic wave sensing system is mainly composed of seismographs, detectors and data processing systems. However, due to the limitations of instruments and electricity, the deployment and maintenance costs of traditional seismic wave sensing systems are high, the data collection range is limited, and it is difficult to achieve high-density real-time monitoring and early warning.
[0004] Distributed acoustic wave sensing technology in fiber optic sensing technology was proposed in the 1990s and has been gradually applied to the field of geological earthquake monitoring in recent years. This technology uses optical fiber as a sensor, measures the strain rate of the optical fiber by monitoring the phase information change of the coherent Rayleigh scattered light in the optical fiber, and senses underground vibrations. By analyzing the time difference when the Rayleigh scattered light is received, the buried position of the optical fiber corresponding to the vibration information is determined, so as to monitor and analyze the underground structure of the rock and soil body and other geological conditions. At present, the sensing length of distributed acoustic wave sensing technology can extend to tens of thousands of meters, the vibration detection bandwidth can reach tens of thousands of hertz, and the array spacing can be flexibly adjusted, and the spatial resolution can be as small as one meter. In the field of earthquake monitoring, distributed acoustic wave sensing technology can sense underground vibration signals in real time and continuously. Compared with traditional seismic wave sensing systems, distributed acoustic wave sensing technology has the advantages of wide coverage, high spatial resolution, and good real-time performance, and can better realize real-time monitoring of underground structures.
[0005] At the same time, the Brillouin scattering type fiber optic sensing technology in the fiber optic sensing technology can measure the strain of the optical fiber by monitoring the frequency shift of the Brillouin scattered light in the optical fiber, and analyze the abnormal deformation of the rock and soil around the tunnel wall. It is worth noting that the phase change of the Rayleigh scattered light in the distributed acoustic wave sensing technology and the frequency shift of the Brillouin scattered light in the Brillouin scattering type fiber optic sensing technology are both affected by the ambient temperature, while the Raman scattering type fiber optic sensing technology in the fiber optic sensing technology can calculate the ambient temperature through the light intensity ratio of Stokes light and anti-Stokes light. Therefore, when monitoring the strain and strain rate based on Brillouin scattering and Rayleigh scattering, the ambient temperature can be determined based on Raman scattering, and the influence of the ambient temperature can be corrected and eliminated.
[0006] Based on this, the present invention proposes a method and device for advanced geological prediction and safety monitoring of tunnels based on optical fiber sensing. The optical fiber sensing system is used to obtain the strain information and strain rate information of each point along the sensing optical fiber layout of the tunnel to be tested, analyze the underground structure, predict the characteristics and changes of the geological conditions in front of the tunnel, make advanced geological predictions for tunnel excavation, monitor the safety of tunnel construction and post-construction, and provide timely warnings for potential safety issues in the tunnel. Summary of the invention
[0007] The purpose of the present invention is to provide a method and device for tunnel advanced geological prediction and safety monitoring based on optical fiber sensing, so as to overcome the defects existing in the prior art.
[0008] In order to achieve the above object, the technical solution adopted by the present invention is as follows:
[0009] A method for advanced geological prediction and safety monitoring of tunnels based on optical fiber sensing comprises the following steps:
[0010] S1. Before or during the lining of the excavated section of the tunnel to be tested, the sensing optical fiber is arranged on the side wall, bottom plate, top plate and tunnel face of the excavated section of the tunnel;
[0011] S2. During the tunnel construction process, for two adjacent tunnel faces where the sensing optical fiber is laid, the time interval from the beginning of laying the sensing optical fiber on the previous face to the beginning of laying the sensing optical fiber on the next face is determined as a monitoring cycle. During the use of the tunnel, a natural month is determined as a monitoring cycle. In each monitoring cycle, the time interval is divided into multiple monitoring periods. In different monitoring periods under different monitoring cycles, the optical fiber integrated demodulator emits laser pulses to the sensing optical fiber, receives the Brillouin scattered light propagating back from the sensing optical fiber, demodulates the optical signal to obtain the frequency shift of the Brillouin scattered light, and obtains the strain information of each point along the arrangement of the sensing optical fiber, and distinguishes the strain information into the deformation of the rock and soil body. Strain and site vibration strain. The deformation strain distribution of the rock and soil at the location where the sensing optical fiber is arranged in each monitoring period under each monitoring cycle is obtained from the deformation strain of the rock and soil. In different monitoring periods under different monitoring cycles, the optical fiber integrated demodulator emits laser pulses to the sensing optical fiber, and receives the Rayleigh scattered light propagating back from the sensing optical fiber. The optical signal is demodulated to obtain the phase change of the Rayleigh scattered light, and the strain rate information of each point along the sensing optical fiber arrangement is obtained. The strain rate information is divided into the deformation strain rate of the rock and soil and the site vibration strain rate. Based on the frequency and time characteristics of the site vibration strain rate in each monitoring period under each monitoring cycle, the site vibration information of the corresponding monitoring cycle and monitoring period is extracted.
[0012] S3. In each monitoring period of each monitoring cycle, the main distribution of rock and soil along the tunnel is obtained according to the regional geological report, regional geological maps and previous exploration data to construct an initial three-dimensional geological model, and the shear modulus G and density ρ of the rock and soil are calculated by the formula The shear wave velocity v of the rock and soil body is calculated to obtain the shear wave velocity structure of the initial three-dimensional geological model. The finite element method is used to simulate the propagation of surface waves in the initial three-dimensional geological model, and the simulated surface wave dispersion curve is obtained by numerical simulation calculation; in each monitoring period under each monitoring cycle, the site vibration information measured by the optical fiber integrated demodulator is filtered and processed to distinguish the vibration information generated by different vibration events, and the vibration information with a high signal-to-noise ratio is extracted. The extracted vibration information is processed by the frequency-time analysis method to obtain the measured surface wave dispersion curve; the difference between the simulated surface wave dispersion curve and the measured surface wave dispersion curve is compared, and the geological characteristics of the rock and soil body of the initial three-dimensional geological model are continuously adjusted using an iterative optimization algorithm until the error between the simulated surface wave dispersion curve and the measured surface wave dispersion curve in the same monitoring period under the same monitoring cycle meets the site monitoring accuracy requirements, and the adjusted initial three-dimensional geological model is determined as the target three-dimensional geological model corresponding to the monitoring cycle and monitoring period;
[0013] S4. During the current monitoring period when the sensor optical fiber is laid out at the tunnel face, the geological characteristics of the rock and soil in front of the tunnel face are obtained based on the target three-dimensional geological model obtained during the monitoring period before the tunnel face is further excavated, and an advanced geological forecast report is issued. The advanced geological forecast report is updated in a timely manner based on the target three-dimensional geological model obtained during the monitoring period after the tunnel face is further excavated; the stability of the rock and soil in front of the tunnel face is analyzed based on the target three-dimensional geological model obtained during the current monitoring period, and the structural stability characteristic value of the rock and soil is calculated. When the structural stability characteristic value of the rock and soil in front of the tunnel face exceeds the warning threshold of the structural stability characteristic value of the rock and soil, an alarm is automatically issued, and treatment suggestions are put forward by comparing with engineering problem examples;
[0014] S5. During the tunnel construction process, based on the site vibration information obtained in each monitoring period under each monitoring cycle, the tunnel construction noise and vibration data are extracted to obtain the daily construction time, frequency and progress. The monitored construction time, frequency and progress are compared with the construction plan and current specifications to evaluate the standardization of the construction; based on the target three-dimensional geological model obtained in each monitoring period under each monitoring cycle, the stability of the rock and soil around the tunnel wall and in front of the face is analyzed, and the structural stability characteristic value of the rock and soil and the difference between the structural stability characteristic value of the rock and soil are calculated. When the structural stability characteristic value of the rock and soil exceeds the structural stability characteristic value of the rock and soil, a warning is issued. Threshold, or when the difference of rock and soil structural stability characteristic values exceeds the warning threshold of rock and soil structural stability characteristic value difference, an automatic alarm is triggered, and treatment suggestions are put forward in accordance with engineering problem examples; based on the deformation strain of the rock and soil obtained in each monitoring period under each monitoring cycle, the deformation of the rock and soil around the tunnel wall is obtained, and the rock and soil deformation strain characteristic value and the difference of the rock and soil deformation strain characteristic value are calculated. When the rock and soil deformation strain characteristic value exceeds the warning threshold of the rock and soil deformation strain characteristic value, or when the difference of the rock and soil deformation strain characteristic value exceeds the warning threshold of the rock and soil deformation strain characteristic value difference, an automatic alarm is triggered, and treatment suggestions are put forward in accordance with engineering problem examples;
[0015] S6. During the use of the tunnel, the stability of the rock and soil around the tunnel wall is analyzed based on the target three-dimensional geological model obtained in each monitoring period under each monitoring cycle, and the structural stability characteristic value of the rock and soil and the difference in the structural stability characteristic value of the rock and soil are calculated. When the structural stability characteristic value of the rock and soil exceeds the warning threshold of the structural stability characteristic value of the rock and soil, or when the difference in the structural stability characteristic value of the rock and soil exceeds the warning threshold of the structural stability characteristic value difference of the rock and soil, an automatic alarm is issued, and treatment suggestions are made by comparing with engineering problem examples; based on the deformation strain of the rock and soil obtained in each monitoring period under each monitoring cycle, the deformation of the rock and soil around the tunnel wall is obtained, and the deformation strain characteristic value of the rock and soil and the difference in the deformation strain characteristic value of the rock and soil are calculated. When the deformation strain characteristic value of the rock and soil exceeds the warning threshold of the deformation strain characteristic value of the rock and soil, or when the difference in the deformation strain characteristic value of the rock and soil exceeds the warning threshold of the deformation strain characteristic value difference of the rock and soil, an automatic alarm is issued, and treatment suggestions are made by comparing with engineering problem examples.
[0016] Furthermore, the principle of arranging the sensing optical fibers in step S1 is that the sensing optical fibers of the tunnel side walls, bottom plate and top plate are arranged continuously, and the sensing optical fibers of the tunnel face are arranged intermittently.
[0017] Furthermore, the arrangement of the sensing optical fiber on the side wall, bottom plate, top plate and face of the excavated section of the tunnel in step S1 specifically includes: excavating small trenches on the side wall, bottom plate, top plate and face of the excavated section of the tunnel, burying the sensing optical fiber in the trenches, and backfilling and fixing it with soil or construction slurry; the sensing optical fiber arranged on the side wall, bottom plate and top plate of the tunnel is connected to an optical fiber integrated demodulator at one end located at the tunnel excavation entrance, and a free section is left at one end close to the tunnel excavation face, and as the tunnel is continuously excavated, the optical fiber of the free section is continuously arranged in the tunnel along the newly excavated section; the sensing optical fiber arranged on the tunnel face is connected to an optical fiber integrated demodulator at one end, and is directly removed as the tunnel is excavated after monitoring, and the sensing optical fiber is re-arranged at the new face to be tested as the tunnel is excavated.
[0018] Furthermore, the rock deformation strain in step S2 is the strain caused by the internal deformation of the rock, the site vibration strain is the strain caused by the rock sensing the site vibration signal, the rock deformation strain rate is the strain rate caused by the internal deformation of the rock, and the site vibration strain rate is the strain rate caused by the rock sensing the site vibration signal; the earthquake sources that excite the site vibration signal include construction noise, environmental noise and man-made earthquakes, and man-made earthquakes include various types such as heavy hammer strikes and gunpowder explosions.
[0019] Furthermore, the geological characteristics of the rock and soil mass in step S3 include lithology distribution, porosity, development of fractures and caves, and groundwater distribution; after tunnel excavation, the actual geological characteristics of the newly excavated section are added to the initial three-dimensional geological model of the latest monitoring period under the current monitoring cycle, and the obtained new three-dimensional geological model is set as the initial three-dimensional geological model of the next adjacent monitoring cycle and monitoring period;
[0020] In the current monitoring cycle, the actual geological characteristics of the newly excavated tunnel section are compared with the geological characteristics reflected by the deduced target three-dimensional geological model, the differences between the two are analyzed, the errors of the target three-dimensional geological model are identified, and the iterative optimization algorithm parameters are improved. In the next monitoring cycle, the improved iterative optimization algorithm is used to adjust the initial three-dimensional geological model.
[0021] Furthermore, in step S5, based on the site vibration information obtained in each monitoring period under each monitoring cycle, the tunnel construction noise and vibration data are extracted to obtain the daily construction time, frequency and progress, which specifically includes: analyzing the extracted tunnel construction noise and vibration data, and obtaining the start and end time and working period of the daily construction according to the time characteristics of the noise and vibration; obtaining the working frequency of different construction equipment and processes according to the frequency distribution of the noise and vibration and the noise frequency characteristics generated by different types of construction equipment; and determining the progress of the construction process according to the intensity, frequency change and vibration position of the noise and vibration.
[0022] Furthermore, in the steps S4, S5 and S6, the rock and soil structural stability characteristic values at least include the length of crack development, the size of cave development, the width of fault development, the elevation of groundwater level, the range of weak rock layer development and the range of unstable area; in the steps S5 and S6, the rock and soil deformation strain characteristic values at least include daily strain, monthly strain and cumulative strain, the difference of the rock and soil structural stability characteristic values is the maximum difference between the rock and soil structural stability characteristic values of the latest monitoring period in the current monitoring cycle and the rock and soil structural stability characteristic values of the monitoring periods in other previous monitoring periods, the difference of the rock and soil deformation strain characteristic values is the maximum difference between the rock and soil deformation strain characteristic values of the latest monitoring period in the current monitoring cycle and the rock and soil deformation strain characteristic values of the monitoring periods in other previous monitoring periods, and different rock and soil structural stability characteristic value warning thresholds, rock and soil structural stability characteristic value difference warning thresholds, rock and soil deformation strain characteristic value warning thresholds, and rock and soil deformation strain characteristic value difference warning thresholds are preset for the rock and soil located at different positions in the tunnel according to current specifications and construction requirements.
[0023] Furthermore, during the entire construction and use period of the tunnel, historical data and real-time data are regularly analyzed, and the structural stability characteristic values and deformation strain characteristic values of the rock and soil around the tunnel wall in each monitoring period under each monitoring cycle are compared. The time periods in which obvious abnormal values and abnormal trends appear are identified, and the construction factors and natural factors that cause the abnormal values and abnormal trends are analyzed. A monitoring report is generated, and improvements and preventions are carried out in the subsequent construction and use of the tunnel.
[0024] The present invention provides a device for realizing the above-mentioned tunnel advanced geological prediction and safety monitoring method based on optical fiber sensing, comprising a sensing optical fiber, an optical fiber integrated demodulator and a central processing station, wherein the optical fiber integrated demodulator is used to emit laser pulses to the sensing optical fiber, and receive Brillouin scattered light, Rayleigh scattered light and Raman scattered light propagating back from the sensing optical fiber, demodulate the optical signal to obtain the frequency shift of the Brillouin scattered light, the phase change of the Rayleigh scattered light and the light intensity of the Raman scattered light, and obtain the strain information and strain rate information of each point along the arrangement of the sensing optical fiber, and the central processing station comprises:
[0025] The data receiving and processing module is used to divide the monitoring cycle and monitoring period, obtain the rock and soil strain information and strain rate information measured by the optical fiber integrated demodulator, distinguish the strain information into rock and soil deformation strain and site vibration strain, distinguish the strain rate information into rock and soil deformation strain rate and site vibration strain rate, extract the site vibration information from the site vibration strain rate, obtain the measured surface wave dispersion curve, and deduce the target three-dimensional geological model of each monitoring period under each monitoring cycle;
[0026] The tunnel advanced geological prediction module is used to obtain the geological characteristics of the rock and soil in front of the tunnel face based on the target three-dimensional geological model obtained in the current monitoring period, and generate an advanced geological prediction report;
[0027] The tunnel construction safety monitoring module is used to extract the noise and vibration data of tunnel construction according to the site vibration information obtained at the site during the tunnel construction process, and obtain the daily construction time, frequency and progress to evaluate the standardization of tunnel construction; and analyze the stability of the rock and soil around the tunnel wall and in front of the face according to the target three-dimensional geological model obtained at the site; and obtain the deformation of the rock and soil around the tunnel wall according to the deformation strain of the rock and soil obtained at the site;
[0028] The post-construction safety monitoring module of the tunnel is used to analyze the stability of the rock and soil around the tunnel wall according to the target three-dimensional geological model obtained on site during the use of the tunnel; and to obtain the deformation of the rock and soil around the tunnel wall according to the deformation strain of the rock and soil obtained on site;
[0029] The tunnel safety early warning module is used to automatically alarm during the construction and use of the tunnel based on the monitoring results of the tunnel advanced geological prediction module, the tunnel construction safety monitoring module and the tunnel post-construction safety monitoring module when the rock and soil structure stability characteristic value exceeds the rock and soil structure stability characteristic value warning threshold, the rock and soil deformation strain characteristic value exceeds the rock and soil deformation strain characteristic value warning threshold, or when the rock and soil structure stability characteristic value difference exceeds the rock and soil structure stability characteristic value difference warning threshold, the rock and soil deformation strain characteristic value difference exceeds the rock and soil deformation strain characteristic value difference warning threshold, analyze the tunnel rock and soil engineering geological problems in the monitoring period and monitoring period corresponding to the automatic alarm, and generate an engineering problem handling suggestion report.
[0030] Furthermore, the tunnel safety warning module has a built-in engineering problem instance database, which covers problems encountered during tunnel construction and use and corresponding treatment method examples. For the identified automatic alarm engineering geological problems of tunnel rock and soil, similar engineering examples are retrieved from the engineering problem instance database by analogy with the main geological conditions of the site, the excavation depth and burial conditions of the tunnel, and the type of engineering geological problems. An engineering problem handling recommendation report is generated based on the treatment methods and response strategies in the engineering examples with the highest similarity; the engineering problems, treatment methods and treatment effects of the monitored tunnel are recorded in detail, and these new records are entered into the engineering problem instance database to continuously update and expand the storage capacity of the engineering problem instance database.
[0031] Compared with the prior art, the advantages of the present invention are:
[0032] 1. The present invention adopts optical fiber sensing technology, which can continuously monitor the deformation strain of rock and soil and the vibration strain rate of the site during the entire construction period and service period of the tunnel. At different periods, the obtained data can be used for tunnel advanced geological prediction, tunnel construction safety monitoring and tunnel post-construction safety monitoring, meeting various tunnel engineering safety monitoring needs.
[0033] 2. The present invention adopts sensing optical fiber to monitor site vibration. Compared with the traditional seismic wave method tunnel advanced geological prediction system, the tunnel advanced geological prediction system based on optical fiber sensing has the advantages of high resolution, long sensing distance, good continuity, simple structure, etc. It can be continuously deployed in long sequences and large areas, which makes up for the difficulty of deploying traditional seismic wave sensing systems. It can be better applied to tunnel monitoring sites with long timeliness, large range and complex environment.
[0034] 3. The present invention adopts sensing optical fiber for advanced geological prediction and tunnel safety monitoring of tunnels. Since optical fiber materials have the advantages of corrosion resistance and electromagnetic interference resistance, small and light, flexible and tough, compared with other tunnel monitoring equipment and instruments that are susceptible to electromagnetic interference and large in size, sensing optical fiber has stronger portability and embeddability, and can be applied to tunnels of various usage types, excavation methods and excavation sizes, and has strong operability.
[0035] 4. The sensing optical fiber used in the present invention can be continuously laid out along the axis of the tunnel as the tunnel is excavated. After the laying is completed, the tunnel can be monitored at any time by connecting the optical fiber integrated demodulator. Continuous monitoring of the entire length and cycle of the tunnel can be achieved without moving. After the monitoring period ends, there is no need to recover the monitoring optical fiber. It is simple and easy to use, and has low maintenance costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0037] Figure 1 It is a flow chart of a tunnel advanced geological prediction and safety monitoring method based on optical fiber sensing in an embodiment of the present invention.
[0038] Figure 2 It is a schematic diagram of a tunnel advanced geological prediction and safety monitoring device based on optical fiber sensing in an embodiment of the present invention.
[0039] Figure 3 It is a schematic diagram of an application scenario of a tunnel advanced geological prediction and safety monitoring method based on optical fiber sensing in an embodiment of the present invention. DETAILED DESCRIPTION
[0040] The preferred embodiments of the present invention are described in detail below in conjunction with the accompanying drawings so that the advantages and features of the present invention can be more easily understood by those skilled in the art, thereby making a clearer and more definite definition of the protection scope of the present invention.
[0041] See also Figure 1 As shown, in this embodiment, a tunnel advanced geological prediction and safety monitoring device based on optical fiber sensing is arranged in a hydraulic tunnel constructed by drilling and blasting method to perform long-term monitoring of soil deformation and site vibration of the site. The specific implementation steps are as follows:
[0042] Step S1, device layout; after the excavation length of the tunnel to be tested reaches 50m, a small trench is excavated on the side wall, bottom plate and face of the excavated section of the tunnel, the sensing optical fiber is buried in the trench, and backfilled with construction slurry to fix it. The sensing optical fiber laid on the side wall and bottom plate of the tunnel is connected to the optical fiber integrated demodulator at one end located at the entrance of the tunnel excavation, and a free section is left at the end close to the tunnel excavation face. The length of the free section is the remaining excavation length of the tunnel. As the tunnel is continuously excavated, the optical fiber of the free section is continuously laid in the tunnel along the newly excavated section. The sensing optical fiber laid on the tunnel face is laid in a cross shape, and one end is connected to the optical fiber integrated demodulator. After the face is monitored, it can be directly removed with the tunnel excavation. As the tunnel is excavated, the sensing optical fiber is re-laid at the new face to be tested every 5m.
[0043] Step S2, data acquisition; during the tunnel construction process, for two adjacent tunnel faces where the sensing optical fiber is laid, the time interval from the beginning of laying the sensing optical fiber on the previous face to the beginning of laying the sensing optical fiber on the next face is determined as a monitoring cycle; during the use of the tunnel, a natural month is determined as a monitoring cycle; in each monitoring cycle, starting from this monitoring cycle, the monitoring period is divided into time intervals of 8 hours and so on; after dividing several monitoring periods, if the remaining time of this monitoring cycle is less than 8 hours, the remaining time is determined as a monitoring period; in different monitoring periods under different monitoring cycles, the optical fiber integrated demodulator emits laser pulses to the sensing optical fiber, receives the Brillouin scattered light back-propagated by the sensing optical fiber, demodulates the optical signal to obtain the frequency shift of the Brillouin scattered light, and obtains the sensing optical fiber. The strain information of each point along the sensing fiber arrangement is obtained, and the strain information is distinguished into rock and soil deformation strain and site vibration strain. The deformation strain distribution of the rock and soil at the sensing fiber arrangement position in each monitoring period under each monitoring cycle is obtained from the rock and soil deformation strain; in different monitoring periods under different monitoring cycles, the optical fiber integrated demodulator emits laser pulses to the sensing fiber, receives the Rayleigh scattered light propagating back from the sensing fiber, demodulates the optical signal to obtain the phase change of the Rayleigh scattered light, and obtains the strain rate information of each point along the sensing fiber arrangement, and distinguishes the strain rate information into rock and soil deformation strain rate and site vibration strain rate. Based on the frequency and time characteristics of the site vibration strain rate in each monitoring period under each monitoring cycle, the site vibration information of the corresponding monitoring cycle and monitoring period is extracted.
[0044] Step S3, data processing: In each monitoring period under each monitoring cycle, the main distribution of rock and soil along the tunnel is obtained according to the regional geological report, regional geological map and previous exploration data, and an initial three-dimensional geological model is constructed. The shear modulus G and density ρ of the rock and soil are calculated by the formula The shear wave velocity v of the rock and soil mass is calculated to obtain the shear wave velocity structure of the initial three-dimensional geological model. The finite element method is used to simulate the propagation of surface waves in the initial three-dimensional geological model, and the simulated surface wave dispersion curve is obtained through numerical simulation calculation. In each monitoring period under each monitoring cycle, the site vibration information measured by the optical fiber integrated demodulator is filtered to distinguish the vibration information generated by different vibration events, and the vibration information with high signal-to-noise ratio in the vibration event (construction noise, environmental noise) is extracted. The extracted vibration information is processed by the frequency-time analysis method to obtain the measured surface wave dispersion curve. The difference between the simulated surface wave dispersion curve and the actual surface wave dispersion curve is compared, and the geological characteristics of the rock and soil mass of the initial three-dimensional geological model, including lithology distribution, porosity, fracture and cave development, and groundwater distribution, are continuously adjusted using an iterative optimization algorithm until the error between the simulated surface wave dispersion curve and the actual surface wave dispersion curve in the same monitoring period under the same monitoring cycle meets the site monitoring accuracy requirements, and the adjusted initial three-dimensional geological model is determined as the target three-dimensional geological model for the corresponding monitoring cycle and monitoring period.
[0045] Algorithm optimization: In the current monitoring cycle, compare the actual geological characteristics of the newly excavated tunnel section with the geological characteristics reflected by the deduced target three-dimensional geological model, analyze the differences between the two, identify the errors of the target three-dimensional geological model, improve the iterative optimization algorithm parameters, and in the next monitoring cycle, use the improved iterative optimization algorithm to adjust the initial three-dimensional geological model.
[0046] Preset warning thresholds; preset warning thresholds for rock and soil masses located at different positions in the tunnel, preset warning thresholds for six rock and soil structure stability characteristic values and corresponding warning thresholds for the difference in rock and soil structure stability characteristic values, including crack development length, cave development size, fault development width, groundwater level elevation, weak rock layer development range and unstable area range, preset warning thresholds for three rock and soil deformation strain characteristic values and corresponding warning thresholds for the difference in rock and soil deformation strain characteristic values, including daily strain, monthly strain and cumulative strain.
[0047] Step S4, advanced geological prediction of the tunnel; within the current monitoring period when the sensor optical fiber is laid out at the tunnel face, the geological characteristics of the rock and soil mass in front of the tunnel face are obtained based on the target three-dimensional geological model obtained during the monitoring period before the tunnel face is further excavated during the monitoring period, and an advanced geological prediction report is issued. The advanced geological prediction report is updated in time according to the target three-dimensional geological model obtained during the monitoring period after the tunnel face is further excavated during the monitoring period; the stability of the rock and soil mass in front of the tunnel face is analyzed based on the target three-dimensional geological model obtained during the current monitoring period, and the structural stability characteristic value of the rock and soil mass is calculated. When the structural stability characteristic value of the rock and soil mass in front of the tunnel face exceeds the warning threshold of the structural stability characteristic value of the rock and soil mass, an alarm is automatically issued, and processing suggestions are put forward by comparing with engineering problem examples.
[0048] Step S5, tunnel construction safety monitoring; during the tunnel construction process, based on the site vibration information obtained in each monitoring period under each monitoring cycle, the tunnel construction noise and vibration data are extracted; according to the time characteristics of the noise and vibration, the start and end time and working period of the daily construction are obtained; according to the frequency distribution of the noise and vibration, combined with the noise frequency characteristics generated by different types of construction equipment, the working frequency of different construction equipment and processes is obtained; according to the intensity, frequency change and vibration position of the noise and vibration, the progress of the construction process such as blasting and excavation is determined to obtain the daily construction time, frequency and progress; the monitored construction time, frequency and progress are compared with the construction plan and current specifications to evaluate the standardization of the construction; based on the target three-dimensional geological model obtained in each monitoring period under each monitoring cycle, the surrounding area of the tunnel wall and the heading face are analyzed The stability of the rock and soil mass ahead is determined by calculating the structural stability characteristic value of the rock and soil mass and the difference between the structural stability characteristic values of the rock and soil mass. When the structural stability characteristic value of the rock and soil mass exceeds the warning threshold of the structural stability characteristic value of the rock and soil mass, or when the difference between the structural stability characteristic values of the rock and soil mass exceeds the warning threshold of the structural stability characteristic value difference of the rock and soil mass, an automatic alarm is issued, and treatment suggestions are made in accordance with engineering problem examples; based on the deformation strain of the rock and soil mass obtained in each monitoring period under each monitoring cycle, the deformation of the rock and soil mass around the tunnel wall is obtained, and the deformation strain characteristic value of the rock and soil mass and the difference between the deformation strain characteristic value of the rock and soil mass are calculated. When the deformation strain characteristic value of the rock and soil mass exceeds the warning threshold of the deformation strain characteristic value of the rock and soil mass, or when the difference between the deformation strain characteristic values of the rock and soil mass exceeds the warning threshold of the deformation strain characteristic value difference of the rock and soil mass, an automatic alarm is issued, and treatment suggestions are made in accordance with engineering problem examples.
[0049] Step S6, post-construction safety monitoring of the tunnel; during the use of the tunnel, the stability of the rock and soil around the tunnel wall is analyzed based on the target three-dimensional geological model obtained in each monitoring period under each monitoring cycle, and the structural stability characteristic value of the rock and soil and the difference of the structural stability characteristic value of the rock and soil are calculated. When the structural stability characteristic value of the rock and soil exceeds the warning threshold of the structural stability characteristic value of the rock and soil, or when the difference of the structural stability characteristic value of the rock and soil exceeds the warning threshold of the structural stability characteristic value difference of the rock and soil, an automatic alarm is triggered, and treatment suggestions are made in accordance with engineering problem examples; based on the deformation strain of the rock and soil obtained in each monitoring period under each monitoring cycle, the deformation of the rock and soil around the tunnel wall is obtained, and the deformation strain characteristic value of the rock and soil and the difference of the deformation strain characteristic value of the rock and soil are calculated. When the deformation strain characteristic value of the rock and soil exceeds the warning threshold of the deformation strain characteristic value of the rock and soil, or when the difference of the deformation strain characteristic value of the rock and soil exceeds the warning threshold of the deformation strain characteristic value difference of the rock and soil, an automatic alarm is triggered, and treatment suggestions are made in accordance with engineering problem examples.
[0050] This embodiment also includes the generation of monitoring reports; during the entire construction period and use period of the tunnel, historical data and real-time data are regularly analyzed, the structural stability characteristic values and deformation strain characteristic values of the rock and soil around the tunnel wall in each monitoring period under each monitoring cycle are compared, the time periods in which obvious abnormal values and abnormal trends appear are identified, the construction factors and natural factors that cause the abnormal values and abnormal trends are analyzed, and a monitoring report is generated to make improvements and preventions in the subsequent construction and use of the tunnel.
[0051] This embodiment also includes database updating; recording the engineering problems, treatment methods and treatment effects of the monitored tunnel in detail, and entering these new records into the engineering problem instance database to continuously update and expand the storage capacity of the engineering problem instance database.
[0052] See also Figure 3 As shown, the present invention provides a device for realizing the above-mentioned tunnel advanced geological prediction and safety monitoring method based on optical fiber sensing, comprising a sensing optical fiber, an optical fiber integrated demodulator and a central processing station, wherein the optical fiber integrated demodulator is used to emit laser pulses to the sensing optical fiber, and receive Brillouin scattered light, Rayleigh scattered light and Raman scattered light propagating back from the sensing optical fiber, demodulate the optical signal to obtain the frequency shift of the Brillouin scattered light, the phase change of the Rayleigh scattered light and the light intensity of the Raman scattered light, and obtain the strain information and strain rate information of each point along the arrangement of the sensing optical fiber, and the central processing station comprises:
[0053] The data receiving and processing module is used to divide the monitoring cycle and monitoring period, obtain the rock and soil strain information and strain rate information measured by the optical fiber integrated demodulator, distinguish the strain information into rock and soil deformation strain and site vibration strain, distinguish the strain rate information into rock and soil deformation strain rate and site vibration strain rate, extract the site vibration information from the site vibration strain rate, obtain the measured surface wave dispersion curve, and deduce the target three-dimensional geological model of each monitoring period under each monitoring cycle;
[0054] The tunnel advanced geological prediction module is used to obtain the geological characteristics of the rock and soil in front of the tunnel face based on the target three-dimensional geological model obtained in the current monitoring period, and generate an advanced geological prediction report;
[0055] The tunnel construction safety monitoring module is used to extract the noise and vibration data of tunnel construction according to the site vibration information obtained at the site during the tunnel construction process, and obtain the daily construction time, frequency and progress to evaluate the standardization of tunnel construction; and analyze the stability of the rock and soil around the tunnel wall and in front of the face according to the target three-dimensional geological model obtained at the site; and obtain the deformation of the rock and soil around the tunnel wall according to the deformation strain of the rock and soil obtained at the site;
[0056] The post-construction safety monitoring module of the tunnel is used to analyze the stability of the rock and soil around the tunnel wall according to the target three-dimensional geological model obtained on site during the use of the tunnel; and to obtain the deformation of the rock and soil around the tunnel wall according to the deformation strain of the rock and soil obtained on site;
[0057] The tunnel safety early warning module is used to automatically alarm during the construction and use of the tunnel based on the monitoring results of the tunnel advanced geological prediction module, the tunnel construction safety monitoring module and the tunnel post-construction safety monitoring module when the rock and soil structure stability characteristic value exceeds the rock and soil structure stability characteristic value warning threshold, the rock and soil deformation strain characteristic value exceeds the rock and soil deformation strain characteristic value warning threshold, or when the rock and soil structure stability characteristic value difference exceeds the rock and soil structure stability characteristic value difference warning threshold, the rock and soil deformation strain characteristic value difference exceeds the rock and soil deformation strain characteristic value difference warning threshold, analyze the tunnel rock and soil engineering geological problems in the monitoring period and monitoring period corresponding to the automatic alarm, and generate an engineering problem handling suggestion report.
[0058] In this embodiment, the tunnel safety warning module has a built-in engineering problem instance database, which covers problems encountered during tunnel construction and use and corresponding treatment method examples. For the identified automatic alarm engineering geological problems of tunnel rock and soil, similar engineering examples are retrieved from the engineering problem instance database by analogy with the main geological conditions of the site, the excavation depth and burial conditions of the tunnel, and the type of engineering geological problems. An engineering problem handling recommendation report is generated based on the treatment methods and response strategies in the engineering examples with the highest similarity; the engineering problems, treatment methods and treatment effects of the monitored tunnel are recorded in detail, and these new records are entered into the engineering problem instance database to continuously update and expand the storage capacity of the engineering problem instance database.
[0059] The present invention adopts optical fiber sensing technology, which can continuously monitor the deformation strain of rock and soil and the site vibration strain rate during the entire construction period and service period of the tunnel. At different times, the obtained data can be used for tunnel advanced geological prediction, tunnel construction safety monitoring and tunnel post-construction safety monitoring, meeting various tunnel engineering safety monitoring needs.
[0060] The present invention adopts sensing optical fiber to monitor site vibration. Compared with the traditional seismic wave method tunnel advanced geological prediction system, the tunnel advanced geological prediction system based on optical fiber sensing has the advantages of high resolution, long sensing distance, good continuity, simple structure, etc. It can be continuously deployed in long sequences and large areas, which makes up for the difficulty of deploying traditional seismic wave sensing systems. It can be better applied to tunnel monitoring sites with long timeliness, large range and complex environment.
[0061] The present invention adopts sensing optical fiber to carry out advanced geological prediction and tunnel safety monitoring of tunnels. Since optical fiber materials have the advantages of corrosion resistance and electromagnetic interference resistance, small and light, flexible and tough, compared with other tunnel monitoring equipment and instruments that are susceptible to electromagnetic interference and large in size, sensing optical fiber has stronger portability and embeddability, can be applied to tunnels of various usage types, excavation methods and excavation sizes, and has strong operability.
[0062] The sensing optical fiber used in the present invention can be continuously laid out along the axis of the tunnel as the tunnel is excavated. After the laying is completed, the tunnel can be monitored at any time by connecting the optical fiber integrated demodulator. Continuous monitoring of the entire length and entire cycle of the tunnel can be achieved without moving it. There is no need to recover the monitoring optical fiber after the monitoring period ends. The invention is simple, easy to use and has low maintenance cost.
[0063] Although the embodiments of the present invention are described in conjunction with the accompanying drawings, the patent owner may make various variations or modifications within the scope of the appended claims. As long as they do not exceed the protection scope described in the claims of the present invention, they should be within the protection scope of the present invention.
Claims
1. A tunnel advanced geological prediction and safety monitoring method based on optical fiber sensing, characterized in that: The following steps are involved: S1. Before or during the lining of the excavated section of the tunnel to be tested, the sensing optical fiber is arranged on the side wall, bottom plate, top plate and tunnel face of the excavated section of the tunnel; S2. During the tunnel construction process, for two adjacent tunnel faces where the sensing optical fiber is laid, the time interval from the beginning of laying the sensing optical fiber on the previous face to the beginning of laying the sensing optical fiber on the next face is determined as a monitoring cycle. During the use of the tunnel, a natural month is determined as a monitoring cycle. In each monitoring cycle, the time interval is divided into multiple monitoring periods. In different monitoring periods under different monitoring cycles, the optical fiber integrated demodulator emits laser pulses to the sensing optical fiber, receives the Brillouin scattered light propagating back from the sensing optical fiber, demodulates the optical signal to obtain the frequency shift of the Brillouin scattered light, and obtains the strain information of each point along the arrangement of the sensing optical fiber, and distinguishes the strain information into the deformation of the rock and soil body. Strain and site vibration strain. The deformation strain distribution of the rock and soil at the location where the sensing optical fiber is arranged in each monitoring period under each monitoring cycle is obtained from the deformation strain of the rock and soil. In different monitoring periods under different monitoring cycles, the optical fiber integrated demodulator emits laser pulses to the sensing optical fiber, and receives the Rayleigh scattered light propagating back from the sensing optical fiber. The optical signal is demodulated to obtain the phase change of the Rayleigh scattered light, and the strain rate information of each point along the sensing optical fiber arrangement is obtained. The strain rate information is divided into the deformation strain rate of the rock and soil and the site vibration strain rate. Based on the frequency and time characteristics of the site vibration strain rate in each monitoring period under each monitoring cycle, the site vibration information of the corresponding monitoring cycle and monitoring period is extracted. S3. In each monitoring period of each monitoring cycle, the main distribution of rock and soil along the tunnel is obtained according to the regional geological report, regional geological maps and previous exploration data to construct an initial three-dimensional geological model, and the shear modulus G and density ρ of the rock and soil are calculated by the formula The shear wave velocity v of the rock and soil body is calculated to obtain the shear wave velocity structure of the initial three-dimensional geological model. The finite element method is used to simulate the propagation of surface waves in the initial three-dimensional geological model, and the simulated surface wave dispersion curve is obtained by numerical simulation calculation; in each monitoring period under each monitoring cycle, the site vibration information measured by the optical fiber integrated demodulator is filtered and processed to distinguish the vibration information generated by different vibration events, and the vibration information with a high signal-to-noise ratio is extracted. The extracted vibration information is processed by the frequency-time analysis method to obtain the measured surface wave dispersion curve; the difference between the simulated surface wave dispersion curve and the measured surface wave dispersion curve is compared, and the geological characteristics of the rock and soil body of the initial three-dimensional geological model are continuously adjusted using an iterative optimization algorithm until the error between the simulated surface wave dispersion curve and the measured surface wave dispersion curve in the same monitoring period under the same monitoring cycle meets the site monitoring accuracy requirements, and the adjusted initial three-dimensional geological model is determined as the target three-dimensional geological model corresponding to the monitoring cycle and monitoring period; S4. In the current monitoring period when the sensor optical fiber is laid out at the tunnel face, the geological characteristics of the rock and soil mass in front of the tunnel face are obtained based on the target three-dimensional geological model obtained during the monitoring period before the tunnel face is further excavated, and an advanced geological forecast report is issued. The advanced geological forecast report is updated in a timely manner based on the target three-dimensional geological model obtained during the monitoring period after the tunnel face is further excavated. Analysis The stability of the rock mass in front of the tunnel face is calculated, and the characteristic value of the rock mass structure stability is calculated. When the rock and soil structure stability characteristic value exceeds the rock and soil structure stability characteristic value warning threshold, an automatic alarm is given and treatment suggestions are given by comparing with engineering problem examples; S5. During the tunnel construction process, based on the site vibration information obtained in each monitoring period under each monitoring cycle, the tunnel construction noise and vibration data are extracted to obtain the daily construction time, frequency and progress. The monitored construction time, frequency and progress are compared with the construction plan and current specifications to evaluate the standardization of the construction; based on the target three-dimensional geological model obtained in each monitoring period under each monitoring cycle, the stability of the rock and soil around the tunnel wall and in front of the face is analyzed, and the structural stability characteristic value of the rock and soil and the difference in the structural stability characteristic value of the rock and soil are calculated. When the structural stability characteristic value of the rock and soil exceeds the warning threshold of the structural stability characteristic value of the rock and soil, or when the difference in the structural stability characteristic value of the rock and soil exceeds the warning threshold of the difference in the structural stability characteristic value of the rock and soil, an automatic alarm is issued, and treatment suggestions are put forward in accordance with engineering problem examples; Based on the deformation and strain of the rock and soil mass obtained in each monitoring period under each monitoring cycle, the deformation of the rock and soil mass around the tunnel wall is obtained, and the characteristic value of the deformation and strain of the rock and soil mass and the difference of the characteristic value of the deformation and strain of the rock and soil mass are calculated. When the characteristic value of the deformation and strain of the rock and soil mass exceeds the warning threshold of the characteristic value of the deformation and strain of the rock and soil mass, or when the difference of the characteristic value of the deformation and strain of the rock and soil mass exceeds the warning threshold of the difference of the characteristic value of the deformation and strain of the rock and soil mass, an automatic alarm is triggered, and treatment suggestions are put forward by comparing with engineering problem examples; S6. During the use of the tunnel, the stability of the rock and soil around the tunnel wall is analyzed based on the target three-dimensional geological model obtained in each monitoring period under each monitoring cycle, and the structural stability characteristic value of the rock and soil and the difference of the structural stability characteristic value of the rock and soil are calculated. When the structural stability characteristic value of the rock and soil exceeds the warning threshold of the structural stability characteristic value of the rock and soil, or when the difference of the structural stability characteristic value of the rock and soil exceeds the warning threshold of the difference of the structural stability characteristic value of the rock and soil, an automatic alarm is issued, and treatment suggestions are put forward in accordance with engineering problem examples; Based on the deformation and strain of the rock and soil mass obtained in each monitoring period under each monitoring cycle, the deformation of the rock and soil mass around the tunnel wall is obtained, and the rock and soil mass deformation strain characteristic value and the difference of the rock and soil mass deformation strain characteristic value are calculated. When the rock and soil mass deformation strain characteristic value exceeds the rock and soil mass deformation strain characteristic value warning threshold, or when the rock and soil mass deformation strain characteristic value difference exceeds the rock and soil mass deformation strain characteristic value difference warning threshold, an automatic alarm is given, and treatment suggestions are put forward by comparing with engineering problem examples.
2. The method for advanced geological prediction and safety monitoring of tunnels based on optical fiber sensing according to claim 1 is characterized in that: The principle of arranging the sensing optical fibers in step S1 is that the sensing optical fibers of the tunnel side walls, bottom plate and top plate are arranged continuously, and the sensing optical fibers of the tunnel face are arranged discontinuously.
3. The method for advanced geological prediction and safety monitoring of tunnels based on optical fiber sensing according to claim 1 is characterized in that: Arranging the sensing optical fiber on the side wall, bottom plate, top plate and face of the excavated section of the tunnel in step S1 specifically includes: digging small trenches on the side wall, bottom plate, top plate and face of the excavated section of the tunnel, burying the sensing optical fiber in the trench, and backfilling and fixing it with soil or construction slurry; the sensing optical fiber arranged on the side wall, bottom plate and top plate of the tunnel is connected to an optical fiber integrated demodulator at one end located at the tunnel excavation entrance, and a free section is left at one end close to the tunnel excavation face. As the tunnel is continuously excavated, the optical fiber of the free section is continuously arranged in the tunnel along the newly excavated section; the sensing optical fiber arranged on the tunnel face is connected to an optical fiber integrated demodulator at one end, and is directly removed as the tunnel is excavated after monitoring. As the tunnel is excavated, the sensing optical fiber is re-arranged at the new face to be tested.
4. The method for advanced geological prediction and safety monitoring of tunnels based on optical fiber sensing according to claim 1 is characterized in that: The rock deformation strain in step S2 is the strain caused by the internal deformation of the rock, the site vibration strain is the strain caused by the rock feeling the site vibration signal, the rock deformation strain rate is the strain rate caused by the internal deformation of the rock, and the site vibration strain rate is the strain rate caused by the rock feeling the site vibration signal; the earthquake sources that excite the site vibration signal include construction noise, environmental noise and man-made earthquakes, and man-made earthquakes include various types such as heavy hammer strikes and gunpowder explosions.
5. The method for advanced geological prediction and safety monitoring of tunnels based on optical fiber sensing according to claim 1 is characterized in that: The geological characteristics of the rock and soil mass in step S3 include lithology distribution, porosity, development of fractures and caves, and groundwater distribution; after tunnel excavation, the actual geological characteristics of the newly excavated section are added to the initial three-dimensional geological model of the latest monitoring period under the current monitoring cycle, and the obtained new three-dimensional geological model is set as the initial three-dimensional geological model of the next adjacent monitoring cycle and monitoring period; in the current monitoring cycle, the actual geological characteristics of the newly excavated section of the tunnel are compared with the geological characteristics reflected by the deduced target three-dimensional geological model, the difference between the two is analyzed, the error of the target three-dimensional geological model is identified, the iterative optimization algorithm parameters are improved, and in the next monitoring cycle, the improved iterative optimization algorithm is used to adjust the initial three-dimensional geological model.
6. The method for advanced geological prediction and safety monitoring of tunnels based on optical fiber sensing according to claim 1 is characterized in that: The step S5 extracts tunnel construction noise and vibration data based on the site vibration information obtained in each monitoring period under each monitoring cycle to obtain the daily construction time, frequency and progress, which specifically includes: analyzing the extracted tunnel construction noise and vibration data, and obtaining the start and end time and working period of daily construction according to the time characteristics of the noise and vibration; obtaining the working frequency of different construction equipment and processes according to the frequency distribution of the noise and vibration and the noise frequency characteristics generated by different types of construction equipment; and determining the progress of the construction process according to the intensity, frequency change and vibration position of the noise and vibration.
7. The method for advanced geological prediction and safety monitoring of tunnels based on optical fiber sensing according to claim 1 is characterized in that: In the steps S4, S5 and S6, the rock and soil structural stability characteristic values at least include the length of crack development, the size of cave development, the width of fault development, the elevation of groundwater level, the range of weak rock layer development and the range of unstable area; in the steps S5 and S6, the rock and soil deformation strain characteristic values at least include daily strain, monthly strain and cumulative strain, the difference of the rock and soil structural stability characteristic values is the maximum difference between the rock and soil structural stability characteristic values of the latest monitoring period in the current monitoring cycle and the rock and soil structural stability characteristic values of the monitoring periods in other previous monitoring periods, the difference of the rock and soil deformation strain characteristic values is the maximum difference between the rock and soil deformation strain characteristic values of the latest monitoring period in the current monitoring cycle and the rock and soil deformation strain characteristic values of the monitoring periods in other previous monitoring periods, and different rock and soil structural stability characteristic value warning thresholds, rock and soil structural stability characteristic value difference warning thresholds, rock and soil deformation strain characteristic value warning thresholds, and rock and soil deformation strain characteristic value difference warning thresholds are preset for the rock and soil located at different positions in the tunnel according to current specifications and construction requirements.
8. The method for advanced geological prediction and safety monitoring of tunnels based on optical fiber sensing according to claim 1 is characterized in that: During the entire construction and use period of the tunnel, historical data and real-time data are analyzed regularly, and the structural stability characteristic values and deformation strain characteristic values of the rock and soil around the tunnel wall in each monitoring period under each monitoring cycle are compared. The time periods with obvious abnormal values and abnormal trends are identified, and the construction and natural factors that cause the abnormal values and abnormal trends are analyzed. A monitoring report is generated, and improvements and preventions are carried out in the subsequent construction and use of the tunnel.
9. A device for implementing the tunnel advanced geological prediction and safety monitoring method based on optical fiber sensing as described in any one of claims 1 to 8, characterized in that: It includes a sensing optical fiber, an optical fiber integrated demodulator and a central processing station. The optical fiber integrated demodulator is used to emit laser pulses to the sensing optical fiber, and receive Brillouin scattered light, Rayleigh scattered light and Raman scattered light propagating back from the sensing optical fiber, demodulate the optical signal to obtain the frequency shift of the Brillouin scattered light, the phase change of the Rayleigh scattered light and the light intensity of the Raman scattered light, and obtain the strain information and strain rate information of each point along the sensing optical fiber arrangement. The central processing station includes: The data receiving and processing module is used to divide the monitoring cycle and monitoring period, obtain the rock and soil strain information and strain rate information measured by the optical fiber integrated demodulator, distinguish the strain information into rock and soil deformation strain and site vibration strain, distinguish the strain rate information into rock and soil deformation strain rate and site vibration strain rate, extract the site vibration information from the site vibration strain rate, obtain the measured surface wave dispersion curve, and deduce the target three-dimensional geological model of each monitoring period under each monitoring cycle; The tunnel advanced geological prediction module is used to obtain the geological characteristics of the rock and soil in front of the tunnel face based on the target three-dimensional geological model obtained in the current monitoring period, and generate an advanced geological prediction report; The tunnel construction safety monitoring module is used to extract the noise and vibration data of tunnel construction according to the site vibration information obtained at the site during the tunnel construction process, and obtain the daily construction time, frequency and progress to evaluate the standardization of tunnel construction; and analyze the stability of the rock and soil around the tunnel wall and in front of the face according to the target three-dimensional geological model obtained at the site; and obtain the deformation of the rock and soil around the tunnel wall according to the deformation strain of the rock and soil obtained at the site; The post-construction safety monitoring module of the tunnel is used to analyze the stability of the rock and soil around the tunnel wall according to the target three-dimensional geological model obtained on site during the use of the tunnel; and to obtain the deformation of the rock and soil around the tunnel wall according to the deformation strain of the rock and soil obtained on site; The tunnel safety early warning module is used to automatically alarm during the construction and use of the tunnel based on the monitoring results of the tunnel advanced geological prediction module, the tunnel construction safety monitoring module and the tunnel post-construction safety monitoring module when the rock and soil structure stability characteristic value exceeds the rock and soil structure stability characteristic value warning threshold, the rock and soil deformation strain characteristic value exceeds the rock and soil deformation strain characteristic value warning threshold, or when the rock and soil structure stability characteristic value difference exceeds the rock and soil structure stability characteristic value difference warning threshold, the rock and soil deformation strain characteristic value difference exceeds the rock and soil deformation strain characteristic value difference warning threshold, analyze the tunnel rock and soil engineering geological problems in the monitoring period and monitoring period corresponding to the automatic alarm, and generate an engineering problem handling suggestion report.
10. The device according to claim 9, characterized in that The tunnel safety early warning module has a built-in engineering problem instance database, which covers problems encountered during tunnel construction and use and corresponding treatment method examples. For the identified tunnel rock and soil engineering geological problems that are automatically alarmed, similar engineering examples are retrieved from the engineering problem instance database by analogy with the main geological conditions of the site, the excavation depth and burial conditions of the tunnel, and the type of engineering geological problems. Based on the treatment methods and response strategies in the engineering examples with the highest similarity, an engineering problem treatment suggestion report is generated; The engineering problems, treatment methods and treatment effects of the monitored tunnel are recorded in detail, and these new records are entered into the engineering problem instance database to continuously update and expand the storage capacity of the engineering problem instance database.
Citation Information
Patent Citations
Full-distributed optical fiber monitoring system and method for linear engineering safety monitoring
CN108225387A
Full-waveform velocity modeling inversion method based on geologic model constraints
CN111290016A
Underground pipeline monitoring system and method based on distributed optical fiber sensing
CN111536892A
On-site test method suitable for surrounding rock wave velocity of deeply-buried tunnel
CN112130204A
Building safety monitoring system based on optical fiber sensing technology and monitoring method thereof
CN115950461A
Cited By
Earth and rockfill dam seepage detector and detection method based on distributed optical fiber acoustic wave sensing
CN119915698A
Fusion type optical fiber disturbance detection system and method based on multi-mode scattering
CN120313648A