Power grid disturbance information detection method and device and electronic equipment
By obtaining the grid information queue, calculating clutter measurements and classifying them, identifying the grid information cluster affected by the disruption, solving the problem of confirming work obstacles of power equipment, and achieving accurate classification and rapid identification of grid information.
Patent Information
- Application Number
- CN202411087082.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-08
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-08-08
AI Technical Summary
The prior art is difficult to accurately determine whether the power grid information is affected by disturbance, resulting in difficulty in confirming the working obstacles of power equipment.
By obtaining the grid information queue, determining the reference subquery and control subqueries, calculating clutter metrics, classifying and dividing, and identifying the grid information cluster affected by the disruption.
It realizes the accurate classification of power grid information, quickly and accurately identify the collection of power grid information affected by disturbances, and solves the problem of confirming work obstacles in power equipment.
Smart Images

Figure CN118965073A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power grid information detection, and in particular to a power grid disturbance information detection method, device and electronic equipment. Background Art
[0002] In recent years, the Internet of Things technology has developed rapidly and has been widely used, playing a great role in promoting the development of all walks of life. The development of smart grid informatization has benefited from the application of Internet of Things technology in the construction of smart grid informatization. The development of smart grid informatization construction of the Internet of Things has realized the mapping of power grid equipment on the Internet of Things, which can perform intelligent processing and comprehensive perception, and promote the intelligent development of power grid construction.
[0003] The display or display of power grid information is often performed using existing technical solutions such as the patent application number "CN201310062823.2" and the patent name defined as "real-time display method and device of power grid information based on GIS and SCADA". Specifically, the server extracts the real-time information value of the power equipment as the power grid information within the display range from the real-time information library for display.
[0004] However, simple display cannot determine whether the power grid information is reasonable or unreasonable, because when the power equipment to which the power grid information belongs fails to work, unreasonable power grid information will be generated. To determine the failure status of the power equipment to which the power grid information belongs, it is necessary to analyze the power grid information sampled from the real-time information library and extract the unreasonable power grid information.
[0005] In the power grid information of the real-time information database, the difference between reasonable power grid information (power grid information when power equipment fails to work) is not large, while the difference between unreasonable power grid information and reasonable power grid information is large, so it can be divided into reasonable power grid information and unreasonable power grid information through cluster analysis, and then unreasonable analysis is performed on each information cluster obtained by the division.
[0006] K-means method is a common clustering method. The rule of this method is: minimize the difference between information in the divided clusters and maximize the difference between information between clusters to achieve power grid information division; when the power grid information in the real-time information database is disturbed externally, it will be mixed with noise values, and the noise values are not formed because of the working failure of the power equipment of the power grid, so it cannot be used to confirm the working failure of the power equipment of the power grid. The difference between the noise value and the reasonable power grid information is also not small. It often separates reasonable power grid information from reasonable power grid information, or unreasonable power grid information from unreasonable power grid information, so it will disturb the accuracy of clustering analysis. Therefore, how to remove the disturbance of noise values to clustering analysis and correctly extract unreasonable power grid information is a defect that needs to be overcome.
[0007] To address the above-mentioned problems, no effective solution has been proposed yet. Summary of the invention
[0008] The embodiments of the present invention provide a method, device and electronic device for detecting power grid disturbance information, so as to at least solve the technical problem in the related art that it is difficult to accurately determine whether power grid information is information that has been affected by disturbance.
[0009] According to one aspect of an embodiment of the present invention, a method for detecting power grid disturbance information is provided, comprising: obtaining a power grid information queue corresponding to a predetermined power line, wherein the power grid information queue includes a plurality of power grid information arranged in time sequence, the plurality of power grid information are a plurality of information of different time periods acquired in a predetermined period, and the power grid information includes current information; determining a reference subqueue and a control subqueue corresponding to each power grid information in the power grid information queue, wherein the control subqueue is a queue obtained by replacing part of the power grid information in the reference subqueue; determining each power grid information according to the reference subqueue and the control subqueue The method comprises the steps of: determining a noise measurement corresponding to each power grid information, wherein the noise measurement indicates a probability that the corresponding power grid information is noise information; classifying and dividing a plurality of power grid information in the power grid information queue according to the noise measurement corresponding to each power grid information, and obtaining a plurality of target information clusters corresponding to the power grid information queue, wherein each of the plurality of target information clusters includes at least one power grid information; determining unreasonable quantities respectively corresponding to the plurality of target information clusters; and determining a disturbance information cluster from the plurality of target information clusters according to the unreasonable quantities respectively corresponding to the plurality of target information clusters, wherein the power grid information included in the disturbance information cluster is power grid information affected by the disturbance.
[0010] Optionally, determining a baseline subqueue and a control subqueue corresponding to each power grid information in the power grid information queue includes: determining a baseline regression equation, a baseline upper decrement and a baseline lower decrement respectively corresponding to each baseline subqueue, and a control regression equation, a control upper decrement and a control lower decrement respectively corresponding to each control subqueue; and determining a clutter measure corresponding to each power grid information based on the baseline regression equation, the baseline upper decrement and the baseline lower decrement respectively corresponding to each baseline subqueue, and the control regression equation, the control upper decrement and the control lower decrement respectively corresponding to each control subqueue.
[0011] Optionally, determining a reference subqueue and a reference subqueue corresponding to each power grid information in the power grid information queue includes: determining a reference subqueue from the power grid information queue; determining target power grid information and adjacent power grid information from the reference subqueue, wherein the adjacent power grid information is the previous power grid information and the next power grid information of the target power grid information; processing the adjacent power grid information to obtain supplementary information corresponding to the target power grid information; and replacing the target power grid information with the supplementary information to obtain a reference subqueue.
[0012] Optionally, determining a reference subqueue from the power grid information queue includes: determining any power grid information from the power grid information queue as central power grid information; determining a subqueue formed by N continuous power grid information within the power grid information queue with the central power grid information as the midpoint as the first reference subqueue, wherein N is a positive integer greater than 1; determining multiple reference subqueues including the first reference subqueue from the power grid information queue, so that the central power grid information respectively included in the multiple reference subqueues is consistent with the multiple power grid information.
[0013] Optionally, based on the clutter measurement corresponding to each power grid information, multiple power grid information in the power grid information queue are classified and divided to obtain multiple target information clusters corresponding to the power grid information queue, including: determining the number of target clusters; dividing the power grid information queue into multiple temporary information clusters, wherein each of the multiple temporary information clusters includes at least one power grid information, wherein the number of the multiple temporary information clusters is the target number of clusters; based on the clutter measurement corresponding to each power grid information, determining the configuration element distinction quantities corresponding to the multiple temporary information clusters respectively; replacing the initial element distinction quantities corresponding to the multiple temporary information clusters respectively with the configuration element distinction quantities, and classifying and dividing the multiple power grid information in the power grid information queue to obtain the multiple target information clusters, wherein the initial element distinction quantities corresponding to the multiple temporary information clusters respectively are obtained based on the corresponding power grid information respectively.
[0014] Optionally, determining the unreasonable quantities corresponding to the multiple target information clusters respectively includes: determining the power grid peak and valley information, the number of power grid information, and the power grid information clutter status respectively corresponding to the multiple target information clusters; determining the unreasonable quantities corresponding to the multiple target information clusters respectively based on the power grid peak and valley information, the number of power grid information, and the power grid information clutter status respectively corresponding to the multiple target information clusters.
[0015] According to one aspect of an embodiment of the present invention, a power grid disturbance information detection device is provided, comprising: an acquisition module, used to acquire a power grid information queue corresponding to a predetermined power line, wherein the power grid information queue includes a plurality of power grid information arranged in time sequence, the plurality of power grid information are a plurality of information of different time periods acquired in a predetermined period, and the power grid information includes current information; a first determination module, used to determine a reference subqueue and a control subqueue corresponding to each power grid information in the power grid information queue, wherein the control subqueue is a queue obtained by replacing part of the power grid information in the reference subqueue; a second determination module, used to determine the reference subqueue and the control subqueue corresponding to each power grid information according to the reference subqueue and the control subqueue. a noise measurement corresponding to each power grid information, wherein the noise measurement indicates the probability that the corresponding power grid information is noise information; a classification module, used to classify and divide the multiple power grid information in the power grid information queue according to the noise measurement corresponding to each power grid information, to obtain multiple target information clusters corresponding to the power grid information queue, wherein each of the multiple target information clusters includes at least one power grid information; a third determination module, used to determine the unreasonable amounts corresponding to the multiple target information clusters respectively; a fourth determination module, used to determine a disturbance information cluster from the multiple target information clusters according to the unreasonable amounts corresponding to the multiple target information clusters respectively, wherein the power grid information included in the disturbance information cluster is the power grid information affected by the disturbance.
[0016] According to one aspect of an embodiment of the present invention, there is provided an electronic device, comprising: a processor; and a memory for storing instructions executable by the processor; wherein the processor is configured to execute the instructions to implement any one of the above-mentioned methods for detecting power grid disturbance information.
[0017] According to one aspect of an embodiment of the present invention, a computer-readable storage medium is provided. When instructions in the computer-readable storage medium are executed by a processor of an electronic device, the electronic device can execute any of the above-mentioned methods for detecting power grid disturbance information.
[0018] According to one aspect of an embodiment of the present invention, there is provided a computer program product, comprising a non-volatile computer-readable storage medium, wherein the non-volatile computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the power grid disturbance information detection method described in any one of the above items is implemented.
[0019] In an embodiment of the present invention, a power grid information queue corresponding to a predetermined power line is obtained, wherein the power grid information queue includes a plurality of power grid information arranged in time sequence, the plurality of power grid information are a plurality of information collected in a predetermined period at different time periods, and the power grid information includes current information. A reference subqueue and a control subqueue corresponding to each power grid information in the power grid information queue are determined, wherein the control subqueue is a queue obtained by replacing part of the power grid information in the reference subqueue. According to the reference subqueue and the control subqueue corresponding to each power grid information, a clutter metric corresponding to each power grid information is determined, wherein the clutter metric indicates the probability that the corresponding power grid information is clutter information. According to the clutter metric corresponding to each power grid information, the plurality of power grid information in the power grid information queue is classified and divided to obtain a plurality of target information clusters corresponding to the power grid information queue, wherein each of the plurality of target information clusters includes at least one power grid information. The unreasonable quantities corresponding to the plurality of target information clusters are determined. According to the unreasonable quantities corresponding to the plurality of target information clusters, a disturbance information cluster is determined from the plurality of target information clusters, wherein the power grid information included in the disturbance information cluster is the power grid information affected by the disturbance. Through the reference sub-queue and the control sub-queue, the clutter metric corresponding to each power grid information can be determined more accurately to determine the probability that each power grid information is clutter information, and then the power grid information is further clustered and divided to obtain multiple target information clusters, so that the unreasonable quantities corresponding to the multiple target information clusters can be used to quickly and accurately determine the entire set of power grid information affected by the disturbance, thereby achieving the purpose of determining the power grid information that has been affected by the disturbance, and further solving the technical problem in the related art that it is difficult to accurately determine whether the power grid information is the information that has been affected by the disturbance. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0021] Figure 1 is a flow chart of a method for detecting power grid disturbance information according to an embodiment of the present invention;
[0022] Figure 2 4 is a structural block diagram of a power grid disturbance information detection device according to an embodiment of the present invention. DETAILED DESCRIPTION
[0023] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0024] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0025] Example 1
[0026] According to an embodiment of the present invention, an embodiment of a method for detecting power grid disturbance information is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0027] Figure 1 is a flow chart of a method for detecting power grid disturbance information according to an embodiment of the present invention. Figure 1 As shown, the method comprises the following steps:
[0028] Step S102, obtaining a grid information queue corresponding to a predetermined power line, wherein the grid information queue includes a plurality of grid information arranged in time sequence, the plurality of grid information is a plurality of information collected in a predetermined period at different time periods, and the grid information includes current information;
[0029] In step S102 provided in the present application, a grid information queue corresponding to a predetermined power line is obtained, and the grid information queue includes multiple grid information arranged in chronological order. The multiple grid information are multiple information of different time periods collected in a predetermined period. The grid information includes current information, such as the first current information collected at 1s, the second current information collected at 2s, the third current information collected at 3s…These current information are sorted according to the time of collection to obtain a grid information queue.
[0030] Optionally, the power grid information queue may also be the power grid information in the real-time information library, which may be obtained by sampling the power grid information of the power equipment once every p seconds through a corresponding transmitter connected to the server for communication, sampling P times, obtaining P pieces of power grid information and transmitting them to the real-time information library of the server, where p represents a pre-set sampling period, and P represents a pre-set number of sampling times, to obtain the above-mentioned power grid information queue.
[0031] Step S104, determining a reference subqueue and a comparison subqueue corresponding to each grid information in the grid information queue, wherein the comparison subqueue is a queue obtained by replacing part of the grid information in the reference subqueue;
[0032] In step S104 provided in the present application, the steps of determining the reference subqueue and the comparison subqueue corresponding to each power grid information in the power grid information queue are described. The comparison subqueue is a queue used for comparison with the reference subqueue. The comparison subqueue is a queue obtained by replacing part of the power grid information in the reference subqueue. In order to determine the disturbed power grid information in the queue through comparison.
[0033] Optionally, the comparison subqueue can be determined in the following manner: define any grid information as the destination grid information, define the previous grid information and the next grid information of the destination grid information as the adjacent information of the destination grid information; use the minimum curvature method to perform the minimum curvature method on the two adjacent information of the destination grid information to obtain the supplementary information of the two adjacent information of the destination grid information, and define it as the supplementary information of the destination grid information; replace the destination grid information in the reference subqueue of the destination grid information with the supplementary information to obtain the comparison subqueue of the destination grid information, and so on to obtain the comparison subqueue of each grid information.
[0034] Step S106, determining the clutter metric corresponding to each grid information according to the reference subqueue and the control subqueue corresponding to each grid information, wherein the clutter metric indicates the probability that the corresponding grid information is clutter information;
[0035] In step S106 provided in the present application, it is described that the noise measurement corresponding to each power grid information is determined based on the reference sub-queue and the control sub-queue corresponding to each power grid information, wherein the noise measurement represents the probability that the corresponding power grid information is noise information, and by determining the noise measurement corresponding to each power grid information, it is determined whether the power grid information is disturbed power grid information.
[0036] The specific process of determining the clutter measure may be determined by a formula, which is introduced in the optional implementation manner below and will not be described in detail here. In this way, the probability of whether the power grid information is disturbed can be accurately reflected by the clutter measure.
[0037] Step S108, classifying and dividing the multiple power grid information in the power grid information queue according to the clutter measurement corresponding to each power grid information, and obtaining multiple target information clusters corresponding to the power grid information queue, wherein each of the multiple target information clusters includes at least one power grid information;
[0038] In step S108 provided in the present application, it is described that according to the clutter measurement corresponding to each power grid information, multiple power grid information in the power grid information queue are classified and divided to obtain multiple target information clusters corresponding to the power grid information queue, wherein the multiple target information clusters each include at least one power grid information, that is, the power grid information is clustered and divided, and power grid information with similarity is aggregated into one class, so as to directly determine multiple power grid information affected by disturbances.
[0039] Step S110, determining unreasonable quantities corresponding to a plurality of target information clusters respectively;
[0040] In step S110 provided in the present application, the unreasonable amounts corresponding to the multiple target information clusters are determined. Since the multiple clusters are determined in the previous step, whether the cluster is a cluster affected by the disturbance needs to be further determined. Therefore, it is necessary to determine the unreasonable amounts corresponding to the multiple target information clusters in order to determine the cluster affected by the disturbance.
[0041] Step S112: determining a disturbance information cluster from the plurality of target information clusters according to the unreasonable quantities respectively corresponding to the plurality of target information clusters, wherein the power grid information included in the disturbance information cluster is the power grid information affected by the disturbance.
[0042] In step S112 provided in the present application, a disturbance information cluster is determined from the multiple target information clusters according to the unreasonable quantities respectively corresponding to the multiple target information clusters, wherein the power grid information included in the disturbance information cluster is the power grid information affected by the disturbance.
[0043] Through the above steps S102-S112, a power grid information queue corresponding to a predetermined power line is obtained, wherein the power grid information queue includes a plurality of power grid information arranged in time sequence, the plurality of power grid information are a plurality of information collected in a predetermined period at different time periods, and the power grid information includes current information. A reference subqueue and a control subqueue corresponding to each power grid information in the power grid information queue are determined, wherein the control subqueue is a queue obtained by replacing part of the power grid information in the reference subqueue. According to the reference subqueue and the control subqueue corresponding to each power grid information, a clutter metric corresponding to each power grid information is determined, wherein the clutter metric indicates the probability that the corresponding power grid information is clutter information. According to the clutter metric corresponding to each power grid information, the plurality of power grid information in the power grid information queue is classified and divided to obtain a plurality of target information clusters corresponding to the power grid information queue, wherein each of the plurality of target information clusters includes at least one power grid information. The unreasonable quantities corresponding to the plurality of target information clusters are determined. According to the unreasonable quantities corresponding to the plurality of target information clusters, a disturbance information cluster is determined from the plurality of target information clusters, wherein the power grid information included in the disturbance information cluster is the power grid information affected by the disturbance. Through the reference sub-queue and the control sub-queue, the clutter metric corresponding to each power grid information can be determined more accurately to determine the probability that each power grid information is clutter information, and then the power grid information is further clustered and divided to obtain multiple target information clusters, so that the unreasonable quantities corresponding to the multiple target information clusters can be used to quickly and accurately determine the entire set of power grid information affected by the disturbance, thereby achieving the purpose of determining the power grid information that has been affected by the disturbance, and further solving the technical problem in the related art that it is difficult to accurately determine whether the power grid information is the information that has been affected by the disturbance.
[0044] As an optional embodiment, determining a reference subqueue and a control subqueue corresponding to each grid information in a grid information queue includes: determining a reference regression equation, a reference upper decrement and a reference lower decrement respectively corresponding to each reference subqueue, and a control regression equation, a control upper decrement and a control lower decrement respectively corresponding to each control subqueue; determining a clutter measure corresponding to each grid information based on the reference regression equation, the reference upper decrement and the reference lower decrement respectively corresponding to each reference subqueue, and the control regression equation, the control upper decrement and the control lower decrement respectively corresponding to each control subqueue.
[0045] In this embodiment, a specific process of determining a reference sub-queue and a control sub-queue corresponding to each grid information in a grid information queue is described. In this process, firstly, a reference regression equation, a reference upper decrement and a reference lower decrement corresponding to each reference sub-queue, and a control regression equation, a control upper decrement and a control lower decrement corresponding to each control sub-queue are determined.
[0046] The specific acquisition process is as follows: for any grid information, the maximum likelihood estimation method is used to regress the benchmark subqueue to obtain the regression equation of the benchmark subqueue, and the regression equation of the control subqueue is obtained by analogy. The regression equation of the benchmark subqueue is subtracted from the regression equation of the control subqueue to obtain the reduction equation, and the modulus of the reduction equation after the ∫ operation is defined as the size of the configuration action area, the modulus of the amount obtained by subtracting the previous grid information from each grid information in the benchmark subqueue is defined as the upper reduction of the benchmark subqueue, the modulus of the amount obtained by subtracting the next grid information from each grid information in the benchmark subqueue is defined as the lower reduction of the benchmark subqueue, the modulus of the amount obtained by subtracting the previous grid information from each grid information in the control subqueue is defined as the upper reduction of the control subqueue, and the modulus of the amount obtained by subtracting the next grid information from each grid information in the control subqueue is defined as the lower reduction of the control subqueue. In order to accurately obtain the above data.
[0047] Then, according to the reference regression equation, the reference upper decrement and the reference lower decrement corresponding to each reference subqueue, and the reference regression equation, the reference upper decrement and the reference lower decrement corresponding to each reference subqueue, the clutter metric corresponding to each power grid information is determined. The specific determination process can be determined according to a formula, and the specific formula will be introduced in the optional implementation mode below, and will not be repeated here. Determining the clutter metric in this way can make the determined clutter metric more accurate.
[0048] As an optional embodiment, determining a reference subqueue and a reference subqueue corresponding to each power grid information in a power grid information queue includes: determining a reference subqueue from the power grid information queue; determining target power grid information and adjacent power grid information from the reference subqueue, wherein the adjacent power grid information is the previous power grid information and the next power grid information of the target power grid information; processing the adjacent power grid information to obtain supplementary information corresponding to the target power grid information; and replacing the target power grid information with the supplementary information to obtain the reference subqueue.
[0049] In this embodiment, a specific process of determining a reference subqueue and a reference subqueue corresponding to each power grid information in a power grid information queue is described. The process is: determining a reference subqueue from the power grid information queue, that is, for any power grid information, a subqueue formed by N continuous power grid information in the power grid information queue with the power grid information as the midpoint is used as a reference subqueue of the power grid information, and N represents the number of elements of the subqueue set in advance.
[0050] Determine the target power grid information and the adjacent power grid information from the reference subqueue, wherein the adjacent power grid information is the previous power grid information and the next power grid information of the target power grid information. Process the adjacent power grid information to obtain supplementary information corresponding to the target power grid information. Optionally, the minimum curvature method can be used to perform the minimum curvature method on the two adjacent information of the target power grid information to obtain the supplementary information of the two adjacent information of the target power grid information, which is defined as the supplementary information of the target power grid information. Replace the target power grid information with the supplementary information to obtain the reference subqueue.
[0051] It should be noted that since the clutter value is often arbitrary, that is, the clutter value is often not continuous, and the difference between the clutter value and the normal power grid information is not small, the clutter value will only affect the change rules in a very narrow range, and the reference sub-queue can reflect the changes in the power grid information in a very narrow range of each power grid information, so the clutter value will affect the change rules of the reference sub-queue, so after the clutter value is cleared, the change rules of the reference sub-queue will change significantly, so the clutter measurement of each power grid information can be detected based on this. Therefore, through the reference sub-queue and the control sub-queue, the clutter value can be better determined to determine whether it is disturbed.
[0052] As an optional embodiment, determining a reference subqueue from a power grid information queue includes: determining any power grid information from the power grid information queue as central power grid information; determining a subqueue formed by N continuous power grid information in the power grid information queue with the central power grid information as the midpoint as a first reference subqueue, wherein N is a positive integer greater than 1; and determining multiple reference subqueues including the first reference subqueue from the power grid information queue, so that the central power grid information respectively included in the multiple reference subqueues is consistent with the multiple power grid information.
[0053] In this embodiment, the steps of determining a reference subqueue from a power grid information queue are described, and any power grid information is determined as central power grid information from the power grid information queue. A subqueue formed by N continuous power grid information in the power grid information queue with the central power grid information as the midpoint is determined as the first reference subqueue, where N is a positive integer greater than 1. Multiple reference subqueues including the first reference subqueue are determined from the power grid information queue, so that the central power grid information respectively included in the multiple reference subqueues is consistent with the multiple power grid information, that is, for any power grid information, a subqueue formed by N continuous power grid information in the power grid information queue with the power grid information as the midpoint is used as the reference subqueue of the power grid information, and N represents the number of elements of the subqueue set in advance. In order to ensure that a complete reference subqueue is determined.
[0054] As an optional embodiment, according to the clutter measurement corresponding to each power grid information, multiple power grid information in the power grid information queue is classified and divided to obtain multiple target information clusters corresponding to the power grid information queue, including: determining the number of target clusters; dividing the power grid information queue into multiple temporary information clusters, wherein each of the multiple temporary information clusters includes at least one power grid information, wherein the number of the multiple temporary information clusters is the number of target clusters; according to the clutter measurement corresponding to each power grid information, determining the configuration element distinction quantities corresponding to the multiple temporary information clusters respectively; replacing the initial element distinction quantities corresponding to the multiple temporary information clusters respectively with the configuration element distinction quantities, and classifying the multiple power grid information in the power grid information queue to obtain multiple target information clusters, wherein the initial element distinction quantities corresponding to the multiple temporary information clusters respectively are obtained based on the corresponding power grid information respectively.
[0055] In this embodiment, the steps of classifying and dividing multiple power grid information in the power grid information queue according to the clutter measurement corresponding to each power grid information to obtain multiple target information clusters corresponding to the power grid information queue are described. In this step, the target number of clusters can be determined first. When the classification method is used to perform division processing on the power grid information queue, the number of clusters must be determined first. In order to avoid the disturbance of the division processing by the clutter value, the division index during the division period must be configured according to the clutter measurement of each power grid information. Therefore, the power grid information queue is first divided into multiple temporary information clusters, wherein each of the multiple temporary information clusters includes at least one power grid information, wherein the number of multiple temporary information clusters is the target number of clusters. According to the clutter measurement corresponding to each power grid information, the configuration element differentiation quantity corresponding to each of the multiple temporary information clusters is determined. That is, the element distinguishing quantities of each temporary information cluster are configured, and the element distinguishing quantities of each temporary information cluster after configuration are defined as the configured element distinguishing quantities of each temporary information cluster. The initial element distinguishing quantities corresponding to the multiple temporary information clusters are replaced with the configured element distinguishing quantities, and the multiple power grid information in the power grid information queue are classified and divided to obtain multiple target information clusters, wherein the initial element distinguishing quantities corresponding to the multiple temporary information clusters are obtained based on the corresponding power grid information, so as to achieve more accurately classified multiple target information clusters.
[0056] As an optional embodiment, determining the unreasonable quantities corresponding to multiple target information clusters respectively includes: determining the power grid peak and valley information, the number of power grid information, and the power grid information noise status respectively corresponding to the multiple target information clusters; determining the unreasonable quantities corresponding to the multiple target information clusters respectively based on the power grid peak and valley information, the number of power grid information, and the power grid information noise status respectively corresponding to the multiple target information clusters.
[0057] In this embodiment, the steps of determining the unreasonable quantities corresponding to the multiple target information clusters are explained. To perform unreasonable identification on the power equipment, unreasonable power grid information must be obtained. The above process has already divided the unreasonable power grid information and the normal power grid information into multiple target information clusters by power grid information division. Therefore, at this time, it is only necessary to perform analysis on the unreasonable status of each target information cluster.
[0058] When the power grid information clutter measurement is not low, it means that the probability of the power grid information being a clutter value is not low, so the probability of the power grid information being unreasonable power grid information is not high. The unreasonable power grid information described here is the unreasonable information formed by the working failure of the power equipment of the power grid, not the clutter value. When the power equipment fails to work and there is no clutter disturbance, the obtained power grid information often has a low change amount, while when the power equipment fails to work, the obtained power grid information has a high change amount. Therefore, the unreasonable amount of each target information cluster is determined based on this.
[0059] In this step, the power grid peak and valley information, the number of power grid information, and the power grid information noise status corresponding to the multiple target information clusters can be determined; based on the power grid peak and valley information, the number of power grid information, and the power grid information noise status corresponding to the multiple target information clusters, the unreasonable quantities corresponding to the multiple target information clusters can be determined.
[0060] Optionally, the last information cluster with unreasonable quantity exceeding the preset unreasonable quantity critical value can be confirmed as an unreasonable information cluster. When there is an unreasonable information cluster, it is confirmed that there is a malfunction in the operation of the power equipment, and a prompt message of the malfunction in the operation of the power equipment is displayed synchronously when the power grid information is displayed.
[0061] Based on the above embodiments and optional embodiments, an optional implementation is provided, which is described in detail below.
[0062] An optional implementation manner of the present invention provides a power grid information detection method, comprising:
[0063] The server is used to extract the real-time information value of the electric power equipment as the power grid information from the real-time information database, and display the power grid information after parsing;
[0064] The method of parsing power grid information includes:
[0065] Step 1: extract multiple power grid information from the real-time information database, and obtain a power grid information queue based on the multiple power grid information;
[0066] Step 2: Obtain the clutter measurement of each grid information according to the grid information queue;
[0067] Step 3: dividing the grid information queue according to the noise measurement of each grid information to obtain multiple final information clusters;
[0068] Step 4: Calculate the unreasonable amount of each last information cluster, and perform unreasonable confirmation based on the unreasonable amount of each last information cluster.
[0069] Preferably, the power grid information in the real-time information database is obtained by sampling the power grid information of the power equipment once every p seconds through a corresponding transmitter connected to the server for communication, sampling P times, obtaining P power grid information and transmitting it to the real-time information database of the server, where p represents a preset sampling period, and P represents a preset number of sampling times;
[0070] The P pieces of power grid information are arranged in the order of sampling to obtain a power grid information queue.
[0071] Preferably, step 2 specifically includes: for any grid information, taking a subqueue formed by N continuous grid information in a grid information queue with the grid information as the midpoint as a reference subqueue of the grid information, where N represents the number of elements of the subqueue set in advance.
[0072] Preferably, step 2 specifically further includes: defining any grid information as the destination grid information, defining the previous grid information and the next grid information of the destination grid information as the adjacent information of the destination grid information; using the minimum curvature method, performing the minimum curvature method on the two adjacent information of the destination grid information to obtain the supplementary information of the two adjacent information of the destination grid information, and defining it as the supplementary information of the destination grid information; replacing the destination grid information in the reference subqueue of the destination grid information with the supplementary information to obtain the reference subqueue of the destination grid information, and so on to obtain the reference subqueue of each grid information.
[0073] Preferably, step 2 specifically further comprises: for any grid information, using the maximum likelihood estimation method to regress the reference subqueue to obtain the regression equation of the reference subqueue, and so on to obtain the regression equation of the control subqueue. The regression equation of the reference subqueue is subtracted from the regression equation of the control subqueue to obtain the reduction equation, the modulus of the reduction equation after the ∫ operation is defined as the size of the configuration action area, the modulus of the amount obtained by subtracting the previous grid information from each grid information in the reference subqueue is defined as the upper reduction of the reference subqueue, the modulus of the amount obtained by subtracting the next grid information from each grid information in the reference subqueue is defined as the lower reduction of the reference subqueue, the modulus of the amount obtained by subtracting the previous grid information from each grid information in the control subqueue is defined as the upper reduction of the control subqueue, and the modulus of the amount obtained by subtracting the next grid information from each grid information in the control subqueue is defined as the lower reduction of the control subqueue.
[0074] Preferably, step 2 specifically further comprises: the clutter effect measurement of each grid information, that is, the calculation equation of the clutter measurement is:
[0075]
[0076] In the equation, ▽D1 jk The kth up-down of the reference subqueue representing the jth power grid information, ▽D2 jk represents the kth down-decrement of the reference subqueue of the jth power grid information, K represents the number of up-decrements of the reference subqueues of each power grid information, and also represents the number of down-decrements of the reference subqueues of each power grid information, ▽D1' jk The kth up-down of the control subqueue representing the jth power grid information, ▽D2' jk represents the kth down-decrement of the comparison sub-queue of the jth power grid information, K' represents the number of up-decrements of the comparison sub-queues of each power grid information, and also represents the number of down-decrements of the comparison sub-queues of each power grid information; B j represents the jth power grid information, represents the average of all grid information in the reference subqueue of the jth grid information; T j represents the size of the configuration action area of the jth power grid information, N represents the number of power grid information contained in the reference subqueue of each power grid information, which also represents the number of elements of the pre-set subqueue, σ j represents the clutter measure of the jth power grid information, and e represents the Euler number.
[0077] Preferably, step 3 specifically includes: using the k-means elbow method to analyze the power grid information queue to obtain the number of clusters K.
[0078] Preferably, step 3 specifically further comprises: according to the number of clusters K, using the K-means method to perform partitioning processing on the power grid information queue, and obtaining multiple temporary information clusters during the partitioning period.
[0079] Preferably, step 3 specifically further comprises:
[0080] The calculation equation for the configuration element differentiation of each temporary information cluster is:
[0081]
[0082] In the equation, σ lj represents the clutter measure of the jth grid information in the lth temporary information cluster during the division period, B lj represents the jth power grid information in the lth temporary information cluster during the division period, represents the average of all power grid information in the lth temporary information cluster during the division period, e represents the Euler number, and J l represents the number of power grid information in the lth temporary information cluster during the division period, e' l Represents the configuration element partitioning quantity of the lth temporary information cluster during the partitioning period.
[0083] Preferably, step 3 specifically further comprises: during the division, replacing the element partitioning quantity of each temporary information cluster with the configuration element partitioning quantity, and using the K-means method to achieve the division of the power grid information queue to obtain multiple final information clusters.
[0084] Preferably, step 4 specifically includes: the operation equation of the unreasonable amount of each final information cluster is:
[0085]
[0086] In the equation, A l represents the number of peak and valley information in the lth last information cluster, E l represents the number of power grid information in the lth last information cluster, σ lj represents the clutter measure of the jth grid information of the lth last information cluster, It reflects the clutter state of the power grid information in the last information cluster. The higher the value, the lower the probability that the power grid information in the last information cluster is unreasonable. e represents the Euler number, and BZ() represents the The Z-Score method is used to perform standardization. l Represents the unreasonable amount of the lth last information cluster.
[0087] Preferably, step 4 specifically further includes: confirming the last information cluster whose unreasonable quantity is higher than the pre-set unreasonable quantity critical value S as an unreasonable information cluster; when there is an unreasonable information cluster, it is confirmed that there is a malfunction in the operation of the power equipment, and a prompt message that there is a malfunction in the operation of the power equipment is synchronously displayed when the power grid information is displayed.
[0088] A power grid information detection device, comprising:
[0089] The server is used to extract the real-time information value of the electric power equipment as the power grid information from the real-time information database, and display the power grid information after parsing;
[0090] The modules running on the server include:
[0091] The first acquisition module is used to extract multiple power grid information in the real-time information database and acquire a power grid information queue according to the multiple power grid information;
[0092] An acquisition module 2, which is used to obtain the clutter measurement of each power grid information according to the power grid information queue;
[0093] An acquisition module 3 is used to perform partitioning processing on the power grid information queue according to the clutter measurement of each power grid information to obtain multiple final information clusters;
[0094] The confirmation module is used to calculate the unreasonable amount of each last information cluster and perform unreasonable confirmation according to the unreasonable amount of each last information cluster.
[0095] The beneficial function of the present invention is that, compared with the prior art, the present invention needs to extract unreasonable power grid information in order to confirm the working failure of the power equipment of the power grid. Because the distinction between reasonable power grid information and unreasonable power grid information is not low, the unreasonable power grid information and the reasonable power grid information can be divided first, and then unreasonable analysis can be performed on the divided power grid information.
[0096] First, the real-time information library is used to obtain the power grid information queue. Because the power grid information queue contains noise values, and the noise values will disrupt the data queue partitioning performance, it is necessary to analyze the state of the attributes of each power grid information that conforms to the noise value to obtain the noise measurement of each power grid information. According to the noise measurement of each power grid information, the element differentiation of each temporary information cluster during the power grid information queue partition is configured to obtain the configuration element differentiation of each temporary information cluster. In this way, the configuration element differentiation of each temporary information cluster is used to control the power grid information queue partitioning process to obtain the final information cluster. In this way, the unreasonable power grid information and the reasonable power grid information can be divided into different final information clusters. It is determined that the final information cluster is the part of the information cluster containing the unreasonable power grid information. Therefore, according to the differentiation of the power grid information in each final information cluster and the noise measurement of each power grid information, the unreasonable amount of each final information cluster is obtained. The unreasonable state of the power grid information in each final information cluster is reflected through the unreasonable amount of each final information cluster, and the working failure of the power equipment of the power grid is confirmed according to the unreasonable amount of each final information cluster.
[0097] The server is used to extract the real-time information values of multiple power equipment as power grid information within the display range from the real-time information database, and display the power grid information after parsing;
[0098] The method of parsing power grid information includes:
[0099] Step 1: extract multiple power grid information from the real-time information database, and obtain a power grid information queue based on the multiple power grid information;
[0100] In a preferred but non-limiting embodiment of the present invention, the power grid information in the real-time information library is obtained by sampling the power grid information of the power equipment once every p seconds through a corresponding transmitter connected to the server, sampling P times, obtaining P power grid information and transmitting it to the real-time information library of the server. The power equipment can be a power line, and the power grid information can be the current of the power line sampled by the current transmitter. p represents a preset sampling period, and P represents a preset number of sampling times. The value of p can be two, and the value of P can be one thousand.
[0101] The P pieces of power grid information are arranged in the order of sampling to obtain a power grid information queue.
[0102] Step 2: Obtain the clutter measurement of each grid information according to the grid information queue;
[0103] Since the difference between the clutter value and the normal power grid information is quite large, in order to perform clutter analysis, part of the power grid information must be used as a benchmark.
[0104] In a preferred but non-limiting embodiment of the present invention, step 2 specifically includes: for any power grid information, a sub-queue formed by N continuous power grid information in a power grid information queue with the power grid information as the midpoint is used as a reference sub-queue of the power grid information, N represents the number of elements of the sub-queue set in advance, and the value of N can be eleven.
[0105] However, the noise value is often arbitrary, that is, the noise value is often not continuous, and the difference between the noise value and the normal power grid information is not small, so the noise value will only affect the change rules in a very narrow range, and the reference sub-queue can reflect the changes in the power grid information in a very narrow range of each power grid information, so the noise value will affect the change rules of the reference sub-queue, so after the noise value is cleared, the change rules of the reference sub-queue will change significantly, so the noise measurement of each power grid information can be detected based on this.
[0106] In a preferred but non-limiting embodiment of the present invention, step 2 specifically further includes: defining any grid information as the destination grid information, defining the previous grid information and the next grid information of the destination grid information as the adjacent information of the destination grid information; using the minimum curvature method, performing the minimum curvature method on the two adjacent information of the destination grid information to obtain the supplementary information of the two adjacent information of the destination grid information, and defining it as the supplementary information of the destination grid information; replacing the destination grid information in the reference subqueue of the destination grid information with the supplementary information to obtain the reference subqueue of the destination grid information, and so on to obtain the reference subqueue of each grid information.
[0107] In a preferred but non-limiting embodiment of the present invention, step 2 specifically further includes: for any grid information, using the maximum likelihood estimation method to regress the reference subqueue to obtain the regression equation of the reference subqueue, and so on to obtain the regression equation of the control subqueue. The regression equation of the reference subqueue is subtracted from the regression equation of the control subqueue to obtain the reduction equation, and the modulus of the reduction equation after the ∫ operation is defined as the size of the configuration action area, the modulus of the amount obtained by subtracting the previous grid information from each grid information in the reference subqueue is defined as the upper reduction of the reference subqueue, the modulus of the amount obtained by subtracting the next grid information from each grid information in the reference subqueue is defined as the lower reduction of the reference subqueue, the modulus of the amount obtained by subtracting the previous grid information from each grid information in the control subqueue is defined as the upper reduction of the control subqueue, and the modulus of the amount obtained by subtracting the next grid information from each grid information in the control subqueue is defined as the lower reduction of the control subqueue.
[0108] The purpose of using the supplementary information of two adjacent information to replace the source grid information instead of directly clearing the source grid information is to avoid the adverse effect of different numbers of information on the analysis conclusion.
[0109] In a preferred but non-limiting embodiment of the present invention, step 2 specifically further includes: the clutter effect measurement of each power grid information, that is, the calculation equation of the clutter measurement is:
[0110]
[0111] In the equation, ▽D1 jk The kth up-down of the reference subqueue representing the jth power grid information, ▽D2 jk represents the kth down-decrement of the reference subqueue of the jth power grid information, K represents the number of up-decrements of the reference subqueues of each power grid information, and also represents the number of down-decrements of the reference subqueues of each power grid information. Represents the fluctuation of the reference sub-queue of the j-th power grid information, ▽D1' jk The kth up-down of the control subqueue representing the jth power grid information, ▽D2' jk represents the kth lower decrement of the comparison subqueue of the jth power grid information, K' represents the number of upper decrements of the comparison subqueues of each power grid information, and also represents the number of lower decrements of the comparison subqueues of each power grid information; represents the fluctuation of the control sub-queue of the j-th power grid information, It reflects the difference between the fluctuation of the reference sub-queue of the j-th power grid information and the fluctuation of the reference sub-queue. The higher the value, the higher the fluctuation before and after the j-th power grid information is replaced. Therefore, the difference between the j-th power grid information and other power grid information is not low. Therefore, the higher the clutter measure of the j-th power grid information, the higher the value of B. j represents the jth power grid information, represents the average of all grid information in the reference subqueue of the jth grid information; T j represents the size of the configuration action area of the jth power grid information, N represents the number of power grid information contained in the reference subqueue of each power grid information, and also represents the number of elements of the pre-set subqueue. It reflects the change in the size of the configuration action area of the reference subqueue before and after the j-th power grid information is replaced. The higher the value, the higher the clutter measure of the j-th power grid information. j represents the clutter measure of the jth power grid information, and e represents the Euler number.
[0112] Thus, the noise measurement of each grid information is obtained, and the probability of each grid information being a noise value can be reflected through the noise measurement.
[0113] Step 3: dividing the grid information queue according to the noise measurement of each grid information to obtain multiple final information clusters;
[0114] When using the K-means method to partition the power grid information queue, the number of clusters must be determined first.
[0115] In a preferred but non-limiting embodiment of the present invention, step 3 specifically includes: using the k-means elbow method to perform analysis on the power grid information queue to obtain the number of clusters K.
[0116] In order to avoid the disturbance of the partitioning process by the clutter value, the partitioning index during the partitioning period should be configured according to the clutter measurement of each power grid information. Here, the partitioning index during the partitioning period in the K-means method is the element differentiation amount of each temporary information cluster.
[0117] In a preferred but non-limiting embodiment of the present invention, step 3 specifically further comprises: according to the number of clusters K, using the K-means method to perform partitioning processing on the power grid information queue, and obtaining multiple temporary information clusters during the partitioning period.
[0118] In a preferred but non-limiting embodiment of the present invention, step 3 specifically further comprises: the operation equation of the element distinction amount of each temporary information cluster during the division of the current K-means method is:
[0119]
[0120] In the equation, B lj represents the jth power grid information in the lth temporary information cluster during the division period, represents the average of all power grid information in the lth temporary information cluster during the division period, J l represents the number of power grid information of the lth temporary information cluster during the division period, e l Represents the element differentiation amount of the kth temporary information cluster during the partitioning period.
[0121] The present application configures the element discrimination amount of each temporary information cluster during the division of the current K-means method, and defines the element discrimination amount of each temporary information cluster after the configuration as the configured element discrimination amount of each temporary information cluster.
[0122] The calculation equation for the configuration element differentiation of each temporary information cluster is:
[0123]
[0124] In the equation, σ lj represents the clutter measure of the jth grid information in the lth temporary information cluster during the division period. To reduce the disturbance of the clutter value to the division analysis, it is necessary to reduce the effect of the grid information with high clutter measure on the division analysis.lj represents the jth power grid information in the lth temporary information cluster during the division period, represents the average of all power grid information in the lth temporary information cluster during the division period, e represents the Euler number, and J l represents the number of power grid information in the lth temporary information cluster during the division period, e' l Represents the configuration element partitioning quantity of the lth temporary information cluster during the partitioning period.
[0125] In a preferred but non-limiting embodiment of the present invention, step 3 specifically further includes: during the division, replacing the element partitioning quantity of each temporary information cluster with the configuration element partitioning quantity, and using the K-means method to achieve the division of the power grid information queue to obtain multiple final information clusters.
[0126] Step 4: Calculate the unreasonable amount of each last information cluster, and perform unreasonable confirmation based on the unreasonable amount of each last information cluster.
[0127] In order to perform unreasonable identification on power equipment, it is necessary to obtain unreasonable power grid information. The above process has already divided the unreasonable power grid information and normal power grid information into multiple final information clusters through power grid information division, so at this time it is only necessary to analyze the unreasonable status of each final information cluster.
[0128] When the grid information noise measurement is not low, it means that the probability of the grid information being a noise value is not low, so the probability of the grid information being unreasonable grid information is not high. The unreasonable grid information described here is the unreasonable information formed by the working failure of the power equipment of the grid, not the noise value. When the power equipment fails to work and there is no noise disturbance, the obtained grid information often has a low change amount, while when the power equipment fails to work, the obtained grid information has a high change amount. Therefore, the unreasonable amount of each final information cluster is determined based on this.
[0129] In a preferred but non-limiting embodiment of the present invention, step 4 specifically includes: the operation equation of the unreasonable amount of each last information cluster is:
[0130]
[0131] In the equation, A l represents the number of peak and valley information in the lth last information cluster (peak and valley information is the power grid information in the last information cluster whose previous power grid information and next power grid information are higher or lower than the current power grid information). l represents the number of power grid information in the lth last information cluster, This quantity reflects the speed of change of the last information cluster. The higher the quantity, the faster the change of the last information cluster is, so the last information cluster is more unreasonable. lj represents the clutter measure of the jth grid information of the lth last information cluster, It reflects the clutter state of the power grid information in the last information cluster. The higher the value, the lower the probability that the power grid information in the last information cluster is unreasonable. e represents the Euler number, and BZ() represents the The Z-Score method is used to perform standardization. l Represents the unreasonable amount of the lth last information cluster.
[0132] In a preferred but non-limiting embodiment of the present invention, step 4 specifically further includes: confirming the last information cluster with an unreasonable amount higher than a preset unreasonable amount critical value S as an unreasonable information cluster, and when there is an unreasonable information cluster, confirming that the power equipment has a problem in operation, and synchronously displaying a prompt message that the power equipment has a problem in operation when the power grid information is displayed. The unreasonable amount critical value S of the present application can be 42%.
[0133] The beneficial function of the present invention is that, compared with the prior art, the present invention needs to extract unreasonable power grid information in order to confirm the working failure of the power equipment of the power grid. Because the distinction between reasonable power grid information and unreasonable power grid information is not low, the unreasonable power grid information and the reasonable power grid information can be divided first, and then unreasonable analysis can be performed on the divided power grid information.
[0134] First, the real-time information library is used to obtain the power grid information queue. Because the power grid information queue contains noise values, and the noise values will disrupt the data queue partitioning performance, it is necessary to analyze the state of the attributes of each power grid information that conforms to the noise value to obtain the noise measurement of each power grid information. According to the noise measurement of each power grid information, the element differentiation of each temporary information cluster during the power grid information queue partition is configured to obtain the configuration element differentiation of each temporary information cluster. In this way, the configuration element differentiation of each temporary information cluster is used to control the power grid information queue partitioning process to obtain the final information cluster. In this way, the unreasonable power grid information and the reasonable power grid information can be divided into different final information clusters. It is determined that the final information cluster is the part of the information cluster containing the unreasonable power grid information. Therefore, according to the differentiation of the power grid information in each final information cluster and the noise measurement of each power grid information, the unreasonable amount of each final information cluster is obtained. The unreasonable state of the power grid information in each final information cluster is reflected through the unreasonable amount of each final information cluster, and the working failure of the power equipment of the power grid is confirmed according to the unreasonable amount of each final information cluster.
[0135] It should be noted that, for the above-mentioned method embodiments, for the sake of simplicity, they are all described as a series of action combinations, but those skilled in the art should know that the present invention is not limited by the described action sequence, because according to the present invention, certain steps can be performed in other sequences or simultaneously. Secondly, those skilled in the art should also know that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the present invention.
[0136] Through the description of the above implementation methods, those skilled in the art can clearly understand that the method according to the above embodiment can be implemented by means of software plus a necessary general hardware platform, and of course can also be implemented by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present invention is essentially or the part that contributes to the prior art can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, a magnetic disk, or an optical disk), and includes a number of instructions for a terminal device (which can be a mobile phone, a computer, a server, or a network device, etc.) to execute the methods of various embodiments of the present invention.
[0137] Example 2
[0138] According to an embodiment of the present invention, a device for implementing the above-mentioned power grid disturbance information detection method is also provided. Figure 2 is a structural block diagram of a power grid disturbance information detection device according to an embodiment of the present invention. Figure 2 As shown, the device includes: an acquisition module 202, a first determination module 204, a second determination module 206, a classification module 208, a third determination module 210 and a fourth determination module 212. The device is described in detail below.
[0139] The acquisition module 202 is used to acquire a grid information queue corresponding to a predetermined power line, wherein the grid information queue includes a plurality of grid information arranged in time sequence, the plurality of grid information is a plurality of information collected in different time periods at a predetermined period, and the grid information includes current information;
[0140] The first determination module 204 is connected to the acquisition module 202 and is used to determine a reference subqueue and a comparison subqueue corresponding to each grid information in the grid information queue, wherein the comparison subqueue is a queue obtained by replacing part of the grid information in the reference subqueue;
[0141] A second determination module 206, connected to the first determination module 204, is used to determine the clutter metric corresponding to each grid information according to the reference subqueue and the reference subqueue corresponding to each grid information, wherein the clutter metric indicates the probability that the corresponding grid information is clutter information;
[0142] The classification module 208 is connected to the second determination module 206, and is used to classify the multiple power grid information in the power grid information queue according to the clutter measurement corresponding to each power grid information, and obtain multiple target information clusters corresponding to the power grid information queue, wherein each of the multiple target information clusters includes at least one power grid information;
[0143] The third determination module 210 is connected to the classification module 208 and is used to determine the unreasonable amounts corresponding to the multiple target information clusters;
[0144] The fourth determination module 212 is connected to the third determination module 210 and is used to determine a disturbance information cluster from the multiple target information clusters according to the unreasonable amounts respectively corresponding to the multiple target information clusters, wherein the power grid information included in the disturbance information cluster is the power grid information affected by the disturbance.
[0145] It should be noted here that the above-mentioned acquisition module 202, the first determination module 204, the second determination module 206, the classification module 208, the third determination module 210 and the fourth determination module 212 correspond to steps S102 to S112 in implementing the power grid disturbance information detection method, and the instances and application scenarios implemented by the multiple modules and the corresponding steps are the same, but are not limited to the contents disclosed in the above-mentioned embodiment 1.
[0146] Example 3
[0147] According to another aspect of an embodiment of the present invention, there is further provided an electronic device, comprising: a processor; and a memory for storing instructions executable by the processor, wherein the processor is configured to execute the instructions to implement any of the above-mentioned methods for detecting power grid disturbance information.
[0148] Example 4
[0149] According to another aspect of an embodiment of the present invention, a computer-readable storage medium is provided. When instructions in the computer-readable storage medium are executed by a processor of an electronic device, the electronic device can execute any of the above-mentioned methods for detecting power grid disturbance information.
[0150] Example 5
[0151] According to another aspect of an embodiment of the present invention, a computer program product is provided, including a non-volatile computer-readable storage medium, wherein the non-volatile computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, any of the above-mentioned methods for detecting power grid disturbance information is implemented.
[0152] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.
[0153] In the above embodiments of the present invention, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0154] In the several embodiments provided in this application, it should be understood that the disclosed technical content can be implemented in other ways. Among them, the device embodiments described above are only schematic. For example, the division of the units can be a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.
[0155] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple units. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.
[0156] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0157] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, magnetic disk or optical disk and other media that can store program codes.
[0158] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A method for detecting power grid disturbance information, It is characterized in that include: Acquire a grid information queue corresponding to a predetermined power line, wherein the grid information queue includes a plurality of grid information arranged in time sequence, the plurality of grid information is a plurality of information collected in a predetermined period at different time periods, and the grid information includes current information; Determine a reference subqueue and a comparison subqueue corresponding to each grid information in the grid information queue, wherein the comparison subqueue is a queue obtained by replacing part of the grid information in the reference subqueue; Determining the clutter metric corresponding to each grid information according to the reference subqueue and the control subqueue corresponding to each grid information, wherein the clutter metric indicates the probability that the corresponding grid information is clutter information; According to the clutter measurement corresponding to each power grid information, multiple power grid information in the power grid information queue are classified and divided to obtain multiple target information clusters corresponding to the power grid information queue, wherein each of the multiple target information clusters includes at least one power grid information; Determine the unreasonable amounts respectively corresponding to the multiple target information clusters; According to the unreasonable amounts respectively corresponding to the multiple target information clusters, a disturbance information cluster is determined from the multiple target information clusters, wherein the power grid information included in the disturbance information cluster is the power grid information affected by the disturbance.
2. The method according to claim 1, It is characterized in that Determining a reference subqueue and a comparison subqueue corresponding to each power grid information in the power grid information queue includes: Determine the baseline regression equations, baseline-upper reduction and baseline-lower reductions corresponding to each baseline subcohort, and the control regression equations, control-upper reduction and control-lower reductions corresponding to each control subcohort; According to the benchmark regression equation, the benchmark upper reduction and the benchmark lower reduction corresponding to each benchmark sub-queue, and the control regression equation, the control upper reduction and the control lower reduction corresponding to each control sub-queue, the clutter measurement corresponding to each power grid information is determined.
3. The method according to claim 1, It is characterized in that Determining a reference subqueue and a comparison subqueue corresponding to each power grid information in the power grid information queue includes: Determine a reference sub-queue from the power grid information queue; Determine target power grid information and adjacent power grid information from the reference subqueue, wherein the adjacent power grid information is the previous power grid information and the next power grid information of the target power grid information; Processing the adjacent power grid information to obtain supplementary information corresponding to the target power grid information; The target power grid information is replaced with the supplementary information to obtain a comparison sub-queue.
4. The method according to claim 3, It is characterized in that Determining a reference sub-queue from the power grid information queue includes: Determining any power grid information from the power grid information queue as central power grid information; Determine a subqueue formed by N continuous grid information in a grid information queue with the central grid information as a midpoint as a first reference subqueue, where N is a positive integer greater than 1; A plurality of reference sub-queues including the first reference sub-queue are determined from the power grid information queue, so that central power grid information respectively included in the plurality of reference sub-queues is consistent with the plurality of power grid information.
5. The method according to claim 1, It is characterized in that According to the clutter measurement corresponding to each power grid information, multiple power grid information in the power grid information queue are classified and divided to obtain multiple target information clusters corresponding to the power grid information queue, including: Determine the number of target clusters; Dividing the power grid information queue into a plurality of temporary information clusters, wherein each of the plurality of temporary information clusters includes at least one power grid information, wherein the number of the plurality of temporary information clusters is the target number of clusters; Determining, according to the clutter measure corresponding to each of the power grid information, the configuration element distinction quantities corresponding to the plurality of temporary information clusters respectively; The initial element distinguishing quantities respectively corresponding to the multiple temporary information clusters are replaced with the configuration element distinguishing quantities, and the multiple power grid information in the power grid information queue are classified and divided to obtain the multiple target information clusters, wherein the initial element distinguishing quantities respectively corresponding to the multiple temporary information clusters are obtained based on the respectively corresponding power grid information.
6. The method according to any one of claims 1 to 5, It is characterized in that Determining the unreasonable amounts respectively corresponding to the plurality of target information clusters includes: Determine the power grid peak and valley information, the number of power grid information, and the power grid information clutter status corresponding to the multiple target information clusters respectively; According to the power grid peak and valley information, the number of power grid information, and the power grid information clutter state respectively corresponding to the multiple target information clusters, the unreasonable amounts respectively corresponding to the multiple target information clusters are determined.
7. A power grid disturbance information detection device, It is characterized in that include: An acquisition module, used for acquiring a grid information queue corresponding to a predetermined power line, wherein the grid information queue includes a plurality of grid information arranged in time sequence, the plurality of grid information is a plurality of information collected in a predetermined period at different time periods, and the grid information includes current information; A first determination module is used to determine a reference subqueue and a comparison subqueue corresponding to each power grid information in the power grid information queue, wherein the comparison subqueue is a queue obtained by replacing part of the power grid information in the reference subqueue; A second determination module is used to determine the clutter metric corresponding to each grid information according to the reference subqueue and the control subqueue corresponding to each grid information, wherein the clutter metric indicates the probability that the corresponding grid information is clutter information; A classification module, configured to classify and divide the plurality of power grid information in the power grid information queue according to the clutter measurement corresponding to each power grid information, to obtain a plurality of target information clusters corresponding to the power grid information queue, wherein each of the plurality of target information clusters includes at least one power grid information; A third determination module is used to determine the unreasonable amounts corresponding to the multiple target information clusters respectively; The fourth determination module is used to determine a disturbance information cluster from the multiple target information clusters according to the unreasonable amounts respectively corresponding to the multiple target information clusters, wherein the power grid information included in the disturbance information cluster is the power grid information affected by the disturbance.
8. An electronic device, It is characterized in that include: processor; a memory for storing instructions executable by the processor; The processor is configured to execute the instructions to implement the power grid disturbance information detection method according to any one of claims 1 to 6.
9. A computer-readable storage medium, It is characterized in that When the instructions in the computer-readable storage medium are executed by a processor of an electronic device, the electronic device is enabled to execute the power grid disturbance information detection method according to any one of claims 1 to 6.
10. A computer program product, It is characterized in that A non-volatile computer-readable storage medium is included, wherein the non-volatile computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the power grid disturbance information detection method according to any one of claims 1 to 6 is implemented.
Citation Information
Patent Citations
Method and device for calculating influence range of subway stray current on buried pipeline
CN111562423A
5G-based power condition information transmission device and method
CN118399611A
Methods and systems for suppressing clutter in radar systems
US9971027B1