Simulation method of anchor rod base plate in tunnel

By establishing a full-ring liner element in Flac3D software and weakening the parameters of the non-pad group, the problem of simulating anchor pads in curved tunnels was solved, realizing a fast and accurate simulation of the pad's effect, applicable to various tunnel shapes.

CN118965502APending Publication Date: 2024-11-15CHINA RAILWAY ERYUAN ENGINEERING GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410975409.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

Existing technologies cannot accurately simulate the interaction between anchor bolts, pads, and surrounding rock in curved tunnels. In particular, the liner element method is difficult to determine coordinates in curved tunnels and involves a large amount of engineering work.

Method used

By establishing a full-ring liner element along the inner contour of the tunnel and weakening the mechanical parameters of the non-pad group to eliminate its influence on the pad group, the interaction between the anchor bolt pads is simulated using Flac3D software.

Benefits of technology

It enables rapid and accurate simulation of the interaction between the pad and the rod and between the pad and the surrounding rock in curved tunnels, reducing the amount of computational work, and is applicable to both rectangular and curved tunnels, thus improving the accuracy of the simulation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118965502A_ABST
    Figure CN118965502A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of anchor rod numerical simulation, in particular to a simulation method of an anchor rod base plate in a tunnel. According to the method, the full-ring liner units are quickly established along the inner contour of the tunnel, and the mechanical parameters related to the liner units of the non-backing-plate group are weakened to eliminate the influence of the liner units of the non-backing-plate group on the liner units of the backing plate group, so that quick simulation of the backing plate is realized, the coordinate range of all nodes of the liner units corresponding to the backing plate does not need to be determined, and the simulation efficiency is improved. And coordinate ranges of a plurality of base plates do not need to be input one by one. The method is not only suitable for a rectangular tunnel, but also suitable for an arc-shaped tunnel, is small in calculation work amount and high in simulation accuracy, can effectively simulate the interaction between the base plate and the rod body and between the base plate and the surrounding rock in the arc-shaped tunnel, and plays an important role in studying the action mechanism and design parameters of the base plate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of anchor rod numerical simulation, in particular to a simulation method of an anchor rod pad in a tunnel. Background Art

[0002] Anchor bolts are important supporting structures that play an important role in controlling the deformation of tunnel surrounding rocks. They are generally composed of rod bodies, pads, anchoring agents, anchor heads, and other parts. Compared with lining, scaffolding and other support methods, anchor bolt support can penetrate deep into the rock mass, thereby forming a whole with the surrounding rock mass to coordinate deformation, so as to achieve the purpose of controlling the deformation of the surrounding rock; in addition, anchor bolt support construction has a small workload and can be quickly installed, and is widely used in tunnels, underground coal mining and other fields. In order to study the mechanism of anchor bolt support in controlling the deformation of surrounding rocks, numerical simulation software is currently widely used for simulation analysis, among which Flac3D is one of the commonly used software in tunneling; the software has built-in cable units and pile units, and can customize the interface parameters between the anchor bolt body and the surrounding rock, thereby simulating the interaction between the anchor bolt body and the surrounding rock. The cabe unit parameters of Flac3D software are highly customized, and various complex models can be simulated to analyze the force characteristics and action mechanism of anchor bolts, so it is widely used in tunnel scientific research and design work.

[0003] In addition to the interaction between the bolt body and the surrounding rock, the pad is also a key part of the bolt to play a supporting role. In Flac3D, there are currently three main methods for simulating the pad: Method 1 is to rigidly connect the anchor end node with the corresponding surrounding rock node so that the anchor end and the surrounding rock deform synchronously; Method 2 is to set the maximum anchor parameter at the end of the anchor to limit the mutual displacement between the end and the surrounding rock, thereby simulating the role of the pad; Method 3 is to establish a liner unit to simulate the pad. Among them, Method 1 and Method 2 both indirectly simulate the role of the pad by controlling the relative deformation of the anchor end and the surrounding rock, ignoring that the pad actually has a certain surface area and can constrain the deformation of the surrounding rock within the surface area. Therefore, these two methods cannot directly reflect the interaction between the anchor body and the pad and the pad and the surrounding rock, and cannot accurately reflect the control effect of the pad on the deformation of the surrounding rock in actual working conditions. Although Method 3 can simulate the actual interaction between the rod body-pad and the pad-surrounding rock, it also has great limitations for pad simulation:

[0004] There are two ways to establish liner units: one is to use the surface contour of the solid unit as the reference plane, and establish the nodes, components, and connections between the liner unit and the solid unit on the surface of the solid unit; the other method is to first establish the structural nodes, and then establish the components of the liner unit to form a shell-type liner unit. Since the components of the liner unit are generally triangular, the method of using structural nodes is relatively complicated, so it is generally used to simulate the pad by establishing the liner unit on the surface of the solid unit; such as Figure 1 The structural diagram of the anchor pad simulated by the liner unit is shown in the figure. The components of the liner unit are triangular, and the intersections between the components are nodes. There are 9 nodes in total in the figure. The existing technology uses the liner unit to simulate the anchor pad only for rectangular tunnel walls, because for the anchor pad supported on the rectangular tunnel wall, the pad coordinates are simple to obtain. The liner unit corresponding to the pad can be directly entered one by one through the sel liner range xyz command to establish the liner unit. At this time, the established liner unit is a planar rectangular structure (the thickness can be adjusted by setting the thickness parameter), which can be well attached to the rectangular tunnel wall. However, in the curved tunnel, the rectangular liner unit will interfere with the curved contour of the tunnel, and the coordinate range of the liner unit corresponding to the pad is not as strong as that of the rectangular tunnel. Only by simply changing the coordinate value of the pad in a certain direction (X / Y / Z direction), the coordinates of all nodes of the liner unit corresponding to the pad can be quickly determined; if the sel liner range xyz is used to establish the liner unit corresponding to the pad, it is necessary to accurately determine all the node coordinates of the liner unit corresponding to each pad to determine the x, y, and z coordinate ranges of the liner unit of the pad. Therefore, in a curved tunnel, determining the coordinate range of each pad corresponding to the liner unit is a tedious, difficult, and labor-intensive task. Summary of the invention

[0005] The purpose of the present invention is to provide a simulation method of anchor pads in tunnels, which can be used to simulate the interaction between rods and pads and pads and surrounding rocks in curved tunnels, in order to address the problem that the numerical simulation methods in the prior art cannot be used to accurately reflect the interaction between rods and pads and pads and surrounding rocks in curved tunnels.

[0006] In order to achieve the above object, the technical solution adopted by the present invention is:

[0007] A method for simulating an anchor pad in a tunnel comprises the following steps:

[0008] Step 1: Establish a stratum structure model, and construct a tunnel model based on the stratum structure model;

[0009] Step 2: Establish a full-circle liner unit along the inner contour of the tunnel;

[0010] Step 3, dividing the full ring liner unit into pad group and non-pad group according to the pad position to be set;

[0011] Step 4, setting the parameters of the non-shim plate group to a preset range, wherein the preset range is used to weaken the mechanical parameters of the liner unit component corresponding to the non-shim plate group to obtain the pre-processed parameters;

[0012] Step 5: Connect the end nodes of the anchor rod body with the corresponding nodes of the pad, and generate simulation results based on the preprocessed parameters.

[0013] As a preferred solution of the present invention, in the step three, after meshing, the mesh components of the full-ring liner unit are triangular, each component carries numbering information and is assigned mechanical parameters, and the numbering of the corresponding component on the full-ring liner unit is determined according to the position to be set of the anchor pad on the inner contour of the tunnel. According to the numbering information, the liner unit components corresponding to all the pads are grouped into a pad group, and the other components on the full-ring liner unit are grouped into a non-pad group.

[0014] As a preferred embodiment of the present invention, the mechanical parameters assigned to the pad group and the non-pad group include thickness, elastic modulus, stiffness and cohesion; further preferably, the elastic modulus, stiffness and cohesion of the liner unit of the non-pad group are set to 0.1 or less, and the thickness is set to 0.001 or less.

[0015] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:

[0016] The present invention quickly establishes a full-circle liner unit along the inner contour of the tunnel, and weakens the mechanical parameters related to the liner unit of the non-pad group to eliminate the influence of the liner unit of the non-pad group on the liner unit of the pad group, thereby realizing a rapid simulation of the pad, without the need to determine the coordinate range of all nodes of the liner unit corresponding to the pad, and without the need to input the coordinate range of multiple pads one by one. The present invention is applicable not only to rectangular tunnels but also to arc tunnels, with a small amount of calculation and high simulation accuracy. It can effectively simulate the interaction between the pad-rod body and the pad-surrounding rock in the arc tunnel, and plays an important role in studying the action mechanism and design parameters of the pad. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the structure of the anchor pad simulated by the liner unit;

[0018] Figure 2 is an operation flow chart of a method for simulating an anchor pad in a tunnel in Example 1;

[0019] Figure 3 It is the initial calculation model diagram of the stratum structure;

[0020] Figure 4 It is a model diagram after excavating the core soil and establishing the anchor rod unit;

[0021] Figure 5 It is a liner unit built along the entire ring of the tunnel;

[0022] Figure 6 It is the grouped liner unit;

[0023] Figure 7 It is a complete anchor unit formed by rigidly connecting the anchor rod body and the pad;

[0024] Figure 8 is the axial force diagram of the anchor rod;

[0025] Fig. 9 is the normal stress distribution diagram of the pad;

[0026] Fig.10 The distribution diagram of the axial force of the anchor rod body under two working conditions, that is, when the pad is established and when no pad is established, is obtained by using the method of the present invention;

[0027] Fig.11 The present invention is used to establish the distribution diagram of shear stress on the anchor rod interface under two working conditions: one with a pad and the other without a pad.

[0028] Icon: 1-surrounding rock; 2-core soil; 3-anchor rod body; 4-full ring liner unit; 41-pad group; 42-non-pad group. DETAILED DESCRIPTION

[0029] The present invention will be described in detail below in conjunction with the accompanying drawings.

[0030] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0031] Example 1

[0032] A simulation method for anchor pads in tunnels, such as Figure 2 As shown, the following steps are included:

[0033] Step 1: Establishing a stratum structure model. In this embodiment, Flac3D software is used to establish a stratum structure constitutive model. Figure 3As shown, the stratum is simulated by solid units, the material models of surrounding rock 1 and core soil 2 (Mohr-Coulomb model) and parameters are defined, the model boundary conditions are applied, the initial geostress field is defined, and the initial geostress calculation is performed.

[0034] In this embodiment, the statements defining the material models and parameters of the surrounding rock 1 and the core soil 2 are:

[0035]

[0036]

[0037] The statements for initializing and calculating the geostress field are:

[0038]

[0039] in_sz=-(m_ais)*den0*10

[0040] in_sx=in_sz*cyxs_zx

[0041] in_sy=in_sz*cyxs_zy

[0042] in_gradz=den0*10

[0043] in_gradx=in_gradz*cyxs_zx

[0044] in_grady=in_gradz*cyxs_zy

[0045] sz_bup=-(m_ais-100)*den0*10

[0046] end

[0047] @strs_ini

[0048] ini sxx@in_sx grad 0 0@in_gradx

[0049] ini syy@in_sy grad 0 0@in_grady

[0050] ini szz@in_sz grad 0 0@in_gradz

[0051] apply szz@sz_bup ran z@az_up@bz_up

[0052] set gravity 0 0 -10

[0053] solve

[0054] Step 2: Then excavate the tunnel core soil 2 and use cable units or pile units to simulate the anchor rod body 3, such as Figure 4 For example, use the sel cable command to create a unit model of the anchor rod body 3 along the inner wall of the tunnel and define related parameters, such as the mechanical parameters of the anchor rod and anchoring agent.

[0055] The statement for excavating core soil 2 is:

[0056] model null range group hxt

[0057] The statement to create the anchor is:

[0058] sel pile id=1begin-7.497342 0.5 -0.199654end

[0059] -13.495216 0.5 -0.359381nseg 60

[0060] sel pile id=2begin-7.457511 0.5 0.797201end

[0061] -13.42352 0.5 1.434959nseg 60

[0062] sel pile id=3begin-7.285724 0.5 1.77995end

[0063] -13.114304 0.5 3.203907nseg 60

[0064] sel pile id=4begin-6.985021 0.5 2.731204end

[0065]

[0066]

[0067] Step 3: Use the sel liner range cylinder command to create a full ring liner unit 4 along the inner contour of the tunnel, such as Figure 5 In this embodiment, the inner contour of the tunnel is circular in plan, the full ring liner unit 4 is also circular and has a certain width, and the full ring liner unit 4 is composed of components and nodes after meshing, the components are triangular and self-defined with numbers, and each node corresponds to a space coordinate information.

[0068] The statement to create a liner unit is:

[0069] sel liner id=1range cyl end1 0 0 0end2 0 1 0rad 7.5

[0070] Step 4: Figure 6 As shown, according to the anchor pad position, the full-ring liner unit is divided into pad group 41 and non-pad group 42. Pad group 41 is a set of anchor pad positions (actually a set of pad position numbers set on the liner unit). Specifically, first determine the number of the corresponding component on the full-ring liner unit according to the setting position of the anchor pad on the tunnel contour; based on the number information, use the sel group command to classify and define the liner unit components corresponding to all pads into a pad group, and other liner unit components are classified and defined as a non-pad group. For example, the command flow for defining a pad group:

[0071] sel groupdianbanl range cid 3393 3394 any cid 3397 3398 any cid 24492450 any cid 2453 2454 any;

[0072] Among them, 3393, 3394, 3397, 3398, 2449, 2450, 2453, and 2454 are the component numbers at a certain pad position on the full-ring liner unit.

[0073] Step 5: Use the sel liner prop command to assign relevant mechanical parameters to the pad group 41 and the non-pad group 42 respectively, weaken the mechanical parameters of all liner unit components corresponding to the non-pad group 42, and eliminate the mechanical influence of the non-pad group 42 on the pad group 41. Specifically, the thickness, elastic modulus, stiffness and cohesion of the liner unit corresponding to the non-pad group are all set to be close to 0, for example, the elastic modulus, stiffness and cohesion are set to 0.1, 0.01 or less, and the thickness is set to 0.001 and less; the relevant parameters of the liner unit corresponding to the pad group are set according to the actual parameters of the pad, so as to simulate the pad.

[0074] In this embodiment, the parameters of the pad group 41 are defined by the following statement:

[0075]

[0076] The definition of non-shim group 42 parameters is achieved through the following statement:

[0077]

[0078] Step 6. Use the sel delete link command to release the original connection (link) between the end node of the anchor rod body 3 on the pad side and the surrounding rock 1 node. Then use the sel link and sel link attach xdir=rigid ydir=rigidzdir=rigid xrdir=rigid yrdir=rigid zrdir=rigid commands to establish a new connection (link) between the end node of the anchor rod body on the pad side and the corresponding pad node, and fix the connection to form a rigid connection so that there is no relative sliding between the anchor rod body and the pad, which is used to simulate the actual boundary conditions between the anchor rod and the pad. The effect diagram is shown in the figure. Figure 7 shown.

[0079] Step seven: Calculate and generate simulation results for observation, such as changes in anchor axial force, anchor interface stress, and ground stress.

[0080] according to Figure 8 , Fig. 9 After the liner unit is established by this method to simulate the pad, the axial force of the anchor rod body shows a distribution law that is large in the middle and small at both ends. The normal stress in the middle position of the pad, that is, the connection position with the rod body, is the largest and gradually decreases toward the surrounding area, which is in line with the distribution law of the anchor rod axial force and the pad normal stress.

[0081] according to Fig.10 It can be seen that after the liner unit is simulated by the method of the present invention, the axial force at the liner end of the anchor rod body increases to 500 kN compared with 0 when there is no liner, which shows that the liner has a greater restraining effect on the anchor rod end; according to Fig.11 It can be seen that after the pad liner unit is simulated by the method of the present invention, the interface shear stress at the pad end of the rod body is 0, indicating that after the pad is added, the pad constrains the relative displacement between the rod body and the surrounding rock, and the rod body and the surrounding rock do not produce relative slip at the pad position. Figure 8 to Figure 11 The calculation results fully demonstrate that the method of the present invention can effectively simulate the actual effect of the pad.

[0082] This embodiment quickly establishes a full-circle liner unit along the inner contour of the tunnel, and weakens the stiffness of the non-pad group liner unit to eliminate the influence of the non-pad group liner unit on the pad group liner unit, thereby achieving rapid simulation of the pad, and solving the problem of difficulty in establishing arc pad units to simulate the interaction between the anchor rod body and the pad under the existing flac3D modeling method. This method is applicable not only to rectangular tunnels but also to arc tunnels. It has a small amount of calculation and high simulation accuracy. It can quickly and effectively simulate the interaction between the pad-rod body and the pad-surrounding rock in the arc tunnel, and plays an important role in studying the pad action mechanism and design parameters.

[0083] As another possible implementation, the step of establishing the anchor rod body unit can also be performed after the pad simulation is established. After the pad is simulated using the liner unit pad group, the anchor rod body unit is established on the liner unit corresponding to the pad group and the connection between the anchor rod body and the liner unit of the pad group is established.

[0084] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for simulating an anchor pad in a tunnel, comprising the following steps: Step 1: Establish a stratum structure model, and construct a tunnel model based on the stratum structure model; Step 2: Establish a full-circle liner unit along the inner contour of the tunnel; Step 3, dividing the full ring liner unit into pad group and non-pad group according to the pad position to be set; Step 4, setting the parameters of the non-shim plate group to a preset range, wherein the preset range is used to weaken the mechanical parameters of the liner unit component corresponding to the non-shim plate group to obtain the pre-processed parameters; Step 5: Connect the end nodes of the anchor rod body with the corresponding nodes of the pad, and generate simulation results based on the preprocessed parameters.

2. A method for simulating anchor pads in a tunnel according to claim 1, characterized in that: The steps of establishing the stratum structure model include establishing the stratum structure constitutive model and applying boundary conditions, material models and parameters to the constitutive model, and applying initial ground stress.

3. A method for simulating anchor pads in a tunnel according to claim 1, characterized in that: The step of constructing the tunnel model includes excavating the tunnel core soil in the stratum structure model.

4. A method for simulating anchor pads in a tunnel according to claim 1, characterized in that: The method also includes the step of establishing an anchor rod body unit.

5. A method for simulating anchor pads in a tunnel according to claim 4, characterized in that: The step of establishing the anchor rod body unit includes assigning mechanical parameters to the anchor rod body unit.

6. A method for simulating anchor pads in a tunnel according to claim 1, characterized in that: In the step 4, the parameters of the pad group are set according to the actual parameters of the pads.

7. A method for simulating anchor pads in a tunnel according to any one of claims 1 to 6, characterized in that: In the step three, after meshing, the mesh components of the full-ring liner unit are triangular, each component has numbering information and is assigned mechanical parameters, and the number of the corresponding component on the full-ring liner unit is determined according to the position to be set of the anchor pad on the inner contour of the tunnel. According to the numbering information, the liner unit components corresponding to all pads are grouped into a pad group, and the other components on the full-ring liner unit are grouped into a non-pad group.

8. A method for simulating anchor pads in a tunnel according to claim 7, characterized in that: Select 8 triangular meshes to form the pad.

9. A method for simulating anchor pads in a tunnel according to any one of claims 1 to 6, characterized in that: The mechanical parameters assigned to the pad group and the non-pad group include thickness, elastic modulus, stiffness and cohesion.

10. A method for simulating anchor pads in a tunnel according to claim 9, characterized in that: Set the elastic modulus, stiffness and cohesion of the liner unit of the non-pad group to 0.1 or less, and the thickness to 0.001 or less.