Method and system for establishing simulation model of nuclear ring crane steam generator system

By establishing a simulation model of the nuclear ring crane steam generator system, the problems of high training costs, low control accuracy and insufficient safety during the steam generator replacement process are solved, and efficient, safe automatic flip and precise control of the steam generator are achieved.

CN118965727APending Publication Date: 2024-11-15CHINA NUCLEAR POWER ENGINEERING COMPANY LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410994729.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-24
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

During the replacement of the steam generator, the nuclear ring crane has problems such as high training cost, long time, low control accuracy and insufficient safety. Especially because the car is walking too fast and the lifting is inconsistent, the equipment is shaken, making it difficult to ensure the ring crane process. Security.

Method used

Establish a simulation model of the nuclear ring crane steam generator system, build a simulation physical model through dynamic model modeling and mechanical simulation software, and import a motion control algorithm to realize the simulation of automatic flip of the steam generator, avoiding manual judgment of synchronous motion and accuracy control.

Benefits of technology

The steam generator can be replaced without special training, which improves the safety and control accuracy of the replacement process. Through multiple simulation experiments, the operation characteristics and parameter changes of the entire machine are understood, the equipment is shaken, and the safety of the ring lifting process is enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118965727A_ABST
    Figure CN118965727A_ABST
Patent Text Reader

Abstract

The invention discloses a method and system for establishing a simulation model of a nuclear ring crane steam generator system, and the method comprises the steps: carrying out the modeling of a kinetic model of the nuclear ring crane steam generator system, and enabling the system to comprise a horizontal trolley system and a lifting and descending system; the horizontal trolley system comprises a trolley driving motor system and a wheel rail system which are connected in sequence; the lifting and descending system comprises a first load system consisting of a lifting motor system, a winding drum system, a lifting hook and a lifting beam, and a second load system consisting of a steam generator which are connected in sequence; building a simulation physical model of the nuclear ring crane steam generator system by utilizing mechanical simulation software; and importing a control algorithm for performing motion control on the automatic overturning of the nuclear ring crane steam generator system into mechanical simulation software to obtain a simulation model of the nuclear ring crane steam generator system. Compared with the prior art, the method and the system for establishing the simulation model of the nuclear ring crane steam generator system have the advantages that multiple repeated physical experiments can be carried out, the dependence on workers can be reduced, and the safety of the ring crane process is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of nuclear ring crane construction, and more specifically, to a method and system for establishing a simulation model of a nuclear ring crane steam generator system. Background Art

[0002] When the nuclear ring crane uses a new steam generator, it needs to be flipped from a horizontal state to a vertical state. The flipping method is to lift one end of the steam generator with a trolley, so that the new steam generator rotates about 90° from horizontal to a vertical state with the U-shaped seat of the flip bracket as the center; when the nuclear ring crane uses an old steam generator, it needs to be flipped from a vertical state to a horizontal state. The flipping method is to lift one end of the steam generator with a trolley, slowly lower it, and rotate the steam generator from vertical to a horizontal state with the U-shaped seat of the flip bracket as the center.

[0003] At present, the main method used by nuclear ring cranes for replacing steam generators is for the staff in the driver's room to perform step-by-step control on the horizontal trolley (installation trolley and working trolley) and the vertical lifting hook respectively, so as to complete the replacement of the steam generator. This solution requires special training for the staff in advance, which requires high training costs and time, and the entire replacement process takes a long time. During the replacement process, it is necessary to use the naked eye to judge whether the horizontal trolley and the vertical lifting hook are in the synchronous movement stage, and the workers are prone to fatigue, and safety cannot be guaranteed. In addition, in actual work, the movement of its various components (installation trolley, working trolley, rope) is very complicated, especially due to the problem of the trolley moving too fast and the uncoordinated lifting, which reduces the control accuracy, causes the trolley to rub and vibrate on the track, and the equipment shakes greatly, which seriously affects the safety of the ring lifting process. As a large special crane, the nuclear ring crane cannot perform repeated physical experiments to understand the operating characteristics of the whole machine and the changes in operating parameters due to its special working environment, so it is necessary to obtain its operating parameters through a combination of theoretical calculation and simulation.

[0004] In view of this, in order to deal with various problems that may arise during the operation of the automated flipping system and to verify the effectiveness of the automated flipping system control algorithm, it is urgent to develop a method and system for establishing a simulation model of a nuclear ring crane steam generator system. Summary of the invention

[0005] In view of the above problems, the object of the present invention is to provide a method and system for establishing a simulation model of a nuclear hoist steam generator system.

[0006] In order to achieve the above-mentioned object of the invention, in a first aspect, the present invention provides a method for establishing a simulation model of a nuclear ring hanging steam generator system, which comprises the following steps:

[0007] S1. Modeling a dynamic model of a nuclear hoist steam generator system, wherein the nuclear hoist steam generator system comprises a horizontal trolley system and a lifting and lowering system; the horizontal trolley system comprises a trolley travel motor system and a wheel-rail system connected in sequence; the lifting and lowering system comprises a first load system composed of a lifting motor system, a drum system, a hook and a lifting beam connected in sequence, and a second load system composed of a steam generator;

[0008] S2. Use mechanical simulation software to build a simulation physical model of the nuclear ring crane steam generator system;

[0009] S3. Importing a control algorithm for motion control of the automatic flipping of the nuclear ring crane steam generator system into the mechanical simulation software to obtain a simulation model of the nuclear ring crane steam generator system.

[0010] In a preferred embodiment of the method for establishing a simulation model of a nuclear hoist steam generator system of the present invention, the step S1 specifically includes: using the momentum theorem, gear transmission theory, Newton's theorem and adhesion theory to construct a first Lagrangian equation of the torque of the working trolley's travel motor and the position, speed and acceleration of the working trolley, and to construct a second Lagrangian equation of the torque of the installation trolley's travel motor and the position, speed and acceleration of the installation trolley;

[0011] A lifting motor system dynamics model that can describe the relationship between the electric torque input and the angular velocity output of the lifting reducer is constructed; then the functional relationship of the tension change of the wire rope when it is wound into and out of the drum in the drum system is analyzed; and the dynamics models of the first load system and the second load system are established;

[0012] During the flipping process of the steam generator, the rope length L3 between the lifting beam hook and the steam generator lifting ear is fixed, and the total acceleration of the lifting, lowering and walking of the steam generator during the flipping process does not exceed 0.2g, where g is the gravitational acceleration, and the dynamic model of the nuclear ring crane steam generator system is obtained.

[0013] In a second aspect, the present invention provides a nuclear hoist steam generator system simulation model establishment system, which comprises:

[0014] A dynamic model modeling module is used to perform dynamic modeling on a nuclear ring crane steam generator system, wherein the nuclear ring crane steam generator system includes a horizontal trolley system and a lifting and lowering system; the horizontal trolley system includes a trolley travel motor system and a wheel rail system connected in sequence; the lifting and lowering system includes a first load system composed of a lifting motor system, a drum system, a hook and a lifting beam connected in sequence, and a second load system composed of a steam generator;

[0015] A mechanical simulation module, which contains mechanical simulation software and is used to build a simulation physical model of a nuclear hoist steam generator system using the mechanical simulation software;

[0016] A control algorithm module, used to obtain a control algorithm for motion control of the automatic flipping of the nuclear ring crane steam generator system and transmit it to the mechanical simulation module;

[0017] The simulation physical model with the control algorithm is a nuclear hoist steam generator system simulation model.

[0018] In a third aspect, the present invention provides a nuclear ring crane steam generator system simulation model, wherein the simulation model is a nuclear ring crane steam generator system simulation model established using the nuclear ring crane steam generator system simulation model establishment method as described in the first aspect.

[0019] In a fourth aspect, the present invention provides a computer-readable storage medium, comprising instructions, which, when executed on a computer, enable the computer to execute the various steps of the method for establishing a nuclear ring crane steam generator system simulation model as described in the first aspect.

[0020] Compared with the prior art, the present invention firstly models the dynamic model of the nuclear ring crane steam generator system, and specifically analyzes the nuclear ring crane steam generator system from the horizontal trolley system and the lifting and lowering system. The horizontal trolley system includes a trolley travel motor system and a wheel-rail system connected in sequence, and the lifting and lowering system includes a first load system composed of a lifting motor system, a drum system, a hook and a lifting beam connected in sequence, and a second load system composed of a steam generator; based on this division method, the dynamic model of the nuclear ring crane steam generator system is obtained, and then the simulation physical model is determined based on the dynamic model, and the control algorithm for motion control of the automatic flipping of the nuclear ring crane steam generator system is applied to the simulation physical model to obtain the simulation model of the nuclear ring crane steam generator system. By adopting the nuclear ring crane steam generator system simulation model of the present invention, there is no need to provide special training for the staff in advance. The simulation model can be used for specific simulation, and then the staff can implement the replacement of the steam generator of the nuclear ring crane according to the specific simulation situation. There is no need to rely on the naked eye of the staff to judge whether the horizontal trolley and the vertical lifting hook are in the synchronous movement stage. Moreover, through this simulation model, repeated physical experiments can be carried out to understand the operating characteristics of the whole machine and the changes in operating parameters. Practical operation based on the simulation can avoid excessive reliance on the staff, and there will be no problems such as the trolley moving too fast and the lifting being uncoordinated, so that the equipment will not shake significantly, thereby improving the safety of the ring crane process. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The following is a detailed description of the method and system for establishing a simulation model of a nuclear ring hanger steam generator system in conjunction with the accompanying drawings and specific embodiments, wherein:

[0022] Figure 1 The present invention is a flow chart of a method for establishing a simulation model of a nuclear hoist steam generator system.

[0023] Figure 2 This is a simplified diagram of the physical structure of the nuclear ring crane steam generator system.

[0024] Figure 3 This is a schematic diagram of the forces and system division of the nuclear ring crane steam generator system.

[0025] Figure 4 Schematic diagram of the modeling scheme for the dynamic model of the nuclear ring crane steam generator system.

[0026] Figure 5 This is the modeling and simulation scheme diagram of the horizontal trolley system.

[0027] Figure 6 Modeling and simulation scheme diagram for the lifting and lowering system.

[0028] Figure 7 This is a specific flow chart of step S3 in the method for establishing a simulation model of a nuclear hoist steam generator system of the present invention.

[0029] Figure 8 A structural block diagram of the system is established for the nuclear ring hoist steam generator system simulation model of the present invention. DETAILED DESCRIPTION

[0030] In order to make the invention purpose, technical solution and technical effect of the present invention clearer, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods. It should be understood that the specific implementation methods described in this specification are only for explaining the present invention, not for limiting the present invention.

[0031] At present, the main method used by the nuclear ring crane for replacing the steam generator 6 is that the staff in the driver's room respectively perform step-by-step control on the horizontal trolley and the vertical lifting hook to complete the replacement of the steam generator 6. However, this solution has the following defects:

[0032] 1) Special training for staff is required in advance, which requires high training costs and time. The entire replacement process takes a long time. During the replacement process, it is necessary to use the naked eye to judge whether the horizontal trolley and the vertical lifting hook are in the synchronous movement stage. The staff are prone to fatigue and safety cannot be guaranteed;

[0033] 2) Due to the problem of the trolley running too fast and the uncoordinated lifting, the control accuracy is reduced, causing the trolley to rub and vibrate on the track, and the equipment to shake greatly, which seriously affects the safety of the ring lifting process;

[0034] 3) As a large special crane, the nuclear ring crane cannot be subjected to repeated physical experiments to understand the operating characteristics of the whole machine and the changes in operating parameters due to its special working environment.

[0035] To this end, this application provides a method for establishing a simulation model of a nuclear ring crane steam generator system, please refer to Figure 1 As shown, the method for establishing a simulation model of a nuclear ring crane steam generator system includes the following steps:

[0036] S1. Modeling a dynamic model of a nuclear hoist steam generator system. The dynamic model of the nuclear hoist steam generator system includes a horizontal trolley system and a lifting and lowering system. The horizontal trolley system includes a trolley travel motor system and a wheel-rail system connected in sequence. The lifting and lowering system includes a first load system composed of a lifting motor system, a drum system, a hook and a lifting beam connected in sequence, and a second load system composed of a steam generator 6.

[0037] S2. Use mechanical simulation software to build a simulation physical model of the nuclear ring crane steam generator system;

[0038] S3. Importing the control algorithm for motion control of the automatic flipping of the nuclear ring crane steam generator system into the mechanical simulation software to obtain a simulation model of the nuclear ring crane steam generator system.

[0039] According to the above steps, the control algorithm for motion control of the automatic flipping of the nuclear ring crane steam generator system is applied to the simulated physical model of the nuclear ring crane steam generator system, thereby realizing the simulation of the automatic flipping of the nuclear ring crane steam generator 6.

[0040] In this embodiment, a dynamic model of a nuclear ring crane steam generator system is firstly established, and the nuclear ring crane steam generator system is specifically analyzed from a horizontal trolley system and a lifting and lowering system. The horizontal trolley system includes a trolley travel motor system and a wheel-rail system connected in sequence, and the lifting and lowering system includes a first load system composed of a lifting motor system, a drum system, a hook and a lifting beam connected in sequence, and a second load system composed of a steam generator. Based on this division method, a dynamic model of the nuclear ring crane steam generator system is obtained, and then a simulation physical model is determined based on the dynamic model. The control algorithm for motion control of automatic flipping of the nuclear ring crane steam generator system is applied to the simulation physical model to obtain a simulation model of the nuclear ring crane steam generator system. By adopting the nuclear ring crane steam generator system simulation model of the present invention, there is no need to provide special training for the staff in advance. The simulation model can be used for simulation, and then the staff can realize the replacement of the steam generator of the nuclear ring crane according to the simulation. There is no need to rely on the naked eye of the staff to judge whether the horizontal trolley and the vertical lifting hook are in the synchronous movement stage. Moreover, through this simulation model, repeated physical experiments can be carried out to understand the operating characteristics of the whole machine and the changes in operating parameters. According to the optimal simulation results of multiple tests, a control algorithm can also be used to achieve precise control of the trolley movement and lifting, and the problems of the trolley moving too fast and lifting uncoordinated will not occur, thereby improving the safety of the ring lifting process.

[0041] The entire method of establishing the nuclear ring crane steam generator system simulation model is described in detail below.

[0042] Here, the physical structure and working principle of the nuclear ring crane steam generator system that can realize the automatic flipping of the steam generator 6 are analyzed. According to the form of the input driving torque, the nuclear ring crane steam generator system (referred to as the ring crane system) is decoupled into a horizontal trolley system and a lifting and lowering system.

[0043] In the existing nuclear hoist steam generator system, the physical structure is shown in Figure 2 As shown, it includes but is not limited to: rail beam, working trolley (217t working trolley 10), installation trolley (190t installation trolley 30), lifting mechanism corresponding to the working trolley (217t lifting mechanism 20), lifting mechanism corresponding to the installation trolley (190t lifting mechanism 40), auxiliary lifting mechanism (10t auxiliary lifting mechanism), lifting beam (396t lifting beam 50), and load steam generator 6. The lifting beam is referred to as a combined lifting beam, which is a lifting beam connected to the lifting mechanism corresponding to the working trolley and the lifting mechanism corresponding to the installation trolley. A hook is provided under the lifting beam, and the hook lifts the steam generator 6 through a steel wire rope. Both the 217t lifting mechanism and the 190t lifting mechanism include a pulley block.

[0044] See also Figure 3 and Figure 4As shown in the figure, in the whole nuclear ring crane steam generator system, according to the mutual motion relationship and the division of the actuators, the nuclear ring crane steam generator system is divided into a horizontal trolley system and a lifting and lowering system. The working trolley and the installation trolley in the horizontal system are respectively x1 ,F x2 At the same time, in the lifting and lowering system, the drum installed on the double trolley system generates a pulling force F under the action of the motor subsystem. L1 ,F L2 , so that the steel wire rope with a vertical length of H (the total length of the steel wire rope projected in the vertical direction, that is, the vertical length of the steel wire rope between the steel wire rope at the lifting mechanism and the steam generator 6) moves upward, and the load system suspended by the steel wire rope under the drum includes a first load system connected by a hook and a combined lifting beam, and a second load system of the steam generator 6. Under the tension of the steel wire rope, the entire system completes the automatic flipping of the steam generator 6.

[0045] The input of the horizontal trolley system is the driving torque of the trolley driving motor, and the output is the speed and position information x of the horizontal system working trolley and the installation trolley. The input of the lifting and lowering system is the driving torque of the winch motor, and the output is the height change y, x of the steam generator 6 lifting lug. 2 +y 2 =R 2 , R is the distance between the steam generator 6 flip support trunnion and the steam generator 6 lifting lug, and the overall dynamic model modeling scheme is as follows Figure 4 Based on the dynamic modeling scheme of the driving torque of the motor in the horizontal trolley system and the position information of the trolley, and the driving torque of the motor in the lifting and lowering system and the lifting and lowering height of the lifting lug of the steam generator 6, the horizontal trolley system and the lifting and lowering system are coupled according to the angle change of the wire rope.

[0046] The trolley driving motor system includes a rotor system, a coupling, a corresponding reducer and a gear system. The wheel-rail system includes a working trolley, an installation trolley, a rail beam, and a steam generator 6. The specific process of obtaining the above position x is as follows: the horizontal trolley system input is the horizontal system motor driving torque (driving torque of the trolley driving motor), which passes through the trolley driving motor system, and then the angular velocity after the corresponding reducer (the reducer in this article is also called a reduction mechanism) is input to the wheel-rail system, and finally the position information x of the working trolley and the installation trolley is output.

[0047] When the nuclear ring crane is used to flip the main equipment (steam generator 6), the ring crane trolley is fixed, the 217T working trolley 10 and the 190T installation trolley 30 move horizontally on the main beam, and the 217T lifting mechanism 20 and the 190T lifting mechanism 40 move vertically upward. Taking the main equipment as the research object, when the main equipment is flipped, it moves in a circle with the flip support ear axis o as the center and the distance R between the flip support ear axis and the lifting ear as the radius. The flip angle of the main equipment is α. At the same time, affected by the movement of the trolley, the wire rope will produce a deflection angle θ.

[0048] Therefore, the nuclear ring crane steam generator system includes a horizontal trolley system and a lifting and lowering system. The horizontal trolley system includes a trolley travel motor system and a wheel rail system, and the trolley travel motor system is connected to the wheel rail system. The lifting and lowering system includes a lifting motor system, a drum system, a first load system composed of a hook and a lifting beam, and a second load system composed of a steam generator 6, and the lifting motor system, the drum system, the first load system and the second load system are connected in sequence. The dynamic modeling of the nuclear ring crane steam generator system includes: respectively performing dynamic modeling on the trolley travel motor system, the wheel rail system, the lifting motor system, the drum system, the first load system, and the second load system; and then performing dynamic modeling on the nuclear ring crane steam generator system.

[0049] In the theoretical modeling of the nuclear hoist steam generator system model, some assumptions and simplified conditions involved are as follows:

[0050] There is no resistance between the stator and the rotor;

[0051] Ignore gear transmission failure;

[0052] The magnetic circuit is not saturated, and eddy current and hysteresis losses are not considered;

[0053] The 217T working trolley 10 and the 190T installation trolley 30 are rigidly connected;

[0054] The wire rope deflection angle changes in a consistent time sequence during the movement;

[0055] There is no relative sliding between the wire rope and the drum, which can ensure that the material speed of the wire rope and the contact part of the drum is the same.

[0056] There is no relative sliding between the wire rope and the pulley, which ensures that the speed of the wire rope and the pulley hook group is the same at the contact part;

[0057] Since the mass of the wire rope is smaller than that of the main equipment and the joint lifting beam, the mass of the wire rope is ignored in the modeling process;

[0058] The wire rope does not undergo elastic deformation during the flipping process;

[0059] During the automatic flipping process, air resistance and wind force are ignored;

[0060] The hook of the lifting and lowering system (located on the lower side of the lifting beam) is treated as a whole with the lifting beam during movement, and its mass is m3;

[0061] Ignoring the flexibility of the wire rope, the wire rope at the hook of the lifting beam and the lifting lug of the steam generator 6 remains in a vertical state, and the length L3 of the wire rope at the hook of the lifting beam and the lifting lug of the steam generator 6 will not change during the entire automatic flipping process;

[0062] The mass of the steam generator 6 is evenly distributed, and its center of mass is the same as its center of gravity, and is distributed at the geometric center of the equipment.

[0063] In the process of dynamic modeling of the horizontal trolley system, the momentum theorem is used to construct the relationship between the motor output torque and various torques, and the relationship between the trolley driving motor system and the wheels is analyzed through the gear transmission theory. For the wheel-rail system, it is necessary not only to use Newton's law to analyze the force of the trolley system, but also to consider the interaction between the trolley wheels and the rail beams, and finally establish the state equations of the trolley driving motor system and the wheel-rail system. Its modeling and simulation design scheme is as follows Figure 5 shown.

[0064] The horizontal trolley system is decoupled into a trolley motor system and a wheel-rail system connected in sequence. The state equations of the output shaft end and the wheel-rail end of the trolley motor system are constructed by using the momentum theorem, gear transmission theory, Newton's theorem, adhesion theory, and D'Alembert principle. With the help of the Lagrangian equation, the dynamic equations of the trolley motor torque and the trolley position, velocity, and acceleration are constructed. The first Lagrangian equation of the working trolley is obtained as follows:

[0065]

[0066] Similarly, the second Lagrange equation for installing the trolley is:

[0067]

[0068] Wherein, m1 represents the mass of the working trolley, m2 represents the mass of the installation trolley, m3 represents the mass of the lifting beam and the hook, m4 represents the mass of the steam generator 6, L1 represents the length of the steel wire rope between the working trolley and the lifting beam, L2 represents the length of the steel wire rope between the installation trolley and the lifting beam, θ represents the deflection angle of the steel wire rope (between the trolley and the lifting beam) about the vertical direction. In this embodiment, it is assumed that the lifting speeds of the two lifting mechanisms are consistent, so the lifting beam remains horizontal, and the angles between the steel wire ropes of the two lifting mechanisms and the vertical direction are consistent, both of which are θ; L 蒸 represents the length of the steam generator 6, α represents the turning angle of the steam generator 6, and F x1Indicates the driving torque of the work carriage in the x direction, F x2 Indicates the driving torque of the installation trolley in the x direction, x1 indicates (F x1 The x-axis coordinate change value of the working trolley caused by the action, x2 represents (F x2 The x-axis coordinate change value of the installation trolley caused by the action, the movement direction of the lifting hook is not perpendicular to the initial travel direction of the trolley, the x-axis is parallel to the horizontal plane, and μ represents the friction coefficient, that is, the horizontal friction coefficient between the working trolley and the installation trolley and the horizontal rail when traveling.

[0069] The theoretical modeling of the horizontal trolley system takes into account the tiny relative sliding and rolling friction between the contact surfaces of the wheels and the rail beams, which can more finely represent the dynamic characteristics of the real system; the drive systems of the working trolley and the installation trolley are combined with the kinematic equations of the system, and the Lagrangian equations of the horizontal trolley system are constructed by adding them together, which can accurately describe the working state of the system and control the movement process of the system.

[0070] By analyzing the physical structure of the lifting and lowering system and combining the drive transmission form of the system, the system is divided into four subsystems. Using the momentum principle, Newton's theorem and Lagrange equation, a mathematical model of the nuclear ring crane lifting and lowering system is established, including: lifting motor system model, drum system model, first load system model and second load system model.

[0071] According to the transmission sequence of the lifting and lowering system drive input, the input of the system is the lifting and lowering system motor driving torque. After passing through the lifting motor system model, the angular velocity after the reducer is converted into wire rope tension and transmitted to the first load system system model. In the second load system system model connected by the first load system system model, mathematical models are established for each subsystem respectively to obtain the mathematical model of the entire lifting and lowering system. Specifically, the momentum principle, gear transmission theory, force analysis, Newton's law, Lagrange equation, lever principle, etc. are used to obtain the wire rope model dynamics model. Its modeling and simulation design scheme is as follows Figure 6 shown.

[0072] Starting from the lifting motor system model, the lifting motor system model was constructed to describe the relationship between the electric torque input and the angular velocity output of the reducer; then the tension change function relationship of the wire rope when winding in and out of the drum was analyzed in the drum system, and finally, the Lagrange equation was used to establish the dynamic model of the first load system model and the second load system model from the perspective of the total energy of the system. The theoretical model of the lifting and lowering system established is as follows:

[0073] The third Lagrangian equation of the first load system is:

[0074]

[0075] The fourth Lagrangian equation of the first load system is:

[0076]

[0077] For the drum system, the functional relationship of the tension change of the wire rope when it is wound into and out of the drum is calculated, and the fifth Lagrange equation of the wire rope is obtained as follows:

[0078]

[0079] The sixth Lagrange equation of the second load system is:

[0080]

[0081] Among them, L 初 Indicates the initial length of the wire rope between the installation trolley, the working trolley and the lifting beam, F L1 Indicates the hook force of the lifting mechanism corresponding to the working trolley, F L2 It represents the force on the hook of the lifting mechanism corresponding to the installation trolley, L3 represents the length of the wire rope between the hook of the lifting beam and the lifting ear of the steam generator 6, and g represents the acceleration of gravity.

[0082] This embodiment starts from the lifting motor system of the lifting mechanism, constructs a model of the lifting motor system, describes the driving torque input of the lifting motor and the angular velocity of the drum output through the reducer, and the mathematical model of the torque provides a refined description method for controlling the uniform speed and acceleration of the lifting mechanism; for the drum system, the functional relationship of the tension change of the wire rope when it is wound in and out of the drum is given; using the Lagrange equation, the first load system and the second load system are constructed, and by analyzing the kinetic energy and potential energy, the motion equation of the lifting motor system is established.

[0083] For the convenience of analysis, during the turning process of the steam generator 6, the rope length L3 between the lifting beam hook and the lifting ear of the steam generator 6 is fixed, that is, And the total acceleration of the lifting / lowering and walking of the steam generator 6 at any time during the flipping process should not exceed 0.2g, so the swing angle of the wire rope is very small and can be approximately transformed. Therefore, the simplified dynamic model of the nuclear ring crane steam generator system can be obtained as follows:

[0084]

[0085]

[0086] Indicates the positive pressure when the working trolley operates on the horizontal rail. Indicates the positive pressure when the trolley is installed and running on the horizontal rail.

[0087] Let q = [x1 x2 L1 L2θα] T , then the dynamic equation (7) of the entire ring hanging system can be rewritten as:

[0088]

[0089] Where q∈R 6 represents the state quantity of the nuclear ring crane steam generator system, b represents the control quantity gain of the nuclear ring crane steam generator system, F∈R 6 , M(q) is the inertia matrix, is the centripetal-Coriolis force matrix, is the gravity factor, G(q) is the friction matrix, F d is the uncertain disturbance quantity of the nuclear ring hanging steam generator system, that is, the friction force of the system, F is the control quantity of the nuclear ring hanging steam generator system, M(q), G(q), F and F d The specific form is:

[0090]

[0091]

[0092] Through the above model, the entire dynamic model of the nuclear ring crane steam generator system is established.

[0093] According to the established dynamic model of the nuclear ring crane steam generator system, a simulation physical model of the nuclear ring crane steam generator system is built using mechanical simulation software.

[0094] Specifically, the Simscape Multibody software was used to perform dynamic simulation to simulate the operation of the nuclear ring crane steam generator system under actual working conditions. A simulation physical model was built based on the Simscape Multibody software platform to verify the effectiveness of the established dynamic model.

[0095] Simscape Multibody itself has certain 3D modeling capabilities. However, it is difficult to fully utilize Simscape Multibody to model large lifting machinery with complex shapes and structures such as nuclear ring cranes. Therefore, the specialized 3D modeling software SoildWorks is used to complete the 3D model of the nuclear ring crane steam generator system, and then the model is transferred back to Simscape Multibody.

[0096] In order to facilitate the subsequent analysis, modeling in SoildWorks follows the following principles:

[0097] The established model is the main structure of the nuclear ring crane steam generator system, such as the bridge, trolley, etc., and simplified processing is adopted for the components that do not affect the overall kinematic characteristics, such as the main and auxiliary lifting mechanisms;

[0098] Parts with relative motion should be modeled separately, such as the trolley running wheels, horizontal guide wheels, etc.

[0099] For structures on the main structure that do not affect the dynamic simulation analysis, such as guardrails, lifting ears, etc., the principle of omission is adopted.

[0100] Based on the above principles, the constructed structural model was finally imported into Simscape Multibody for simulation using the data sharing interface between SoildWorks and Simscape Multibody to obtain the simulation model of the nuclear ring crane steam generator system.

[0101] In the process of building a model in Simscape Multibody, the components, constraints, contact forces, and frictions involved are shown in Tables 1 to 3 below.

[0102] Table 1 Components in Simscape Multibody model

[0103]

[0104]

[0105] Table 2 Constraints defined in the simulation model of the nuclear ring hoist steam generator system

[0106]

[0107] Table 3 Contact force and friction parameters

[0108]

[0109] See also Figure 5 and Figure 6 As shown, during the model building process, the constraints of the horizontal trolley system include trolley synchronization and balance equations; the boundary conditions of the lifting and lowering system include: rated conditions of lifting motor parameters, drum motion, and various equations of the lifting and lowering system.

[0110] In addition, since there are many flexible parts involved in the ring suspension system, it is necessary to establish relevant flexible parts on the simulation platform, such as flexible beams and flexible steel cables.

[0111] After building the simulation physical model of the nuclear ring crane steam generator system based on Simscape, MATLABSimulinkSimscape joint simulation was carried out. Simulink is a visual simulation tool in MATLAB. Simscape has a two-way interface with CAD and Matlab Simulink, so it can well realize the simulation verification of the control algorithm. It is very beneficial for adjusting the control algorithm parameters and verifying the model.

[0112] Using Matlab Simulink Simscape software, the system parameters of the simulation model were designed according to the real nuclear ring crane mechanism, and the corresponding constraints and component connection methods as well as the relative motion methods of each structure were defined. Finally, through the interface between the dynamic simulation software Simscape and MATLAB, the control algorithm was imported into the interface of MATLAB to complete the establishment of the simulation model of the nuclear ring crane steam generator system. At this point, the motion control of the virtual model of the automatic flipping state space of the nuclear ring crane steam generator system can be carried out. By adjusting parameters and control strategies, effective control of the simulation model can be achieved, providing an effective solution for the automatic control of the physical model.

[0113] It can be understood that the control algorithm includes the step of searching for initial values ​​of the nuclear hoist steam generator system.

[0114] In this embodiment, step three also includes a step of verifying the model, specifically including:

[0115] The simulation analysis is performed using the nuclear ring crane steam generator system simulation model to obtain the simulation analysis results, and the simulation analysis results are compared with the actual operation results of the nuclear ring crane steam generator system to obtain the comparison results. If the comparison results meet the preset requirements, the nuclear ring crane steam generator system simulation model is verified and can be put into use. Otherwise, the nuclear ring crane steam generator system simulation model is optimized.

[0116] In this embodiment, step three also includes the step of optimizing the nuclear ring hanger steam generator system simulation model. The optimization step may be before, during or after the model verification step, and is not limited here.

[0117] The steps of optimizing the simulation model of the nuclear ring crane steam generator system are: performing simulation analysis to obtain simulation analysis results, comparing the simulation analysis results with the actual operation results of the nuclear ring crane steam generator system, and optimizing the simulation model of the nuclear ring crane steam generator system according to the comparison results.

[0118] It can be understood that the optimization steps may be to first perform rough optimization, then perform component optimization, and finally perform fine optimization.

[0119] In a preferred embodiment, see Figure 7As shown, the process of step S3 is as follows:

[0120] S301, importing a control algorithm for motion control of automatic flipping of a nuclear ring crane steam generator system into a mechanical simulation software;

[0121] S302, applying kinematic pairs, operating constraints and kinematic loads to the simulation physical model;

[0122] S303, setting output data of the simulation physical model;

[0123] S304, performing simulation analysis, i.e. inputting experimental data, adding experimental data curves, and performing simulation analysis to obtain experimental results through control algorithms;

[0124] S305, if the experimental result is consistent with the theoretical result, proceed to S306;

[0125] If the experimental results are inconsistent with the theoretical results, the simulation physical model parameters are checked, the load parameters are improved, the control parameters are modified, and the process returns to S304;

[0126] S306, setting variable parameter points, defining variables, and preliminarily obtaining a nuclear ring crane steam generator system simulation model;

[0127] S307. Obtain the finalized simulation model of the nuclear ring crane steam generator system: conduct research on major influencing factors, conduct experimental design research, and conduct simulation model optimization research to obtain the finalized simulation model of the nuclear ring crane steam generator system.

[0128] The method for establishing a simulation model of a nuclear hoist steam generator system of the present invention takes into account the tiny relative sliding and rolling friction between the contact surface of the wheel and the rail beam, and can more finely represent the dynamic characteristics of the real system. The drive system of the working trolley and the installation trolley is combined with the kinematic equation of the system to construct the Lagrange equation of the horizontal motion system, which can accurately describe the working state of the system and control the motion process of the system. Starting from the motor of the lifting mechanism, the present invention constructs a model of the lifting motor system, describes the mathematical model of the motor's driving torque input and the drum angular velocity and torque output by the lifting reducer, and provides a refined description method for controlling the uniform speed and acceleration of the lifting mechanism. For the drum system, the functional relationship of the tension change when the wire rope is wound in and out of the drum is given; using the Lagrange equation, the first load system and the second load system are constructed by analyzing the kinetic energy and potential energy. Based on this, the motion equation of the entire nuclear hoist steam generator system is established, and a simulation physical model is built based on the dynamic model, and then combined with the control algorithm to obtain a simulation model of the nuclear hoist steam generator system.

[0129] See also Figure 8As shown, the present invention provides a nuclear hoist steam generator system simulation model establishment system, which includes a dynamic model building module, a mechanical simulation module and a control algorithm module, wherein:

[0130] The dynamic model modeling module is used to model the dynamic model of the nuclear ring crane steam generator system. The nuclear ring crane steam generator system includes a horizontal trolley system and a lifting and lowering system; the horizontal trolley system includes a trolley travel motor system and a wheel rail system connected in sequence; the lifting and lowering system includes a first load system composed of a lifting motor system, a drum system, a hook and a lifting beam connected in sequence, and a second load system composed of a steam generator;

[0131] A mechanical simulation module, which contains mechanical simulation software and is used to build a simulation physical model of a nuclear hoist steam generator system using the mechanical simulation software;

[0132] The control algorithm module is used to obtain the control algorithm for motion control of the automatic flipping of the nuclear ring crane steam generator system and transmit it to the mechanical simulation module.

[0133] The simulation physical model with control algorithm is the nuclear ring crane steam generator system simulation model.

[0134] The present invention also provides a nuclear ring crane steam generator system simulation model, which is a nuclear ring crane steam generator system simulation model established by using the nuclear ring crane steam generator system simulation model establishment method of any of the above embodiments.

[0135] The present invention also provides a computer-readable storage medium including instructions, which, when executed on a computer, enable the computer to execute each step of the method for establishing a simulation model of a nuclear ring crane steam generator system in any of the above embodiments.

[0136] It should be noted that in the above embodiments, the description of each embodiment has its own emphasis, and for parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0137] According to the above principles, the present invention can also make appropriate changes and modifications to the above embodiments. Therefore, the present invention is not limited to the specific embodiments disclosed and described above, and some modifications and changes to the present invention should also fall within the scope of protection of the claims of the present invention. In addition, although some specific terms are used in this specification, these terms are only for the convenience of description and do not constitute any limitation to the present invention.

Claims

1. A method for establishing a simulation model of a nuclear hoist steam generator system, characterized in that: The following steps are involved: S1. Modeling a dynamic model of a nuclear hoist steam generator system, wherein the nuclear hoist steam generator system comprises a horizontal trolley system and a lifting and lowering system; the horizontal trolley system comprises a trolley travel motor system and a wheel-rail system connected in sequence; the lifting and lowering system comprises a first load system composed of a lifting motor system, a drum system, a hook and a lifting beam connected in sequence, and a second load system composed of a steam generator; S2. Use mechanical simulation software to build a simulation physical model of the nuclear ring crane steam generator system; S3. Importing a control algorithm for motion control of the automatic flipping of the nuclear ring crane steam generator system into the mechanical simulation software to obtain a simulation model of the nuclear ring crane steam generator system.

2. The method for establishing a simulation model of a nuclear ring crane steam generator system according to claim 1, characterized in that: The step S1 specifically includes: Using the momentum theorem, gear transmission theory, Newton's theorem and adhesion theory, the first Lagrangian equation of the working trolley's driving motor torque and the working trolley's position, speed and acceleration is constructed, and the second Lagrangian equation of the installation trolley's driving motor torque and the installation trolley's position, speed and acceleration is constructed; A lifting motor system dynamics model that can describe the relationship between the electric torque input and the angular velocity output of the lifting reducer is constructed; then the functional relationship of the tension change of the wire rope when it is wound into and out of the drum in the drum system is analyzed; and the dynamics models of the first load system and the second load system are established; During the flipping process of the steam generator, the rope length L3 between the lifting beam hook and the steam generator lifting ear is fixed, and the total acceleration of the lifting, lowering and walking of the steam generator during the flipping process does not exceed 0.2g, where g is the gravitational acceleration, and the dynamic model of the nuclear ring crane steam generator system is obtained.

3. The method for establishing a simulation model of a nuclear ring crane steam generator system according to claim 2, characterized in that: The first Lagrangian equation of the working vehicle is: The second Lagrangian equation for the installation trolley is: Where m1 represents the mass of the working trolley, m2 represents the mass of the installation trolley, m3 represents the mass of the lifting beam and hook, m4 represents the mass of the steam generator, L1 represents the length of the wire rope between the working trolley and the lifting beam, θ represents the deflection angle of the wire rope about the vertical direction, L 蒸 represents the length of the steam generator, α represents the flip angle of the steam generator, represents the driving torque of the working trolley in the x direction, It represents the driving torque of the installation trolley in the x direction, x1 represents the x-axis coordinate change value of the working trolley, x2 represents the x-axis coordinate change value of the installation trolley, the movement direction of the lifting hook is not perpendicular to the initial travel direction of the trolley, the x-axis is parallel to the horizontal plane, and μ represents the friction coefficient.

4. The method for establishing a simulation model of a nuclear ring crane steam generator system according to claim 3, characterized in that: The dynamic models of the first load system and the second load system include a third Lagrangian equation of the first load system, a fourth Lagrangian equation of the first load system, and a sixth Lagrangian equation of the second load system; The third Lagrangian equation of the first load system is: The fourth Lagrangian equation of the first load system is: The functional relationship of the tension change of the wire rope when winding in and out of the drum is the fifth Lagrange equation of the wire rope, which is: The sixth Lagrangian equation of the second load system is: Where m1 represents the mass of the working trolley, m2 represents the mass of the installation trolley, m3 represents the mass of the lifting beam and hook, m4 represents the mass of the steam generator, L1 represents the length of the wire rope between the working trolley and the lifting beam, θ represents the deflection angle of the wire rope about the vertical direction, L 蒸 represents the length of the steam generator, α represents the flip angle of the steam generator, represents the driving torque of the working trolley in the x direction, represents the driving torque of the installation trolley in the x direction, x1 represents the x-axis coordinate change value of the working trolley, x2 represents the x-axis coordinate change value of the installation trolley, the movement direction of the lifting hook is not perpendicular to the initial travel direction of the trolley, the x-axis is parallel to the horizontal plane, μ represents the friction coefficient, L 初 Indicates the initial length of the wire rope between the installation trolley, the working trolley and the lifting beam. Indicates the force on the hook of the lifting mechanism corresponding to the working trolley. It indicates the force on the hook of the lifting mechanism corresponding to the installation trolley, and g indicates the acceleration of gravity.

5. The method for establishing a simulation model of a nuclear ring crane steam generator system according to claim 2, characterized in that: The dynamic model of the nuclear ring hanging steam generator system obtained in step S1 is: Where, q = [x1 x2 L1 L2θα] T ∈R 6 represents the state quantity of the nuclear ring crane steam generator system, b represents the control quantity gain of the nuclear ring crane steam generator system, M(q) is the inertia matrix, is the centripetal-Coriolis force matrix, is the gravity factor, G(q) is the friction matrix, F d is the uncertain disturbance quantity of the nuclear ring hanging steam generator system, F is the control quantity of the nuclear ring hanging steam generator system, M(q), G(q), F and F d The specific form is: Where m1 represents the mass of the working trolley, m2 represents the mass of the installation trolley, m3 represents the mass of the lifting beam and hook, m4 represents the mass of the steam generator, L1 represents the length of the wire rope between the working trolley and the lifting beam, θ represents the deflection angle of the wire rope about the vertical direction, L 蒸 represents the length of the steam generator, α represents the flip angle of the steam generator, represents the driving torque of the working trolley in the x direction, represents the driving torque of the installation trolley in the x direction, x1 represents the x-axis coordinate change value of the working trolley, x2 represents the x-axis coordinate change value of the installation trolley, the movement direction of the lifting hook is not perpendicular to the initial travel direction of the trolley, the x-axis is parallel to the horizontal plane, μ represents the friction coefficient, g represents the acceleration of gravity, L 初 Indicates the initial length of the wire rope between the installation trolley, the working trolley and the lifting beam. Indicates the force on the hook of the lifting mechanism corresponding to the working trolley. It indicates the force on the hook of the lifting mechanism corresponding to the installation trolley, L3 indicates the length of the wire rope between the lifting beam hook and the steam generator lifting lug, g indicates the acceleration of gravity, Indicates the positive pressure when the working trolley operates on the horizontal rail, F N2 Indicates the positive pressure when the trolley is installed and running on the horizontal rail.

6. The method for establishing a simulation model of a nuclear hoist steam generator system according to claim 1, characterized in that: The mechanical simulation software uses Simscape Multibody, and the step S2 specifically includes: using SoildWorks to perform structural modeling, importing Simscape Multibody to perform simulation, and obtaining a simulation physical model of the nuclear ring hanger steam generator system.

7. The method for establishing a simulation model of a nuclear hoist steam generator system according to claim 1, characterized in that: It also includes steps to validate the model: The simulation analysis is performed using the nuclear ring crane steam generator system simulation model to obtain simulation analysis results; the simulation analysis results are compared with the actual operation results of the nuclear ring crane steam generator system, and the nuclear ring crane steam generator system simulation model is verified and / or optimized based on the comparison results.

8. The method for establishing a simulation model of a nuclear hoist steam generator system according to claim 7, characterized in that: The method also includes the step of optimizing the nuclear ring hanger steam generator system simulation model, wherein the optimization step is before, during or after the step of verifying the model.

9. The method for establishing a simulation model of a nuclear hoist steam generator system according to claim 8, characterized in that: The step of optimizing the nuclear ring crane steam generator system simulation model includes: performing simulation analysis to obtain simulation analysis results, comparing the simulation analysis results with actual operation results of the nuclear ring crane steam generator system, and optimizing the nuclear ring crane steam generator system simulation model according to the comparison results.

10. The method for establishing a simulation model of a nuclear hoist steam generator system according to claim 1, characterized in that: The step S2 specifically includes: S301, importing a control algorithm for motion control of automatic flipping of a nuclear ring crane steam generator system into the mechanical simulation software; S302, applying kinematic pairs, operating constraints and kinematic loads to the simulation physical model; S303, setting output data of the simulation physical model; S304, input experimental data, add experimental data curves, and perform simulation analysis through control algorithms to obtain experimental results; S305. If the experimental result is consistent with the theoretical result, proceed to S306; If the experimental results are inconsistent with the theoretical results, the simulation physical model parameters are checked, the load parameters are improved, the control parameters are modified, and the process returns to S304; S306, setting variable parameter points and defining variables; S307. Obtain a finalized nuclear ring crane steam generator system simulation model.

11. A nuclear hoist steam generator system simulation model establishment system, characterized in that: include: A dynamic model modeling module is used to perform dynamic modeling on a nuclear ring crane steam generator system, wherein the nuclear ring crane steam generator system includes a horizontal trolley system and a lifting and lowering system; the horizontal trolley system includes a trolley travel motor system and a wheel rail system connected in sequence; the lifting and lowering system includes a first load system composed of a lifting motor system, a drum system, a hook and a lifting beam connected in sequence, and a second load system composed of a steam generator; A mechanical simulation module, which contains mechanical simulation software and is used to build a simulation physical model of a nuclear hoist steam generator system using the mechanical simulation software; A control algorithm module, used to obtain a control algorithm for motion control of the automatic flipping of the nuclear ring crane steam generator system and transmit it to the mechanical simulation module; The simulation physical model with the control algorithm is a nuclear hoist steam generator system simulation model.

12. A nuclear hoist steam generator system simulation model, characterized in that: The simulation model is a nuclear ring crane steam generator system simulation model established by using the nuclear ring crane steam generator system simulation model establishment method described in any one of claims 1 to 10.

Citation Information

Cited By

  • Simulation model establishment method and system for nuclear polar crane steam generator system

    WO2026020682A1