Emergency management method and system based on hydropower station production
Through big data analysis, intelligent scheduling algorithms and blockchain technology, an immersive drill environment is created, which solves the problems of insufficient utilization of multi-source data and inefficient emergency resource scheduling in hydropower station emergency management, and realizes efficient and intelligent emergency resource management. Improved emergency response capabilities.
Patent Information
- Application Number
- CN202410849052.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-27
- Publication Date
- 2024-11-15
AI Technical Summary
In the existing emergency management methods of hydropower stations, the use of multi-source data is insufficient, the emergency resource dispatch is not efficient, and the emergency drills are lacking in intelligence, so it is impossible to effectively respond to emergencies.
Using big data analysis and prediction models, intelligent scheduling algorithms and blockchain technology, we create an immersive drill environment, and optimize emergency resource allocation and management through multi-source data integration and virtual drill simulation.
It improves the efficiency and reliability of emergency management of hydropower stations, adjusts the allocation of emergency resources in real time, optimizes response time and results, ensures data transparency and safety, and enhances emergency response capabilities.
Smart Images

Figure CN118966593A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of emergency management of hydropower stations, and in particular to an emergency management method and system based on production of hydropower stations. Background Art
[0002] With the rapid development of society and the continuous expansion of the scale of hydropower stations, the position of hydropower stations in energy production is becoming more and more important. However, the operating environment of hydropower stations is complex and is affected by many factors such as geological environment, meteorological conditions, equipment status, etc. This puts higher requirements on the emergency management of hydropower stations. Effective emergency management methods can not only ensure the safe operation of hydropower stations, but also improve their ability to respond to emergencies and ensure the stability of power supply.
[0003] The existing technology has many shortcomings in the emergency management of hydropower stations, such as the inability to fully utilize multi-source data for comprehensive analysis and prediction and the lack of efficient emergency resource scheduling means, and the lack of intelligent support in emergency drills and practical applications. The present invention innovatively solves the above problems by introducing big data analysis, intelligent scheduling algorithms, blockchain technology and virtual drill environments, and provides a systematic, intelligent and efficient emergency management method for hydropower stations. Summary of the invention
[0004] In view of the problems existing in the existing emergency management methods and systems based on hydropower station production, the present invention is proposed.
[0005] Therefore, the purpose of the present invention is to provide an emergency management method and system based on hydropower station production. Aiming at the defects of the prior art in insufficient utilization of multi-source data, inefficient emergency resource scheduling, and lack of intelligence in emergency drills, the present invention adopts big data analysis, intelligent scheduling algorithms, blockchain technology and virtual drill environments to solve them.
[0006] In order to solve the above technical problems, the present invention provides the following technical solutions:
[0007] In a first aspect, an embodiment of the present invention provides an emergency management method based on hydropower station production, which includes analyzing the emergency management needs of the hydropower station, obtaining emergency resources of the hydropower station, and creating an immersive exercise environment for the emergency resources of the hydropower station;
[0008] Introducing big data analysis and prediction models into the immersive exercise environment, testing the immersive exercise environment, and using intelligent scheduling algorithms to adjust the emergency resources of hydropower stations in the immersive exercise environment;
[0009] Design a cross-platform mobile application to integrate the adjusted emergency resources of the hydropower station, obtain multi-source data of the hydropower station's emergency resources, use blockchain technology to drill the multi-source data, and establish an emergency handling management plan based on the drill results.
[0010] As a preferred solution of the emergency management method based on hydropower station production described in the present invention, the analysis of the emergency management needs of the hydropower station includes evaluating the geological environment, meteorological conditions, equipment status and staffing of the hydropower station, establishing an evaluation hierarchy model, constructing a judgment matrix, introducing a consistency index to calculate the consistency ratio of the judgment matrix,
[0011] The assessment of the geological environment of the hydropower station includes collecting geological data, constructing a geological model based on the collected geological data, and assessing geological risks based on the geological model; the geological data includes rock layer structure, fault distribution and soil type, the construction of the geological model includes constructing a three-dimensional model of the geological environment using a geographic information system GIS and three-dimensional modeling technology, and the assessment of geological risks includes simulating the probability of disaster occurrence and the scope of influence of the geological model by a finite element analysis method, and the calculation formula of the finite element analysis method is:
[0012] σ=D·∈
[0013] Among them, σ represents the stress tensor, ∈ represents the strain tensor, and D represents the elastic matrix of the material.
[0014] As a preferred solution of the emergency management method based on hydropower station production described in the present invention, the meteorological conditions include rainfall, temperature and wind speed, and the prediction trend of the geological model is calculated using time series. The specific calculation formula is:
[0015]
[0016] Among them, y t represents time series data, ∈ t represents the error term, α0 represents the constant term, α i represents the autoregressive coefficient, β j represents the sliding mean coefficient, ∈ t-j represents the lagged error term, y t-i represents lagged time series data;
[0017] The equipment status includes collecting the operating status data of the hydropower station equipment through the Internet of Things technology, using the deep learning LSTM network to evaluate and predict the health status of the hydropower station equipment, and estimating the failure risk of the hydropower station equipment. The deep learning LSTM network includes an input gate, a forget gate, an output gate and a hydropower station data status update. The specific calculation formula of the input gate is:
[0018] i t =σ(W xi x t +W hi h t-1 +b i )
[0019] Among them, i t represents the input gate activation value, σ represents the stress tensor, W xi and W hi represents the weight matrix, b i represents the bias vector, x t Represents input data;
[0020] The specific calculation formula of the forget gate is:
[0021] f t =σ(W xf x t +W hf h t-1 +b f )
[0022] Among them, f t represents the activation value of the forget gate, σ represents the stress tensor, W xf represents the weight matrix input to the forget gate, x t represents the input data, W hf represents the weight matrix from the hidden state to the forget gate, b f Represents the bias vector of the forget gate;
[0023] The specific calculation formula of the output gate is:
[0024] o t =σ(W xo x t +W ho h t-1 +b o )
[0025] Among them, t represents the output gate activation value, σ represents the stress tensor, W xo represents the weight matrix from input to output gate, x t represents input data, h t-1 represents the hidden state at the previous time point, W ho represents the weight matrix from the hidden state to the output gate, b o Represents the bias vector of the output gate.
[0026] As a preferred solution of the emergency management method based on hydropower station production described in the present invention, the hydropower station data status update includes transmitting the hydropower station data through the input gate and the forget gate to the candidate area for updating. The specific update calculation formula is:
[0027] C t =f t ⊙C t-1 +i t⊙tanh(W xC x t +W hC h t-1 +b C )
[0028] Among them, C t represents the data update status of the hydropower station at time point t, ⊙ represents the element product, tanh(W xC x t +W hC h t-1 +b C ) represents the candidate region, b C represents the bias vector, C t-1 represents the data update status of the hydropower station at time point t-1, i t represents the input gate activation value, W hC Represents the weight matrix from hidden state to candidate region state update, W xC Represents the updated state weight matrix of the hydropower station data input to the candidate area.
[0029] As a preferred solution of the emergency management method based on hydropower station production described in the present invention, the immersive exercise environment includes simulating the geological environment and meteorological conditions of the hydropower station in a virtual environment, using an intelligent scheduling algorithm to adjust the emergency resource configuration, and optimizing the simulated response time and effect. The specific calculation formula of the intelligent scheduling algorithm is:
[0030]
[0031] Among them, f(x) represents the optimization objective function, C t represents the data update status of the hydropower station at time point t, x i Represents a resource allocation plan;
[0032] The use of the intelligent scheduling algorithm to adjust the emergency resources of the hydropower station in the immersive exercise environment includes defining an optimization objective function, wherein the definition of the optimization objective function includes calculating the rainfall, temperature and wind speed of meteorological conditions, and adjusting the optimization objective function based on the calculation results;
[0033] The specific calculation formula for the rainfall is:
[0034]
[0035] Among them, R t represents the rainfall at time point t, is the constant term for rainfall, represents the autoregressive part of rainfall, represents the moving average part of rainfall, represents the error term of rainfall at time t;
[0036] The specific calculation formula of the temperature is:
[0037]
[0038] Among them, T t represents the temperature at time t, The constant term representing temperature, represents the autoregressive part of temperature, represents the moving average part of the temperature, represents the error term of temperature at time t;
[0039] The specific calculation formula of the wind speed is:
[0040]
[0041] Among them, W t represents the wind speed at time point t, is the constant term for wind speed, represents the autoregressive part of wind speed, represents the moving average part of the wind speed, represents the error term of wind speed at time t.
[0042] As a preferred solution of the emergency management method based on hydropower station production described in the present invention, wherein: the integration of the adjusted hydropower station emergency resources includes calculating according to the resource scheduling within the meteorological conditions to obtain the hydropower station emergency resources, and the resource scheduling includes resource cost, resource scheduling time and resource demand;
[0043] The specific calculation formula of the resource cost is:
[0044] C i =a1R t +a2T t +a3W t
[0045] Among them, C i represents the resource cost of the i-th category, and a1 represents the rainfall R t The impact coefficient on resource cost, R t represents the rainfall at time point t, and a2 represents the temperature T t The impact coefficient on resource cost, a3 represents the wind speed W t The impact coefficient on resource cost;
[0046] The specific calculation formula for the resource scheduling time is:
[0047] T i =b1Rt +b2T t +b3W t
[0048] Among them, T i represents the resource scheduling time of the i-th category, b1 represents the rainfall R t The impact coefficient on resource scheduling time, R t represents the rainfall at time point t, b2 represents the temperature T t The influence coefficient on resource scheduling time, b3 represents the wind speed W t The impact coefficient on resource scheduling time;
[0049] The specific calculation formula for the resource demand is:
[0050] R i =c1R t +c2T t +c3W t
[0051] Among them, R i represents the resource demand of the i-th category, and c1 represents the rainfall R t The coefficient of influence on resource demand, R t represents the rainfall at time point t, c2 represents the temperature T t The influence coefficient on resource demand, c3 represents the wind speed W t The impact coefficient on resource demand.
[0052] As a preferred solution of the emergency management method based on hydropower station production described in the present invention, wherein: the multi-source data of the hydropower station emergency resources is obtained by integrating and calculating the resource scheduling to obtain the multi-source data of the hydropower station emergency resources. The specific calculation formula is:
[0053]
[0054] Where ∝ represents the multi-source data of emergency resources of hydropower stations, C i represents the resource cost of the i-th category, T i represents the resource scheduling time of the i-th category, R i represents the resource demand of the i-th category;
[0055] The multi-source data drill includes simulating various emergency scenarios in a virtual environment, using blockchain to record and track all operational decisions, and writing smart contracts based on the recorded results to complete automatic data processing and emergency resource scheduling management.
[0056] In a second aspect, an embodiment of the present invention provides an emergency management system based on hydropower station production, which includes: a creation module that analyzes the emergency management needs of the hydropower station, obtains emergency resources of the hydropower station, and creates an immersive exercise environment for emergency resources of the hydropower station;
[0057] The testing module introduces a big data analysis and prediction model into the immersive exercise environment, tests the immersive exercise environment, and uses an intelligent scheduling algorithm to adjust the emergency resources of the hydropower station in the immersive exercise environment;
[0058] Management module, which is designed as a cross-platform mobile application to integrate the adjusted emergency resources of the hydropower station and establish an emergency treatment management plan based on the drill results.
[0059] In a third aspect, an embodiment of the present invention provides a computer device, including a memory and a processor, wherein the memory stores a computer program, wherein: when the processor executes the computer program, any step of the above-mentioned emergency management method based on hydropower station production is implemented.
[0060] In a fourth aspect, an embodiment of the present invention provides a computer-readable storage medium having a computer program stored thereon, wherein: when the computer program is executed by a processor, any step of the above-mentioned emergency management method based on hydropower station production is implemented.
[0061] The beneficial effects of the present invention are as follows: the present invention improves the efficiency and reliability of emergency management of hydropower stations by introducing big data analysis and prediction models, intelligent scheduling algorithms and blockchain technology, and by creating an immersive exercise environment, simulating multiple emergency scenarios, adjusting emergency resource allocation in real time, and optimizing response time and effect. The design of cross-platform mobile applications realizes the integrated management of emergency resources, uses blockchain technology to record and track all operations and decisions, ensures data transparency and security, and realizes automatic processing of multi-source data and emergency resource scheduling management through smart contracts, effectively responding to emergencies such as geological disasters, equipment failures and extreme weather, and improving the safety and emergency response capabilities of hydropower stations. BRIEF DESCRIPTION OF THE DRAWINGS
[0062] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. Among them:
[0063] Figure 1 A flow chart of an emergency management method and system based on hydropower station production provided by one embodiment of the present invention.
[0064] Figure 2A specific flow chart of a management scheme of an emergency management method and system based on hydropower station production provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0065] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the drawings of the specification. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary persons in the art without creative work should fall within the scope of protection of the present invention.
[0066] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0067] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.
[0068] The present invention is described in detail with reference to schematic diagrams. When describing the embodiments of the present invention, for the sake of convenience, the cross-sectional diagrams showing the device structure will not be partially enlarged according to the general scale, and the schematic diagrams are only examples, which should not limit the scope of protection of the present invention. In addition, in actual production, the three-dimensional dimensions of length, width and depth should be included.
[0069] At the same time, in the description of the present invention, it should be noted that the directions or positional relationships indicated by the terms "upper, lower, inner and outer" are based on the directions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first, second or third" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0070] In the present invention, unless otherwise clearly specified and limited, the terms "install, connect, connect" should be understood in a broad sense, for example: it can be a fixed connection, a detachable connection or an integral connection; it can also be a mechanical connection, an electrical connection or a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0071] Example 1
[0072] Reference Figure 1 and Figure 2 , which is the first embodiment of the present invention, and provides an emergency management method based on hydropower station production, including:
[0073] S1: Analyze the emergency management needs of hydropower stations, obtain emergency resources of hydropower stations, and create an immersive exercise environment for emergency resources of hydropower stations.
[0074] The analysis of the emergency management needs of hydropower stations includes the evaluation of the geological environment, meteorological conditions, equipment status and staffing of hydropower stations, the establishment of an evaluation hierarchy model, the construction of a judgment matrix, and the introduction of consistency indicators to calculate the consistency ratio of the judgment matrix.
[0075] The assessment of the geological environment of the hydropower station includes collecting geological data, building a geological model based on the collected geological data, and assessing geological risks based on the geological model; the geological data includes rock structure, fault distribution and soil type, and the construction of the geological model includes using the geographic information system GIS and three-dimensional modeling technology to build a three-dimensional model of the geological environment. The assessment of geological risks includes simulating the probability of disaster occurrence and the scope of influence of the geological model through the finite element analysis method. The calculation formula of the finite element analysis method is:
[0076] σ=D·∈
[0077] Among them, σ represents the stress tensor, ∈ represents the strain tensor, and D represents the elastic matrix of the material.
[0078] S1.1: Meteorological conditions include rainfall, temperature and wind speed. The prediction trend of the geological model is calculated using time series. The specific calculation formula is:
[0079]
[0080] Among them, y t represents time series data, ∈ t represents the error term, α0 represents the constant term, α i represents the autoregressive coefficient, β j represents the sliding mean coefficient, ∈ t-j represents the lagged error term, y t-i represents lagged time series data;
[0081] The equipment status includes collecting the operating status data of the hydropower station equipment through the Internet of Things technology, using the deep learning LSTM network to evaluate and predict the health status of the hydropower station equipment, and estimating the failure risk of the hydropower station equipment. The deep learning LSTM network includes an input gate, a forget gate, an output gate, and a hydropower station data status update. The specific calculation formula of the input gate is:
[0082] i t =σ(W xi x t +W hi h t-1 +b i )
[0083] Among them, i t represents the input gate activation value, σ represents the stress tensor, W xi and W hi represents the weight matrix, b i represents the bias vector, x t Represents input data;
[0084] The specific calculation formula of the forget gate is:
[0085] f t =σ(W xf x t +W hf h t-1 +b f )
[0086] Among them, f t represents the activation value of the forget gate, σ represents the stress tensor, W xf represents the weight matrix input to the forget gate, x t represents the input data, W hf represents the weight matrix from the hidden state to the forget gate, b f Represents the bias vector of the forget gate;
[0087] The specific calculation formula of the output gate is:
[0088] o t =σ(W xo x t +W ho h t-1 +b o )
[0089] Among them, t represents the output gate activation value, σ represents the stress tensor, W xo represents the weight matrix from input to output gate, x t represents input data, h t-1 represents the hidden state at the previous time point, W horepresents the weight matrix from the hidden state to the output gate, b o Represents the bias vector of the output gate.
[0090] S1.1.1: The data status update of the hydropower station includes passing the hydropower station data through the input gate and the forget gate and transmitting them to the candidate area for updating. The specific update calculation formula is:
[0091] C t =f t ⊙C t-1 +i t ⊙tanh(W xC x t +W hC h t-1 +b C )
[0092] Among them, C t represents the data update status of the hydropower station at time point t, ⊙ represents the element product, tanh(W xC x t +W hC h t-1 +b C ) represents the candidate region, b C represents the bias vector, C t-1 represents the data update status of the hydropower station at time point t-1, i t represents the input gate activation value, W hC Represents the weight matrix from hidden state to candidate region state update, W xC Represents the updated state weight matrix of the hydropower station data input to the candidate area.
[0093] S2: Introduce a big data analysis and prediction model into the immersive exercise environment, test the immersive exercise environment, and use an intelligent scheduling algorithm to adjust the emergency resources of the hydropower station in the immersive exercise environment.
[0094] The immersive exercise environment includes simulating the geological environment and meteorological conditions of the hydropower station in a virtual environment, using the intelligent scheduling algorithm to adjust the emergency resource allocation, and optimizing the simulated response time and effect. The specific calculation formula of the intelligent scheduling algorithm is:
[0095]
[0096] Among them, f(x) represents the optimization objective function, C t represents the data update status of the hydropower station at time point t, x i Represents a resource allocation plan;
[0097] Using intelligent scheduling algorithms to adjust the emergency resources of hydropower stations in the immersive exercise environment includes defining an optimization objective function, defining the optimization objective function includes calculating the rainfall, temperature and wind speed of meteorological conditions, and adjusting the optimization objective function based on the calculation results;
[0098] The specific calculation formula for rainfall is:
[0099]
[0100] Among them, R t represents the rainfall at time point t, is the constant term for rainfall, represents the autoregressive part of rainfall, represents the moving average part of rainfall, represents the error term of rainfall at time t;
[0101] The specific calculation formula for temperature is:
[0102]
[0103] Among them, T t represents the temperature at time t, The constant term representing temperature, represents the autoregressive part of temperature, represents the moving average part of the temperature, represents the error term of temperature at time t;
[0104] The specific calculation formula for wind speed is:
[0105]
[0106] Among them, W t represents the wind speed at time point t, is the constant term for wind speed, represents the autoregressive part of wind speed, represents the moving average part of the wind speed, represents the error term of wind speed at time t.
[0107] Furthermore, in the immersive exercise environment, the specific geological environment and meteorological conditions data were obtained through the big data analysis and prediction model. For example, at a certain moment, the forecast showed that the rainfall in the next hour would be 10 mm, the temperature would be 25 degrees Celsius, and the wind speed would be 15 meters per second. Using these data, the intelligent scheduling algorithm optimized the configuration of emergency resources. The results showed that the resource scheduling cost was reduced by 20%, the response time was shortened by 15%, and the resource demand was reduced by 10%. The accurate prediction of these data and the optimization of intelligent scheduling make emergency management more efficient and reliable. The comparison of the simulation data of emergency management of hydropower stations is shown in Table 1 below:
[0108] Table 1 Comparison of simulation data of emergency management of hydropower stations
[0109]
[0110] The table shows the comparison of the cost, dispatch time and demand of emergency resources of hydropower stations under different meteorological conditions (rainfall, temperature, wind speed). Through the intelligent dispatch algorithm, the resource allocation is optimized, so that in the case of high rainfall, high temperature or high wind speed, the resource cost and dispatch time are controlled and the demand is balanced. Various data show that the intelligent dispatch algorithm effectively improves the efficiency and effectiveness of emergency management under different weather conditions.
[0111] S3: Design a cross-platform mobile application to integrate the adjusted emergency resources of the hydropower station, obtain multi-source data of the emergency resources of the hydropower station, use blockchain technology to drill the multi-source data, and establish an emergency handling management plan based on the drill results.
[0112] Among them, the integration of the adjusted hydropower station emergency resources includes calculating the resource dispatch within the meteorological conditions to obtain the hydropower station emergency resources, and the resource dispatch includes resource cost, resource dispatch time and resource demand;
[0113] The specific calculation formula for resource cost is:
[0114] C i =a1R t +a2T t +a3W t
[0115] Among them, C i represents the resource cost of the i-th category, and a1 represents the rainfall R t The impact coefficient on resource cost, R t represents the rainfall at time point t, and a2 represents the temperature T t The impact coefficient on resource cost, a3 represents the wind speed W t The impact coefficient on resource cost;
[0116] The specific calculation formula for resource scheduling time is:
[0117] T i =b1R t +b2T t +b3W t
[0118] Among them, T i represents the resource scheduling time of the i-th category, b1 represents the rainfall R t The impact coefficient on resource scheduling time, R t represents the rainfall at time point t, b2 represents the temperature T t The influence coefficient on resource scheduling time, b3 represents the wind speed W t The impact coefficient on resource scheduling time;
[0119] The specific calculation formula for resource demand is:
[0120] R i =c1R t +c2T t +c3W t
[0121] Among them, R i represents the resource demand of the i-th category, and c1 represents the rainfall R t The coefficient of influence on resource demand, R t represents the rainfall at time point t, c2 represents the temperature T t The influence coefficient on resource demand, c3 represents the wind speed W t The impact coefficient on resource demand.
[0122] Furthermore, obtaining multi-source data of emergency resources of hydropower stations includes integrating and calculating resource scheduling to obtain multi-source data of emergency resources of hydropower stations. The specific calculation formula is:
[0123]
[0124] Where ∝ represents the multi-source data of emergency resources of hydropower stations, C i represents the resource cost of the i-th category, T i represents the resource scheduling time of the i-th category, R i represents the resource demand of the i-th category;
[0125] The drill on multi-source data includes simulating various emergency scenarios in a virtual environment, using blockchain to record and track all operational decisions, writing smart contracts based on the recorded results, and completing automatic data processing and emergency resource scheduling management.
[0126] In a preferred embodiment, an emergency management system based on hydropower station production includes a creation module that analyzes the emergency management needs of the hydropower station, obtains emergency resources of the hydropower station, and creates an immersive exercise environment for emergency resources of the hydropower station;
[0127] The testing module introduces a big data analysis and prediction model into the immersive exercise environment, tests the immersive exercise environment, and uses an intelligent scheduling algorithm to adjust the emergency resources of the hydropower station in the immersive exercise environment;
[0128] Management module, which is designed as a cross-platform mobile application to integrate the adjusted emergency resources of the hydropower station and establish an emergency treatment management plan based on the drill results.
[0129] The above-mentioned unit modules may be embedded in or independent of a processor in a computer device in the form of hardware, or may be stored in a memory in a computer device in the form of software, so that the processor can call and execute operations corresponding to the above-mentioned modules.
[0130] The computer device may be a terminal, and the computer device includes a processor, a memory, a communication interface, a display screen and an input device connected via a system bus. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The communication interface of the computer device is used to communicate with an external terminal in a wired or wireless manner, and the wireless manner can be achieved through WIFI, an operator network, NFC (near field communication) or other technologies. The display screen of the computer device may be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device may be a touch layer covering the display screen, or a key, trackball or touchpad provided on the housing of the computer device, or an external keyboard, touchpad or mouse, etc.
[0131] In summary, the present invention improves the efficiency and reliability of emergency management of hydropower stations by introducing big data analysis and prediction models, intelligent scheduling algorithms and blockchain technology. It creates an immersive exercise environment, simulates multiple emergency scenarios, adjusts emergency resource allocation in real time, and optimizes response time and effect. The design of cross-platform mobile applications realizes the integrated management of emergency resources, uses blockchain technology to record and track all operations and decisions, ensures data transparency and security, and realizes automatic processing of multi-source data and emergency resource scheduling management through smart contracts, effectively responds to emergencies such as geological disasters, equipment failures and extreme weather, and improves the safety and emergency response capabilities of hydropower stations.
[0132] Example 2
[0133] Reference Figure 1 and Figure 2 , which is the second embodiment of the present invention, and this embodiment provides an emergency management method based on hydropower station production. In order to verify the beneficial effects of the present invention, scientific demonstration is carried out through simulation experiments.
[0134] This experiment uses a time series model to predict meteorological conditions, including rainfall, temperature and wind speed, to calculate the trend of the geological model. Specifically, the time series data includes the values of rainfall of 50 mm, temperature of 22 ° C, and wind speed of 15 km / h at time point t. The standard deviation of the error term is 0.5, the constant term is 2.0, the autoregressive coefficient is 0.8, the sliding mean coefficient is 0.3, the lagged error term is 0.2, and the lagged time series data is the value of the previous time point.
[0135] Through the Internet of Things technology, the operating status data of the hydropower station equipment was collected. For example, the operating temperature of a certain device at time point t was 75°C and the vibration frequency was 12Hz. The deep learning LSTM network was used to evaluate and predict the health status of these data and estimate the failure risk of the equipment. The LSTM network includes input gates, forget gates, output gates, and hydropower station data status updates. The input gate activation value is 0.7, the stress tensor is 1.2, the input gate weight matrix is 0.6, the hidden state weight matrix is 0.4, the bias vector is 0.1, and the input data is the current status data of the device.
[0136] The activation value of the forget gate is 0.5, the stress tensor is 1.1, the weight matrix input to the forget gate is 0.7, the input data is the historical data of the equipment status, the weight matrix from the hidden state to the forget gate is 0.5, the bias vector of the forget gate is 0.2, the output gate activation value is 0.6, the stress tensor is 1.0, the weight matrix input to the output gate is 0.8, the input data is the real-time data of the equipment status, the hidden state at the previous time point is 0.4, the weight matrix from the hidden state to the output gate is 0.7, and the bias vector of the output gate is 0.3. Through the above calculations, the health status of the equipment can be accurately predicted and possible failure risks can be identified in advance, thereby improving the emergency management capabilities of the hydropower station. The meteorological and equipment data are shown in Table 2 below:
[0137] Table 2 Weather and equipment data display table
[0138] Parameter Type Numeric Rainfall 50mm temperature 22℃ Wind speed 15km / h Error term standard deviation 0.5 Constant term 2.0 Autoregressive coefficient 0.8 Lag error term 0.2 Moving average coefficient 0.3 Equipment operating temperature 75℃ Equipment vibration frequency 12Hz Input gate activation value 0.7 Input gate stress tensor 1.2 Input gate weight matrix 0.6 Input gate bias vector 0.1 Forget gate activation value 0.5 Forget gate stress tensor 1.1 Forget gate weight matrix 0.7 Forget gate bias vector 0.2 Output gate activation value 0.6 Output gate stress tensor 1.0
[0139] The table contains specific data on meteorological conditions, namely rainfall, temperature and wind speed, and the status of hydropower station equipment. The present invention is compared with the prior art as shown in Table 3 below:
[0140] Table 3 Comparison between the present invention and the prior art
[0141] Comparison Items Technical solution of the present invention Prior art Data collection method IoT technology collection Traditional manual collection Data processing method Deep Learning LSTM Network Traditional statistical methods Data prediction accuracy high generally How to adjust the drill environment Intelligent scheduling algorithm Manual Adjustment Data recording and tracking methods Blockchain Technology Traditional database Emergency resource allocation efficiency high generally Experimental accuracy high generally
[0142] This solution combines IoT technology and deep learning LSTM network to collect and process hydropower station data in real time, improving the accuracy and efficiency of data processing. The application of intelligent scheduling algorithms and blockchain technology enhances the intelligence and traceability of the exercise environment and optimizes emergency resource allocation and data management efficiency.
[0143] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.
Claims
1. An emergency management method based on hydropower station production, characterized in that: include, Analyze the emergency management needs of hydropower stations, obtain emergency resources of hydropower stations, and create an immersive exercise environment for emergency resources of hydropower stations; Introducing big data analysis and prediction models into the immersive exercise environment, testing the immersive exercise environment, and using intelligent scheduling algorithms to adjust the emergency resources of hydropower stations in the immersive exercise environment; Design a cross-platform mobile application to integrate the adjusted emergency resources of the hydropower station, obtain multi-source data of the hydropower station's emergency resources, use blockchain technology to drill the multi-source data, and establish an emergency handling management plan based on the drill results.
2. The emergency management method based on hydropower station production as claimed in claim 1, characterized in that: The analysis of the emergency management needs of the hydropower station includes evaluating the geological environment, meteorological conditions, equipment status and staffing of the hydropower station, establishing an evaluation hierarchy model, constructing a judgment matrix, and introducing a consistency index to calculate the consistency ratio of the judgment matrix. The assessment of the geological environment of the hydropower station includes collecting geological data, constructing a geological model based on the collected geological data, and assessing geological risks based on the geological model; the geological data includes rock layer structure, fault distribution and soil type, the construction of the geological model includes constructing a three-dimensional model of the geological environment using a geographic information system GIS and three-dimensional modeling technology, and the assessment of geological risks includes simulating the probability of disaster occurrence and the scope of influence of the geological model by a finite element analysis method, and the calculation formula of the finite element analysis method is: σ=D·∈ Among them, σ represents the stress tensor, ∈ represents the strain tensor, and D represents the elastic matrix of the material.
3. The emergency management method based on hydropower station production as claimed in claim 2, characterized in that: The meteorological conditions include rainfall, temperature and wind speed. The prediction trend of the geological model is calculated using the time series. The specific calculation formula is: Among them, y t represents time series data, ∈ t represents the error term, α0 represents the constant term, α i represents the autoregressive coefficient, β j represents the sliding mean coefficient, ∈ t-j represents the lagged error term, y t-i represents lagged time series data; The equipment status includes collecting the operating status data of the hydropower station equipment through the Internet of Things technology, using the deep learning LSTM network to evaluate and predict the health status of the hydropower station equipment, and estimating the failure risk of the hydropower station equipment. The deep learning LSTM network includes an input gate, a forget gate, an output gate and a hydropower station data status update. The specific calculation formula of the input gate is: i t =σ(W si x t +W hi h t-1 +b i ) Among them, i t represents the input gate activation value, σ represents the stress tensor, W xi and W hi represents the weight matrix, b i represents the bias vector, x t Represents input data; The specific calculation formula of the forget gate is: f t =σ(W xf x t +W hf h t-1 +b f ) Among them, f t represents the activation value of the forget gate, σ represents the stress tensor, W xf represents the weight matrix input to the forget gate, x t represents the input data, W hf represents the weight matrix from the hidden state to the forget gate, b f Represents the bias vector of the forget gate; The specific calculation formula of the output gate is: o t =σ(W xo x t +W ho h t-1 +b o ) Among them, t represents the output gate activation value, σ represents the stress tensor, W xo represents the weight matrix from input to output gate, x t represents input data, h t-1 represents the hidden state at the previous time point, W ho represents the weight matrix from the hidden state to the output gate, b o Represents the bias vector of the output gate.
4. The emergency management method based on hydropower station production as claimed in claim 3, characterized in that: The hydropower station data status update includes transmitting the hydropower station data through the input gate and the forget gate to the candidate area for updating. The specific update calculation formula is: C t =f t ⊙C t-1 +i t ⊙tanh(W xC x t +W hC h t-1 +b C ) Among them, C t represents the data update status of the hydropower station at time point t, ⊙ represents the element product, tanh(W xC x t +W hC h t-1 +b C ) represents the candidate region, b C represents the bias vector, C t-1 represents the data update status of the hydropower station at time point t-1, i t represents the input gate activation value, W hC Represents the weight matrix from hidden state to candidate region state update, W xC Represents the updated state weight matrix of the hydropower station data input to the candidate area.
5. The emergency management method based on hydropower station production as claimed in claim 4, characterized in that: The immersive exercise environment includes simulating the geological environment and meteorological conditions of the hydropower station in a virtual environment, using an intelligent scheduling algorithm to adjust the emergency resource configuration, and optimizing the simulated response time and effect. The specific calculation formula of the intelligent scheduling algorithm is: Among them, f(x) represents the optimization objective function, C t represents the data update status of the hydropower station at time point t, x i Represents a resource allocation plan; The use of the intelligent scheduling algorithm to adjust the emergency resources of the hydropower station in the immersive exercise environment includes defining an optimization objective function, wherein the definition of the optimization objective function includes calculating the rainfall, temperature and wind speed of meteorological conditions, and adjusting the optimization objective function based on the calculation results; The specific calculation formula for the rainfall is: Among them, R t represents the rainfall at time point t, is the constant term for rainfall, represents the autoregressive part of rainfall, represents the moving average part of rainfall, represents the error term of rainfall at time t; The specific calculation formula of the temperature is: Among them, T t represents the temperature at time t, The constant term representing temperature, represents the autoregressive part of temperature, represents the moving average part of the temperature, represents the error term of temperature at time t; The specific calculation formula of the wind speed is: Among them, W t represents the wind speed at time point t, is the constant term for wind speed, represents the autoregressive part of wind speed, represents the moving average part of the wind speed, represents the error term of wind speed at time t.
6. The emergency management method based on hydropower station production as claimed in claim 5, characterized in that: The integration of the adjusted emergency resources of the hydropower station includes calculating the resource scheduling within the meteorological conditions to obtain the emergency resources of the hydropower station, wherein the resource scheduling includes resource cost, resource scheduling time and resource demand; The specific calculation formula of the resource cost is: <h2 style=";text-align:left;direction:ltr">C<h2 style=";text-align:left;direction:ltr"> i <h2 style=";text-align:left;direction:ltr"> =a1R<h2 style=";text-align:left;direction:ltr"> t <h2 style=";text-align:left;direction:ltr"> +a2T<h2 style=";text-align:left;direction:ltr"> t <h2 style=";text-align:left;direction:ltr"> +a3W<h2 style=";text-align:left;direction:ltr"> t Among them, C i represents the resource cost of the i-th category, and a1 represents the rainfall R t The impact coefficient on resource cost, R t represents the rainfall at time point t, and a2 represents the temperature T t The impact coefficient on resource cost, a3 represents the wind speed W t The impact coefficient on resource cost; The specific calculation formula for the resource scheduling time is: T i =b1R t +b2T t +b3W t Among them, T i represents the resource scheduling time of the i-th category, b1 represents the rainfall R t The impact coefficient on resource scheduling time, R t represents the rainfall at time point t, b2 represents the temperature T t The influence coefficient on resource scheduling time, b3 represents the wind speed W t The impact coefficient on resource scheduling time; The specific calculation formula for the resource demand is: R i =c1R t +c2T t +c3W t Among them, R i represents the resource demand of the i-th category, and c1 represents the rainfall R t The coefficient of influence on resource demand, R t represents the rainfall at time point t, c2 represents the temperature T t The influence coefficient on resource demand, c3 represents the wind speed W t The impact coefficient on resource demand.
7. The emergency management method based on hydropower station production as claimed in claim 6, characterized in that: The method of obtaining multi-source data of emergency resources of the hydropower station includes integrating and calculating the resource scheduling to obtain multi-source data of emergency resources of the hydropower station. The specific calculation formula is: Where ∝ represents the multi-source data of emergency resources of hydropower stations, C i represents the resource cost of the i-th category, T i represents the resource scheduling time of the i-th category, R i represents the resource demand of the i-th category; The multi-source data drill includes simulating various emergency scenarios in a virtual environment, using blockchain to record and track all operational decisions, and writing smart contracts based on the recorded results to complete automatic data processing and emergency resource scheduling management.
8. An emergency management system based on hydropower station production, based on the emergency management method based on hydropower station production according to any one of claims 1 to 7, characterized in that: include, Create a module that analyzes the emergency management needs of hydropower stations, obtains emergency resources of hydropower stations, and creates an immersive exercise environment for emergency resources of hydropower stations; The testing module introduces a big data analysis and prediction model into the immersive exercise environment, tests the immersive exercise environment, and uses an intelligent scheduling algorithm to adjust the emergency resources of the hydropower station in the immersive exercise environment; Management module, which is designed as a cross-platform mobile application to integrate the adjusted emergency resources of the hydropower station and establish an emergency treatment management plan based on the drill results.
9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the emergency management method based on hydropower station production described in any one of claims 1 to 7 are implemented.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the emergency management method based on hydropower station production described in any one of claims 1 to 7 are implemented.