Power construction resource optimal configuration system
Through real-time data acquisition and performance degradation prediction, combined with cost-benefit analysis and dynamic resource allocation optimization, the resource waste and project delay problems caused by static resource management in the existing technology are solved, and efficient operation and economic management of power construction projects are achieved.
Patent Information
- Application Number
- CN202411038701.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-11-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing power construction resource optimization allocation system relies on static resource management and scheduled scheduling plans, lacks a dynamic response mechanism, resulting in resource waste and project delays, and resource allocation decisions lack scientificity, affecting economic efficiency and project progress.
The real-time data acquisition module is used to collect the working time, load and energy efficiency data of construction equipment through the Internet of Things technology, perform real-time monitoring and data synchronization processing, combine time series analysis and regression analysis to predict equipment performance degradation, and dynamic resource allocation optimization is carried out based on cost-benefit analysis. , use simulated annealing algorithms and genetic algorithms to adjust resource allocation to achieve a balance of lowest cost and highest efficiency.
It significantly improves the foresight of construction equipment maintenance needs, reduces faults and resource waste, improves work efficiency and project completion rate, ensures the scientificity and dynamic adaptability of resource allocation decisions, and improves the economic and efficiency of project management.
Smart Images

Figure CN118966683A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of resource optimization, and in particular to a power construction resource optimization configuration system. Background Art
[0002] The field of resource optimization technology focuses on improving operational efficiency, reducing costs and enhancing system performance through efficient configuration and use of available resources, making resource allocation more scientific and systematic. The technology includes but is not limited to the application of computer algorithms, mathematical modeling, statistical analysis and artificial intelligence technology, which aims to solve complex problems of physical and digital resource management and is widely used in many fields, such as manufacturing, transportation and logistics, power engineering, and more extensive enterprise resource planning and supply chain management, all of which require efficient management and optimal configuration of resources.
[0003] The power construction resource optimization allocation system is a system developed specifically for power construction projects. It aims to optimize the allocation and management of resources during the construction process. The core lies in the use of advanced data processing technology and algorithms to ensure the most effective allocation and use of human, mechanical, material and financial resources in the project. It mainly improves the work efficiency of power construction projects, reduces resource waste, speeds up project progress, and ultimately reduces project costs, ensuring the economy and efficiency of power infrastructure construction projects.
[0004] Existing technologies often rely on static resource management and predetermined scheduling plans for optimizing the allocation of power construction resources, and lack a dynamic response mechanism for actual changes at the construction site. In terms of equipment performance management, traditional methods often fail to foresee performance degradation, which may lead to resource waste and project delays. The reliance on experience in the resource allocation decision-making process limits the scientific nature of the decision, and the lack of data support may lead to miscalculations of resource requirements, affecting economic efficiency and project progress. This is particularly evident when facing complex or urgent projects, which may lead to cost increases, quality risks, and delays, showing deficiencies in dynamic resource management and data-driven decision-making. Summary of the invention
[0005] The purpose of the present invention is to solve the shortcomings of the prior art and to propose an electric power construction resource optimization configuration system.
[0006] In order to achieve the above-mentioned purpose, the present invention adopts the following technical scheme: A power construction resource optimization configuration system comprises:
[0007] The real-time data acquisition module captures working time, load, and energy efficiency monitoring data by connecting to construction equipment at the power construction site. It uses the Internet of Things technology to collect data from the sensor network, performs real-time data synchronization processing, and generates a real-time monitoring data set.
[0008] The performance degradation prediction module uses the real-time monitoring data set to perform time series analysis, applies regression analysis to the construction equipment performance data, identifies trends and seasonal changes in the data, and predicts the performance degradation path and potential failure points of the equipment based on the identification results to obtain performance degradation prediction results;
[0009] The cost-benefit analysis module evaluates and compares the input and expected output of different resource configurations based on the performance degradation prediction results, calculates and analyzes the cost-benefit ratio of all resource configurations using economic principles, and generates and outputs cost-benefit analysis records;
[0010] The dynamic resource allocation module dynamically optimizes the power construction resource allocation according to the cost-benefit analysis records, applies the simulated annealing algorithm to perform a global search, adjusts and optimizes resource allocation based on the search results in combination with the genetic algorithm, achieves a balance between minimum cost and maximum efficiency, and obtains a dynamic optimization plan for power construction resource allocation.
[0011] As a further solution of the present invention, the step of acquiring the real-time monitoring data set is:
[0012] Through the Internet of Things technology, the construction equipment at the power construction site is connected to collect working timestamps, load volume and energy efficiency parameters from sensors, and the formula is used.
[0013]
[0014] Get a comprehensive data set, where s i,time Represents the working time data of the i-th device, s i,load Represents the load data of the i-th device, s i,eff represents the energy efficiency data of the i-th device, D represents the weighted comprehensive data value collected and processed from the device sensors, and n represents the number of devices in the power construction;
[0015] Time synchronization is performed on the comprehensive data set to ensure that all data have a consistent time reference, and data weights are adjusted and synchronized using formulas.
[0016]
[0017] Among them, D i represents the collected data of the i-th device, w i is the data weight, which assigns difference weights according to the importance of the device, and obtains the synchronized data set S after weight adjustment;
[0018] Extract key performance indicators from the synchronized data set, including average load factor and energy efficiency ratio, and calculate them using a weighted average method.
[0019]
[0020] Among them, l i represents the working time of the i-th device, p i represents the load data of the ith device, e i represents the energy efficiency data of the i-th device, P represents the weighted average load rate, and E represents the weighted energy efficiency ratio, and the device performance data is obtained;
[0021] Integrate the equipment performance data with real-time data, using the formula,
[0022]
[0023] Form a real-time monitoring data set, where P i represents the weighted average load rate of the ith device, E i represents the weighted energy efficiency ratio of the ith device, and M represents the comprehensive value of the integrated real-time monitoring data, reflecting the overall performance status of the device.
[0024] As a further embodiment of the present invention, the steps of identifying trends and seasonal changes are:
[0025] The performance data of the construction equipment is extracted from the real-time monitoring data set, and normalized, using the formula,
[0026]
[0027] Among them, Data norm represents the normalized data, indicating the degree of dispersion of the data, n represents the number of power construction equipment, X i represents the performance data of the i-th device, μ represents the mean of all device data, and σ represents the standard deviation of all device performance data, and the normalized data set is obtained;
[0028] The normalized performance data is constructed as a time series using the formula,
[0029]
[0030] Among them, k is the time window size, Data norm [ti] represents the normalized data at the tith moment, t represents time, MA t Represents the moving average of time t, outputting time series data;
[0031] Perform trend and seasonality analysis on the time series data using the formula:
[0032]
[0033] Among them, Y trepresents the predicted value of the model, t is the time variable, ω is the seasonal cycle, β0, β1, β2, β3 are all regression coefficients, ∈ t is the error term, identifying the trend and seasonal changes in the data and obtaining trend and seasonal analysis results.
[0034] As a further solution of the present invention, the step of obtaining the performance degradation prediction result is:
[0035] Based on the trend and seasonality analysis results, a performance degradation path prediction model is constructed using the formula,
[0036]
[0037] Among them, γ0, γ1, γ2 represent model parameters, Y t is the trend forecast value, t represents time, Path t Representing the performance degradation path, generating the performance degradation path prediction result;
[0038] Using the performance degradation path prediction result, the fault identification threshold θ is set, and the logical judgment formula is used:
[0039] Faults = {t|Path t ≥θ}
[0040] Generate potential failure points, where Path t represents the performance degradation path, θ represents the set fault identification threshold, Faults represents the identified fault point, and outputs the potential fault point analysis results;
[0041] The potential failure point analysis results are integrated to obtain performance degradation prediction results, including all potential failure points and predicted performance degradation paths.
[0042] As a further solution of the present invention, the steps of evaluating and comparing the input and expected output of the differential resource allocation are:
[0043] According to the performance degradation prediction results, the amount and type of data of differential resource configuration are collected, and the formula is used:
[0044]
[0045] Among them, R data represents comprehensive resource data, r i represents the amount of the i-th resource, k i is the complexity index of resources, representing the complexity or technical level of resource configuration, and n represents the total number of resources, generating a comprehensive resource data set;
[0046] Based on the comprehensive resource data set, the potential impact of each resource configuration on performance is calculated using the formula,
[0047]
[0048] Among them, I r Represents the total performance impact value, p i is the performance contribution coefficient of resource i, q i is the amount of resources, λ i It is a resource adjustment parameter, which is determined according to the efficiency loss of resources and external factors, and outputs the resource configuration impact data;
[0049] Based on the resource allocation impact data, calculate the resource input to expected output ratio using the formula,
[0050]
[0051] Among them, O / IRatio represents the input-output ratio, which measures the economic benefits of resource allocation, c i Represents resource cost and generates resource input-output ratio dataset.
[0052] As a further solution of the present invention, the steps of obtaining the cost-benefit analysis record are:
[0053] Integrate the resource input-output ratio data set and cost data, using the formula:
[0054]
[0055] Among them, ID stands for integrated data, O / IRatio i represents the input-output ratio of the i-th resource, c i represents the cost, h i is the resource persistence indicator, n represents the total number of resources, and the cost-benefit analysis data is obtained;
[0056] Based on the cost-effectiveness analysis data, calculate the cost-effectiveness ratio of all resource allocations using the formula,
[0057]
[0058] Among them, b i is the benefit brought by the i-th resource, generating the cost-benefit ratio Ratio;
[0059] According to the cost-effectiveness ratio Ratio, the mathematically processed cost-effectiveness ratio is converted into a percentage form, and a cost-effectiveness analysis record is output.
[0060] As a further solution of the present invention, the step of performing global search is:
[0061] Extract key data from the cost-benefit analysis record, including the costs and benefits of all resources, using the formula,
[0062]
[0063] Among them, K i represents the weighted resource benefit ratio, B i represents the benefit of the ith resource, C i is the cost of the i-th resource, r i is the risk factor of the resource, R max It is the largest risk factor among all resources, and exp represents the natural exponential function, which generates adjusted benefit ratio data;
[0064] According to the adjusted benefit ratio data, the global search algorithm parameters are set using the formula:
[0065]
[0066] Among them, P represents the parameter of global search, α is the global impact factor used to adjust the search sensitivity, ∈ is a small positive number to prevent the denominator from being zero, which is used to ensure the stability of calculation, and γ is a weighted index used to enhance the influence of key resources;
[0067] The global search algorithm parameters are applied, a simulated annealing algorithm is used to perform a global search, the goal is to minimize the cost and maximize the benefit, and the search results are output.
[0068] As a further solution of the present invention, the steps for obtaining the dynamic optimization solution for power construction resource configuration are:
[0069] According to the search results, the optimal configuration data is extracted, the cost and efficiency are evaluated, and the formula is used.
[0070]
[0071] Among them, T eff represents the total efficiency evaluation value, the cost-efficiency ratio after nonlinear adjustment, e i is the efficiency value of resource i under the optimal configuration, c i is the cost corresponding to resource i, n represents the total number of resources, and δ is a nonlinear adjustment index used to highlight the importance of high-efficiency resources and obtain the analysis results of efficiency and cost;
[0072] According to the analysis results of the efficiency and cost, adjust the resource allocation to optimize the efficiency and cost, using the formula,
[0073]
[0074] Among them, s i is the number of resources in the optimal configuration, vi is the adjustment coefficient of resources, Ψ is the overall adjustment factor of resource utilization, β is the coefficient affecting the adjustment intensity, and the adjusted resource allocation data is obtained;
[0075] Integrate the adjusted resource allocation data and use the formula,
[0076]
[0077] Among them, O final Represents the incremental percentage of resource utilization efficiency after optimization, R adj,i Represents the configuration value of each resource after adjustment, and outputs the dynamic optimization plan for power construction resource configuration.
[0078] Compared with the prior art, the advantages and positive effects of the present invention are:
[0079] In the present invention, the performance degradation path and potential failure points of power construction equipment are predicted through comprehensive time series and regression analysis, which significantly improves the predictability of power construction equipment maintenance needs, effectively prevents failures, reduces unexpected shutdowns, improves work efficiency and timely completion rate of projects, and uses performance degradation data to conduct cost-benefit analysis to ensure the scientific nature of resource allocation decisions. By optimizing resource allocation through global search, the optimal balance between cost and efficiency is further achieved, the dynamic adaptability of resource management and the data-driven nature of decision-making are improved, so that power construction projects can maintain efficient operation in complex environments and enhance the economy and efficiency of project management. BRIEF DESCRIPTION OF THE DRAWINGS
[0080] Figure 1 is a system flow chart of the present invention;
[0081] Figure 2 This is a flowchart of obtaining a real-time monitoring data set of the present invention;
[0082] Figure 3 A flow chart for identifying trends and seasonal changes of the present invention;
[0083] Figure 4 A flowchart for obtaining the performance degradation prediction result of the present invention;
[0084] Figure 5 A flow chart for evaluating and comparing the inputs and expected outputs of differential resource allocations of the present invention;
[0085] Figure 6 A flow chart for obtaining records of cost-benefit analysis of the present invention;
[0086] Figure 7 A flow chart for performing a global search for the present invention;
[0087] Figure 8This is a flow chart for obtaining the dynamic optimization solution for power construction resource configuration according to the present invention. DETAILED DESCRIPTION
[0088] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0089] In the description of the present invention, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, in the description of the present invention, "multiple" means two or more, unless otherwise clearly and specifically defined.
[0090] Embodiment 1
[0091] See also Figure 1 , a power construction resource optimization configuration system includes:
[0092] The real-time data acquisition module captures working time, load, and energy efficiency monitoring data by connecting to construction equipment at the power construction site. It uses the Internet of Things technology to collect data from the sensor network, performs real-time data synchronization processing, and generates a real-time monitoring data set.
[0093] The performance degradation prediction module uses real-time monitoring data sets to perform time series analysis, applies regression analysis to construction equipment performance data, identifies trends and seasonal changes in the data, and predicts the performance degradation path and potential failure points of the equipment based on the identification results to obtain performance degradation prediction results;
[0094] The cost-benefit analysis module evaluates and compares the input and expected output of different resource configurations based on the performance degradation prediction results, calculates and analyzes the cost-benefit ratio of all resource configurations using economic principles, and generates and outputs cost-benefit analysis records;
[0095] The dynamic resource allocation module dynamically optimizes the power construction resource allocation based on the cost-benefit analysis records, performs global search, adjusts and optimizes resource allocation based on the search results, achieves a balance between minimum cost and maximum efficiency, and obtains a dynamic optimization plan for power construction resource allocation.
[0096] The real-time monitoring data set includes sensor data, power construction equipment synchronization status records and data quality indicators. The performance degradation prediction results include the power construction equipment degradation path, predicted fault points and power construction equipment performance evaluation results. The cost-benefit analysis records include scheme comparison results, cost analysis details and benefit evaluation indicators. The dynamic optimization scheme for power construction resource allocation includes the power construction resource allocation scheme and optimization strategy.
[0097] See also Figure 2 ,The steps to obtain the real-time monitoring data set are:
[0098] Through the Internet of Things technology, the construction equipment at the power construction site is connected to collect working timestamps, load volume and energy efficiency parameters from sensors, and the formula is used.
[0099]
[0100] Get a comprehensive data set, where s i,time Represents the working time data of the i-th device, s i,load Represents the load data of the i-th device, s i,eff represents the energy efficiency data of the i-th device, D represents the weighted comprehensive data value collected and processed from the device sensors, and n represents the number of devices in the power construction;
[0101] Time synchronization of comprehensive data sets to ensure that all data have consistent time references, use formulas to adjust data weights and synchronize them,
[0102]
[0103] Among them, D i represents the collected data of the i-th device, w i is the data weight, which assigns difference weights according to the importance of the device, and obtains the synchronized data set S after weight adjustment;
[0104] Extract key performance indicators from the synchronized data set, including average load factor and energy efficiency ratio, and calculate them using the weighted average method.
[0105]
[0106] Among them, l i represents the working time of the i-th device, p i represents the load data of the ith device, e i represents the energy efficiency data of the i-th device, P represents the weighted average load rate, and E represents the weighted energy efficiency ratio, and the device performance data is obtained;
[0107] Integrate equipment performance data with real-time data, using formulas,
[0108]
[0109] Form a real-time monitoring data set, where P i represents the weighted average load rate of the ith device, E i represents the weighted energy efficiency ratio of the ith device, and M represents the comprehensive value of the integrated real-time monitoring data, reflecting the overall performance status of the device.
[0110] Assume that there are 3 devices on a construction site, and their parameters are as follows:
[0111] Device 1:s 1,time = 2 hours, s 1,load =50 kW, s 1,eff =0.8;
[0112] Device 2:s 2,time = 3 hours, s 2,load =40 kW, s 2,eff =0.9;
[0113] Device 3:s 3,time = 1.5 hours, s 3,load =60 kW, s 3,eff =0.85;
[0114] Substituting into the formula, we get,
[0115]
[0116] The final result D=11.93 represents the comprehensive data value, reflecting the weighted combination of equipment working time, load and efficiency.
[0117] Use the comprehensive data D values of the above equipment (44, 45, 53.25) and set the weights as follows:
[0118] w1=0.5;
[0119] w2=0.3;
[0120] w3=0.2;
[0121] Substituting into the formula, we get,
[0122]
[0123] The final result S=46.15 represents the synchronized data set, which is the result of weighted average according to the importance of the devices.
[0124] Calculate the weighted average load rate and weighted energy efficiency ratio of the equipment:
[0125]
[0126] The final result P=79.28 represents the weighted average load rate of the three groups of equipment, and E=0.858 is the weighted energy efficiency ratio of the three groups of equipment, reflecting the average level of performance of the three groups of equipment.
[0127] Use the values of P and E:
[0128]
[0129] The final result M = 22.674 represents the value of the comprehensive real-time monitoring data set, which reflects the overall performance status of the three groups of power construction equipment and is used for analysis and decision support.
[0130] See also Figure 3 , the steps to identify trend and seasonal changes are:
[0131] The performance data of construction equipment is extracted from the real-time monitoring data set and normalized using the formula,
[0132]
[0133] Among them, Data norm represents the normalized data, indicating the degree of dispersion of the data, n represents the number of power construction equipment, X i represents the performance data of the i-th device, μ represents the mean of all device data, and σ represents the standard deviation of all device performance data, and the normalized data set is obtained;
[0134] The normalized performance data is structured as a time series using the formula,
[0135]
[0136] Among them, k is the time window size, Data norm [ti] represents the normalized data at the tith moment, t represents time, MA t Represents the moving average of time t, outputting time series data;
[0137] To perform trend and seasonality analysis on time series data, use the formula:
[0138]
[0139] Among them, Y t represents the predicted value of the model, t is the time variable, ω is the seasonal cycle, β0, β1, β2, β3 are all regression coefficients, ∈ t is the error term, identifying the trend and seasonal changes in the data and obtaining trend and seasonal analysis results.
[0140] Assume that the performance data of three devices are X1=100, X2=150, and X3=120;
[0141] Then the average value is:
[0142] μ=(100+150+120) / 3=123.33
[0143] Then the standard deviation is:
[0144]
[0145] Substitute into the formula to calculate:
[0146]
[0147] The value 2.999 represents the total variance ratio of the normalized performance data. A high ratio indicates that the data deviates greatly from the mean, which may mean that the device performance varies significantly.
[0148] Assume that k=3 is selected, and the Data calculated in the previous step is norm [1] = 2.99, assuming Data norm [2] = 3.14, Data norm [3] = 4.75;
[0149] Substituting into the formula, we get:
[0150]
[0151] The value 4.28 represents the moving average at time t=3, reflecting the average power of the normalized data over the past three moments, which helps smooth data fluctuations for subsequent trend analysis.
[0152] Assume t = 3, ω = 2π / 12 (monthly data);
[0153] β0=1, β1=0.1, β2=0.2, β3=0.3, ∈3=0.05;
[0154] Substituting into the formula, we get:
[0155]
[0156] The value 1.43 represents the forecast value of the adjusted trend and seasonal model at time t=3. It shows the performance forecast after considering seasonality and time trend. It helps to understand the behavior of performance at a specific moment. Further analysis and prediction can be performed based on this model.
[0157] See also Figure 4 , the steps to obtain the performance degradation prediction results are:
[0158] Based on the trend and seasonality analysis results, a performance degradation path prediction model is constructed using the formula,
[0159]
[0160] Among them, γ0, γ1, γ2 represent model parameters, Y t is the trend forecast value, t represents time, Path t Representing the performance degradation path, generating the performance degradation path prediction result;
[0161] Using the performance degradation path prediction results, set the fault identification threshold θ and use the logical decision formula,
[0162] Faults = {t|Path t ≥θ}
[0163] Generate potential failure points, where Path t represents the performance degradation path, θ represents the set fault identification threshold, Faults represents the identified fault point, and outputs the potential fault point analysis results;
[0164] The potential failure point analysis results are integrated to obtain the performance degradation prediction results, including all potential failure points and predicted performance degradation paths.
[0165] The trend analysis result obtained from the above calculation is Y3 = 1.43, and assuming that the model parameters γ0 = 0.5, γ1 = 1.5, γ2 = 0.1, and the current time t = 3,
[0166] Substituting into the formula, we get:
[0167]
[0168] The value 2.727 represents the predicted performance degradation value at time t = 3, indicating the degree of performance degradation of the equipment after considering the time variable and trend prediction results. The high or low value can help determine whether the performance of the equipment is declining rapidly, which helps to perform maintenance or replace parts in advance.
[0169] Assume that the fault threshold θ = 2.5, based on the performance degradation path Path3 of the previous step = 2.727,
[0170] Substitute the formula for logical judgment:
[0171] Faults = {3|2.2.727≥2.5}
[0172] The result set contains t=3 because Path3 exceeds the threshold θ.
[0173] The logical judgment result indicates that at time t=3, the degradation of equipment performance has reached or is close to a critical failure state, which helps to take measures in advance, such as performing necessary maintenance or monitoring, to avoid potential equipment failures.
[0174] See also Figure 5 , the steps for evaluating and comparing the input and expected output of differential resource allocation are:
[0175] According to the performance degradation prediction results, the amount and type of data of differential resource configuration are collected, and the formula is used.
[0176]
[0177] Among them, R data represents comprehensive resource data, r i represents the amount of the i-th resource, k i is the complexity index of resources, representing the complexity or technical level of resource configuration, and n represents the total number of resources, generating a comprehensive resource data set;
[0178] Based on the comprehensive resource data set, the potential impact of each resource configuration on performance is calculated using the formula,
[0179]
[0180] Among them, I r Represents the total performance impact value, p i is the performance contribution coefficient of resource i, q i is the amount of resources, λ i It is a resource adjustment parameter, which is determined according to the efficiency loss of resources and external factors, and outputs the resource configuration impact data;
[0181] According to the resource allocation impact data, calculate the ratio of resource input to expected output, using the formula,
[0182]
[0183] Among them, O / IRatio represents the input-output ratio, which measures the economic benefits of resource allocation, c i Represents resource cost and generates resource input-output ratio dataset.
[0184] Assume that there are three resource configurations during the power construction process:
[0185] Resource 1: r1 = 100 units, complexity index k1 = 4;
[0186] Resource 2: r2 = 150 units, complexity index k2 = 9;
[0187] Resource 3: r3 = 200 units, complexity index k3 = 16;
[0188] Substituting into the formula, we get:
[0189]
[0190] R data =100·2+150·3+200·4
[0191] R data =200+450+800=1450
[0192] The value of 1450 represents the total amount of comprehensive resource data, taking into account the number and complexity of resources. This value is used to assess the diversity and technological level of resource configurations, with high values indicating large or complex resource inputs.
[0193] Calculate the potential performance impact of each resource configuration, assuming:
[0194] Resource 1: p1 = 0.8, q1 = 100, λ1 = 0.1;
[0195] Resource 2: p2 = 0.6, q2 = 150, λ2 = 0.2;
[0196] Resource 3: p3 = 0.4, q3 = 200, λ3 = 0.3;
[0197] Substituting into the formula, we get:
[0198]
[0199] The value 209.27 represents the total performance impact value, which is a measure that quantifies the contribution of each resource to performance. High values indicate a large performance improvement, and the comparison of inputs shows the benefits of resources.
[0200] Assuming resource costs:
[0201] Resource 1: c1=10;
[0202] Resource 2: c2 = 20;
[0203] Resource 3: c3=30;
[0204] Substituting into the formula, we get:
[0205]
[0206] The value 0.020927 represents the output ratio of each unit of resource input. A low ratio indicates low resource allocation efficiency or high cost, and resource allocation needs to be optimized to improve economic benefits.
[0207] See also Figure 6 , the steps to obtain the cost-benefit analysis record are:
[0208] Integrate the resource input-output ratio data set and cost data, using the formula:
[0209]
[0210] Among them, ID stands for integrated data, O / IRatio i represents the input-output ratio of the i-th resource, c i represents the cost, h i is the resource persistence indicator, n represents the total number of resources, and the cost-benefit analysis data is obtained;
[0211] Based on the cost-effectiveness analysis data, calculate the cost-effectiveness ratio of all resource allocations using the formula,
[0212]
[0213] Among them, b i is the benefit brought by the i-th resource, generating the cost-benefit ratio Ratio;
[0214] According to the cost-effectiveness ratio Ratio, the mathematically processed cost-effectiveness ratio is converted into a percentage form and the cost-effectiveness analysis record is output.
[0215] In a certain power construction process, it is assumed that there are three resource configurations, and the input-output ratio and cost are as follows:
[0216] Resource 1: O / IRatio1=0.020, c1=100, h1=0.1;
[0217] Resource 2: O / IRatio2=0.015, c2=200, h2=0.2;
[0218] Resource 3: O / IRatio3=0.010, c3=300, h3=0.3;
[0219] Substituting into the formula, we get:
[0220]
[0221] The value of 6.63 represents the integrated resource benefit data. A higher value indicates that after considering the cost and diminishing returns factors, the overall resource allocation still shows relatively good economic benefits.
[0222] Calculate the cost-effectiveness ratio:
[0223] Combining the above resource allocation data and substituting it into the formula, we get:
[0224]
[0225] The value of 0.04736 represents the comprehensive benefit per unit cost, and the low ratio indicates that the efficiency of resource allocation needs to be further optimized.
[0226] Translated into a percentage of 4.736%, it represents the cost-effectiveness ratio of overall resource allocation. The low percentage indicates that the resource allocation strategy needs to be adjusted to improve economic benefits. This record will help decision makers understand the economic benefits of existing resource allocation and make corresponding adjustments.
[0227] See also Figure 7 , the steps to perform a global search are:
[0228] Extract key data from cost-benefit analysis records, including the costs and benefits of all resources, using formulas,
[0229]
[0230] Among them, K i represents the weighted resource benefit ratio, B i represents the benefit of the ith resource, C i is the cost of the ith resource, r i is the risk factor of the resource, R max It is the largest risk factor among all resources, and exp represents the natural exponential function, which generates adjusted benefit ratio data;
[0231] According to the adjusted benefit ratio data, the global search algorithm parameters are set using the formula:
[0232]
[0233] Among them, P represents the parameter of global search, α is the global impact factor used to adjust the search sensitivity, ∈ is a small positive number to prevent the denominator from being zero, which is used to ensure the stability of calculation, and γ is a weighted index used to enhance the influence of key resources;
[0234] Apply the global search algorithm parameters and use the simulated annealing algorithm to perform global search with the goal of minimizing costs and maximizing benefits, and output search results.
[0235] In a power construction project, suppose there are the following data:
[0236] B i : The benefit brought by the first resource is assumed to be 100 units;
[0237] C i : The cost of the resource, assumed to be 50 units;
[0238] r i : Risk coefficient of resources, assumed to be 0.2;
[0239] Rmax : The maximum risk factor among all resources, assuming the maximum risk factor is 0.5;
[0240] If a specific target resource is calculated, then,
[0241]
[0242] K i =0.08×0.6703≈0.05362
[0243] The value of 0.05362 represents the adjusted resource benefit ratio, and a lower ratio may indicate that although the resource brings higher benefits, its costs and risks are higher, reducing its overall benefit ratio.
[0244] Set the global search algorithm parameters:
[0245] P: search parameter, adjusted to take into account the inverse of the benefit ratio and the weighting of resource importance;
[0246] K i : The resource benefit ratio calculated above;
[0247] α: global impact factor, set to 1.5;
[0248] ∈: a decimal number to prevent division by zero errors, set to 0.01;
[0249] γ: weighting exponent, set to 1.2.
[0250] Continue to use the above calculation data K1, and assume K2 and K3,
[0251] K1=0.05362
[0252] K2=0.10
[0253] K3=0.05
[0254] Substituting into the formula, we get:
[0255]
[0256] P≈44.36+22.99+47.59≈114.94
[0257] The value 114.94 represents the search parameter. A larger value indicates that there are higher costs and risks in the given resource configuration, and further search optimization is needed to find a better balance of resource configuration.
[0258] See also Figure 8 ,The steps for obtaining the dynamic optimization plan for power construction resource allocation are:
[0259] Based on the search results, extract the optimal configuration data, evaluate the cost and efficiency, and use the formula,
[0260]
[0261] Among them, T eff represents the total efficiency evaluation value, the cost-efficiency ratio after nonlinear adjustment, e i is the efficiency value of resource i under the optimal configuration, c i is the cost corresponding to resource i, n represents the total number of resources, and δ is a nonlinear adjustment index used to highlight the importance of high-efficiency resources and obtain the analysis results of efficiency and cost;
[0262] According to the analysis results of efficiency and cost, adjust resource allocation to optimize efficiency and cost, using the formula,
[0263]
[0264] Among them, s i is the number of resources in the optimal configuration, v i is the adjustment coefficient of resources, Ψ is the overall adjustment factor of resource utilization, β is the coefficient affecting the adjustment intensity, and the adjusted resource allocation data is obtained;
[0265] Integrate the adjusted resource allocation data and use the formula,
[0266]
[0267] Among them, O final Represents the incremental percentage of resource utilization efficiency after optimization, R adj,i Represents the configuration value of each resource after adjustment, and outputs the dynamic optimization plan for power construction resource configuration.
[0268] During a power construction process,
[0269] Assume there are three resource configurations, that is, n=3, and their respective efficiency values and costs are as follows:
[0270] Resource 1: e1=100, c1=50;
[0271] Resource 2: e2=80, c2=40;
[0272] Resource 3: e3=60, c3=30;
[0273] Set δ = 1.5, substitute it into the formula, and we get:
[0274]
[0275] T eff =2 1.5 +2 1.5+2 1.5
[0276] T eff =2.828+2.828+2.828=8.484
[0277] The value 8.484 represents the result of the overall efficiency evaluation, showing that the efficiency brought by each resource configuration is significant at a given cost. This high value indicates that the current resource configuration efficiency is already optimized.
[0278] Adjust resource configuration:
[0279] s i : The number of resources in the optimal configuration, assuming that the number before adjustment is s i =200, 150, 100;
[0280] Ψ: Overall adjustment factor for resource utilization, set to 450 (i.e., s1+s2+s3);
[0281] β: Adjust the strength coefficient, set to 0.7;
[0282] v i : Resource adjustment coefficient, set to v1 = 1.1, v2 = 1.2, v3 = 1.3;
[0283] Substituting into the formula, we get:
[0284]
[0285] R adj =0.444 0.7 ×1.1+0.333 0.7 ×1.2+0.222 0.7 ×1.3
[0286] R adj =0.566×1.1+0.463×1.2+0.349×1.3
[0287] R adj ≈0.6226+0.5556+0.4537=1.6319
[0288] The value 1.6319 represents the total of resource allocation after adjustment, showing the contribution of each resource allocation after adjustment. The adjustment results show that the reallocation of resources can make more effective use of existing resources and improve overall efficiency.
[0289] Output the final optimization solution:
[0290] From the above calculation, we can get: R adj =1.6319, we get:
[0291] Ofinal =exp(1.6319)-1
[0292] O final ≈5.114-1=4.114
[0293] The value 4.114 represents the final resource allocation optimization result, which is expressed as the increment of resource utilization efficiency after optimization. This result shows that the optimization measures can significantly improve resource utilization efficiency.
[0294] The above are only preferred embodiments of the present invention and are not intended to limit the present invention in other forms. Any technician familiar with the profession may use the technical contents disclosed above to change or modify them into equivalent embodiments with equivalent changes and apply them to other fields. However, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present invention without departing from the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.
Claims
1. A power construction resource optimization configuration system, characterized in that: The system comprises: The real-time data acquisition module captures working time, load, and energy efficiency monitoring data by connecting to construction equipment at the power construction site. It uses the Internet of Things technology to collect data from the sensor network, performs real-time data synchronization processing, and generates a real-time monitoring data set. The performance degradation prediction module uses the real-time monitoring data set to perform time series analysis, applies regression analysis to the construction equipment performance data, identifies trends and seasonal changes in the data, and predicts the performance degradation path and potential failure points of the equipment based on the identification results to obtain performance degradation prediction results; The cost-benefit analysis module evaluates and compares the input and expected output of different resource configurations based on the performance degradation prediction results, calculates and analyzes the cost-benefit ratio of all resource configurations using economic principles, and generates and outputs cost-benefit analysis records; The dynamic resource allocation module dynamically optimizes the power construction resource allocation according to the cost-benefit analysis records, applies the simulated annealing algorithm to perform a global search, adjusts and optimizes resource allocation based on the search results in combination with the genetic algorithm, achieves a balance between minimum cost and maximum efficiency, and obtains a dynamic optimization plan for power construction resource allocation.
2. The power construction resource optimization configuration system according to claim 1 is characterized in that: The real-time monitoring data set includes sensor data, power construction equipment synchronization status records and data quality indicators; the performance degradation prediction results include power construction equipment degradation paths, predicted fault points and power construction equipment performance evaluation results; the cost-benefit analysis records include scheme comparison results, cost analysis details and benefit evaluation indicators; the power construction resource configuration dynamic optimization scheme includes power construction resource allocation scheme and optimization strategy.
3. The power construction resource optimization configuration system according to claim 1, characterized in that: The execution steps of the real-time data synchronization process are: Through the Internet of Things technology, the construction equipment at the power construction site is connected to collect working timestamps, load volume and energy efficiency parameters from sensors, and the formula is used. Get a comprehensive data set, where s i,time Represents the working time data of the i-th device, s i,load Represents the load data of the ith device, s i,eff represents the energy efficiency data of the i-th device, D represents the weighted comprehensive data value collected and processed from the device sensors, and n represents the number of devices in the power construction; Time synchronization is performed on the comprehensive data set to ensure that all data have a consistent time reference, and data weights are adjusted and synchronized using formulas. Among them, D i represents the collected data of the i-th device, w i is the data weight, and the difference weight is assigned according to the importance of the device to obtain the synchronized data set S after weight adjustment.
4. The power construction resource optimization configuration system according to claim 3 is characterized in that: The steps for obtaining the real-time monitoring data set are: Extract key performance indicators from the synchronized data set, including average load factor and energy efficiency ratio, and calculate them using a weighted average method. Among them, l i represents the working time of the i-th device, p i represents the load data of the i-th device, e i represents the energy efficiency data of the i-th device, P represents the weighted average load rate, and E represents the weighted energy efficiency ratio, and the device performance data is obtained; Integrate the equipment performance data with real-time data, using the formula, Form a real-time monitoring data set, where P i represents the weighted average load rate of the ith device, E i represents the weighted energy efficiency ratio of the ith device, and M represents the comprehensive value of the integrated real-time monitoring data, reflecting the overall performance status of the device.
5. The power construction resource optimization configuration system according to claim 1 is characterized in that: The steps for identifying trends and seasonal changes are: The performance data of the construction equipment is extracted from the real-time monitoring data set, and normalized, using the formula, Among them, Data norm represents the normalized data, indicating the degree of dispersion of the data, n represents the number of power construction equipment, X i represents the performance data of the i-th device, μ represents the mean of all device data, and σ represents the standard deviation of all device performance data, and the normalized data set is obtained; The normalized performance data is constructed as a time series using the formula, Among them, k is the time window size, Data norm [ti] represents the normalized data at the tith moment, t represents time, MA t Represents the moving average of time t, outputting time series data; Perform trend and seasonality analysis on the time series data using the formula: Among them, Y t represents the predicted value of the model, t is the time variable, ω is the seasonal cycle, β0, β1, β2, β3 are all regression coefficients, ∈ t is the error term, identifying the trend and seasonal changes in the data and obtaining trend and seasonal analysis results.
6. The power construction resource optimization configuration system according to claim 5, characterized in that: The steps for obtaining the performance degradation prediction result are: Based on the trend and seasonality analysis results, a performance degradation path prediction model is constructed using the formula, Among them, γ0, γ1, γ2 represent model parameters, Y t is the trend forecast value, t represents time, Path t Representing the performance degradation path, generating the performance degradation path prediction result; Using the performance degradation path prediction result, the fault identification threshold θ is set, and the logical judgment formula is used: Faults={t∣Path t ≥θ} Generate potential failure points, where Path t represents the performance degradation path, θ represents the set fault identification threshold, Faults represents the identified fault point, and outputs the potential fault point analysis results; The potential failure point analysis results are integrated to obtain performance degradation prediction results, including all potential failure points and predicted performance degradation paths.
7. The power construction resource optimization configuration system according to claim 1, characterized in that: The steps for evaluating and comparing the input and expected output of the differential resource allocation are: According to the performance degradation prediction results, the amount and type of data of differential resource configuration are collected, and the formula is used: Among them, R data represents comprehensive resource data, r i represents the amount of the i-th resource, k i is the complexity index of resources, representing the complexity or technical level of resource configuration, and n represents the total number of resources, generating a comprehensive resource data set; Based on the comprehensive resource data set, the potential impact of each resource configuration on performance is calculated using the formula, Among them, I r Represents the total performance impact value, p i is the performance contribution coefficient of resource i, q i is the amount of resources, λ i It is a resource adjustment parameter, which is determined according to the efficiency loss of resources and external factors, and outputs the resource configuration impact data; Based on the resource allocation impact data, calculate the resource input to expected output ratio using the formula, Among them, O / IRatio represents the input-output ratio, which measures the economic benefits of resource allocation, c i Represents resource cost and generates resource input-output ratio dataset.
8. The power construction resource optimization configuration system according to claim 7 is characterized in that: The steps for obtaining the cost-benefit analysis record are: Integrate the resource input-output ratio data set and cost data, using the formula: Among them, ID stands for integrated data, O / IRatio i represents the input-output ratio of the i-th resource, c i represents the cost, h i is the resource persistence indicator, n represents the total number of resources, and the cost-benefit analysis data is obtained; Based on the cost-effectiveness analysis data, calculate the cost-effectiveness ratio of all resource allocations using the formula, Among them, b i is the benefit brought by the i-th resource, generating the cost-benefit ratio Ratio; According to the cost-effectiveness ratio Ratio, the mathematically processed cost-effectiveness ratio is converted into a percentage form, and a cost-effectiveness analysis record is output.
9. The power construction resource optimization configuration system according to claim 1, characterized in that: The steps of performing a global search are: Extract key data from the cost-benefit analysis record, including the costs and benefits of all resources, using the formula, Among them, K i represents the weighted resource benefit ratio, B i represents the benefit of the ith resource, C i is the cost of the i-th resource, r i is the risk factor of the resource, R max It is the largest risk factor among all resources, and exp represents the natural exponential function, which generates adjusted benefit ratio data; According to the adjusted benefit ratio data, the global search algorithm parameters are set using the formula: Among them, P represents the parameter of global search, α is the global impact factor used to adjust the search sensitivity, ∈ is a small positive number to prevent the denominator from being zero, which is used to ensure the stability of calculation, and γ is a weighted index used to enhance the influence of key resources; The global search algorithm parameters are applied, a simulated annealing algorithm is used to perform a global search, the goal is to minimize the cost and maximize the benefit, and the search results are output.
10. The power construction resource optimization configuration system according to claim 9, characterized in that: The steps for obtaining the dynamic optimization scheme for power construction resource configuration are as follows: According to the search results, the optimal configuration data is extracted, the cost and efficiency are evaluated, and the formula is used. Among them, T eff represents the total efficiency evaluation value, the cost-efficiency ratio after nonlinear adjustment, e i is the efficiency value of resource i under the optimal configuration, c i is the cost corresponding to resource i, n represents the total number of resources, and δ is a nonlinear adjustment index used to highlight the importance of high-efficiency resources and obtain the analysis results of efficiency and cost; According to the analysis results of the efficiency and cost, adjust the resource allocation to optimize the efficiency and cost, using the formula, Among them, s i is the number of resources in the optimal configuration, v i is the adjustment coefficient of resources, Ψ is the overall adjustment factor of resource utilization, β is the coefficient affecting the adjustment intensity, and the adjusted resource allocation data is obtained; Integrate the adjusted resource allocation data and use the formula, Among them, O final Represents the incremental percentage of resource utilization efficiency after optimization, R adj,i Represents the configuration value of each resource after adjustment, and outputs the dynamic optimization plan for power construction resource configuration.