Power plant equipment health management method and system based on digital twinning

Through digital twin technology, the health management of power plant equipment is solved, and the problems of incomplete data acquisition and inaccurate prediction in traditional methods are achieved, and more efficient data acquisition and more accurate prediction are achieved, ensuring the stable operation of power plant equipment and reducing operation and maintenance costs.

CN118966862APending Publication Date: 2024-11-15STATE GRID JIANGSU ELECTRIC POWER CO LTD NANTONG POWER SUPPLY BRANCH +3
View PDF 0 Cites 4 Cited by

Patent Information

Application Number
CN202410943515.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-15
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

Traditional power plant equipment health management methods have problems such as incomplete data collection and inaccurate prediction, which is difficult to meet the efficiency, accuracy and safety needs of modern power plants.

Method used

Adopt the power plant equipment health management method based on digital twins, and obtain basic equipment information by connecting the power plant equipment management system, combining digital twin technology to carry out three-dimensional simulation modeling, generate power plant equipment twin models, collect equipment operating parameters and environmental data in real time, and perform pre-pre- Suppose the equipment in the time period is simulated and run, trigger warning statistics and perform abnormal identification.

Benefits of technology

Improve the integrity of data acquisition and prediction accuracy, ensure the normal operation and reliability of power plant equipment, and reduce the failure rate and operation and maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118966862A_ABST
    Figure CN118966862A_ABST
Patent Text Reader

Abstract

The invention discloses a power plant equipment health management method based on digital twinning, and relates to the technical field of equipment management, and the method comprises the steps: connecting a power plant equipment management system, and obtaining power plant equipment information; carrying out three-dimensional simulation modeling by combining a digital twinning technology to generate a twinning model; equipment operation parameters are collected in real time, and an operation parameter set is obtained; collecting real-time environment data of the power plant; loading the equipment operation parameters and the real-time environment data to a twinborn model, and performing equipment simulation operation in a preset time period through the twinborn model; when the simulation operation parameter triggers the parameter early warning index, performing early warning triggering statistics to obtain the number of times of early warning triggering; and when the number of times of triggering early warning is greater than an early warning threshold value, performing abnormal identification on equipment corresponding to the number of times of triggering early warning, and performing operation management. According to the invention, the technical problems of incomplete data acquisition and inaccurate prediction in the prior art are solved, and the technical effects of improving the integrity of data acquisition and the accuracy of prediction are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of equipment management, and in particular to a power plant equipment health management method and system based on digital twins. Background Art

[0002] With the rapid development of the power industry, the operation and maintenance of power plant equipment has become increasingly important. However, with the continuous expansion of equipment scale and the complexity of process flow, power plant equipment health management faces increasing challenges. Traditional power plant equipment health management methods often have problems such as incomplete data collection and inaccurate predictions, which are difficult to meet the efficiency, accuracy and safety requirements of modern power plants. Summary of the invention

[0003] The present application provides a power plant equipment health management method and system based on digital twins, which are used to solve the technical problems of incomplete data collection and inaccurate prediction in the prior art.

[0004] In view of the above problems, the present application provides a power plant equipment health management method and system based on digital twins.

[0005] The first aspect of the present application provides a power plant equipment health management method based on digital twins, the method comprising:

[0006] Connect to the power plant equipment management system, query and obtain the basic equipment information of the target power plant, wherein the basic equipment information includes the equipment type and the number of equipment; combine the digital twin technology, perform three-dimensional simulation modeling of the target power plant in the visual simulation platform based on the basic equipment information, and generate a power plant equipment twin model; collect the equipment operating parameters of the target power plant in real time to obtain a set of power plant equipment operating parameters; collect and obtain the real-time environmental data of the target power plant, wherein the real-time environmental data at least includes temperature parameters, humidity parameters, wind parameters and weather parameters; load the power plant equipment operating parameters and the real-time environmental data into the power plant equipment twin model, and perform equipment simulation operation within a preset time period through the power plant equipment twin model; when the equipment simulation operation parameters trigger the preset parameter warning indicator, a trigger warning statistics is performed to obtain the number of equipment trigger warnings within the preset time period; when the number of equipment trigger warnings is greater than the preset warning threshold, the equipment corresponding to the number of equipment trigger warnings is abnormally marked, and the equipment operation management of the target power plant is performed based on the equipment abnormality identification result.

[0007] The second aspect of the present application provides a power plant equipment health management system based on digital twins, the system comprising:

[0008] An equipment basic information acquisition module, the equipment basic information acquisition module is connected to the power plant equipment management system, queries and obtains the equipment basic information of the target power plant, wherein the equipment basic information includes the equipment type and the number of equipment; a power plant equipment twin model construction module, the power plant equipment twin model construction module combines the digital twin technology, and based on the equipment basic information, performs three-dimensional simulation modeling of the target power plant in a visual simulation platform to generate a power plant equipment twin model; an equipment operation parameter acquisition module, the equipment operation parameter acquisition module performs real-time acquisition of the equipment operation parameters of the target power plant to obtain a set of power plant equipment operation parameters; a real-time environmental data acquisition module, the real-time environmental data acquisition module acquires and obtains real-time environmental data of the target power plant, wherein the real-time environmental data at least includes Including temperature parameters, humidity parameters, wind parameters and weather parameters; an equipment simulation operation module, which loads the power plant equipment operation parameters and the real-time environmental data into the power plant equipment twin model, and performs equipment simulation operation within a preset time period through the power plant equipment twin model; a trigger warning statistics module, when the equipment simulation operation parameters trigger the preset parameter warning index, the trigger warning statistics module performs a trigger warning statistics to obtain the number of equipment trigger warnings within the preset time period; an abnormal identification module, when the number of equipment trigger warnings is greater than the preset number of warning thresholds, the abnormal identification module performs abnormal identification on the equipment corresponding to the number of equipment trigger warnings, and performs equipment operation management of the target power plant based on the equipment abnormal identification results.

[0009] One or more technical solutions provided in this application have at least the following technical effects or advantages:

[0010] This application obtains power plant equipment information by connecting to the power plant equipment management system; combines digital twin technology to perform three-dimensional simulation modeling and generate a twin model; collects equipment operating parameters in real time to obtain an operating parameter set; collects real-time environmental data of the power plant; loads equipment operating parameters and real-time environmental data into the twin model, and simulates the operation of the equipment for a preset time period through the twin model; when the simulated operating parameters trigger the parameter warning index, trigger warning statistics are performed to obtain the number of trigger warnings; when the number of trigger warnings is greater than the warning threshold, the equipment corresponding to the number of trigger warnings is abnormally marked and operated and managed. The present invention solves the technical problems of incomplete data collection and inaccurate prediction in the prior art, and achieves the technical effect of improving the integrity of data collection and the accuracy of prediction. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0012] Figure 1 A schematic diagram of a process flow of a power plant equipment health management method based on digital twins provided in an embodiment of the present application;

[0013] Figure 2 A schematic diagram of a process for generating a power plant equipment twin model by performing three-dimensional simulation modeling of the target power plant in a visual simulation platform based on the basic information of the equipment in the power plant equipment health management method based on the digital twin provided in the embodiment of the present application;

[0014] Figure 3 A schematic diagram of the structure of a power plant equipment health management system based on digital twins provided in an embodiment of the present application.

[0015] Explanation of the accompanying drawings: equipment basic information acquisition module 11, power plant equipment twin model construction module 12, equipment operation parameter collection module 13, real-time environmental data collection module 14, equipment simulation operation module 15, trigger warning statistics module 16, abnormal identification module 17. DETAILED DESCRIPTION

[0016] The present application provides a power plant equipment health management method and system based on digital twins, which is used to solve the technical problems in the prior art that traditional power plant equipment health management methods often have incomplete data collection and inaccurate predictions, thereby achieving the technical effect of improving the integrity of data collection and the accuracy of predictions.

[0017] The technical solutions in the embodiments of the present application will be described clearly and completely below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0018] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or server that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or modules that are not clearly listed or inherent to these processes, methods, products or devices.

[0019] Embodiment 1

[0020] like Figure 1 As shown, the present application provides a power plant equipment health management method based on digital twins, the method comprising:

[0021] Step S100: connecting to the power plant equipment management system, querying and acquiring basic equipment information of the target power plant, wherein the basic equipment information includes equipment type and equipment quantity;

[0022] In an embodiment of the present application, it is first necessary to establish a connection with the equipment management system of the target power plant, usually by communicating with the technical department of the power plant, obtaining the necessary access rights and interface information, and establishing a communication channel with the equipment management system through a suitable network connection. After establishing a connection with the equipment management system, the basic equipment information of the target power plant can be queried. This information includes equipment type, equipment quantity, equipment configuration, installation location, operating status, etc. Equipment type refers to the type, model or classification of equipment, such as generators, boilers, transformers, etc. The number of equipment refers to the number of each type of equipment in the power plant, such as the number of generator sets, the number of boilers, etc.

[0023] Step S200: combining digital twin technology, performing three-dimensional simulation modeling of the target power plant in a visual simulation platform based on the basic information of the equipment, and generating a twin model of the power plant equipment;

[0024] In the embodiment of the present application, building a digital twin model requires not only basic equipment information of the target power plant, but also physical model data, sensor data, etc. of the equipment. Physical model data can be collected through on-site surveying and mapping, and sensor data mainly refers to various parameters during the operation of the equipment, such as temperature, pressure, current, etc. These data can be collected by installing sensors or through existing sensor interfaces.

[0025] Through the collected equipment data, digital twin technology and visual simulation platform are used to perform three-dimensional simulation modeling of the target power plant. According to the type and quantity of equipment, the corresponding virtual model is constructed, and it is ensured to be consistent with the actual size, shape, structure, etc. In the three-dimensional model, various properties of the equipment need to be set, such as the operating status, temperature, pressure, etc. of the equipment. At the same time, the virtual model needs to be associated with the actual equipment to ensure data interaction and status feedback between the two.

[0026] In order to simulate the actual operating environment of the equipment, it is necessary to add corresponding backgrounds and scenes to the 3D model, such as boiler flames, turbine steam, etc. At the same time, it is also necessary to simulate the operation process and operation flow of the equipment, such as start, stop, normal operation, etc.

[0027] Through the above steps, the power plant equipment twin model of the target power plant can be generated. During the model generation process, continuous optimization and adjustment are required to ensure that the digital twin model can accurately reflect the status and performance of the actual equipment.

[0028] Step S300: collecting the equipment operating parameters of the target power plant in real time to obtain a set of equipment operating parameters of the power plant;

[0029] In the embodiments of the present application, before collecting the equipment operation parameters, it is necessary to clarify the specific parameters to be collected, which include temperature, pressure, vibration, current, etc., depending on the type of equipment and operating requirements. According to the characteristics and accessibility of the equipment, select a suitable collection method. For example, for some accessible equipment, real-time data collection is performed through a sensor interface or a data acquisition card. For equipment that cannot be directly accessed, data collection is performed through a wireless sensor network or a remote detection system.

[0030] According to the selected collection method and determined collection parameters, configure the corresponding data collection equipment. This includes selecting appropriate sensors, data collection cards or wireless sensor network devices. Through the configured collection equipment, the equipment operating parameters of the target power plant are collected in real time.

[0031] Step S400: collecting and acquiring real-time environmental data of the target power plant, wherein the real-time environmental data at least includes temperature parameters, humidity parameters, wind parameters and weather parameters;

[0032] In an embodiment of the present application, before collecting real-time environmental data, it is necessary to clarify the type of environmental data to be collected. According to the power plant equipment and operating requirements, at least temperature parameters, humidity parameters, wind parameters and weather parameters need to be included. These parameters may directly or indirectly affect the operating status and performance of the equipment. According to the characteristics and accessibility of the environmental data, select a suitable collection method. For parameters such as temperature and humidity, temperature sensors, humidity sensors and other devices can be used for real-time data collection. For wind parameters and weather parameters, a meteorological station or related sensors can be used for data collection.

[0033] According to the selected collection method and determined collection parameters, configure the corresponding data collection equipment. This includes selecting appropriate sensors, data acquisition cards or wireless sensor network devices. Through the configured collection equipment, the real-time environmental data of the target power plant is collected.

[0034] Step S500: loading the power plant equipment operating parameters and the real-time environmental data into the power plant equipment twin model, and performing equipment simulation operation within a preset time period through the power plant equipment twin model;

[0035] In the embodiment of the present application, by establishing a data interface, the collected power plant equipment operating parameters and real-time environmental data are loaded into the power plant equipment twin model. After the data is loaded, the power plant equipment twin model is used to simulate the equipment within a preset time period. This includes simulating the start-up, normal operation, and stop states of the equipment, as well as the performance of the equipment under different working conditions. Through the simulated operation, the data and performance of the equipment in various states can be obtained.

[0036] Perform necessary analysis and processing on the generated data, such as data cleaning, feature extraction, anomaly detection, etc., to extract information related to equipment health management.

[0037] Step S600: When the equipment simulation operation parameters trigger the preset parameter warning indicator, a trigger warning statistics is performed to obtain the number of equipment trigger warnings within the preset time period;

[0038] In an embodiment of the present application, before performing a simulated operation of the device, corresponding early warning indicators need to be set. These indicators include thresholds of device operating parameters, abnormal ranges, etc., which are used to determine whether the device is in an abnormal state. The setting of early warning indicators should be determined based on the operating characteristics, historical data, and actual needs of the device. During the simulated operation of the device, if the simulated operation parameters exceed the preset early warning indicators, an early warning statistic is triggered. The specific parameters, time, early warning level, and other information that trigger the early warning are recorded and saved in the corresponding database or log file.

[0039] By analyzing the statistical results of triggering warnings, you can understand the abnormal conditions of the equipment within the preset time period. By counting the number of triggers of different parameters, the trigger frequency in different time periods, etc., you can find potential problems or failure trends of the equipment. Based on the statistical results of triggering warnings, calculate the number of times the equipment triggers warnings within the preset time period. This can be achieved through simple counting or frequency calculation based on time periods. For example, if the preset time period is one day, then the number of triggering warnings is the number of warnings triggered in one day.

[0040] Step S700: When the number of times the equipment triggers an early warning is greater than a preset number of early warning thresholds, the equipment corresponding to the number of times the equipment triggers an early warning is marked as abnormal, and equipment operation management of the target power plant is performed based on the equipment abnormality marking result.

[0041] In the embodiment of the present application, when the number of times a device triggers an early warning exceeds a preset early warning threshold, the corresponding device is marked as abnormal. This step is achieved by setting an abnormal status flag in the device twin model, adding an abnormal label in the device list, etc. The abnormal identification can intuitively indicate the abnormal status of the device and provide a reference for subsequent device operation management.

[0042] Based on the equipment abnormality identification results, the equipment operation management of the target power plant is carried out. This mainly includes determining the priority processing order of the equipment according to the severity of the equipment abnormality and the scope of impact. For equipment with a greater impact and a higher probability of failure, inspection and maintenance are given priority to ensure the safe and stable operation of the power plant. According to the abnormality identification results of the equipment, a corresponding maintenance plan is formulated. For equipment that requires emergency treatment, emergency maintenance can be arranged; for equipment with a smaller impact and can be handled later, a corresponding maintenance plan can be formulated and maintenance can be carried out at the appropriate time.

[0043] Through the above measures, the equipment operation management of the target power plant is carried out based on the equipment abnormality identification results, which can ensure the normal operation and reliability of the power plant equipment and reduce the failure rate and operation and maintenance costs.

[0044] Further, such as Figure 2 As shown, step S200 in the method provided in the application embodiment also includes:

[0045] Taking the equipment type in the equipment basic information as a search condition, information query is performed in the power plant equipment management system to obtain equipment basic parameters corresponding to the equipment type, wherein the equipment basic parameters at least include specification parameters, structural parameters and equipment connection relationships;

[0046] Selecting a first device from the device types, and obtaining first specification parameters and first structural parameters of the first device;

[0047] In combination with the digital twin technology, simulation modeling is performed on the first device in a visual simulation platform based on the first specification parameter and the first structural parameter to obtain a first device twin model of the first device;

[0048] A power plant equipment twin model of the target power plant is built based on the first equipment twin model.

[0049] In an embodiment of the present application, by using the equipment type in the equipment basic information as a search condition, an information query is performed in the power plant equipment management system to obtain the basic equipment parameters corresponding to the equipment type. Specifically, the basic equipment parameters include at least specification parameters, structural parameters, and equipment connection relationships. Specification parameters are parameters that describe the physical characteristics of the equipment, such as size, weight, and performance. By querying the power plant equipment management system, the specific specification parameters of the equipment can be obtained, such as the length, width, and height of the equipment, the power, voltage, and current of the equipment. Structural parameters are parameters that describe the internal structure and components of the equipment. By querying the power plant equipment management system, the structural parameters of the equipment can be obtained, such as the components of the equipment, the materials of the components, the connection methods of the components, etc. The equipment connection relationship refers to the way and relationship between the devices. By querying the power plant equipment management system, the connection relationship between the devices can be obtained, such as the power connection, signal connection, and control connection of the equipment.

[0050] When selecting the first equipment, it is necessary to clearly define the type of equipment to be selected and select the appropriate type of equipment according to the actual needs of the power plant and the characteristics of the equipment. Select the first equipment based on the actual needs and factors such as the performance and scope of application of the equipment. Ensure that the selected equipment meets the operation needs and safety requirements of the power plant. After selecting the first equipment, the specification parameters and structural parameters of the equipment can be obtained through the power plant equipment management system. These parameters include information such as the size, weight, performance parameters, internal structure, and component composition of the equipment.

[0051] The acquired specification parameters and structural parameters of the first device are imported into the visual simulation platform. In the visual simulation platform, a digital twin model of the device is established based on the specification parameters and structural parameters of the first device, so as to obtain a first device twin model of the first device.

[0052] Finally, the twin model of the first device is used as a basis to expand to the device twin model of the entire target power plant. By integrating and combining the twin models of multiple devices, the device twin model of the entire power plant can be constructed.

[0053] Furthermore, the method further comprises:

[0054] Calling the equipment layout planning diagram of the target power plant, and obtaining the equipment location coordinates based on the equipment layout planning diagram;

[0055] Obtaining multiple device twin models based on the first device twin model;

[0056] The multiple equipment twin models are fused and constructed according to the equipment connection relationship and the equipment location coordinates to obtain the power plant equipment twin model.

[0057] In an embodiment of the present application, it is first necessary to call the equipment layout planning map of the target power plant. This planning map contains the layout and location information of each device in the power plant. By calling this planning map, the specific location coordinates of the equipment can be obtained. After calling the equipment layout planning map, the specific location coordinates of each device can be extracted according to the information in the planning map. These coordinates can be used for subsequent equipment twin model construction and fusion.

[0058] Then, according to the actual needs of the target power plant, multiple equipment twin models are expanded based on the first equipment twin model. After obtaining multiple equipment twin models, they are integrated and built according to the connection relationship and position coordinates of the equipment. This process needs to consider factors such as the interconnection method and position relationship of the equipment to ensure the coordination and consistency between the twin models of each device. Through the integrated construction, a complete power plant equipment twin model is obtained. It should be noted that during the integrated construction process, the accuracy and completeness of the twin models of each device need to be ensured. At the same time, it is also necessary to adjust and optimize according to actual needs and the operation of the power plant to ensure the practicality and effectiveness of the power plant equipment twin model.

[0059] Furthermore, step S600 in the method provided in the application embodiment also includes:

[0060] Retrieve multiple historical equipment failure events based on power big data;

[0061] Performing source tracing analysis on the multiple historical equipment failure events based on the accident tree principle to obtain multiple failure factor sets, wherein the failure factor sets correspond to the historical equipment failure events one by one;

[0062] Clustering the multiple historical equipment failure events to obtain multiple equipment failure types;

[0063] Selecting a first device failure type from the multiple device failure types, and obtaining multiple first failure factor sets corresponding to the first device failure type;

[0064] A device-warning indicator matching table is constructed based on the first device failure type and the plurality of first failure factor sets, and trigger warning statistics are performed based on the device-warning indicator matching table.

[0065] In the embodiment of the present application, the power big data platform is used to retrieve the data of historical equipment failure events. These data include information such as equipment model, failure time, failure type, and failure cause. By collecting and analyzing these data, basic data can be provided for subsequent source tracing analysis and fault warning.

[0066] Through the principle of accident tree, historical equipment failure events are traced and analyzed to find the failure factors that cause the failure. These failure factors include problems with the equipment itself, problems with the operating environment, problems with human operation, etc. By analyzing these failure factors, multiple failure factor sets can be obtained, each of which corresponds to a historical equipment failure event.

[0067] By clustering historical equipment failure events, we can classify them into different types based on the similarities and differences of the failures. In this way, similar failures can be grouped into one category, and multiple equipment failure types can be obtained to facilitate subsequent analysis and early warning.

[0068] After obtaining multiple equipment failure types, one equipment failure type is selected as the focus of research according to actual needs and importance. This is referred to as the first equipment failure type. For the selected first equipment failure type, multiple first failure factor sets related to the type are found by querying relevant historical data.

[0069] According to the first device fault type and the first fault factor set, a device-early warning indicator matching table is constructed. This table includes information such as the device model, fault type, and early warning indicator. Through this table, you can understand which devices and which factors are related. Finally, according to the device-early warning indicator matching table, the operating status of each device can be monitored and early warning statistics can be performed. That is, when the operating status of the device reaches a certain early warning indicator, the corresponding early warning can be triggered. In this way, potential problems of the device can be discovered in time and the occurrence of equipment failures can be reduced.

[0070] Furthermore, the method further comprises:

[0071] Performing fault factor frequency statistics on the first fault factor set in sequence, and arranging the fault factors from large to small according to the frequency, to generate a first fault factor sequence;

[0072] Extracting the first N fault factors in the first fault factor sequence as first frequent correlation factors of the first device fault type, and identifying the first frequent correlation factors as first early warning indicators, where N is an integer greater than 2;

[0073] The device-early warning indicator matching table is constructed by taking the first device fault type as a child node and the first early warning indicator as a leaf node of the child node.

[0074] In the embodiment of the present application, the frequency of occurrence of each fault factor in the first fault factor set is counted by traversing the historical equipment failure event data and counting the number of occurrences of each fault factor. According to the result of the frequency statistics, the fault factors are sorted from large to small according to the frequency. The sorted fault factor sequence can clearly show which fault factors are the most common and important in equipment failures. This sequence is called the first fault factor sequence.

[0075] Select the first N fault factors from the first fault factor sequence, and refer to these selected fault factors as first frequent correlation factors. These correlation factors are the factors that are most relevant to the first equipment fault type and have the highest frequency of occurrence. When selecting fault factors, at least three fault factors should be selected as first frequent correlation factors. The selected first frequent correlation factors are identified as first warning indicators, which are key parameters for monitoring and warning equipment status.

[0076] When constructing the equipment-warning indicator matching table, the first equipment fault type is used as a child node, and its corresponding first warning indicator is used as the leaf node of the child node. The matching table constructed in this way can clearly show the relationship between different equipment fault types and their corresponding warning indicators. Through this matching table, the key warning indicators corresponding to a specific equipment fault type can be quickly located, thereby realizing accurate monitoring and warning of the equipment status.

[0077] Furthermore, the method further comprises:

[0078] Input the equipment type of the target power plant into the equipment-early warning indicator matching table for matching, and establish a mapping association between the power plant equipment and the early warning indicator;

[0079] The equipment simulation operation parameters are judged based on the mapping association, and when the equipment simulation operation parameters meet the corresponding warning indicators, a trigger warning statistics is performed.

[0080] In an embodiment of the present application, the equipment type of the target power plant is first matched with the equipment type in the equipment-early warning indicator matching table. By comparing the equipment type of the target power plant with the equipment type in the matching table, it is determined which equipment has a mapping association with the early warning indicator. After finding the early warning indicator that matches the equipment type of the target power plant, a mapping association between the power plant equipment and the early warning indicator is established. This association can record the early warning indicators corresponding to each device, as well as the specific meanings and triggering conditions of these indicators.

[0081] The simulated operation parameters of the equipment in the target power plant are judged by extracting the real-time operation data of the equipment and comparing it with the early warning indicators. If the simulated operation parameters of the equipment meet the corresponding early warning indicator conditions, it means that the equipment may have potential problems or failure risks. When the simulated operation parameters of the equipment meet the corresponding early warning indicators, a trigger early warning statistics is performed.

[0082] In summary, the embodiments of the present application have at least the following technical effects:

[0083] This application obtains power plant equipment information by connecting to the power plant equipment management system; combines digital twin technology to perform three-dimensional simulation modeling and generate a twin model; collects equipment operating parameters in real time to obtain an operating parameter set; collects real-time environmental data of the power plant; loads equipment operating parameters and real-time environmental data into the twin model, and simulates the operation of the equipment for a preset time period through the twin model; when the simulated operating parameters trigger the parameter warning index, trigger warning statistics are performed to obtain the number of trigger warnings; when the number of trigger warnings is greater than the warning threshold, the equipment corresponding to the number of trigger warnings is abnormally marked and operated and managed. The present invention solves the technical problems of incomplete data collection and inaccurate prediction in the prior art, and achieves the technical effect of improving the integrity of data collection and the accuracy of prediction.

[0084] Embodiment 2

[0085] Based on the same inventive concept as the power plant equipment health management method based on digital twin in the aforementioned embodiment, Figure 3 As shown, the present application provides a power plant equipment health management system based on digital twins, and the system and method embodiments in the present application embodiments are based on the same inventive concept. The system includes:

[0086] The basic equipment information acquisition module 11 is connected to the power plant equipment management system to query and acquire the basic equipment information of the target power plant, wherein the basic equipment information includes equipment type and equipment quantity;

[0087] A power plant equipment twin model construction module 12, wherein the power plant equipment twin model construction module 12 combines digital twin technology, performs three-dimensional simulation modeling of the target power plant in a visual simulation platform based on the basic information of the equipment, and generates a power plant equipment twin model;

[0088] An equipment operation parameter acquisition module 13, wherein the equipment operation parameter acquisition module 13 acquires the equipment operation parameters of the target power plant in real time to obtain a set of power plant equipment operation parameters;

[0089] A real-time environment data acquisition module 14, wherein the real-time environment data acquisition module 14 collects and obtains real-time environment data of the target power plant, wherein the real-time environment data at least includes temperature parameters, humidity parameters, wind parameters and weather parameters;

[0090] An equipment simulation operation module 15, wherein the equipment simulation operation module 15 loads the power plant equipment operation parameters and the real-time environmental data into the power plant equipment twin model, and performs equipment simulation operation within a preset time period through the power plant equipment twin model;

[0091] The trigger warning statistics module 16 performs a trigger warning statistics when the equipment simulation operation parameters trigger the preset parameter warning index, and obtains the number of equipment trigger warnings within the preset time period;

[0092] The abnormal identification module 17, when the number of times the equipment triggers an early warning is greater than a preset number of early warning thresholds, the abnormal identification module 17 will mark the equipment corresponding to the number of times the equipment triggers an early warning as abnormal, and perform equipment operation management of the target power plant based on the equipment abnormal identification result.

[0093] Furthermore, the system also includes:

[0094] Taking the equipment type in the equipment basic information as a search condition, information query is performed in the power plant equipment management system to obtain equipment basic parameters corresponding to the equipment type, wherein the equipment basic parameters at least include specification parameters, structural parameters and equipment connection relationships;

[0095] Selecting a first device from the device types, and obtaining first specification parameters and first structural parameters of the first device;

[0096] In combination with the digital twin technology, simulation modeling is performed on the first device in a visual simulation platform based on the first specification parameter and the first structural parameter to obtain a first device twin model of the first device;

[0097] A power plant equipment twin model of the target power plant is built based on the first equipment twin model.

[0098] Furthermore, the system also includes:

[0099] Calling the equipment layout planning diagram of the target power plant, and obtaining the equipment location coordinates based on the equipment layout planning diagram;

[0100] Obtaining multiple device twin models based on the first device twin model;

[0101] The multiple equipment twin models are fused and constructed according to the equipment connection relationship and the equipment location coordinates to obtain the power plant equipment twin model.

[0102] Furthermore, the system also includes:

[0103] Retrieve multiple historical equipment failure events based on power big data;

[0104] Performing source tracing analysis on the multiple historical equipment failure events based on the accident tree principle to obtain multiple failure factor sets, wherein the failure factor sets correspond to the historical equipment failure events one by one;

[0105] Clustering the multiple historical equipment failure events to obtain multiple equipment failure types;

[0106] Selecting a first device failure type from the multiple device failure types, and obtaining multiple first failure factor sets corresponding to the first device failure type;

[0107] A device-warning indicator matching table is constructed based on the first device failure type and the plurality of first failure factor sets, and trigger warning statistics are performed based on the device-warning indicator matching table.

[0108] Furthermore, the system also includes:

[0109] Performing fault factor frequency statistics on the first fault factor set in sequence, and arranging the fault factors from large to small according to the frequency, to generate a first fault factor sequence;

[0110] Extracting the first N fault factors in the first fault factor sequence as first frequent correlation factors of the first device fault type, and identifying the first frequent correlation factors as first early warning indicators, where N is an integer greater than 2;

[0111] The device-early warning indicator matching table is constructed by taking the first device fault type as a child node and the first early warning indicator as a leaf node of the child node.

[0112] Furthermore, the system also includes:

[0113] Input the equipment type of the target power plant into the equipment-early warning indicator matching table for matching, and establish a mapping association between the power plant equipment and the early warning indicator;

[0114] The equipment simulation operation parameters are judged based on the mapping association, and when the equipment simulation operation parameters meet the corresponding warning indicators, a trigger warning statistics is performed.

[0115] It should be noted that the above-mentioned sequence of the embodiments of the present application is only for description and does not represent the advantages and disadvantages of the embodiments. And the above-mentioned specific embodiments of this specification are described. Other embodiments are within the scope of the attached claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the embodiments and still achieve the desired results. In addition, the processes depicted in the drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0116] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the protection scope of the present application.

[0117] This specification and drawings are merely exemplary illustrations of the present application and are deemed to cover any and all modifications, variations, combinations or equivalents within the scope of the present application. Obviously, a person skilled in the art may make various modifications and variations to the present application without departing from the scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the present application and its equivalents, the present application intends to include these modifications and variations.

Claims

1. A power plant equipment health management method based on digital twins, characterized in that: The method comprises: Connect to the power plant equipment management system to query and obtain basic equipment information of the target power plant, where the basic equipment information includes equipment type and equipment quantity; In combination with digital twin technology, three-dimensional simulation modeling of the target power plant is performed in a visual simulation platform based on the basic information of the equipment to generate a twin model of the power plant equipment; Collecting the equipment operating parameters of the target power plant in real time to obtain a set of equipment operating parameters of the power plant; Collecting and acquiring real-time environmental data of the target power plant, wherein the real-time environmental data at least includes temperature parameters, humidity parameters, wind parameters and weather parameters; Loading the power plant equipment operating parameters and the real-time environmental data into the power plant equipment twin model, and performing equipment simulation operation within a preset time period through the power plant equipment twin model; When the equipment simulation operation parameters trigger the preset parameter warning indicators, a trigger warning statistics is performed to obtain the number of equipment trigger warnings within the preset time period; When the number of times the equipment triggers an early warning is greater than a preset number of early warning thresholds, the equipment corresponding to the number of times the equipment triggers an early warning is marked as abnormal, and the equipment operation management of the target power plant is performed based on the equipment abnormality marking result.

2. The method according to claim 1, characterized in that The method further comprises: performing three-dimensional simulation modeling of the target power plant in a visual simulation platform based on the basic equipment information to generate a twin model of the power plant equipment; Taking the equipment type in the equipment basic information as a search condition, information query is performed in the power plant equipment management system to obtain equipment basic parameters corresponding to the equipment type, wherein the equipment basic parameters at least include specification parameters, structural parameters and equipment connection relationships; Selecting a first device from the device types, and obtaining first specification parameters and first structural parameters of the first device; In combination with the digital twin technology, simulation modeling is performed on the first device in a visual simulation platform based on the first specification parameter and the first structural parameter to obtain a first device twin model of the first device; A power plant equipment twin model of the target power plant is built based on the first equipment twin model.

3. The method according to claim 2, characterized in that The step of building the power plant equipment twin model of the target power plant based on the first equipment twin model further includes: Calling the equipment layout planning diagram of the target power plant, and obtaining the equipment location coordinates based on the equipment layout planning diagram; Obtaining multiple device twin models based on the first device twin model; The multiple equipment twin models are fused and constructed according to the equipment connection relationship and the equipment location coordinates to obtain the power plant equipment twin model.

4. The method according to claim 1, characterized in that When the equipment simulation operation parameters trigger the preset parameter warning indicators, a trigger warning statistics is performed, which also includes: Retrieve multiple historical equipment failure events based on power big data; Performing source tracing analysis on the multiple historical equipment failure events based on the accident tree principle to obtain multiple failure factor sets, wherein the failure factor sets correspond to the historical equipment failure events one by one; Clustering the multiple historical equipment failure events to obtain multiple equipment failure types; Selecting a first device failure type from the multiple device failure types, and obtaining multiple first failure factor sets corresponding to the first device failure type; A device-warning indicator matching table is constructed based on the first device failure type and the plurality of first failure factor sets, and trigger warning statistics are performed based on the device-warning indicator matching table.

5. The method according to claim 4, characterized in that The constructing of a device-early warning indicator matching table based on the first device fault type and the plurality of first fault factor sets further includes: Performing fault factor frequency statistics on the first fault factor set in sequence, and arranging the fault factors from large to small according to the frequency, to generate a first fault factor sequence; Extracting the first N fault factors in the first fault factor sequence as first frequent correlation factors of the first device fault type, and identifying the first frequent correlation factors as first early warning indicators, where N is an integer greater than 2; The device-early warning indicator matching table is constructed by taking the first device fault type as a child node and the first early warning indicator as a leaf node of the child node.

6. The method according to claim 4, characterized in that The triggering warning statistics based on the equipment-warning indicator matching table also includes: Input the equipment type of the target power plant into the equipment-early warning indicator matching table for matching, and establish a mapping association between the power plant equipment and the early warning indicator; The equipment simulation operation parameters are judged based on the mapping association, and when the equipment simulation operation parameters meet the corresponding warning indicators, a trigger warning statistics is performed.

7. The power plant equipment health management system based on digital twin is characterized by: The system comprises: A basic equipment information acquisition module, which is connected to the power plant equipment management system to query and acquire basic equipment information of the target power plant, wherein the basic equipment information includes equipment type and equipment quantity; A power plant equipment twin model construction module, wherein the power plant equipment twin model construction module combines digital twin technology, performs three-dimensional simulation modeling of the target power plant in a visual simulation platform based on the basic information of the equipment, and generates a power plant equipment twin model; An equipment operation parameter acquisition module, wherein the equipment operation parameter acquisition module acquires the equipment operation parameters of the target power plant in real time to obtain a set of power plant equipment operation parameters; A real-time environmental data acquisition module, wherein the real-time environmental data acquisition module collects and obtains real-time environmental data of the target power plant, wherein the real-time environmental data at least includes temperature parameters, humidity parameters, wind parameters and weather parameters; An equipment simulation operation module, which loads the power plant equipment operation parameters and the real-time environmental data into the power plant equipment twin model, and performs equipment simulation operation within a preset time period through the power plant equipment twin model; A trigger warning statistics module, wherein when the equipment simulation operation parameters trigger the preset parameter warning index, the trigger warning statistics module performs a trigger warning statistics to obtain the number of equipment trigger warnings within the preset time period; The abnormal identification module, when the number of times the equipment triggers an early warning is greater than a preset number of early warning thresholds, marks the equipment corresponding to the number of times the equipment triggers an early warning as abnormal, and performs equipment operation management of the target power plant based on the equipment abnormal identification results.

Citation Information

Cited By

  • Environment data processing method and device based on digital twinning and storage medium

    CN119645151A

  • Photovoltaic power station remote monitoring method and system based on three-dimensional digital twinning technology

    CN120710211A

  • Photovoltaic power station remote monitoring method and system based on three-dimensional digital twinning technology

    CN120710211B

  • Asset equipment early warning management method, device and system based on digital twin model, equipment and medium

    CN121639106A