Multi-strategy collaborative regional power grid rapid and safe correction method and system

Through the rapid safety correction method of regional power grids with multi-strategy collaboration, effective equipment and sections are identified and multi-stage optimization models are built, which solves the problem of insufficient computing performance in the traditional power system scheduling mode, and realizes the stability of power supply and new energy consumption. maximization.

CN118970969AActive Publication Date: 2024-11-15NARI NANJING CONTROL SYSTEM CO LTD +2
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202410835651.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-26
Publication Date
2024-11-15
Estimated Expiration
2044-06-26

AI Technical Summary

Technical Problem

When facing the complex characteristics of Fengguang new energy and the power spot market, the traditional power system scheduling model cannot effectively solve the calculation performance problem of regional power grid safety correction, resulting in a significant increase in solution difficulty and cannot meet the stability of power supply and new energy. Consumption needs.

Method used

Using a multi-strategy collaborative regional power grid rapid safety correction method, by obtaining boundary data from regional and provincial power grids, identifying effective equipment and sections, and building a multi-stage optimization model, including unit output, unit start and stop, inter-provincial outlets and out-of-regional DC The plan is to adopt the safety constraint economic scheduling algorithm and the unit combination algorithm to gradually optimize the decision variables, reduce the calculation period and constraint dimensions, and improve the solution efficiency.

Benefits of technology

It realizes rapid safety correction of regional power grids in the power spot market environment, ensures the stability of power supply and the maximum consumption of new energy, improves computing efficiency and optimization space, and ensures the safe operation of the power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118970969A_ABST
    Figure CN118970969A_ABST
Patent Text Reader

Abstract

The invention discloses a multi-strategy collaborative regional power grid rapid safety correction method and system. The method comprises the steps of obtaining a power grid range and a calculation period for carrying out regional power grid safety correction; safety check calculation is carried out, and the load flow out-of-limit condition is analyzed; determining a provincial power grid participating in safety correction, and identifying effective constraints; a safety correction model considering unit output adjustment is constructed, and unit output is optimized and adjusted; if the out-of-limit still exists, a time period merging safety correction model considering unit output-start-stop-inter-province port-out-of-region direct current adjustment is constructed, and the start-stop state of the unit is determined; assigning the start-stop state of the unit subjected to time frame merging to the whole time frame and fixing, constructing a whole-time-frame safety correction model of unit output-inter-province port-out-of-region direct current adjustment, and eliminating power flow out-of-limit; and carrying out safety check and safety correction iterative calculation to obtain a correction result meeting the safety of the regional power grid. According to the invention, technical guarantee is provided for guaranteeing supply and promoting consumption of the regional power grid in the electric power spot market environment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of power system dispatching automation, and in particular relates to a multi-strategy coordinated regional power grid rapid safety correction method and system. Background Art

[0002] Under the traditional three-public dispatching mode, each provincial power grid is responsible for compiling its own day-ahead and day-intraday power generation plan, reporting seven types of data to the regional power grid, and the regional power grid conducts a safety check of the entire network based on the provincial boundary data. When there are equipment exceeding the limit in the regional power grid, further safety correction of the regional power grid is carried out. Because the start and stop status of the unit is fixed in advance under the traditional three-public dispatching mode, the inter-provincial ports and the inter-regional interconnection lines are planned as fixed parameters. Therefore, the traditional safety correction model only adjusts the unit output, and the mathematical model type is a safety-constrained economic dispatching model, which is easy to solve and has a fast calculation speed.

[0003] With the rapid advancement of the construction of new power systems and power spot markets, the proportion of wind and solar energy and flexible regulation resources has gradually increased, showing the characteristics of diversified market entities, diversified trading varieties, massive regulation resources, global decision-making scope, and complex application scenarios. It puts forward higher requirements for efficient solution of clearing algorithms, safe and stable power supply, and maximum consumption of new energy, and the complexity and importance of regional power grid safety correction have been comprehensively improved. The regulation resources for regional power grid safety correction have been transformed from traditional unit output to unit output, unit start and stop, inter-provincial exchange roads, and out-of-region DC plans. The type of mathematical model has been transformed from traditional safety-constrained economic dispatch to consider multi-dimensional, multi-trading varieties, and complex operation modes of safety-constrained unit combination and economic dispatch. The variables and constraints to be solved have increased from hundreds of thousands to more than one million, and the difficulty of solving has been greatly increased, and the computing performance cannot be guaranteed. Summary of the invention

[0004] Purpose of the invention: The purpose of the present invention is to provide a strategy-coordinated regional power grid rapid safety correction method and system, which, on the one hand, provides technical support for regional power grid supply guarantee and consumption promotion in the power spot market environment, and on the other hand, solves the defect that the computing performance of the existing technology cannot meet the practical requirements of regional power grid safety correction.

[0005] Technical solution: A multi-strategy coordinated regional power grid rapid safety correction method of the present invention includes:

[0006] Obtain boundary data and calculation cycles for regional power grid security correction from regional and provincial power grid D5000 or new generation control systems, and generate regional power grid security correction calculation scenarios;

[0007] Based on the safety correction calculation scenario of the regional power grid, the regional power grid safety verification calculation is carried out to analyze the power flow exceeding the limit of each provincial power grid in the regional power grid;

[0008] If there are devices / sections exceeding the limit in the regional power grid, the effective devices / sections for regional power grid safety correction are identified based on the power flow results of the devices / sections; and the provincial power grids participating in the regional power grid safety correction are determined based on the effective devices / sections, so as to narrow the adjustment scope of safety correction and improve the calculation efficiency of safety correction in subsequent steps;

[0009] Construct a regional power grid security correction model with the unit output of the provincial power grid participating in the regional power grid security correction as the decision variable, and based on the security correction model taking into account the unit output adjustment, use the security constraint economic dispatch algorithm to adjust the unit output of the provincial power grid participating in the regional power grid security correction to eliminate the equipment / section power flow exceeding the limit;

[0010] If the safety correction model taking into account the adjustment of unit output cannot eliminate the equipment / section over-limit, then a period-merged safety correction model of the regional power grid is constructed with unit output, unit start-stop, inter-provincial port plan, and extra-regional interconnection line plan as decision variables. Based on the period-merged safety correction model, the safety-constrained unit combination algorithm is used to adjust each decision variable in turn and calculate the start-stop status of the unit.

[0011] Based on the unit start-stop status calculated by the period-merged safety correction model that takes into account unit output-start-stop-inter-provincial connection-external DC adjustment, a full-time safety correction model for the regional power grid is established. Based on the full-time safety correction model, a safety-constrained economic dispatch algorithm is used to optimize unit output, inter-provincial connection plan and external interconnection line plan in turn to eliminate equipment / section power flow over-limit.

[0012] Based on the calculation results of the full-time safety correction model taking into account the unit output-inter-provincial interface-out-of-region DC adjustment, the regional power grid safety verification calculation is carried out to analyze the over-limit situation of regional power grid equipment / section power flow. If new over-limit equipment / section is added, it will be added to the safety correction model taking into account the unit output adjustment. Through iterative calculation, the correction result that meets the safety of the regional power grid is finally obtained.

[0013] Furthermore, the boundary data generated by the scenario includes provincial power grid system data, unit data, interconnection line data, load data and unit group data; the calculation period is the shortest clearing period of the provincial power grid under the jurisdiction of the regional power grid.

[0014] Furthermore, the power grid security analysis adopts a provincial balance calculation strategy, and simultaneously calculates power flow and sensitivity. The power flow is used to analyze power grid equipment / section power flow exceeding the limit, and the sensitivity is used to construct a safety correction optimization model.

[0015] Furthermore, the effective section identified by the effective constraint is the transmission section that will restrict the operation of the unit during the operation of the power grid, and the identification method is as follows:

[0016] According to the power flow results of the transmission section F s,t The physical transmission limit P of the transmission section max,s The relationship between them is used to classify the effective types of transmission sections:

[0017] If |F s,t |<σ*P max,s , then the transmission section s is an invalid section in time period t;

[0018] If |F s,t |≥σ*P max,s , then the transmission section s is an effective section in time period t;

[0019] In the formula, σ is the effective constraint determination coefficient;

[0020] The method for determining the provinces participating in the adjustment is as follows:

[0021] If the effective equipment / section is within the province, the province where the equipment / section is located shall participate in the adjustment independently;

[0022] If the effective equipment / section is an inter-provincial equipment / section, all provinces connected to the equipment / section will participate in the adjustment.

[0023] Furthermore, the safety correction model taking into account the adjustment of unit output only optimizes the unit output. The start and stop status of the unit, the inter-provincial port plan and the inter-regional tie line plan are all known parameters, and the data reported by the provincial power grid shall prevail.

[0024] The optimization objective function of the safety correction model taking into account the unit output adjustment is as follows:

[0025]

[0026] Where N is the total number of units; T is the total number of time considered in the calculation; NS is the total number of equipment / sections; ΔP i,t Represents the output adjustment of unit i at time t; M p M is the penalty factor for adjusting the unit output; b is the penalty factor for power generation and consumption balance constraint; M s is the penalty factor of equipment / section s at time t; are the positive and negative slack variables of the power generation and consumption balance constraint at time t respectively; are the positive and reverse power flow relaxation variables of equipment / section s at time t, respectively; are the positive and negative slack variables of the power generation and consumption balance constraint at time t respectively;

[0027] The constraints of the safety correction model taking into account the unit output adjustment include provincial balance constraints, unit output adjustment amount, unit output upper and lower limits, unit output climbing and landslide, and power grid safety constraints; among which:

[0028] Provincial balance constraints:

[0029] The total output of each province's units is equal to the difference between the short-term forecast value of the provincial system load and the inter-provincial exchange power, as shown in the following formula:

[0030]

[0031] Where P i,t represents the output of unit i at time t, the decision variable; Assemble the units for province a; represents the initial inter-provincial power exchange plan of province a at time t; D a,t is the system load of province a at time t;

[0032] Definition of unit output adjustment:

[0033]

[0034] Where: is the output plan of unit i at time t reported by the province or city, is the clearing result of the power market of each provincial power grid, ΔP i,t is the planned output adjustment of unit i at time t;

[0035] Unit output upper and lower limit constraints:

[0036]

[0037] Where U i,t is the start / stop state of unit i at time t. If the unit is shut down, U i,t =0. This constraint condition can limit the unit output to 0. When the unit is turned on, U i,t =1, this constraint is the conventional upper and lower limit constraint of output; is the minimum technical output of unit i at time t; is the maximum technical output of unit i at time t;

[0038] Unit output climbing constraints:

[0039]

[0040] In the formula, is the maximum climbing grade of unit i, is the maximum downhill climbing amount of unit i; when the unit is at the start-up moment, the unit's lifting force range is determined by the unit's allowable startup rate, η i,t is the unit startup integer variable, η i,t =1 means that unit i is started at time t; when the unit is at shutdown, the output reduction range of the unit is determined by the allowable shutdown rate of the unit; γi,t is the unit startup integer variable, γ i,t =1 means unit i is shut down at time t.

[0041] Power flow constraints for transmission equipment:

[0042] Safety correction model and safety verification The cross-section flow constraints of the first iteration can be described as:

[0043]

[0044] The cross-sectional flow constraints of the second round of safety correction model and subsequent iterations can be described as:

[0045]

[0046] Where P i,t is the active power of unit i in period t; D is the active power of the unit i in the previous period t; k,t is the bus load value of node k in period t; are the forward and reverse power flow transmission limits of equipment / section s respectively; G s-i G is the generator output power transfer distribution factor of the node where unit i is located to the equipment / section s; s-k is the output power transfer distribution factor of node k to device / section s; G s-j is the output power transfer distribution factor of the node where the tie line j is located to the equipment / section s; are the forward and reverse power flow relaxation variables of equipment / section s respectively; It is the AC power flow of the last round of safety correction results of equipment / section s in period t.

[0047] Furthermore, the time period merging safety correction model taking into account unit output-start and stop-inter-provincial port-out-of-region DC adjustment, wherein the merging of similar time periods comprises the following steps:

[0048] Let L t is the system load in period t, then the system load change rate in adjacent periods t and t+1 is:

[0049]

[0050] Calculate the system load change rate for all time periods and find the minimum change rate ΔL t The corresponding time period;

[0051] Merge time periods t and t+1 into a new time period;

[0052] Minimum change rate ΔL tWhether it is greater than the set threshold, or whether the number of time periods remaining after merging reaches the preset number, the judgment condition takes effect, and the time period merging is completed, otherwise the system load change rate of the adjacent time periods t and t+1 is recalculated.

[0053] Furthermore, the optimization objective function of the period-merged safety correction model taking into account unit output-start-stop-inter-provincial ports-extra-regional DC adjustment is expressed as:

[0054]

[0055] Where N is the total number of units; T is the total number of periods after the safety correction period is merged; NS is the total number of equipment / sections; DN is the total number of DC interconnection lines; NT is the province and city collection; ΔP i,t Indicates the output adjustment of unit i at time t; ΔP d,t is the planned adjustment amount of DC tie line d at time t; is the start / stop status of the unit i in period t reported by each province and city; U i,t is the start and stop status of the unit in period t of the unit i after calculation; is the inter-provincial exchange power plan for the original province a during period t; T a,t M is the inter-provincial exchange power plan for the next province a period t; d M is the penalty factor for the planned adjustment of the DC tie line; a M is the penalty factor for adjusting the inter-provincial exchange power plan; p M is the penalty factor for adjusting the unit output; u M is the penalty factor for the start and stop changes of the unit; b is the penalty factor for power generation and consumption balance constraint; M s is the penalty factor of equipment / section s at time t; are the positive and negative slack variables of the power generation and consumption balance constraint at time t respectively; are the positive and reverse power flow relaxation variables of equipment / section s at time t respectively.

[0056] Furthermore, the optimization objective function of the period-merged safety correction model considering the unit output-start-stop-inter-provincial port-extra-regional DC adjustment includes multiple penalty factors, wherein the penalty factors are in the following order from large to small: balance constraint relaxation penalty factor M b , Power grid security constraint relaxation penalty factor M s , DC tie line planned adjustment penalty factor M d , inter-provincial exchange power plan adjustment penalty factor M a , change the penalty factor M for unit start and stop u , Penalty factor M for unit output adjustment p , adjust in order from large to small.

[0057] Furthermore, in the process of constructing a time-period merged safety correction model that takes into account unit output-startup and shutdown-inter-provincial ports-extra-regional DC adjustment, the following constraints need to be established:

[0058] Provincial balance constraints:

[0059] After the inter-provincial port plan and the inter-regional connection line plan are adjusted, the provincial balance constraints are modified to:

[0060]

[0061] Where P i,t represents the output of unit i at time t, the decision variable; is the set of units in province a; T a,t represents the inter-provincial exchange power of province a at time t; D a,t is the system load of province a at time t;

[0062] Minimum continuous start and stop time constraints for units:

[0063]

[0064] Where, T U 、T D The minimum continuous start time and minimum continuous shutdown time of the unit; The continuous startup time and continuous shutdown time of unit i in period t can be expressed as the state variable U i,t To express:

[0065]

[0066] Unit startup and shutdown switching variable constraints:

[0067]

[0068]

[0069] Where η i,t is the unit startup integer variable, η i,t =1 means the unit is turned on during period t; when the unit is shut down, γ i,t is the unit startup integer variable, γ i,t =1 means the unit i is shut down during period t and the following conditions are met:

[0070]

[0071] Inter-provincial exchange plan power flow balance constraints:

[0072] For the adjustment of inter-provincial exchange power in each province within the region, the cumulative change of inter-provincial exchange power must be equal to the cumulative change of DC power outside the region. The specific expression is:

[0073]

[0074] Definition of DC transmission plan adjustment:

[0075]

[0076] Where: is the initial transmission plan of DC transmission channel d at time t; P d,t is the active power of DC transmission channel d at time t;

[0077] Constraints on inter-provincial power distribution of DC interconnection lines:

[0078] After the DC power is connected to the grid at the DC converter station, it is distributed to each province and city in a certain proportion, meeting the following constraints:

[0079]

[0080] Where: r d,a is the power allocation factor of DC transmission channel d to province a; ΔDT a,t It represents the change in inter-provincial exchange power caused by the change of DC outside the region at time t in province a under the jurisdiction of the sub-center; the allocation factor must meet the following conditions:

[0081]

[0082] DC tie line power limit constraints:

[0083] Due to the physical properties of the DC interconnection line, the planned power of the DC interconnection line cannot exceed the maximum value allowed and cannot be lower than the minimum value allowed, and must meet the following constraints:

[0084]

[0085] In the formula, is the minimum power limit of the DC tie line d at time t; is the maximum power limit of the DC tie line d at time t;

[0086] DC tie line power converter station allocation constraints:

[0087] After the DC power is connected to the grid at the DC converter station, it is distributed to each province and city in a certain proportion, meeting the following constraints:

[0088]

[0089] In the formula, v d,his the power allocation factor of the DC transmission channel d to the converter station h; Δp h,t Indicates the planned adjustment of converter station power; the allocation factor must meet the following conditions:

[0090]

[0091] Furthermore, the full-time safety correction model taking into account the adjustment of unit output-inter-provincial interface-external DC is based on the unit operating status calculated by the period-merged safety correction model taking into account the unit output-start and stop-inter-provincial interface-external DC adjustment. The unit operating status of the merged period is assigned to the full period and fixed as a known parameter, and only the unit output, inter-provincial interface plan and external DC plan are adjusted; the constraints related to the unit operating status are eliminated from the constraints.

[0092] Furthermore, based on the calculation results of the full-time safety correction model taking into account the unit output-inter-provincial outlet-out-of-region DC adjustment, the regional power grid safety verification calculation is carried out to analyze the over-limit situation of the regional power grid equipment / section power flow. If a new over-limit equipment / section is over-limited, it is added to the safety correction model taking into account the unit output adjustment. Through iterative calculation, a correction result that meets the safety of the regional power grid is finally obtained, including:

[0093] The safety check adopts the AC power flow calculation method to analyze the over-limit situation of regional power grid equipment / power flow after safety correction, and send the newly added over-limit equipment / section and over-limit period for safety correction;

[0094] Carry out iterative calculations of safety correction and safety verification until no equipment / section in the regional power grid exceeds the limit or the maximum number of iterations is reached.

[0095] Based on the same inventive concept, a multi-strategy coordinated regional power grid rapid safety correction system of the present invention includes:

[0096] The scenario generation module is used to obtain the boundary data and calculation cycle for regional power grid security correction from the regional and provincial power grid D5000 or the new generation control system, and generate the regional power grid security correction calculation scenario;

[0097] The power grid security analysis module is used to carry out regional power grid security verification calculations based on the security correction calculation scenarios of the regional power grid, and analyze the over-limit conditions of the tidal equipment / section flow of each provincial power grid in the regional power grid;

[0098] The identification module is used to identify effective equipment / sections and determine the provinces participating in the adjustment. If there are equipment / sections exceeding the limit in the regional power grid, the effective sections for the regional power grid security correction are identified based on the power flow results of the transmission section. The provincial power grids participating in the regional power grid security correction are determined based on the effective equipment / sections, so as to narrow the scope of security correction adjustment and improve the calculation efficiency of security correction in subsequent steps.

[0099] The safety correction model construction module is used to construct a safety correction model of the regional power grid with the unit output of the provincial power grid participating in the safety correction of the regional power grid as the decision variable, and based on the safety correction model, the unit output of the provincial power grid participating in the safety correction of the regional power grid is adjusted by using the safety constraint economic dispatch algorithm to eliminate the equipment / section power flow exceeding the limit;

[0100] The module for constructing a time-period-merged safety correction model is used to construct a time-period-merged safety correction model for the regional power grid with unit output, unit start and stop, inter-provincial port plan, and extra-regional tie line plan as decision variables, in order to solve the problem that the safety correction model taking into account the unit output adjustment cannot eliminate the equipment / section over-limit. Based on the time-period-merged safety correction model, the safety-constrained unit combination algorithm is used to adjust each decision variable in turn to eliminate the power flow over-limit.

[0101] The full-time safety correction model construction module is used to establish a full-time safety correction model for the regional power grid based on the unit start-stop status calculated by the period-merged safety correction model that takes into account unit output-start-stop-inter-provincial port-extra-regional DC adjustment. Based on the full-time safety correction model, the safety-constrained economic dispatch algorithm is used to sequentially optimize unit output, inter-provincial port plan and extra-regional tie line plan to eliminate power flow over-limit.

[0102] The iterative calculation module is used to carry out regional safety verification calculations based on the calculation results of the full-time safety correction model that takes into account the unit output-inter-provincial port-out-of-region DC adjustment, analyze the over-limit situation of regional power grid equipment / section power flow, and add the newly added over-limit equipment / section to the safety correction model that takes into account the unit output adjustment, re-carry out the safety correction optimization solution, and finally obtain the correction results that meet the regional power grid safety through iterative calculation.

[0103] Furthermore, the boundary data generated by the scenario includes provincial power grid system data, unit data, interconnection line data, load data and unit group data; the calculation period is the shortest clearing period of the provincial power grid under the jurisdiction of the regional power grid.

[0104] Furthermore, the power grid security analysis adopts a provincial balance calculation strategy, and simultaneously calculates power flow and sensitivity. The power flow is used to analyze the power grid power flow over-limit situation, and the sensitivity is used to construct a safety correction optimization model.

[0105] Furthermore, the effective section identified by the effective constraint is the transmission section that will restrict the operation of the unit during the operation of the power grid, and the identification method is as follows:

[0106] According to the power flow results of the transmission section F s,t The physical transmission limit P of the transmission section max,s The relationship between them is used to classify the effective types of transmission sections:

[0107] If |F s,t |<σ*P max,s , then the transmission section s is an invalid section in time period t;

[0108] If |F s,t |≥σ*P max,s , then the transmission section s is an effective section in time period t;

[0109] In the formula, σ is the effective constraint determination coefficient;

[0110] The method for determining the provinces participating in the adjustment is as follows:

[0111] If the effective equipment / section is within the province, the province where the equipment / section is located shall participate in the adjustment independently;

[0112] If the effective equipment / section is an inter-provincial equipment / section, all provinces connected to the equipment / section will participate in the adjustment.

[0113] Furthermore, the safety correction model taking into account the adjustment of unit output only optimizes the unit output. The start and stop status of the unit, the inter-provincial port plan and the inter-regional tie line plan are all known parameters, and the data reported by the provincial power grid shall prevail.

[0114] The optimization objective function of the safety correction model taking into account the unit output adjustment is as follows:

[0115]

[0116] Where N is the total number of units; T is the total number of time considered in the calculation; NS is the total number of equipment / sections; ΔP i,t Represents the output adjustment of unit i at time t; M p M is the penalty factor for adjusting the unit output; b is the penalty factor for power generation and consumption balance constraint; M s is the penalty factor of equipment / section s at time t; are the positive and negative slack variables of the power generation and consumption balance constraint at time t respectively; are the positive and reverse power flow relaxation variables of equipment / section s at time t, respectively; are the positive and negative slack variables of the power generation and consumption balance constraint at time t respectively;

[0117] The constraints of the safety correction model taking into account the unit output adjustment include provincial balance constraints, unit output adjustment amount, unit output upper and lower limits, unit output climbing and landslide, and power grid safety constraints; among which:

[0118] Provincial balance constraints:

[0119] The total output of each province's units is equal to the difference between the short-term forecast value of the provincial system load and the inter-provincial exchange power, as shown in the following formula:

[0120]

[0121] Where P i,t represents the output of unit i at time t; Assemble the units for province a; represents the initial inter-provincial power exchange plan of province a at time t; D a,t is the system load of province a at time t;

[0122] Definition of unit output adjustment:

[0123]

[0124] Where: is the output plan of unit i at time t reported by the province or city, is the clearing result of the power market of each provincial power grid, ΔP i,t is the planned output adjustment of unit i at time t;

[0125] Unit output upper and lower limit constraints:

[0126]

[0127] Where U i,t is the start / stop state of unit i at time t. If the unit is shut down, U i,t =0. This constraint condition can limit the unit output to 0. When the unit is turned on, U i,t =1, this constraint is the conventional upper and lower limit constraint of output; is the minimum technical output of unit i at time t; is the maximum technical output of unit i at time t;

[0128] Unit output climbing constraints:

[0129]

[0130] In the formula, is the maximum climbing grade of unit i, is the maximum downhill climbing amount of unit i; when the unit is at the start-up moment, the unit's lifting force range is determined by the unit's allowable startup rate, η i,t is the unit startup integer variable, η i,t =1 means that unit i is started at time t; when the unit is at shutdown, the output reduction range of the unit is determined by the allowable shutdown rate of the unit; γ i,t is the unit startup integer variable, γ i,t =1 means unit i is shut down at time t.

[0131] Transmission equipment / section flow constraints:

[0132] Safety Correction Model and Safety Verification The equipment / section power flow constraints of the first iteration can be described as:

[0133]

[0134] The equipment / section power flow constraints of the second round and subsequent iterations of safety correction model and safety verification can be described as:

[0135]

[0136] Where P i,t is the active power of unit i in period t; D is the active power of the unit i in the previous period t; k,t is the bus load value of node k in period t; are the forward and reverse power flow transmission limits of equipment / section s respectively; G s-i G is the generator output power transfer distribution factor of the node where unit i is located to the equipment / section s; s-k is the output power transfer distribution factor of node k to device / section s; G s-j is the output power transfer distribution factor of the node where the tie line j is located to the equipment / section s; are the forward and reverse power flow relaxation variables of equipment / section s respectively; It is the AC power flow of the last round of safety correction results of equipment / section s in period t.

[0137] Furthermore, the time period merging safety correction model taking into account unit output-start and stop-inter-provincial ports-extra-regional DC adjustment, and its time period merging method include the following steps:

[0138] Let L t is the system load in period t, then the system load change rate in adjacent periods t and t+1 is:

[0139]

[0140] Calculate the system load change rate for all time periods and find the minimum change rate ΔL t The corresponding time period;

[0141] Merge time periods t and t+1 into a new time period;

[0142] Minimum change rate ΔL t Whether it is greater than the set threshold, or whether the number of time periods remaining after merging reaches the preset number, the judgment condition takes effect, and the time period merging is completed, otherwise the system load change rate of the adjacent time periods t and t+1 is recalculated.

[0143] Furthermore, the objective function of the period-merged safety correction model taking into account unit output-start-stop-inter-provincial ports-extra-regional DC adjustment is expressed as:

[0144]

[0145] Where N is the total number of units; T is the total number of periods after the safety correction period is merged; NS is the total number of equipment / sections; DN is the total number of DC interconnection lines; NT is the province and city collection; ΔP i,t Indicates the output adjustment of unit i at time t; ΔP d,t is the planned adjustment amount of DC tie line d at time t; is the start / stop status of the unit i in period t reported by each province and city; U i,t is the start and stop status of the unit in period t of the unit i after calculation; is the inter-provincial exchange power plan for the original province a during period t; T a,t M is the inter-provincial exchange power plan for the next province a period t; d M is the penalty factor for the planned adjustment of the DC tie line; a M is the penalty factor for adjusting the inter-provincial exchange power plan; p M is the penalty factor for adjusting the unit output; u M is the penalty factor for the start and stop changes of the unit; b is the penalty factor for power generation and consumption balance constraint; M s is the penalty factor of equipment / section s at time t; are the positive and negative slack variables of the power generation and consumption balance constraint at time t respectively; are the positive and reverse power flow relaxation variables of equipment / section s at time t respectively.

[0146] Furthermore, the optimization objective function of the period-merged safety correction model considering the unit output-start-stop-inter-provincial port-extra-regional DC adjustment includes multiple penalty factors, and the order of the penalty factors from large to small is as follows: Balance constraint relaxation penalty factor M b , Power grid security constraint relaxation penalty factor M s , DC tie line planned adjustment penalty factor M d , inter-provincial exchange power plan adjustment penalty factor M a , change the penalty factor M for unit start and stop u , Penalty factor M for unit output adjustment p , adjust in order from large to small.

[0147] Furthermore, in the process of constructing a time-period merged safety correction model that takes into account unit output-startup and shutdown-inter-provincial ports-extra-regional DC adjustment, the following constraints need to be established:

[0148] Provincial balance constraints:

[0149] After the inter-provincial port plan and the inter-regional connection line plan are adjusted, the provincial balance constraints are modified to:

[0150]

[0151] Where P i,t represents the output of unit i at time t, the decision variable; is the set of units in province a; T a,t represents the inter-provincial exchange power of province a at time t; D a,t is the system load of province a at time t;

[0152] Minimum continuous start and stop time constraints for units:

[0153]

[0154] Where, T U , T D The minimum continuous start time and minimum continuous shutdown time of the unit; The continuous startup time and continuous shutdown time of unit i in period t can be expressed as the state variable U i,t To express:

[0155]

[0156] Unit startup and shutdown switching variable constraints:

[0157]

[0158] Where η i,t is the unit startup integer variable, η i,t =1 means the unit is turned on during period t; when the unit is shut down, γ i,t is the unit startup integer variable, γ i,t =1 means the unit i is shut down during period t and the following conditions are met:

[0159]

[0160] Inter-provincial exchange plan power flow balance constraints:

[0161] For the adjustment of inter-provincial exchange power in each province within the region, the cumulative change of inter-provincial exchange power must be equal to the cumulative change of DC power outside the region. The specific expression is:

[0162]

[0163] Definition of DC transmission plan adjustment:

[0164]

[0165] Where: is the initial transmission plan of DC transmission channel d at time t; P d,t is the active power of DC transmission channel d at time t;

[0166] Constraints on inter-provincial power distribution of DC interconnection lines:

[0167] After the DC power is connected to the grid at the DC converter station, it is distributed to each province and city in a certain proportion, meeting the following constraints:

[0168]

[0169] Where: r d,a is the power allocation factor of DC transmission channel d to province a; ΔDT a,t It represents the change in inter-provincial exchange power caused by the change of DC outside the region at time t in province a under the jurisdiction of the sub-center; the allocation factor must meet the following conditions:

[0170]

[0171] DC tie line power limit constraints:

[0172] Due to the physical properties of the DC interconnection line, the planned power of the DC interconnection line cannot exceed the maximum value allowed and cannot be lower than the minimum value allowed, and must meet the following constraints:

[0173]

[0174] In the formula, is the minimum power limit of the DC tie line d at time t; is the maximum power limit of the DC tie line d at time t;

[0175] DC tie line power converter station allocation constraints:

[0176] After the DC power is connected to the grid at the DC converter station, it is distributed to each province and city in a certain proportion, meeting the following constraints:

[0177]

[0178] In the formula, v d,h is the power allocation factor of the DC transmission channel d to the converter station h; Δp h,t Indicates the planned adjustment of converter station power; the allocation factor must meet the following conditions:

[0179] ∑h ∈H v d, h=1.

[0180] Furthermore, the full-time safety correction model taking into account the adjustment of unit output-inter-provincial interface-external DC is based on the unit operating status calculated by the period-merged safety correction model taking into account the unit output-start and stop-inter-provincial interface-external DC adjustment. The unit operating status of the merged period is assigned to the full period and fixed as a known parameter, and only the unit output, inter-provincial interface plan and external DC plan are adjusted; the constraints related to the unit operating status are eliminated from the constraints.

[0181] Furthermore, based on the calculation results of the full-time safety correction model taking into account the unit output-inter-provincial outlet-out-of-region DC adjustment, the regional power grid safety verification calculation is carried out to analyze the over-limit situation of the regional power grid equipment / section power flow. If a new over-limit equipment / section is over-limited, it is added to the safety correction model taking into account the unit output adjustment. Through iterative calculation, a correction result that meets the safety of the regional power grid is finally obtained, including:

[0182] The safety check adopts the AC power flow calculation method to analyze the over-limit situation of regional power grid equipment / power flow after safety correction, and send the newly added over-limit equipment and over-limit period for safety correction;

[0183] Carry out iterative calculations of safety correction and safety verification until no equipment in the regional power grid exceeds the limit or the maximum number of iterations is reached.

[0184] Based on the same inventive concept, a multi-strategy coordinated regional power grid rapid and safe correction device of the present invention includes a processor and a memory, wherein the memory stores computer instructions, and the processor is used to execute the computer instructions stored in the memory. When the computer instructions are executed by the processor, the electronic device implements the steps of the above-mentioned multi-strategy coordinated regional power grid rapid and safe correction method.

[0185] Based on the same inventive concept, a computer-readable storage medium of the present invention stores a computer program thereon, and when the program is executed by a processor, the steps of the above-mentioned multi-strategy coordinated regional power grid rapid safety correction method are implemented.

[0186] Beneficial effects: Compared with the prior art, the significant technical effects of the present invention are:

[0187] A multi-stage collaborative optimization strategy has been formulated to achieve rapid execution of the safety correction process, including effective constraint identification and determination of provinces involved in adjustment, safety correction taking into account unit output adjustment, period merging safety correction taking into account unit output - start and stop - inter-provincial ports - DC adjustment outside the region, and full-time safety correction taking into account unit output - inter-provincial ports - DC adjustment outside the region.

[0188] By participating in the adjustment of provincial power grid judgment, merging of similar time periods, and identification of effective safety constraints, the time period scale and constraint dimension of safety correction calculation are reduced, the feasible solution space is narrowed, and the solution efficiency is improved.

[0189] A modeling strategy is proposed for sequential adjustment of unit output, unit start and stop, inter-provincial exchange power, and extra-regional interconnection line plans to ensure reliable power supply and maximize the absorption of new energy to the greatest extent.

[0190] Through the coordination of multiple strategies, the feasible domain of the unit combination problem is narrowed, and a more compact and effective optimization space is obtained. Without affecting the optimal solution of the unit combination, the calculation efficiency is improved, the solution process is clear, the calculation results are stable, and it has high applicability. BRIEF DESCRIPTION OF THE DRAWINGS

[0191] Figure 1 It is a flow chart of a method for rapid and safe correction of a regional power grid using multiple strategies in coordination disclosed in an embodiment of the present invention;

[0192] Figure 2 It is a structural schematic diagram of a multi-strategy coordinated regional power grid rapid safety correction system disclosed in an embodiment of the present invention;

[0193] Figure 3 It is a structural schematic diagram of a multi-strategy coordinated regional power grid rapid safety correction device disclosed in an embodiment of the present invention. DETAILED DESCRIPTION

[0194] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. It will be understood by those skilled in the art that the purposes and advantages that can be achieved with the present invention are not limited to the specific description of the above beneficial effects, and the above and other purposes that can be achieved by the present invention will be more clearly understood based on the following detailed description.

[0195] It should be understood by those skilled in the art that the exemplary components, systems and methods described in conjunction with the embodiments disclosed in the present invention can be implemented in hardware, software or a combination of the two. Whether it is implemented in hardware or software depends on the specific application and design of the technical solution. Professional and technical personnel can use different methods to implement the functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.

[0196] Reference to "embodiments" in the present invention means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present invention. The appearance of the phrase in various places in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0197] Example 1

[0198] See also Figure 1 , Figure 1 This is a flow chart of a method for rapid and secure correction of a regional power grid using multiple strategies in coordination disclosed in an embodiment of the present invention. Figure 1 The described regional power grid rapid safety correction method is applied to power systems, such as automatic dispatching of power systems, etc., which is not limited in the embodiments of the present invention. Figure 1 As shown, the multi-strategy coordinated regional power grid rapid security correction method may include the following operations:

[0199] Step S1, scenario generation: Obtain boundary data and calculation cycles for regional power grid security correction from regional and provincial power grid D5000 or new generation control systems, and generate a regional power grid security correction calculation scenario.

[0200] Among them, the boundary data includes provincial power grid system data, unit data, interconnection line data, load data and unit group data, and the calculation period is the shortest clearing period of the provincial power grid under the jurisdiction of the regional power grid.

[0201] In this embodiment, the power grid scope and calculation cycle for which regional power grid safety correction calculations need to be carried out are determined, and data preparation is performed, including provincial power grid system data, unit data, interconnection line data, load data, and unit group data, to generate a regional power grid safety correction calculation scenario.

[0202] System data includes time period information, system load and system reserve requirements. Unit data includes basic unit information, unit calculation parameters, unit energy quotation, unit initial state, unit power constraint and unit ramp rate. Tie line planning data includes basic tie line information and tie line planned power. Load data includes bus load forecast. Unit group data includes unit group power limit and unit group power limit. Sensitivity data includes generation transfer distribution factors of unit and load injection power to line and section flow.

[0203] Step S2, power grid safety analysis. Carry out regional power grid safety verification calculations and analyze the power flow exceeding the limit of each provincial power grid in the regional power grid. If the power flow of the entire network equipment / section is not exceeding the limit, proceed to step S8;

[0204] In this embodiment, the safety check calculation adopts a provincial balance calculation strategy, and calculates the power flow and sensitivity at the same time. On the one hand, it analyzes the power flow exceeding the limit of the power grid equipment / section, and on the other hand, it provides sensitivity information for the construction of the safety correction optimization model.

[0205] In this step, the regional power grid safety verification calculation is carried out to analyze the over-limit situation of the power flow of each provincial power grid in the regional power grid. If there is no over-limit, go to step S8; if there is an over-limit, determine the provincial power grid involved in the adjustment.

[0206] Step S3, identification and determination of effective constraints and provinces participating in the adjustment. If there are devices / sections exceeding the limit in the regional power grid, the effective devices / sections for safety correction of the regional power grid are identified based on the power flow results of the devices / sections, reducing the number of devices / sections considered by the safety correction model; and based on the effective devices / sections, the provincial power grids participating in the safety correction of the regional power grid are determined to narrow the adjustment scope of the safety correction and improve the calculation efficiency of the safety correction in the subsequent steps.

[0207] In this embodiment, the effective section for effective constraint identification is the transmission section that will restrict the operation of the unit during the operation of the power grid. The identification method is as follows:

[0208] According to the power flow results of the transmission section F s,t The physical transmission limit P of the transmission section max,s The relationship between them is used to classify the effective types of transmission sections:

[0209] According to the power flow results of the transmission section F s,t The physical transmission limit P of the transmission section max,s The relationship between them is used to classify the effective types of transmission sections:

[0210] If |F s,t |<σ*P max,s , then the transmission section s is an invalid section in time period t;

[0211] If |F s,t |≥σ*P max,s , then the transmission section s is an effective section in time period t;

[0212] Where σ is the effective constraint determination coefficient.

[0213] The determination method for provinces participating in the adjustment is as follows:

[0214] If the effective equipment / section is within the province, the province where the equipment / section is located shall participate in the adjustment independently;

[0215] If the effective equipment / section is an inter-provincial equipment / section, all provinces connected to the equipment / section will participate in the adjustment.

[0216] In this embodiment, if the effective section is in provincial power grid a, the units in provincial power grid a participate in the adjustment; if the effective section is an inter-provincial section, spanning provincial power grids a and b, the units in provincial power grids a and b participate in the adjustment at the same time.

[0217] Through effective constraints, we can identify the equipment / sections that are within the limit (i.e., effective equipment / sections), filter out invalid equipment / sections, reduce the number of equipment / sections considered in the safety correction optimization model, determine the provincial power grids involved in the adjustment based on effective equipment / sections, narrow the scope of safety correction optimization calculations, and improve the efficiency of regional power grid safety correction calculations.

[0218] Step S4: A safety correction model taking into account the unit output adjustment is constructed with the unit output of the provincial power grid participating in the regional power grid safety correction as the decision variable. Security Correction Model of Regional Power Grid , and based on the adjustment of unit output install Fully calibrated model, The safety-constrained economic dispatch algorithm is used to adjust the unit output of the provincial power grid participating in the regional power grid safety correction to eliminate the equipment / section power flow exceeding the limit; if all equipment / section exceeding the limit is successfully eliminated, then go to step S8, otherwise go to step S5. If the power flow exceeding the limit is eliminated, go to step S8; otherwise, proceed to the next step.

[0219] In this embodiment, the optimization objective function of the safety correction model taking into account the unit output adjustment is as follows:

[0220]

[0221] Where N is the total number of units; T is the total number of time considered in the calculation; NS is the total number of equipment / sections; ΔP i,t M represents the output adjustment of unit i at time t (non-grid-adjusted direct-adjusted unit); p M is the penalty factor for adjusting the unit output; b is the penalty factor for power generation and consumption balance constraint; M s is the penalty factor of equipment / section s at time t; are the positive and negative slack variables of the power generation and consumption balance constraint at time t respectively; are the positive and reverse power flow relaxation variables of equipment / section s at time t, respectively; They are the positive and negative slack variables of the power generation and consumption balance constraint at time t.

[0222] In this embodiment, in the process of constructing the safety correction model taking into account the unit output adjustment, it is necessary to establish model constraints.

[0223] The model constraints include provincial balance constraints, unit output adjustment, unit output upper and lower limits, unit output ramp and power grid security constraints.

[0224] 1) Provincial balance constraints:

[0225] The total output of each province's units is equal to the difference between the short-term forecast value of the provincial system load and the inter-provincial exchange power, as shown in the following formula:

[0226]

[0227] Where P i,t represents the output of unit i at time t, the decision variable; Assemble the units for province a; represents the initial inter-provincial power exchange plan of province a at time t (input is positive, output is negative), with known parameters; D a,t is the system load of province a at time t, with known parameters;

[0228] 2) Definition of unit output adjustment:

[0229]

[0230] Where: is the output plan of unit i at time t reported by the province or city, is the clearing result of the power market of each provincial power grid, ΔP i,t is the planned output adjustment of unit i at time t;

[0231] 3) Upper and lower limits of unit output:

[0232]

[0233] Where U i,t is the start / stop state of unit i at time t. If the unit is shut down, U i,t =0. This constraint condition can limit the unit output to 0. When the unit is turned on, U i,t =1, this constraint is the conventional upper and lower limit constraint of output; is the minimum technical output of unit i at time t; is the maximum technical output of unit i at time t;

[0234] 4) Unit output climbing constraints:

[0235]

[0236] In the formula, is the maximum climbing grade of unit i, is the maximum downhill climbing amount of unit i; when the unit is at the start-up moment, the unit's lifting force range is determined by the unit's allowable start-up rate (here is ) determines, i,t is the unit startup integer variable, η i,t= 1 means that unit i is started at time t; when the unit is at the shutdown time, the unit's output reduction range is determined by the unit's allowable shutdown rate (here is ) decides; i,t is the unit startup integer variable, γ i,t =1 means unit i is shut down at time t.

[0237] 5) Power flow constraints of transmission equipment:

[0238] Safety correction model and safety verification The cross-section flow constraints of the first iteration can be described as:

[0239]

[0240] The cross-sectional flow constraints of the second round of safety correction model and subsequent iterations can be described as:

[0241]

[0242] Where P i,t is the active power of unit i in period t, which is used as the decision variable; D is the active power of the unit i in the previous period t; k,t is the bus load value of node k in period t; are the forward and reverse power flow transmission limits of equipment / section s respectively; G s-i G is the generator output power transfer distribution factor of the node where unit i is located to the equipment / section s; s-k is the output power transfer distribution factor of node k to device / section s; G s-j is the output power transfer distribution factor of the node where the tie line j is located to the equipment / section s; are the forward and reverse power flow relaxation variables of equipment / section s respectively; It is the AC power flow of the last round of safety correction results of equipment / section s in period t.

[0243] Step S5, a time period-merged safety correction model taking into account unit output-start and stop-inter-provincial port-extra-regional DC adjustment: If the safety correction model taking into account unit output adjustment cannot eliminate equipment / section over-limit, a time period-merged safety correction model of the regional power grid is constructed with unit output, unit start and stop, inter-provincial port plan, and extra-regional interconnection line plan as decision variables, and based on the time period-merged safety correction model, the safety constraint unit combination algorithm is used to adjust each decision variable in turn to provide the unit operation status for step S6.

[0244] Based on the calculation results of the "safety correction model taking into account unit output adjustment", effective sections are identified, power grid safety constraints are constructed, and the number of dense constraints is reduced; according to the changing trend of the power grid's total network load in different time periods within the calculation cycle, similar calculation time periods are merged to reduce the number of time periods entering the optimization and the scale of the calculation time periods; unit output, unit start and stop, inter-provincial port plans, and out-of-region interconnection line plans are adjusted in sequence to eliminate section over-limits.

[0245] In this embodiment, according to the change trend of the whole grid load in different periods within the calculation cycle, the similar calculation periods are merged, and the specific process is as follows:

[0246] Let L t is the system load in period t, then the system load change rate in adjacent periods t and t+1 is:

[0247]

[0248] Calculate the system load change rate for all time periods and find the minimum change rate ΔL t The corresponding time period;

[0249] Merge time periods t and t+1 into a new time period;

[0250] According to the rate of change of system load, the time period merging is repeated until the minimum rate of change ΔL is reached. t If the value is greater than the set threshold, or the number of time periods remaining after merging reaches the preset number, the judgment condition takes effect, and the time period merging is completed; otherwise, the system load change rate of the adjacent time periods t and t+1 is recalculated.

[0251] In this embodiment, the optimization objective function of the period-merged safety correction model taking into account the unit output-start-stop-inter-provincial interface-out-of-region DC adjustment is expressed as:

[0252]

[0253] Where N is the total number of units; T is the total number of periods after the safety correction period is merged; NS is the total number of equipment / sections; DN is the total number of DC interconnection lines; NT is the province and city collection; ΔP i,t represents the output adjustment of unit i at time t, as the decision variable; ΔP d,t is the planned adjustment amount of DC tie line d at time t, which is used as the decision variable; is the start / stop status of the unit i in period t reported by each province and city, with known parameters; U i,t The start and stop status of the unit i in time period t after calculation is used as the decision variable; is the inter-provincial exchange power plan for the original province a during period t, with known parameters; T a,tTo calculate the inter-provincial exchange power plan for the next province a period t, as the decision variable; M d M is the penalty factor for the planned adjustment of the DC tie line; a M is the penalty factor for adjusting the inter-provincial exchange power plan; p M is the penalty factor for adjusting the unit output; u M is the penalty factor for the start and stop changes of the unit; b is the penalty factor for power generation and consumption balance constraint; M s is the penalty factor of equipment / section s at time t; are the positive and negative slack variables of the power generation and consumption balance constraint at time t respectively; are the positive and reverse power flow relaxation variables of equipment / section s at time t respectively.

[0254] In this embodiment, the penalty factors in the optimization objective function of the period-merged safety correction model taking into account the unit output-start-stop-inter-provincial port-out-of-region DC adjustment are in descending order: the balance constraint relaxation penalty factor M b , Power grid security constraint relaxation penalty factor M s , DC tie line planned adjustment penalty factor M d , inter-provincial exchange power plan adjustment penalty factor M a , change the penalty factor M for unit start and stop u , Penalty factor M for unit output adjustment p , through the different order of their sizes, their priorities can be adjusted.

[0255] In the process of constructing the period-merged safety correction model taking into account the unit output-start-stop-inter-provincial outlet-out-of-region DC adjustment, it is necessary to establish model constraints. Compared with the safety correction optimization model taking into account the unit output adjustment, the following constraints are added:

[0256] 1) Provincial balance constraints:

[0257] After the inter-provincial port plan and the inter-regional connection line plan are adjusted, the provincial balance constraints are modified to:

[0258]

[0259] Where P i,t represents the output of unit i at time t, the decision variable; is the set of units in province a; T a,t represents the inter-provincial exchange power of province a at time t (input is positive, output is negative), a decision variable; D a,t is the system load of province a at time t, with known parameters.

[0260] 2) Minimum continuous start and stop time constraints of the unit:

[0261]

[0262] Where, T U 、T D The minimum continuous start time and minimum continuous shutdown time of the unit; The continuous startup time and continuous shutdown time of unit i in period t can be expressed as the state variable U i,t To express:

[0263]

[0264] 3) Unit startup and shutdown switching variable constraints:

[0265]

[0266] Where η i,t is the unit startup integer variable, η i,t =1 means the unit is turned on during period t; when the unit is shut down, γ i,t is the unit startup integer variable, γ i,t =1 means the unit i is shut down during period t and the following conditions are met:

[0267]

[0268] 4) Inter-provincial exchange plan flow balance constraints:

[0269] For the adjustment of inter-provincial exchange power in each province within the region, the cumulative change of inter-provincial exchange power must be equal to the cumulative change of DC power outside the region. The specific expression is:

[0270]

[0271] 5) Definition of DC transmission plan adjustment:

[0272]

[0273] Where: is the initial transmission plan of DC transmission channel d at time t, with known parameters; P d,t is the active power of DC transmission channel d at time t, the decision variable;

[0274] 6) DC interconnection line power distribution constraints between provinces:

[0275] After the DC power is connected to the grid at the DC converter station, it is distributed to each province and city in a certain proportion, meeting the following constraints:

[0276]

[0277] Where: r d,ais the power allocation factor of DC transmission channel d to province a; ΔDT a,t It represents the change in inter-provincial exchange power caused by the change of DC outside the region at time t in province a under the jurisdiction of the sub-center; the allocation factor must meet the following conditions:

[0278]

[0279] 7) DC tie line power limit constraints:

[0280] Due to the physical properties of the DC interconnection line, the planned power of the DC interconnection line cannot exceed the maximum value allowed and cannot be lower than the minimum value allowed, and must meet the following constraints:

[0281]

[0282] In the formula, is the minimum power limit of the DC tie line d at time t; is the maximum power limit of the DC tie line d at time t;

[0283] 8) DC tie line power converter station allocation constraints:

[0284] After the DC power is connected to the grid at the DC converter station, it is distributed to each province and city in a certain proportion, meeting the following constraints:

[0285]

[0286] In the formula, v d,h is the power allocation factor of the DC transmission channel d to the converter station h; Δph ,t Indicates the planned adjustment of converter station power; the allocation factor must meet the following conditions:

[0287] ∑h ∈H v d, h=1.

[0288] Step S6, a full-time safety correction model considering unit output-inter-provincial ports-external DC adjustment. Based on the unit start-stop status calculated by the "period merged safety correction model considering unit output-start-stop-inter-provincial ports-external DC adjustment", a full-time safety correction model for the regional power grid is established, and a safety-constrained economic dispatch algorithm is used to optimize the unit output, inter-provincial ports plan and external tie line plan in turn to eliminate equipment / section power flow over-limit.

[0289] The full-time safety correction model considering the adjustment of unit output-inter-provincial ports-external DC is based on the period-merged safety correction model considering the adjustment of unit output-start-stop-inter-provincial ports-external DC, and the calculated unit operation status is used as the basis. The unit operation status of the merged period is assigned to the full period and fixed as a known parameter, and only the unit output, inter-provincial ports plan and external DC plan are adjusted. The constraints such as the minimum start-stop time and the number of start-stops related to the unit operation status are excluded from the constraints. Other constraints are the same as the period-merged safety correction model considering the adjustment of unit output-start-stop-inter-provincial ports-external DC, and will not be repeated.

[0290] In this scheme, the abstract model of "the full-time safety correction model considering unit output-inter-provincial ports-external DC adjustment" and "the period-merged safety correction model considering unit output-start-stop-inter-provincial ports-external DC adjustment" are the same, but the instance models are different, which are mainly reflected in the following points: 1) The optimization period of "the full-time safety correction model considering unit output-inter-provincial ports-external DC adjustment" is the full time period, which is different from "the period-merged safety correction model considering unit output-start-stop-inter-provincial ports-external DC adjustment". The number of time periods in the "full-time safety correction model taking into account unit output-inter-provincial ports-extra-regional DC adjustment" is larger; 2) the "full-time safety correction model taking into account unit output-start and stop-inter-provincial ports-extra-regional DC adjustment" takes the unit start and stop status calculated by the "period merged safety correction model taking into account unit output-start and stop-inter-provincial ports-extra-regional DC adjustment" as the benchmark, and assigns its start and stop status to the entire time period; 3) the "full-time safety correction model taking into account unit output-inter-provincial ports-extra-regional DC adjustment" fixes the unit start and stop status, and only optimizes the unit output, inter-provincial exchange power and extra-regional DC plan for the entire time period.

[0291] Step S7, safety correction and safety verification iteration. Safety verification calculation is carried out based on the calculation results of the full-time safety correction model taking into account the unit output-inter-provincial port-extra-regional DC adjustment, and the over-limit situation of the equipment / section power flow in the regional power grid is analyzed. If a new over-limit equipment / section is over-limited, it will be added to the safety correction model taking into account the unit output adjustment, and then go to step S4. Through iterative calculation, the correction result that meets the safety of the regional power grid is finally obtained.

[0292] In this embodiment, the iterative calculation of safety correction and safety verification includes:

[0293] The safety check adopts the AC power flow calculation method to analyze the over-limit situation of regional power grid equipment / sections after safety correction, and send the newly added over-limit equipment / sections and over-limit time periods for safety correction;

[0294] Carry out iterative calculations of safety correction and safety verification until no equipment / section in the regional power grid exceeds the limit or the maximum number of iterations is reached.

[0295] Step S8: Send the correction results that meet the security of the regional power grid to each provincial power grid, and the calculation is completed.

[0296] The technical solution of the present invention obtains the power grid scope and calculation cycle for carrying out regional power grid security correction, generates a calculation scenario; carries out power grid security analysis, analyzes the power flow exceeding the limit of regional power grid equipment / section; determines the provincial power grid participating in the regional power grid security correction, identifies effective constraints, reduces the adjustment scope and calculation scale; constructs a regional power grid security correction optimization model taking into account the unit output adjustment, adopts a safety constraint economic dispatch algorithm to optimize and adjust the unit output, and eliminates power flow exceeding the limit; if exceeding the limit still exists, merges similar time periods and identifies effective power grid security constraints, reduces the number of optimization time periods and constraints, and constructs a regional power grid security correction optimization model taking into account the unit output-start-stop-province The period-merged safety correction model for inter-province-outside DC adjustment is constructed, and the safety-constrained unit combination algorithm is used to adjust each decision variable in turn; then, based on the unit start-stop status calculated by the period-merged safety correction model taking into account unit output-start-stop-inter-province-outside DC adjustment, a full-time safety correction model taking into account unit output-inter-province-outside DC adjustment is constructed, and full-time safety-constrained economic dispatch is carried out; safety verification analysis is carried out based on the full-time safety-constrained economic dispatch results, and the newly added over-limit equipment / sections are added to the regional power grid safety correction model. Through iterative calculation, the correction results that meet the safety of the regional power grid are finally obtained.

[0297] The technical solution of the present invention is a regional verification method to ensure the normal operation of the spot markets in various provinces and cities within the regional power grid. With the rapid advancement of the construction of the provincial power spot market, the market participants and market transaction types have increased dramatically, and the operation mode of the power grid is complex and changeable. The provincial power grid security verification function can no longer guarantee the safe and stable operation of the inter-provincial section. When safety risks occur, it is impossible to give an optimization correction strategy, and there are problems such as inaccurate local equipment flow and low calculation efficiency, which have a profound impact on the safety management and control of the power grid, and there are risks in the safe operation of the power grid. The multi-strategy coordinated regional power grid rapid safety correction algorithm under the power market environment proposed by the present invention provides technical support for the reliable execution of the clearing results of the provincial spot market in the region, the standardized organization and operation management of power production under the new situation, and the improvement of the ability to "ensure safety, supply, and consumption", which is conducive to promoting the safe and stable development of the power marketization process, and playing the core hub role of optimizing the overall resource allocation of the regional power grid and promoting the consumption of clean energy.

[0298] Example 2

[0299] See also Figure 2 , Figure 2 1 is a schematic diagram of a structure of a multi-strategy coordinated regional power grid rapid safety correction system disclosed in an embodiment of the present invention. The system can realize rapid safety correction of regional power grids, specifically including:

[0300] The scenario generation module is used to obtain the boundary data and calculation cycle for regional power grid security correction from the regional and provincial power grid D5000 or the new generation control system, and generate the regional power grid security correction calculation scenario;

[0301] The power grid security analysis module is used to carry out regional power grid security verification calculations based on the security correction calculation scenarios of the regional power grid, and analyze the over-limit conditions of the tidal equipment / section flow of each provincial power grid in the regional power grid;

[0302] The identification module is used to identify effective equipment / sections and determine the provinces participating in the adjustment. If there are equipment / sections exceeding the limit in the regional power grid, the effective sections for the regional power grid security correction are identified based on the power flow results of the transmission section. The provincial power grids participating in the regional power grid security correction are determined based on the effective equipment / sections, so as to narrow the scope of security correction adjustment and improve the calculation efficiency of security correction in subsequent steps.

[0303] The safety correction model construction module is used to construct a safety correction model of the regional power grid with the unit output of the provincial power grid participating in the safety correction of the regional power grid as the decision variable, and based on the safety correction model, the unit output of the provincial power grid participating in the safety correction of the regional power grid is adjusted by using the safety constraint economic dispatch algorithm to eliminate the equipment / section power flow exceeding the limit;

[0304] The module for constructing a time-period-merged safety correction model is used to construct a time-period-merged safety correction model for the regional power grid with unit output, unit start and stop, inter-provincial port plan, and extra-regional tie line plan as decision variables, in order to solve the problem that the safety correction model taking into account the unit output adjustment cannot eliminate the equipment / section over-limit. Based on the time-period-merged safety correction model, the safety-constrained unit combination algorithm is used to adjust each decision variable in turn to eliminate the power flow over-limit.

[0305] The full-time safety correction model construction module is used to establish a full-time safety correction model for the regional power grid based on the unit start-stop status calculated by the period-merged safety correction model that takes into account unit output-start-stop-inter-provincial port-extra-regional DC adjustment. Based on the full-time safety correction model, the safety-constrained economic dispatch algorithm is used to sequentially optimize unit output, inter-provincial port plan and extra-regional tie line plan to eliminate power flow over-limit.

[0306] The iterative calculation module is used to carry out regional safety verification calculations based on the calculation results of the full-time safety correction model that takes into account the unit output-inter-provincial port-out-of-region DC adjustment, analyze the over-limit situation of regional power grid equipment / section power flow, and add the newly added over-limit equipment / section to the safety correction model that takes into account the unit output adjustment, re-carry out the safety correction optimization solution, and finally obtain the correction results that meet the regional power grid safety through iterative calculation.

[0307] In an optional implementation, a multi-strategy coordinated regional power grid rapid safety correction method includes: a) obtaining the power grid scope and calculation cycle for carrying out regional power grid safety correction, and generating a calculation scenario; b) conducting power grid safety analysis, analyzing the over-limit situation of regional power grid tidal equipment / section flow; c) determining the provincial power grids participating in the regional power grid safety correction, identifying effective constraints, and reducing the adjustment scope and calculation scale; d) constructing a regional power grid safety correction optimization model with unit output as the decision variable, and using a safety-constrained economic dispatch algorithm to optimize and adjust the unit output to eliminate over-limit of tidal current; e) if over-limit still exists, merging of similar time periods and identification of effective power grid safety constraints are carried out to reduce Optimize the time periods and the number of constraints, build a regional power grid safety correction model with unit output, unit start and stop, inter-provincial port plan, and extra-regional interconnection line plan as decision variables, and use the safety constraint unit combination algorithm to adjust each decision variable in turn to eliminate power flow over-limit; f) Based on the unit start and stop status optimized by the safety constraint unit combination, carry out full-time safety constraint economic dispatch; g) Carry out safety verification analysis based on the full-time safety constraint economic dispatch results, and add the newly added over-limit equipment to the regional power grid safety correction model. Through iterative calculation, finally obtain the correction result that meets the safety of the regional power grid; h) Send the correction result that meets the safety of the regional power grid to each provincial power grid, and the calculation is completed.

[0308] Furthermore, the boundary data generated by the scenario includes provincial power grid system data, unit data, interconnection line data, load data and unit group data; the calculation period is the shortest clearing period of the provincial power grid under the jurisdiction of the regional power grid.

[0309] Furthermore, the power grid security analysis adopts a provincial balance calculation strategy, and calculates the power flow and sensitivity at the same time. The power flow is used to analyze the power grid power flow exceeding the limit, and the sensitivity is used to build a safety correction optimization model.

[0310] Furthermore, the effective section for effective constraint identification is the transmission section that will restrict the operation of the unit during the operation of the power grid. The identification method is as follows:

[0311] According to the power flow results of the transmission section F s,t The physical transmission limit P of the transmission section max,s The relationship between them is used to classify the effective types of transmission sections:

[0312] If |F s,t |<σ*P max,s , then the transmission section s is an invalid section in time period t;

[0313] If |F s,t |≥σ*P max,s , then the transmission section s is an effective section in time period t;

[0314] In the formula, σ is the effective constraint determination coefficient;

[0315] The determination method for provinces participating in the adjustment is as follows:

[0316] If the effective equipment / section is within the province, the province where the equipment / section is located shall participate in the adjustment independently;

[0317] If the effective equipment / section is an inter-provincial equipment / section, all provinces connected to the equipment / section will participate in the adjustment.

[0318] Furthermore, the safety correction model taking into account the adjustment of unit output only optimizes the unit output. The start and stop status of the unit, the inter-provincial port plan and the inter-regional tie line plan are all known parameters, and the data reported by the provincial power grid shall prevail.

[0319] The optimization objective function of the safety correction model taking into account the unit output adjustment is as follows:

[0320]

[0321] Where N is the total number of units; T is the total number of time considered in the calculation; NS is the total number of equipment / sections; ΔP i,t Represents the output adjustment of unit i at time t; M p M is the penalty factor for adjusting the unit output; b is the penalty factor for power generation and consumption balance constraint; M s is the penalty factor of equipment / section s at time t; are the positive and negative slack variables of the power generation and consumption balance constraint at time t respectively; are the positive and reverse power flow relaxation variables of equipment / section s at time t, respectively; are the positive and negative slack variables of the power generation and consumption balance constraint at time t respectively;

[0322] The constraints of the safety correction model considering the unit output adjustment include provincial balance constraints, unit output adjustment, unit output upper and lower limits, unit output climbing and grid safety constraints; among which:

[0323] Provincial balance constraints:

[0324] The total output of each province's units is equal to the difference between the short-term forecast value of the provincial system load and the inter-provincial exchange power, as shown in the following formula:

[0325]

[0326] Where P i,t represents the output of unit i at time t; Assemble the units for province a; represents the initial inter-provincial power exchange plan of province a at time t; D a,t is the system load of province a at time t;

[0327] Definition of unit output adjustment:

[0328]

[0329] Where: is the output plan of unit i at time t reported by the province or city, is the clearing result of the power market of each provincial power grid, ΔP i,t is the planned output adjustment of unit i at time t;

[0330] Unit output upper and lower limit constraints:

[0331]

[0332] Where U i,t is the start / stop state of unit i at time t. If the unit is shut down, U i,t =0. This constraint condition can limit the unit output to 0. When the unit is turned on, U i,t =1, this constraint is the conventional upper and lower limit constraint of output; is the minimum technical output of unit i at time t; is the maximum technical output of unit i at time t;

[0333] Unit output climbing constraints:

[0334]

[0335] In the formula, is the maximum climbing grade of unit i, is the maximum downhill climbing amount of unit i; when the unit is at the start-up moment, the unit's lifting force range is determined by the unit's allowable startup rate, η i,t is the unit startup integer variable, η i,t =1 means that unit i is started at time t; when the unit is at shutdown, the output reduction range of the unit is determined by the allowable shutdown rate of the unit; γ i,t is the unit startup integer variable, γ i,t =1 means unit i is shut down at time t.

[0336] Transmission equipment / section flow constraints:

[0337] Safety Correction Model and Safety Verification The equipment / section power flow constraints of the first iteration can be described as:

[0338]

[0339] The equipment / section power flow constraints of the second round and subsequent iterations of safety correction model and safety verification can be described as:

[0340]

[0341] Where P i,t is the active power of unit i in period t; D is the active power of the unit i in the previous period t; k,t is the bus load value of node k in period t; are the forward and reverse power flow transmission limits of equipment / section s respectively; G s-i G is the generator output power transfer distribution factor of the node where unit i is located to the equipment / section s; s-k is the output power transfer distribution factor of node k to device / section s; G s-j is the output power transfer distribution factor of the node where the tie line j is located to the equipment / section s; are the forward and reverse power flow relaxation variables of equipment / section s respectively; It is the AC power flow of the last round of safety correction results of equipment / section s in period t.

[0342] Furthermore, a time period merging safety correction model is developed taking into account unit output, start and stop, inter-provincial ports, and DC adjustment outside the region. The time period merging method includes the following steps:

[0343] Let L t is the system load in period t, then the system load change rate in adjacent periods t and t+1 is:

[0344]

[0345] Calculate the system load change rate for all time periods and find the minimum change rate ΔL t The corresponding time period;

[0346] Merge time periods t and t+1 into a new time period;

[0347] Minimum change rate ΔL t Whether it is greater than the set threshold, or whether the number of time periods remaining after merging reaches the preset number, the judgment condition takes effect, and the time period merging is completed, otherwise the system load change rate of the adjacent time periods t and t+1 is recalculated.

[0348] Furthermore, the objective function of the period-merged safety correction model considering unit output-start-stop-inter-provincial ports-extra-regional DC adjustment is expressed as:

[0349]

[0350] Where N is the total number of units; T is the total number of periods after the safety correction period is merged; NS is the total number of equipment / sections; DN is the total number of DC interconnection lines; NT is the province and city collection; ΔP i,tIndicates the output adjustment of unit i at time t; ΔP d,t is the planned adjustment amount of DC tie line d at time t; is the start / stop status of the unit i in period t reported by each province and city; U i,t is the start and stop status of the unit in period t of the unit i after calculation; is the inter-provincial exchange power plan for the original province a during period t; T a,t M is the inter-provincial exchange power plan for the next province a period t; d M is the penalty factor for the planned adjustment of the DC tie line; a M is the penalty factor for adjusting the inter-provincial exchange power plan; p M is the penalty factor for adjusting the unit output; u M is the penalty factor for the start and stop changes of the unit; b is the penalty factor for power generation and consumption balance constraint; M s is the penalty factor of equipment / section s at time t; are the positive and negative slack variables of the power generation and consumption balance constraint at time t respectively; are the positive and reverse power flow relaxation variables of equipment / section s at time t respectively.

[0351] Furthermore, the optimization objective function of the period-merged safety correction model considering the unit output-start-stop-inter-provincial port-extra-regional DC adjustment contains multiple penalty factors, and the order of the penalty factors from large to small is as follows: Balance constraint relaxation penalty factor M b , Power grid security constraint relaxation penalty factor M s , DC tie line planned adjustment penalty factor M d , inter-provincial exchange power plan adjustment penalty factor M a , change the penalty factor M for unit start and stop u , Penalty factor M for unit output adjustment p , adjust in order from large to small.

[0352] Furthermore, in the process of constructing a time-period merged safety correction model that takes into account unit output-startup and shutdown-inter-provincial ports-extra-regional DC adjustment, the following constraints need to be established:

[0353] Provincial balance constraints:

[0354] After the inter-provincial port plan and the inter-regional connection line plan are adjusted, the provincial balance constraints are modified to:

[0355]

[0356] Where P i,t represents the output of unit i at time t, the decision variable; is the set of units in province a; T a,trepresents the inter-provincial exchange power of province a at time t; D a,t is the system load of province a at time t;

[0357] Minimum continuous start and stop time constraints for units:

[0358]

[0359] Where, T U , T D The minimum continuous start time and minimum continuous shutdown time of the unit; The continuous startup time and continuous shutdown time of unit i in period t can be expressed as the state variable U i,t To express:

[0360]

[0361] Unit startup and shutdown switching variable constraints:

[0362]

[0363] Where η i,t is the unit startup integer variable, η i,t =1 means the unit is turned on during period t; when the unit is shut down, γ i,t is the unit startup integer variable, γ i,t =1 means the unit i is shut down during period t and the following conditions are met:

[0364]

[0365] Inter-provincial exchange plan power flow balance constraints:

[0366] For the adjustment of inter-provincial exchange power in each province within the region, the cumulative change of inter-provincial exchange power must be equal to the cumulative change of DC power outside the region. The specific expression is:

[0367]

[0368] Definition of DC transmission plan adjustment:

[0369]

[0370] Where: is the initial transmission plan of DC transmission channel d at time t; P d,t is the active power of DC transmission channel d at time t;

[0371] Constraints on inter-provincial power distribution of DC interconnection lines:

[0372] After the DC power is connected to the grid at the DC converter station, it is distributed to each province and city in a certain proportion, meeting the following constraints:

[0373]

[0374] Where: r d,a is the power allocation factor of DC transmission channel d to province a; ΔDT a,t It represents the change in inter-provincial exchange power caused by the change of DC outside the region at time t in province a under the jurisdiction of the sub-center; the allocation factor must meet the following conditions:

[0375]

[0376] DC tie line power limit constraints:

[0377] Due to the physical properties of the DC interconnection line, the planned power of the DC interconnection line cannot exceed the maximum value allowed and cannot be lower than the minimum value allowed, and must meet the following constraints:

[0378]

[0379] In the formula, is the minimum power limit of the DC tie line d at time t; is the maximum power limit of the DC tie line d at time t;

[0380] DC tie line power converter station allocation constraints:

[0381] After the DC power is connected to the grid at the DC converter station, it is distributed to each province and city in a certain proportion, meeting the following constraints:

[0382]

[0383] In the formula, v d,h is the power allocation factor of the DC transmission channel d to the converter station h; Δp h,t Indicates the planned adjustment of converter station power; the allocation factor must meet the following conditions:

[0384] ∑h ∈H v d, h=1.

[0385] Furthermore, the full-time safety correction model taking into account the adjustment of unit output-inter-provincial interface-extra-regional DC is based on the unit operating status calculated by the period-merged safety correction model taking into account unit output-start and stop-inter-provincial interface-extra-regional DC adjustment. The unit operating status of the merged period is assigned to the full period and fixed as a known parameter, and only the unit output, inter-provincial interface plan and extra-regional DC plan are adjusted; the constraints related to the unit operating status are eliminated from the constraints.

[0386] Furthermore, based on the calculation results of the full-time security correction model taking into account the unit output-inter-provincial port-extra-regional DC adjustment, the regional power grid security verification calculation is carried out to analyze the over-limit situation of regional power grid equipment / section power flow. If a new over-limit device / section is over-limited, it will be added to the security correction model taking into account the unit output adjustment. Through iterative calculation, the correction results that meet the regional power grid security are finally obtained, including:

[0387] The safety check adopts the AC power flow calculation method to analyze the over-limit situation of regional power grid equipment / power flow after safety correction, and send the newly added over-limit equipment and over-limit period for safety correction;

[0388] Carry out iterative calculations of safety correction and safety verification until no equipment in the regional power grid exceeds the limit or the maximum number of iterations is reached.

[0389] Example 3

[0390] See also Figure 3 , Figure 3 This is a schematic diagram of the structure of a multi-strategy coordinated regional power grid rapid safety correction device disclosed in an embodiment of the present invention. Figure 3 The described device can be applied to a power system, such as automatic dispatching of a power system, and the embodiments of the present invention do not limit this.

[0391] like Figure 3 As shown, the device may include a processor and a memory, wherein the memory stores computer instructions, and the processor is used to execute the computer instructions stored in the memory. When the computer instructions are executed by the processor, the electronic device implements the steps of the method described in the above embodiment and can achieve the technical effect consistent with the above method.

[0392] The memory may include computer system readable media in the form of volatile memory, such as random access memory (RAM) and / or cache memory. The device may further include other removable / non-removable, volatile / non-volatile computer system storage media. By way of example only, the memory may be used to read and write non-removable, non-volatile magnetic media (commonly referred to as a "hard drive"). A program / utility having a set (at least one) of program modules may be stored in, for example, the memory, such program modules including but not limited to an operating system, one or more application programs, other program modules, and program data, each of which or some combination may include the implementation of a network environment. The program modules typically perform the functions and / or methods in the embodiments described herein.

[0393] The processor executes various functional applications and data processing by running the program stored in the memory, such as implementing the method provided in the first embodiment of the present invention.

[0394] Example 4

[0395] Embodiment 4 of the present invention further provides a computer-readable storage medium on which a computer program is stored. When the program is executed by a processor, the steps of the method described in the above embodiment are implemented and the technical effect consistent with the above method can be achieved.

[0396] The computer storage medium of the embodiment of the present invention can adopt any combination of one or more computer-readable media. The computer-readable medium can be a computer-readable signal medium or a computer-readable storage medium. The computer-readable storage medium can be, for example, but not limited to, a system, device or device of electricity, magnetism, light, electromagnetic, infrared, or semiconductor, or any combination of the above. More specific examples (non-exhaustive list) of computer-readable storage media include: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In this document, a computer-readable storage medium can be any tangible medium containing or storing a program, which can be used by an instruction execution system, a device or a device or used in combination with it.

[0397] Computer-readable signal media may include data signals propagated in baseband or as part of a carrier wave, which carry computer-readable program code. Such propagated data signals may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. Computer-readable signal media may also be any computer-readable medium other than a computer-readable storage medium, which may send, propagate, or transmit a program for use by or in conjunction with an instruction execution system, apparatus, or device.

[0398] The program code embodied on the computer readable medium may be transmitted using any appropriate medium, including but not limited to wireless, wireline, optical fiber cable, RF, etc., or any suitable combination of the foregoing.

[0399] Computer program code for performing the operation of the present invention may be written in one or more programming languages ​​or combinations thereof, including object-oriented programming languages ​​such as Java, Smalltalk, C++, and conventional procedural programming languages ​​such as "C" or similar programming languages. The program code may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In cases involving a remote computer, the remote computer may be connected to the user's computer through any type of network including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., via the Internet using an Internet service provider).

[0400] Of course, the storage medium containing computer executable instructions provided by an embodiment of the present invention, whose computer executable instructions are not limited to the above method operations, can also execute related operations in the method provided by any embodiment of the present invention.

[0401] The specific embodiments described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A multi-strategy coordinated regional power grid rapid security correction method, characterized in that: include: Obtain boundary data and calculation cycles for regional power grid security correction from regional and provincial power grid D5000 or new generation control systems, and generate regional power grid security correction calculation scenarios; Based on the safety correction calculation scenario of the regional power grid, the regional power grid safety verification calculation is carried out to analyze the power flow exceeding the limit of each provincial power grid in the regional power grid; If there are devices / sections exceeding the limit in the regional power grid, the effective devices / sections for regional power grid safety correction are identified based on the power flow results of the devices / sections; and the provincial power grids participating in the regional power grid safety correction are determined based on the effective devices / sections, so as to narrow the adjustment scope of safety correction and improve the calculation efficiency of safety correction in subsequent steps; Construct a regional power grid security correction model with the unit output of the provincial power grid participating in the regional power grid security correction as the decision variable, and based on the security correction model taking into account the unit output adjustment, use the security constraint economic dispatch algorithm to adjust the unit output of the provincial power grid participating in the regional power grid security correction to eliminate the equipment / section power flow exceeding the limit; If the safety correction model taking into account the adjustment of unit output cannot eliminate the equipment / section over-limit, then a period-merged safety correction model of the regional power grid is constructed with unit output, unit start-stop, inter-provincial port plan, and extra-regional interconnection line plan as decision variables. Based on the period-merged safety correction model, the safety-constrained unit combination algorithm is used to adjust each decision variable in turn and calculate the start-stop status of the unit. Based on the unit start-stop status calculated by the period-merged safety correction model that takes into account unit output-start-stop-inter-provincial connection-external DC adjustment, a full-time safety correction model for the regional power grid is established. Based on the full-time safety correction model, a safety-constrained economic dispatch algorithm is used to optimize unit output, inter-provincial connection plan and external interconnection line plan in turn to eliminate equipment / section power flow over-limit. Based on the calculation results of the full-time safety correction model taking into account the unit output-inter-provincial interface-out-of-region DC adjustment, the regional power grid safety verification calculation is carried out to analyze the over-limit situation of regional power grid equipment / section power flow. If new over-limit equipment / section is added, it will be added to the safety correction model taking into account the unit output adjustment. Through iterative calculation, the correction result that meets the safety of the regional power grid is finally obtained.

2. According to claim 1, a method for rapid safety correction of regional power grids with multi-strategy coordination is characterized by: The boundary data generated by the scenario includes provincial power grid system data, unit data, interconnection line data, load data and unit group data; the calculation period is the shortest clearing period of the provincial power grid under the jurisdiction of the regional power grid.

3. According to claim 1, a method for rapid safety correction of regional power grids with multi-strategy coordination is characterized by: The power grid security analysis adopts a provincial balance calculation strategy and simultaneously calculates power flow and sensitivity. The power flow is used to analyze power grid power flow over-limit conditions, and the sensitivity is used to construct a security correction optimization model.

4. The method for rapid security correction of regional power grids with multi-strategy coordination according to claim 1 is characterized by: The effective section for effective constraint identification is the transmission section that will restrict the operation of the unit during the operation of the power grid. The identification method is as follows: According to the power flow results of the transmission section F s,t The physical transmission limit P of the transmission section max,s The relationship between them is used to classify the effective types of transmission sections: If |F s,t |<σ*P max,s , then the transmission section s is an invalid section in time period t; If |F s,t |≥σ*P max,s , then the transmission section S is the effective section in time period t; In the formula, σ is the effective constraint determination coefficient; The method for determining the provinces participating in the adjustment is as follows: If the effective equipment / section is within the province, the province where the equipment / section is located shall participate in the adjustment independently; If the effective equipment / section is an inter-provincial equipment / section, all provinces connected to the equipment / section will participate in the adjustment.

5. According to claim 1, a method for rapid safety correction of regional power grids with multi-strategy coordination is characterized in that: The safety correction model taking into account the adjustment of unit output only optimizes the unit output. The unit start-stop status, inter-provincial port plan and extra-regional tie line plan are all known parameters, and the data reported by the provincial power grid shall prevail. The optimization objective function of the safety correction model taking into account the unit output adjustment is as follows: Where N is the total number of units; T is the total number of time considered in the calculation; NS is the total number of equipment / sections; ΔP i,t Represents the output adjustment of unit i at time t; M p M is the penalty factor for adjusting the unit output; b is the penalty factor for power generation and consumption balance constraint; M s is the penalty factor of equipment / section s at time t; are the positive and negative slack variables of the power generation and consumption balance constraint at time t respectively; are the positive and reverse power flow relaxation variables of equipment / section s at time t, respectively; are the positive and negative slack variables of the power generation and consumption balance constraint at time t respectively; The constraints of the safety correction model taking into account the unit output adjustment include provincial balance constraints, unit output adjustment amount, unit output upper and lower limits, unit output climbing and landslide, and power grid safety constraints; among which: Provincial balance constraints: The total output of each province's units is equal to the difference between the short-term forecast value of the provincial system load and the inter-provincial exchange power, as shown in the following formula: Where P i,t represents the output of unit i at time t; Assemble the units for province a; represents the initial inter-provincial power exchange plan of province a at time t; D a,t is the system load of province a at time t; Definition of unit output adjustment: Where: is the output plan of unit i at time t reported by the province or city, is the clearing result of the power market of each provincial power grid, ΔP i,t is the planned output adjustment of unit i at time t; Unit output upper and lower limit constraints: Where U i,t is the start / stop state of unit i at time t. If the unit is shut down, U i,t =0. This constraint condition can limit the unit output to 0. When the unit is turned on, U i,t =1, this constraint is the conventional upper and lower limit constraint of output; is the minimum technical output of unit i at time t; is the maximum technical output of unit i at time t; Unit output climbing constraints: In the formula, is the maximum climbing grade of unit i, is the maximum downhill climbing amount of unit i; when the unit is at the start-up moment, the unit's lifting force range is determined by the unit's allowable startup rate, η i,t is the unit startup integer variable, η i,t =1 means that unit i is started at time t; when the unit is at shutdown, the output reduction range of the unit is determined by the allowable shutdown rate of the unit; γ i,t is the unit startup integer variable, γ i,t =1 means unit i is shut down at time t. Transmission equipment / section flow constraints: Safety Correction Model and Safety Verification The equipment / section power flow constraints of the first iteration can be described as: The equipment / section power flow constraints of the second round and subsequent iterations of safety correction model and safety verification can be described as: Where P i,t is the active power of unit i in period t; D is the active power of the unit i in the previous period t; k,t is the bus load value of node k in period T; are the forward and reverse power flow transmission limits of equipment / section s respectively; G s-i G is the generator output power transfer distribution factor of the node where unit i is located to the equipment / section s; s-k is the output power transfer distribution factor of node k to device / section s; G s-j is the output power transfer distribution factor of the node where the tie line j is located to the equipment / section s; are the forward and reverse power flow relaxation variables of equipment / section s respectively; It is the AC power flow of the last round of safety correction results of equipment / section s in period t.

6. A method for rapid security correction of regional power grids with multi-strategy coordination according to claim 1, characterized in that: The time period merging safety correction model taking into account unit output-start and stop-inter-provincial ports-out-of-region DC adjustment, and its time period merging method include the following steps: Let L t is the system load in period t, then the system load change rate in adjacent periods t and t+1 is: Calculate the system load change rate for all time periods and find the minimum change rate ΔL t The corresponding time period; Merge time periods t and t+1 into a new time period; Minimum change rate ΔL t Whether it is greater than the set threshold, or whether the number of time periods remaining after merging reaches the preset number, the judgment condition takes effect, and the time period merging is completed, otherwise the system load change rate of the adjacent time periods t and t+1 is recalculated.

7. A method for rapid security correction of regional power grids with multi-strategy coordination according to claim 1, characterized in that: The objective function of the period-merged safety correction model considering unit output-start-stop-inter-provincial ports-out-of-region DC adjustment is expressed as: Where N is the total number of units; T is the total number of periods after the safety correction period is merged; NS is the total number of equipment / sections; DN is the total number of DC interconnection lines; NT is the province and city collection; ΔP i,t Indicates the output adjustment of unit i at time t; ΔP d,t is the planned adjustment amount of DC tie line d at time t; is the start / stop status of the unit i in period t reported by each province and city; U i,t is the start and stop status of the unit in period t of the unit i after calculation; is the inter-provincial exchange power plan for the original province a during period t; T a,t M is the inter-provincial exchange power plan for the next province a period t; d M is the penalty factor for the planned adjustment of the DC tie line; a M is the penalty factor for adjusting the inter-provincial exchange power plan; p M is the penalty factor for adjusting the unit output; u M is the penalty factor for the start and stop changes of the unit; b is the penalty factor for power generation and consumption balance constraint; M s is the penalty factor of equipment / section s at time t; are the positive and negative slack variables of the power generation and consumption balance constraint at time t respectively; are the positive and reverse power flow relaxation variables of equipment / section s at time t respectively.

8. A method for rapid safety correction of regional power grids with multi-strategy coordination according to claim 7, characterized in that: The optimization objective function of the period-merged safety correction model considering unit output-start-stop-inter-provincial port-out-of-region DC adjustment includes multiple penalty factors, and the order of the penalty factors from large to small is as follows: Balance constraint relaxation penalty factor M b , Power grid security constraint relaxation penalty factor M s , DC tie line planned adjustment penalty factor M d , inter-provincial exchange power plan adjustment penalty factor M a , the penalty factor m for the start and stop of the unit u , Penalty factor M for unit output adjustment p , adjust in order from large to small.

9. A method for rapid safety correction of regional power grids with multi-strategy coordination according to claim 7, characterized in that: In the process of constructing a time-period merged safety correction model that takes into account unit output, start-stop, inter-provincial ports, and DC adjustment outside the region, the following constraints need to be established: Provincial balance constraints: After the inter-provincial port plan and the inter-regional connection line plan are adjusted, the provincial balance constraints are modified to: Where P i,t represents the output of unit i at time t, the decision variable; is the set of units in province a; T a,t represents the inter-provincial exchange power of province a at time t; D a,t is the system load of province a at time t; Minimum continuous start and stop time constraints for units: Where, T U , T D The minimum continuous start time and minimum continuous shutdown time of the unit; The continuous startup time and continuous shutdown time of unit i in period t can be expressed as the state variable U i,t To express: Unit startup and shutdown switching variable constraints: Where η i,t is the unit startup integer variable, η i,t =1 means the unit is turned on during period t; when the unit is shut down, γ i,t is the unit startup integer variable, γ i,t =1 means the unit i is shut down during period t and the following conditions are met: Inter-provincial exchange plan power flow balance constraints: For the adjustment of inter-provincial exchange power in each province within the region, the cumulative change of inter-provincial exchange power must be equal to the cumulative change of DC power outside the region. The specific expression is: Definition of DC transmission plan adjustment: Where: is the initial transmission plan of DC transmission channel d at time t; P d,t is the active power of DC transmission channel d at time t; Constraints on inter-provincial power distribution of DC interconnection lines: After the DC power is connected to the grid at the DC converter station, it is distributed to each province and city in a certain proportion, meeting the following constraints: Where: r d,a is the power allocation factor of DC transmission channel d to province a; ΔDT a,t It represents the change in inter-provincial exchange power caused by the change of DC outside the region at time t in province a under the jurisdiction of the sub-center; the allocation factor must meet the following conditions: DC tie line power limit constraints: Due to the physical properties of the DC interconnection line, the planned power of the DC interconnection line cannot exceed the maximum value allowed and cannot be lower than the minimum value allowed, and must meet the following constraints: In the formula, is the minimum power limit of the DC tie line d at time t; is the maximum power limit of the DC tie line d at time t; DC tie line power converter station allocation constraints: After the DC power is connected to the grid at the DC converter station, it is distributed to each province and city in a certain proportion, meeting the following constraints: In the formula, v d,h is the power allocation factor of the DC transmission channel d to the converter station h; Δp h,t Indicates the planned adjustment of converter station power; the allocation factor must meet the following conditions: ∑h ∈H v d, h=1。 10. The method for rapid security correction of regional power grids with multi-strategy coordination according to claim 1 is characterized in that: The full-time safety correction model taking into account the adjustment of unit output-inter-provincial ports-extra-regional DC is based on the unit operating status calculated by the period-merged safety correction model taking into account unit output-start and stop-inter-provincial ports-extra-regional DC adjustment. The unit operating status of the merged period is assigned to the full period and fixed as a known parameter, and only the unit output, inter-provincial port plan and extra-regional DC plan are adjusted; the constraints related to the unit operating status are eliminated from the constraints.

11. The method for rapid security correction of regional power grids with multi-strategy coordination according to claim 1 is characterized in that: Based on the calculation results of the full-time security correction model taking into account the unit output-inter-provincial outlet-out-of-region DC adjustment, the regional power grid security verification calculation is carried out to analyze the over-limit situation of the regional power grid equipment / section power flow. If a new over-limit equipment / section is over-limited, it is added to the security correction model taking into account the unit output adjustment. Through iterative calculation, the correction result that meets the regional power grid security is finally obtained, including: The safety check adopts the AC power flow calculation method to analyze the over-limit situation of regional power grid equipment / power flow after safety correction, and send the newly added over-limit equipment and over-limit period for safety correction; Carry out iterative calculations of safety correction and safety verification until no equipment in the regional power grid exceeds the limit or the maximum number of iterations is reached.

12. A multi-strategy coordinated regional power grid rapid security correction system, characterized in that: include: The scenario generation module is used to obtain the boundary data and calculation cycle for regional power grid security correction from the regional and provincial power grid D5000 or the new generation control system, and generate the regional power grid security correction calculation scenario; The power grid security analysis module is used to carry out regional power grid security verification calculations based on the security correction calculation scenarios of the regional power grid, and analyze the over-limit conditions of the tidal equipment / section flow of each provincial power grid in the regional power grid; The identification module is used to identify effective equipment / sections and determine the provinces participating in the adjustment. If there are equipment / sections exceeding the limit in the regional power grid, the effective sections for the regional power grid security correction are identified based on the power flow results of the transmission section. The provincial power grids participating in the regional power grid security correction are determined based on the effective equipment / sections, so as to narrow the scope of security correction adjustment and improve the calculation efficiency of security correction in subsequent steps. The safety correction model construction module taking into account the unit output adjustment is used to construct a safety correction model of the regional power grid with the unit output of the provincial power grid participating in the safety correction of the regional power grid as the decision variable, and based on the safety correction model, the unit output of the provincial power grid participating in the safety correction of the regional power grid is adjusted by using the safety constraint economic dispatch algorithm to eliminate the equipment / section power flow exceeding the limit; The module for constructing a period-merged safety correction model that takes into account unit output-start-stop-inter-provincial connection-external DC adjustment is used to build a period-merged safety correction model for the regional power grid with unit output, unit start-stop, inter-provincial connection plan, and external interconnection line plan as decision variables, in order to solve the problem that the safety correction model taking into account unit output adjustment cannot eliminate the equipment / section over-limit. Based on the period-merged safety correction model, the safety constraint unit combination algorithm is used to adjust each decision variable in turn to eliminate the power flow over-limit; The full-time safety correction model construction module taking into account the unit output-inter-provincial port-external DC adjustment is used to establish the full-time safety correction model of the regional power grid based on the unit start-stop state calculated by the period-merged safety correction model taking into account the unit output-start-stop-inter-provincial port-external DC adjustment, and based on the full-time safety correction model, the safety-constrained economic dispatch algorithm is used to optimize the unit output, inter-provincial port plan and external tie line plan in turn to eliminate power flow over-limit; The iterative calculation module is used to carry out regional safety verification calculations based on the calculation results of the full-time safety correction model that takes into account the unit output-inter-provincial port-out-of-region DC adjustment, analyze the over-limit situation of regional power grid equipment / section power flow, and add the newly added over-limit equipment / section to the safety correction model that takes into account the unit output adjustment, re-carry out the safety correction optimization solution, and finally obtain the correction results that meet the regional power grid safety through iterative calculation.

13. The multi-strategy coordinated regional power grid rapid security correction system according to claim 12, characterized in that: The boundary data generated by the scenario includes provincial power grid system data, unit data, interconnection line data, load data and unit group data; the calculation period is the shortest clearing period of the provincial power grid under the jurisdiction of the regional power grid.

14. The multi-strategy coordinated regional power grid rapid security correction system according to claim 12, characterized in that: The power grid security analysis adopts a provincial balance calculation strategy and simultaneously calculates power flow and sensitivity. The power flow is used to analyze the power grid power flow over-limit situation, and the sensitivity is used to build a security correction optimization model.

15. The multi-strategy coordinated regional power grid rapid security correction system according to claim 12, characterized in that: The effective section for effective constraint identification is the transmission section that will restrict the operation of the unit during the operation of the power grid. The identification method is as follows: According to the power flow results of the transmission section F s,t The physical transmission limit P of the transmission section max,s The relationship between them is used to classify the effective types of transmission sections: If |F s,t |<σ*P max,s , then the transmission section s is an invalid section in time period t; If |F s,t |≥σ*P max,s , then the transmission section s is an effective section in time period t; In the formula, σ is the effective constraint determination coefficient; The method for determining the provinces participating in the adjustment is as follows: If the effective equipment / section is within the province, the province where the equipment / section is located shall participate in the adjustment independently; If the effective equipment / section is an inter-provincial equipment / section, all provinces connected to the equipment / section will participate in the adjustment.

16. The multi-strategy coordinated regional power grid rapid security correction system according to claim 12, characterized in that: The safety correction model taking into account the adjustment of unit output only optimizes the unit output. The unit start-stop status, inter-provincial port plan and extra-regional tie line plan are all known parameters, and the data reported by the provincial power grid shall prevail. The optimization objective function of the safety correction model taking into account the unit output adjustment is as follows: Where N is the total number of units; T is the total number of time considered in the calculation; NS is the total number of equipment / sections; ΔP i,t Represents the output adjustment of unit i at time t; M p M is the penalty factor for adjusting the unit output; b is the penalty factor for power generation and consumption balance constraint; M s is the penalty factor of equipment / section s at time t; are the positive and negative slack variables of the power generation and consumption balance constraint at time t respectively; are the positive and reverse power flow relaxation variables of equipment / section s at time t, respectively; are the positive and negative slack variables of the power generation and consumption balance constraint at time t respectively; The constraints of the safety correction model taking into account the unit output adjustment include provincial balance constraints, unit output adjustment amount, unit output upper and lower limits, unit output climbing and landslide, and power grid safety constraints; among which: Provincial balance constraints: The total output of each province's units is equal to the difference between the short-term forecast value of the provincial system load and the inter-provincial exchange power, as shown in the following formula: Where P i,t represents the output of unit i at time t; Assemble the units for province a; represents the initial inter-provincial power exchange plan of province a at time t; D a,t is the system load of province a at time t; Definition of unit output adjustment: Where: is the output plan of unit i at time t reported by the province or city, is the clearing result of the power market of each provincial power grid, ΔP i,t is the planned output adjustment of unit i at time t; Unit output upper and lower limit constraints: Where U i,t is the start / stop state of unit i at time t. If the unit is shut down, U i,t =0. This constraint condition can limit the unit output to 0. When the unit is turned on, U i,t =1, this constraint is the conventional upper and lower limit constraint of output; is the minimum technical output of unit i at time t; is the maximum technical output of unit i at time t; Unit output climbing constraints: In the formula, is the maximum climbing grade of unit i, is the maximum downhill climbing amount of unit i; when the unit is at the start-up moment, the unit's lifting force range is determined by the unit's allowable startup rate, η i,t is the unit startup integer variable, η i,t =1 means that unit i is started at time t; when the unit is at shutdown, the output reduction range of the unit is determined by the allowable shutdown rate of the unit; γ i,t is the unit startup integer variable, γ i,t =1 means unit i is shut down at time t. Transmission equipment / section flow constraints: Safety Correction Model and Safety Verification The equipment / section power flow constraints of the first iteration can be described as: The equipment / section power flow constraints of the second round and subsequent iterations of safety correction model and safety verification can be described as: Where P i,t is the active power of unit i in period t; D is the active power of the unit i in the previous period t; k,t is the bus load value of node k in period t; are the forward and reverse power flow transmission limits of equipment / section s respectively; G s-i G is the generator output power transfer distribution factor of the node where unit i is located to the equipment / section s; s-k is the output power transfer distribution factor of node k to device / section s; G s-j is the output power transfer distribution factor of the node where the tie line j is located to the equipment / section s; are the forward and reverse power flow relaxation variables of equipment / section s respectively; It is the AC power flow of the last round of safety correction results of equipment / section s in period t.

17. The multi-strategy coordinated regional power grid rapid security correction system according to claim 12, characterized in that: The time period merging safety correction model taking into account unit output-start and stop-inter-provincial ports-out-of-region DC adjustment, and its time period merging method include the following steps: Let L t is the system load in period t, then the system load change rate in adjacent periods t and t+1 is: Calculate the system load change rate for all time periods and find the minimum change rate ΔL t The corresponding time period; Merge time periods t and t+1 into a new time period; Minimum change rate ΔL t Whether it is greater than the set threshold, or whether the number of time periods remaining after merging reaches the preset number, the judgment condition takes effect, and the time period merging is completed, otherwise the system load change rate of the adjacent time periods t and t+1 is recalculated.

18. The multi-strategy coordinated regional power grid rapid security correction system according to claim 12, characterized in that: The objective function of the period-merged safety correction model considering unit output-start-stop-inter-provincial ports-out-of-region DC adjustment is expressed as: Where N is the total number of units; T is the total number of periods after the safety correction period is merged; NS is the total number of equipment / sections; DN is the total number of DC interconnection lines; NT is the province and city collection; ΔP i,t Indicates the output adjustment of unit i at time t; ΔP d,t is the planned adjustment amount of DC tie line d at time t; is the start / stop status of the unit i in period t reported by each province and city; U i,t is the start and stop status of the unit in period t of the unit i after calculation; is the inter-provincial exchange power plan for the original province a during period t; T a,t M is the inter-provincial exchange power plan for the next province a period t; d M is the penalty factor for the planned adjustment of the DC tie line; a M is the penalty factor for adjusting the inter-provincial exchange power plan; p M is the penalty factor for adjusting the unit output; u M is the penalty factor for the start and stop changes of the unit; b is the penalty factor for power generation and consumption balance constraint; M d is the penalty factor of equipment / section s at time t; are the positive and negative slack variables of the power generation and consumption balance constraint at time t respectively; are the positive and reverse power flow relaxation variables of equipment / section s at time t respectively.

19. A multi-strategy coordinated regional power grid rapid security correction system according to claim 18, characterized in that: The optimization objective function of the period-merged safety correction model considering unit output-start-stop-inter-provincial port-out-of-region DC adjustment includes multiple penalty factors, and the order of the penalty factors from large to small is as follows: Balance constraint relaxation penalty factor M b , Power grid security constraint relaxation penalty factor M s , DC tie line planned adjustment penalty factor M d , inter-provincial exchange power plan adjustment penalty factor M a , change the penalty factor M for unit start and stop u , Penalty factor M for unit output adjustment p , adjust in order from large to small.

20. The multi-strategy coordinated regional power grid rapid security correction system according to claim 18, characterized in that: In the process of constructing a time-period merged safety correction model that takes into account unit output, start-stop, inter-provincial ports, and DC adjustment outside the region, the following constraints need to be established: Provincial balance constraints: After the inter-provincial port plan and the inter-regional connection line plan are adjusted, the provincial balance constraints are modified to: Where P i,t represents the output of unit i at time t, the decision variable; is the set of units in province a; T a,t represents the inter-provincial exchange power of province a at time t; D a,t is the system load of province a at time t; Minimum continuous start and stop time constraints for units: Where, T U , T D The minimum continuous start time and minimum continuous shutdown time of the unit; The continuous startup time and continuous shutdown time of unit i in period t can be expressed as the state variable U i,t To express: Unit startup and shutdown switching variable constraints: Where η i,t is the unit startup integer variable, η i,t =1 means the unit is turned on during period t; when the unit is shut down, γ i,t is the unit startup integer variable, γ i,t =1 means the unit i is shut down during period t and the following conditions are met: Inter-provincial exchange plan power flow balance constraints: For the adjustment of inter-provincial exchange power in each province within the region, the cumulative change of inter-provincial exchange power must be equal to the cumulative change of DC power outside the region. The specific expression is: Definition of DC transmission plan adjustment: Where: is the initial transmission plan of DC transmission channel d at time t; P d,t is the active power of DC transmission channel d at time t; Constraints on inter-provincial power distribution of DC interconnection lines: After the DC power is connected to the grid at the DC converter station, it is distributed to each province and city in a certain proportion, meeting the following constraints: Where: r d,a is the power allocation factor of DC transmission channel d to province a; ΔDT a,t It represents the change in inter-provincial exchange power caused by the change of DC outside the region at time t in province a under the jurisdiction of the sub-center; the allocation factor must meet the following conditions: DC tie line power limit constraints: Due to the physical properties of the DC interconnection line, the planned power of the DC interconnection line cannot exceed the maximum value allowed and cannot be lower than the minimum value allowed, and must meet the following constraints: In the formula, is the minimum power limit of the DC tie line d at time t; is the maximum power limit of the DC tie line d at time t; DC tie line power converter station allocation constraints: After the DC power is connected to the grid at the DC converter station, it is distributed to each province and city in a certain proportion, meeting the following constraints: In the formula, v d,h is the power allocation factor of the DC transmission channel d to the converter station h; Δp h,t Indicates the planned adjustment of converter station power; the allocation factor must meet the following conditions: ∑ h∈H v d,h =1。 21. The multi-strategy coordinated regional power grid rapid security correction system according to claim 12, characterized in that: The full-time safety correction model taking into account the adjustment of unit output-inter-provincial ports-extra-regional DC is based on the unit operating status calculated by the period-merged safety correction model taking into account unit output-start and stop-inter-provincial ports-extra-regional DC adjustment. The unit operating status of the merged period is assigned to the full period and fixed as a known parameter, and only the unit output, inter-provincial port plan and extra-regional DC plan are adjusted; the constraints related to the unit operating status are eliminated from the constraints.

22. The multi-strategy coordinated regional power grid rapid security correction system according to claim 12, characterized in that: Based on the calculation results of the full-time security correction model taking into account the unit output-inter-provincial outlet-out-of-region DC adjustment, the regional power grid security verification calculation is carried out to analyze the over-limit situation of the regional power grid equipment / section power flow. If a new over-limit equipment / section is over-limited, it is added to the security correction model taking into account the unit output adjustment. Through iterative calculation, the correction result that meets the regional power grid security is finally obtained, including: The safety check adopts the AC power flow calculation method to analyze the over-limit situation of regional power grid equipment / power flow after safety correction, and send the newly added over-limit equipment and over-limit period for safety correction; Carry out iterative calculations of safety correction and safety verification until no equipment in the regional power grid exceeds the limit or the maximum number of iterations is reached.

23. A multi-strategy coordinated regional power grid rapid safety correction device, characterized in that: The electronic device comprises a processor and a memory, wherein the memory stores computer instructions, and the processor is used to execute the computer instructions stored in the memory. When the computer instructions are executed by the processor, the electronic device implements the steps of the multi-strategy coordinated regional power grid rapid safety correction method as described in any one of claims 1 to 11.

24. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the multi-strategy coordinated regional power grid rapid security correction method as described in any one of claims 1 to 11.

Citation Information

Patent Citations

  • Equivalent coordinative optimization method for large-scale power grid dispatching plan

    CN105226708A

  • Power grid branch active power flow out-of-limit correction control method, system, equipment and medium

    CN116632852A

  • Direct-current power flow internal iteration method and system for power dispatching optimization

    CN118134216A