Dispatching method, device and equipment of active power distribution network and medium
By generating and optimizing the scheduling parameters of the active distribution network and calculating the scheduling score using the target distribution network model, the problem of large peak-to-valley difference in the load of the active distribution network is solved, and load balancing and efficiency improvement are achieved.
Patent Information
- Application Number
- CN202411024045.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-29
- Publication Date
- 2024-11-15
AI Technical Summary
The load peak-to-valley difference between the existing active distribution networks is relatively large and the energy efficiency is relatively low, resulting in low power consumption efficiency and energy utilization efficiency.
By generating multiple sets of scheduling parameters of active distribution networks based on the constraints of each scheduling parameter, calculating scheduling scores using the target distribution network optimization scheduling model, determining the target scheduling parameters, and scheduling the active distribution network to achieve balanced distribution of load.
The balanced distribution of the active distribution network load during the scheduling period is achieved, the power consumption efficiency and energy utilization efficiency are improved, and the user's electricity consumption cost is reduced and user satisfaction is improved.
Smart Images

Figure CN118970974A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of electric power dispatching, and in particular to a dispatching method, device, equipment and medium for an active power distribution network. Background Art
[0002] The access of renewable energy sources such as photovoltaic and wind power provides more available resources for the distribution network side, but distributed power sources such as photovoltaic and wind power are seriously affected by meteorological factors and have the characteristics of volatility and randomness, which greatly restricts the scale of distributed power access and energy utilization. At present, it is generally achieved by adding energy storage devices to power generation and using the charging and discharging characteristics of energy storage devices to reduce the fluctuation of electric energy, or implementing time-of-use electricity price measures for different power users in the distribution network, so as to improve energy efficiency, reduce load peak-valley difference and improve load curve.
[0003] However, as the peak-to-valley difference increases, although the above method can reduce the peak-to-valley difference, the optimized load curve always presents a multi-peak or concave-convex phenomenon. Summary of the invention
[0004] The present invention provides a scheduling method, device, equipment and medium for an active distribution network, which can solve the problems of relatively large peak-to-valley difference and relatively low energy efficiency of the existing active distribution network, so that the load of the active distribution network is evenly distributed during the entire scheduling period, and can improve power consumption efficiency and energy utilization efficiency.
[0005] According to one aspect of the present invention, there is provided a scheduling method for an active power distribution network, comprising:
[0006] According to the constraints of various dispatching parameters, multiple groups of dispatching parameters of the active distribution network are generated;
[0007] According to the dispatching parameters of each group of active distribution networks and the target distribution network optimization dispatching model, the dispatching scores matched by the dispatching parameters of each group of active distribution networks are calculated respectively;
[0008] According to the dispatching score, target dispatching parameters are determined, and the active distribution network is dispatched using the target dispatching parameters.
[0009] According to another aspect of the present invention, there is provided a dispatching device for an active power distribution network, comprising:
[0010] A dispatch parameter acquisition module is used to generate multiple groups of dispatch parameters of the active distribution network according to the constraints of each dispatch parameter;
[0011] The dispatch score calculation module is used to calculate the dispatch score matched by the dispatch parameters of each group of active distribution networks according to the dispatch parameters of each group of active distribution networks and the target distribution network optimization dispatch model;
[0012] The active distribution network scheduling module is used to determine the target scheduling parameters according to the scheduling score, and use the target scheduling parameters to schedule the active distribution network.
[0013] According to another aspect of the present invention, an electronic device is provided, the electronic device comprising:
[0014] at least one processor; and
[0015] a memory communicatively connected to the at least one processor; wherein,
[0016] The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the scheduling method for the active power distribution network described in any embodiment of the present invention.
[0017] According to another aspect of the present invention, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the scheduling method for the active power distribution network described in any embodiment of the present invention when executed.
[0018] The technical solution of the embodiment of the present invention generates multiple groups of dispatching parameters of active distribution networks according to the constraints of each dispatching parameter, calculates the dispatching scores matched by the dispatching parameters of each group of active distribution networks according to the dispatching parameters of each group of active distribution networks and the target distribution network optimization dispatching model, determines the target dispatching parameters according to the dispatching scores, and dispatches the active distribution network using the target dispatching parameters. This can perform multi-source collaborative optimization dispatching on the active distribution network, solve the problems of relatively large peak-to-valley difference and relatively low energy efficiency of the existing active distribution network, make the load of the active distribution network evenly distributed during the entire dispatching period, improve power consumption efficiency and energy utilization efficiency, and at the same time, reduce the user's electricity cost and improve user satisfaction.
[0019] It should be understood that the contents described in this section are not intended to identify the key or important features of the embodiments of the present invention, nor are they intended to limit the scope of the present invention. Other features of the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0021] Figure 1is a flow chart of a scheduling method for an active distribution network provided according to Embodiment 1 of the present invention;
[0022] Figure 2 is a flow chart of another scheduling method for an active distribution network provided according to Embodiment 2 of the present invention;
[0023] Figure 3 This is a structural schematic diagram of a dispatching device for an active power distribution network provided according to a third embodiment of the present invention;
[0024] Figure 4 It is a structural schematic diagram of an electronic device for implementing the scheduling method of the active power distribution network according to an embodiment of the present invention. DETAILED DESCRIPTION
[0025] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0026] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0027] Embodiment 1
[0028] Figure 1 This is a flow chart of a dispatching method for an active distribution network provided in the first embodiment of the present invention. This embodiment can be applied to obtain the optimal dispatching parameters of the active distribution network to reduce the load peak-valley difference. The method can be executed by a dispatching device of the active distribution network. The dispatching device of the active distribution network can be implemented in the form of hardware and / or software, and can generally be configured in a computer or processor with data processing capabilities. Figure 1 As shown, the method includes:
[0029] S110. Generate multiple groups of dispatching parameters of the active distribution network according to the constraints of each dispatching parameter.
[0030] Among them, the dispatching parameters of each group of active distribution networks may include wind farm parameters, photovoltaic power station parameters, energy storage system parameters and time-of-use electricity prices in each time period within a single dispatching cycle.
[0031] It can be understood that after obtaining multiple groups of dispatching parameters of the active distribution network according to the dispatching parameter constraints, the optimal dispatching parameters can be obtained from these parameters as the parameters ultimately used for the dispatching of the active distribution network.
[0032] Optionally, in each scheduling cycle, multiple time periods may be pre-divided, such as peak, flat, and valley time periods. Specific division methods may include:
[0033] The actual load power per hour in a historical single dispatching cycle is obtained, and the single dispatching cycle is divided into multiple time periods according to the actual load power per hour and multiple preset load power intervals.
[0034] Optionally, wind farm parameters may include the rated output power of the wind turbine and the cut-in, cut-out and rated wind speed of the wind turbine; photovoltaic power station parameters may include the rated output power of photovoltaic power generation and the rated solar radiation intensity of photovoltaic power generation; energy storage system parameters may include the upper and lower limits of the energy storage system capacity; time-of-use electricity price may refer to the electricity price corresponding to each time period within a single scheduling cycle.
[0035] The advantage of this setting is that the time-of-use electricity price mechanism can be implemented for users, which can encourage electricity users to use electricity rationally, shift peak loads, and improve the utilization efficiency of electricity resources.
[0036] S120, calculating the dispatching score matched by the dispatching parameters of each group of active distribution networks according to the dispatching parameters of each group of active distribution networks and the target distribution network optimization dispatching model.
[0037] Optionally, according to the dispatching parameters of each group of active distribution networks and the target distribution network optimization dispatching model, the dispatching scores matched by the dispatching parameters of each group of active distribution networks are calculated respectively, including:
[0038] Determine the predicted load power of the active distribution network in each time period according to the time-of-use electricity price in the dispatching parameters of the target group, and obtain the first distribution network optimization dispatching score according to the predicted load power;
[0039] Obtain a second distribution network optimization scheduling score according to the wind farm parameters, photovoltaic power station parameters, energy storage system parameters and the predicted load power in each time period in the scheduling parameters of the target group;
[0040] A scheduling score that matches the scheduling parameters of the target group is calculated according to the first distribution network optimization scheduling score, the second distribution network optimization scheduling score and the target distribution network optimization scheduling model.
[0041] Optionally, the predicted load power can be calculated according to the following formula:
[0042]
[0043] Where E is the electricity demand elasticity matrix, q t0 is the historical load power in each time period t when the time-of-use electricity price mechanism is not adopted, p t0 is the historical electricity price in each time period, q t is the predicted load power in each time period t after adopting the time-of-use electricity price mechanism, p t It is the time-of-use electricity price in each time period.
[0044] Optionally, the electricity demand elasticity matrix may be obtained based on a pre-established self-elasticity model and a cross-elasticity model.
[0045] Optionally, the self-elastic model refers to the ratio of the rate of change of electricity consumption to the rate of change of electricity price in a certain period of time, which indicates the sensitivity of electricity consumption to price in this period of time. The self-elastic model can be expressed by the following formula:
[0046]
[0047] Among them, e ii is the self-elastic model, q i0 is the historical load power in each time period i when the time-of-use electricity price mechanism is not adopted, p i0 is the historical electricity price in each time period, △q i is the difference between the load power in each time period i and the historical load power after the time-of-use electricity price mechanism is used, △p i It is the time-of-use electricity price in each time period after the time-of-use electricity price mechanism is used.
[0048] Optionally, considering that the power consumption of power users in a certain period is not only related to the electricity price in that period, but also affected by the electricity prices in other periods, cross elasticity is proposed to describe the elasticity of power demand. The cross elasticity model can be expressed by the following formula:
[0049]
[0050] Among them, e ij is the cross elasticity model, q i0 is the load power in time period i when the time-of-use electricity price mechanism is adopted, p j0 is the load power in time period j when the time-of-use electricity price mechanism is adopted, △q iis the difference between the load power in time period i after using the time-of-use electricity price mechanism and the load power in the historical time period i, △p i It is the difference between the load power in time period j after the time-of-use electricity price mechanism is used and the load power in the historical time period j.
[0051] Alternatively, the electricity demand elasticity matrix can be expressed by the following formula:
[0052]
[0053] Among them, the vectors on the main diagonal of the electricity demand elasticity matrix are obtained through the self-elasticity model, and the remaining vectors are obtained through the cross-elasticity model. m is the time period in a single scheduling cycle.
[0054] Optionally, after obtaining the first distribution network optimization scheduling score and the second distribution network optimization scheduling score, the first distribution network optimization scheduling score and the second distribution network optimization scheduling score can be input into a pre-established target distribution network optimization scheduling model, and the final scheduling score output by the target distribution network optimization scheduling model can be obtained.
[0055] Optional, target distribution network optimization scheduling model The above formula can indicate that the target distribution network optimization scheduling model is obtained based on the first distribution network optimization scheduling score and the second distribution network optimization scheduling score.
[0056] S130. Determine target dispatching parameters according to the dispatching score, and use the target dispatching parameters to dispatch the active distribution network.
[0057] Optionally, after obtaining the scheduling score, a scheduling parameter with the highest scheduling score may be selected as a target scheduling parameter, and scheduling may be performed using the target scheduling parameter.
[0058] The technical solution of the embodiment of the present invention generates multiple groups of dispatching parameters of active distribution networks according to the constraints of each dispatching parameter, calculates the dispatching scores matched by the dispatching parameters of each group of active distribution networks according to the dispatching parameters of each group of active distribution networks and the target distribution network optimization dispatching model, determines the target dispatching parameters according to the dispatching scores, and dispatches the active distribution network using the target dispatching parameters. This can perform multi-source collaborative optimization dispatching on the active distribution network, solve the problems of relatively large peak-to-valley difference and relatively low energy efficiency of the existing active distribution network, make the load of the active distribution network evenly distributed during the entire dispatching period, improve power consumption efficiency and energy utilization efficiency, and at the same time, reduce the user's electricity cost and improve user satisfaction.
[0059] Embodiment 2
[0060] Figure 2This is a flow chart of a dispatching method for an active power distribution network provided in the second embodiment of the present invention. This embodiment specifically describes the dispatching method for an active power distribution network based on the above embodiment. Figure 2 As shown, the method includes:
[0061] S210. Generate multiple groups of dispatching parameters of the active distribution network according to the constraints of each dispatching parameter.
[0062] S220. Determine the predicted load power of the active distribution network in each time period according to the time-of-use electricity price in the dispatching parameters of the target group, and obtain a first distribution network optimization dispatching score according to the predicted load power.
[0063] Optionally, determining the predicted load power of the active distribution network in each time period according to the time-of-use electricity price in the dispatching parameters of the target group may include:
[0064] Generate an electricity demand elasticity matrix based on the pre-established self-elasticity model and cross-elasticity model;
[0065] The predicted load power of the active distribution network in each time period is determined according to the power demand elasticity matrix, the time-of-use electricity price, the historical electricity price and the historical load power.
[0066] Optionally, obtaining a first distribution network optimization scheduling score according to the predicted load power may include:
[0067] The first distribution network optimization scheduling score is calculated according to the predicted load power of the active distribution network in each time period and the following first formula:
[0068]
[0069] Among them, f1 is the first distribution network optimization scheduling score, T is the scheduling period, t is the pre-divided time period in a single scheduling period, P L,t is the predicted load power of the active distribution network in time period t.
[0070] S230. Obtain a second distribution network optimization scheduling score according to the wind farm parameters, photovoltaic power station parameters, energy storage system parameters and predicted load power in each time period in the scheduling parameters of the target group.
[0071] Optionally, obtaining the second distribution network optimization scheduling score according to the wind farm parameters, photovoltaic power station parameters, energy storage system parameters and the predicted load power in each time period in the scheduling parameters of the target group may include:
[0072] According to the pre-established wind farm power model, photovoltaic power station power model, energy storage system charge and discharge model, wind farm parameters, photovoltaic power station parameters, and energy storage system parameters, obtain the predicted wind farm power, photovoltaic power station predicted power, and energy storage system charge and discharge power in each time period;
[0073] The second distribution network optimization scheduling score is calculated based on the predicted power of the wind farm, the predicted power of the photovoltaic power station, the charging and discharging power of the energy storage system, the predicted load power and the following second formula:
[0074]
[0075] Among them, f2 is the optimization scheduling score of the second distribution network, C W , C PV , C TR are the electricity purchase prices of wind farms, photovoltaic power stations and active distribution networks, respectively, E is the operating cost of the energy storage system, P W,t , P PV,t , are the predicted power of wind farm and photovoltaic power station in time period t, P TR,t is the predicted load power of the active distribution network in time period t, P E,t is the charging and discharging power of the energy storage system in time period t.
[0076] Optionally, the predicted power of the wind farm can be calculated by the following formula:
[0077]
[0078] Among them, P W is the predicted power of the wind farm, P Wt is the rated output power of the wind turbine, Vci, Vco and Vr are the cut-in, cut-out and rated wind speed of the wind turbine respectively.
[0079] Optionally, the predicted power of the photovoltaic power station can be calculated by the following formula:
[0080]
[0081] Among them, Ppv(r) is the predicted power of the photovoltaic power station, Ppv is the rated output power of the photovoltaic power station, r is the predicted solar radiation intensity, r rated is the rated solar radiation intensity.
[0082] Optionally, the charging power of the energy storage system can be calculated by the following formula:
[0083]
[0084] Where Soct is the charging power of the energy storage system in time period t, d represents the self-discharge rate of the battery, Soct-1 is the charging power of the energy storage system in time period t-1, η c Indicates the charging efficiency of the battery, E S is the rated capacity of the battery, △t is the duration of time period t, and Pc,t is the charging power of the battery during time period t.
[0085] Optionally, the discharge power of the energy storage system can be calculated by the following formula:
[0086]
[0087] Where Soct is the discharge power of the energy storage system in time period t, d represents the self-discharge rate of the battery, Soct-1 is the discharge power of the energy storage system in time period t-1, η d Indicates the discharge efficiency of the battery, E S is the rated capacity of the battery, △t is the duration of time period t, and Pd,t is the discharge power of the battery in time period t.
[0088] S240: Calculate a scheduling score that matches the scheduling parameters of the target group according to the first distribution network optimization scheduling score, the second distribution network optimization scheduling score, and the target distribution network optimization scheduling model.
[0089] S250: Determine target scheduling parameters according to the scheduling score.
[0090] S260, using the target dispatching parameters to simulate the active distribution network dispatching, obtain the simulated load power and load utilization in each time period, and calculate the load balancing entropy based on the simulated load power and load utilization.
[0091] Optionally, the load balancing entropy can be calculated using the following formula:
[0092]
[0093] Among them, H is the load balancing entropy, P L,t is the simulated load power in time period t, p L,t Indicates load utilization.
[0094] Optionally, when the load values at each moment are closer, the load balancing entropy value is greater.
[0095] S270: Perform secondary verification on the target scheduling parameters according to the load balancing entropy.
[0096] S280. Dispatching the active distribution network using target dispatching parameters.
[0097] The technical solution of the embodiment of the present invention generates multiple groups of dispatching parameters of active distribution networks according to the constraints of each dispatching parameter, calculates the dispatching scores matched by the dispatching parameters of each group of active distribution networks according to the dispatching parameters of each group of active distribution networks and the target distribution network optimization dispatching model, determines the target dispatching parameters according to the dispatching scores, and dispatches the active distribution network using the target dispatching parameters. This can perform multi-source collaborative optimization dispatching on the active distribution network, solve the problems of relatively large peak-to-valley difference and relatively low energy efficiency of the existing active distribution network, make the load of the active distribution network evenly distributed during the entire dispatching period, improve power consumption efficiency and energy utilization efficiency, and at the same time, reduce the user's electricity cost and improve user satisfaction.
[0098] Embodiment 3
[0099] Figure 3 This is a schematic diagram of the structure of a dispatching device for an active power distribution network provided in the third embodiment of the present invention. Figure 3 As shown, the device includes: a scheduling parameter acquisition module 310, a scheduling score calculation module 320 and an active distribution network scheduling module 330.
[0100] The dispatch parameter acquisition module 310 is used to generate multiple groups of dispatch parameters of the active power distribution network according to various dispatch parameter constraints.
[0101] The dispatch score calculation module 320 is used to calculate the dispatch score matched by the dispatch parameters of each group of active distribution networks according to the dispatch parameters of each group of active distribution networks and the target distribution network optimization dispatch model.
[0102] The active distribution network scheduling module 330 is used to determine target scheduling parameters according to the scheduling score, and use the target scheduling parameters to schedule the active distribution network.
[0103] The technical solution of the embodiment of the present invention generates multiple groups of dispatching parameters of active distribution networks according to the constraints of each dispatching parameter, calculates the dispatching scores matched by the dispatching parameters of each group of active distribution networks according to the dispatching parameters of each group of active distribution networks and the target distribution network optimization dispatching model, determines the target dispatching parameters according to the dispatching scores, and dispatches the active distribution network using the target dispatching parameters. This can perform multi-source collaborative optimization dispatching on the active distribution network, solve the problems of relatively large peak-to-valley difference and relatively low energy efficiency of the existing active distribution network, make the load of the active distribution network evenly distributed during the entire dispatching period, improve power consumption efficiency and energy utilization efficiency, and at the same time, reduce the user's electricity cost and improve user satisfaction.
[0104] On the basis of the above embodiments, the dispatching parameters of each group of active distribution networks include wind farm parameters, photovoltaic power station parameters, energy storage system parameters and time-of-use electricity prices in each time period within a single dispatching cycle.
[0105] Based on the above embodiments, the scheduling score calculation module 320 may include:
[0106] A first distribution network optimization scheduling score acquisition unit, used to determine the predicted load power of the active distribution network in each time period according to the time-of-use electricity price in the scheduling parameters of the target group, and acquire the first distribution network optimization scheduling score according to the predicted load power;
[0107] A second distribution network optimization scheduling score acquisition unit, used to acquire a second distribution network optimization scheduling score according to the wind farm parameters, photovoltaic power station parameters, energy storage system parameters and the predicted load power in each time period in the scheduling parameters of the target group;
[0108] The scheduling score acquisition unit is used to calculate a scheduling score that matches the scheduling parameters of the target group according to the first distribution network optimization scheduling score, the second distribution network optimization scheduling score and the target distribution network optimization scheduling model.
[0109] Based on the above embodiments, the first distribution network optimization scheduling score acquisition unit can be specifically used for:
[0110] Generate an electricity demand elasticity matrix based on the pre-established self-elasticity model and cross-elasticity model;
[0111] The predicted load power of the active distribution network in each time period is determined according to the power demand elasticity matrix, the time-of-use electricity price, the historical electricity price and the historical load power.
[0112] On the basis of the above embodiments, the first distribution network optimization scheduling score acquisition unit may also be specifically used for:
[0113] The first distribution network optimization scheduling score is calculated according to the predicted load power of the active distribution network in each time period and the following first formula:
[0114]
[0115] Among them, f1 is the first distribution network optimization scheduling score, T is the scheduling period, t is the pre-divided time period in a single scheduling period, P L,t is the predicted load power of the active distribution network in time period t.
[0116] Based on the above embodiments, the second distribution network optimization scheduling score acquisition unit can be specifically used to:
[0117] According to the pre-established wind farm power model, photovoltaic power station power model, energy storage system charge and discharge model, wind farm parameters, photovoltaic power station parameters, and energy storage system parameters, obtain the predicted wind farm power, photovoltaic power station predicted power, and energy storage system charge and discharge power in each time period;
[0118] The second distribution network optimization scheduling score is calculated based on the predicted power of the wind farm, the predicted power of the photovoltaic power station, the charging and discharging power of the energy storage system, the predicted load power and the following second formula:
[0119]
[0120] Among them, f2 is the optimization scheduling score of the second distribution network, C W , C PV , C TR are the electricity purchase prices of wind farms, photovoltaic power stations and active distribution networks, respectively, E is the operating cost of the energy storage system, P W,t , P PV,t , are the predicted power of wind farm and photovoltaic power station in time period t, P TR,t is the predicted load power of the active distribution network in time period t, P E,t is the charging and discharging power of the energy storage system in time period t.
[0121] Based on the above embodiments, a secondary verification module may be further included to:
[0122] Using the target dispatching parameters to simulate the active distribution network dispatching, obtain the simulated load power and load utilization rate in each time period, and calculate the load balancing entropy according to the simulated load power and load utilization rate;
[0123] According to the load balancing entropy, the target scheduling parameter is verified twice.
[0124] The dispatching device for the active power distribution network provided in the embodiment of the present invention can execute the dispatching method for the active power distribution network provided in any embodiment of the present invention, and has the functional modules and beneficial effects corresponding to the execution method.
[0125] Embodiment 4
[0126] Figure 4A schematic diagram of the structure of an electronic device 10 that can be used to implement an embodiment of the present invention is shown. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device can also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices (such as helmets, glasses, watches, etc.) and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present invention described and / or required herein.
[0127] like Figure 4 As shown, the electronic device 10 includes at least one processor 11, and a memory connected to the at least one processor 11, such as a read-only memory (ROM) 12, a random access memory (RAM) 13, etc., wherein the memory stores a computer program that can be executed by at least one processor, and the processor 11 can perform various appropriate actions and processes according to the computer program stored in the read-only memory (ROM) 12 or the computer program loaded from the storage unit 18 to the random access memory (RAM) 13. In the RAM 13, various programs and data required for the operation of the electronic device 10 can also be stored. The processor 11, the ROM 12, and the RAM 13 are connected to each other through a bus 14. An input / output (I / O) interface 15 is also connected to the bus 14.
[0128] A number of components in the electronic device 10 are connected to the I / O interface 15, including: an input unit 16, such as a keyboard, a mouse, etc.; an output unit 17, such as various types of displays, speakers, etc.; a storage unit 18, such as a disk, an optical disk, etc.; and a communication unit 19, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 19 allows the electronic device 10 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.
[0129] The processor 11 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the processor 11 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various dedicated artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, digital signal processors (DSPs), and any appropriate processors, controllers, microcontrollers, etc. The processor 11 executes the various methods and processes described above, such as the scheduling method of the active distribution network described in an embodiment of the present invention. That is:
[0130] According to the constraints of various dispatching parameters, multiple groups of dispatching parameters of the active distribution network are generated;
[0131] According to the dispatching parameters of each group of active distribution networks and the target distribution network optimization dispatching model, the dispatching scores matched by the dispatching parameters of each group of active distribution networks are calculated respectively;
[0132] According to the dispatching score, target dispatching parameters are determined, and the active distribution network is dispatched using the target dispatching parameters.
[0133] In some embodiments, the dispatching method of the active power distribution network may be implemented as a computer program, which is tangibly contained in a computer-readable storage medium, such as a storage unit 18. In some embodiments, part or all of the computer program may be loaded and / or installed on the electronic device 10 via the ROM 12 and / or the communication unit 19. When the computer program is loaded into the RAM 13 and executed by the processor 11, one or more steps of the dispatching method of the active power distribution network described above may be performed. Alternatively, in other embodiments, the processor 11 may be configured to execute the dispatching method of the active power distribution network in any other appropriate manner (e.g., by means of firmware).
[0134] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.
[0135] Computer programs for implementing the methods of the present invention may be written in any combination of one or more programming languages. These computer programs may be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that when the computer program is executed by the processor, the functions / operations specified in the flow chart and / or block diagram are implemented. The computer program may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.
[0136] In the context of the present invention, a computer-readable storage medium may be a tangible medium that may contain or store a computer program for use by or in combination with an instruction execution system, device or equipment. A computer-readable storage medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices or equipment, or any suitable combination of the foregoing. Alternatively, a computer-readable storage medium may be a machine-readable signal medium. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0137] To provide interaction with a user, the systems and techniques described herein may be implemented on an electronic device having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and a pointing device (e.g., a mouse or trackball) through which the user can provide input to the electronic device. Other types of devices may also be used to provide interaction with the user; for example, the feedback provided to the user may be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user may be received in any form (including acoustic input, voice input, or tactile input).
[0138] The systems and techniques described herein may be implemented in a computing system that includes backend components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes frontend components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such backend components, middleware components, or frontend components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), a blockchain network, and the Internet.
[0139] A computing system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The client and server relationship is generated by computer programs running on the corresponding computers and having a client-server relationship with each other. The server may be a cloud server, also known as a cloud computing server or cloud host, which is a host product in the cloud computing service system to solve the defects of difficult management and weak business scalability in traditional physical hosts and VPS services.
[0140] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps described in the present invention can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solution of the present invention can be achieved, and this document does not limit this.
[0141] The above specific implementations do not constitute a limitation on the protection scope of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A dispatching method for an active distribution network, characterized in that: include: According to the constraints of various dispatching parameters, multiple groups of dispatching parameters of the active distribution network are generated; According to the dispatching parameters of each group of active distribution networks and the target distribution network optimization dispatching model, the dispatching scores matched by the dispatching parameters of each group of active distribution networks are calculated respectively; According to the dispatching score, target dispatching parameters are determined, and the active distribution network is dispatched using the target dispatching parameters.
2. The method according to claim 1, characterized in that The dispatching parameters of each active distribution network include wind farm parameters, photovoltaic power station parameters, energy storage system parameters and time-of-use electricity prices in each time period within a single dispatching cycle.
3. The method according to claim 2, characterized in that According to the dispatching parameters of each group of active distribution networks and the target distribution network optimization dispatching model, the dispatching scores matched by the dispatching parameters of each group of active distribution networks are calculated respectively, including: Determine the predicted load power of the active distribution network in each time period according to the time-of-use electricity price in the dispatching parameters of the target group, and obtain the first distribution network optimization dispatching score according to the predicted load power; Obtain a second distribution network optimization scheduling score according to the wind farm parameters, photovoltaic power station parameters, energy storage system parameters and the predicted load power in each time period in the scheduling parameters of the target group; A scheduling score that matches the scheduling parameters of the target group is calculated according to the first distribution network optimization scheduling score, the second distribution network optimization scheduling score and the target distribution network optimization scheduling model.
4. The method according to claim 3, characterized in that According to the time-of-use electricity price in the dispatching parameters of the target group, the predicted load power of the active distribution network in each time period is determined, including: Generate an electricity demand elasticity matrix based on the pre-established self-elasticity model and cross-elasticity model; The predicted load power of the active distribution network in each time period is determined according to the power demand elasticity matrix, the time-of-use electricity price, the historical electricity price and the historical load power.
5. The method according to claim 4, characterized in that According to the predicted load power, obtaining a first distribution network optimization scheduling score includes: The first distribution network optimization scheduling score is calculated according to the predicted load power of the active distribution network in each time period and the following first formula: Among them, f1 is the first distribution network optimization scheduling score, T is the scheduling period, t is the pre-divided time period in a single scheduling period, P L,t is the predicted load power of the active distribution network in time period t.
6. The method according to claim 5, characterized in that According to the wind farm parameters, photovoltaic power station parameters, energy storage system parameters and the predicted load power in each time period in the dispatching parameters of the target group, a second distribution network optimization dispatching score is obtained, including: According to the pre-established wind farm power model, photovoltaic power station power model, energy storage system charge and discharge model, wind farm parameters, photovoltaic power station parameters, and energy storage system parameters, obtain the predicted wind farm power, photovoltaic power station predicted power, and energy storage system charge and discharge power in each time period; The second distribution network optimization scheduling score is calculated based on the predicted power of the wind farm, the predicted power of the photovoltaic power station, the charging and discharging power of the energy storage system, the predicted load power and the following second formula: Among them, f2 is the optimization scheduling score of the second distribution network, C W , C PV , C TR are the electricity purchase prices of wind farms, photovoltaic power stations and active distribution networks, respectively, E is the operating cost of the energy storage system, P W,t , P PV,t , are the predicted power of wind farm and photovoltaic power station in time period t, P TR,t is the predicted load power of the active distribution network in time period t, P E,t is the charging and discharging power of the energy storage system in time period t.
7. The method according to claim 6, characterized in that After determining the target scheduling parameters according to the scheduling score, the method further includes: Using the target dispatching parameters to simulate the active distribution network dispatching, obtain the simulated load power and load utilization rate in each time period, and calculate the load balancing entropy according to the simulated load power and load utilization rate; According to the load balancing entropy, the target scheduling parameter is verified twice.
8. A dispatching device for an active power distribution network, characterized in that: include: A dispatch parameter acquisition module is used to generate multiple groups of dispatch parameters of the active distribution network according to the constraints of each dispatch parameter; The dispatch score calculation module is used to calculate the dispatch score matched by the dispatch parameters of each group of active distribution networks according to the dispatch parameters of each group of active distribution networks and the target distribution network optimization dispatch model; The active distribution network scheduling module is used to determine the target scheduling parameters according to the scheduling score, and use the target scheduling parameters to schedule the active distribution network.
9. An electronic device, characterized in that: The electronic device comprises: at least one processor; and a memory communicatively connected to the at least one processor; wherein, The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the scheduling method for the active power distribution network described in any one of claims 1 to 7 of the present invention.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the scheduling method for an active power distribution network according to any one of claims 1 to 7 when executed.