Ridge jar film mulching device and method for strawberry planting
By introducing motor-driven coil installation and insertion mechanisms into the ridge coating device for strawberry planting, the problems of high working strength and low coating efficiency in the prior art are solved, and rapid installation and continuous coating are achieved, which significantly Improves coating efficiency.
Patent Information
- Application Number
- CN202411316201.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-20
- Publication Date
- 2024-11-19
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing ridge and altar coating device for strawberry planting has high working strength and low efficiency during the installation and coating process. It requires multiple rotation of threaded connections and manual shoveling of soil to fix the mulch, resulting in a long installation and coating time.
A coating device including a motor-driven coil mounting mechanism and an insertion mechanism is designed to quickly install the coil through the motor and automatically fix the plastic film using the insertion mechanism to reduce manual operation and time.
It greatly reduces the work intensity of workers, improves the coating efficiency, realizes rapid installation and continuous coating, and shortens the coating time.
Smart Images

Figure CN118975485A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of covering ground film on the top surface of a ridge, in particular to a ridge covering film device and method for strawberry planting. Background Art
[0002] On the ground 1 of the strawberry planting area, there are rows of parallel ridges 2 with a certain height. The ridges 2 are formed by piling up soil, and the top surface of the ridges 2 is used to plant strawberry plants. Figure 1 It is a schematic diagram showing that a plurality of ridges 2 are distributed on the ground 1. The method for workers to plant strawberry plants on the top surface of the ridge 2 is as follows: the workers first cover the top surface of the ridge 2 and along its length with a layer of ground film, then dig a plurality of holes arranged at intervals on the ground film, and finally the workers pass through the holes and plant the strawberry plants on the top surface of the ridge, thereby finally achieving the planting of strawberry plants on the top surface of the ridge 2.
[0003] The purpose of covering the top surface of the ridge 2 is: 1. It can increase the soil temperature and significantly reduce the evaporation of soil moisture. In the case of continuous rainfall, it also has the function of reducing humidity. 2. It can maintain suitable conditions such as temperature and humidity, which is conducive to the reproduction of microorganisms and accelerates the decomposition and transformation of organic matter. 3. It keeps the soil loose and prevents compaction.
[0004] In a strawberry plantation, Figure 2~Figure 3 The film covering device shown is used to cover a layer of ground film on the top surface of multiple ridges 2. The film covering device includes a trailer plate 3. A bracket 4, a first guide assembly 5 and a second guide assembly 6 are fixed on the top surface of the trailer plate 3 from right to left in sequence. A rotating drum 7 is rotatably mounted on the front end surface of the bracket 4 via a rotating shaft. A threaded rod 8 is welded on the front end surface of the rotating drum 7. The first guide assembly 5 includes a vertical frame 9 fixed on the top surface of the trailer plate 3 and two front guide rollers 10 rotatably mounted in the vertical frame 9. The two front guide rollers 10 are in contact with each other. The second guide assembly 6 includes a bending frame 11 fixedly mounted on the top surface of the trailer board 3, the upper end of the bending frame 11 extends to the left outside the trailer board 3, and two rear guide rollers 12 are rotatably mounted inside the extended end, and the two rear guide rollers 12 are in contact with each other; support legs are fixedly mounted on the bottom surface of the trailer board 3 and at its four corners, wheels 13 are rotatably mounted on the bottom surfaces of the support legs, and a mop 14 is hinged at the right end of the trailer board 3.
[0005] The method in which the worker utilizes the film coating device to coat the top surface of the ridge 2 and along its length direction is as follows: S1. A worker takes out a coil 15 [the structure of the coil 15 is as follows Figure 4~Figure 5 As shown, it comprises a hollow plastic tube 16, and a plurality of circles of ground film 17 are wound around the outer surface of the hollow plastic tube 16]. S2, installation of coil 15: workers put the hollow plastic tube 16 of coil 15 on the rotating drum 7 from front to back. Figure 6~Figure 7 As shown, a baffle 19 in the shape of a threaded rod 8 is then threadedly connected to restrict the hollow plastic tube 16 of the coil 15 between the bracket 4 and the baffle 19, thereby preventing the hollow plastic tube 16 from escaping from the rotating drum 7, thereby achieving the installation of the coil 15, as shown in FIG. Figure 8~Figure 9 As shown; S3, the worker pulls the mop 14 to move the trailer plate 3. When the trailer plate 3 moves to the top of the first end of the ridge 2, as shown in FIG. Fig.10 As shown, the worker stops pulling the mop 14; S4, the worker pulls out the head end of the ground film 17 on the coil 15, and then sequentially passes the head end of the ground film 17 through the area surrounded by the two front guide rollers 10 and the area surrounded by the two rear guide rollers 12, and finally pulls the head end of the ground film 17 to the top surface of the head end of the ridge 2; S5. The worker shovels the soil on the ground 1 onto the top surface of the head end of the ground film 17 with a shovel, so as to press the head end of the ground film 17 through the soil pile 18. Fig.11 As shown; S6, the worker continues to pull the mop 14 to the right, so that the trailer plate 3 continues to move to the right along the length direction of the ridge 2. During the movement, the ground film 17 on the coil 15 is gradually released from the hollow plastic tube 16, and the released ground film 17 gradually covers the top surface of the ridge 2; when the trailer plate 3 moves to the right end of the ridge 2, as shown in FIG. Fig.12 As shown, stop dragging the mop 14; S7, the worker cuts off the tail section of the ground film 17, and the cutting direction is as follows Fig.12 As shown by the middle arrow, the tail end of the ground film 17 is then placed flat on the top surface of the tail end of the ridge 2; S8, the worker shovels the soil on the ground onto the top surface of the rear end of the ground film 17 with a shovel, so as to press the rear end of the ground film 17 through the soil pile 18, as shown in FIG. Fig.13 As shown, the coating is finally achieved on the top surface of a ridge 2 and along its length direction; S9. The worker repeats the operations of steps S3 to S9 to continuously cover the top surfaces of multiple ridges 2 with ground film 17.
[0006] However, although the coating device can coat the top surface of the ridge 2 and along its length, the following technical problems are still reported in actual operation: I. In step S2, the worker needs to rotate the baffle plate 19 for multiple turns to thread the threaded hole in the baffle plate 19 to the threaded rod 8, thereby realizing the installation of the coil 15. This undoubtedly increases the work intensity of installing the coil 15.
[0007] II. The coating device can only install one coil 15 at a time. When all the ground film 17 wrapped on the coil 15 is used up, workers are required to pick up new coils 15 and then install the new coils 15. As a result, it takes a long time to evenly cover the top surfaces of all the ridges 2 with the ground film, thereby reducing the efficiency of coating the ridges.
[0008] III. In step S5, workers are required to use a shovel to shovel soil to the top surface of the front end of the ground film 17, and then press the front end of the ground film 17 through the soil pile 18; in addition, in step S8, workers are required to use a shovel to shovel soil to the top surface of the rear end of the ground film 17, so as to press the rear end of the ground film 17 through the soil pile 18, and then the ground film 17 can be covered on the top surface of the ridge 2; in this process, it takes a long time to shovel to form the soil pile 18 to fix the front and rear ends of the ground film 17, which results in a long time to cover the top surfaces of all the ridges 2 with ground film, which undoubtedly further reduces the efficiency of covering the ridges with film.
[0009] Therefore, there is a great need for a ridge film covering device and method for strawberry planting that can greatly reduce the workload of workers and greatly improve the efficiency of film covering on ridges. Summary of the invention
[0010] The purpose of the present invention is to overcome the shortcomings of the prior art and provide a ridge film covering device and method for strawberry planting, which greatly reduces the workload of workers and greatly improves the efficiency of film covering on ridges.
[0011] The object of the present invention is achieved through the following technical solutions: a ridge film covering device for strawberry planting, which includes a trailer board, on the top surface of the trailer board, a coil installation mechanism, a first guide assembly and a second guide assembly are fixedly arranged from right to left in sequence, the coil installation mechanism includes a vertical plate fixedly arranged on the top surface of the trailer board, a motor fixedly arranged on the rear end surface of the vertical plate, the output shaft of the motor passes through the vertical plate forward, and a rotating plate is fixedly arranged on the extended end, and two limit assemblies for limiting the coil are arranged on the left and right sides of the rotating plate; The limit assembly located on the left side includes a connecting plate fixedly arranged on the left end of the rotating plate, a rotating drum rotatably mounted on the left end of the connecting plate, and a supporting plate fixedly arranged on the top surface of the connecting plate, an L-plate is arranged on the upper end of the supporting plate, a vertical portion of the L-plate is welded to the upper end of the supporting plate and is parallel to the rotating drum, a horizontal portion of the L-plate is located on the front side of the connecting plate and is parallel to the connecting plate, a fixing rod is fixedly arranged on the horizontal portion of the L-plate, a blocking bar that blocks the rotating drum is rotatably mounted on the fixing rod, a torsion spring is sleeved on the fixing rod, one end of the torsion spring is fixedly arranged on the horizontal portion of the L-plate, and the other end is fixedly arranged on the blocking bar; The vertical frame of the first guide assembly is provided with an inserting mechanism for fixing the head and tail ends of the ground film, and the inserting mechanism includes a horizontal plate fixedly arranged on the top surface of the vertical frame of the first guide assembly, the horizontal plate extends to the left on the left side of the second guide assembly, and a mounting frame is fixedly arranged on the extended bottom surface, a first electric cylinder and a second electric cylinder are fixedly arranged on the horizontal plate, a piston rod of the first electric cylinder penetrates downwardly through the bottom wall of the horizontal plate, and a pressure plate is fixedly arranged on the extended end, a piston rod of the second electric cylinder penetrates downwardly through the bottom wall of the horizontal plate, and the extended end slides downwardly through the inserting plate.
[0012] Support legs are fixedly arranged on the bottom surface of the trailer plate and at the four corners thereof, and wheels are rotatably mounted on the bottom surfaces of the support legs.
[0013] Two hinge seats arranged front and back are fixedly arranged on the top surface of the right end portion of the trailer board, and a mop is hinged between the two hinge seats.
[0014] The first guide assembly comprises a vertical frame fixed on the top surface of the trailer board, and two front guide rollers rotatably installed in the vertical frame, and the two front guide rollers are in contact with each other.
[0015] The second guide assembly includes a bending frame fixed on the top surface of the trailer plate, the upper end of the bending frame extends leftward outside the trailer plate, and two rear guide rollers are rotatably installed in the extended end, and the two rear guide rollers are in contact with each other.
[0016] The bottom edge of the plug board is arc-shaped or triangular.
[0017] A rectangular groove is provided in the pressing plate, and the inserting plate slides downward and passes through the rectangular groove.
[0018] A controller is also fixedly disposed on the top surface of the trailer plate, and the controller is electrically connected to the motor, the first electric cylinder and the second electric cylinder via a signal line.
[0019] A film covering method for a ridge for strawberry planting comprises the following steps: S1. The specific steps for installing two coils are as follows: S11. The worker takes out a coil and moves the upper end of the baffle of the left limit assembly to the left, so that the baffle rotates clockwise around the axis of the fixed rod. During the rotation of the baffle, the torsion spring is gradually twisted and deformed. At the same time, the lower end of the baffle gradually staggers with the rotating drum. After the baffle is moved to a certain angle, the worker keeps the baffle stationary. S12. The worker puts the hollow plastic tube of the coiled material on the rotating drum from front to back, and then loosens the blocking bar. Under the restoring force of the torsion spring, the torsion spring drives the blocking bar to rotate counterclockwise. When the torsion spring is reset, the blocking bar blocks the rotating drum again, thereby achieving the installation of the first coiled material on the left limit assembly. At this time, the hollow plastic tube of the coiled material is restricted between the connecting plate and the blocking bar to prevent the hollow plastic tube from falling off the rotating drum. S13, the worker repeats the operations of steps S11 to S12 to install the second coil on the right limit assembly, thereby finally achieving the installation of two coils; S2, the worker pulls the mop to move the trailer plate, and when the trailer plate moves to just above the head end of the ridge, the worker stops pulling the mop; S3, the worker pulls out the head end of the rolled mulch film on the left limit assembly, and then passes the head end of the mulch film through the area surrounded by the two front guide rollers and the area surrounded by the two rear guide rollers in sequence, and finally pulls the head end of the mulch film to the top surface of the head end of the ridge, at which point the head end of the mulch film is just below the plug plate of the inserting mechanism; S4. Insertion of the head end of the ground film: the worker first controls the piston rod of the second electric cylinder to extend downward, and the piston rod drives the plug plate to move downward relative to the stationary pressing plate, and the bottom edge of the plug plate inserts the head end of the ground film into the head end of the ridge pot; then, the piston rod of the first electric cylinder is controlled to extend downward, and the piston rod drives the pressing plate to move downward, and the pressing plate presses the ground film exposed on the top surface of the ridge pot; then, the piston rod of the second electric cylinder is controlled to retract upward, and the piston rod drives the plug plate to move downward relative to the stationary pressing plate. When the plug plate is reset, the piston rod of the first electric cylinder is controlled to retract upward to reset the pressing plate upward, thereby finally realizing the insertion of the head end of the ground film into the head end of the ridge pot; S5. The worker continues to pull the mop to the right, so that the trailer plate continues to move to the right along the length direction of the ridge. During the movement, the mulch film on the roll is gradually released from the hollow plastic cylinder, and the released mulch film gradually covers the top surface of the ridge. When the trailer plate moves to the right end of the ridge, the mop is stopped. S6, the worker cuts off the tail section of the mulch film, and then places the tail end of the mulch film flat on the top surface of the tail end of the ridge altar; S7, the worker repeats the operation of step S4 to insert the tail end of the ground film into the tail end of the ridge, thereby finally achieving film coating on the top surface of a ridge and along its length direction; S8. The worker repeats the operations of steps S2 to S7 to continuously cover the top surfaces of multiple ridges with ground film.
[0020] The invention has the following advantages: greatly reducing the work intensity of workers and greatly improving the efficiency of film covering on the ridge. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic diagram of multiple ridges distributed on the ground; Figure 2 This is a schematic diagram of the structure of a film covering device used in a strawberry plantation; Figure 3 for Figure 2 AA cross-sectional diagram of ; Figure 4 It is the main view of the coil; Figure 5 for Figure 4 Schematic side section of Figure 6 It is a schematic diagram of putting the hollow plastic cylinder of the coiled material on the rotating drum from front to back; Figure 7 for Figure 6 BB cross-section diagram; Figure 8 A schematic diagram for realizing the installation of coiled materials; Fig. 9 for Figure 8 Schematic diagram of CC cross section; Fig.10 This is a schematic diagram showing the trailer board moving to the position just above the head end of the ridge; Fig.11 A schematic diagram of pressing the head end of the ground film by a soil pile; Fig.12 It is a schematic diagram of the trailer board moving to the right end of the ridge; Fig.13 A schematic diagram of pressing the rear end of the ground film by a soil pile; Fig.14 This is a structural schematic diagram of the present invention without the right-side limit assembly; Fig.15 It is a front view of the present invention; Fig.16 The isometric drawing of the coil installation mechanism without the right limit assembly; Fig.17 for Fig.16 The main view; Fig.18 for Fig.17 DD cross-sectional view; Fig.19 It is an axonometric drawing of the insertion mechanism; Fig. 20 This is a schematic diagram after the barrier bar is moved to a certain angle; Fig.21 It is a schematic diagram of putting the hollow plastic cylinder of the coiled material on the rotating drum from front to back; Fig. 22 A schematic diagram of installing the first coil on the left limit assembly; Fig.23 for Fig. 22 EE cross-sectional view; Fig.24 A schematic diagram of installing the second coil on the limiting assembly on the right; Fig.25 This is a schematic diagram showing the trailer board moving to the position just above the head end of the ridge; Fig.26 A schematic diagram of pulling the head end of the ground film onto the top surface of the head end of the ridge; Fig. 27 A schematic diagram of inserting the head end of the ground film into the head end of the ridge pot through the bottom edge of the plug board; Fig.28 The schematic diagram is that the pressing plate presses down the ground film exposed on the top surface of the ridge pot; Fig.29 A schematic diagram of inserting the head end of the ground film into the head end of the ridge pot; Fig.30 for Fig.29 A partial enlarged view of the F part; Fig.31 It is a schematic diagram after the trailer board moves to the right end of the ridge; Fig.32 A schematic diagram of inserting the tail end of the ground film into the tail end of the ridge altar; Fig.33 for Fig.32 A partial enlarged view of the G section; In the figure: 1- ground, 2- ridge, 3- trailer plate, 4- bracket, 5- first guide assembly, 6- second guide assembly, 7- rotating drum, 8- threaded rod, 9- vertical frame, 10- front guide roller, 11- bending frame, 12- rear guide roller, 13- wheel, 14- mop, 15- coil, 16- hollow plastic cylinder, 17- ground film, 18- soil pile, 19- baffle; 20- coil mounting mechanism, 21- motor, 22- rotating plate, 23- limiting assembly, 24- connecting plate, 25- support plate, 26- L plate, 27- vertical portion, 28- horizontal portion, 29- fixing rod, 30- stop bar, 31- torsion spring; 32-insertion mechanism, 33-transverse plate, 34-mounting frame, 35-first electric cylinder, 36-second electric cylinder, 37-pressing plate, 38-insertion plate. DETAILED DESCRIPTION
[0022] The present invention is further described below in conjunction with the accompanying drawings, and the protection scope of the present invention is not limited to the following: like Figure 14~Figure 19 As shown, a ridge film covering device for strawberry planting includes a trailer plate 3, on the top surface of the trailer plate 3, a coil installation mechanism 20, a first guide assembly 5 and a second guide assembly 6 are fixedly arranged from right to left in sequence, the coil installation mechanism 20 includes a vertical plate fixedly arranged on the top surface of the trailer plate 3, a motor 21 fixedly arranged on the rear end surface of the vertical plate, the output shaft of the motor 21 passes through the vertical plate forward, and a rotating plate 22 is fixedly arranged on the extended end, and two limiting assemblies 23 for limiting the coil 15 are arranged on the left and right sides of the rotating plate 22; the limiting assembly 23 located on the left side includes a connecting plate 24 fixedly arranged on the left end of the rotating plate 22 , a rotating drum 7 rotatably mounted on the left end portion of the connecting plate 24, a support plate 25 fixedly mounted on the top surface of the connecting plate 24, an L-plate 26 being arranged on the upper end portion of the support plate 25, a vertical portion 27 of the L-plate 26 being welded to the upper end portion of the support plate 25 and being parallel to the rotating drum 7, a horizontal portion 28 of the L-plate 26 being located on the front side of the connecting plate 24 and being parallel to the connecting plate 24, a fixing rod 29 being fixedly mounted on the horizontal portion 28 of the L-plate 26, a blocking bar 30 for blocking the rotating drum 7 being rotatably mounted on the fixing rod 29, a torsion spring 31 being sleeved on the fixing rod 29, one end of the torsion spring 31 being fixedly mounted on the horizontal portion 28 of the L-plate 26, and the other end being fixedly mounted on the blocking bar 30.
[0023] The vertical frame 9 of the first guide assembly 5 is provided with an inserting mechanism 32 for fixing the head and tail ends of the ground film. The inserting mechanism 32 includes a horizontal plate 33 fixedly mounted on the top surface of the vertical frame 9 of the first guide assembly 5. The horizontal plate 33 extends to the left on the left side of the second guide assembly 6, and a mounting frame 34 is fixedly mounted on the extended bottom surface. A first electric cylinder 35 and a second electric cylinder 36 are fixedly mounted on the horizontal plate 33. The piston rod of the first electric cylinder 35 penetrates downwardly through the bottom wall of the horizontal plate 33, and a pressure plate 37 is fixedly mounted on the extended end. The piston rod of the second electric cylinder 36 penetrates downwardly through the bottom wall of the horizontal plate 33, and the extended end slides downward through the insert plate 38. A rectangular groove is opened in the pressure plate 37, and the insert plate 38 slides downward through the rectangular groove. The bottom side of the insert plate 38 is arc-shaped or triangular.
[0024] Support legs are fixedly provided on the bottom surface of the trailer board 3 and at the four corners thereof, and wheels 13 are rotatably mounted on the bottom surfaces of the support legs. Two hinge seats arranged front and back are fixedly provided on the top surface of the right end of the trailer board 3, and a mop 14 is hingedly connected between the two hinge seats.
[0025] The first guide assembly 5 includes a vertical frame 9 fixed on the top surface of the trailer board 3, and two front guide rollers 10 rotatably installed in the vertical frame 9, and the two front guide rollers 10 are in contact with each other; the second guide assembly 6 includes a bending frame 11 fixed on the top surface of the trailer board 3, the upper end of the bending frame 11 extends to the left outside the trailer board 3, and two rear guide rollers 12 are rotatably installed in the extended end, and the two rear guide rollers 12 are in contact with each other.
[0026] A controller is also fixedly provided on the top surface of the trailer plate 3, and the controller is electrically connected to the motor 21, the first electric cylinder 35 and the second electric cylinder 36 via a signal line. The worker can control the start or stop of the motor 21 through the controller, and can also control the extension or retraction of the piston rods of the first electric cylinder 35 and the second electric cylinder 36, which facilitates the worker's operation.
[0027] A film covering method for a ridge for strawberry planting comprises the following steps: S1. Installation of two coils 15, the specific operation steps are as follows: S11, the worker takes out a coil 15, and moves the upper end of the baffle 30 of the left limit assembly 23 to the left, so that the baffle 30 rotates clockwise around the axis of the fixed rod 29. During the rotation of the baffle 30, the torsion spring 31 is gradually twisted and deformed. At the same time, the lower end of the baffle 30 is gradually staggered from the rotating drum 7. When the baffle 30 is moved to a certain angle, such as Fig. 20 As shown, the worker keeps the barrier bar 30 stationary; S12, the worker sets the hollow plastic tube 16 of the coil 15 on the rotating drum 7 from front to back. Fig.21 As shown, the baffle 30 is then released. Under the restoring force of the torsion spring 31, the torsion spring 31 drives the baffle 30 to rotate counterclockwise. When the torsion spring 31 is reset, the baffle 30 again blocks the rotating drum 7, thereby achieving the installation of the first coil 15 on the left limit assembly 23, as shown in FIG. Figure 22~Figure 23 As shown, at this time, the hollow plastic tube 16 of the coil 15 is restricted between the connecting plate 24 and the stop bar 30 to prevent the hollow plastic tube 16 from escaping from the rotating drum 7; S13, the worker repeats the operations of steps S11 to S12 to install the second coil 15 on the right limit assembly 23, such as Fig.24 As shown, the installation of the two coils 15 is finally achieved; Among them, it can be seen from step S1 that the present laminating device only needs to first move the upper end of the baffle 30, then put the hollow plastic tube 16 of the coil 15 on the rotating drum 7, and then release the baffle 30 to achieve the rapid installation of the coil 15. It can be seen that compared with the present laminating device, the present laminating device is Figure 1~Figure 3The laminating device shown does not require workers to rotate the baffle 19 on the threaded rod 8 for multiple turns to install the coil 15, thereby greatly reducing the work intensity of the workers and improving the installation efficiency of the coil 15.
[0028] S2, the worker pulls the mop 14 to move the trailer plate 3. When the trailer plate 3 moves to the top of the first end of the ridge 2, as shown in FIG. Fig.25 As shown, the worker stops pulling the mop 14; S3, the worker pulls out the head end of the ground film 17 of the coil 15 on the left limit assembly 23, and then sequentially passes the head end of the ground film 17 through the area surrounded by the two front guide rollers 10 and the area surrounded by the two rear guide rollers 12, and finally pulls the head end of the ground film 17 to the top surface of the head end of the ridge 2, as shown in FIG. Fig.26 As shown, at this time, the head end of the ground film 17 is just below the plug plate 38 of the plug-in mechanism 32; S4, inserting the head end of the ground film 17: the worker first controls the piston rod of the second electric cylinder 36 to extend downward, and the piston rod drives the plug plate 38 to move downward relative to the stationary pressure plate 37, and the bottom edge of the plug plate 38 inserts the head end of the ground film 17 into the head end of the ridge 2, as shown in FIG. Fig. 27 Then, the piston rod of the first electric cylinder 35 is controlled to extend downward, and the piston rod drives the pressing plate 37 to move downward, and the pressing plate 37 presses the ground film 17 exposed on the top surface of the ridge 2, as shown. Fig.28 Then, the piston rod of the second electric cylinder 36 is controlled to retract upward, and the piston rod drives the plug plate 38 to move downward relative to the stationary pressure plate 37. When the plug plate 38 is reset, the piston rod of the first electric cylinder 35 is controlled to retract upward to reset the pressure plate 37 upward, thereby finally realizing the insertion of the head end of the ground film 17 into the head end of the ridge 2, as shown in FIG. Figure 29~Figure 30 As shown; S5, the worker continues to pull the mop 14 to the right, so that the trailer plate 3 continues to move to the right along the length direction of the ridge 2. During the movement, the ground film 17 on the coil 15 is gradually released from the hollow plastic tube 16, and the released ground film 17 gradually covers the top surface of the ridge 2; when the trailer plate 3 moves to the right end of the ridge 2, as shown in FIG. Fig.31 As shown, stop dragging the mop 14; S6, the worker cuts off the tail section of the ground film 17, and then places the tail end of the ground film 17 flat on the top surface of the tail end of the ridge 2; S7, the worker repeats the operation of step S4 to insert the tail end of the ground film 17 into the tail end of the ridge 2. Figure 32~Figure 33 As shown, the coating is finally achieved on the top surface of a ridge 2 and along its length direction; S8. The worker repeats the operations of steps S2 to S7 to continuously cover the top surfaces of multiple ridges 2 with ground film 17.
[0029] Among them, it can be seen from steps S4 and S8 that the present film covering device can quickly insert the head end of the ground film 17 into the head end of the ridge 2, and quickly insert the tail end of the ground film 17 into the tail end of the ridge 2, only through the linkage cooperation of the first electric cylinder 35 and the second electric cylinder 36 of the insertion mechanism 32, thereby realizing the rapid covering of the ground film 17 on the ridge 2. It can be seen that compared with the present film covering device, the present film covering device is more convenient to use. Figure 1~Figure 3 The film covering device shown does not require workers to fix the head and tail ends of the ground film 17 with soil piles 18, thereby achieving film covering on the top surface of the ridge 2 in a short time, and further achieving ground film covering on the top surfaces of all ridges 2 in a short time, thereby greatly improving the efficiency of film covering on the ridges.
[0030] When the ground film 17 of the coil 15 on the left limit assembly 23 is used up, the worker controls the motor 21 to start, the motor 21 drives the rotating plate 22 to rotate, and the rotating plate 22 drives the two limit assemblies 23 to rotate synchronously. After rotating 180°, the controller controls the motor 21 to turn off. At this time, the coil 15 on the right limit assembly 23 enters the film coating station. It can be seen that compared with the film coating device shown in the figure, the present film coating device does not require workers to pick up new coils 15 and then install the new coils 15, but realizes continuous film coating of multiple ridges 2, and realizes that the top surface of all ridges 2 is coated with ground film in a short time, thereby greatly improving the efficiency of film coating on the ridges.
Claims
1. A ridge film covering device for strawberry planting, characterized in that: It comprises a trailer plate (3), on the top surface of which a coil installation mechanism (20), a first guide assembly (5) and a second guide assembly (6) are fixedly arranged from right to left in sequence, the coil installation mechanism (20) comprising a vertical plate fixedly arranged on the top surface of the trailer plate (3), a motor (21) fixedly arranged on the rear end surface of the vertical plate, the output shaft of the motor (21) passing through the vertical plate forward, and a rotating plate (22) fixedly arranged on the extended end, and two limiting assemblies (23) for limiting the position of the coil (15) are arranged on the left and right sides of the rotating plate (22); The limiting assembly (23) located on the left side comprises a connecting plate (24) fixedly mounted on the left end of the rotating plate (22), a rotating drum (7) rotatably mounted on the left end of the connecting plate (24), and a supporting plate (25) fixedly mounted on the top surface of the connecting plate (24). An L-plate (26) is provided at the upper end of the supporting plate (25). The vertical portion (27) of the L-plate (26) is welded to the upper end of the supporting plate (25) and is parallel to the rotating drum (7). The horizontal portion (28) is located at the front side of the connecting plate (24) and is parallel to the connecting plate (24). A fixing rod (29) is fixedly provided on the horizontal portion (28) of the L plate (26). A blocking bar (30) for blocking the rotating drum (7) is rotatably mounted on the fixing rod (29). A torsion spring (31) is sleeved on the fixing rod (29). One end of the torsion spring (31) is fixedly provided on the horizontal portion (28) of the L plate (26), and the other end is fixedly provided on the blocking bar (30). The vertical frame (9) of the first guide assembly (5) is provided with an insertion mechanism (32) for fixing the head end and the tail end of the ground film. The insertion mechanism (32) comprises a horizontal plate (33) fixedly arranged on the top surface of the vertical frame (9) of the first guide assembly (5). The horizontal plate (33) extends leftward to the left side of the second guide assembly (6), and a mounting frame (34) is fixedly arranged on the extended bottom surface. A first electric cylinder (35) and a second electric cylinder (36) are fixedly arranged on the horizontal plate (33). The piston rod of the first electric cylinder (35) penetrates downward through the bottom wall of the horizontal plate (33), and a pressure plate (37) is fixedly arranged on the extended end. The piston rod of the second electric cylinder (36) penetrates downward through the bottom wall of the horizontal plate (33), and the extended end slides downward through the insertion plate (38).
2. A ridge film covering device for strawberry planting according to claim 1, characterized in that: Support legs are fixedly provided on the bottom surface of the trailer board (3) and at the four corners thereof, and wheels (13) are rotatably mounted on the bottom surfaces of the support legs.
3. A ridge film covering device for strawberry planting according to claim 2, characterized in that: Two hinge seats arranged front and rear are fixedly provided on the top surface of the right end of the trailer plate (3), and a mop (14) is hingedly connected between the two hinge seats.
4. A ridge film covering device for strawberry planting according to claim 3, characterized in that: The first guide assembly (5) comprises a vertical frame (9) fixedly mounted on the top surface of the trailer board (3), and two front guide rollers (10) rotatably mounted in the vertical frame (9), wherein the two front guide rollers (10) are in contact with each other.
5. A ridge film covering device for strawberry planting according to claim 4, characterized in that: The second guide assembly (6) comprises a bending frame (11) fixedly mounted on the top surface of the trailer plate (3), the upper end of the bending frame (11) extending to the left outside the trailer plate (3), and two rear guide rollers (12) are rotatably mounted inside the extended end, and the two rear guide rollers (12) are in contact with each other.
6. A ridge film covering device for strawberry planting according to claim 5, characterized in that: The bottom edge of the inserting plate (38) is arc-shaped or triangular.
7. A ridge film covering device for strawberry planting according to claim 6, characterized in that: A rectangular groove is provided in the pressing plate (37), and the inserting plate (38) slides downward and passes through the rectangular groove.
8. The ridge film covering device for strawberry planting according to claim 7, characterized in that: A controller is also fixedly provided on the top surface of the trailer plate (3), and the controller is electrically connected to the motor (21), the first electric cylinder (35) and the second electric cylinder (36) via a signal line.
9. A method for covering a ridge for strawberry planting, using the ridge covering device for strawberry planting according to claim 8, characterized in that: It includes the following steps: S1. The installation of two coils (15) is as follows: S11, the worker takes out a coil (15), and moves the upper end of the stop bar (30) of the left limit assembly (23) to the left, so that the stop bar (30) rotates clockwise around the axis of the fixed rod (29). During the rotation of the stop bar (30), the torsion spring (31) is gradually twisted and deformed, and at the same time, the lower end of the stop bar (30) is gradually offset from the rotating drum (7); after the stop bar (30) is moved to a certain angle, the worker keeps the stop bar (30) stationary; S12, the worker sets the hollow plastic tube (16) of the coil (15) on the rotating drum (7) from front to back, and then loosens the blocking bar (30). Under the restoring force of the torsion spring (31), the torsion spring (31) drives the blocking bar (30) to rotate counterclockwise. When the torsion spring (31) is reset, the blocking bar (30) blocks the rotating drum (7) again, thereby achieving the installation of the first coil (15) on the left limit assembly (23). At this time, the hollow plastic tube (16) of the coil (15) is restricted between the connecting plate (24) and the blocking bar (30) to prevent the hollow plastic tube (16) from falling off the rotating drum (7); S13, the worker repeats the operations of steps S11 to S12, and the second coil (15) can be installed on the right limit assembly (23), thereby finally achieving the installation of two coils (15); S2, the worker pulls the mop (14) to move the trailer plate (3), and when the trailer plate (3) moves to just above the head end of the ridge (2), the worker stops pulling the mop (14); S3, the worker pulls out the head end of the ground film (17) of the coil (15) on the left limit assembly (23), and then sequentially passes the head end of the ground film (17) through the area surrounded by the two front guide rollers (10) and the area surrounded by the two rear guide rollers (12), and finally pulls the head end of the ground film (17) to the top surface of the head end of the ridge (2). At this time, the head end of the ground film (17) is just below the plug plate (38) of the insertion mechanism (32); S4, inserting the head end of the ground film (17): the worker first controls the piston rod of the second electric cylinder (36) to extend downward, and the piston rod drives the insert plate (38) to move downward relative to the stationary pressure plate (37), and the bottom edge of the insert plate (38) inserts the head end of the ground film (17) into the head end of the ridge altar (2); then, the piston rod of the first electric cylinder (35) is controlled to extend downward, and the piston rod drives the pressure plate (37) to move downward, and the pressure plate (37) presses the ground film (17) exposed on the top surface of the ridge altar (2); then, the piston rod of the second electric cylinder (36) is controlled to retract upward, and the piston rod drives the insert plate (38) to move downward relative to the stationary pressure plate (37). When the insert plate (38) is reset, the piston rod of the first electric cylinder (35) is controlled to retract upward to reset the pressure plate (37) upward, thereby finally achieving the insertion of the head end of the ground film (17) into the head end of the ridge altar (2); S5. The worker continues to pull the mop (14) to the right, so that the trailer plate (3) continues to move to the right along the length direction of the ridge (2). During the movement, the ground film (17) on the roll (15) is gradually released from the hollow plastic tube (16), and the released ground film (17) gradually covers the top surface of the ridge (2); when the trailer plate (3) moves to the right end of the ridge (2), the mop (14) is stopped; S6, the worker cuts off the tail section of the ground film (17), and then places the tail end of the ground film (17) flat on the top surface of the tail end of the ridge (2); S7, the worker repeats the operation of step S4 to insert the tail end of the ground film (17) into the tail end of the ridge (2), thereby finally achieving film coating on the top surface of one ridge (2) and along its length direction; S8. The worker repeats the operations of steps S2 to S7 to continuously cover the top surfaces of the plurality of ridges (2) with the ground film (17).
