Efficient manufacturing system for diaphragm gas meter

By introducing transit modules, pallet loading and unloading modules and diaphragm positioning modules into the membrane gas meter manufacturing system, the problem of low efficiency in metering shell production and assembly is solved, and efficient production of finished metering shell products and improving the quality of gas metering is achieved.

CN118976842AActive Publication Date: 2024-11-19QIANWEI KROMSCHRODER METERS CHONGQING
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202411050759.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-01
Publication Date
2024-11-19
Estimated Expiration
2044-08-01

AI Technical Summary

Technical Problem

The production and assembly efficiency of the metering shell in the existing membrane gas meter is low, which affects the production efficiency and quality of the entire meter. In addition, traditional processes have problems such as insufficient sealing and poor product consistency.

Method used

A membrane gas meter efficient manufacturing system is designed, including a metering shell production line and a metering shell pre-pressure line. The transit module is used to achieve the continuity of stamping molding and glue coating processes, and the pallet loading and unloading module realizes the continuous supply and stacking of pallets, and the diaphragm is used to achieve the continuous supply and stacking of pallets. The positioning module realizes accurate positioning and pre-pressing of the diaphragm, improving the finished product production efficiency and quality of the metering shell.

Benefits of technology

By improving the production efficiency and quality of finished products of metered shells, the labor intensity and site space occupation are reduced, and the overall production efficiency and consistency of the gas meter are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118976842A_ABST
    Figure CN118976842A_ABST
Patent Text Reader

Abstract

The invention discloses a diaphragm gas meter efficient manufacturing system which comprises a metering shell production line and a metering shell pre-pressing line, the metering shell production line comprises a transfer module and a tray loading and unloading module, and the transfer module can continuously turn over metering shells in batches to enable concave cavities of the metering shells to face upwards so as to facilitate gluing operation; the tray loading and unloading module comprises a tray supply unit and a tray transfer unit; the metering shell pre-pressing line comprises a metering shell pre-assembling station, a metering shell tray stacking station, and a membrane positioning module, a metering shell grabbing and releasing mechanism and a metering shell pre-pressing structure which are arranged corresponding to the metering shell pre-assembling station. By the adoption of the scheme, the three process steps of metering shell forming, loading and transferring of the finished metering shell and assembling of the metering shell and the machine core body are mainly started, the continuity of all the steps is improved, the completion quality and efficiency of all the steps are controlled, and therefore the overall production quality and efficiency of the membrane meter are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of gas meter production equipment, and in particular relates to a high-efficiency manufacturing system for a membrane gas meter. Background Art

[0002] The metering shell is one of the important parts in the diaphragm gas meter, and its production and assembly efficiency directly affects the production efficiency of the diaphragm gas meter. The metering shell is usually produced by stamping. The gas meter core body and the metering shell have a sealing surface. After the main body is formed, in order to further improve the sealing of the membrane cavity, a sealing strip will be set on the inside of the metering shell. The traditional method is to directly bond the finished sealing ring, or transfer the metering shell to the gluing equipment for on-site gluing to form an annular sealing strip. The operation process of both processes adds the transportation and independent feeding process of the metering shell, and the process continuity is poor, which greatly reduces the production efficiency and increases the site space occupation, which is not conducive to the rapid mass production of the metering shell.

[0003] After the production of the metering shell is completed, the assembly process of the metering shell and the movement body begins. During the assembly process of the metering shell, the seal is mainly formed by the contact between the molded rubber ring and the edge of the diaphragm. At the same time, the metering shell presses the edge of the diaphragm to fix it. The applicant found in the study that the depth of the diaphragm cavity directly affects the metering accuracy. During the installation of the diaphragm, the initial fixed position of the diaphragm directly affects the volume of the diaphragm cavity. On the other hand, whether the fitting area of ​​the diaphragm and the movement body is uniform also directly affects the rotational friction of the rocker arm. The contact and sealing condition of the sealing rubber ring of the metering shell and the diaphragm also affects the sealing quality of the metering shell. In summary, the assembly process of the metering shell plays a vital role in the assembly process of the gas meter. In the prior art, when assembling the metering shell, most of the folding plates connected to the rocker arm are lifted manually and then the metering shell is pressed, that is, the depth of the diaphragm cavity is adjusted manually. The efficiency is relatively low, and the product consistency is poor, which seriously affects the quality of the gas meter.

[0004] Based on the above problems, and the fact that the finished product molding cycle of the metering shell and the pre-pressing cycle of the movement body account for a large proportion of the entire production cycle of the diaphragm gas meter, on the other hand, the quality of the rubber ring on the metering shell and the contact position between the sealing rubber ring and the diaphragm during the pre-pressing process also directly affect the quality of the diaphragm meter. For this reason, the applicant has made further improvements in the production and assembly process of the metering shell. Summary of the invention

[0005] In view of this, the present invention provides an efficient manufacturing system for a diaphragm gas meter to solve the problems in the prior art of low efficiency in the production and assembly process of the meter shell of the diaphragm gas meter, which affects the production efficiency and quality of the entire meter.

[0006] The technical solution is as follows:

[0007] A highly efficient manufacturing system for diaphragm gas meters, comprising a metering shell production line and a metering shell pre-pressing line, the key of which is that: the metering shell production line comprises a transfer module and a tray loading and unloading module, wherein the transfer module can continuously flip the metering shells in batches so that their concave cavities face upwards for gluing operations;

[0008] The pallet loading and unloading module includes a pallet supply unit and a pallet transfer unit, wherein the pallet supply unit includes an empty pallet stacking station, and a pallet transfer line and an empty pallet gripper assembly arranged corresponding to the empty pallet stacking station, and the pallet transfer unit includes a pallet fixing station and a full pallet stacking station, and a pallet fixing component, a metering shell gripper assembly and a full pallet gripper assembly arranged corresponding to the pallet fixing station;

[0009] The metering shell pre-pressing line includes a metering shell pre-installation station and a metering shell pallet stacking station, as well as a diaphragm positioning module, a metering shell grasping and releasing mechanism and a metering shell pre-pressing structure arranged corresponding to the metering shell pre-installation station. The diaphragm positioning module is used to adjust the depth of the membrane cavity in the movement body, the metering shell grasping and releasing mechanism is used to grasp the metering shell and snap it onto the movement body, the metering shell pre-pressing structure is used to pre-tighten the metering shell on the movement body, and the metering shell pallet stacking station is used to receive a pallet containing metering shells transferred from a fully loaded pallet stacking station.

[0010] The above scheme mainly utilizes the transfer module to realize the continuity between the stamping and batch gluing processes, and the pallet loading and unloading module to realize the continuity of the empty pallet supply, metering shell grabbing and placement, and full pallet stacking processes, thereby reducing the intermediate waiting time and improving the production efficiency of the metering shell finished product. On the other hand, the diaphragm positioning module is used to realize the precise positioning of the diaphragm, improve the pre-pressure suitability of the metering shell and the diaphragm, and improve the quality of the membrane surface.

[0011] As a preferred embodiment, the transfer module includes a transfer conveyor line A, a transfer conveyor line B and a feeding mechanism, and a turning mechanism is provided between the transfer conveyor line A and the transfer conveyor line B. With the above scheme, the metering shell punching machine is connected with the batch gluing device by using the transfer module, and the punched metering shell is directly transferred to the gluing device in a posture that is conducive to gluing, thereby achieving the purpose of combining rapid punching and gluing, greatly improving the production efficiency of the metering shell finished product, facilitating the rapid assembly of the subsequent gas meter, and reducing the labor intensity of personnel and the occupation of site space.

[0012] As a preference: the transfer conveyor line A and the transfer conveyor line B are both belt conveyor lines, and the transfer conveyor line B is located directly below the transfer conveyor line A, and the end of the transfer conveyor line A away from the discharge port has a slope section, and the turnover mechanism is arranged corresponding to the slope section;

[0013] The flipping mechanism includes a stopper plate and at least one retaining block, wherein the stopper plate corresponds to the lower end of the slope section, and the vertical distance between the stopper plate and the end thereof is less than half the width of the metering shell and greater than the thickness of the metering shell, and at least one retaining block corresponds to the upper end of the slope section and is rotatably arranged directly above the upper end of the slope section, and the vertical distance between the stopper plate and the upper end of the slope section is less than the thickness of the metering shell. The above scheme is adopted, because the concave cavity of the stamped metering shell is downward when it comes out of the discharge port, the flipping mechanism is used to flip it, which is convenient for the next step of gluing operation, and the structure is simple and easy to install.

[0014] Preferably, the pallet transfer line has a pallet placement position and a pallet waiting position, and the empty pallet gripper assembly can grab the empty pallet at the empty pallet stacking position and place it at the pallet placement position, and then transport it to the pallet waiting position;

[0015] The empty pallet stacking station and the fully loaded pallet stacking station are located on one side of the pallet transfer line and correspond to the pallet placement position and the pallet fixing position respectively, and the pallet fixing position is located directly above the pallet waiting position. With the above solution, the overall structure is more compact and the operation efficiency is better.

[0016] Preferably, the tray comprises a plate-like body, the outer edge of the plate-like body has a flange bent upward along the thickness direction thereof, the plate-like body has a plurality of placement holes distributed at intervals, the placement holes can be used for the metering shell cavity to be placed upward, the outer edge of the metering shell is supported on the plate-like body, the bottom of the plate-like body has at least three evenly distributed support columns, the height of the support columns is greater than the thickness of the metering shell, and the flange has at least two groups of clamping openings symmetrically arranged in pairs in the width direction;

[0017] The empty pallet gripper assembly comprises a gripper seat A, a gripper drive mechanism A for driving the gripper seat A to rise and fall, and to move horizontally between an empty pallet stacking station and a pallet placement station;

[0018] The gripper seat A comprises a connecting beam A arranged along the conveying direction of the pallet transfer line, and the connecting beam A has at least two horizontally arranged gripper mounting beams A, and the ends of each gripper mounting beam A are mounted with gripper assemblies A, and the spacing between adjacent gripper mounting beams A is an integer multiple of the placement holes on the pallet;

[0019] The gripper assembly A includes a horizontally arranged clamping cylinder, which is arranged horizontally with its piston rod facing outwards and connected to a clamping cylinder, whose piston rod faces downwards and is equipped with a clamping block, which has a bottom fitting surface and a side fitting surface that can pass through the placement hole and are arranged in an L shape, and the bottom thickness of the clamping block is less than the height of the support column. With the above scheme, during the grabbing process, the clamping block extends into the placement hole, then stretches outwards to stretch the pallet, and then moves upward as a whole to take out the top pallet of the stack and place it on the pallet transfer line, effectively preventing the pallet from being deflected during the grabbing process, resulting in uneven force, thereby preventing the lower pallet from getting stuck, and has good reliability.

[0020] As a preferred embodiment: the two ends of the abutting block have pressing blocks, and there is a gap between the bottom surface of the pressing block and the bottom fitting surface, and the gap is adapted to the thickness of the plate-like body. With the above solution, during the process of grabbing an empty pallet, when the abutting block is lowered and tightened, the pressing block simultaneously contacts the upper surface of the pallet, plays a certain pressing role, and cooperates with the abutting block to achieve the tightening of three surfaces, which greatly improves the balance and stability of the pallet during the grabbing and transfer process, and is conducive to further improving its working reliability.

[0021] Preferably, the diaphragm positioning module includes a positioning rod and a rod driving mechanism for driving the positioning rod to extend and retract horizontally. The diaphragm positioning module is located on one side of the metering shell pre-installation station. The positioning rod can be driven by the rod driving mechanism to extend horizontally into the movement body in the placement seat and lift the diaphragm in the movement body horizontally to a designed height.

[0022] As a preferred embodiment, the positioning rod comprises a rod body and a rod head, and the rod head is detachably connected to the rod body. By adopting the above solution, different rod heads can be replaced as needed to adapt to different types of membrane surfaces.

[0023] As a preferred embodiment: the front end of the positioning rod is provided with a guiding slope and at least one horizontal step surface in sequence. When the positioning rod is inserted into the movement body, the folding plate used to install the diaphragm is lifted up through the horizontal step surface. With the above scheme, the guiding slope can better ensure that the positioning rod is inserted under the folding plate, and the horizontal step surface can better ensure the horizontality of the folding plate when it is lifted up, preventing it from tilting to one side, further improving the accuracy of the diaphragm posture adjustment, and different step surfaces can adapt to the adjustment requirements of different depths, which relatively expands its scope of application, that is, it can meet the assembly of more specifications of diaphragm tables.

[0024] Preferably, the metering shell pre-pressing line includes a workbench C, and a movement assembly transport line and a placement seat across the workbench C. The metering shell pre-installation station is located on the workbench C. The workbench C is provided with a placement seat fixing structure and a movement body fixing structure corresponding to the metering shell pre-installation station. The diaphragm positioning module, metering shell gripping and releasing mechanism, and metering shell pre-pressing structure are all arranged on the workbench C. The workbench C is also provided with a metering shell adjustment module, and the metering shell adjustment module includes a metering shell flipping structure and a metering shell tooth expansion structure. The above scheme is adopted to migrate the overall disassembly and assembly of the metering shell pre-pressing line, and the use of the flipping structure and the tooth expansion structure can shorten the time for the metering shell to be buckled onto the movement body, further improving the assembly efficiency.

[0025] Compared with the prior art, the present invention has the following beneficial effects:

[0026] The efficient manufacturing system of the diaphragm gas meter provided by the present invention mainly starts from the three process steps of metering shell molding, loading and transporting of the finished metering shell, and assembling the metering shell and the movement body, improves the continuity between the steps, and controls the completion quality and efficiency of each step, thereby improving the overall production quality and efficiency of the diaphragm meter. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 This is a schematic diagram of the structure of the metering shell production line of the present invention;

[0028] Figure 2 for Figure 1 Top view; Figure 3 It is a schematic diagram of the transfer module structure; Figure 4 This is a side view of the transfer module;

[0029] Figure 5 It is a schematic diagram of the feeding mechanism structure; Figure 6 It is a structural schematic diagram of a batch glue coating device;

[0030] Figure 7 This is a schematic diagram of the structure of the pallet loading and unloading module; Figure 8 for Figure 7 Axonometric drawing;

[0031] Fig. 9 This is a schematic diagram of the installation of the pallet transfer line and pallet fixing components; Fig.10 It is a working diagram of the pallet transfer line and pallet fixing components;

[0032] Fig.11 It is a schematic diagram of the structure of the empty pallet gripper assembly; Fig.12 for Fig.11 Axonometric drawing; Fig.13 This is a schematic diagram of the structure of the gripper seat A;

[0033] Fig.14 This is a schematic diagram of the structure of the gripper seat B; Fig.15It is a schematic diagram of the structure of the gripper seat C; Fig.16 This is the working diagram of gripper seat C;

[0034] Fig.17 This is a schematic diagram of the pallet structure; Fig.18 Schematic diagram of the bottom structure of the tray.

[0035] Fig.19 This is a schematic diagram of the structure of the metering shell pre-pressing line of the present invention;

[0036] Fig. 20 for Fig.19 Top view; Fig.21 It is a top view of the structure above the workbench C; Fig. 22 It is a stereogram of the diaphragm positioning module;

[0037] Fig.23 22 is a top view; Fig.24 A side view of another embodiment of a positioning rod; Fig.25 A three-dimensional diagram of the measuring shell gripper assembly;

[0038] Fig.26 for Fig.25 Axonometric drawing;

[0039] Fig. 27 It is a partial enlarged view of the placement seat fixing structure, the movement body fixing structure, the diaphragm positioning module and the metering shell pre-pressing structure;

[0040] Fig.28 for Fig. 27 A front view of Fig.29 It is a schematic diagram of the structure of the metering shell adjustment module; Fig.30 for Fig.29 Front view of

[0041] Fig.31 It is a schematic diagram of the gear expansion seat structure. DETAILED DESCRIPTION

[0042] The present invention will be further described in detail below in conjunction with the accompanying drawings.

[0043] refer to Figures 1 to 31 The high-efficiency manufacturing system of the diaphragm gas meter shown mainly includes a metering shell production line and a metering shell pre-pressing line. The metering shell production line is mainly used to complete the stamping and forming of the metering shell and the forming of the sealing rubber ring, while the metering shell pre-pressing line is mainly used to pre-tighten the metering shell and the movement body, which plays a role in preliminarily fixing the diaphragm, facilitating the next step of complete pressing and fixing process.

[0044] As shown in the figure, the metering shell production line in the present application mainly includes a metering shell punch 100, a batch gluing device 200, a transfer module 300 and a pallet loading and unloading module which are arranged in sequence, wherein the transfer module 300 can flip the metering shell with the cavity facing downward sent out from the metering shell punch 100, so that it enters the batch gluing device 200 with the cavity facing upward for gluing operation, and the pallet loading and unloading module includes a pallet supply unit 400 and a pallet transfer unit 500 arranged corresponding to the batch gluing device 200.

[0045] The metering shell pre-pressing line includes a metering shell pre-installation station and a metering shell pallet stacking station, as well as a diaphragm positioning module 700, a metering shell grasping and releasing mechanism 800 and a metering shell pre-pressing structure arranged corresponding to the metering shell pre-installation station. The diaphragm positioning module 700 is used to adjust the depth of the membrane cavity in the movement body, the metering shell grasping and releasing mechanism 800 is used to grasp the metering shell and snap it onto the movement body, the metering shell pre-pressing structure is used to pre-tighten the metering shell on the movement body, and the metering shell pallet stacking station is used to receive a pallet containing metering shells transferred from the pallet transfer unit 500.

[0046] like Figures 1 to 18 As shown, the metering shell punch 100 has a discharge port 110 for removing the punched metering shells, and the batch gluing device 200 includes a plurality of gluing conveying lines 210 and a gluing mechanism 220 arranged corresponding to the gluing conveying lines 210, and the gluing mechanism 220 is used to form a sealing rubber ring on the metering shell.

[0047] The transfer module 300 is located between the metering shell punching machine 100 and the batch gluing device 200, and includes a transfer conveyor line A310, a transfer conveyor line B320 and a feeding mechanism 330. A flipping mechanism 340 is provided between the transfer conveyor line A310 and the transfer conveyor line B320. Specifically, the transfer conveyor line B320 has a first material receiving end and a first material discharging end, and the transfer conveyor line B320 has a second material receiving end, which protrudes to the outside of the first material discharging end. The flipping mechanism 340 is provided between the first material discharging end and the second material receiving end. The transfer conveyor line A310 is used to receive the metering shell sent out from the discharge port 110. After the metering shell is flipped by the flipping mechanism 340, the concave cavity faces upward and enters the transfer conveyor line B320. The feeding mechanism 330 sends the metering shell on the transfer conveyor line B320 to the gluing conveyor line 210.

[0048] Key References Figures 1 to 5 The transfer module 300 mainly includes a workbench A350. The transfer conveyor line A310 and the transfer conveyor line B320 are both horizontally mounted on the workbench A350 through a frame A351. In the present embodiment, both are belt conveyor lines, and the transfer conveyor line B320 is located directly below the transfer conveyor line A310. The first discharge end of the transfer conveyor line A310 is a slope section 311, and the flipping mechanism 340 is arranged corresponding to the slope section 311.

[0049] As shown in the figure, the flipping mechanism 340 includes a stop plate 341 and at least one retaining block 342, wherein the stop plate 341 corresponds to the lower end of the ramp section 311, and the vertical distance between the stop plate 341 and its end is less than half the width of the metering shell and greater than the thickness of the metering shell, at least one retaining block 342 corresponds to the upper end of the ramp section 311, and is rotatably arranged directly above the upper end of the ramp section 311, and the vertical distance between the stop plate 341 and the upper end of the ramp section 311 is less than the thickness of the metering shell. In this embodiment, the inclination angle of the ramp section 311 is less than or equal to 45°, ensuring that it has a good fit with the conveying surface to prevent deflection.

[0050] Specifically, the top of the frame A351 has a fixed support frame 352, which is arranged along the width direction of the transfer conveyor line A310 and is located above the transfer conveyor line A310. The retaining block 342 is suspended on the support frame 352 by a hook 353. The hook 353 can rotate relative to the support frame 352. At the same time, the retaining block 342 can rotate relative to the hook 352. The two relative rotation planes are parallel to each other, and the rotation planes are perpendicular to the conveying surface of the transfer conveyor line A310. In this embodiment, two retaining blocks 342 are provided, one of which is arranged corresponding to the upper end of the ramp section 311, and the other is arranged corresponding to the middle of the ramp section 311.

[0051] The stop plate 341 is located just in front of the lower end of the slope section 311, and the end of the transfer conveyor line B320 corresponding to the slope section 311 is relatively longer, ensuring that the metering shell falling from the gap between the stop plate 341 and the slope section 311 can fall on the transfer conveyor line B320, and the conveying direction of the transfer conveyor line B320 is opposite to that of the transfer conveyor line A310, so that the metering shell (with the concave cavity facing downward) transported from its horizontal section into the slope section 311 on the transfer conveyor line A310 is restricted by the retaining block 342 and can basically maintain a fit posture with the conveying surface, and then affected by the stop plate 341, its lower side in the length direction first contacts the transfer conveyor line B320 at a slightly inclined angle, and affected by the inertia of the transfer conveyor line B320, its upper side falls backwards, and at this time the concave cavity of the metering shell faces upward, that is, the metering shell is flipped.

[0052] In this embodiment, the feeding mechanism 330 is located on one side of the width direction of the transfer conveyor line B320, and mainly includes a base plate 331, a mounting frame 332 supported on the base plate 331, a feeding frame 333 movably arranged on the mounting frame 332, and a feeding cylinder 334 connected to the feeding frame 333, wherein the feeding frame 333 has a pushing plate 335 arranged perpendicular to the length direction of the transfer conveyor line B320, and the feeding cylinder 334 is used to drive the feeding frame 333 to approach or move away from the transfer conveyor line B320. When installed, the feeding mechanism 330 is fixed on the workbench A350 as a whole through the base plate 331.

[0053] In specific implementation, the mounting frame 332 is movably supported on the base plate 331, and a vertical guide structure is provided between the two. A height adjustment cylinder 336 is provided on the base plate 331, and its piston rod faces upward and is connected to the mounting frame 332, so that the overall height of the mounting frame 332 can be adjusted by the height adjustment cylinder 336.

[0054] There is a horizontal guide structure between the feeding rack 333 and the mounting rack, and the guide direction is perpendicular to the conveying direction of the transfer conveyor line B320. The push plates 335 on the feeding rack 333 are distributed at intervals. At the same time, a feed alignment plate 337 and a plurality of feed sensing seats 338 are provided on the frame A351 corresponding to the transfer conveyor line B320. The feed alignment plate 337 is set on the transfer conveyor line B320 and is relatively far away from the slope section 311, that is, the feed alignment plate 337 corresponds to the end of the transfer conveyor line B320 away from the second material receiving end, and the feed sensing seat 338 and the push plate 335 are arranged one by one. The feed alignment plate 337 and multiple feed sensing seats 338 are equipped with material sensors for detecting whether there is a metering shell at the corresponding position on the transfer conveyor line B320. When the metering shells are transferred to the transfer conveyor line B320 in turn, when the first metering shell abuts against the feed alignment plate 337, there is basically a metering shell facing the push plate 335. In this way, the facing metering shell can be pushed to the other side of the transfer conveyor line B320 through the push plate 335, that is, pushed into the glue conveyor line 210, and sent to the working position of the glue coating mechanism 220 through the glue conveyor line 210 to perform the gluing operation of the metering shell.

[0055] refer to Figures 7 to 18 In this application, in order to quickly store the metering shells that have been coated with glue in a centralized manner so as to be used in the subsequent process of gas meter assembly (i.e., the pressing process of the metering shells), a pallet loading and unloading module is also provided at the discharge end of the corresponding batch gluing device 200, and a special pallet 600 for holding the metering shells is provided, wherein the pallet loading and unloading module mainly includes a pallet supply unit 400 and a pallet transfer unit 500.

[0056] As shown in the figure, the tray 600 includes a plate-like main body 610, and the outer edge of the plate-like main body 610 has a flange 620 bent upward along its thickness direction. The plate-like main body 610 has a plurality of spaced placement holes 611, and the placement holes 611 can allow the metering shell cavity to be placed upward, while the outer edge of the metering shell is supported on the plate-like main body 610. The bottom of the plate-like main body 610 has at least three evenly distributed support columns 612, and the height of the support columns 612 is greater than the depth of the metering shell. This ensures that when the upper and lower trays 600 are stacked, the metering shell in the upper tray will not contact the metering shell in the lower tray.

[0057] In this embodiment, the plate-like body 610 is generally a rectangular plate-like structure, with grips 613 at both ends in the length direction, and at least two groups of clamping openings 621 symmetrically arranged in the width direction are provided on the flange 620. A positioning boss 630 symmetrically arranged along the length direction is provided near the middle of the tray 600, and a positioning groove 640 corresponding to the positioning boss 630 is provided at the bottom of the tray. When the upper and lower trays 600 are stacked, the positioning boss 630 of the lower tray is just inserted into the positioning groove 640 of the upper tray.

[0058] An inward ridge 650 is arranged along the outer edge of the bottom of the plate-like main body 610, and a first positioning step is formed between the inward ridge 650 and the plate-like main body 610. At the same time, the four corners of the plate-like main body 610 have generally L-shaped positioning pieces 614, which are located on the inner side of the inward ridge 650, and form a second positioning step between the inward ridge 650. The two positioning steps work together to fully ensure the stability of the trays when they are stacked, and the corners of the plate-like main body 610, the flange 620, the inward ridge 650 and the positioning piece 614 are all chamfered with arcs. The stepped positioning structure is also conducive to quickly aligning the trays and stacking them up and down, as well as removing the upper tray to prevent jamming, thereby improving ease of use.

[0059] Key References Figures 11 to 17 In this embodiment, the pallet supply unit 400 mainly includes an empty pallet stacking station 410, and a pallet transfer line 420 and an empty pallet gripper assembly 430 arranged corresponding to the empty pallet stacking station, wherein the pallet transfer line 420 at least includes a pallet placement position and a pallet waiting position, and the empty pallet gripper assembly 430 can grab and place the empty pallet at the empty pallet stacking station 410 to the pallet placement position, and transport it to the pallet waiting position. The pallet transfer unit 500 mainly includes a pallet fixing station and a full pallet stacking station 540, and a pallet fixing component 510 and a metering shell gripper assembly 520 arranged corresponding to the pallet fixing station, and a full pallet gripper assembly 530 for grabbing and placing the pallet at the pallet fixing station to the full pallet stacking station, wherein the metering shell gripper assembly 520 is used to grab and place the metering shell at the material taking station on the batch gluing device 200 to the pallet on the pallet fixing station.

[0060] Specifically, the pallet supply unit 400 and the pallet transfer unit 500 share a main frame beam structure, which is mainly composed of columns, cross beams and protective grilles. The pallet supply unit 400 includes a frame B440 fixed on the main frame, the frame B440 includes two horizontal main beams 441 arranged opposite to each other, and a plurality of sub-beams 442 connecting the two main beams 441. The pallet transfer line 420 is fixed on the frame B440 and is located between the two main beams 441. It includes two straight belts arranged parallel to each other on the left and right. The main beam 441 is provided with a guide beam 444, and the inner side of the guide beam 444 is provided with a vertically arranged roller 443. The vertical distance between the two rollers 443 opposite to each other on the left and right is adapted to the width of the pallet.

[0061] The empty pallet stacking station 410 is located at one side of the end of the pallet transfer line 420 (i.e., the pallet placement position), and the empty pallet gripper assembly 430 mainly includes a gripper seat A431, which is used to drive the gripper seat A431 to rise and fall, and a gripper drive mechanism A432 that moves horizontally between the empty pallet stacking station 410 and the pallet placement position. As shown in the figure, the gripper drive mechanism A432 mainly includes two horizontally arranged X-axis gripper guide rails A4320, and a Y-axis base A4321 that slides with the X-axis gripper guide rails A4320. The X-axis gripper guide rails A4320 cover the empty pallet stacking station 410 and the pallet placement position. When implemented, the X-axis gripper guide rails A4320 are fixed on the top of the main frame beam structure, and the Y-axis base A4321 has There is a Z-axis base A4322 that slides with it, and the lower end of the Z-axis base A4322 is fixedly connected to the gripper base A431. At the same time, the X-axis gripper guide A4320 has an X-axis rack A4323 set parallel to it, and an X-axis gear A4324 meshing with the X-axis rack A4323, and the Y-axis base A4321 has an X-axis motor A4325 for driving the X-axis gear A4324 to rotate, and the Z-axis base A4322 is set vertically, and one side of it has a Z-axis rack A4326 set fixed and parallel to it, and the Z-axis rack A4326 is configured with a Z-axis gear A4327 meshing with it, and the Y-axis base A4321 has a Z-axis motor A4328 for driving the Z-axis gear A4327 to rotate.

[0062] The gripper seat A431 mainly includes a connecting beam A4310 arranged along the length direction of the pallet transfer line 420, and the connecting beam A4310 has at least two horizontally arranged gripper mounting beams A4311. The end of each gripper mounting beam A4311 is installed with a gripper assembly A, and the spacing between adjacent gripper mounting beams A4311 is an integer multiple of the placement holes 611 on the pallet. In this embodiment, only two gripper mounting beams A4311 are provided, corresponding to the positions of the placement holes at both ends of the pallet. The gripper assembly A mainly includes a horizontally arranged clamping cylinder 4312, which is arranged horizontally with its piston rod facing outward and connected to a clamping cylinder 4313. The piston rod of the clamping cylinder 4313 faces downward and is installed with a clamping block 4314. As shown in the figure, the clamping block 4314 is L-shaped and has a bottom fitting surface 43140 and a side fitting surface 43141, and its notch is outside. The lateral ends of the clamping block 4314 are connected to clamping blocks 4315. There is a gap between the clamping surface of the clamping block 4315 and the bottom fitting surface 43140. Usually, the gap is adapted to the thickness of the grasped object. In the embodiment, the gap is adapted to the thickness of the tray. When working, the gripper drive mechanism A drives the gripper seat A431 to the approximate position, the gripper assembly A is directly opposite to the placement hole 611, and then the pressing cylinder 4313 drives the pressing block 4314 to move downward until the pressing block 4315 contacts the upper surface of the tray, and then the pressing cylinder 4312 drives the pressing block 4314 to move horizontally outward, so that the bottom contact surface 43140 of the pressing block 4314 contacts the bottom surface of the tray near the placement hole, and the side contact surface 43141 contacts the side of the placement hole 611, thereby achieving the grasping of the tray. And fully ensure the grasping balance to prevent the situation where the upper and lower trays are difficult to separate due to skew.

[0063] In addition, in order to further improve the adaptability of the gripper seat A431, a locking groove 43100 is provided on the connecting beam A4310 along its length direction. The gripper mounting beam A4311 is fixed to the connecting beam A4310 by a locking screw, and the position of the locking screw corresponds to the locking groove 43100. In this way, the spacing of the gripper mounting beam A4311 can be adjusted as needed.

[0064] In this embodiment, the other end of the pallet transfer line 420 is a pallet fixing station. The pallet fixing assembly 510 mainly includes positioning cylinders 511 arranged in pairs around the pallet fixing station, and a lifting cylinder 512 arranged below the pallet transfer line 420. As shown in the figure, the piston rods of the positioning cylinders 511 are all horizontally facing inward, and a tightening piece 513 is provided at the end thereof. The lifting cylinder 512 is fixed on the subbeam 442, and its piston rod faces upward, and has a horizontally arranged lifting positioning plate 514. Usually, the bottom of the pallet has reinforcing ribs, and the lifting positioning plate 514 has a positioning groove 5130 adapted to the position of the reinforcing ribs, to ensure that the width direction position of the pallet after being lifted is not affected by the horizontal force, and the lifting The lifting and positioning plate 514 is located between two straight belts. When the pallet reaches this position (i.e., the pallet waiting position, which is usually sensed by a position sensor), the pallet transfer line 420 stops working, and the lifting and positioning plate 514 is lifted up by the lifting cylinder 512, and the pallet on the straight belt is lifted at the same time, until it is adapted to the position of the abutting piece 513, and the positioning cylinder 511 works to fix the pallet through the abutting piece 513 (in the pallet fixing position). In this embodiment, the end face of the abutting piece 513 abuts against the side of the inward convex ridge 650 of the pallet, and the upper surface contacts the plate-like body 610, which plays a certain supporting role, and can fully ensure the stability of the pallet posture at this time. Then, the lifting cylinder 512 is reset, the lifting and positioning plate 514 falls, and the pallet transfer line 420 continues to work, and the pallet in the pallet placement position is transported to the pallet waiting position, and a pallet is kept in a waiting state, which is conducive to improving production efficiency.

[0065] The metering shell gripper assembly 520 mainly includes a gripper seat B521 and a gripper drive mechanism B for driving the gripper seat B521 to rise and fall and to move horizontally. The fully loaded pallet gripper assembly 530 mainly includes a gripper seat C531 and a gripper drive mechanism C for driving the gripper seat C531 to rise and fall and to move horizontally. The gripper drive mechanism B and the gripper drive mechanism C in this application are similar in structure to the gripper drive mechanism A, wherein the gripper seat B521 is provided with a suction cup gripper 522 which is arranged one by one in correspondence with the material picking station. The suction cup gripper 522 can be driven by the gripper drive mechanism B to move horizontally to the top of the material picking station, and then descend and extend into the groove of the metering shell to suck it up through negative pressure, and then move horizontally to the pallet fixing station, and after descending, the metering shell is placed on the pallet of the station.

[0066] The gripper seat C531 includes a connecting beam C5310 and a plurality of gripper mounting beams C5311. As shown in the figure, the gripper mounting beam C5311 and the connecting beam C5310 are both horizontally arranged and perpendicular to each other, wherein both ends of the gripper mounting beam C5311 are installed with gripper assemblies C, and the gripper assembly C mainly includes a clamping cylinder 5312, the piston rod of the clamping cylinder 5312 faces outward and is connected with a clamping plate 5313. As shown in the figure, the position of the gripper mounting beam C5311 in this embodiment is adapted to the position of the positioning groove 640 and the clamping port 621 on the pallet. It should be noted that the inner side of the clamping plate 5313 corresponding to the clamping port 621 has a clamping groove 5314, while the clamping plate 5313 corresponding to the positioning groove 640 only has a bending portion that is horizontally bent inward at the bottom.

[0067] In addition, in order to further improve the working stability and reliability of the fully loaded pallet gripper assembly 530, elastic clamping sheets 5315 are provided on the gripper mounting beams C5311 at both ends. In this embodiment, there are at least two elastic clamping sheets 5315, which are diagonally distributed. The elastic clamping sheets 5315 are fixed to the gripper mounting beams C5311 through elastic connectors 5316. The elastic clamping sheets 5315 are in a three-sided angle shape, and the bottom has an outwardly inclined outer flange. When the pallet in the pallet fixing position is full, the gripper mounting beams C5311 are provided with elastic clamping sheets 5315. After measuring the shells, the fully loaded pallet gripper assembly 530 starts to work, and the gripper seat C531 descends towards the fully loaded pallet to first contact and press the upper surface of the pallet, and then clamps the two sides of the pallet through the gripper assembly C, and then rises and moves horizontally to the fully loaded pallet stacking station through the gripper drive mechanism C. Multiple fully loaded pallets are stacked up and down in sequence to facilitate subsequent rapid transportation. Usually, a pallet cart is set at the fully loaded pallet stacking station to place the fully loaded pallets, which can be quickly moved to the measuring shell pallet stacking station for rapid assembly.

[0068] As shown in the figure, the gripper drive mechanism C has a similar structure to the gripper drive mechanism A. The gripper drive mechanism C532 mainly includes two horizontally arranged X-axis gripper guide rails C5320 and a Y-axis base C5321 that slides with the X-axis gripper guide rails C5320. The X-axis gripper guide rails C5320 cover the pallet fixing station and the fully loaded pallet stacking station 540. The Y-axis base C5321 has a Z-axis base C5322 that slides with it. The lower end of the Z-axis base C5322 is fixedly connected to the gripper seat C531. When implemented, the X-axis gripper guide rails C5320 are fixed on the top of the main frame beam structure. At the same time, the X-axis gripper guide rails The rail C5320 has an X-axis rack C5323 set parallel to it, and an X-axis gear C5324 meshing with the X-axis rack C5323, the Y-axis base C5321 has an X-axis motor C5325 for driving the X-axis gear C5324 to rotate, the Z-axis base C5322 is set vertically, and its lower end is fixedly connected to the connecting beam C5310, and one side of it has a Z-axis rack C5326 fixed and set parallel to it, the Z-axis rack C5326 is provided with a Z-axis gear C5327 meshing with it, and the Y-axis base C5321 has a Z-axis motor C5328 for driving the Z-axis gear C5327 to rotate.

[0069] Main references Figures 19 to 31 In this application, the metering shell pre-pressing line also includes a movement assembly transport line L and a placement seat N. The movement assembly structure in this application refers to the patent number "202022713612.9" and the patent name "A new type of diaphragm gas meter movement structure". The placement seat can refer to the patent number "202323087586.3" and the patent name "A diaphragm processing assembly line".

[0070] The movement assembly transport line is provided with a metering shell pre-installation station in its transport direction, and a placement seat fixing structure, a movement body fixing structure and a diaphragm positioning module 700, a metering shell grabbing and releasing mechanism 800 and a metering shell pre-pressing structure are provided corresponding to the metering shell pre-installation station.

[0071] During the operation, the placement seat fixing structure is used to fix the placement seat at the metering shell pre-installation station, the movement body fixing structure is used to keep the movement body in the placement seat relatively fixed to the placement seat, the diaphragm positioning module 700 is used to adjust the depth of the membrane cavity, the metering shell grasping and releasing mechanism 800 is used to grasp the metering shell and snap it onto the movement body in the placement seat, and the metering shell pre-pressing structure is used to pre-tighten the metering shell on the movement body in the placement seat.

[0072] Key References Figure 22 to Figure 24In the present application, the diaphragm positioning module 700 includes a positioning rod 710 and a rod driving mechanism 720 for driving the positioning rod 710 to extend and retract horizontally. The diaphragm positioning module 700 is located on one side of the metering shell pre-installation station. The positioning rod 710 can be driven by the rod driving mechanism 720 to extend into the movement body in the placement seat, and lift the diaphragm in the movement body horizontally to the designed height (referring to the height of the diaphragm relative to the bottom of the diaphragm cavity after calculation). During specific implementation, it extends into the inner cavity from the window on one side of the movement body. In this embodiment, the rod driving mechanism 720 adopts a sliding cylinder structure.

[0073] Among them, the positioning rod 710 can be composed of a rod body 711 and a rod head 712. The rod head 712 is connected to the rod body 711 in a detachable manner, such as threaded connection or clamping. The positioning rod 710 is generally in the shape of a round rod, and the end of the rod body 710 has a square fixed head 715.

[0074] The front end of the positioning rod 710 of the present application is provided with at least a guiding slope 713, through which the folding plate can be lifted and at the same time can be better extended under the folding plate. On this basis, at least one or more horizontal step surfaces 714 can be sequentially arranged behind the guiding slope 713, such as Fig.24 As shown, there is a bevel transition or a smooth arc transition between adjacent horizontal step surfaces 714. When the positioning rod 710 is extended into the movement body, the folding plate is lifted by the horizontal step surface 714, which can fully ensure the horizontality of the folding plate.

[0075] In view of the fact that the front end of the existing folding plate has a sliding fitting part that cooperates with the membrane clamp, in the present application, it is preferred that when the positioning rod 710 is extended into the movement body, the guiding inclined surface 713 or the horizontal step surface 714 corresponds to the lower side of the sliding fitting part at the contact position with the membrane clamp, which is basically the middle area of ​​the diaphragm. In this way, the uniformity of the diaphragm extension can be better guaranteed when lifting.

[0076] refer to Figure 20 to Figure 21 , Fig.25 and Fig.26 In the present application, the metering shell grasping and releasing mechanism 800 includes a mechanical arm 810 and a metering shell gripper assembly 820 connected to the free end of the mechanical arm 810, wherein the metering shell gripper assembly 820 includes a connecting plate 821 and a floating plate 822 arranged opposite to each other in the upper and lower directions, a metering shell suction cup 823 is fixedly provided at the bottom of the floating plate 822, and a constraint structure adapted to the contour of the metering shell, the connecting plate 821 and the floating plate 822 are slidably matched, the connecting plate 821 and the floating plate 822 can slide horizontally, and a locking mechanism 830 is provided between the two, and the locking mechanism 830 can lock the connecting plate 821 and the floating plate 822.

[0077] In this embodiment, the locking mechanism 830 includes a locking cylinder 831 and a locking seat 832 respectively arranged on the floating plate 822 and the connecting plate 821. The piston rod head end of the locking cylinder 831 has a locking tongue 833 engaged with the locking seat 832. When the piston rod of the locking cylinder 831 is pushed out, the locking tongue 833 can be engaged with the locking seat 832, thereby achieving the purpose of locking the connecting plate 821 and the floating plate 822. In this embodiment, the locking seat 832 has a V-shaped groove. Of course, in addition to the above results, the method of injecting a lock pin and locking it with the pin hole can also be used.

[0078] The constraint structure mainly includes a straightening plate 824 arranged on the four sides corresponding to the raised part of the metering shell. The lower end of the straightening plate 824 has a fitting inclined surface adapted to the side of the raised part of the metering shell. In order to further improve the grasping and releasing stability, in another embodiment, the constraint structure also includes a positioning column 825 arranged corresponding to the through holes at the four corners of the metering shell. When the metering shell suction cup 823 grabs the metering shell, the lower end face of the positioning column 825 is abutted against the upper surface of the outer edge of the metering shell. On this basis, at least two diagonally arranged positioning columns 825 are provided with a limit head 8250 at the lower end portion. The size of the limit head 8250 is adapted to the through holes at the four corners of the metering shell. In this way, when the metering shell is grabbed, the limit head 8250 can be extended into the corresponding through hole to further limit the posture of the metering shell.

[0079] refer to Fig. 20 , Fig.21 , Figures 27 to 31 In order to improve the compactness and convenience of the system, a workbench C900 is set corresponding to the metering shell pre-installation station. As shown in the figure, the aforementioned placement seat fixing structure M, the movement body fixing structure 950 and the diaphragm positioning module 700, the metering shell grasping and releasing mechanism 800 and the metering shell pre-pressing structure are all arranged on the workbench C900, and the movement component transportation line L passes over the top of the workbench C900.

[0080] As shown in the figure, a metering shell adjustment module 910 is provided on one side of the metering shell pre-installation station on the workbench C900, and a metering shell pallet stacking station and a metering shell feeding robot arm 920 are provided on one side of the workbench C900. The metering shell pallet stacking station is used to stack the pallets 600 containing the metering shells, and the metering shell feeding robot arm 920 is used to grab the metering shell from the metering shell pallet stacking station and place it on the metering shell adjustment module 910, and flip the metering shell through the metering shell adjustment module 910 until the cavity is horizontal and facing downward.

[0081] Specifically, the metering shell adjustment module 910 mainly includes an adjustment platform 911 and a metering shell flipping structure and a metering shell expansion tooth structure arranged on the adjustment platform 911. As shown in the figure, the metering shell flipping structure can refer to the patent with application number "202122860827.8" and name "Diaphragm Gas Meter Metering Shell Sealing Device", which mainly includes a flip seat 912 and a copy tooling 913 corresponding to it. The flip seat 912 has a corresponding clamping structure and a flip cylinder 913. The metering shell feeding robot arm 920 can grab the metering shell and place it on the flip seat 912. After flipping it 180° through the flip cylinder 913, it is snapped onto the copy tooling 913 with the concave cavity facing downward.

[0082] The difference in this embodiment is that, in order to better adapt to the metering shell grasping and releasing mechanism 800, that is, to adapt to the structure of the limit head 8250, a countersunk hole 9130 arranged in a one-to-one correspondence with the limit head 8250 is provided on the imitation tooling 913.

[0083] On the other hand, the tooth expansion structure is also optimized in the present embodiment. As shown in the figure, the tooth expansion structure mainly expands the tooth seat 914. As shown in the figure, the adjustment platform 911 has a tooth expansion guide rail 915 that slides with the tooth expansion seat 914, and a tooth expansion cylinder 916 for driving the tooth expansion seat 914 to slide horizontally. The tooth expansion seat 914 can slide under the sliding of the tooth expansion cylinder 916 to be directly above the imitation tooling 913.

[0084] The tooth expansion seat 914 has a cavity with an open opening facing downward, and its structure and size are adapted to the outer contour of the metering shell. The four sides of the profiling tool 913 are provided with tooth expansion slopes. When the metering shell is located on the profiling tool 913, the rivet teeth on the metering shell are in contact with the tooth expansion slopes. The bottom of the profiling tool 913 is provided with a profiling lifting cylinder 917. When the tooth expansion seat 914 is located directly above the profiling tool 913, the profiling tool 913 and the metering shell thereon are pushed into the cavity of the tooth expansion seat 914 by the profiling lifting cylinder 917. Under the action of the tooth expansion slopes, the rivet teeth are pushed outward, which is conducive to the later buckling onto the movement. Compared with the traditional tooth expansion structure, the four sides of the metering shell are expanded at the same time, and the tooth expansion effect is more uniform, which is conducive to maintaining consistency.

[0085] In order to further improve the adaptability and convenience of disassembly and assembly of the metering shell adjustment module 910, in this embodiment, the metering shell adjustment module 910 is supported on the workbench C900 through the intermediate plate 918. As shown in the figure, the intermediate plate 918 has an adjustment guide rail arranged along its length direction, and the adjustment platform 911 slides with the adjustment guide rail. At the same time, a driver for driving the adjustment platform 911 to slide along the adjustment guide rail is provided on the intermediate plate 918. Correspondingly, a cylinder avoidance groove 9180 corresponding to the imitation lifting cylinder 917 is provided on the intermediate plate 918. With the above structure, on the one hand, the height space is fully utilized to install the imitation lifting cylinder 917, and the overall structure is more compact. In the later stage, it is also convenient to adjust the longitudinal position according to needs, so that it can better adapt to the metering shell feeding robot arm 920 and the metering shell grasping and releasing mechanism 800.

[0086] The movement body fixing structure 950 mainly includes a horizontally arranged movement body fixing cylinder 951, and a movement body fixing seat 952 connected to the end of the piston rod of the movement body fixing cylinder 951. As shown in the figure, the core body fixing seat 952 has a head 953 adapted to the side positioning column of the movement body. When the placement seat is in the metering shell pre-installation position, the placement seat is first fixed by the placement seat fixing structure, and then the movement body can be fixed by the movement body fixing structure 950.

[0087] refer to Fig. 20 , Fig.21 , Fig. 27 and Fig.28 As shown, the metering shell pre-stressing structure in the present application includes a pre-stressing cylinder A930 and a pre-stressing cylinder B940 which are arranged on both sides of the metering shell pre-installation station, and the piston rod ends of the pre-stressing cylinder A930 and the pre-stressing cylinder B940 are respectively connected with rivet teeth A931 and rivet teeth B941, and the pre-tightening force provided by the pre-stressing cylinder B940 is greater than the pre-tightening force of the pre-stressing cylinder A930. In short, the cylinder diameter of the pre-stressing cylinder B940 is greater than the cylinder diameter of the pre-stressing cylinder A930. In the specific implementation, in order to ensure the pre-tightening effect, the rivet teeth of the rivet teeth A931 and the rivet teeth B941 are inclined at an angle greater than or equal to 45°.

[0088] refer to Figures 1 to 31 In the high-efficiency manufacturing system of the diaphragm gas meter shown in the figure, during the specific implementation process, the metering shell punched by the metering shell punch 100 is sent out with the cavity facing downward, and after being flipped by the transfer module 300, it continues to enter the glue conveying line 210 with the cavity facing upward, and the glue coating mechanism 220 works to perform the glue coating operation.

[0089] After the gluing is completed, the metering shell moves to the material picking station, and the metering shell gripper assembly 520 grabs the metering shell at the material picking station and places it on the pallet at the pallet fixed position. When the pallet at the pallet fixed position is full of metering shells, the full-load pallet gripper assembly 530 starts working to grab the pallet and place it at the full-load pallet stacking station.

[0090] When the carrier at the full-load pallet stacking station is full of full-load pallets, it is transferred to the metering shell pallet stacking station for use in the metering shell pre-pressing line. The placement seat N carrying the organic core body is transported to the metering shell pre-installation station via the movement component transportation line L. The placement seat N is first fixed by the placement seat fixing structure, and then the movement body can be fixed by the movement body fixing structure 950.

[0091] The diaphragm positioning module 700 works, so that the positioning rod 710 extends into it through the window on the side of the movement body, lifts the diaphragm clamp to the designed height, ensures that the edge of the diaphragm extends outward evenly to cover the end face of the movement body, and then uses the metering shell grasping and releasing mechanism 800 to grasp the metering shell that has been flipped and expanded and snapped onto the movement body, and then uses the metering shell pre-stressing structure to perform riveting pre-stressing. It should be noted that in the process of grasping the metering shell and snapping it onto the movement body, the locking mechanism 830 is in a locked state. When the metering shell pre-stressing structure is working, the locking structure 830 is in an unlocked state. After the pre-stressing is completed, the diaphragm positioning module 700 works to make the positioning rod 710 withdraw from the movement body and reset.

[0092] Finally, it should be noted that the above description is only a preferred embodiment of the present invention. Under the guidance of the present invention, ordinary technicians in this field can make various similar expressions without violating the purpose and claims of the present invention, and such changes all fall within the scope of protection of the present invention.

Claims

1. An efficient manufacturing system for a diaphragm gas meter, comprising a metering shell production line and a metering shell pre-pressing line, characterized in that: The metering shell production line comprises a transfer module (300) and a pallet loading and unloading module, wherein the transfer module (300) is capable of continuously turning over the metering shells in batches so that their concave cavities face upwards for gluing operations; The pallet loading and unloading module comprises a pallet supply unit (400) and a pallet transfer unit (500), wherein the pallet supply unit (400) comprises an empty pallet stacking station (410), and a pallet transfer line (420) and an empty pallet gripper assembly (430) arranged corresponding to the empty pallet stacking station (410), and the pallet transfer unit (500) comprises a pallet fixing station and a full pallet stacking station (540), and a pallet fixing component (510), a metering shell gripper assembly (520) and a full pallet gripper assembly (530) arranged corresponding to the pallet fixing station; The metering shell pre-pressing line includes a metering shell pre-installation station and a metering shell pallet stacking station, as well as a diaphragm positioning module (700), a metering shell grasping and releasing mechanism (800) and a metering shell pre-pressing structure arranged corresponding to the metering shell pre-installation station, wherein the diaphragm positioning module (700) is used to adjust the depth of the diaphragm cavity in the machine core body, the metering shell grasping and releasing mechanism (800) is used to grasp the metering shell and snap it onto the machine core body, the metering shell pre-pressing structure is used to pre-tighten the metering shell on the machine core body, and the metering shell pallet stacking station is used to receive a pallet containing metering shells transferred from a fully loaded pallet stacking station (540).

2. The high-efficiency manufacturing system of a diaphragm gas meter according to claim 1 is characterized in that: The transfer module (300) comprises a transfer conveyor line A (310), a transfer conveyor line B (320) and a feeding mechanism (330), and a turning mechanism (340) is provided between the transfer conveyor line A (310) and the transfer conveyor line B (320).

3. The high-efficiency manufacturing system of a diaphragm gas meter according to claim 2 is characterized in that: The transfer conveyor line A (310) and the transfer conveyor line B (320) are both belt conveyor lines, and the transfer conveyor line B (320) is located directly below the transfer conveyor line A (310). The end of the transfer conveyor line A (310) away from the discharge port (110) has a slope section (311), and the turnover mechanism (340) is arranged corresponding to the slope section (311); The turning mechanism (340) comprises a stop plate (341) and at least one retaining block (342), wherein the stop plate (341) corresponds to the lower end of the slope section (311), and the vertical distance between the stop plate (341) and the end thereof is less than half the width of the metering shell and greater than the thickness of the metering shell, and at least one retaining block (342) corresponds to the upper end of the slope section (311), and is rotatably arranged directly above the upper end of the slope section (311), and the vertical distance between the stop plate (341) and the upper end of the slope section (311) is less than the thickness of the metering shell.

4. The efficient manufacturing system for diaphragm gas meters according to any one of claims 1 to 3, characterized in that: The pallet transfer line (420) has a pallet placement position and a pallet waiting position, and the empty pallet gripper assembly (430) can grab the empty pallet at the empty pallet stacking station (410) and place it at the pallet placement position, and then transport it to the pallet waiting position; The empty pallet stacking station (410) and the fully loaded pallet stacking station (540) are located on one side of the pallet transfer line (420), and correspond to the pallet placement position and the pallet fixing position respectively, and the pallet fixing position is located directly above the pallet waiting position.

5. The high-efficiency manufacturing system of a diaphragm gas meter according to claim 4 is characterized in that: The tray comprises a plate-like body (610), the outer edge of the plate-like body (610) has a flange (620) bent upward along the thickness direction thereof, the plate-like body (610) has a plurality of placement holes (611) distributed at intervals, the placement holes (611) can be used for the metering shell cavity to be placed upward, the outer edge of the metering shell is supported on the plate-like body (610), the bottom of the plate-like body (610) has at least three evenly distributed support columns (612), the height of the support columns (612) is greater than the thickness of the metering shell, and the flange (620) has at least two groups of clamping openings (621) arranged symmetrically in pairs in the width direction; The empty pallet gripper assembly (430) comprises a gripper seat A (431), a gripper driving mechanism A (432) for driving the gripper seat A (431) to rise and fall, and to move horizontally between the empty pallet stacking station (410) and the pallet placement station; The gripper seat A (431) comprises a connecting beam A (4310) arranged along the conveying direction of the pallet transfer line (420), and the connecting beam A (4310) has at least two horizontally arranged gripper mounting beams A (4311), and the ends of each gripper mounting beam A (4311) are mounted with a gripper assembly A, and the spacing between adjacent gripper mounting beams A (4311) is an integer multiple of the placement hole ((4311)) on the pallet; The gripper assembly A includes a horizontally arranged clamping cylinder (4312), the clamping cylinder (4312) is horizontally arranged with its piston rod facing outward and connected to a clamping cylinder (4313), the piston rod of the clamping cylinder (4313) facing downward and installed with a clamping block (4314), the clamping block (4314) having a bottom fitting surface (43140) and a side fitting surface (43141) which can pass through the placement hole (611) and are arranged in an L shape, and the bottom thickness of the clamping block (4314) is less than the height of the support column (612).

6. The high-efficiency manufacturing system of a diaphragm gas meter according to claim 5 is characterized in that: The two ends of the pressing block (4314) are provided with pressing blocks (4315), and there is a gap between the bottom surface of the pressing block (4315) and the bottom fitting surface (43140), and the gap is adapted to the thickness of the plate-like body (610).

7. The high-efficiency manufacturing system of a diaphragm gas meter according to claim 1 is characterized in that: The diaphragm positioning module (700) comprises a positioning rod (710) and a rod driving mechanism (720) for driving the positioning rod (710) to extend and retract horizontally. The diaphragm positioning module (700) is located on one side of the metering shell pre-installation station. The positioning rod (710) can be driven by the rod driving mechanism (720) to extend horizontally into a machine core body in a placement seat and lift the diaphragm in the machine core body horizontally to a designed height.

8. The high-efficiency manufacturing system of a diaphragm gas meter according to claim 7 is characterized in that: The positioning rod (710) comprises a rod body (711) and a rod head (712), and the rod head (712) is connected to the rod body (711) in a detachable manner.

9. The high-efficiency manufacturing system of a diaphragm gas meter according to claim 7 or 8, characterized in that: The front end of the positioning rod (710) is provided with a guiding inclined surface (713) and at least one horizontal step surface (714) in sequence. When the positioning rod (710) extends into the movement body, the folding plate used for installing the diaphragm is lifted up through the horizontal step surface (714).

10. The high-efficiency manufacturing system of a diaphragm gas meter according to claim 1, 7 or 8, characterized in that: The metering shell pre-pressing line comprises a workbench C (900), and a movement assembly transport line and a placement seat crossing the workbench C (900); a metering shell pre-installation station is located on the workbench C (900); a placement seat fixing structure and a movement body fixing structure are provided on the workbench C (900) corresponding to the metering shell pre-installation station; the diaphragm positioning module (700), the metering shell grasping and releasing mechanism (800) and the metering shell pre-pressing structure are all provided on the workbench C (900); The workbench C (900) is also provided with a metering shell adjustment module (910), and the metering shell adjustment module (910) comprises a metering shell flipping structure and a metering shell tooth expansion structure.

Citation Information

Patent Citations

  • Novel diaphragm gas meter movement structure

    CN213688518U

  • Metering shell pressing and sealing device of diaphragm gas meter

    CN216126797U

  • Membrane treatment assembly line

    CN221212806U

  • Metering shell press sealing system of diaphragm gas meter

    CN113927277A

  • Capacitor bottom cover processing device and processing method thereof

    CN115780646A