Dragging and sliding device for steel truss girder and construction method

By designing the outer slip system and lateral slip mechanism, the impact and stability of steel truss drag construction on existing lines is solved, and the smooth drag and translation of steel truss is achieved, ensuring the stability and safety of the construction process .

CN118979444APending Publication Date: 2024-11-19JIANG SU SHENG ZHEN JIANG SHI LU QIAO GONG CHENG ZONG GONG SI +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411311649.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-20
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

During the construction of steel truss traction, existing pass lines need to be closed, occupying existing lines for a long time, affecting normal use. Moreover, due to the large volume and self-weight of the steel truss, the drag slip stability is poor.

Method used

A steel truss pulling and sliding device including an outer slip system and a transverse slip mechanism is designed. The steel truss is realized through the combination of leading beams, yard blocks, slip shoe systems, continuous jacks, slip brackets and lifting jacks. The smooth longitudinal drag and transverse translation of the beam ensures the stability of the construction process and does not affect the use of existing lines.

Benefits of technology

The smooth longitudinal drag and lateral translation of the steel truss is achieved, which reduces the impact on existing lines, improves construction stability, avoids movement and jumping caused by the long length of the steel strand, and falls in stages. The beam controls the maximum stroke to ensure construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure FT_1
    Figure FT_1
  • Figure FT_2
    Figure FT_2
  • Figure FT_3
    Figure FT_3
Patent Text Reader

Abstract

The dragging and sliding device comprises an outer side sliding system, a transverse sliding mechanism and the steel truss girder, and is characterized in that a front guide beam is installed at the front end of the steel truss girder, a plurality of pairs of stacking blocks are welded to the two sides of the lower portion of the steel truss girder, the stacking blocks are located at the joints of the steel truss girder, and the steel truss girder is arranged on the outer side sliding system. Each pair of stacking blocks is used for being connected with one sliding shoe system in a clamped mode, the outer side sliding system comprises a conveying end on one side of a river channel and a receiving end on the other side of the river channel, first sliding way beams are arranged above the conveying end and the receiving end, and a plurality of outer side beam body supports are fixedly arranged below the first sliding way beams. And a counter-force base is fixedly arranged at the end, away from the river channel, of the receiving end, two sets of continuous jacks are arranged at the two ends of the counter-force base correspondingly, and the problem that existing lines are seriously affected by current bridge construction is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of bridge construction, and in particular relates to a dragging and sliding device for a steel truss beam and a construction method. Background Art

[0002] The expansion project of the Xueyan hub to Xiwu hub section of the Wuxi-Yixing Expressway is designed as a two-way eight-lane expressway. This section starts from the south side of Yincun Port River in Wanshi Town, Yixing City, and ends at the south side of Qiting Interchange in Qiting Street, Yixing City. The total length of the route is 5.793km. The steel truss main bridge is designed as a single-span 162.16m bottom-supported simply supported steel truss, crossing the third-level waterway of the Wuyi Canal, with a width of 70m and an intersection angle of 142.3° with the waterway. The main truss adopts a triangular truss with equal height and vertical bars, with a truss height of 17m and a standard node spacing of 11.4m. The whole bridge has a total of 14 bays; the left main truss spacing is 26.4m, weighing 4568t, and the right main truss spacing is 22.4m, weighing 4298t. After completion, it will be the largest span ultra-wide simply supported steel truss bridge on domestic highways.

[0003] The steel truss of the main bridge of this project is designed as a bottom-supported simply-supported steel truss, divided into two sections, with a span of 159.6m, a bridge length of 162m, a node spacing of 11.4m, a main truss height of 17m, a main truss spacing of 26.4m on the left section, a main truss spacing of 22.4m on the right section, and a net spacing of 0.8m between the left and right main trusses. When the steel truss is dragged and constructed, it is often necessary to close the existing traffic line, occupying the existing line as a construction site for a long time, which has a serious impact on the normal use of the existing line. At the same time, due to the large volume and deadweight of the steel truss itself, the stability of the dragging and sliding work is also very important. Summary of the invention

[0004] The purpose of the present invention is to provide a dragging and sliding device and a construction method for a steel truss beam in view of the existing device, so as to solve the problems raised in the above-mentioned background technology.

[0005] In order to solve the above technical problems, the present invention provides the following technical solutions: a dragging and sliding device and construction method for a steel truss, comprising an outer sliding system, a lateral sliding mechanism and a steel truss, characterized in that a front guide beam is installed at the front end of the steel truss, and a plurality of pairs of code blocks are welded on both sides below the steel truss, the code blocks are located at the nodes of the steel truss, and each pair of the code blocks is used to clamp a set of sliding shoe systems; The outer sliding system includes a conveying end on one side of the river channel and a receiving end on the other side of the river channel, and the conveying end and the receiving end both contain a first slideway beam above, and a plurality of outer beam body brackets are fixedly arranged below the first slideway beam, and a reaction seat is fixedly arranged at one end of the receiving end away from the river channel, and two groups of continuous jacks are respectively arranged at both ends of the reaction seat, and each group of the continuous jacks is provided with a steel strand, and the end of the steel strand away from the continuous jack is anchored on the steel truss; The lateral sliding mechanism includes a sliding bracket, and the sliding bracket includes a first translation bracket and a second translation bracket. A left four piers are fixedly arranged on one side of the first translation bracket, and a left three piers are arranged on one side of the second translation bracket. The left four piers and the left three piers are located on both sides of the river channel of the bridge setting line and are parallel to each other and their top surfaces are on the same horizontal plane. The first translation bracket and the second translation bracket are both provided with box-shaped slide beams, and each of the box-shaped slide beams is provided with a transverse jack. The output end of the transverse jack is close to the sliding shoe system On one side of the system, a jack block is arranged at the other end of the transverse jack, the other end of the two sections of the box-shaped slide beams is located above the left ends of the left four piers and the left three piers, and another group of box-shaped slide beams are fixedly installed above the right ends of the left four piers and the left three piers, and beam dropping pads are arranged at the left and right ends of the left four piers and the left three piers, and the left and right beam dropping pads are located on the inner sides of the left and right groups of box-shaped slide beams, and lifting jacks are arranged above the box-shaped slide beam at the left end and the beam dropping pad at the right end as temporary fulcrums.

[0006] The present invention further illustrates that the sliding shoe system comprises rubber pads, steel pads, slide plates, MGE plates and stainless steel plates from top to bottom, respectively. The rubber pads are 5 to 20 mm thick to adapt to changes in the bottom curve of the beam, which is beneficial to adjusting the unevenness of the bottom plate of the steel beam and the control error of the top elevation of the slideway. The rubber pads serve as a deformation layer for buffering the vertical height pressure, which not only meets the requirements of compressive strength, but also has a certain deformation to adapt to the requirements of the vertical curve of the main bridge and the design of the bridge line shape.

[0007] The present invention further describes that the sliding bracket is welded from top to bottom by a transverse load-bearing beam, a longitudinal load-bearing beam, a column and a connecting pipe, and is used to support the transverse sliding of the steel truss beam.

[0008] The present invention further describes that the outer beam support includes a first type of support frame, a second type of support frame, a first type of sliding frame and a second type of sliding frame. The outer beam support is also welded from the transverse load-bearing beam, the longitudinal load-bearing beam, the column and the connecting pipe. The outer beam support is provided with different types of structures to suit different levels and work requirements. Different types of outer beam supports differ in height and the number of load-bearing beams.

[0009] The present invention further describes that the dragging and sliding construction method of a steel truss beam comprises the following steps: S1: Lay the temporarily supported conveying end and the receiving end on both sides of the river channel respectively, install the first slideway beam at the position where the slide rail needs to be laid to ensure smooth and stable sliding; set the front guide beam on the conveying end, then assemble the steel truss beam, and ensure that the slider at the bottom of the steel truss beam is slidably connected with the first slideway beam; install the reaction seat and the continuous jack on the receiving end, and connect the steel strand to the steel truss beam; S2: Start the continuous jack, and use the steel strand to pull the steel truss girder to slide along the first slideway girder toward the receiving end to perform longitudinal dragging. During the sliding process, the posture and stability of the steel truss girder must be closely monitored, and the lateral deviation must be corrected in time to ensure a smooth and safe sliding process; S3: After the steel truss is dragged longitudinally, the transverse sliding mechanism is set at an appropriate position according to the needs, and the lifting jack on the temporary fulcrum is installed. The lifting jack is lifted until the steel truss is separated from the longitudinal sliding frame, and then the sliding shoe system is installed; S4: After the installation is completed, the lifting jack is retracted until the leveling steel plate is in close contact with the sliding shoe system, and then the temporary bracket between the left fourth pier and the left third pier is removed, and the transverse jack and the jack block on the sliding bracket are installed; S5: the steel truss starts to translate laterally until it translates to just above the designed bridge position; S6: The lifting jack is lifted, the permanent support is emptied, part of the box slideway beam is removed, the steel pads, pad cross braces and diagonal braces under the permanent support are padded, and the pads of the left fourth pier and the left third pier need to be constructed in stages; S7: the lifting jack is lowered until the steel truss is in close contact with the beam-dropping pad, all the box-shaped slideway beams are removed, the steel pads of the inner beam-dropping fulcrums are padded, and the steel pads under the permanent piers and temporary fulcrums are alternately extracted to complete the overall beam-dropping of the steel truss.

[0010] The present invention further describes that in step S2, the assembled steel truss is longitudinally dragged. In order to avoid the phenomenon of movement and frog leaping in the dragging work due to the excessive length of the steel strand, the longitudinal dragging is carried out in two sliding constructions.

[0011] The present invention further illustrates that in step S6, the steel truss beam dropping plan uses a total of four groups of the jacking jacks to carry out the steel truss beam dropping construction, and the jacking jacks are respectively located on the four temporary fulcrums.

[0012] The present invention further illustrates that in step S7, the steel truss beam is dropped as a whole, and the maximum stroke of each drop is controlled to be 5 cm; when the distance between the steel truss beam part just above the left four piers and the pad stone is only 60 cm to 80 cm, the beam dropping construction is stopped and the permanent support on the left four piers is installed, and a 3 cm thick rubber pad is laid between the left four piers and the permanent support. After the concrete grouting material of the support bolt hole reaches 90% of the design strength, the beam dropping is continued until the steel truss beam part above the left four piers is tightly attached to the rubber pad on the permanent support.

[0013] The present invention further illustrates that after the beams on the left fourth pier are lowered, the steel truss beam portion above the left third pier continues to lower the beams and completes the installation of the permanent support on the left third pier, until the steel truss beam portion above the left third pier is about to be in close contact with the permanent support of the left third pier, the steel truss beam portion above the left fourth pier is jacked up, the rubber pads of the left fourth pier are pulled out, and finally the lifting jacks are synchronously retracted to complete the lowering of the steel truss beams.

[0014] Compared with the prior art, the beneficial effects achieved by the present invention are: (1) By providing the outer sliding system, the continuous jack and the steel strand to pull the steel truss girder to slide along the first slideway girder from the conveying end toward the receiving end, so that the steel truss girder can be smoothly dragged longitudinally; (2) By providing the lateral sliding mechanism, utilizing the combination of the sliding bracket, the lateral jack and the lifting jack, and installing the sliding shoe system under the steel truss, the lateral translation of the steel truss is performed. By translating the assembled steel truss from the outside to the required section, the steel truss does not affect the use of the existing line during assembly and longitudinal dragging, thereby reducing the impact on the traffic of the existing line. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings: Figure 1 is an overall schematic diagram of a tractor mechanism according to an embodiment of the present invention; Figure 2 is a schematic diagram of a left four-pier translation mechanism according to an embodiment of the present invention; Figure 3 is a schematic diagram of a left three-pier translation mechanism according to an embodiment of the present invention; Figure 4 is a schematic diagram of the beam support structure of an embodiment of the present invention; Figure 5 is a structural diagram of a sliding shoe system according to an embodiment of the present invention; Figure 6 is a schematic diagram of a fixing measure of a sliding shoe system according to an embodiment of the present invention; In the figure: 1, front guide beam; 2, steel truss beam; 3, sliding shoe system; 31, rubber pad; 32, steel pad; 33, sliding plate; 34, MGE plate; 35, stainless steel plate; 4, code block; 5, first slideway beam; 6, lifting jack; 7, horizontal load-bearing beam; 8, longitudinal load-bearing beam; 9, sliding bracket; 91, first translation bracket; 92, second translation bracket; 10, column; 11, connecting pipe; 12, outer side Beam support; 121, first type support frame; 122, second type support frame; 123, first type sliding frame; 124, second type sliding frame; 13, conveying end; 14, receiving end; 15, reaction seat; 16, continuous jack; 17, steel strand; 18, left fourth pier; 181, left third pier; 182, beam drop pad; 19, box slide beam; 20, transverse jack; 21, jack stopper. DETAILED DESCRIPTION

[0016] The following is a further non-limiting detailed description of the technical solution of the present invention in conjunction with the preferred embodiments and the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0017] The embodiment of the present invention provides a dragging and sliding device and a construction method for a steel truss beam. Figure 1 FIG. 1 is an overall schematic diagram of a tractor mechanism according to an embodiment of the present invention. Figure 1 As shown, a dragging and sliding device and construction method for a steel truss beam include an outer sliding system, a lateral sliding mechanism and a steel truss beam 2, and a front guide beam 1 is installed at the front end of the steel truss beam 2. Figure 6 As shown, a plurality of pairs of code blocks 4 are welded on both sides of the lower side of the steel truss 2 . The code blocks 4 are located at the nodes of the steel truss 2 . Each pair of code blocks 4 is used to clamp a set of sliding shoe systems 3 .

[0018] like Figure 1As shown, the outer sliding system includes a conveying end 13 on one side of the river channel and a receiving end 14 on the other side of the river channel. The upper part of the conveying end 13 and the receiving end 14 both include a first slideway beam 5. A plurality of outer beam supports 12 are fixedly arranged below the first slideway beam 5. A reaction seat 15 is fixedly arranged at the end of the receiving end 14 away from the river channel. Two groups of continuous jacks 16 are respectively arranged at both ends of the reaction seat 15. A steel strand 17 is passed through each group of continuous jacks 16. The end of the steel strand 17 away from the continuous jack 16 is anchored on the steel truss 2. Two oil cylinders are arranged in front and behind each continuous jack 16. When one of the oil cylinders is working, the other oil cylinder retracts the original stroke. When the stroke of the working oil cylinder reaches the set stroke, it stops working. At the same time, the sensor commands the other oil cylinder to work, and the cycle is repeated at a uniform speed.

[0019] The lateral sliding mechanism includes a sliding bracket 9, such as Figure 2 and Figure 3 As shown, the sliding bracket 9 includes a first translation bracket 91 and a second translation bracket 92. A left fourth pier 18 is fixedly arranged on one side of the first translation bracket 91, and a left third pier 181 is arranged on one side of the second translation bracket 92. The left fourth pier 18 and the left third pier 181 are located on both sides of the river channel of the bridge setting line and are parallel to each other and their top surfaces are on the same horizontal plane. A box-shaped slideway beam 19 is arranged on the first translation bracket 91 and the second translation bracket 92, and each box-shaped slideway beam 19 is arranged on a transverse jack 20. The output end of the transverse jack 20 is close to one side of the sliding shoe system 3. The transverse jack A jack stopper 21 is provided at the other end of the jack 20. The other ends of the two sections of box-shaped slide beams 19 are respectively located above the left ends of the left four piers 18 and the left three piers 181. Another set of box-shaped slide beams 19 are fixedly installed above the right ends of the left four piers 18 and the left three piers 181. Beam drop pads 182 are provided at both the left and right ends of the left four piers 18 and the left three piers 181, and the left and right beam drop pads 182 are located on the inner sides of the left and right sets of box-shaped slide beams 19. Lifting jacks 6 are provided above the left end box-shaped slide beam 19 and the right end beam drop pads 182 as temporary fulcrums. After the longitudinal dragging of the steel truss beam 2 is completed, a transverse sliding mechanism is provided to translate the steel truss beam 2 transversely. The first translation bracket 91 and the second translation bracket 92 are usually provided downstream or near the target position of the first type sliding frame 123 and the second type sliding frame 124, respectively.

[0020] In certain preferred embodiments, Figure 6As shown, the sliding shoe system 3 includes a rubber pad 31, a steel pad 32, a slide plate 33, an MGE plate 34 and a stainless steel plate 35 from top to bottom. The rubber pad 31 is 5-20 mm thick to adapt to the change of the bottom curve of the beam, which is conducive to adjusting the unevenness of the bottom plate of the steel beam and the control error of the top elevation of the slideway. The rubber pad 31 serves as a deformation layer for buffering the vertical height pressure. It not only meets the requirements of compressive strength, but also has a certain deformation to adapt to the requirements of the vertical curve of the main bridge and the design of the bridge line shape. The top of the sliding shoe system 3 can use a steel pad 32 to adjust the height according to the pre-camber condition.

[0021] In certain preferred embodiments, Figure 4 As shown, the sliding bracket 9 is welded from top to bottom by a transverse load-bearing beam 7, a longitudinal load-bearing beam 8, a column 10 and a connecting pipe 11, and is used to support the transverse sliding of the steel truss beam 2.

[0022] In certain preferred embodiments, Figure 1 As shown, the outer beam support 12 includes a first type support frame 121, a second type support frame 122, a first type sliding frame 123 and a second type sliding frame 124. The outer beam support 12 is also welded with a transverse load-bearing beam 7, a longitudinal load-bearing beam 8, a column 10 and a connecting pipe 11. The outer beam support 12 is provided with different types of structures to suit different levels and work requirements. Different types of outer beam supports 12 differ in height, overlap form and number of load-bearing beams.

[0023] In certain preferred embodiments, a dragging and sliding construction method for a steel truss beam comprises the following steps: S1: On both sides of the river channel, the temporary supported delivery end 13 and receiving end 14 are overlapped respectively, and the first slideway beam 5 is installed at the position where the slide rail needs to be laid to ensure smooth and stable sliding; the front guide beam 1 is set on the delivery end 13, and then the steel truss beam 2 is assembled, and it is ensured that the slider at the bottom of the steel truss beam 2 is slidably connected with the first slideway beam 5; the reaction seat 15 and the continuous jack 16 are installed on the receiving end 14, and the steel strand 17 is connected to the steel truss beam 2; S2: Start the continuous jack 16, and use the steel strand 17 to pull the steel truss 2 along the first slideway beam 5 toward the receiving end 14 to perform longitudinal dragging. During the sliding process, the posture and stability of the steel truss 2 must be closely monitored, and the lateral deviation must be corrected in time to ensure a smooth and safe sliding process; S3: After the steel truss 2 is dragged longitudinally, a transverse sliding mechanism is set at an appropriate position according to the needs, and the lifting jack 6 on the temporary support is installed. The lifting jack 6 is lifted until the steel truss 2 is separated from the longitudinal sliding frame, and then the sliding shoe system 3 is installed; S4: After the installation is completed, the lifting jack 6 is retracted until the leveling steel plate is in close contact with the sliding shoe system 3, and then the temporary bracket between the left fourth pier 18 and the left third pier 181 is removed, and the transverse jack 20 and the jack block 21 on the sliding bracket 9 are installed; S5: The steel truss 2 starts to translate horizontally until it translates to just above the designed bridge position; S6: Lifting jack 6 is used to lift, the permanent support is emptied, and part of the box slide beam 19 is removed. The steel pads, pad cross braces and diagonal braces under the permanent support are shoveled. The left fourth pier 18 and the left third pier 181 need to be constructed in stages. S7: The lifting jack 6 is lowered until the steel truss beam 2 is in close contact with the beam-dropping pad 182, all the box-shaped slideway beams 19 are removed, and the steel pads of the inner beam-dropping fulcrum are copied. The steel pads under the permanent pier and the temporary fulcrum are alternately extracted to complete the overall beam-dropping of the steel truss beam 2.

[0024] In certain preferred embodiments, in step S2, the assembled steel truss 2 is dragged longitudinally. To avoid the dragging operation from moving or leapfrogging due to the excessive length of the steel strands 17, the longitudinal dragging is performed in two sliding operations.

[0025] In some preferred embodiments, in step S6, the steel truss beam 2 is planned to be dropped using a total of four sets of lifting jacks 6 for the steel truss beam 2 drop construction, and the lifting jacks 6 are respectively located on four temporary fulcrums.

[0026] In certain preferred embodiments, in step S7, the steel truss beam 2 is dropped as a whole, and the maximum stroke of each drop is controlled to be 5 cm; when the distance between the portion of the steel truss beam 2 directly above the left fourth pier 18 and the pad stone is only 60 cm to 80 cm, the drop construction is stopped and the permanent support on the left fourth pier 18 is installed, and a 3 cm thick rubber pad is laid between the left fourth pier 18 and the permanent support to increase the friction between the steel truss beam 2 and the permanent support to avoid longitudinal displacement of the steel truss beam 2 due to the longitudinal slope during the drop construction process, and after the concrete grouting material of the support bolt hole reaches 90% of the design strength, the drop construction is continued until the portion of the steel truss beam 2 above the left fourth pier 18 is in close contact with the rubber pad on the permanent support.

[0027] In certain preferred embodiments, after the upper and lower beams of the left fourth pier 18 are completed, the portion of the steel truss beam 2 above the left third pier 181 continues to begin to drop the beams and complete the installation of the permanent support on the left third pier 181, until the portion of the steel truss beam 2 above the left third pier 181 is about to be in close contact with the permanent support of the left third pier 181, the portion of the steel truss beam 2 above the left fourth pier 18 is jacked up, the rubber pad of the left fourth pier 18 is pulled out, and finally the jacking jack 6 is synchronously retracted to complete the dropping of the steel truss beam 2.

[0028] In the above embodiment, the continuous jack 16 of the outer sliding system drives the steel strand 17 to pull the steel truss 2 to slide along the first slide beam 5 from the conveying end 13 toward the receiving end 14 to perform smooth longitudinal dragging; then the assembled steel truss 2 is translated from the outside to the required section, and to the left fourth pier 18 and the left third pier 181 through the lateral sliding mechanism, so that the steel truss 2 does not affect the use of the existing line during assembly and longitudinal dragging, thereby reducing the impact on the traffic of the existing line.

[0029] In the description of the present invention, it is necessary to understand that the terms "up", "down", "front", "back", "left", "right", etc., indicating directions or positional relationships, are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention.

[0030] Finally, it should be pointed out that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit them. Although the present invention has been described in detail with reference to the above embodiments, a person skilled in the art should understand that the technical solutions described in the above embodiments can still be modified, or some of the technical features can be replaced by equivalents, and these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A dragging and sliding device for a steel truss beam, comprising an outer sliding system, a lateral sliding mechanism and a steel truss beam (2), characterized in that: A front guide beam (1) is installed at the front end of the steel truss (2), and a plurality of pairs of code blocks (4) are welded on both sides below the steel truss (2), wherein the code blocks (4) are located at the nodes of the steel truss (2), and each pair of the code blocks (4) is used to clamp a set of sliding shoe systems (3); The outer sliding system comprises a conveying end (13) on one side of the river channel and a receiving end (14) on the other side of the river channel, wherein the conveying end (13) and the receiving end (14) both comprise a first slideway beam (5) above, and a plurality of outer beam supports (12) are fixedly arranged below the first slideway beam (5), and a reaction seat (15) is fixedly arranged at the end of the receiving end (14) away from the river channel, and two groups of continuous jacks (16) are respectively arranged at both ends of the reaction seat (15), and each group of the continuous jacks (16) is provided with a steel strand (17), and the end of the steel strand (17) away from the continuous jack (16) is anchored to the steel truss beam (2); The lateral sliding mechanism comprises a sliding bracket (9), the sliding bracket (9) comprising a first translation bracket (91) and a second translation bracket (92), a left four-pier (18) being fixedly arranged on one side of the first translation bracket (91), a left three-pier (181) being arranged on one side of the second translation bracket (92), the left four-pier (18) and the left three-pier (181) being located on both sides of a river channel of a set bridge route and being parallel to each other and having top surfaces on the same horizontal plane, the first translation bracket (91) and the second translation bracket (92) being both provided with a box-shaped slideway beam (19), each of the box-shaped slideway beams (19) being provided with a transverse jack (20), and the output end of the transverse jack (20) being close to the sliding shoe system (3) On one side, the other end of the transverse jack (20) is provided with a jack stopper (21), the other ends of the two sections of the box-shaped slide beams (19) are located above the left ends of the left four piers (18) and the left three piers (181), and another group of box-shaped slide beams (19) are fixedly installed above the right ends of the left four piers (18) and the left three piers (181), and beam drop pads (182) are provided at both left and right ends of the left four piers (18) and the left three piers (181), and the left and right beam drop pads (182) are located on the inner sides of the left and right groups of the box-shaped slide beams (19), and a lifting jack (6) is provided above the box-shaped slide beam (19) at the left end and the beam drop pad (182) at the right end as temporary fulcrums.

2. A dragging and sliding device for a steel truss beam according to claim 1, characterized in that: The sliding shoe system (3) comprises, from top to bottom, a rubber pad (31), a steel pad (32), a sliding plate (33), an MGE plate (34) and a stainless steel plate (35). The rubber pad (31) has a thickness of 5 to 20 mm to adapt to the change of the bottom curve of the beam, which is conducive to adjusting the unevenness of the bottom plate of the steel beam and the control error of the top elevation of the slideway. The rubber pad (31) serves as a deformation layer for buffering the vertical pressure, which not only meets the requirements of compressive strength, but also has a certain deformation to adapt to the requirements of the vertical curve of the bridge and the design of the bridge line shape.

3. The dragging and sliding device for a steel truss beam according to claim 2, characterized in that: The sliding bracket (9) is formed by welding, from top to bottom, a transverse load-bearing beam (7), a longitudinal load-bearing beam (8), a column (10) and a connecting pipe (11), and is used to support the transverse sliding of the steel truss beam (2).

4. The dragging and sliding device for a steel truss beam according to claim 3, characterized in that: The outer beam support (12) includes a first type support frame (121), a second type support frame (122), a first type sliding frame (123) and a second type sliding frame (124). The outer beam support (12) is also welded with the transverse load-bearing beam (7), the longitudinal load-bearing beam (8), the column (10) and the connecting pipe (11). The outer beam support (12) is provided with different types of structures to be suitable for different horizontal heights and work requirements. Different types of outer beam supports (12) differ in height and the number of load-bearing beams.

5. The method for dragging and sliding a steel truss beam according to claim 4 comprises the following steps: S1: The conveying end (13) and the receiving end (14) are respectively overlapped with temporary supports on both sides of the river channel, and the first slideway beam (5) is installed at the position where the slide rail needs to be laid to ensure smooth and stable sliding; the front guide beam (1) is arranged on the conveying end (13), and then the steel truss beam (2) is assembled, and it is ensured that the slider at the bottom of the steel truss beam (2) is slidably connected to the first slideway beam (5); the reaction seat (15) and the continuous jack (16) are installed on the receiving end (14), and the steel strand (17) is connected to the steel truss beam (2); S2: starting the continuous jack (16) to pull the steel truss (2) through the steel strand (17) to slide along the first slideway beam (5) toward the receiving end (14) to perform longitudinal dragging. During the sliding process, the posture and stability of the steel truss (2) must be closely monitored, and the lateral deviation must be corrected in a timely manner to ensure a smooth and safe sliding process; S3: After the steel truss (2) has completed longitudinal dragging, the transverse sliding mechanism is arranged at an appropriate position according to needs, and the lifting jack (6) on the temporary support point is installed. The lifting jack (6) is lifted until the steel truss (2) is separated from the longitudinal sliding frame, and then the sliding shoe system (3) is installed; S4: After the installation is completed, the lifting jack (6) is retracted until the leveling steel plate is in close contact with the sliding shoe system (3), and then the temporary bracket between the left fourth pier (18) and the left third pier (181) is removed, and the transverse jack (20) and the jack stopper (21) on the sliding bracket (9) are installed; S5: the steel truss (2) begins to translate laterally until it translates to just above the designed bridge position; S6: The lifting jack (6) is lifted, the permanent support is emptied, part of the box-shaped slideway beam (19) is removed, the steel pads, pad cross braces and diagonal braces under the permanent support are padded, and the pads of the left fourth pier (18) and the left third pier (181) need to be constructed in stages; S7: The lifting jack (6) is lowered until the steel truss (2) is in close contact with the beam-dropping pad (182), all the box-shaped slideway beams (19) are removed, the steel pads of the inner beam-dropping fulcrums are padded, and the steel pads under the permanent piers and temporary fulcrums are alternately extracted to complete the overall beam-dropping of the steel truss (2).

6. A dragging and sliding construction method for a steel truss beam according to claim 5, characterized in that: In step S2, the assembled steel truss (2) is longitudinally dragged. In order to avoid the phenomenon of movement and frog leaping during the dragging operation due to the excessive length of the steel strand (17), the longitudinal dragging is carried out in two sliding operations.

7. The method for dragging and sliding a steel truss beam according to claim 5, characterized in that: In step S6, the steel truss beam (2) is planned to be dropped using a total of four groups of the jacking jacks (6) to carry out the steel truss beam (2) drop construction, and the jacking jacks (6) are respectively located on the four temporary fulcrums.

8. The method for dragging and sliding a steel truss beam according to claim 5, characterized in that: In step S7, the steel truss beam (2) is dropped as a whole, and the maximum stroke of each drop is controlled to be 5 cm; when the distance between the portion of the steel truss beam (2) directly above the left fourth pier (18) and the cushion stone is only 60 cm to 80 cm, the drop construction is stopped and the permanent support on the left fourth pier (18) is installed, and a 3 cm thick rubber pad is laid between the left fourth pier (18) and the permanent support. After the concrete grouting material of the support bolt hole reaches 90% of the design strength, the drop construction is continued until the portion of the steel truss beam (2) above the left fourth pier (18) is in close contact with the rubber pad on the permanent support.

9. A dragging and sliding construction method for a steel truss beam according to claim 8, characterized in that: After the upper and lower beams of the left fourth pier (18) are completed, the portion of the steel truss beam (2) above the left third pier (181) continues to begin to lower the beams and complete the installation of the permanent support on the left third pier (181), until the portion of the steel truss beam (2) above the left third pier (181) is about to be in close contact with the permanent support of the left third pier (181), the portion of the steel truss beam (2) above the left fourth pier (18) is lifted up, the rubber pad of the left fourth pier (18) is pulled out, and finally the lifting jack (6) is synchronously retracted to complete the lowering of the steel truss beam (2).