Gravel pile and construction method thereof

By designing the water-retaining layer structure of the gravel section and the curing agent filling section in the gravel pile, combined with the insulation section and the pile perimeter constraints, the problem of instability in the bearing capacity of the gravel pile in the permafrost area is solved, and the load capacity of the gravel pile is realized More stable foundation bearing and reduce engineering cost.

CN118979488APending Publication Date: 2024-11-19CCCC FIRST HIGHWAY CONSULTANTS CO LTD
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202411258285.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-09
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

In highway projects in the Qinghai-Tibet Plateau area, the pile body permeability coefficient of gravel piles is relatively large, causing the water of the frozen soil in the seasonal frozen soil layer to come into contact with the frozen front of the permafrost layer after melting in summer, causing freezing The upper limit of the soil layer moves downward, which leads to the risk of instability of the pile end load capacity.

Method used

Design a gravel pile whose pile body includes a gravel section and a curing agent filling section. The gravel section has a large pore structure to form a vertical drainage channel. The gravel section is located below the gravel section, and the top is elevated for many years. The upper limit of the frozen soil layer is limited to a predetermined distance, and the whole is formed after mixing and bonding. It acts as a water barrier to prevent water from penetration, reduces the possibility of the upper limit of the frozen soil layer being moved downward, and sets thermal insulation sections and pile perimeter constraints around the pile to improve the overall load. force.

Benefits of technology

Effectively prevent the water in the gravel section from directly penetrating the frozen front of the permafrost layer, reduce the upper limit of the frozen soil layer, reduce the risk of instability of the pile bearing capacity, improve the cost-effectiveness of construction, and reduce hydration. Thermal heat and construction complexity reduce the impact on the permafrost layer.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118979488A_ABST
    Figure CN118979488A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of frozen soil composite foundation treatment, in particular to a gravel pile and a construction method thereof, and the gravel pile comprises a pile body, a gravel section and a curing agent filling section. The bottom of the pile body goes deep into a permafrost layer, and the pile body comprises a gravel section and a curing agent filling section. The gravel section is located on the upper portion of the pile body and filled with gravel. The curing agent filling section is located below the gravel section, the top elevation of the curing agent filling section is higher than the upper limit preset distance of the permafrost layer, and the curing agent filling section is filled with gravel and a curing agent. The curing agent filling section can be used as a water-resisting layer while improving the strength of the bottom pile body, so that melting water of the upper seasonal frozen soil layer is prevented from directly penetrating through the freezing frontal surface of the permafrost layer, the possibility that the upper limit of the permafrost layer moves downwards is reduced, and then the risk that the bearing capacity of the pile end is unstable is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of frozen soil composite foundation treatment, and in particular to a gravel pile and a construction method thereof. Background Art

[0002] With the rapid growth of highway mileage in my country, smooth highway traffic has become an important condition for regional economic development and improvement of people's living standards. In the construction of highway projects in the Qinghai-Tibet Plateau, the treatment of permafrost foundation has gradually become an inevitable problem. Especially in permafrost areas dominated by fine-grained soils such as silt and silty clay, the groundwater in the thaw interlayer and thaw plate in the highway foundation cannot be removed in time, which is very easy to form pressurized water. With repeated freeze-thaw cycles, the thaw plate and thaw interlayer gradually expand, resulting in serious diseases of the highway subgrade and pavement. The application of crushed stone pile composite foundation is relatively mature in soft soil areas such as soft soil. The main purpose is to serve as a vertical drainage channel to accelerate soil drainage and consolidation while improving the bearing capacity of the foundation. However, due to the large permeability coefficient of the crushed stone pile, when the pile end as the bearing layer penetrates into the permafrost layer (non-melting layer), the water in the seasonal frozen soil layer after melting in summer directly contacts and penetrates the frozen front of the permafrost through the pile body, which is very easy to cause the upper limit of the permafrost layer to move downward, thereby leading to the risk of instability of the bearing capacity of the pile end. Summary of the invention

[0003] The purpose of the present invention is to overcome the shortcomings of the prior art that, due to the large permeability coefficient of the gravel pile body, when the pile end as a bearing layer penetrates deep into the permafrost layer, the water of the seasonal frozen soil layer after melting in summer directly contacts and penetrates the freezing front of the permafrost layer through the pile body, which can easily cause the upper limit of the permafrost layer to move downward, thereby causing the bearing capacity of the pile end to become unstable, and to provide a gravel pile and a construction method thereof.

[0004] In a first aspect, the present invention provides a gravel pile, comprising:

[0005] The pile body has a bottom that penetrates deep into the permafrost layer, and the pile body comprises a crushed stone section and a curing agent filling section.

[0006] The crushed stone section is located at the upper part of the pile body, and the crushed stone section is filled with crushed stones.

[0007] The curing agent filling section is located below the crushed stone section, the top elevation of the curing agent filling section is higher than the upper limit of the permafrost layer by a predetermined distance, and the curing agent filling section is filled with crushed stone and curing agent.

[0008] The present invention provides a gravel pile, the upper part of which is a gravel section, the gravel section is filled with gravel, and the gravel section has a large pore structure, so that the water seepage speed therein is faster, and an effective vertical drainage channel can be formed. The top elevation of the curing agent filling section is higher than the upper limit of the permafrost layer by a predetermined distance, and the curing agent filling section is filled with gravel and curing agent. The gravel and the curing agent are mixed and bonded to form a whole, which can serve as a waterproof layer while improving the strength of the bottom pile body, preventing the water in the upper gravel section from directly penetrating the freezing front of the permafrost layer, reducing the possibility of the upper limit of the permafrost layer moving downward, and further reducing the risk of instability of the pile end bearing capacity. The freezing front specifically refers to the movable contact interface between frozen soil and non-frozen soil.

[0009] The curing agent material may be of various types, for example, cement paste, cement mortar, and fine stone concrete.

[0010] The curing agent filling section is composed of crushed stone and curing agent. Compared with concrete piles or cement piles, the strength of the curing agent does not need to be very high, and the amount of hydraulic material used is relatively less than that of concrete piles or cement piles, thereby generating less hydration heat, thereby reducing the impact of the hydration heat of the hydraulic material on the permafrost layer. At the same time, the curing agent filling section is simpler to construct than concrete piles or cement piles, and the construction cost is also lower.

[0011] Preferably, the predetermined distance is 30 cm-50 cm.

[0012] Preferably, a thermal insulation section is provided between the gravel section and the curing agent filling section, and the thermal insulation section is filled with gravel and thermal insulation hydraulic material. The gravel and thermal insulation hydraulic material are mixed and bonded to form a whole, which can play a role of thermal insulation between the gravel section and the curing agent filling section, and further reduce the influence of the upper strata, such as the permafrost active layer, on the permafrost layer. The thermal insulation hydraulic material is a porous hydraulic material, such as foamed cement or foamed lightweight soil. These porous structures form a structure similar to a "thermal insulation layer" inside the hydraulic material, which can effectively prevent the conduction of heat. This porous structure significantly reduces the thermal conductivity of the foamed cement or foamed lightweight soil, thereby improving its thermal insulation performance.

[0013] Preferably, the height of the thermal insulation section is 20cm-40cm.

[0014] Preferably, the curing agent is cement paste or cement mortar. The cement paste and cement mortar have better fluidity and can be better filled into the gaps of the crushed stones, making the whole of the curing agent filling section more compact.

[0015] Preferably, a pile constraint is provided on the periphery of the pile body, and the cross-sectional shape of the pile constraint matches the pile body. As a bulk material pile, the bearing capacity and integrity of the gravel pile are greatly affected by the constraint of the soil around the pile. For example, due to the repeated freezing and thawing and sorting of the seasonal frozen soil layer, the constraint of the pile side soil is weakened, and the bulk material pile body collapses and loses its bearing capacity. This solution provides lateral active constraints through the pile constraint, thereby improving the integrity of the pile body of the gravel section inside the seasonal frozen soil layer under the repeated freezing and thawing cycles, thereby ensuring that the gravel pile can provide a stable bearing capacity. The pile constraint can have various structural forms, such as a mesh structure and a perforated structure.

[0016] Preferably, the pile perimeter constraint is a mesh structure, which may be a steel mesh, a wire mesh, or a geofiber grid.

[0017] Preferably, the mesh structure is a plastic-coated steel mesh, which comprises a skeleton and a grid, and the grid is located in a grid formed by the skeleton.

[0018] Preferably, the skeleton of the plastic-coated steel mesh is composed of steel bars with a diameter of 6mm-8mm, and the grid of the plastic-coated steel mesh is composed of steel wire ropes with a diameter of 2m-4mm.

[0019] In a second aspect, the present invention provides a method for constructing a gravel pile, comprising the following steps:

[0020] S1: Drill the pile hole to the designed depth at the predetermined location according to the design parameters;

[0021] S2: placing a pile perimeter constraint within the depth range of the pile hole;

[0022] S3: filling the pile hole with crushed stones in layers and vibrating and compacting them to a predetermined distance above the upper limit of the permafrost layer, inserting a conduit into the top surface of the crushed stone layer, and filling the curing agent from the bottom of the pile hole to a predetermined distance above the upper limit of the permafrost layer to form a curing agent filling section;

[0023] S4: Continue to fill the thermal insulation hydraulic material to a predetermined height from the top surface of the curing agent filling section to form a thermal insulation section;

[0024] S5: Continue to fill the pile hole with crushed stones in layers to complete the crushed stone section.

[0025] The present invention provides a method for constructing a gravel pile, which improves the bearing capacity of the pile body by placing the pile perimeter constraint in the pile hole. Gravel is filled in the pile hole in layers, and the curing agent and the thermal insulation hydraulic material are filled in sections to form a curing agent filling section and a thermal insulation section, so as to prevent the water in the upper gravel section from directly penetrating the freezing front of the permafrost layer, thereby reducing the possibility of the upper limit of the permafrost layer moving downward, thereby reducing the risk of instability of the bearing capacity of the pile end.

[0026] Compared with the prior art, the present invention has the following beneficial effects:

[0027] 1. The present invention provides a gravel pile, wherein the curing agent filling section formed by mixing and bonding the gravel and the curing agent can improve the strength of the bottom pile body and serve as a water-proof layer to prevent the water in the upper gravel section from directly penetrating the freezing front of the permafrost layer, thereby reducing the possibility of the upper limit of the permafrost layer moving downward, thereby reducing the risk of instability of the bearing capacity of the pile end;

[0028] 2. The present invention provides a method for constructing gravel piles, which fills the pile hole with gravel in layers, and fills the curing agent and the thermal insulation hydraulic material in sections to form a curing agent filling section and a thermal insulation section, thereby preventing the water in the upper gravel section from directly penetrating the freezing front of the permafrost layer, reducing the possibility of the upper limit of the permafrost layer moving downward, and thereby reducing the risk of instability of the bearing capacity at the pile end. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 A schematic diagram of the structure of a gravel pile.

[0030] Figure 2 The figure is a schematic diagram of the structure of a crushed stone pile for composite foundation treatment in frozen soil areas.

[0031] Markings in the figure:

[0032] 1-pile hole, 2-gravel section, 3-thermal insulation section, 4-curing agent filling section, 5-ground line, 6-seasonal frozen soil layer, 7-upper limit of permafrost layer, 8-permafrost layer, 9-pile top cushion, 10-roadbed, 11-steel-plastic geogrid, 12-roadbed center line. DETAILED DESCRIPTION

[0033] The present invention is further described in detail below in conjunction with specific embodiments. However, this should not be understood as the scope of the above subject matter of the present invention being limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.

[0034] Unless otherwise specified, in the description of the specific embodiments of the present invention, the terms indicating the orientation or position relationship such as "up", "down", "left", "right", "center", "inside", "outside", etc. are all expressions based on the orientation or position relationship shown in the drawings, or are the orientation or position relationship when the invented product / equipment / device is usually used. These terms of orientation or position relationship are only for the convenience of describing the scheme of the present invention or simplifying the description in the specific embodiments, so as to facilitate the technicians to quickly understand the scheme, and do not indicate or imply that a specific device / component / element must have a specific orientation, or be constructed and operated in a specific position relationship, and therefore cannot be understood as a limitation on the present invention.

[0035] In addition, if the terms "horizontal", "vertical", "overhanging", "parallel" and the like appear, it does not mean that the corresponding devices / components / elements are required to be absolutely horizontal or vertical or overhanging or parallel, but may be slightly tilted or have deviations. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but may be slightly tilted. Alternatively, it can be simplified to mean that the corresponding devices / components / elements are set in directions such as "horizontal", "vertical", "overhanging", "parallel", etc., and can have an error / deviation of ±10% relative to the corresponding direction setting, more preferably an error / deviation within ±8%, more preferably an error / deviation within ±6%, more preferably an error / deviation within ±5%, and more preferably an error / deviation within ±4%. As long as the corresponding devices / components / elements are within the error / deviation range, they can still achieve their functions in the scheme of the present invention.

[0036] In addition, the expressions “first”, “second”, “third”, etc., which appear in the terms, are merely used to distinguish the description of the same or similar components and should not be understood as emphasizing or implying the relative importance of specific components.

[0037] In addition, in the description of the embodiments of the present invention, "several", "plurality" and "a number" represent at least 2. It can be any number such as 2, 3, 4, 5, 6, 7, 8, 9, and even more than 9.

[0038] In addition, in the description of the technical solution of the present invention, unless otherwise clearly specified / defined / restricted, the terms "set", "install", "connect", "connected", "provided with", "laid", and "arranged" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection, and can be welding, riveting, bolting, threading, and other commonly used connection means in the field. This connection can be a mechanical connection, an electrical connection, or a communication connection; it can be a direct connection, or an indirect connection through an intermediate medium, and it can be the internal connection of two elements.

[0039] Example 1

[0040] like Figure 1 As shown, a gravel pile includes a pile body, a gravel section 2, and a curing agent filling section 4.

[0041] The bottom of the pile body is deep in the permafrost layer 8 , and the pile body includes a crushed stone section 2 and a curing agent filling section 4 .

[0042] The crushed stone section 2 is located at the upper part of the pile body, and crushed stones are filled in the crushed stone section 2. The crushed stone section 2 is generally located in the seasonal frozen soil layer 6.

[0043] The curing agent filling section 4 is located below the gravel section 2, and the top elevation of the curing agent filling section 4 is higher than the upper limit 7 of the permafrost layer by a predetermined distance, and the curing agent filling section 4 is filled with gravel and curing agent. The upper limit 7 of the permafrost layer refers to the boundary between the permafrost layer 8 and the seasonal frozen layer 6, and the strata / soil layers below this boundary are in a frozen state all year round.

[0044] In an optional embodiment, the top mark of the curing agent filling section 4 may be a predetermined distance 30 cm-50 cm above the upper limit 7 of the permafrost layer, and the specific distance may be 30 cm, 35 cm, 40 cm, 45 cm, or 50 cm.

[0045] In an optional embodiment, a thermal insulation section 3 is provided between the gravel section 2 and the curing agent filling section 4, and the thermal insulation section 3 is filled with gravel and thermal insulation hydraulic materials. The thermal insulation hydraulic material can specifically be foamed cement or foamed lightweight soil. The foamed cement is a building material that introduces a large number of closed pores into the cement paste by physical or chemical methods, thereby reducing its density and improving the thermal insulation, sound insulation and other properties. It is usually made by mixing cement, water, foaming agent and stabilizer materials in a certain proportion and making it through a foaming process. Foamed lightweight soil is a lightweight solid material made by mixing cement, water, foaming agent and fine aggregate (such as sand) in a certain proportion, preparing the foaming liquid into foam by physical methods, and then mixing the foam into a mixed slurry uniformly stirred by cement, admixtures, additives and water in proportion, and then pumping, pouring and solidifying to form a large number of uniformly closed micropores.

[0046] In an optional implementation, the height of the thermal insulation section 3 may be 20 cm-40 cm, and the specific height may be 20 cm, 25 cm, 30 cm, 35 cm, or 40 cm.

[0047] In an optional embodiment, the curing agent can be cement paste or cement mortar. The strength grade of the cement paste can be M2.5, M5, M7.5, M10, and the strength grade of the cement mortar can be M2.5, M5, M7.5, M10. The hydraulic material of the cement paste and cement mortar can be low-heat silicate cement with low hydration heat, which can further reduce the heat released by cement hydration and reduce the impact on the permafrost layer 8. The fluidity of the cement paste is greater than or equal to 200mm, specifically 200mm, 205mm, 210mm, 220mm, to ensure that the cement paste can fill the gaps between the gravel. The fluidity of the cement mortar is greater than or equal to 220mm, specifically 220mm, 225mm, 230mm, 240mm, to ensure that the cement mortar can fill the gaps between the gravel.

[0048] In an optional embodiment, a pile circumferential constraint may be provided on the periphery of the pile body, and the cross-sectional shape of the pile circumferential constraint matches the pile body. The top of the pile circumferential constraint is flush with the top surface of the pile body, and the bottom of the pile circumferential constraint is flush with the bottom surface of the pile body. The cross-section of the pile body is generally circular. In this case, the cross-section of the pile circumferential constraint is also circular, and the diameter of the pile circumferential constraint is generally slightly smaller than the diameter of the pile body, so that the pile circumferential constraint can be smoothly lowered to the bottom of the pile hole 1.

[0049] In an optional embodiment, the pile perimeter constraint may be a mesh structure.

[0050] In an optional embodiment, the mesh structure may be a plastic-coated steel mesh, which may include a skeleton and a grid, wherein the grid is located in a grid formed by the skeleton. Considering that the gravel in the pile hole 1 will diffuse to the outside of the pile hole 1 during the subsequent vibration compaction process, the diameter of the pile body will increase, and the plastic-coated steel mesh needs to reserve a certain lateral deformation capacity during the weaving process. The grid shape formed by the skeleton may be a square or a regular hexagon, and the grid shape may be a square or a regular hexagon.

[0051] In an optional embodiment, the skeleton of the plastic-coated steel mesh can be composed of steel bars with a diameter of 6mm-8mm, and the specific diameter of the steel bars can be 6mm, 7mm, or 8mm. The grid of the plastic-coated steel mesh can be composed of 2mm-4mm steel wire ropes, and the specific diameter of the steel wire ropes can be 2mm, 3mm, or 4mm.

[0052] Example 2

[0053] A method for constructing a gravel pile comprises the following steps:

[0054] S1: According to the design parameters, the pile hole 1 is drilled to the designed depth at the predetermined position by using the vibration or hammer method.

[0055] S2: Place a pile perimeter constraint within the depth range of the pile hole 1. The pile perimeter constraint may be a plastic-coated steel mesh.

[0056] S3: Gravel is filled in layers in the pile hole 1 and vibrated and compacted to a predetermined distance above the upper limit 7 of the permafrost layer, for example, 100 cm, a conduit is inserted into the top surface of the gravel layer, and a curing agent is filled from the bottom of the pile hole 1 to a predetermined distance above the upper limit 7 of the permafrost layer, for example, 50 cm, to form a curing agent filling section 4.

[0057] S4: Continue to fill the thermal insulation hydraulic material to a predetermined height of 40 cm from the top surface of the curing agent filling section 4 to form the thermal insulation section 3.

[0058] S5: Continue to fill the pile hole 1 with crushed stones in layers to complete the crushed stone section 2.

[0059] S6: Figure 2 As shown, the filling construction of two layers of steel-plastic geogrid 11, pile top cushion 9 and roadbed 10 above the ground line 5 is continued. Figure 2 Taking the roadbed centerline 12 as the symmetry line, only half of the road cross section is illustrated.

[0060] When filling the curing agent and the thermal insulation hydraulic material, a slow flow form can be adopted to ensure that the corresponding pile segment can be fully filled with the curing agent or the thermal insulation hydraulic material, and avoid the situation where there are gaps between the gravel in the corresponding pile segment that are not filled.

[0061] The gravel pile and the construction method thereof described in the present invention solve the problem that gravel piles are difficult to promote and apply on a large scale in permafrost areas. Compared with rigid piles such as cast-in-place piles and precast piles, while solving the drainage problems of the melting interlayer and melting pan of permafrost foundations, the project cost is effectively reduced, and it is more economical and practical.

[0062] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A gravel pile, characterized in that: include: A pile body, the bottom of which is deeply embedded in the permafrost layer (8), and the pile body comprises a crushed stone section (2) and a curing agent filling section (4); The crushed stone section (2) is located at the upper part of the pile body, and the crushed stone section (2) is filled with crushed stones; The curing agent filling section (4) is located below the crushed stone section (2), the top elevation of the curing agent filling section (4) is higher than the upper limit (7) of the permafrost layer by a predetermined distance, and the curing agent filling section (4) is filled with crushed stone and curing agent.

2. A gravel pile according to claim 1, characterized in that: The predetermined distance is 30cm-50cm.

3. A gravel pile according to claim 1, characterized in that: A heat-insulating section (3) is provided between the crushed stone section (2) and the curing agent filling section (4), and the heat-insulating section (3) is filled with crushed stone and heat-insulating hydraulic material.

4. A gravel pile according to claim 3, characterized in that: The height of the thermal insulation section (3) is 20 cm-40 cm.

5. A gravel pile according to claim 1, characterized in that: The curing agent is cement paste or cement mortar.

6. A gravel pile according to any one of claims 1 to 5, characterized in that: A pile circumferential constraint is arranged on the periphery of the pile body, and the cross-sectional shape of the pile circumferential constraint matches the pile body.

7. A gravel pile according to claim 6, characterized in that: The pile perimeter constraint is a mesh structure.

8. A gravel pile according to claim 7, characterized in that: The mesh structure is a plastic-coated steel mesh, which includes a skeleton and a grid, and the grid is located in a grid formed by the skeleton.

9. A gravel pile according to claim 8, characterized in that: The skeleton of the plastic-coated steel mesh is composed of steel bars with a diameter of 6mm-8mm, and the grid of the plastic-coated steel mesh is composed of steel wire ropes with a diameter of 2mm-4mm.

10. A method for constructing a gravel pile, applied to a gravel pile as claimed in any one of claims 6 to 9, comprising the following steps: S1: drilling a pile hole (1) to a designed depth at a predetermined location according to design parameters; S2: placing a pile constraint within the depth range of the pile hole (1); S3: filling the pile hole (1) with crushed stones in layers and vibrating and compacting them to a predetermined distance above the upper limit (7) of the permafrost layer, inserting a conduit into the top surface of the crushed stone layer, and filling the curing agent from the bottom of the pile hole (1) to a predetermined distance above the upper limit (7) of the permafrost layer, thereby forming a curing agent filling section (4); S4: Continue to fill the thermal insulation hydraulic material to a predetermined height from the top surface of the curing agent filling section (4) to form a thermal insulation section (3); S5: Continue to fill the pile hole (1) with crushed stones in layers to complete the crushed stone section (2).

Citation Information

Cited By

  • Geomembrane wrapped macadam / high polymer macadam composite pile-closed dimension stone composite roadbed structure in permafrost region

    CN119553558A

  • A geomembrane-wrapped gravel / polymer gravel composite pile-sealed block stone composite roadbed structure in permafrost areas

    CN119553558B

  • Solid waste treatment method and solid waste treatment system

    CN122032982A