Connecting structure of two adjacent high-low-span raft plate foundations and construction method

By adopting segmented construction and a double-sided support system between the high and low span raft foundations, combining water-stop embedded parts and connecting parts, the stability and construction difficulty of the high and low span raft foundations are solved, and a higher level of construction is achieved structural stability and construction quality.

CN118979516APending Publication Date: 2024-11-19BEIJING FOURTH CONSTR & ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411211071.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-30
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

In construction, the connection structure between high and low span raft foundations is difficult to achieve a stable connection under the lack of ground anchors and throwing support settings, especially in positions with large height differences, and traditional single-sided support system is difficult to construct. This leads to increased construction difficulty of concrete retaining walls and reduced structural stability.

Method used

Using the method of segmented construction, the wall foundation and the wall main body are set on the garage raft foundation, and the water stop embedded parts and water stop connectors are set between the two, and the double-sided support formwork system is used to realize the concrete retaining wall. Stable connections, reduce construction difficulty and improve structural stability.

Benefits of technology

Through segmented construction and double-sided support system, the construction difficulty of concrete retaining walls is reduced, the connection stability between the garage raft foundation and the main building raft foundation is enhanced, the risk of settlement and inclination is reduced, and the construction quality is improved, so as to avoid Water leakage problem.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118979516A_ABST
    Figure CN118979516A_ABST
Patent Text Reader

Abstract

The connecting structure comprises a garage raft foundation, a main building raft foundation and a bottom span bottom plate, a wall foundation is arranged on the side, close to the bottom span bottom plate, of the upper surface of the garage raft foundation, a wall body is poured on the wall foundation, a lower construction joint is formed between the wall foundation and the wall body, and the lower construction joint is connected with the main building raft foundation. A water stop embedded part is arranged at the position of the lower construction joint, the wall body extends upwards to the bottom face of the main building raft foundation and is connected with the main building raft foundation, an upper construction joint is arranged between the wall body and the main building raft foundation, and a water stop connecting part is arranged at the position of the upper construction joint. The main building raft foundation, the bottom span bottom plate, the garage raft foundation, the wall foundation and the wall body are jointly poured with a concrete filling layer. The concrete retaining wall is constructed in a segmented mode, the problem that the concrete retaining wall is difficult to construct through a single-side formwork system is solved, the problem that a throwing and supporting system cannot be erected at the position of a bottom span bottom plate is solved, and construction of the concrete retaining wall can be achieved through a conventional double-side formwork system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of building construction, and in particular to a connection structure of two adjacent high and low span raft foundations and a construction method. Background Art

[0002] The raft foundation is composed of a bottom plate, beams, etc.; the building load is large and the bearing capacity of the foundation is weak, so a concrete bottom plate raft is often used to bear the building load and form a raft foundation. It has good integrity and can resist uneven settlement of the foundation.

[0003] During on-site construction, it is often encountered that the garage raft foundation and the main building raft foundation are adjacent to each other and at different heights, that is, there are high and low spans between the garage raft foundation and the main building raft foundation. In order to ensure the structural stability of the garage raft foundation and the main building raft foundation, a vertical concrete retaining wall is usually set to firmly connect the two. However, during the construction of the concrete retaining wall, only a single-sided formwork system can be used. The traditional single-sided formwork system often adopts a rear-side support system to resist the lateral pressure during the concrete pouring process, but the support system often needs to be used in conjunction with ground anchors. For situations where there are no conditions for setting ground anchors and support, it is very difficult to implement the single-sided formwork system, especially when there are high and low spans on site, and a side wall that can be approximately regarded as a side wall is formed at a position with a large height difference. The outside of the side wall is the bottom plate of the bottom span to be poured. Therefore, the concrete retaining wall does not have the conditions for setting support during the formwork support process, that is, the support system of the concrete retaining wall cannot be supported on the bottom plate of the bottom span.

[0004] Therefore, how to make the garage raft foundation firmly connected with the main building raft foundation in this case and ensure the construction safely and reasonably is an urgent problem to be solved. Summary of the invention

[0005] The present invention aims to solve the above-mentioned problems, thereby providing a connection structure and construction method for two adjacent high and low span raft foundations, optimizing the overall construction process of the garage raft foundation, the concrete retaining wall and the main building raft foundation, and constructing the concrete retaining wall in sections, thereby reducing the construction difficulty of the concrete retaining wall, solving the technical problem that the concrete retaining wall is difficult to construct through a single-sided formwork system, and solving the technical problem that the guying system cannot be supported at the bottom span bottom plate position, and the construction of the concrete retaining wall can be achieved through a conventional double-sided formwork system.

[0006] The present invention solves the above-mentioned problem by adopting the following technical solution: The invention discloses a connection structure of two adjacent high-low span raft foundations, comprising a garage raft foundation, a main building raft foundation and a bottom span bottom plate, wherein the garage raft foundation is adjacent to the main building raft foundation, the bottom span bottom plate is obliquely arranged between the garage raft foundation and the main building raft foundation, and the main building raft foundation is located above the garage raft foundation; a wall foundation is vertically arranged on one side of the upper surface of the garage raft foundation close to the bottom span bottom plate, a wall body is cast on the wall foundation, a lower construction joint is arranged between the wall foundation and the wall body, a water-stopping embedded part cast between the wall foundation and the wall body is arranged at the lower construction joint, the wall body extends upward to the bottom surface of the main building raft foundation and is connected to the main building raft foundation, an upper construction joint is arranged between the wall body and the main building raft foundation, a water-stopping connector sandwiched between the wall body and the main building raft foundation is arranged at the upper construction joint, and a concrete filling layer is cast together on the main building raft foundation, the bottom span bottom plate, the garage raft foundation, the wall foundation and the wall body.

[0007] Preferably, the top elevation of the wall body is consistent with the bottom elevation of the garage raft foundation.

[0008] Preferably, the waterstop embedded part is a waterstop steel plate, which is continuously arranged along the length direction of the lower construction joint, and the water-facing side of the waterstop steel plate faces the concrete filling layer.

[0009] Preferably, the waterstop connector is a rubber waterstop strip, and the rubber waterstop strip is connected and arranged along the length direction of the upper construction joint.

[0010] A construction method for a connection structure of two adjacent high-low span raft foundations comprises the following steps: S1. Tie the garage raft foundation steel bars in the garage, tie the wall foundation steel bars on the side of the garage raft foundation steel bars close to the main building raft foundation, so that the wall foundation steel bars and the garage raft foundation steel bars are connected as one; S2. Fix the water-stop embedded parts on the wall foundation steel bars, and set up formwork around the wall foundation steel bars, and then pour concrete on the garage raft foundation steel bars and wall foundation steel bars to form the garage raft foundation and wall foundation; S3, connecting the main wall steel bars to the wall foundation steel bars, and connecting the main wall steel bars to the water-stop embedded parts, then supporting the formwork around the main wall steel bars and pouring concrete, so that the main wall and the wall foundation are connected as one; S4. Backfill concrete between the wall foundation, the wall body and the bottom span bottom plate to form a concrete filling layer, so that the concrete filling layer is consistent with the top elevation of the wall body and the bottom elevation of the main building raft foundation; S5. Construct water-stop connectors on the upper top surface of the main wall body, and tie the main building raft foundation steel bars in the main building. Then, set up formwork around the main building raft foundation steel bars and pour concrete to form the main building raft foundation.

[0011] Compared with the prior art, the present invention adopting the above technical solution has the following outstanding features: The present invention optimizes the overall construction process of the garage raft foundation, the concrete retaining wall and the main building raft foundation, constructs the concrete retaining wall in sections, constructs the wall foundation first and then the wall body, so that the connection between the garage raft foundation and the main building raft foundation is achieved through the cooperation of the wall foundation and the wall body, which not only reduces the construction difficulty of the concrete retaining wall, but also solves the technical problem that the concrete retaining wall is difficult to construct through a single-side formwork system, and solves the technical problem that the bottom span bottom plate position cannot support the castellated support system, and the construction of the concrete retaining wall can be achieved through a conventional double-side formwork system; in addition, the stability of the connection structure between the garage raft foundation and the main building raft foundation is strengthened through the concrete filling layer, and the structural stability of the main building raft foundation is also effectively improved, and the probability of settlement and tilt of the main building raft foundation is reduced; in addition, by correspondingly constructing water-stop connectors and water-stop embedded parts in the upper construction joint and the lower construction joint, the risk of water seepage and leakage in the two construction joints is reduced, and the construction quality of the concrete retaining wall is effectively guaranteed. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a schematic diagram of the construction structure of the present invention. Figure 1 ; Figure 2 It is a schematic diagram of the construction structure of the present invention. Figure 2 ; Figure 3 It is a schematic diagram of the construction structure of the present invention. Figure 3 ; Figure 4 It is a schematic diagram of the construction structure of the present invention. Figure 4 ; In the figure: 1. Garage raft foundation; 2. Main building raft foundation; 3. Bottom span bottom plate; 4. Wall foundation; 5. Wall body; 6. Lower construction joint; 7. Waterstop embedded parts; 8. Upper construction joint; 9. Waterstop connector; 10. Concrete filling layer. DETAILED DESCRIPTION

[0013] The following description of the embodiments will help the public better understand the present invention, but the specific embodiments given by the applicant cannot and should not be regarded as limitations on the technical solutions of the present invention. Any changes to the definitions of components or technical features and / or formal but not substantial changes to the overall structure should be regarded as the scope of protection defined by the technical solutions of the present invention.

[0014] See also Figures 1 to 4 As shown, the technical solution of the present invention is as follows: A connection structure of two adjacent high-low span raft foundations, comprising a garage raft foundation 1, a main building raft foundation 2 and a bottom span bottom plate 3, wherein the garage raft foundation 1 is adjacent to the main building raft foundation 2, the bottom span bottom plate 3 is obliquely arranged between the garage raft foundation 1 and the main building raft foundation 2, and the main building raft foundation 2 is located above the garage raft foundation 1; a wall foundation 4 is constructed on one side of the upper surface of the garage raft foundation 1 close to the bottom span bottom plate 3, and the wall foundation 4 is perpendicular to the garage raft foundation 1 and connected to the garage raft foundation The wall foundation 1 is connected as a whole, a wall body 5 is cast on the wall foundation 4, a lower construction joint 6 is constructed between the wall foundation 4 and the wall body 5, and a water-stop embedded part 7 cast between the wall foundation 4 and the wall body 5 is constructed at the lower construction joint 6. The water-stop embedded part 7 is a water-stop steel plate, which is continuously arranged along the length direction of the lower construction joint 6, and the water-facing side of the water-stop steel plate faces the side of the concrete filling layer 10, so that the risk of water seepage and leakage at the position of the lower construction joint 6 is reduced by the water-stop steel plate, and the wall body 5 is upward. It extends to the bottom surface of the main building raft foundation 2 and is connected to the main building raft foundation 2, so that the connection between the garage raft foundation 1 and the main building raft foundation 2 is realized through the cooperation of the wall foundation 4 and the wall body 5, an upper construction joint 8 is constructed between the wall body 5 and the main building raft foundation 2, and a waterstop connector 9 is constructed at the upper construction joint 8 and sandwiched between the wall body 5 and the main building raft foundation 2. The waterstop connector 9 is a rubber waterstop strip, and the rubber waterstop strip is connected and arranged along the length direction of the upper construction joint 8, so that the risk of water seepage and leakage at the position of the lower construction joint 6 is reduced by the rubber waterstop strip. The main building raft foundation 2, the bottom span bottom plate 3, the garage raft foundation 1, the wall foundation 4 and the wall body 5 are jointly cast with a concrete filling layer 10, and the concrete filling layer 10 is cast with concrete of grade C20, so that the stability of the connection structure between the garage raft foundation 1 and the main building raft foundation 2 is strengthened by the concrete filling layer 10, the structural stability of the main building raft foundation 2 is improved, and the probability of settlement and tilt of the main building raft foundation 2 is reduced.

[0015] The top elevation of the wall body 5 and the top elevation of the concrete filling layer 10 are consistent with the bottom elevation of the garage raft foundation 1 .

[0016] A construction method for a connection structure of two adjacent high-low span raft foundations comprises the following steps: S1. Tie the garage raft foundation steel bars in the garage, tie the wall foundation steel bars on the side of the garage raft foundation steel bars close to the main building raft foundation 2, so that the wall foundation steel bars are connected to the garage raft foundation steel bars as a whole; S2, fixing the water-stop embedded parts 7 on the wall foundation steel bars, and supporting the formwork around the wall foundation steel bars, and then pouring concrete on the garage raft foundation steel bars and the wall foundation steel bars to form the garage raft foundation 1 and the wall foundation 4, so that the wall foundation 4 and the garage raft foundation 1 are connected as one; S3, connect the wall main body steel bars to the wall foundation steel bars, and connect the wall main body steel bars to the water-stop embedded parts 7, then support the formwork around the wall main body steel bars and pour concrete, so that the wall main body 5 and the wall foundation 4 are connected as one; S4, backfill concrete between the wall foundation 4, the wall body 5 and the bottom span bottom plate 3 to form a concrete filling layer 10, so that the concrete filling layer 10 is consistent with the top elevation of the wall body 5 and the bottom elevation of the main building raft foundation 2. In addition, when constructing the concrete filling layer 10, support the side of the wall foundation 4 and the wall body 5 away from the concrete filling layer 10 to prevent the risk of cracking of the wall foundation 4 and the wall body 5 due to the lateral pressure of the backfilled concrete; S5. Construct a water-stop connector 9 on the upper top surface of the wall body 5, and tie the main building raft foundation 2 steel bars in the main building, then support the formwork around the main building raft foundation 2 steel bars and pour concrete to form the main building raft foundation 2.

[0017] The present invention optimizes the overall construction process of the garage raft foundation 1, the concrete retaining wall and the main building raft foundation 2, and constructs the concrete retaining wall in sections, first constructing the wall foundation 4 and then constructing the wall body 5, so that the garage raft foundation 1 and the main building raft foundation 2 are connected through the cooperation of the wall foundation 4 and the wall body 5, which not only reduces the construction difficulty of the concrete retaining wall, but also solves the technical problem that the concrete retaining wall is difficult to construct through a single-side formwork system, and solves the technical problem that the bottom span bottom plate 3 cannot support the support system, and the construction of the concrete retaining wall can be achieved through a conventional double-side formwork system; in addition, the stability of the connection structure between the garage raft foundation 1 and the main building raft foundation 2 is strengthened by the concrete filling layer 10, and the structural stability of the main building raft foundation 2 is effectively improved, and the probability of settlement and tilting of the main building raft foundation 2 is reduced; in addition, by correspondingly constructing a waterproof connector 9 and a waterproof embedded part 7 in the upper construction joint 8 and the lower construction joint 6, the risk of water seepage and leakage in the two construction joints is reduced, and the construction quality of the concrete retaining wall is effectively guaranteed.

[0018] The above description is only a preferred feasible embodiment of the present invention, and does not limit the scope of rights of the present invention. All equivalent changes made using the contents of the present specification and its drawings are included in the scope of rights of the present invention.

Claims

1. A connection structure of two adjacent high-low span raft foundations, comprising a garage raft foundation, a main building raft foundation and a bottom span bottom plate, wherein the garage raft foundation is adjacent to the main building raft foundation, the bottom span bottom plate is inclinedly arranged between the garage raft foundation and the main building raft foundation, and the main building raft foundation is located above the garage raft foundation; characterized in that: A wall foundation is vertically arranged on one side of the upper surface of the garage raft foundation close to the bottom slab of the bottom span, a wall body is cast on the wall foundation, a lower construction joint is arranged between the wall foundation and the wall body, a water-stop embedded part cast between the wall foundation and the wall body is arranged at the lower construction joint, the wall body extends upward to the bottom surface of the main building raft foundation and is connected with the main building raft foundation, an upper construction joint is arranged between the wall body and the main building raft foundation, a water-stop connector sandwiched between the wall body and the main building raft foundation is arranged at the upper construction joint, and a concrete filling layer is cast together with the main building raft foundation, the bottom span bottom slab, the garage raft foundation, the wall foundation and the wall body.

2. The connection structure of two adjacent high and low span raft foundations according to claim 1, characterized in that: The top elevation of the main wall is consistent with the bottom elevation of the garage raft foundation.

3. The connection structure of two adjacent high and low span raft foundations according to claim 1, characterized in that: The embedded water-stop part is a water-stop steel plate, which is continuously arranged along the length direction of the lower construction joint, and the water-facing side of the water-stop steel plate faces the concrete filling layer.

4. The connection structure of two adjacent high and low span raft foundations according to claim 1, characterized in that: The water stop connector is a rubber water stop strip, and the rubber water stop strip is connected and arranged along the length direction of the upper construction joint.

5. A construction method for a connection structure of two adjacent high and low span raft foundations according to any one of claims 1 to 4, characterized in that: The following steps are involved: S1. Tie the garage raft foundation steel bars in the garage, tie the wall foundation steel bars on the side of the garage raft foundation steel bars close to the main building raft foundation, so that the wall foundation steel bars and the garage raft foundation steel bars are connected as one; S2. Fix the water-stop embedded parts on the wall foundation steel bars, and set up formwork around the wall foundation steel bars, and then pour concrete on the garage raft foundation steel bars and wall foundation steel bars to form the garage raft foundation and wall foundation; S3, connecting the main wall steel bars to the wall foundation steel bars, and connecting the main wall steel bars to the water-stop embedded parts, then supporting the formwork around the main wall steel bars and pouring concrete, so that the main wall and the wall foundation are connected as one; S4. Backfill concrete between the wall foundation, the wall body and the bottom span bottom plate to form a concrete filling layer, so that the concrete filling layer is consistent with the top elevation of the wall body and the bottom elevation of the main building raft foundation; S5. Construct water-stop connectors on the upper top surface of the main wall body, and tie the main building raft foundation steel bars in the main building. Then, set up formwork around the main building raft foundation steel bars and pour concrete to form the main building raft foundation.