Underwater rapid steel bar planting installation device without waiting for curing of steel bar planting glue and construction method of underwater rapid steel bar planting installation device

By using the device of the planting rubber in the underwater planting rib installation without waiting for solidification, using structures such as screws, locking expansion sleeves and conical nuts, rapid installation is achieved, and the problems of long construction cycles and insufficient planting rib strength are solved. Improve construction efficiency and safety.

CN118979529APending Publication Date: 2024-11-19NORTH CHINA UNIV OF WATER RESOURCES & ELECTRIC POWER
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411386153.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-30
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

The existing underwater hole drilling method requires waiting for the steel rubber to cure, resulting in a long construction cycle, increasing the working time and danger of divers, and the strength of the steel rubber is difficult to guarantee.

Method used

The underwater rapid underwater planting rib installation device is used without waiting for solidification. The screw, locking expansion sleeve and conical nut are installed in the drilling hole, and the planting rib installation is carried out when the planting rib is not solidified, and the positioning seal is used. Structures such as hole sleeves and reinforcement rings ensure the stability of the screw and the barrier of the reinforcement glue, achieving rapid installation.

Benefits of technology

The construction can be completed without waiting for the reinforcement glue to cure, which improves work efficiency and reinforcement strength, reduces the safety risks and construction time of divers, and avoids the impact of secondary water outage on the project.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118979529A_ABST
    Figure CN118979529A_ABST
Patent Text Reader

Abstract

The invention discloses a construction method of an underwater rapid steel bar planting mounting device without waiting for curing of steel bar planting glue. The construction method comprises the following steps: (1) constructing a drill hole; (2) hole cleaning; (3) feeding a locking expansion sleeve and a conical nut into the bottom of the drill hole; (4) steel bar planting glue is injected into the drill holes; (5) inserting ribs; and (6) fastening and mounting a component at the outer end of the screw rod. Compared with a traditional steel bar planting construction method, the device does not need to wait for the curing time of steel bar planting glue, next-step construction can be conducted after the planted steel bars are inserted, and the working efficiency and the steel bar planting strength are improved; when underwater steel bar planting construction operation is carried out, in order to guarantee safety and construction quality, water cut-off operation such as gate closing is generally needed firstly, and a still water operation environment is provided; according to the device, underwater steel bar planting operation can be completed at a time, the construction quality is guaranteed, the construction efficiency is improved, meanwhile, the influence of secondary water cut-off on normal water supply of a project is avoided, and the safety risk of underwater operating personnel is reduced to a certain degree.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of underwater engineering, and specifically relates to an underwater rapid rebar planting installation device and a construction method thereof, which does not require waiting for the solidification of rebar planting glue. Background Art

[0002] Underwater drilling and rebar planting is an important underwater engineering technology, which is widely used in the maintenance and reinforcement of water conservancy projects such as water channels, bridges, docks, and shipyards. Due to the special nature of the underwater environment, drilling and rebar planting is difficult. Currently, there are several common methods for underwater drilling and rebar planting, including manual drilling and rebar planting by divers, mechanical drilling and rebar planting, high-pressure water jet drilling and rebar planting, and drilling and rebar planting. Among them, drilling and rebar planting uses professional underwater drilling machinery to perform drilling operations, and then injects the rebar planting glue into the drilled hole. Then, the rebar is immediately screwed into the drilled hole after the injection of glue. Next, it is necessary to wait for about a week for the rebar planting glue to solidify before the diver goes into the water again to install the underwater components on the rebar. This operation method has the following disadvantages or shortcomings: (1) The construction period is long due to waiting for the anchor glue to solidify.

[0003] (2) Divers need to be arranged to go into the water a second time, which not only increases working time but also poses a greater risk.

[0004] (3) The anchor bolts are only anchored in the drilled holes by anchor glue, and the strength of the anchor bolts cannot be guaranteed. Summary of the invention

[0005] In order to solve the above technical problems existing in the prior art, the present invention provides an underwater rapid rebar planting installation device and its construction method, which only requires a diver to go into the water once to complete all underwater installation operations, has fast construction, and has high rebar planting strength and does not require waiting for the rebar to solidify.

[0006] In order to solve the above technical problems, the present invention adopts the following technical solutions: an underwater fast rebar planting installation device without waiting for the rebar planting glue to solidify, a drill hole is drilled at a designated position of an underwater building, and the direction from the hole mouth to the bottom of the hole is from the outside to the inside, including a screw rod, a locking expansion sleeve and a conical nut all coaxially installed in the drill hole, the conical nut is located at the bottom of the drill hole and is threadedly connected to the inner end of the screw rod, the outer circle of the conical nut is thick inside and thin outside, the maximum diameter of the outer circle of the conical nut is slightly smaller than the inner diameter of the drill hole, and the locking expansion sleeve is installed in the screw rod. The outer circle of the inner half of the locking expansion sleeve on the rod matches the outer circle of the tapered nut, the outer circle of the inner end of the locking expansion sleeve is crimped with the wall of the drilled hole, the drilled hole is injected with anchor glue that pre-embeds the screw, the locking expansion sleeve and the tapered nut, the drilled hole mouth is provided with a positioning sealing sleeve and a mounting component sleeved on the screw, the inner end of the positioning sealing sleeve extends into the drilled hole mouth, the outer end of the positioning sealing sleeve is flush with the outer wall of the underwater building, and the outer end of the screw is threadedly connected with a fastening nut and a flat washer that fasten and crimp the mounting component to the outer wall of the underwater building.

[0007] The locking expansion sleeve includes a sleeve that is transparent inside and outside. The outer end of the sleeve is integrally provided with a reinforcement ring whose outer diameter is larger than the outer diameter of the sleeve. The outer circle of the inner end of the reinforcement ring is provided with an external chamfer structure. A plurality of expansion joints are evenly opened on the sleeve along the circumferential direction. The length direction of each expansion joint is parallel to the center line of the sleeve. The inner end of each expansion joint is flush with the inner end of the sleeve. The inner circle of the inner port of the sleeve is provided with an internal chamfer structure. The inner circle of the inner port of the sleeve is provided with an internal chamfer structure.

[0008] The outer circle of the positioning sealing sleeve is composed of a cone section and a cylindrical section from the outside to the inside. The outer circle of the cone section is larger on the outside and smaller on the inside. The borehole opening is provided with a tapered opening that matches the cone section. The outer diameter of the cylindrical section is equal to the inner diameter of the borehole, and the cylindrical section is extended into and assembled into the borehole.

[0009] The construction method of the underwater rapid rebar planting installation device without waiting for the rebar planting glue to solidify includes the following steps: (1) Construction drilling; (2) Cleaning the hole; (3) Insert the locking sleeve and conical nut into the bottom of the drilled hole; (4) Injecting rebar glue into the drilled hole; (5) Inserting reinforcement; (6) Tighten the mounting component at the outer end of the screw.

[0010] In step (1), before drilling, a steel bar detector is used to find out the position of the embedded steel bars in the underwater building to avoid breaking the steel bars; the hole wall should be intact without cracks or local damage; and the tapered mouth of the hole is drilled together during the drilling process.

[0011] The specific process of hole cleaning in step (2) is: use a high-pressure water gun to blow out the dust and debris in the drilled hole to ensure that the hole is clean and free of dirt.

[0012] The specific process of step (3) is as follows: first, the support sleeve is put onto the long bolt, the outer end of the support sleeve contacts the inner end of the hexagonal head of the long bolt, then the locking sleeve is put onto the long bolt, the outer end of the locking sleeve contacts the inner end of the support sleeve, then the small head end of the tapered nut is screwed onto the inner end of the long screw, the outer circle of the small head end of the tapered nut extends into the inner port of the locking sleeve and stops rotating the tapered nut when it does not expand radially; then, the hexagonal end of the long bolt is held to push the tapered nut and the locking sleeve into the bottom of the drilled hole, and finally, the long bolt is rotated in the opposite direction, the inner end of the long bolt is separated from the tapered nut, and the long bolt and the support sleeve are pulled out.

[0013] Step (4) The amount of glue injected is 40%-60% of the drilling capacity.

[0014] The specific process of inserting the rebar in step (5) is as follows: after the injection of glue is completed, the positioning sealing sleeve is first installed on the borehole opening, the screw first passes through the positioning sealing sleeve and extends into the borehole, when the inner end of the screw contacts the rebar embedding glue, the screw is rotated in one direction and inserted while rotating to allow the glue to fully bond with the rebar, the rebar embedding glue is squeezed outward along the borehole by the screw, the positioning sealing sleeve blocks the rebar embedding glue from overflowing the hole opening, the front end of the screw then passes through the locking expansion sleeve and is threadedly connected to the conical nut, the screw is stopped after it is screwed in to a specified length, and the specified length indicates that the inner end of the screw has passed through the conical nut.

[0015] The specific process of step (6) is as follows: first, the installation component, the flat washer and the two fastening nuts are sequentially mounted on the outer end of the screw rod, and a wrench is used to clamp and rotate a fastening nut at the inner end, so that the fastening nut is pressed against the installation component, and the installation component is tightly attached to the positioning sealing sleeve and the outer wall of the underwater building. The screw rod drives the conical nut to rotate and move axially from the inside to the outside. The locking expansion sleeve is axially stable and immovable under the obstruction of the rebar embedding glue. The inner side of the locking expansion sleeve expands radially under the action of the axial movement of the outer circle of the conical nut, and the expansion gap expands until the inner end of the locking expansion sleeve is squeezed against the wall of the drilled hole so that the conical nut no longer moves axially. Then, the wrench is stopped to turn the inner fastening nut, and then the wrench is used to turn the outer fastening nut to press the inner fastening nut. From then on, the operation of fixing the installation component of a rebar embedding is completed.

[0016] By adopting the above technical solution, the structural features of the device of the present invention have the following technical effects: 1) The positioning sealing sleeve is set at the outer end of the drilled hole (rebar hole). The conical section of the positioning sealing sleeve cooperates with the conical surface of the conical mouth to ensure that the center position and verticality requirements of the screw (rebar) are guaranteed when the rebar glue is not solidified, and at the same time prevent the rebar glue from overflowing outward to ensure the axial stability of the locking expansion sleeve.

[0017] 2) Use a wrench to tighten the inner end of the fastening nut to the preload requirement. The inner side of the locking expansion sleeve expands radially and presses the inner wall of the drill hole to ensure the axial stability of the screw. The outer fastening nut is used to tighten the inner end of the fastening nut to ensure that the fastening nut does not loosen.

[0018] 3) A reinforcing ring is integrally arranged at the outer end of the locking expansion sleeve, which not only enhances the strength of the locking expansion sleeve, but also increases the annular area of ​​the outer end of the locking expansion sleeve, that is, increases the contact area with the anchor glue, and improves the stability of the locking expansion sleeve when the fastening nut is turned to pull the screw outward.

[0019] 4) The outer circle of the inner end of the reinforcing ring is provided with an external chamfer structure, which plays a role in guiding and reducing resistance when the locking sleeve and the tapered nut are sent to the bottom of the drilled hole; the inner circle of the inner port of the sleeve is provided with an internal chamfer structure to facilitate the cooperation with the tapered nut. During the process of the screw and the tapered nut moving outward to lock, the sliding resistance between the inner end of the locking sleeve and the tapered nut is reduced to avoid jamming.

[0020] 5) The end of the long bolt adopts a thickened hexagonal head to improve the torque bearing condition of the wrench during tightening, and at the same time increase the rotation operation space of the wrench.

[0021] To sum up, compared with the traditional rebar planting construction method, the device of the present invention does not need to wait for the curing time of the rebar planting glue, and the next construction step can be carried out after the rebar is inserted, thereby improving work efficiency and rebar planting strength; when performing underwater rebar planting construction, in order to ensure safety and construction quality, it is usually necessary to first perform water stop operations such as closing the gate to provide a static water working environment; this device can complete the underwater rebar planting operation in one go, while ensuring construction quality and improving construction efficiency, avoiding the impact of secondary water stoppage on the normal water supply of the project, and reducing the safety risks of underwater workers to a certain extent. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 is a schematic diagram of step (3) in the construction method of the present invention; Figure 2 is a schematic diagram of step (4) in the construction method of the present invention; Figure 3 is a schematic diagram of step (5) in the construction method of the present invention; Figure 4 is a schematic diagram of step (6) in the construction method of the present invention; Figure 5 It is a structural schematic diagram of the conical nut in the present invention; Figure 6 It is a structural schematic diagram of the locking expansion sleeve in the present invention; Figure 7 It is a structural schematic diagram of the positioning and sealing sleeve in the present invention; Figure 8 It is a schematic diagram of the structure of the support sleeve used in the construction method of the present invention; Fig. 9 It is a schematic diagram of the structure of the long bolt used in the construction method of the present invention. DETAILED DESCRIPTION

[0023] The embodiments of the present invention are further described in detail below in conjunction with the accompanying drawings and examples.

[0024] like Figure 4-Figure 7As shown, the rebar embedding glue of the present invention does not need to wait for curing, and the underwater rapid rebar embedding installation device is provided. A borehole 2 is drilled at a designated position of an underwater building 1, and the direction from the hole mouth of the borehole 2 to the bottom of the hole is from the outside to the inside, including a screw 3 (rebar embedding), a locking expansion sleeve 4 and a conical nut 5 which are all coaxially installed in the borehole 2. The conical nut 5 is located at the bottom of the borehole 2 and is threadedly connected to the inner end of the screw 3. The outer circle of the conical nut 5 is thick inside and thin outside. The maximum diameter of the outer circle of the conical nut 5 is slightly smaller than the inner diameter of the borehole 2. The locking expansion sleeve 4 is installed on the screw 3 and the locking expansion sleeve 4 is inside. The outer circle of the side half cooperates with the outer circle of the tapered nut 5, the outer circle of the inner end of the locking expansion sleeve 4 is crimped with the wall of the borehole 2, and the borehole 2 is injected with a reinforcing bar glue 6 that pre-buries the screw 3, the locking expansion sleeve 4 and the tapered nut 5. The borehole 2 is provided with a positioning sealing sleeve 7 and a mounting component 8 that are sleeved on the screw 3. The inner end of the positioning sealing sleeve 7 extends into the borehole 2. The outer end of the positioning sealing sleeve 7 is flush with the outer wall of the underwater building 1, and the outer end of the screw 3 is threadedly connected with a fastening nut 9 and a flat washer 10 that fasten and crimp the mounting component 8 to the outer wall of the underwater building 1.

[0025] The locking expansion sleeve 4 includes a sleeve 11 that is transparent inside and outside. The outer end of the sleeve 11 is integrally provided with a reinforcement ring 12 whose outer diameter is larger than the outer diameter of the sleeve 11. The outer circle of the inner end of the reinforcement ring 12 is provided with an outer chamfer structure 13. A plurality of expansion joints 14 are evenly opened on the sleeve 11 along the circumferential direction. The length direction of each expansion joint 14 is parallel to the center line of the sleeve 11. The inner end of each expansion joint 14 is flush with the inner end of the sleeve 11. The inner circle of the inner port of the sleeve 11 is provided with an inner chamfer structure 15. The inner circle of the inner port of the sleeve 11 is provided with an inner chamfer structure 15.

[0026] The outer circle of the positioning sealing sleeve 7 is composed of a conical section 16 and a cylindrical section 17 from the outside to the inside. The outer circle of the conical section 16 is larger on the outside and smaller on the inside. The opening of the borehole 2 is provided with a conical opening that matches the conical section 16. The outer diameter of the cylindrical section 17 is equal to the inner diameter of the borehole 2, and the cylindrical section 17 extends into and is assembled into the borehole 2.

[0027] like Figure 1-Figure 4 As shown, the construction method of the underwater rapid rebar planting installation device without curing of the rebar planting glue 6 includes the following steps: (1) Construction drilling 2; (2) Cleaning the hole; (3) Insert the locking sleeve 4 and the conical nut 5 into the bottom of the borehole 2; (4) injecting reinforcing bar glue 6 into the drill hole 2; (5) Inserting reinforcement; (6) Tighten the mounting member 8 on the outer end of the screw rod 3. In step (1), before drilling hole 2, a steel bar detector is used to find out the position of the embedded steel bars in the underwater building 1 to avoid breaking the steel bars; the hole wall of the drill hole 2 should be intact without cracks or local damage; and the tapered mouth of the hole mouth is drilled together during the drilling process of the hole 2.

[0028] The specific process of hole cleaning in step (2) is: use a high-pressure water gun to blow out the dust and debris in the borehole 2 to ensure that the hole is clean and free of dirt.

[0029] like Figure 1 , Figure 8 and Fig. 9 As shown, the specific process of step (3) is as follows: first, the support sleeve 18 is put onto the long bolt 19, and the outer end of the support sleeve 18 contacts the inner end of the hexagonal head of the long bolt 19; then, the locking sleeve 4 is put onto the long bolt 19, and the outer end of the locking sleeve 4 contacts the inner end of the support sleeve 18; then, the small end of the tapered nut 5 is screwed onto the inner end of the long screw 3, and the outer circle of the small end of the tapered nut 5 extends into the inner port of the locking sleeve 4 and stops rotating the tapered nut 5 when it does not expand radially; then, the hexagonal end of the long bolt 19 is held and the tapered nut 5 and the locking sleeve 4 are sent to the bottom of the borehole 2; finally, the long bolt 19 is rotated in the opposite direction, and the inner end of the long bolt 19 is separated from the tapered nut 5, and the long bolt 19 and the support sleeve 18 are pulled out.

[0030] The amount of glue injected in step (4) is 40%-60% of the capacity of borehole 2.

[0031] The specific process of inserting the rebar in step (5) is as follows: after the glue injection is completed, the positioning sealing sleeve 7 is first installed on the hole opening of the drill hole 2, and the screw 3 first passes through the positioning sealing sleeve 7 and extends into the drill hole 2. When the inner end of the screw 3 contacts the rebar embedding glue 6, the screw 3 is rotated unidirectionally and inserted while rotating to allow the glue to fully bond with the rebar. The rebar embedding glue 6 is squeezed outward along the drill hole 2 by the screw 3, and the positioning sealing sleeve 7 prevents the rebar embedding glue 6 from overflowing the hole opening. The front end of the screw 3 then passes through the locking expansion sleeve 4 and is threadedly connected with the conical nut 5. The screw 3 is stopped after it is screwed in to a specified length. The specified length indicates that the inner end of the screw 3 has passed through the conical nut 5.

[0032] The specific process of step (6) is as follows: first, the installation component 8, the flat washer 10 and the two fastening nuts 9 are sequentially mounted on the outer end of the screw rod 3, and a wrench is used to clamp and rotate a fastening nut 9 at the inner end, so that the fastening nut 9 presses the installation component 8 tightly, and the installation component 8 is close to the positioning sealing sleeve 7 and the outer wall of the underwater building 1. The screw rod 3 drives the conical nut 5 to rotate together and move axially from the inside to the outside. The locking expansion sleeve 4 is axially stable and immovable under the obstruction of the rebar embedding glue 6. The inner side of the locking expansion sleeve 4 expands radially under the action of the axial movement of the outer circle of the conical nut 5, and the expansion joint 14 expands until the inner end of the locking expansion sleeve 4 is squeezed with the wall of the borehole 2 so that the conical nut 5 no longer moves axially. Then, the wrench is stopped to tighten the inner fastening nut 9, and then the outer fastening nut 9 is used to tighten the inner fastening nut 9 with a wrench, thereby completing the operation of fixing the installation component 8 of a rebar embedding.

[0033] The above embodiments illustrate the basic principles and features of the present invention, but the above only illustrates the preferred embodiments of the present invention and is not limited to the embodiments. Under the inspiration of this patent, a person skilled in the art can make many forms of deformation and improvement without departing from the scope of protection of the present invention and the claims, which are all within the protection scope of the present invention. Therefore, the patent and protection scope of the present invention shall be subject to the attached claims.

Claims

1. The rebar glue does not need to wait for curing. The underwater rapid rebar installation device has a drill hole at the designated position of the underwater building. The direction from the hole mouth to the bottom of the hole is from outside to inside. It is characterized by: It includes a screw rod, a locking expansion sleeve and a tapered nut which are all coaxially installed in the borehole. The tapered nut is located at the bottom of the borehole and is threadedly connected to the inner end of the screw rod. The outer circle of the tapered nut is thick inside and thin outside. The maximum diameter of the outer circle of the tapered nut is slightly smaller than the inner diameter of the borehole. The locking expansion sleeve is installed on the screw rod and the outer circle of the inner half of the locking expansion sleeve cooperates with the outer circle of the tapered nut. The outer circle of the inner end of the locking expansion sleeve is crimped with the wall of the borehole. The borehole is filled with rebar embedding glue for pre-embedding the screw rod, the locking expansion sleeve and the tapered nut. The borehole opening is provided with a positioning sealing sleeve and a mounting component sleeved on the screw rod. The inner end of the positioning sealing sleeve extends into the borehole opening. The outer end of the positioning sealing sleeve is flush with the outer wall of the underwater building. The outer end of the screw rod is threadedly connected with a fastening nut and a flat washer which are fastened and crimped to the outer wall of the underwater building.

2. The underwater fast rebar planting installation device for rebar planting glue without waiting for curing according to claim 1 is characterized in that: The locking expansion sleeve includes a sleeve that is transparent inside and outside. The outer end of the sleeve is integrally provided with a reinforcement ring whose outer diameter is larger than the outer diameter of the sleeve. The outer circle of the inner end of the reinforcement ring is provided with an external chamfer structure. A plurality of expansion joints are evenly opened on the sleeve along the circumferential direction. The length direction of each expansion joint is parallel to the center line of the sleeve. The inner end of each expansion joint is flush with the inner end of the sleeve. The inner circle of the inner port of the sleeve is provided with an internal chamfer structure. The inner circle of the inner port of the sleeve is provided with an internal chamfer structure.

3. The underwater rapid rebar planting installation device according to claim 2, which does not require waiting for the rebar planting glue to solidify, is characterized in that: The outer circle of the positioning sealing sleeve is composed of a cone section and a cylindrical section from the outside to the inside. The outer circle of the cone section is larger on the outside and smaller on the inside. The borehole opening is provided with a tapered opening that matches the cone section. The outer diameter of the cylindrical section is equal to the inner diameter of the borehole, and the cylindrical section is extended into and assembled into the borehole.

4. The construction method of the underwater rapid rebar planting installation device without waiting for the rebar planting glue to solidify according to claim 3 is characterized by: The following steps are involved: (1) Construction drilling; (2) Cleaning the hole; (3) Insert the locking sleeve and conical nut into the bottom of the drilled hole; (4) Injecting rebar glue into the drilled hole; (5) Inserting reinforcement; (6) Tighten the mounting component at the outer end of the screw.

5. The construction method of the underwater rapid rebar planting installation device without waiting for the rebar planting glue to solidify according to claim 4 is characterized in that: In step (1), before drilling, a steel bar detector is used to find out the position of the embedded steel bars in the underwater building to avoid breaking the steel bars; the hole wall should be intact without cracks or local damage; and the tapered mouth of the hole is drilled together during the drilling process.

6. The construction method of the underwater rapid rebar planting installation device without waiting for the rebar planting glue to solidify according to claim 4 is characterized in that: The specific process of hole cleaning in step (2) is: use a high-pressure water gun to blow out the dust and debris in the drilled hole to ensure that the hole is clean and free of dirt.

7. The construction method of the underwater rapid rebar planting installation device without waiting for the rebar planting glue to solidify according to claim 4 is characterized by: The specific process of step (3) is as follows: first, the support sleeve is put onto the long bolt, the outer end of the support sleeve contacts the inner end of the hexagonal head of the long bolt, then the locking sleeve is put onto the long bolt, the outer end of the locking sleeve contacts the inner end of the support sleeve, then the small head end of the tapered nut is screwed onto the inner end of the long screw, the outer circle of the small head end of the tapered nut extends into the inner port of the locking sleeve and stops rotating the tapered nut when it does not expand radially; then, the hexagonal end of the long bolt is held to push the tapered nut and the locking sleeve into the bottom of the drilled hole, and finally, the long bolt is rotated in the opposite direction, the inner end of the long bolt is separated from the tapered nut, and the long bolt and the support sleeve are pulled out.

8. The construction method of the underwater rapid rebar planting installation device according to claim 7, wherein the rebar planting glue does not need to wait for curing, and is characterized in that: Step (4) The amount of glue injected is 40%-60% of the drilling capacity.

9. The construction method of the underwater rapid rebar planting installation device without waiting for the rebar planting glue to solidify according to claim 8 is characterized in that: The specific process of inserting the rebar in step (5) is as follows: after the injection of glue is completed, the positioning sealing sleeve is first installed on the borehole opening, the screw first passes through the positioning sealing sleeve and extends into the borehole, when the inner end of the screw contacts the rebar embedding glue, the screw is rotated in one direction and inserted while rotating to allow the glue to fully bond with the rebar, the rebar embedding glue is squeezed outward along the borehole by the screw, the positioning sealing sleeve blocks the rebar embedding glue from overflowing the hole opening, the front end of the screw then passes through the locking expansion sleeve and is threadedly connected to the conical nut, the screw is stopped after it is screwed in to a specified length, and the specified length indicates that the inner end of the screw has passed through the conical nut.

10. The construction method of the underwater rapid rebar planting installation device without waiting for the rebar planting glue to solidify according to claim 9 is characterized in that: The specific process of step (6) is as follows: first, the installation component, the flat washer and the two fastening nuts are sequentially mounted on the outer end of the screw rod, and a wrench is used to clamp and rotate a fastening nut at the inner end, so that the fastening nut is pressed against the installation component, and the installation component is tightly attached to the positioning sealing sleeve and the outer wall of the underwater building. The screw rod drives the conical nut to rotate and move axially from the inside to the outside. The locking expansion sleeve is axially stable and immovable under the obstruction of the rebar embedding glue. The inner side of the locking expansion sleeve expands radially under the action of the axial movement of the outer circle of the conical nut, and the expansion gap expands until the inner end of the locking expansion sleeve is squeezed against the wall of the drilled hole so that the conical nut no longer moves axially. Then, the wrench is stopped to turn the inner fastening nut, and then the wrench is used to turn the outer fastening nut to press the inner fastening nut. From then on, the operation of fixing the installation component of a rebar embedding is completed.