Tunnel waterproof construction scaffold
By designing adjustable tunnel waterproof construction scaffolding, the problem of poor adaptability of traditional construction equipment is solved, efficient and safe tunnel waterproof construction is achieved, adapting to different tunnel sizes, and improving construction efficiency and convenience.
Patent Information
- Application Number
- CN202411121606.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-15
- Publication Date
- 2024-11-19
AI Technical Summary
Traditional tunnel waterproof construction scaffolding is difficult to adapt to tunnels of different widths and heights, resulting in low construction efficiency and cumbersome demolition and installation, which affects the construction progress.
A construction scaffolding including a frame, main platform and sub-platform is designed. Through roller movement and telescopic components, it can adapt to different tunnel sizes and achieve convenient waterproof construction. The main platform and the secondary platform adjust the vertical and horizontal positions through telescopic components, and cooperate with the support mechanism and positioning components to ensure the stability and safety of the construction platform.
It improves the convenience and efficiency of tunnel waterproof construction, adapts to tunnels of different sizes, enhances the stability and safety of the construction platform, and simplifies the construction process.
Smart Images

Figure CN118979757A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of tunnel waterproofing construction, and in particular to a scaffold for tunnel waterproofing construction. Background Art
[0002] Tunnels are engineering structures buried in the ground. They are a form of human use of underground space. They can be divided into traffic tunnels, hydraulic tunnels, municipal tunnels, mining tunnels and military tunnels. During the construction of tunnels, waterproofing measures are required to ensure that tunnel operations will not be affected by water leakage, water accumulation, or other disasters that affect the use of functions and corrode equipment.
[0003] For waterproof construction of dark excavated tunnels, traditional construction includes two types. One is to set up steel pipe scaffolding according to the height of the tunnel, but it needs to be dismantled as it is set up, the construction process is cumbersome, affecting the construction progress and not easy to construct. The second is to optimize the first type by setting up a section of scaffolding, the bottom of the scaffolding is set on the I-beam, and wheels are set under the I-beam to facilitate forward and backward movement. However, this type of scaffolding is only for a single tunnel and is dismantled after construction. Therefore, it cannot be adapted to the construction of tunnels of different widths and heights, thereby reducing the adaptability during construction and reducing the efficiency of waterproof construction. Summary of the invention
[0004] In order to improve the waterproofing efficiency, the present application provides a tunnel waterproofing construction scaffold.
[0005] The present application provides a tunnel waterproof construction scaffold, which adopts the following technical solution: A tunnel waterproof construction scaffold, comprising: A frame, wherein the frame is arranged on an I-beam, and rollers are arranged on the I-beam, and the frame and the I-beam are moved by the rollers and positioned under the action of gravity; A main platform, wherein the main platform is arranged on the frame through a telescopic component 1, and the telescopic component 1 is used to adjust the position of the main platform in the vertical direction; The auxiliary platform is arranged on the main platform through a telescopic component 2, and the telescopic component 2 is used to adjust the distance of the auxiliary platform in the horizontal direction. The auxiliary platform and the main platform cooperate to form a construction platform for construction.
[0006] By adopting the above technical solution, the staff stand on the construction platform to carry out waterproof construction in the tunnel. When the construction is completed, the frame and I-beam are pushed to move in the tunnel through rollers, thereby driving the construction platform and personnel to move. After the movement is completed, the frame and I-beam are positioned under the action of their gravity, and then the construction staff carry out waterproof construction of the next section of the tunnel; when it is necessary to construct tunnels of different widths and heights, the telescopic component 1 adjusts the vertical position of the main platform and the auxiliary platform to adapt to the height of the tunnel, and the telescopic component 2 adjusts the horizontal position of the auxiliary platform to adapt to the width of the tunnel. Therefore, it can adapt to the waterproof construction of tunnels of different heights and widths, improves the convenience during waterproof construction, and improves the efficiency of waterproof construction.
[0007] Optionally, the telescopic component 1 includes: A telescopic member, the telescopic member is arranged on the main platform and is slidably arranged on the frame and is provided with a plurality of positioning holes spaced apart vertically; A positioning screw passes through the frame body and the positioning hole and is threadedly connected with a positioning nut for positioning.
[0008] By adopting the above technical solution, the positioning nut is turned to disengage the positioning screw, and then the positioning screw can be removed. The movement of the main platform drives the telescopic part to move on the frame, and then the positioning screw is passed through the frame and the positioning hole, and the positioning nut is threadedly connected to the positioning screw, so as to realize the positioning of the main platform, thereby realizing the adjustment of the position of the main platform and the auxiliary platform in the vertical direction.
[0009] Optionally, two auxiliary platforms are provided and located on both sides of the main platform, and the telescopic component 2 includes: A gear, the gear is rotatably arranged on the main platform through a rotating column, and a driving rod is arranged on the rotating column to drive the rotating column to rotate; Two racks are detachably arranged on the two sub-platforms and are located on both sides of the gear and mesh with the gear. The gear rotates to drive the two racks to move and is used to realize the two sub-platforms approaching or moving away from each other.
[0010] By adopting the above technical solution, the staff stands on the main platform and rotates the driving rod. The rotation of the driving rod drives the rotating column and the gear to rotate. The rotation of the gear drives the two racks to move, thereby driving the two sub-platforms to move closer or farther away from each other, so as to adapt to the width of different tunnels. Moreover, the two sub-platforms are located on both sides of the frame, which makes the frame and the construction platform more stable and safer during movement, thereby improving the safety during the construction process.
[0011] Moreover, the auxiliary platform moves horizontally on the main platform. When the workers stand on the main platform, the movement of the auxiliary platform will not be affected by their own gravity. After the two auxiliary platforms are moved, due to the friction at the sliding connection between the auxiliary platform and the main platform, they can position themselves under the action of their own gravity, which improves the convenience of positioning, reduces the time spent on adjustment, and improves construction efficiency. Moreover, the two auxiliary platforms are symmetrically arranged, which makes the construction platform stable during operation and improves the safety of construction.
[0012] Optionally, a support mechanism connected to the two sub-platforms is provided on the frame and below the two sub-platforms, and the support mechanism is used to support and position the two sub-platforms, and the support mechanism includes: Two support rods, the two support rods are rotatably connected to each other through a rotating shaft and are in a scissor shape, the tops of the two support rods are rotatably connected to the lower surfaces of the two auxiliary platforms away from the main platform, and the bottoms of the two support rods are movably connected to the frame; A fixing assembly is used to position the bottoms of the two support rods.
[0013] By adopting the above technical solution, the sub-platform is in a mobile state, so the side of the sub-platform away from the main platform is in a suspended state, so the stability of one end of the sub-platform is poor, and the use of a fixed support structure cannot adapt to supporting the mobile sub-platform, thereby reducing the safety during construction.
[0014] During the scaffolding installation process, it is installed from the bottom to the top. After the main platform is installed, the gear and rack are located on the main platform, and then the two sub-platforms are slid and installed onto the main platform. Then the two racks are respectively connected to the two sub-platforms, and the tops of the two support rods are rotatably connected to the lower surfaces of the two sub-platforms. The staff can stand on the main platform and rotate the gears to drive the two sub-platforms to move. At the same time, the staff located under the main platform drives the two support rods to cooperate to drive the two sub-platforms to move, thereby greatly improving the convenience of driving the two sub-platforms to move. Finally, the fixing assembly locks the support rods, so that the positions of the two support rods and the two sub-platforms can be positioned. Therefore, the two support rods can support the lower surface of the two sub-platforms away from the main platform, and the pressure of the two sub-platforms can be dispersed to the frame through the two support rods, thereby further improving the safety of the construction platform construction and improving the safety of construction.
[0015] Optionally, the fixing assembly is provided with two and one-to-one correspondence with the two support rods, the bottom of the support rod is provided with a position avoidance hole along the length direction of the support rod, and the frame is provided with a plurality of fixing holes at vertical intervals, and the fixing assembly includes: A limit block, wherein the limit block is slidably arranged on the avoidance hole; A fixing screw rod passes through the limiting block and the fixing hole and is threadedly connected with a fixing nut for fixing.
[0016] By adopting the above technical solution, the fixing nut is twisted to disengage the fixing screw, and then the fixing screw is removed from the fixing hole and temporarily stays on the limit block, driving the two support rods to move and rotate, so as to drive the two sub-platforms to move. After the movement is completed, the fixing screw pushes the limit block to move so that the fixing screw is aligned with the fixing hole, the fixing screw is passed through the fixing hole, and then the fixing nut is threadedly connected to the fixing screw to fix and install the two support rods, thereby achieving the goal of dispersing the pressure of the sub-platform on the two support rods to the entire frame, thereby improving the safety of construction.
[0017] Optionally, a positioning component for positioning the rack is provided on the main platform.
[0018] By adopting the above technical solution, the two support rods position the sub-platform, and the sub-platform generates an inclined downward force on the support rods. This force will push the sub-platform to generate a component force in the horizontal direction. Therefore, the rack is positioned through the positioning assembly, so that the two sub-platforms can be positioned in the horizontal direction, thereby further improving the safety during construction.
[0019] Optionally, the positioning component includes: A positioning block, which is plug-mounted on the main platform and plug-fitted with the rack for positioning; A shifting block, which is arranged on the positioning block and is used to leverage the force when the positioning block is shifted away from the main platform; A soft belt is arranged on the positioning block and connected to the main platform.
[0020] By adopting the above technical solution, the positioning block is plugged and installed on the main platform for positioning, and the positioning block is plugged and installed on the rack for positioning, so that the two sub-platforms can be positioned. When unlocking is required, the shifting block is driven to drive the positioning block to disengage from the main platform and the rack, and the soft belt can position the positioning block, thereby improving the convenience of positioning and unlocking the two sub-platforms.
[0021] Optionally, a mounting groove is provided on the main platform, and the gear and positioning assembly are located in the mounting groove. A plurality of scaffolding boards are set up on the upper surfaces of the main platform and the auxiliary platform. The scaffolding boards block the mounting groove and rest against the top of the positioning block to prevent the positioning block from detaching from the main platform.
[0022] By adopting the above technical scheme, multiple scaffolding boards are laid out to form a construction platform, thereby making the construction platform more flat, and the scaffolding boards block the installation grooves and can also be positioned against the positioning blocks, thereby further reducing the stability of the positions of the two sub-platforms during construction, and also reducing the adverse effects of the driving rods and rotating columns on the construction workers, thereby improving construction safety; and in the present application, when waterproofing construction is required for tunnels of different sizes, the scaffolding boards need to be removed before being used to adjust the two sub-platforms, thereby greatly improving the construction convenience and safety under the special working conditions of the present application.
[0023] Optionally, a plurality of the construction platforms are vertically spaced apart, and two adjacent construction platforms are connected to each other via a detachable ladder.
[0024] By adopting the above technical solution, tunnel waterproofing construction can be more conveniently carried out through multiple construction platforms, thereby improving tunnel construction efficiency.
[0025] In summary, the present application includes at least one of the following beneficial technical effects: When it is necessary to construct tunnels of different widths and heights, telescopic component 1 adjusts the vertical positions of the main platform and the sub-platform to adapt to the height of the tunnel, while telescopic component 2 adjusts the horizontal position of the sub-platform to adapt to the width of the tunnel. Therefore, it can adapt to the waterproofing construction of tunnels of different heights and widths, improves the convenience of waterproofing construction, and improves the efficiency of waterproofing construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a schematic diagram of the three-dimensional structure of the scaffold; Figure 2 It is a partial structural diagram of the scaffold, mainly showing the telescopic component 1 and the supporting mechanism; Figure 3 It is a partial structural diagram of the scaffolding, mainly showing the telescopic component 2 and the positioning component.
[0027] Figure numerals: 11, frame; 12, main platform; 13, auxiliary platform; 16, construction platform; 17, scaffolding; 18, guardrail; 21, mounting groove; 22, rotating column; 23, driving rod; 3, telescopic component one; 31, telescopic part; 32, positioning screw; 33, positioning hole; 4, telescopic component two; 41, gear; 42, rack; 5, positioning component; 51, positioning block; 52, shift block; 6, supporting mechanism; 61, supporting rod; 62, avoidance hole; 63, rotating shaft; 7, fixing component; 71, limit block; 72, fixing screw; 73, fixing hole. DETAILED DESCRIPTION
[0028] The present application is further described in detail below in conjunction with the accompanying drawings 1-3.
[0029] The embodiment of the present application discloses a tunnel waterproof construction scaffold.
[0030] Reference Figure 1 and Figure 2 The tunnel waterproof construction scaffolding includes a frame 11, a main platform 12 and a secondary platform 13. A plurality of I-beams are installed on the bottom wall of the tunnel, and the length direction of the I-beams is parallel to the length direction of the tunnel. A plurality of rollers are installed on the bottom of the I-beams to rotate along the length direction. The rollers roll on the tunnel to realize the movement of the I-beams. The frame 11 is constructed by a plurality of steel pipes. The bottom of the frame 11 is fixedly installed on a plurality of I-beams for support. Pushing the frame 11 can make the frame 11 and the I-beams move through the rollers. The main platform 12 is set on the frame 11 through a telescopic component 13, and the telescopic component 13 is used to adjust the position of the main platform 12 in the vertical direction. The secondary platform 13 is set on the main platform 12 through a telescopic component 24, and the telescopic component 24 is used to adjust the position of the two secondary platforms 13 in the horizontal direction. The secondary platform 13 and the main platform 12 cooperate to form a construction platform 16 for construction.
[0031] There are multiple construction platforms 16 arranged at vertical intervals, and there are also multiple frames 11 arranged in one-to-one correspondence with the multiple construction platforms 16, and the frame 11 located at the lowest point is fixedly installed on the I-beam, and two adjacent construction platforms 16 are connected to each other by a ladder, and the ladder and the construction platform 16 are detachably connected; the following is explained using one construction platform 16 as an example.
[0032] Reference Figure 1 and Figure 2 The main platform 12 and the auxiliary platform 13 are constructed as needed, and the construction materials can be steel pipes or steel plates. The main platform 12 and the auxiliary platform 13 are both cube or rectangular structures. The main platform 12 and the auxiliary platform 13 are both provided with multiple vertical guardrails 18, which are used to prevent workers from falling from the construction platform 16.
[0033] There are multiple telescopic components 3 located at the four corners of the main platform 12. The telescopic components 3 include a telescopic part 31 and a positioning screw 32. The telescopic part 31 is fixedly installed on the lower surface of the main platform 12 and is in a vertical state. The telescopic part 31 can be a round or square steel pipe. A plurality of positioning holes 33 that horizontally penetrate the telescopic part 31 are vertically spaced on the side wall of the telescopic part 31. The telescopic part 31 is slidably penetrated on the top of the frame 11; the positioning screw 32 horizontally penetrates the frame 11 and the positioning hole 33 and is threadedly connected with a positioning nut for fixing.
[0034] Twist the positioning nut to remove it from the positioning screw 32, then remove the positioning screw 32 from the frame 11 and the positioning hole 33, move the main platform 12 for adjustment, and after the adjustment is completed, pass the positioning screw 32 through the frame 11 and the positioning hole 33, and thread the positioning nut onto the positioning screw 32 for positioning, so as to achieve the adjustment of the position of the main platform 12.
[0035] Reference Figure 2 and Figure 3 Two auxiliary platforms 13 are arranged at intervals and are located on both sides of the main platform 12. The two auxiliary platforms 13 are slidably installed on the opposite side walls of the main platform 12, and the two auxiliary platforms 13 are close to or far away from each other; the telescopic component 24 includes a gear 41 and two racks 42. A mounting groove 21 is opened on the upper surface of the main platform 12. A rotating column 22 in a vertical state is rotatably installed at the bottom of the mounting groove 21. The gear 41 is keyed to the rotating column 22. A horizontal driving rod 23 is fixedly installed on the top of the rotating column 22. The driving rod 23 is used to drive the rotating column 22 and the gear 41 to rotate.
[0036] The two racks 42 are slidably installed on the opposite side walls of the main platform 12 and extend into the installation groove 21. The two racks 42 are respectively located on both sides of the gear 41 and are meshed with the gear 41. The two ends of the two racks 42 away from the gear 41 are detachably connected to the opposite side walls of the two sub-platforms 13. Therefore, the gear 41 and the two racks 42 are pre-arranged on the main platform 12. After the two sub-platforms 13 are slidably installed on the opposite side walls of the main platform 12, the two racks 42 are fixedly connected to the two sub-platforms 13, so that the gear 41 rotates to drive the two sub-platforms 13 to move closer or farther away from each other; when dismantling, the racks 42 can be disassembled from the two sub-platforms 13, and finally the gear 41 is rotated to move the two racks 42 into the main platform 12, so as to facilitate subsequent transportation.
[0037] Reference Figure 3 , a positioning assembly 5 for positioning the two sub-platforms 13 is provided on the main platform 12, and the positioning assembly 5 includes a positioning block 51, a shifting block 52 and a soft belt. Two positioning blocks 51 are provided and are arranged one-to-one with the two racks 42. The rack 42 is vertically plugged and installed on the bottom of the mounting groove 21 and plugged and matched with the rack 42, so as to realize the positioning of the rack 42. The shifting block 52 is fixedly installed on the top of the two positioning blocks 51 and is used to shift the positioning block 51 upward and disengage it from the mounting groove 21 after it moves up. When positioning, the positioning block 51 is horizontally close to the rack 42 and plugged and matched with the rack 42. The positioning block 51 is moved down so that the positioning block 51 is plugged and installed on the bottom of the mounting groove 21, so as to realize the positioning of the rack 42; the soft belt is fixedly installed on the bottom of the mounting groove 21, and the soft belt is fixedly connected to the positioning block 51, so as to prevent the positioning block 51 from being lost after being removed.
[0038] Reference Figure 1 and Figure 3 The upper surfaces of the main platform 12 and the two auxiliary platforms 13 are flush and are provided with a plurality of scaffolding boards 17, which cooperate to block the mounting grooves 21. At the same time, the lower surfaces of the scaffolding boards 17 rest against the shifting blocks 52 to prevent the two positioning blocks 51 from disengaging from the two racks 42. The plurality of scaffolding boards 17 facilitate construction work for the staff and improve the flatness and stability of the construction platform 16.
[0039] Reference Figure 2 and Figure 3 A supporting mechanism 6 is provided on the frame 11 and below the two sub-platforms 13. The supporting mechanism 6 is connected to the two sub-platforms 13 and is used to support and position the two sub-platforms 13; the supporting mechanism 6 includes two supporting rods 61 and a fixing assembly 7. The two supporting rods 61 are located in a vertical plane. The two supporting rods 61 are rotatably connected by a rotating shaft 63 and form a scissors shape. The tops of the two supporting rods 61 extend to the bottom of the two sub-platforms 13 respectively and are rotatably connected to the sub-platforms 13. The connection between the supporting rods 61 and the sub-platforms 13 is located on the side of the sub-platform 13 away from the main platform 12. The rotating shaft 63 is in a horizontal state, and the axis of the rotation direction between the supporting rods 61 and the sub-platform 13 is parallel to the axis of the rotating shaft 63.
[0040] The bottoms of the two support rods 61 extend to the frame body 11 and are movably connected to the frame body 11. Avoidance holes 62 are provided at the bottoms of the two support rods 61 along their respective length directions, and a plurality of fixing holes 73 are provided vertically spaced on the frame body 11 below the positioning screw 32; two fixing components 7 are provided and are arranged one-to-one with the two support rods 61, and the fixing components 7 are used to position the two support rods 61. The fixing components 7 include a limit block 71 and a fixing screw 72, and the limit block 71 is slidably installed on the avoidance hole 62 along the length direction of the support rod 61; the fixing screw 72 passes through the limit block 71 and the fixing hole 73 and is threadedly connected with a fixing nut for positioning.
[0041] The main platform 12 and two auxiliary platforms 13 are built. Some staff members are located under the main platform 12, and the two support rods 61 are rotatably connected to the lower surface of the two auxiliary platforms 13 away from the main platform 12. The two support rods 61 move up and down to drive the two auxiliary platforms 13 to move. At the same time, some staff members are located on the main platform 12, and use the drive rod 23 to drive the gear 41 to rotate to realize the movement of the two auxiliary platforms 13, so that the positions of the two auxiliary platforms 13 are adapted to the width of the tunnel. Then the positioning assembly 5 positions the two auxiliary platforms 13, and then the staff members pass the fixing screw 72 through the limit block 71 and push the limit block The block 71 is moved to align the fixing screw 72 with the fixing hole 73, and the fixing screw 72 is pushed through the fixing hole 73, and the fixing nut is threadedly connected to the fixing screw 72, so as to position the two support rods 61. The staff on the main platform 12 set up multiple scaffolding boards 17 on the main platform 12 and the auxiliary platform 13. The scaffolding boards 17 block the installation grooves 21 and rest on the shifting blocks 52 for positioning, so as to further position the positioning assembly 5 and improve the stability after construction; and anti-slip mats can be laid on multiple scaffolding boards 17 to further improve the stability of construction.
[0042] The working principle of the embodiment of the present application is as follows: First, install multiple I-beams, and let the rollers roll on the tunnel. Fix the first layer of the frame 11 on the I-beams, set up the main platform 12, slide the telescopic member 31 onto the frame 11, adjust the position of the main platform 12, pass the positioning screw 32 through the frame 11 and the fixing hole 73, and finally thread the positioning nut onto the positioning screw 32 for positioning, install two sub-platforms 13, slide the two sub-platforms 13 onto the main platform 12 and connect them to the rack 42, and at the same time, rotatably install the two support rods 61 on the two sub-platforms 13, and fix the two load-bearing rods 81 to support and position the main platform 12.
[0043] The rotating gear 41 drives the two sub-platforms 13 to move away from each other and closer to the tunnel, and at the same time pushes the two support rods 61 to drive the two sub-platforms 13 to move, so as to cooperate with each other to adjust the positions of the two sub-platforms 13 to adapt to the width of the tunnel. After the adjustment is completed, the two positioning blocks 51 are plugged and installed on the bottom of the installation groove 21 and the two racks 42 for positioning. At the same time, the fixing screw 72 is passed through the limit block 71 and the fixing hole 73, and the fixing nut is threadedly connected to the fixing screw 72 for positioning. Finally, multiple scaffolding boards 17 are erected on the main platform 12 and the two sub-platforms 13, thereby completing the erection of a layer of construction platform 16.
[0044] Continue to erect structures such as the frame 11, main platform 12, auxiliary platform 13, and support mechanism 6 upwards. When erecting the frame 11, it is fixedly connected to the main platform 12 or frame 11 located below, so as to realize installation on multiple construction platforms 16. At the same time, ladders are fixedly installed on two adjacent construction platforms 16 to realize the movement of workers between multiple construction platforms 16, so that the width and height of the scaffolding can be adapted to the width and height of the tunnel, thereby improving the efficiency of waterproofing construction. Then, tunnel waterproofing construction is carried out. After the construction is completed, the frame 11 is pushed so that the frame 11 and the I-beam are moved on the tunnel by rollers. After the movement is completed, the frame 11 and the I-beam are positioned under the action of gravity, and then the tunnel waterproofing construction is continued, thereby improving the efficiency of waterproofing construction.
[0045] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A tunnel waterproof construction scaffold, characterized in that: include: A frame (11), the frame (11) being arranged on an I-beam, the I-beam being provided with rollers, the frame (11) and the I-beam being moved by the rollers and being positioned under the action of gravity; A main platform (12), the main platform (12) being arranged on the frame (11) via a telescopic component one (3), the telescopic component one (3) being used to adjust the position of the main platform (12) in the vertical direction; A secondary platform (13), the secondary platform (13) is arranged on the main platform (12) through a second telescopic component (4), the second telescopic component (4) is used to adjust the distance of the secondary platform (13) in the horizontal direction, and the secondary platform (13) and the main platform (12) cooperate to form a construction platform (16) for construction.
2. A tunnel waterproof construction scaffold according to claim 1, characterized in that: The telescopic component one (3) comprises: A telescopic member (31), the telescopic member (31) being arranged on the main platform (12) and slidably arranged on the frame (11) and having a plurality of positioning holes (33) spaced apart vertically; A positioning screw (32), wherein the positioning screw (32) passes through the frame (11) and the positioning hole (33) and is threadedly connected with a positioning nut for positioning.
3. A tunnel waterproof construction scaffold according to claim 1, characterized in that: The auxiliary platforms (13) are provided with two and are located on both sides of the main platform (12), and the telescopic component 2 (4) comprises: a gear (41), the gear (41) being rotatably disposed on the main platform (12) via a rotating column (22), the rotating column (22) being provided with a driving rod (23) for driving the rotating column (22) to rotate; Two racks (42), the two racks (42) are respectively detachably arranged on the two auxiliary platforms (13) and are located on both sides of the gear (41) and are meshed with the gear (41); the gear (41) rotates to drive the two racks (42) to move and is used to achieve the two auxiliary platforms (13) to move closer to or farther away from each other.
4. A tunnel waterproof construction scaffold according to claim 3, characterized in that: A support mechanism (6) connected to the two sub-platforms (13) is provided on the frame (11) and below the two sub-platforms (13). The support mechanism (6) is used to support and position the two sub-platforms (13). The support mechanism (6) comprises: Two support rods (61), the two support rods (61) are rotatably connected to each other via a rotating shaft (63) and are scissor-shaped, the tops of the two support rods (61) are rotatably connected to the lower surfaces of the two auxiliary platforms (13) on a side away from the main platform (12), and the bottoms of the two support rods (61) are movably connected to the frame (11); A fixing assembly (7), wherein the fixing assembly (7) is used to position the bottoms of the two support rods (61).
5. A tunnel waterproof construction scaffold according to claim 4, characterized in that: The fixing components (7) are provided with two and one-to-one correspondence with the two support rods (61), the bottom of the support rod (61) is provided with a position avoidance hole (62) along the length direction of the support rod (61), and a plurality of fixing holes (73) are provided on the frame (11) at vertical intervals. The fixing components (7) include: A limit block (71), wherein the limit block (71) is slidably disposed on the avoidance hole (62); A fixing screw rod (72), wherein the fixing screw rod (72) passes through the limiting block (71) and the fixing hole (73) and is threadedly connected to a fixing nut for fixing.
6. A tunnel waterproof construction scaffold according to claim 4, characterized in that: The main platform (12) is provided with a positioning component (5) for positioning the rack (42).
7. A tunnel waterproof construction scaffold according to claim 6, characterized in that: The positioning component (5) comprises: A positioning block (51), the positioning block (51) is plug-fitted and installed on the main platform (12) and plug-fitted with the rack (42) for positioning; a shifting block (52), the shifting block (52) being arranged on the positioning block (51) and being used to provide leverage when the positioning block (51) is shifted away from the main platform (12); A soft belt, wherein the soft belt is arranged on the positioning block (51) and connected to the main platform (12).
8. A tunnel waterproof construction scaffold according to claim 7, characterized in that: The main platform (12) is provided with a mounting groove (21), the gear (41) and the positioning assembly (5) are both located in the mounting groove (21), and a plurality of scaffolding boards (17) are provided on the upper surfaces of the main platform (12) and the auxiliary platform (13), the scaffolding boards (17) block the mounting groove (21) and abut against the top of the positioning block (51) to prevent the positioning block (51) from being separated from the main platform (12).
9. A tunnel waterproof construction scaffold according to claim 1, characterized in that: A plurality of the construction platforms (16) are arranged vertically at intervals, and two adjacent construction platforms (16) are connected to each other via a detachable ladder.