Quick starting system suitable for all-working-condition steam turbine of once-through boiler
By introducing high-temperature water energy recovery and electromagnetic heating devices into the DC boiler full-condition steam turbine, the problem of difficulty in starting the boiler in cold state when the power plant is completely shut down and the lack of a cooling water source in the high-side system is solved, and the water supply temperature is increased and the unit is fast , stable extremely hot start.
Patent Information
- Application Number
- CN202411173863.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2024-11-19
AI Technical Summary
When the power plant is completely shut down, if the boiler and external steam source are not started, the boiler cannot start quickly, the water temperature of the water supply system is low, and the high-side system lacks suitable cooling water sources when starting the non-stop unit, resulting in increased startup difficulties and risks .
A rapid start system suitable for the full working conditions of DC boilers is designed, including a high-temperature water energy recovery system, an electromagnetic heating device and a high-side temperature reduction water source supply. The high-temperature water is recovered through the boiler hydrophobic system, and the water supply temperature is increased by starting water supply pump. , and quickly heat the water in the deaerator, and use the high-temperature and high-pressure feed water of the non-stop unit as a high-side cooling water source.
The water supply temperature is increased, the switching risks of boiler hydrophobic system and water supply system are reduced, the rapid start-up of the unit and stable operation in extremely hot states, and the investment risk of high-side systems is reduced.
Smart Images

Figure CN118979796A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of thermoelectric technology, and in particular to a rapid starting system suitable for a steam turbine of a direct current boiler under full working conditions. Background Art
[0002] During the construction of power plants, oil-fired starting boilers and steam-driven feedwater pumps are usually built, with electric feedwater pumps as backup. In order to save construction costs, some power plants do not build electric feedwater pumps. After the entire plant is shut down, the unit needs to ignite the starting boiler before it can be restarted to generate qualified steam as the steam source for driving the steam-driven feedwater pump, the heating steam source for the deaerator, the auxiliary steam user, and the shaft seal steam source. When the starting boiler cannot be used, units with electric feedwater pumps or using condensate to feed water to the boiler can be started without auxiliary steam. However, when the power plant is completely shut down, there is no starting boiler, no external steam source, and no heating steam source for the deaerator to feed water to the boiler, the following conditions will occur:
[0003] 1. When the boiler is cold, the pre-pump can meet the water supply requirements for the boiler, but cannot meet the water supply requirements after the boiler is ignited.
[0004] 2. When the unit is started, the boiler starts draining and then returns it to the turbine condenser through the start-up drain pump after it passes the test, which is not conducive to the recovery of working fluid heat and the rapid start-up of the unit;
[0005] 3. For units that use condensate to start the boiler, the feed water system has been using condensate before the steam-driven feed water pump is connected in parallel, and the water temperature is low, which is not conducive to the safe and economical operation of the boiler; for units that use condensate to start the boiler, the risks of connecting the feed water pump in parallel and switching the boiler drain system are relatively high;
[0006] 4. The deaerator has no heating device. The water inside the deaerator cannot be heated at the initial startup, which is not conducive to the rapid startup of the unit.
[0007] 5. Under extremely hot conditions, the steam source for the small steam pump of the non-shutdown unit comes from the auxiliary steam header, and the steam source for the auxiliary steam header is taken from the cold recirculation. In order to ensure the continuity of the cold recirculation steam supply, the high bypass system needs to be put into operation. The temperature of the unit that has just been shut down is relatively high, and there is no suitable high bypass cooling water source, so the high bypass system cannot be put into operation, which can easily form a dead loop. Summary of the invention
[0008] The purpose of the present invention is to provide a quick start system suitable for a steam turbine of a direct current boiler under full working conditions to solve the above technical problems in view of the above shortcomings.
[0009] In order to achieve the above object, the present invention adopts the following technical solutions:
[0010] A quick start system suitable for a steam turbine of a direct current boiler under full working conditions comprises a high-pressure cylinder input end connected to a main steam pipe of a boiler, an output end of the high-pressure cylinder connected to an input end of a boiler reheater through a pipeline one, an output end of the boiler reheater connected to an input end of a medium-pressure cylinder through a pipeline two, an output end of the medium-pressure cylinder connected to an input end of a low-pressure cylinder through a pipeline three, an output end of the low-pressure cylinder connected to a boiler drain system, a water outlet end of the boiler drain system connected to a high-temperature water energy recovery system, an output end of the high-temperature water energy recovery system connected to a separator group, an output end of the separator group connected to a superheater group and a water storage tank, a steam outlet end of the superheater group connected to a high-pressure cylinder through a steam pipe, a water outlet end of the water storage tank connected to a boiler drain expansion tank through a pipeline four, a water outlet end of the boiler drain expansion tank connected to a drain tank, and a water outlet end of the drain tank connected to the boiler drain system through a pipeline five.
[0011] Furthermore, the boiler drain system includes a condenser, the water outlet end of the drain tank is connected to the drainage end of the condenser through pipe five, drain pipe one and drain pipe two are connected in parallel on the pipe five, drain pump A and drain pump B are installed on the drain pipe one and drain pipe two, respectively, and the pipe two is connected to the input end of the condenser through a low bypass pipe.
[0012] Furthermore, the high-temperature water energy recovery system includes a deaerator, a pipe six used to connect the input end of the deaerator and the water outlet end of the condenser, a low-pressure heating group and two condensate pump pipes in parallel are arranged on the pipe six, and the two condensate pump pipes are respectively provided with a condensate pump A and a condensate pump B, a pipe seven and a pipe eight are connected in parallel to the output end of the deaerator, the ends of the pipes seven and eight are connected to the pipe nine, the pipe nine is connected to the separator group, the pipe seven is provided with an A pre-pump and an A feed water pump, the pipe eight is provided with a B pre-pump and a B feed water pump, a starting feed water pump is connected in parallel on the pipe seven at the A pre-pump, and the pipe nine is connected to the high-pressure heating group, a drain pipe and an economizer.
[0013] Furthermore, the low-pressure heating group includes a low-pressure heating pipe connected to the pipe six at both ends, and a plurality of low-pressure heaters connected in series on the low-pressure heating pipe; the high-pressure heating group includes a high-pressure heating pipe connected to the pipe nine at both ends, and a plurality of high-pressure heaters connected in series on the high-pressure heating pipe.
[0014] Furthermore, the high-temperature iron removal and temperature return system includes a temperature return pipe used to connect the pipeline five and the low-pressure heating pipeline, and a high-temperature iron remover is arranged on the temperature return pipe.
[0015] Furthermore, an electromagnetic heating device is also provided on the pipeline 6, and the electromagnetic heating device is arranged close to the water inlet end of the deaerator.
[0016] Furthermore, the separator group includes a separation main pipe, one end of which is connected to two separation branch pipes of the separation main pipe, on which separators A and B are respectively installed, one end of the separation branch pipe away from the separation main pipe is connected to the superheater group, and one end of the separation main pipe is connected to the water inlet end of the water storage tank.
[0017] Furthermore, the water outlet of the water storage tank is connected to a pipe 10; the superheater group includes a superheating pipe 1 and a superheating pipe 2 connected to two separate branch pipes, and along the flow direction of water, the superheating pipe 1 and the superheating pipe 2 are sequentially provided with a low-temperature superheater, a screen superheater, a secondary desuperheater and a high-temperature superheater, and one end of the pipe 11 is connected to the superheating pipe 2, and the pipe 11 is arranged between the secondary desuperheater and the high-temperature superheater, and one end of the pipe 11 is connected to the water outlet of the water storage tank.
[0018] Furthermore, it also includes a high bypass pipe connecting the steam pipe and pipeline 1, one end of which is connected to the water supply pipe of the high bypass pipe, and the other end of the water supply pipe is connected to the initial boiler system of the non-shutdown unit.
[0019] The beneficial effects of the present invention are:
[0020] 1. Add a high-temperature water energy recovery system at the outlet of the boiler drain system. When the boiler drain is qualified, the high-temperature water is recovered through the boiler drain system through this system to increase the feed water temperature;
[0021] Second, by connecting a starting water supply pump with a flow rate of 200T / H and a pressure of 4.0Mpa in parallel to the A front pump, the outlet head of the front pump can be increased, replacing the condensate water to feed the boiler water starting system and optimizing the boiler water supply plan. In addition, when the boiler is ignited and the deaerator is ready for heating, the heating system can be put into use in time to increase the water supply temperature. At the same time, the startup process eliminates the process of condensate water feeding the boiler, avoiding the risk of switching between the boiler drain system and the water supply system;
[0022] 3. By installing an electromagnetic heating device on pipe 6, the water inside the deaerator can be quickly heated at the initial start-up, which is conducive to the rapid start-up of the unit;
[0023] 4. Modify the drainage of the original water supply pipeline and utilize the high-temperature, high-pressure feed water retained in the boiler system in the initial stage of the non-shutdown unit to reversely flow as the unit's high-bypass cooling water backup water source, ensure the high-bypass system is reliably put into use, and ensure that the steam source of the steam pump is stable and reliable when the unit is started in an extremely hot state. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the following is a brief introduction to the drawings required for the specific embodiments or the description of the prior art. In all the drawings, similar elements or parts are generally identified by similar reference numerals. In the drawings, the elements or parts are not necessarily drawn according to the actual scale.
[0025] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0026] Figure 2 This is a schematic diagram of the structure after starting the water supply pump in the present invention; DETAILED DESCRIPTION
[0027] See also Figure 1-2 As shown, the present embodiment provides a rapid start-up system suitable for a steam turbine of a direct current boiler under full working conditions, comprising an input end of a high-pressure cylinder 1 connected to a main steam pipe of the boiler, an output end of the high-pressure cylinder 1 connected to an input end of a boiler reheater 3 through a pipe 1 201, an output end of the boiler reheater 3 connected to an input end of an intermediate-pressure cylinder 4 through a pipe 202, an output end of the intermediate-pressure cylinder 4 connected to an input end of a low-pressure cylinder 5 through a pipe 3 203, an output end of the low-pressure cylinder 5 connected to a boiler drain system, a water outlet end of the boiler drain system connected to a high-temperature water energy recovery system, an output end of the high-temperature water energy recovery system connected to a separator group, an output end of the separator group connected to a superheater group and a water storage tank 6, a steam outlet end of the superheater group connected to the high-pressure cylinder 1 through a steam pipe, a water outlet end of the water storage tank 6 connected to a boiler drain expansion tank 7 through a pipe 4 204, a water outlet end of the boiler drain expansion tank 7 connected to a drain tank 8, and a water outlet end of the drain tank 8 connected to the boiler drain system through a pipe 5 205.
[0028] A high-temperature water energy recovery system is added to the outlet of the boiler drain system. When the boiler drain is qualified, the high-temperature water is recovered by the boiler drain system through this system to increase the feed water temperature; by connecting a starter feed water pump 1009 with a flow rate of 200T / H and a pressure of 4.0Mpa in parallel to the A pre-pump 1005, it can not only increase the outlet head of the pre-pump, replace the condensate water to feed the boiler water start-up system, optimize the boiler water supply plan, but also can timely start the heating system when the deaerator 1001 is heated after the boiler is ignited to increase the feed water temperature. The startup process eliminates the process of condensate water feeding the boiler, avoiding the risk of switching between the boiler drain system and the water supply system; by installing an electromagnetic heating device on pipeline 6 206, the water inside the deaerator 1001 can be quickly heated at the initial startup, which is conducive to the rapid startup of the unit; the original water supply pipe 131 is modified to drain the water, and the high-temperature and high-pressure feed water retained in the boiler system in the initial stage of the non-shutdown unit is used to reversely flow as the unit's high-bypass cooling water backup water source, ensuring the reliable commissioning of the high-bypass system and ensuring that the steam source of the steam pump is stable and reliable when the unit is started in an extremely hot state.
[0029] See also Figure 1-2 As shown, the boiler drain system includes a condenser 91, and the water outlet end of the drain box 8 is connected to the drainage end of the condenser 91 through a pipe 5 205, and a drain pipe 1 2051 and a drain pipe 2 2052 are connected in parallel to the pipe 5 205, and the drain pipe 1 2051 and the drain pipe 2 2052 are respectively installed with an A drain pump 2053 and a B drain pump 2054, and the pipe 2 202 is connected to the input end of the condenser 91 through a low bypass pipe 10.
[0030] See also Figure 1-2As shown, the high-temperature water energy recovery system includes a deaerator 1001, a pipe 6 206 used to connect the input end of the deaerator 1001 and the water outlet end of the condenser 91, the pipe 6 206 is provided with a low-pressure group and two parallel condensate pump pipes 1002, the two condensate pump pipes 1002 are respectively provided with an A condensate pump 1003 and a B condensate pump 1004, the output end of the deaerator 1001 is connected in parallel with a pipe 7 207 and a pipe 8 208, the ends of the pipe 7 207 and the pipe 8 208 are connected to a pipe 9 209, the pipe 9 209 is connected to the separator group, the pipe 7 207 is provided with an A pre-pump 1005 and an A feed water pump 1006, and the pipe 8 208 is provided with B pre-pump 1007 and B feed water pump 1008, a starting feed water pump 1009 is connected in parallel to the pipe seven 207 at the A pre-pump 1005, and the pipe nine 209 is connected to the high pressure heating group, the drain pipe 1010 and the economizer 1011; in this embodiment, by connecting a starting feed water pump 1009 with a flow rate of 200T / H and a pressure of 4.0Mpa in parallel to the A pre-pump 1005, it can not only increase the outlet head of the pre-pump, replace the condensate water to feed the boiler water starting system, optimize the boiler water supply plan, but also can timely start the heating system when the deaerator 1001 is heated after the boiler is ignited to increase the feed water temperature, and at the same time, the startup process eliminates the condensate water supply process to the boiler, avoiding the risk of switching between the boiler drain system and the feed water system.
[0031] See also Figure 1-2 As shown, the LP heater group includes a LP heater pipe 1012 connected to the pipe six 206 at both ends, and a plurality of low-pressure heaters 1013 connected in series to the LP heater pipe 1012; the HP heater group includes a HP heater pipe 1014 connected to the pipe nine 209 at both ends, and a plurality of high-pressure heaters 1015 connected in series to the HP heater pipe 1014.
[0032] See also Figure 1-2 As shown, an electromagnetic heating device is also provided on the pipeline 6 206, and the electromagnetic heating device is arranged close to the water inlet end of the deaerator 1001; in this embodiment, by arranging the electromagnetic heating device on the pipeline 6 206, the water inside the deaerator 1001 can be quickly heated at the initial start-up stage, which is beneficial to the rapid start-up of the unit.
[0033] See also Figure 1-2 As shown, the high-temperature iron removal and regeneration system includes a regeneration pipe 1016 used to connect the pipeline 5 205 and the low-pressure pipeline 1012, and a high-temperature iron remover 1017 is arranged on the regeneration pipe 1016; in this embodiment, by arranging the regeneration pipe 1016 and the high-temperature iron remover 1017, energy can be further recovered, the inlet temperature of the deaerator 1001 can be increased, and the feed water temperature can be increased.
[0034] See also Figure 1-2As shown, the separator group includes a separation main pipe 1101, one end of which is connected to two separation branch pipes 1102 of the separation main pipe 1101, on which separator A 1103 and separator B 1104 are respectively installed, one end of the separation branch pipe 1102 away from the separation main pipe 1101 is connected to the superheater group, and one end of the separation main pipe 1101 is connected to the water inlet end of the water storage tank 6.
[0035] See also Figure 1-2 As shown, the water outlet end of the water storage tank 6 is connected to a pipe ten 210; the superheater group includes a superheating pipe one 1201 and a superheating pipe two 1202 connected to two separated branch pipes 1102, and along the flow direction of water, the superheating pipe one 1201 and the superheating pipe two 1202 are sequentially provided with a low-temperature superheater 1203, a screen superheater 1204, a secondary desuperheater 1205 and a high-temperature superheater 1206, and a pipe eleven 211 connected to the superheating pipe two 1202 at one end, and the pipe eleven 211 is arranged between the secondary desuperheater 1205 and the high-temperature superheater 1206, and one end of the pipe eleven 211 is connected to the water outlet end of the water storage tank 6.
[0036] See also Figure 1-2 As shown, it also includes a high bypass pipe 13 connecting the steam pipe and the pipe 1 201, one end of which is connected to a water supply pipe 131 of the high bypass pipe 13, and the other end of the water supply pipe 131 is connected to the initial boiler system of the non-shutdown unit; in this embodiment, the initial boiler system of the non-shutdown unit can be the water circulation system of the economizer 1011 working unit chassis in other working units, and the high-temperature and high-pressure feed water retained in other working units is reversely flowed through the water supply pipe 131 and the high bypass pipe 13 as a backup water source for high bypass cooling water in this system, ensuring the reliable input of the high bypass system and ensuring that the steam source of the steam pump small machine is stable and reliable when the unit is started in an extremely hot state.
[0037] The specific embodiments described herein are merely examples of the spirit of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in similar ways without departing from the scope defined by the spirit of the present invention.
Claims
1. A quick start system for steam turbines in full working conditions of once-through boilers. Features: The invention comprises an input end of a high-pressure cylinder (1) connected to a main steam pipe of a boiler, an output end of the high-pressure cylinder (1) connected to an input end of a boiler reheater (3) through a first pipe (201), an output end of the boiler reheater (3) connected to an input end of a medium-pressure cylinder (4) through a second pipe (202), an output end of the medium-pressure cylinder (4) connected to an input end of a low-pressure cylinder (5) through a third pipe (203), an output end of the low-pressure cylinder (5) connected to a boiler drain system, and a water outlet end of the boiler drain system connected to a high-temperature water energy recovery system. The high-temperature water energy recovery system is connected to a separator group, the output end of the separator group is connected to a superheater group and a water storage tank (6), the steam outlet end of the superheater group is connected to a high-pressure cylinder (1) through a steam pipe, the water outlet end of the water storage tank (6) is connected to a boiler drain expansion tank (7) through a pipeline four (204), the water outlet end of the boiler drain expansion tank (7) is connected to a drain tank (8), and the water outlet end of the drain tank (8) is connected to a boiler drain system through a pipeline five (205) via a high-temperature iron remover.
2. A quick start system for a steam turbine of a once-through boiler under full working conditions according to claim 1, Features: The boiler drain system comprises a condenser (91); the water outlet end of the drain tank (8) is connected to the drainage end of the condenser (91) via a pipe five (205); a drain pipe one (2051) and a drain pipe two (2052) are connected in parallel to the pipe five (205); a drain pump A (2053) and a drain pump B (2054) are respectively installed on the drain pipe one (2051) and the drain pipe two (2052); the pipe two (202) is connected to the input end of the condenser (91) via a low bypass pipe (10).
3. A quick start system for a steam turbine of a once-through boiler under full working conditions according to claim 2, Features: The high-temperature water energy recovery system comprises a deaerator (1001), an input end of the deaerator (1001) is connected to a high-temperature iron removal and temperature recovery system, a pipeline six (206) is used at the water outlet of the condenser (91), a low-pressure heating group and two parallel condensate pump pipes (1002) are arranged on the pipeline six (206), and the two condensate pump pipes (1002) are respectively provided with an A condensate pump (1003) and a B condensate pump (1004), the output end of the deaerator (1001) is connected in parallel with a pipeline seven (207) and a pipeline eight (208), and the pipeline seven The ends of pipeline (207) and pipeline eight (208) are connected to pipeline nine (209), and the pipeline nine (209) is connected to the separator group. The pipeline seven (207) is provided with an A pre-pump (1005) and an A feed water pump (1006), and the pipeline eight (208) is provided with a B pre-pump (1007) and a B feed water pump (1008). A starting feed water pump (1009) is connected in parallel to the pipeline seven (207) at the A pre-pump (1005), and the pipeline nine (209) is connected to a high pressure heating group, a drain pipe (1010) and an economizer (1011).
4. A quick start system for a steam turbine of a once-through boiler under full working conditions according to claim 3, Features: The low-pressure heater group includes a low-pressure heater pipeline (1012) whose two ends are connected to the pipeline six (206), and a plurality of low-pressure heaters (1013) connected in series to the low-pressure heater pipeline (1012); the high-pressure heater group includes a high-pressure heater pipeline (1014) whose two ends are connected to the pipeline nine (209), and a plurality of high-pressure heaters (1015) connected in series to the high-pressure heater pipeline (1014).
5. A quick start system for a steam turbine of a once-through boiler under full working conditions according to claim 4, Features: The high-temperature iron removal and temperature return system comprises a temperature return pipe (1016) used to connect the pipeline five (205) and the low-pressure heating pipeline (1012), and a high-temperature iron remover (1017) is arranged on the temperature return pipe (1016).
6. A quick start system for a steam turbine of a once-through boiler under full working conditions according to claim 3, Features: The pipeline six (206) is also provided with an electromagnetic heating device, and the electromagnetic heating device is arranged close to the water inlet end of the deaerator (1001).
7. A quick start system for a steam turbine of a once-through boiler under full working conditions according to claim 1, Features: The separator group comprises a separation main pipe (1101), one end of which is connected to two separation branch pipes (1102) of the separation main pipe (1101), a separator A (1103) and a separator B (1104) being respectively installed on the two separation branch pipes (1102), one end of the separation branch pipe (1102) away from the separation main pipe (1101) being connected to the superheater group, and one end of the separation main pipe (1101) being connected to the water inlet end of the water storage tank (6).
8. A quick start system for a steam turbine of a once-through boiler under full working conditions according to claim 7, Features: The water outlet of the water storage tank (6) is connected to a pipe 10 (210); the superheater group comprises a superheating pipe 1 (1201) and a superheating pipe 2 (1202) connected to two separated branch pipes (1102); along the flow direction of water, the superheating pipe 1 (1201) and the superheating pipe 2 (1202) are provided with a low-temperature superheater (1203), a platen superheater (1204), a secondary desuperheater (1205) and a high-temperature superheater (1206) in sequence; one end of the pipe 11 (211) is connected to the superheating pipe 2 (1202); the pipe 11 (211) is provided between the secondary desuperheater (1205) and the high-temperature superheater (1206); one end of the pipe 11 (211) is connected to the water outlet of the water storage tank (6).
9. A quick start system for a steam turbine of a once-through boiler under full working conditions according to claim 4, Features: It also includes a high bypass pipe (13) connecting the main steam pipe and pipe one (201), one end of which is connected to the water supply pipe (131) of the high bypass pipe (13), and the other end of the reheat cold section steam pipe (131) is connected to the initial boiler system of the non-shutdown unit.