Construction method based on auxiliary construction of titanium alloy structure

Through BIM technology and deep neural network detection model, the problems of complexity of titanium alloy materials and inefficient management of consumable parts in civil engineering are solved, and more efficient and safer construction processes and engineering quality improvements are achieved.

CN118981818APending Publication Date: 2024-11-19SHENZHEN NAO JIANGLAN INVESTMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411011289.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

In the field of civil engineering, especially in large-scale infrastructure construction, the construction process of titanium alloy materials is complex, and traditional two-dimensional design drawings cannot visually display the entire project, resulting in design errors and progress impacts; the processing of consumable parts mainly depends on manual labor. Inspection and manual operation are inefficient and difficult to ensure construction quality and safety.

Method used

The three-dimensional model generation and deep neural network detection model based on BIM technology are adopted to automatically identify consumable parts and mark their replacement properties, generate target construction plans, and improve the efficiency and accuracy of design and construction.

Benefits of technology

Through BIM technology, the overall project is intuitively displayed, the management of consumable parts is optimized, the construction efficiency and safety of titanium alloy materials are improved, the quality of the project is improved, and design errors and construction errors are avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118981818A_ABST
    Figure CN118981818A_ABST
Patent Text Reader

Abstract

The invention provides a construction method based on titanium alloy structure auxiliary construction, and the method comprises the steps: correspondingly obtaining building information in response to a user request, the building information comprising a BIM power transmission and transformation project model, a construction environment model and an equipment position model; generating a target building three-dimensional model according to the BIM power transmission and transformation project model, the construction environment model and the equipment position model; determining easily-worn parts according to the target building three-dimensional model; the replacement attribute corresponding to the easy-to-wear part is determined, the replacement attribute comprises a replaceable attribute and a replacement-free attribute, and the easy-to-wear part with the replaceable replacement attribute is marked as a replacement part; and generating a target construction scheme according to the replacement part and the target building three-dimensional model. The design efficiency and accuracy are improved; the management of easily-worn parts is optimized; the construction efficiency and safety of the titanium alloy material are improved; the engineering quality is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of civil engineering, and in particular to a construction method based on titanium alloy structure-assisted construction. Background Art

[0002] In the field of civil engineering, especially in the field of large-scale infrastructure construction, such as power transmission and transformation projects, the construction process is complex and involves a large amount of building structure design and construction.

[0003] At the same time, with the development of science and technology, the application of building information modeling (BIM) technology in the field of civil engineering is becoming more and more extensive. It can intuitively display the overall picture of the project and improve the efficiency and accuracy of the design. In the field of building structures, titanium alloys are widely used in various building structures due to their advantages such as high strength, light weight, and corrosion resistance. However, the operation of titanium alloys during the construction process is difficult and requires special equipment and technology. In the field of titanium alloy material science, how to better apply the advantages of titanium alloys to the field of civil engineering is an important research direction at present.

[0004] The existing solution is mainly to carry out construction through traditional two-dimensional design drawings. Although this method can meet basic construction needs, it cannot intuitively display the overall picture of the project, and is prone to design errors, which affects the quality and progress of the project. At the same time, in dealing with the problem of consumable parts, it is mainly through manual inspection and replacement. This method is not only inefficient, but also prone to omissions or wrong replacements. Finally, the existing method of dealing with the application of titanium alloy materials is mainly through manual operation. This method is not only inefficient, but also difficult to ensure the quality and safety of construction. Summary of the invention

[0005] In view of the above problems, the present application is proposed to provide a construction method based on titanium alloy structure auxiliary construction to overcome the above problems or at least partially solve the above problems, comprising:

[0006] A construction method based on titanium alloy structure auxiliary construction, the method comprising:

[0007] Responding to the user's request, obtaining building information, wherein the building information includes a BIM power transmission and transformation project model, a construction environment model, and an equipment location model;

[0008] Generate a three-dimensional model of the target building based on the BIM power transmission and transformation engineering model, the construction environment model and the equipment location model;

[0009] Determining consumable parts according to the three-dimensional model of the target building;

[0010] Determine a replacement attribute corresponding to the consumable part, wherein the replacement attribute includes replaceable and no need to be replaced, and mark the consumable part whose replacement attribute is replaceable as a replacement part;

[0011] A target construction plan is generated based on the replacement parts and the target building three-dimensional model.

[0012] Furthermore, the step of obtaining building information in response to a user request includes:

[0013] Responding to the user's request, obtaining target architectural drawing information in the architectural drawing;

[0014] The building information is generated according to the target building drawing information and the real-time building image data.

[0015] Furthermore, the step of generating a target building three-dimensional model based on the BIM power transmission and transformation engineering model, the construction environment model and the equipment location model includes:

[0016] Generate a digital twin model based on the BIM power transmission and transformation engineering model;

[0017] The target building three-dimensional model is generated based on the digital twin model, the construction environment model and the coordinate system position information corresponding to the equipment position model.

[0018] Furthermore, the step of determining consumable parts based on the target building three-dimensional model includes:

[0019] Acquire appearance image information in the target building three-dimensional model, wherein the appearance image information includes an image of a smart device and an image of a connector;

[0020] Determining a loss category according to the smart device image and the connector image;

[0021] constructing an appearance image dataset according to the wear category, the smart device image, and the connector image;

[0022] Using the appearance image dataset to perform deep neural network learning to generate a detection model that can be used to detect loss;

[0023] Determining the degree of wear of all components in the three-dimensional model of the target building according to the detection model;

[0024] determining component properties corresponding to all of the components;

[0025] The consumable parts are determined according to all the components, the component properties corresponding to all the components, the wear degrees and preset component loss rules.

[0026] Furthermore, the step of determining the consumable parts according to all the components, the component attributes corresponding to all the components, the wear degree and the preset component loss rules includes:

[0027] Acquire a target component among all the components and a target wear degree corresponding to the target component;

[0028] Determining a target component attribute corresponding to the target component based on the target component and the component attribute;

[0029] Determining a target loss threshold corresponding to the target component attribute according to the target component attribute and the preset component loss rule;

[0030] Determining whether it is the consumable part according to the target loss threshold and the target wear degree;

[0031] When the target wear degree is less than the target wear threshold, the target component is determined to be a non-consumable component; or, when the target wear degree is greater than the target wear threshold, the target component is determined to be a consumable component.

[0032] Further, the step of determining a replacement attribute corresponding to the consumable part, wherein the replacement attribute includes replaceable and no need to be replaced, and marking the consumable part having the replaceable replacement attribute as a replacement part, comprises:

[0033] Acquire object properties corresponding to the consumable parts, wherein the object properties include fixed parts and consumable parts;

[0034] Filter the object attribute to be the target consumable part of the consumable part;

[0035] Acquiring material information corresponding to the target consumable part;

[0036] Determining whether the target consumable part is replaceable according to the material information;

[0037] When the material information is titanium alloy material, the replacement attribute of the target consumable part is determined to be no need to be replaced; or, when the material information is non-titanium alloy material, the replacement attribute of the target consumable part is determined to be replaceable, and the target consumable part is marked as the replacement part.

[0038] Furthermore, the step of generating a target construction plan based on the replacement part and the target building three-dimensional model includes:

[0039] Determining a target position corresponding to the replacement part according to the replacement part and the target building three-dimensional model;

[0040] Generating construction information according to the target position and the replacement part, wherein the construction information includes the model, quantity and installation position corresponding to the replacement part;

[0041] The target construction plan is generated according to the model, the quantity, and the installation location.

[0042] In one embodiment of the present application, a construction system based on titanium alloy structure auxiliary construction is also disclosed, and the system includes:

[0043] An acquisition module, configured to acquire building information in response to a user request, wherein the building information includes a BIM power transmission and transformation engineering model, a construction environment model, and an equipment location model;

[0044] A first generating module is used to generate a target building three-dimensional model based on the BIM power transmission and transformation engineering model, the construction environment model and the equipment location model;

[0045] A first determination module, used to determine consumable parts according to the target building three-dimensional model;

[0046] A second determining module is used to determine a replacement attribute corresponding to the consumable part, wherein the replacement attribute includes replaceable and no need to be replaced, and mark the consumable part whose replacement attribute is replaceable as a replacement part;

[0047] The second generating module is used to generate a target construction plan based on the replacement parts and the target building three-dimensional model.

[0048] In one embodiment of the present application, a computer device is also disclosed, including a processor, a memory, and a computer program stored in the memory and capable of running on the processor. When the computer program is executed by the processor, the steps of a construction method based on titanium alloy structure assisted construction as described above are implemented.

[0049] In one embodiment of the present application, a computer-readable storage medium is further disclosed, on which a computer program is stored. When the computer program is executed by a processor, the steps of the construction method based on titanium alloy structure assisted construction as described above are implemented.

[0050] This application has the following advantages:

[0051] In the embodiments of the present application, compared with the prior art, "the existing solution is mainly to carry out construction through traditional two-dimensional design drawings. Although this method can meet the basic construction needs, it cannot intuitively display the overall picture of the project, and is prone to design errors, which affects the quality and progress of the project. At the same time, in dealing with the problem of consumable parts, it is mainly through manual inspection and replacement. This method is not only inefficient, but also prone to omissions or wrong replacements. Finally, in dealing with the application problems of titanium alloy materials, the existing methods are mainly through manual operations. This method is not only inefficient, but also difficult to ensure the quality and safety of construction", this application provides a solution of "a construction method based on titanium alloy structure auxiliary construction". The specific case is: "A construction method based on titanium alloy structure assisted construction, the method comprising: obtaining building information in response to user requests, wherein the building information includes a BIM power transmission and transformation engineering model, a construction environment model, and an equipment location model; generating a target building three-dimensional model based on the BIM power transmission and transformation engineering model, the construction environment model, and the equipment location model; determining consumable parts based on the target building three-dimensional model; determining replacement attributes corresponding to the consumable parts, wherein the replacement attributes include replaceable and no need to be replaced, and marking the consumable parts with the replacement attribute of replaceable as replacement parts; generating a target construction plan based on the replacement parts and the target building three-dimensional model." By "determining the replacement attributes corresponding to the consumable parts, wherein the replacement attributes include replaceable and no need to replace, and marking the consumable parts with the replacement attribute of replaceable as replacement parts; generating a target construction plan based on the replacement parts and the target building three-dimensional model", the problem of "the existing solutions are mainly carried out through traditional two-dimensional design drawings. Although this method can meet basic construction needs, it cannot intuitively display the overall picture of the project, and is prone to design errors, affecting the quality and progress of the project. At the same time, in dealing with the problem of consumable parts, it is mainly through manual inspection and replacement, which is not only inefficient, but also prone to missed or wrong replacement.Finally, the existing methods for dealing with the application of titanium alloy materials mainly rely on manual operations, which is not only inefficient but also difficult to ensure the quality and safety of construction". The problem of "improving design efficiency and accuracy. By using BIM technology, the overall picture of the project can be intuitively displayed, avoiding the problem that traditional two-dimensional design drawings cannot intuitively display the overall picture of the project, thereby improving the efficiency and accuracy of the design; optimizing the management of consumable parts. By marking the attributes of consumable parts, it is clear which consumable parts need to be replaced and which do not, avoiding the inefficiency of manual inspection and replacement of consumable parts and the possible omission or wrong replacement; improving the construction efficiency and safety of titanium alloy materials, which can effectively solve the problem of the difficulty of operating titanium alloys during the construction process and improve the efficiency and safety of construction; improving the quality of the project. Due to the improvement of the efficiency and accuracy of design and construction, as well as the effective management of consumable parts, the overall quality of the project can be ensured to be improved". BRIEF DESCRIPTION OF THE DRAWINGS

[0052] In order to more clearly illustrate the technical solution of the present application, the drawings required for use in the description of the present application will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.

[0053] Figure 1 It is a flowchart of the steps of a construction method based on titanium alloy structure auxiliary construction provided by an embodiment of the present application;

[0054] Figure 2 It is a structural block diagram of a construction system based on titanium alloy structure auxiliary construction provided by an embodiment of the present application;

[0055] Figure 3 It is a structural schematic diagram of a computer device provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0056] In order to make the objects, features and advantages of the present application more obvious and understandable, the present application is further described in detail below in conjunction with the accompanying drawings and specific implementation methods. Obviously, the described embodiments are part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.

[0057] Reference Figure 1 , showing a flow chart of steps of a construction method based on titanium alloy structure auxiliary construction provided by an embodiment of the present application;

[0058] The method comprises:

[0059] S110, acquiring building information in response to a user request, wherein the building information includes a BIM power transmission and transformation project model, a construction environment model, and an equipment location model;

[0060] S120, generating a three-dimensional model of a target building according to the BIM power transmission and transformation engineering model, the construction environment model, and the equipment location model;

[0061] S130, determining consumable parts according to the three-dimensional model of the target building;

[0062] S140, determining a replacement attribute corresponding to the consumable part, wherein the replacement attribute includes replaceable and no need to be replaced, and marking the consumable part whose replacement attribute is replaceable as a replacement part;

[0063] S150: Generate a target construction plan based on the replacement parts and the target building three-dimensional model.

[0064] In the embodiments of the present application, compared with the prior art, "the existing solution is mainly to carry out construction through traditional two-dimensional design drawings. Although this method can meet basic construction needs, it cannot intuitively display the overall picture of the project, and is prone to design errors, affecting the quality and progress of the project. At the same time, in dealing with the problem of consumable parts, it is mainly through manual inspection and replacement. This method is not only inefficient, but also prone to omissions or wrong replacements. Finally, in dealing with the application of titanium alloy materials, the existing method is mainly through manual operation. This method is not only inefficient, but also difficult to ensure the quality and safety of construction." This application provides a solution of "a construction method based on titanium alloy structure auxiliary construction". Specifically: "A construction method based on titanium alloy structure auxiliary construction, the method comprising: S110, in response to a user request, obtaining building information, wherein the building information includes a BIM power transmission and transformation engineering model, a construction environment model, and an equipment location model; S120, generating a target building three-dimensional model based on the BIM power transmission and transformation engineering model, the construction environment model, and the equipment location model; S130, determining consumable parts based on the target building three-dimensional model; S140, determining replacement attributes corresponding to the consumable parts, wherein the replacement attributes include replaceable and no need to replace, and marking the consumable parts with the replaceable replacement attributes as replacement parts; S150, determining the replacement attributes of the replacement parts And the target building three-dimensional model generates a target construction plan" solves the problem that "the existing solution is mainly to carry out construction through traditional two-dimensional design drawings. Although this method can meet basic construction needs, it cannot intuitively display the overall picture of the project, and is prone to design errors, affecting the quality and progress of the project. At the same time, in dealing with the problem of consumable parts, it is mainly through manual inspection and replacement. This method is not only inefficient, but also prone to omissions or wrong replacements. Finally, in dealing with the application of titanium alloy materials, the existing method is mainly through manual operation. This method is not only inefficient, but also difficult to ensure the quality and safety of construction." It has achieved the goal of "improving design efficiency and accuracy, and through the use of BIM technology , which can intuitively display the overall picture of the project, avoiding the problem that traditional two-dimensional design drawings cannot intuitively display the overall picture of the project, thereby improving the efficiency and accuracy of the design; optimizing the management of consumable parts, by marking the attributes of consumable parts, you can clearly know which consumable parts need to be replaced and which do not, avoiding the inefficiency of manual inspection and replacement of consumable parts and the possible omission or wrong replacement; improving the construction efficiency and safety of titanium alloy materials, which can effectively solve the problem of the difficulty of operating titanium alloys during the construction process, and improve the efficiency and safety of construction; improving the quality of the project, due to the improvement of the efficiency and accuracy of design and construction, as well as the effective management of consumable parts, it can ensure that the overall quality of the project is improved. "

[0065] Next, a construction method based on titanium alloy structure-assisted construction in this exemplary embodiment will be further described.

[0066] As described in step S110, building information is obtained in response to a user request, wherein the building information includes a BIM power transmission and transformation engineering model, a construction environment model, and an equipment location model.

[0067] In an embodiment of the present invention, the specific process of "obtaining building information in response to a user request" in step S110 can be further explained in combination with the following description.

[0068] As described in the following steps,

[0069] S210, acquiring target architectural drawing information in the architectural drawing in response to the user request;

[0070] S220: Generate the building information according to the target building drawing information and the real-time building image data.

[0071] It should be noted that the architectural drawing includes multiple blocks, and the primitive information of each block is obtained, and the minimum bounding rectangle of the primitive information of each block is calculated to obtain the minimum bounding rectangle of all blocks. Compared with the prior art of splitting image information, this embodiment obtains the information at the image level and combines it with the relevant real drawing files after parsing in the architectural drawing (such as DWG format, STP format, etc.) to construct a building model. Compared with a single image, the data accuracy reaches the millimeter level in the real situation and is not easy to be distorted.

[0072] As an example, in response to a user's request to obtain building information, the BIM power transmission and transformation project model, construction environment model, and equipment location model in the building information are obtained. In this way, the overall picture of the project can be displayed intuitively, avoiding design errors caused by the inability of two-dimensional design drawings to intuitively display the overall picture of the project, thereby improving the quality and progress of the project.

[0073] As described in step S120, a three-dimensional model of a target building is generated based on the BIM power transmission and transformation engineering model, the construction environment model and the equipment location model.

[0074] In one embodiment of the present invention, the specific process of "generating a target building three-dimensional model based on the BIM power transmission and transformation engineering model, the construction environment model and the equipment location model" in step S120 can be further explained in combination with the following description.

[0075] As described in the following steps,

[0076] S310, generating a digital twin model according to the BIM power transmission and transformation engineering model;

[0077] S320. Generate the target building three-dimensional model based on the digital twin model, the construction environment model, and the coordinate system position information corresponding to the equipment position model.

[0078] It should be noted that digital twins use digital technology and sensor technology to simulate the physical, chemical and mechanical processes of real-world systems to achieve digital simulation and optimization. Its purpose is to improve the efficiency and reliability of product development, manufacturing, testing and maintenance, while reducing the time, cost and resource consumption of physical experiments and tests. Digital twin models refer to real-time simulation models created in the digital world, which are used to simulate and optimize the operation of objects or systems in the physical world. Digital twin technology can be widely used in many fields such as industry, cities, logistics, etc. to improve human work efficiency. Digital twins have been widely used in the fields of automobiles, aerospace, electricity and industrial production. The key to the accuracy and effect of digital twin models is the accuracy, real-time and coordination of sensor feedback data, as well as high-precision and high-performance data processing and loading. The higher the accuracy of the data that the sensor can return, the stronger the simulation of the digital twin system, the more accurate the simulation state, and the more excellent the simulation effect.

[0079] As an example, a digital twin model is generated based on the BIM power transmission and transformation engineering model, and then a three-dimensional model of the target building is generated in combination with the construction environment model and the coordinate system position information corresponding to the equipment position model. This can more accurately determine consumable parts and avoid missing or wrong replacement due to the inefficiency of the existing method of handling consumable parts.

[0080] As described in step S130, consumable parts are determined according to the target building three-dimensional model;

[0081] In an embodiment of the present invention, the specific process of "determining consumable parts according to the target building three-dimensional model" in step S130 can be further explained in combination with the following description.

[0082] As described in the following steps,

[0083] S410, acquiring appearance image information in the target building three-dimensional model, wherein the appearance image information includes an image of a smart device and an image of a connector;

[0084] S420, determining a loss category according to the smart device image and the connector image;

[0085] S430, constructing an appearance image dataset according to the wear category, the smart device image, and the connector image;

[0086] S440, using the appearance image dataset to perform deep neural network learning to generate a detection model that can be used to detect loss;

[0087] S450, determining the degree of wear of all components in the three-dimensional model of the target building according to the detection model;

[0088] S460, determining component attributes corresponding to all the components;

[0089] S470: Determine the consumable parts according to all the components, the component attributes corresponding to all the components, the wear degrees, and preset component loss rules.

[0090] It should be noted that smart devices are public equipment in buildings, and the connectors are pipes or lines, etc. Taking public equipment as an example, the degree of appearance loss of public equipment is generally evaluated by evaluating large contact surfaces such as the front or back. The loss part in the acquired image is cropped out, and the cropped image is used as the smart device image. The smart device image is labeled with loss categories to establish an appearance image dataset; the loss categories include a variety of loss types based on prior knowledge, including scratches, paint peeling, and explosions; the loss categories include but are not limited to scratches, paint peeling, and explosions. Under the premise that the loss detection model is determined, the loss categories can be adjusted to increase or decrease the loss categories, and the loss detection model can be continuously trained.

[0091] As an example, appearance image information is obtained in the three-dimensional model of the target building, and the appearance image information includes a smart device image and a connector image; a loss category is determined based on the smart device image and the connector image; an appearance image dataset is constructed based on the loss category, the smart device image and the connector image; deep neural network learning is performed using the appearance image dataset to generate a detection model that can be used to detect loss; the degree of wear corresponding to all components in the three-dimensional model of the target building is determined based on the detection model; component properties corresponding to all the components are determined; the consumable parts are determined based on all the components, the component properties corresponding to all the components, the degree of wear and preset component loss rules; whether a component is a consumable part is determined by the degree of wear; in this way, the application problem of titanium alloy materials in construction can be handled more effectively, and the construction quality and safety can be avoided from being affected by inefficient manual operations.

[0092] As described in step S470, the consumable parts are determined according to all the components, the component attributes corresponding to all the components, the wear degrees, and the preset component wear rules;

[0093] In one embodiment of the present invention, the specific process of "determining the consumable parts based on all the components, the component properties corresponding to all the components, the wear degree and the preset component loss rules" in step S470 can be further explained in combination with the following description.

[0094] As described in the following steps,

[0095] S510, obtaining a target component among all the components and a target wear degree corresponding to the target component;

[0096] S520, determining a target component attribute corresponding to the target component according to the target component and the component attribute;

[0097] S530, determining a target loss threshold corresponding to the target component attribute according to the target component attribute and the preset component loss rule;

[0098] S540, determining whether it is the consumable part according to the target loss threshold and the target wear degree;

[0099] S550: When the target wear degree is less than the target wear threshold, the target component is determined to be a non-consumable component; or, when the target wear degree is greater than the target wear threshold, the target component is determined to be a consumable component.

[0100] It should be noted that the preset component loss rules refer to the scrapping standards of various components in the industry, that is, the conditions under which the component can be considered to be scrapped, that is, the conditions under which the component can no longer be used;

[0101] It should be noted that the target component attributes may be lines, pipes, movable connectors, switches, etc.

[0102] As an example, in the present application, a target wear threshold of a target component is determined by a target component attribute, and whether the target component is a consumable part is determined by the target wear threshold and a target wear degree corresponding to the target component.

[0103] As described in step S140, determining a replacement attribute corresponding to the consumable part, wherein the replacement attribute includes replaceable and no need to be replaced, and marking the consumable part whose replacement attribute is replaceable as a replacement part;

[0104] In one embodiment of the present invention, the specific process of "determining the replacement attributes corresponding to the consumable parts, wherein the replacement attributes include replaceable and no need to be replaced, and marking the consumable parts whose replacement attributes are replaceable as replacement parts" in step S140 can be further explained in combination with the following description.

[0105] As described in the following steps,

[0106] S610, acquiring object attributes corresponding to the consumable parts, wherein the object attributes include fixed parts and consumable parts;

[0107] S620, screening the target consumable parts whose object attributes are the consumable parts;

[0108] S630, acquiring material information corresponding to the target consumable part;

[0109] S640, determining whether the target consumable part is replaceable according to the material information;

[0110] S650. When the material information is titanium alloy material, the replacement attribute of the target consumable part is determined to be no need to be replaced; or, when the material information is non-titanium alloy material, the replacement attribute of the target consumable part is determined to be replaceable, and the target consumable part is marked as the replacement part.

[0111] It should be noted that fixings such as load-bearing walls, shear walls, load-bearing beams, door head beams, steel bars in walls, walls that cannot be horizontally grooved, squat toilets, toilets, kitchen waterproof layers, bathroom waterproof layers, heating pipes, gas pipes, beams and columns, etc., are the core structural parts of the entire building. Therefore, this part is a fixing, and replacement of the fixing is not allowed; that is, the above-mentioned fixings are screened out in this application.

[0112] As an example, after removing the above-mentioned fixing parts, the present application further lists the remaining parts as consumable parts, and further analyzes the consumable parts to determine whether they are replaceable.

[0113] In a specific implementation, if the consumable part is in an environment where a large public announcement device is running, and due to the heat generated by the operation of the large public device, the consumable part is in a high-temperature environment under long-term operation and the material is plastic, long-term exposure to high heat may cause deformation, and deformation may easily cause a short circuit in the device. For such consumable parts, they will be marked as replacement parts;

[0114] In another specific implementation, if the material of the consumable part itself is one of the titanium alloy products, for the consumable part, it is only necessary to determine whether it is damaged. If it is damaged, it can be replaced; if it is not damaged, it does not need to be replaced.

[0115] As described in step S150, a target construction plan is generated based on the replacement part and the target building three-dimensional model;

[0116] In an embodiment of the present invention, the specific process of "generating a target construction plan based on the replacement part and the target building three-dimensional model" in step S150 can be further explained in combination with the following description.

[0117] As described in the following steps,

[0118] S710, determining a target position corresponding to the replacement part according to the replacement part and the target building three-dimensional model;

[0119] S720, generating construction information according to the target position and the replacement part, wherein the construction information includes the model, quantity and installation position corresponding to the replacement part;

[0120] S730: Generate the target construction plan according to the model, the quantity, and the installation location.

[0121] It should be noted that the models, quantities, and installation locations mentioned in this application are all examples used to illustrate the technical solution of this application, and are not limited to models, quantities, and installation locations, but may also include sizes, or corresponding titanium alloy materials, etc.

[0122] As an example, if there is no existing titanium alloy product suitable for a replacement part, titanium can be processed according to its size specifications to obtain a target replacement part.

[0123] In a specific implementation, construction information is generated based on the target position and the replacement parts, which can more conveniently guide the construction and improve the construction efficiency and quality.

[0124] Embodiment 1

[0125] Step 1: Respond to user requests and obtain the BIM power transmission and transformation engineering model and construction environment model. Specifically, users can send requests to the system through computers or other smart devices, and the system will retrieve the corresponding BIM power transmission and transformation engineering model, construction environment model and equipment location model according to the user's request. These models can be pre-stored in the system or created by the user. Step 2: Generate a three-dimensional model of the target building based on the BIM power transmission and transformation engineering model, construction environment model and equipment location model. Specifically, the system will integrate the acquired BIM power transmission and transformation engineering model, construction environment model and equipment location model to generate a three-dimensional model of the target building. This model can intuitively display the overall picture of the project and avoid design errors caused by the inability of two-dimensional design drawings to intuitively display the overall picture of the project. Step 3: Determine the attributes corresponding to consumable parts, where the attributes include replaceable and no need to be replaced, and mark the consumable parts with replaceable attributes as replacement parts. Specifically, the system will automatically identify consumable parts based on the three-dimensional model of the target building and determine the attributes of these consumable parts. For example, some screws, nuts and other parts can be marked as replacement parts. Step 4: Determine the target position corresponding to the replacement part based on the replacement part and the three-dimensional model of the target building. Specifically, the system will determine the target position of the replacement part based on the three-dimensional model of the target building and the properties of the replacement part. This can more accurately locate the position of the replacement part and avoid construction errors caused by inaccurate positioning. Step 5: Generate construction information based on the target position and replacement parts. Specifically, the system will generate construction information based on the target position of the replacement part and the properties of the replacement part. This construction information may include the model, quantity, installation location, etc. of the replacement part, and form a construction plan to facilitate construction personnel to carry out construction.

[0126] The beneficial effects of this embodiment can be widely used in the fields of civil engineering, building structure design, titanium alloy material application, etc. First, it can effectively improve the construction efficiency and quality of civil engineering, reduce construction costs, and meet the market demand for efficient and low-cost civil engineering construction. Secondly, the method of the present invention can intuitively display the overall picture of the project, avoid design errors that may occur in traditional two-dimensional design drawings, improve the quality and progress of the project, and meet the market demand for high-quality and efficient building structure design. Finally, the method of the present invention can effectively solve the management problem of consumable parts, improve construction efficiency, reduce construction errors, and meet the market demand for efficient and accurate construction management.

[0127] As for the system embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.

[0128] Reference Figure 2, showing a structural block diagram of a construction system based on titanium alloy structure auxiliary construction provided by an embodiment of the present application;

[0129] A construction system based on titanium alloy structure auxiliary construction, the system comprising:

[0130] The acquisition module 210 is used to acquire building information in response to a user request, wherein the building information includes a BIM power transmission and transformation engineering model, a construction environment model, and an equipment location model;

[0131] A first generating module 220 is used to generate a target building three-dimensional model based on the BIM power transmission and transformation engineering model, the construction environment model and the equipment location model;

[0132] A first determination module 230, configured to determine consumable parts according to the target building three-dimensional model;

[0133] A second determining module 240 is configured to determine a replacement attribute corresponding to the consumable part, wherein the replacement attribute includes replaceable and no need to be replaced, and mark the consumable part having the replaceable replacement attribute as a replacement part;

[0134] The second generating module 250 is used to generate a target construction plan according to the replacement part and the target building three-dimensional model.

[0135] In one embodiment of the present invention, the acquisition module 210 includes:

[0136] A first acquisition submodule, configured to acquire target architectural drawing information in the architectural drawing in response to the user request;

[0137] The first construction submodule is used to generate the building information according to the target building drawing information and the real-time building image data.

[0138] In one embodiment of the present invention, the first generating module 220 includes:

[0139] A first generation submodule is used to generate a digital twin model based on the BIM power transmission and transformation engineering model;

[0140] The second generating submodule is used to generate the target building three-dimensional model based on the digital twin model, the construction environment model and the coordinate system position information corresponding to the equipment position model.

[0141] In one embodiment of the present invention, the first determining module 230 includes:

[0142] A second acquisition submodule is used to acquire appearance image information in the target building three-dimensional model, wherein the appearance image information includes an intelligent device image and a connector image;

[0143] A first determination submodule, configured to determine a loss category according to the smart device image and the connector image;

[0144] A second construction submodule is used to construct an appearance image dataset according to the wear category, the smart device image and the connection component image;

[0145] A third generation submodule is used to use the appearance image dataset to perform deep neural network learning to generate a detection model that can be used to detect loss;

[0146] A second determination submodule is used to determine the wear degree of all components in the three-dimensional model of the target building according to the detection model;

[0147] A third determination submodule, used to determine component attributes corresponding to all the components;

[0148] The fourth determination submodule is used to determine the consumable parts according to all the components, the component attributes corresponding to all the components, the wear degrees and preset component loss rules.

[0149] In an embodiment of the present invention, the fourth determining submodule includes:

[0150] An acquisition unit, used for acquiring a target component among all the components and a target wear degree corresponding to the target component;

[0151] A first determining unit, configured to determine a target component attribute corresponding to the target component according to the target component and the component attribute;

[0152] A second determining unit, configured to determine a target loss threshold corresponding to the target component attribute according to the target component attribute and the preset component loss rule;

[0153] A third determination unit, configured to determine whether the part is a consumable part according to the target wear threshold and the target wear degree;

[0154] A determination unit is used to determine that the target component is a non-consumable component when the target wear degree is less than the target wear threshold; or to determine that the target component is a consumable component when the target wear degree is greater than the target wear threshold.

[0155] In one embodiment of the present invention, the second determining module 240 includes:

[0156] A third acquisition submodule is used to acquire object attributes corresponding to the consumable parts, wherein the object attributes include fixed parts and consumable parts;

[0157] A first screening submodule is used to screen the target consumable parts whose object attributes are the consumable parts;

[0158] A fourth acquisition submodule, used to acquire material information corresponding to the target consumable part;

[0159] A fifth determination submodule, configured to determine whether the target consumable part is replaceable according to the material information;

[0160] The sixth determination submodule is used to determine that the replacement attribute of the target consumable part is no need to be replaced when the material information is titanium alloy material; or, when the material information is non-titanium alloy material, determine that the replacement attribute of the target consumable part is replaceable, and mark the target consumable part as the replacement part.

[0161] In one embodiment of the present invention, the second generation module 250 includes:

[0162] a seventh determination submodule, configured to determine a target position corresponding to the replacement part according to the replacement part and the target building three-dimensional model;

[0163] a fourth generation submodule, configured to generate construction information according to the target position and the replacement part, wherein the construction information includes a model, quantity and installation position corresponding to the replacement part;

[0164] The fifth generation submodule is used to generate the target construction plan according to the model, the quantity, and the installation location.

[0165] Reference Figure 3 , showing a computer device of a construction method based on titanium alloy structure auxiliary construction of the present invention, which may specifically include the following:

[0166] The computer device 12 is in the form of a general-purpose computing device, and the components of the computer device 12 may include but are not limited to: one or more processors or processing units 16, a system memory 28, and a bus 18 connecting different system components (including the system memory 28 and the processing unit 16).

[0167] The bus 18 represents one or more of several types of bus 18 structures, including a memory bus 18 or memory controller, a peripheral bus 18, an accelerated graphics port, a processor or a local bus 18 using any of a variety of bus 18 architectures. These architectures include, by way of example, but are not limited to, an Industry Standard Architecture (ISA) bus 18, a Micro Channel Architecture (MAC) bus 18, an Enhanced ISA bus 18, an Audio Video Electronics Standards Association (VESA) local bus 18, and a Peripheral Component Interconnect (PCI) bus 18.

[0168] The computer device 12 typically includes a variety of computer system readable media. These media can be any available media that can be accessed by the computer device 12, including volatile and non-volatile media, removable and non-removable media.

[0169] System memory 28 may include computer system readable media in the form of volatile memory, such as random access memory (RAM) 30 and / or cache memory 32. Computer device 12 may further include other removable / non-removable, volatile / non-volatile computer system storage media. By way of example only, storage system 34 may be used to read and write to non-removable, non-volatile magnetic media (commonly referred to as a "hard drive"). Although Figure 3 Not shown, a disk drive for reading and writing to a removable non-volatile disk (such as a "floppy disk"), and an optical disk drive for reading and writing to a removable non-volatile optical disk (such as a CD-ROM, DVD-ROM or other optical medium) may be provided. In these cases, each drive may be connected to the bus 18 via one or more data medium interfaces. The memory may include at least one program product having a set (e.g., at least one) of program modules 42, which are configured to perform the functions of various embodiments of the present invention.

[0170] A program / utility 40 having a set (at least one) of program modules 42 may be stored in, for example, a memory, such program modules 42 including, but not limited to, an operating system, one or more application programs, other program modules 42, and program data, each of which or some combination may include an implementation of a network environment. The program modules 42 generally perform the functions and / or methods of the embodiments described herein.

[0171] The computer device 12 may also communicate with one or more external devices 14 (e.g., keyboards, pointing devices, displays 24, cameras, etc.), one or more devices that enable a user to interact with the computer device 12, and / or any device that enables the computer device 12 to communicate with one or more other computing devices (e.g., network cards, modems, etc.). Such communication may be performed via an input / output (I / O) interface 22. Furthermore, the computer device 12 may also communicate with one or more networks (e.g., local area networks (LANs)), wide area networks (WANs), and / or public networks (e.g., the Internet) via a network adapter 20. As shown, the network adapter 20 communicates with the other modules of the computer device 12 via the bus 18. It should be understood that although Figure 3Not shown, other hardware and / or software modules may be used in conjunction with the computer device 12, including but not limited to: microcode, device drivers, redundant processing units 16, external disk drive arrays, RAID systems, tape drives, and data backup storage systems 34, etc.

[0172] The processing unit 16 executes various functional applications and data processing by running the programs stored in the system memory 28, for example, implementing a construction method based on titanium alloy structure auxiliary construction provided by an embodiment of the present invention.

[0173] That is, when the processing unit 16 executes the program, it realizes: obtaining building information in response to a user request, wherein the building information includes a BIM power transmission and transformation engineering model, a construction environment model, and an equipment location model; generating a target building three-dimensional model based on the BIM power transmission and transformation engineering model, the construction environment model, and the equipment location model; determining consumable parts based on the target building three-dimensional model; determining replacement attributes corresponding to the consumable parts, wherein the replacement attributes include replaceable and no need to be replaced, and marking the consumable parts with the replacement attribute of replaceable as replacement parts; generating a target construction plan based on the replacement parts and the target building three-dimensional model.

[0174] In an embodiment of the present invention, the present invention further provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements a construction method based on titanium alloy structure-assisted construction as provided in all embodiments of the present application:

[0175] That is, when the program is executed by the processor, it is implemented as follows: in response to a user request, building information is obtained, wherein the building information includes a BIM power transmission and transformation engineering model, a construction environment model, and an equipment location model; a target building three-dimensional model is generated based on the BIM power transmission and transformation engineering model, the construction environment model, and the equipment location model; consumable parts are determined based on the target building three-dimensional model; replacement attributes corresponding to the consumable parts are determined, wherein the replacement attributes include replaceable and no need to be replaced, and the consumable parts with the replacement attribute of replaceable are marked as replacement parts; a target construction plan is generated based on the replacement parts and the target building three-dimensional model.

[0176] Any combination of one or more computer-readable media may be used. A computer-readable medium may be a computer readable signal medium or a computer-readable storage medium. A computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media (a non-exhaustive list) include: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In this document, a computer-readable storage medium may be any tangible medium containing or storing a program that may be used by or in conjunction with an instruction execution system, device or device.

[0177] Computer-readable signal media may include a data signal propagated in baseband or as part of a carrier wave, which carries a computer-readable program code. Such propagated data signals may take a variety of forms, including, but not limited to, electromagnetic signals, optical signals, or any suitable combination of the above. Computer-readable signal media may also be any computer-readable medium other than a computer-readable storage medium, which may send, propagate, or transmit a program for use by or in conjunction with an instruction execution system, apparatus, or device.

[0178] The computer program code for performing the operation of the present invention can be written in one or more programming languages ​​or a combination thereof, including object-oriented programming languages, such as Java, Smalltalk, C++, and conventional procedural programming languages, such as "C" language or similar programming languages. The program code can be executed entirely on the user's computer, partially on the user's computer, as an independent software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer can be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or can be connected to an external computer (for example, using an Internet service provider to connect through the Internet). The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same and similar parts between the various embodiments can be referred to each other.

[0179] Although the preferred embodiments of the present application have been described, those skilled in the art may make additional changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the embodiments of the present application.

[0180] Finally, it should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or terminal device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or terminal device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or terminal device including the elements.

[0181] The above is a detailed introduction to a construction method based on titanium alloy structure assisted construction provided by the present application. Specific examples are used in this article to illustrate the principles and implementation methods of the present application. The description of the above embodiments is only used to help understand the method of the present application and its core idea; at the same time, for general technical personnel in this field, according to the idea of ​​the present application, there will be changes in the specific implementation method and application scope. In summary, the content of this specification should not be understood as a limitation on the present application.

Claims

1. A construction method based on titanium alloy structure auxiliary construction, characterized in that: The method comprises: Responding to the user's request, obtaining building information, wherein the building information includes a BIM power transmission and transformation project model, a construction environment model, and an equipment location model; Generate a three-dimensional model of the target building based on the BIM power transmission and transformation engineering model, the construction environment model and the equipment location model; Determining consumable parts according to the three-dimensional model of the target building; Determine a replacement attribute corresponding to the consumable part, wherein the replacement attribute includes replaceable and no need to be replaced, and mark the consumable part whose replacement attribute is replaceable as a replacement part; A target construction plan is generated based on the replacement parts and the target building three-dimensional model.

2. The method according to claim 1, characterized in that The step of obtaining building information in response to a user request includes: Responding to the user's request, obtaining target architectural drawing information in the architectural drawing; The building information is generated according to the target building drawing information and the real-time building image data.

3. The method according to claim 1, characterized in that The step of generating a target building three-dimensional model based on the BIM power transmission and transformation engineering model, the construction environment model and the equipment location model comprises: Generate a digital twin model based on the BIM power transmission and transformation engineering model; The target building three-dimensional model is generated based on the digital twin model, the construction environment model and the coordinate system position information corresponding to the equipment position model.

4. The method according to claim 1, characterized in that The step of determining consumable parts according to the target building three-dimensional model comprises: Acquire appearance image information in the target building three-dimensional model, wherein the appearance image information includes an image of a smart device and an image of a connector; Determining a loss category according to the smart device image and the connector image; constructing an appearance image dataset according to the wear category, the smart device image, and the connector image; Using the appearance image dataset to perform deep neural network learning to generate a detection model that can be used to detect loss; Determining the degree of wear of all components in the three-dimensional model of the target building according to the detection model; determining component properties corresponding to all of the components; The consumable parts are determined according to all the components, the component properties corresponding to all the components, the wear degrees and preset component loss rules.

5. The method according to claim 4, characterized in that The step of determining the consumable parts according to all the components, the component attributes corresponding to all the components, the wear degree and the preset component loss rules includes: Acquire a target component among all the components and a target wear degree corresponding to the target component; Determining a target component attribute corresponding to the target component based on the target component and the component attribute; Determining a target loss threshold corresponding to the target component attribute according to the target component attribute and the preset component loss rule; Determining whether it is the consumable part according to the target loss threshold and the target wear degree; When the target wear degree is less than the target wear threshold, the target component is determined to be a non-consumable component; or, when the target wear degree is greater than the target wear threshold, the target component is determined to be a consumable component.

6. The method according to claim 1, characterized in that The step of determining a replacement attribute corresponding to the consumable part, wherein the replacement attribute includes replaceable and no need to be replaced, and marking the consumable part having the replaceable replacement attribute as a replacement part, comprises: Acquire object properties corresponding to the consumable parts, wherein the object properties include fixed parts and consumable parts; Filter the object attribute to be the target consumable part of the consumable part; Acquiring material information corresponding to the target consumable part; Determining whether the target consumable part is replaceable according to the material information; When the material information is titanium alloy material, the replacement attribute of the target consumable part is determined to be no need to be replaced; or, when the material information is non-titanium alloy material, the replacement attribute of the target consumable part is determined to be replaceable, and the target consumable part is marked as the replacement part.

7. The method according to claim 1, characterized in that The step of generating a target construction plan based on the replacement part and the target building three-dimensional model includes: Determining a target position corresponding to the replacement part according to the replacement part and the target building three-dimensional model; Generating construction information according to the target position and the replacement part, wherein the construction information includes the model, quantity and installation position corresponding to the replacement part; The target construction plan is generated according to the model, the quantity, and the installation location.

8. A construction system based on titanium alloy structure auxiliary construction, characterized in that: The system comprises: An acquisition module, configured to acquire building information in response to a user request, wherein the building information includes a BIM power transmission and transformation engineering model, a construction environment model, and an equipment location model; A first generation module is used to generate a target building three-dimensional model based on the BIM power transmission and transformation engineering model, the construction environment model and the equipment location model; A first determination module, used to determine consumable parts according to the target building three-dimensional model; A second determining module is used to determine a replacement attribute corresponding to the consumable part, wherein the replacement attribute includes replaceable and no need to be replaced, and mark the consumable part whose replacement attribute is replaceable as a replacement part; The second generating module is used to generate a target construction plan based on the replacement parts and the target building three-dimensional model.

9. A computer device, characterized in that: The method comprises a processor, a memory, and a computer program stored in the memory and capable of running on the processor, wherein the computer program implements the method according to any one of claims 1 to 7 when executed by the processor.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the method according to any one of claims 1 to 7 is implemented.