New energy facility parameter calculation method matched with construction project and related device
By calculating the parameters of new energy facilities required for construction projects, the problem of matching facility parameters in construction projects was solved, achieving efficient capacity allocation and cost optimization, and expanding the application scope of photovoltaic energy storage.
Patent Information
- Application Number
- CN202411082363.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-08
- Publication Date
- 2024-11-19
AI Technical Summary
Existing technologies lack effective methods for calculating and matching the parameters of new energy facilities required for construction projects, including photovoltaic energy storage power stations, battery swapping stations, and new energy heavy trucks, in order to optimize their application in construction projects.
A calculation method and apparatus are provided to ensure the matching and optimization of each link by determining the number of vehicles, batteries, battery swapping stations, shuttle buses and photovoltaic energy storage power stations required for a construction project, including formulas and modular calculation steps.
It has achieved efficient matching of new energy facilities in construction projects, optimized transportation capacity allocation, reduced investment costs, improved operational efficiency, and expanded the application scope of photovoltaic energy storage.
Smart Images

Figure CN118982200A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a method for calculating parameters of new energy facilities matched with a construction project and a related device, belonging to the field of new energy planning. Background Art
[0002] In areas with sufficient sunshine conditions, there is a foundation for building large-scale photovoltaic energy storage power stations, and there is also the application and promotion of new energy heavy trucks. Specifically, new energy heavy trucks are used to provide transportation capacity for construction projects in the area, and battery swap stations are used to swap batteries for new energy heavy trucks. In order to give full play to the low-cost advantages of photovoltaic natural energy, increase profits while reasonably controlling the investment scale of new energy vehicles and related supporting systems, and meet the actual working conditions, it is necessary to match new energy facilities (i.e. photovoltaic energy storage power stations, battery swap stations and new energy heavy trucks) with construction projects, that is, to match corresponding photovoltaic energy storage power stations, battery swap stations and new energy heavy trucks according to the needs of the construction projects, specifically to calculate the parameters of the adapted new energy facilities, but there is currently no corresponding method. Summary of the invention
[0003] The present invention provides a method for calculating parameters of new energy facilities matching a construction project and related devices, which solve the problems disclosed in the background technology.
[0004] According to one aspect of the present disclosure, a method for calculating parameters of new energy facilities matching a construction project is provided, comprising: Determine the number of vehicles required for the construction project based on the transport capacity required for the construction project, the single loading time of a single vehicle, the single unloading time of a single vehicle, the distance from the operation point to the battery swap station, the average per-kilometer power consumption of a single vehicle, the power consumption of a single vehicle for loading and unloading operations, the battery capacity of a single vehicle, the lower limit of the SOC of a single vehicle, the average speed of a single vehicle, the round-trip mileage of a single operation, the battery swap time of a single vehicle, the single-day working hours of the construction project and the transportation volume of a single vehicle; among which, the vehicles are new energy operation vehicles that provide transport capacity for the construction project; Determine the number of batteries and battery swap stations required for the construction project based on the number of vehicles, vehicle-to-battery ratio, battery swap time per vehicle, loading time per vehicle, unloading time per vehicle, operation routes, site space, and investment scale; The number of shuttle buses is determined based on the battery replacement time of the batteries on the shuttle bus, the time the shuttle bus is in transit, the time it takes to complete charging of the batteries on the shuttle bus, the number of batteries on the shuttle bus, the number of batteries required for the construction project, and the number of battery swap stations. The shuttle bus is used to transport batteries between the photovoltaic energy storage power station and the battery swap station. Based on the number of shuttle buses, the charging power required for the batteries on a single shuttle bus, the battery replacement time on the shuttle bus, the time it takes to complete charging of the batteries on the shuttle bus, the time the shuttle bus is in transit, the number of charging guns required for a single shuttle bus, the number of guns carried by the charging piles, the daily external discharge of the photovoltaic energy storage power station, the energy storage efficiency, the discharge margin coefficient, the average daily photovoltaic power generation, the average daily power generation time, the photovoltaic energy storage capacity, the battery replacement energy storage capacity and the lower limit of the energy storage SCO, determine the total charging power provided by the photovoltaic energy storage power station for the batteries on the shuttle bus, the number of charging piles in the photovoltaic energy storage power station, the minimum capacity of the photovoltaic energy storage power station and the total daily photovoltaic power generation.
[0005] In some embodiments of the present disclosure, the number of vehicles required for a construction project is determined using the formula: N v ≥L g / L d ; L d = L v ×N d ×N h ; N h =T g / T v ; T v =T r -T zx -T h -T f ; T f =2S z / V p ; T zx =(T z +T x )×N d ; T r = S v / V p ; N d =(S v +2S z ) / S d ; S v =(D k -D zx ×N d ×N h ) / D p ; D k = D v ×(1-X v -K y ); Ky ≥D p ×S z ; Where, L g is the transportation capacity required for the construction project, N v is the number of vehicles required for the construction project, L d is the daily transport volume of a single vehicle, L v is the transport volume per vehicle, N d is the number of single-power operations of the vehicle, N h is the number of battery replacements per vehicle, T g is the single-day working hours of the construction project, T v is the operation time of a single charge of a bicycle, T r is the driving time of the bicycle without battery replacement, T zx is the single charge loading and unloading time, T h The battery replacement time for a bicycle, T f The duration of battery replacement for a bicycle, S z is the distance from the operation point to the battery swap station, V p is the average speed of a single vehicle, T z is the single loading time of a single vehicle, T x is the single unloading time of a single vehicle, S v is the single-vehicle operating range, S d is the round trip mileage of a single operation, D k is the available power of the bicycle, D zx is the power consumption of single vehicle loading and unloading operation, D p is the average power consumption per kilometer under single-vehicle operation, D v is the battery capacity of the bicycle, X v is the lower limit of the single vehicle SOC, K y is the vehicle power reserve coefficient.
[0006] In some embodiments of the present disclosure, the number of batteries required for a construction project is determined using the formula: N y ≥N v ×K b ; Where N y is the number of batteries required for the construction project, N v is the number of vehicles required for the construction project, K b is the vehicle-to-electricity ratio.
[0007] In some embodiments of the present disclosure, the number of shuttle buses is determined using the formula: N s (T c +T y )≤N e ×T h + N b ×Tt ; Where N s is the number of shuttle buses, T c The time it takes for the battery on the shuttle bus to complete charging, T y is the shuttle bus en route time, N e T is the number of batteries in the battery swap station calculated based on the number of batteries required for the construction project and the number of battery swap stations. h The battery replacement time for a bicycle, T t is the battery replacement time of the shuttle bus, N b The number of batteries on the shuttle bus.
[0008] In some embodiments of the present disclosure, the total charging power provided by the photovoltaic energy storage power station to the battery on the shuttle bus is determined by the formula: P bz ≥P b (N s ×T c / ( T t +T y )); P b ≥N b ×D k / T c ; Where P bz is the total charging power provided by the photovoltaic energy storage power station to the battery on the shuttle bus, P b is the charging power required for the battery on a single ferry, N s is the number of shuttle buses, T t is the battery replacement time of the shuttle bus, T y is the shuttle bus en route time, T c The time it takes for the battery on the shuttle bus to be fully charged, D k is the available power of the bicycle, N b The number of batteries on the shuttle bus.
[0009] In some embodiments of the present disclosure, the number of charging piles in a photovoltaic energy storage power station is determined by the formula: N z =( N q ×N s ) / N k ; Where N z is the number of charging piles in the photovoltaic energy storage power station, N q is the number of charging guns required for a single shuttle bus, N k The number of guns carried by the charging pile, N s is the number of shuttle buses.
[0010] In some embodiments of the present disclosure, the minimum capacity of the photovoltaic energy storage power station is determined by the formula: D s ≥P w (1-A d ) / C n ; (P bz ×T d ) / η f ≤P w ≤T d ×C d ; Where D s is the minimum capacity of the photovoltaic energy storage power station, P w is the daily discharge of the photovoltaic energy storage power station, C n is the energy storage efficiency, A d is the discharge residual coefficient, T d is the duration of external charging of the photovoltaic energy storage power station, η f is the efficiency of releasing the stored electricity to the battery, P bz is the total charging power provided by the photovoltaic energy storage power station to the battery on the shuttle bus, C d It is the charging rate.
[0011] In some embodiments of the present disclosure, the total photovoltaic power generation per day is determined using the formula: D f =P f ×T e ; P f = S f ×A s ×G×η r ; D f ≥D c ×(1-X c )+ D h ×K y ; Where D f is the total photovoltaic power generation per day, P f is the average daily photovoltaic power generation, T e is the average daily power generation duration, D c is the photovoltaic energy storage capacity, D h is the battery storage capacity, X c is the lower limit of energy storage SCO, K y is the vehicle power reserve coefficient, S f is the power generation area, A s is the area utilization coefficient, G is the solar radiation intensity, η r For transformation efficiency.
[0012] According to another aspect of the present disclosure, there is provided a new energy facility parameter calculation device matching a construction project, comprising: The first determination module determines the number of vehicles required for the construction project based on the transportation capacity required for the construction project, the single loading time of a single vehicle, the single unloading time of a single vehicle, the distance from the operation point to the battery swap station, the average per-kilometer power consumption of a single vehicle, the power consumption of a single vehicle for loading and unloading operations, the battery capacity of a single vehicle, the lower limit of the single vehicle SOC, the average speed of a single vehicle, the round-trip mileage of a single operation, the battery swap time of a single vehicle, the single-day working hours of the construction project, and the transportation volume of a single vehicle; among them, the vehicles are new energy operation vehicles that provide transportation capacity for the construction project; The second determination module determines the number of batteries and battery swap stations required for the construction project based on the number of vehicles, vehicle-to-battery ratio, single-vehicle battery swap time, single-vehicle loading time, single-vehicle unloading time, operation routes, site space and investment scale; The third determination module determines the number of shuttle buses according to the battery replacement time of the shuttle bus, the shuttle bus in transit time, the battery charging time of the shuttle bus, the number of batteries on the shuttle bus, the number of batteries required for the construction project and the number of battery swap stations; the shuttle bus is a shuttle bus that transports batteries between the photovoltaic energy storage power station and the battery swap station; The fourth determination module determines the total charging power provided by the photovoltaic energy storage power station for the battery on the shuttle bus, the number of charging piles in the photovoltaic energy storage power station, the minimum capacity of the photovoltaic energy storage power station and the total daily photovoltaic power generation according to the number of shuttle buses, the charging power required for the battery on a single shuttle bus, the battery replacement time on the shuttle bus, the battery charging time on the shuttle bus, the shuttle bus in transit, the number of charging guns required for a single shuttle bus, the number of guns carried by the charging pile, the daily external discharge of the photovoltaic energy storage power station, the energy storage efficiency, the discharge margin coefficient, the average daily photovoltaic power generation, the average daily power generation time, the photovoltaic energy storage capacity, the battery replacement energy storage capacity and the lower limit of the energy storage SCO.
[0013] The beneficial effects achieved by the present invention are as follows: Starting from the transport capacity required for the construction project, the present invention reversely deduces the application matching parameters of each link such as the required vehicles, battery swap stations, photovoltaic energy storage power stations, etc., matches the minimum requirements of each link with the construction project, and can analyze the possibility of matching application between photovoltaic energy storage and battery swap models and battery swap stations. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 A flow chart of the method for calculating parameters of new energy facilities that match the construction project; Figure 2 The block diagram of the device for calculating parameters of new energy facilities matching the construction project. DETAILED DESCRIPTION
[0015] The following will be combined with the drawings in the embodiments of the present disclosure to clearly and completely describe the technical solutions in the embodiments of the present disclosure. It is obvious that the described embodiments are only part of the embodiments of the present disclosure, rather than all the embodiments. The following description of at least one exemplary embodiment is actually only illustrative and is by no means intended to limit the present disclosure and its application or use. Based on the embodiments in the present disclosure, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present disclosure.
[0016] Unless otherwise specified, the relative arrangement of components and steps, the numerical expressions and numerical values set forth in these embodiments do not limit the scope of the present disclosure.
[0017] At the same time, it should be understood that for the convenience of description, the sizes of the various parts shown in the drawings are not drawn according to the actual proportional relationship.
[0018] Technologies, methods, and equipment known to ordinary technicians in the relevant art may not be discussed in detail, but where appropriate, the technologies, methods, and equipment should be considered part of the specification.
[0019] In all examples shown and discussed herein, any specific values should be interpreted as merely exemplary and not as limiting. Therefore, other examples of the exemplary embodiments may have different values.
[0020] It should be noted that similar symbols and letters refer to similar items in the following figures, and therefore, once an item is defined in one figure, it does not require further discussion in subsequent figures.
[0021] In order to solve the problem of matching construction projects with new energy facilities, the present disclosure proposes a method for calculating parameters of new energy facilities that match construction projects and related devices. Specifically, starting from the transportation capacity required for the construction project, the application matching parameters of each link such as the required vehicles, battery swap stations, and photovoltaic energy storage power stations are reversed.
[0022] Figure 1 The figure is a schematic diagram of an embodiment of a method for calculating parameters of new energy facilities matching a construction project disclosed in the present invention. Figure 1 The embodiments may be executed by a terminal (such as a computer).
[0023] like Figure 1As shown, step 1 of the embodiment determines the number of vehicles required for the construction project according to the transportation capacity required for the construction project, the single loading time of a single vehicle, the single unloading time of a single vehicle, the distance from the operation point to the battery swap station, the average per-kilometer power consumption of a single vehicle, the single vehicle loading and unloading operation power, the single vehicle battery capacity, the single vehicle SOC lower limit, the average vehicle speed of the single vehicle, the round-trip mileage of a single operation, the single vehicle battery swap time, the single-day working hours of the construction project and the single vehicle transportation volume; wherein the vehicle is a new energy operation vehicle that provides transportation capacity for the construction project, specifically a new energy heavy truck.
[0024] It should be noted that new energy heavy-duty trucks are limited by the battery life and often cannot achieve greater capacity with a smaller number of vehicles like fuel vehicles. Instead, they need to comprehensively consider the refueling cycle and refueling time, as well as the transportation distance of a single charging and discharging cycle, and offset the capacity impact caused by insufficient refueling time and transportation distance by appropriately expanding the number of fleets.
[0025] It should also be noted that the number of loading and unloading stations and the number of fleet channels need to match; assuming that the single loading time of a single vehicle is T z , the single unloading time of a single vehicle is T x The maximum value of the two durations is taken as the workshop interval period of each channel of the fleet to ensure orderly operation. Each channel can be defined according to the loading point (excavator and other operating machinery) and the unloading point such as the yard or unloading conveying station. When the loading and unloading time is very different, the comprehensive capacity demand can be calculated according to the relationship between the time lengths. Within the least common multiple of the time, the proportional relationship between the two durations is used to calculate the number of loading / unloading channels to ensure a balanced match of the operating time.
[0026] If it takes 5 minutes to load each vehicle and 3 minutes to unload each vehicle, then within 15 minutes, based on 5 loading points and 3 unloading points, it can be achieved that 3 vehicles can be loaded at each unloading point and 5 vehicles can be unloaded at each unloading point, and a total of 15 vehicles can be completed.
[0027] Definition: The distance from the operation point to the battery swap station is S z The average power consumption per kilometer of a single vehicle is D p , vehicle power reserve coefficient K y The remaining power is greater than the power required to reach the battery swap station, that is, K y ≥D p ×S z ; The power consumption of a single vehicle loading and unloading operation is D zx , the battery capacity of a bicycle is D v , the lower limit of the single vehicle SOC is X v , then the available power of the bicycle is D k It can be expressed as D k = D v ×(1-X v -K y); Single vehicle operating range S v It can be expressed as S v =(D k -D zx ×N d ×N h ) / D p ; The average speed of a single vehicle is V p , then the duration of battery replacement on the way is T f It can be expressed as T r = S v / V p ; The round trip mileage of a single operation is S d , then the vehicle single power operation times N d It can be expressed as N d =(S v +2S z ) / S d , single charge loading and unloading time T zx It can be expressed as T zx =(T z +T x )×N d ; The battery replacement time of a bicycle is T h The driving time of a bicycle without battery replacement is T f =2S z / V p , then the operation time of a single charge of a bicycle is T v It can be expressed as T v =T r -T zx -T h -T f ; The single-day working hours of the construction project is T g (excluding the driver's rest breaks, shift changes and meal time, only considering the driver's working time), then the number of battery replacements per vehicle N h It can be expressed as N h =T g / T v ; The transport volume of a bicycle is L v , then the daily transport volume of a single vehicle is L d It can be expressed as L d = L v ×N d ×N h ; The transport capacity required for the construction project is L g , then the number of vehicles N required for the construction project v N v ≥Lg / L d ; Among them, N v The specific number can be appropriately enlarged by taking into account the vehicle failure rate, operation and maintenance cycle, investment amount, etc., for example, in L g / L d Add 3~5 vehicles on the basis of the previous one.
[0028] return Figure 1 In step 2 of the embodiment, the number of batteries and battery swap stations required for the construction project is determined based on the number of vehicles, the vehicle-to-battery ratio, the battery swap time for a single vehicle, the loading time for a single vehicle, the unloading time for a single vehicle, the operation routes, the site space and the investment scale.
[0029] In some embodiments, the formula for determining the number of batteries required for a construction project can be expressed as: N y ≥N v ×K b ; Where N y is the number of batteries required for the construction project, N v is the number of vehicles required for the construction project, K b is the vehicle-to-electricity ratio, where K b and N v It cannot be too large, as it will affect the investment amount; K b The empirical value is set to comprehensively consider factors such as battery maintenance, charging / replacement cycle matching error, and vehicle operation cycle error.
[0030] It should be noted that when T x or T z The maximum value is greater than T h But if the difference is not too big, you can avoid waiting in line for battery replacement. h is significantly smaller, then the battery swap station can be used immediately without waiting. h If it is obviously too large, there will be a serious waiting time for battery replacement. The number or scale of battery replacement stations can be expanded as needed to reduce T h At the same time, the number of battery swap stations needs to be determined according to the operating routes, site space and investment scale. For example, one battery swap station can be set in the middle of a single round-trip route, one at the starting point and the end point, or several intersections of several routes, etc. In other words, the number of battery swap stations and the scale of each battery swap station are determined artificially according to numerical values, acceptable sites and investment amounts.
[0031] It should also be noted that if there are few battery swap stations, then more batteries will need to be stored and the charging power will need to be greater, or more shuttle buses will be required to improve battery transportation efficiency, and consideration should be given to increasing the number of battery swap grabbing mechanisms and vehicle lanes in the battery swap station.
[0032] return Figure 1 In step 3 of the embodiment, the number of shuttle buses is determined according to the battery replacement time of the batteries on the shuttle bus, the time the shuttle bus is in transit, the time it takes to complete charging of the batteries on the shuttle bus, the number of batteries on the shuttle bus, the number of batteries required for the construction project, and the number of battery replacement stations; wherein the shuttle bus is a shuttle bus that transports batteries between the photovoltaic energy storage power station and the battery replacement station.
[0033] It should be noted that the battery replacement time on the shuttle bus is defined as T t , the shuttle bus is on the way for T y 、The time it takes to complete charging the battery on the shuttle bus is T c 、Number of batteries on the shuttle bus b , then the number of shuttle buses can be expressed by the following formula: N s (T c +T y )≤N e ×T h + N b ×T t ; Where N s is the number of shuttle buses, N e The number of batteries in the battery swap station is calculated based on the number of batteries required for the construction project and the number of battery swap stations, that is, the division of the two.
[0034] return Figure 1 , step 4 of the embodiment, according to the number of shuttle buses, the charging power required for the battery on a single shuttle bus, the battery replacement time of the battery on the shuttle bus, the battery charging time on the shuttle bus, the shuttle bus in transit, the number of charging guns required for a single shuttle bus, the number of guns carried by the charging pile, the daily external discharge of the photovoltaic energy storage power station, the energy storage efficiency, the discharge margin coefficient, the average daily photovoltaic power generation power, the average daily power generation time, the photovoltaic energy storage capacity, the battery replacement energy storage capacity and the energy storage SCO lower limit, determine the total charging power provided by the photovoltaic energy storage power station for the battery on the shuttle bus, the number of charging piles in the photovoltaic energy storage power station, the minimum capacity of the photovoltaic energy storage power station and the total daily photovoltaic power generation.
[0035] It should be noted that the shuttle bus and its supporting batteries can be used as the main or auxiliary energy storage device for photovoltaic energy storage, and are also the main energy supply method for battery energy supply of battery swap stations and auxiliary battery swap sub-stations.
[0036] In some embodiments, the charging power required for the battery on a single shuttle can be expressed as: P b ≥N b ×D k / T c ; Where P b The charging power required for the battery on a single ferry; The total charging power provided by the external battery to the shuttle bus can be expressed as: P bz ≥P b (N s ×T c / ( T t +T y )); Where P bz is the total charging power provided by the photovoltaic energy storage power station to the batteries on the shuttle bus.
[0037] The number of charging piles in a photovoltaic energy storage power station can be expressed as: N z =( N q ×N s ) / N k ; N q = N b ×N j ; Where N z is the number of charging piles in the photovoltaic energy storage power station, N q is the number of charging guns required for a single shuttle bus, N k The number of guns carried by the charging pile, N j It is the number of charging sockets for a single battery, that is, the number of charging guns supported by a single battery.
[0038] It should be noted that if the shuttle bus and its supporting battery are used as a transition link between the energy storage battery and the battery swap station, the photovoltaic energy storage power station must have a charging system. If the efficiency of the stored electricity released to the battery is η f , then the minimum capacity of the photovoltaic energy storage power station can be expressed as: D s ≥P w (1-A d ) / C n ; (P bz ×T d ) / η f ≤P w ≤T d ×C d ; Where D s is the minimum capacity of the photovoltaic energy storage power station, P w is the daily discharge of the photovoltaic energy storage power station, C n is the energy storage efficiency, A d is the discharge residual coefficient, T d is the duration of external charging of the photovoltaic energy storage power station, C d It is the charging rate.
[0039] The total daily photovoltaic power generation can be expressed as: D f =P f ×T e ; P f = S f ×A s ×G×η r ; Where D f is the total photovoltaic power generation per day, P f is the average daily photovoltaic power generation, T e is the average daily power generation duration, S f is the power generation area, A s is the area utilization coefficient, G is the solar radiation intensity, η r is the transformation efficiency; D f ≥D c ×(1-X c )+ D h ×K y ; Where D c is the photovoltaic energy storage capacity, D h is the battery storage capacity, X c is the lower limit of energy storage SCO; this constraint formula can ensure that the total daily power generation is sufficient to cover the energy storage capacity, and can maximize the high energy storage capacity in the case of insufficient sunshine, which is enough to meet the usage demand and save the investment amount of energy storage capacity.
[0040] The above method starts from the transportation capacity required for the construction project, and reversely deduces the application matching parameters of each link such as the required vehicles, battery swap stations, photovoltaic energy storage power stations, etc., matches the minimum requirements of each link with the construction project, and can analyze the possibility of matching the application of photovoltaic energy storage with battery swap models and battery swap stations.
[0041] The research results show that the new energy battery exchange system and photovoltaic energy storage have a good matching application effect, and can achieve good complementarity and mutual benefit. It is of great significance to promote the application of photovoltaic energy storage, solve the energy supply of battery exchange and expand the applicable scenarios, and do a good job in demand matching calculation and investment planning analysis for the implementation of the application.
[0042] Figure 2 The figure is a schematic diagram of an embodiment of a new energy facility parameter calculation device matching a construction project disclosed in the present invention. Figure 2 An embodiment of the invention is a virtual device that can be loaded and executed by a terminal (such as a computer), and includes a first determination module, a second determination module, a third determination module and a fourth determination module.
[0043] The first determination module of the embodiment is configured to determine the number of vehicles required for the construction project based on the transportation capacity required for the construction project, the single loading time of a single vehicle, the single unloading time of a single vehicle, the distance from the work point to the battery swap station, the average per-kilometer power consumption of a single vehicle, the single vehicle loading and unloading operation power, the single vehicle battery capacity, the single vehicle SOC lower limit, the average vehicle speed of the single vehicle, the round-trip mileage of a single operation, the battery swap time of a single vehicle, the single-day working hours of the construction project and the single vehicle transportation volume; wherein the vehicle is a new energy operation vehicle that provides transportation capacity for the construction project.
[0044] The second determination module of the embodiment is configured to determine the number of batteries and battery swap stations required for the construction project based on the number of vehicles, the vehicle-to-battery ratio, the time required for battery swapping per vehicle, the time required for loading and unloading per vehicle, the time required for unloading per vehicle, the operation routes, the site space and the scale of investment.
[0045] The third determination module of the embodiment is configured to determine the number of ferry buses based on the battery replacement time on the ferry bus, the time the ferry bus is in transit, the time it takes to complete charging of the batteries on the ferry bus, the number of batteries on the ferry bus, the number of batteries required for the construction project and the number of battery swap stations; wherein the ferry bus is a ferry bus that transports batteries between the photovoltaic energy storage power station and the battery swap station.
[0046] The fourth determination module of the embodiment is configured to determine the total charging power provided by the photovoltaic energy storage power station for the battery on the shuttle bus, the number of charging piles in the photovoltaic energy storage power station, the minimum capacity of the photovoltaic energy storage power station and the total daily photovoltaic power generation according to the number of shuttle buses, the charging power required for the battery on a single shuttle bus, the battery replacement time on the shuttle bus, the time it takes to complete charging of the battery on the shuttle bus, the time the shuttle bus is in transit, the number of charging guns required for a single shuttle bus, the number of guns carried by the charging piles, the daily external discharge of the photovoltaic energy storage power station, the energy storage efficiency, the discharge margin coefficient, the average daily photovoltaic power generation power, the average daily power generation time, the photovoltaic energy storage capacity, the battery replacement energy storage capacity and the lower limit of the energy storage SCO.
[0047] Similar to the above method, the above device starts from the transportation capacity required for the construction project, reversely deduces the application matching parameters of each link such as the required vehicles, battery swap stations, photovoltaic energy storage power stations, etc., matches the minimum requirements of each link with the construction project, and can analyze the possibility of matching the application of photovoltaic energy storage with battery swap models and battery swap stations.
[0048] Based on the same technical solution, the present disclosure also relates to a computer-readable storage medium, which stores one or more programs, and the one or more programs include instructions. When the instructions are executed by a computing device, the computing device executes a new energy facility parameter calculation method that matches the construction project.
[0049] Based on the same technical solution, the present disclosure also relates to a computer device, including one or more processors and one or more memories, one or more programs are stored in the one or more memories and are configured to be executed by one or more processors, and the one or more programs include instructions for executing a new energy facility parameter calculation method matching a construction project.
[0050] It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Furthermore, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0051] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0052] These computer program instructions may also be stored in a computer readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer readable memory produce an article of manufacture including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0053] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0054] The above are merely embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention are included in the scope of the claims of the present invention to be approved.
Claims
1. A method for calculating parameters of new energy facilities matching the construction project, characterized in that: include: Determine the number of vehicles required for the construction project based on the transport capacity required for the construction project, the single loading time of a single vehicle, the single unloading time of a single vehicle, the distance from the operation point to the battery swap station, the average per-kilometer power consumption of a single vehicle, the power consumption of a single vehicle for loading and unloading operations, the battery capacity of a single vehicle, the lower limit of the SOC of a single vehicle, the average speed of a single vehicle, the round-trip mileage of a single operation, the battery swap time of a single vehicle, the single-day working hours of the construction project and the transportation volume of a single vehicle; among which, the vehicles are new energy operation vehicles that provide transport capacity for the construction project; Determine the number of batteries and battery swap stations required for the construction project based on the number of vehicles, vehicle-to-battery ratio, battery swap time per vehicle, loading time per vehicle, unloading time per vehicle, operation routes, site space, and investment scale; The number of shuttle buses is determined based on the battery replacement time of the batteries on the shuttle bus, the time the shuttle bus is in transit, the time it takes to complete charging of the batteries on the shuttle bus, the number of batteries on the shuttle bus, the number of batteries required for the construction project, and the number of battery swap stations. The shuttle bus is used to transport batteries between the photovoltaic energy storage power station and the battery swap station. Based on the number of shuttle buses, the charging power required for the batteries on a single shuttle bus, the battery replacement time on the shuttle bus, the time it takes to complete charging of the batteries on the shuttle bus, the time the shuttle bus is in transit, the number of charging guns required for a single shuttle bus, the number of guns carried by the charging piles, the daily external discharge of the photovoltaic energy storage power station, the energy storage efficiency, the discharge margin coefficient, the average daily photovoltaic power generation, the average daily power generation time, the photovoltaic energy storage capacity, the battery replacement energy storage capacity and the lower limit of the energy storage SCO, determine the total charging power provided by the photovoltaic energy storage power station for the batteries on the shuttle bus, the number of charging piles in the photovoltaic energy storage power station, the minimum capacity of the photovoltaic energy storage power station and the total daily photovoltaic power generation.
2. The method for calculating parameters of new energy facilities matching a construction project according to claim 1, characterized in that: Determine the number of vehicles needed for a construction project using the formula: N v ≥L g / L d ; L d = L v ×N d ×N h ; N h =T g / T v ; T v =T r -T zx -T h -T f ; T f =2S z / V p ; T zx =(T z +T x )×N d ; T r = S v / V p ; N d =(S v +2S z ) / S d ; S v =(D k -D zx ×N d ×N h ) / D p ; D k = D v ×(1-X v -K y ); K y ≥D p ×S z ; Where, L g is the transportation capacity required for the construction project, N v is the number of vehicles required for the construction project, L d is the daily transport volume of a single vehicle, L v is the transport volume per vehicle, N d is the number of single-power operations of the vehicle, N h is the number of battery replacements per vehicle, T g is the single-day working hours of the construction project, T v is the operation time of a single charge of a bicycle, T r is the driving time of the bicycle without battery replacement, T zx is the single power loading and unloading time, T h The battery replacement time for a bicycle, T f The duration of battery replacement for a bicycle, S z is the distance from the operation point to the battery swap station, V p is the average speed of a single vehicle, T z is the single loading time of a single vehicle, T x is the single unloading time of a single vehicle, S v is the single-vehicle operating range, S d is the round trip mileage of a single operation, D k is the available power of the bicycle, D zx is the power consumption of single vehicle loading and unloading operation, D p is the average power consumption per kilometer under single-vehicle operation, D v is the battery capacity of the bicycle, X v is the lower limit of the single vehicle SOC, K y is the vehicle power reserve coefficient.
3. The method for calculating parameters of new energy facilities matching a construction project according to claim 1, characterized in that: Determine the number of batteries needed for a construction project using the formula: N y ≥N v ×K b ; Where N y is the number of batteries required for the construction project, N v is the number of vehicles required for the construction project, K b is the vehicle-to-electricity ratio.
4. The method for calculating parameters of new energy facilities matching a construction project according to claim 1, characterized in that: Determine the number of shuttle buses, the formula is: N s (T c +T y )≤N e ×T h + N b ×T t ; Where N s is the number of shuttle buses, T c The time it takes for the battery on the shuttle bus to complete charging, T y is the shuttle bus en route time, N e T is the number of batteries in the battery swap station calculated based on the number of batteries required for the construction project and the number of battery swap stations. h The battery replacement time for a bicycle, T t is the battery replacement time of the shuttle bus, N b The number of batteries on the shuttle bus.
5. The method for calculating parameters of new energy facilities matching construction projects according to claim 1, characterized in that: Determine the total charging power provided by the photovoltaic energy storage power station to the battery on the shuttle bus, the formula is: P bz ≥P b (N s ×T c / ( T t +T y )); P b ≥N b ×D k / T c ; Where P bz is the total charging power provided by the photovoltaic energy storage power station to the battery on the shuttle bus, P b is the charging power required for the battery on a single ferry, N s is the number of shuttle buses, T t is the battery replacement time of the shuttle bus, T y is the shuttle bus en route time, T c The time it takes for the battery on the shuttle bus to be fully charged, D k is the available power of the bicycle, N b The number of batteries on the shuttle bus.
6. The method for calculating parameters of new energy facilities matching construction projects according to claim 1, characterized in that: The formula for determining the number of charging piles in a photovoltaic energy storage power station is: N z =( N q ×N s ) / N k ; Where N z is the number of charging piles in the photovoltaic energy storage power station, N q is the number of charging guns required for a single shuttle bus, N k The number of guns carried by the charging pile, N s is the number of shuttle buses.
7. The method for calculating parameters of new energy facilities matching construction projects according to claim 1, characterized in that: The formula for determining the minimum capacity of a photovoltaic energy storage power station is: D s ≥P w (1-A d ) / C n ; (P bz ×T d ) / the f ≤P w ≤T d ×C d ; Where D s is the minimum capacity of the photovoltaic energy storage power station, P w is the daily discharge of the photovoltaic energy storage power station, C n is the energy storage efficiency, A d is the discharge residual coefficient, T d is the duration of external charging of the photovoltaic energy storage power station, η f is the efficiency of releasing the stored electricity to the battery, P bz is the total charging power provided by the photovoltaic energy storage power station to the battery on the shuttle bus, C d It is the charging rate.
8. The method for calculating parameters of new energy facilities matching a construction project according to claim 1, characterized in that: Determine the total photovoltaic power generation per day, the formula is: D f =P f ×T e ; P f = S f ×A s ×G×η r ; D f ≥D c ×(1-X c )+ D h ×K y ; Where D f is the total photovoltaic power generation per day, P f is the average daily photovoltaic power generation, T e is the average daily power generation duration, D c is the photovoltaic energy storage capacity, D h is the battery storage capacity, X c is the lower limit of energy storage SCO, K y is the vehicle power reserve coefficient, S f is the power generation area, A s is the area utilization coefficient, G is the solar radiation intensity, η r For transformation efficiency.
9. A new energy facility parameter calculation device matching the construction project, characterized in that: include: The first determination module determines the number of vehicles required for the construction project based on the transportation capacity required for the construction project, the single loading time of a single vehicle, the single unloading time of a single vehicle, the distance from the operation point to the battery swap station, the average per-kilometer power consumption of a single vehicle, the power consumption of a single vehicle for loading and unloading operations, the battery capacity of a single vehicle, the lower limit of the single vehicle SOC, the average speed of a single vehicle, the round-trip mileage of a single operation, the battery swap time of a single vehicle, the single-day working hours of the construction project, and the transportation volume of a single vehicle; among them, the vehicles are new energy operation vehicles that provide transportation capacity for the construction project; The second determination module determines the number of batteries and battery swap stations required for the construction project based on the number of vehicles, vehicle-to-battery ratio, single-vehicle battery swap time, single-vehicle loading time, single-vehicle unloading time, operation routes, site space and investment scale; The third determination module determines the number of shuttle buses according to the battery replacement time of the shuttle bus, the shuttle bus in transit time, the battery charging time of the shuttle bus, the number of batteries on the shuttle bus, the number of batteries required for the construction project and the number of battery swap stations; the shuttle bus is a shuttle bus that transports batteries between the photovoltaic energy storage power station and the battery swap station; The fourth determination module determines the total charging power provided by the photovoltaic energy storage power station for the battery on the shuttle bus, the number of charging piles in the photovoltaic energy storage power station, the minimum capacity of the photovoltaic energy storage power station and the total daily photovoltaic power generation according to the number of shuttle buses, the charging power required for the battery on a single shuttle bus, the battery replacement time on the shuttle bus, the battery charging time on the shuttle bus, the shuttle bus in transit, the number of charging guns required for a single shuttle bus, the number of guns carried by the charging pile, the daily external discharge of the photovoltaic energy storage power station, the energy storage efficiency, the discharge margin coefficient, the average daily photovoltaic power generation, the average daily power generation time, the photovoltaic energy storage capacity, the battery replacement energy storage capacity and the lower limit of the energy storage SCO.