Method for evaluating grid-connected electric energy quality of new energy power station and computer program product
By building a power quality evaluation index system in the power system and user perception dimensions, and combining weight empowerment and load type correction, the problem of inaccurate power quality assessment is solved, and a comprehensive and accurate assessment of the power quality of new energy power stations is achieved. Power quality control.
Patent Information
- Application Number
- CN202411068687.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-05
- Publication Date
- 2024-11-19
AI Technical Summary
In the prior art, the evaluation of power quality is inaccurate, especially in new energy grid-connected power systems, the evaluation of indicators such as voltage, frequency and three-phase imbalance is insufficient, and the impact of load type on the degree of focus on the power quality is not fully considered.
A new energy power station grid-connected power quality evaluation method is proposed. By obtaining power grid data, an evaluation index system based on the power system dimension and user perception dimension is constructed. Combined with the order relationship analysis method and the gray correlation analysis method, the subjective and the evaluation index are determined. Objective weights and corrected according to load type to obtain accurate target evaluation metrics.
A comprehensive and accurate assessment of the power quality of new energy power plants has been achieved, the scientificity and effectiveness of power quality management has been improved, and the objectivity and practicality of the evaluation results have been ensured.
Smart Images

Figure CN118982287A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of power grid assessment, and in particular to a method for assessing the quality of grid-connected power of a new energy power station, a computer program product, and an electronic device. Background Art
[0002] With the large-scale application of new energy, the randomness and volatility of new energy output have a certain impact on the power quality indicators such as voltage, frequency, and three-phase imbalance of the new energy grid-connected power system. At the same time, as a harmonic source, new energy will also cause certain harmonic pollution to the power system. For the power system that needs to ensure safe and stable electricity use for users and provide high-quality power supply services, the power quality level seriously affects the safety, stability and power supply quality of the power system. In the context of the development of large-scale grid connection of new energy, how to evaluate the power quality of new energy grid-connected power to accurately grasp the current power quality level and carry out targeted power quality management and improvement is one of the key research contents.
[0003] At present, comprehensive evaluation of power quality is mainly carried out by formulating evaluation indicators, calculating indicator weights and applying evaluation methods. Evaluation indicators generally consider power quality indicators such as voltage deviation, frequency deviation, and three-phase imbalance, involving subjective and objective weighting methods such as AHP (Analytic Hierarchy Process) and entropy weight method, solution ideas such as matter-element analysis and game theory, evaluation methods such as TOPSIS (Technique for Order Preference by Similarity to IdealSo1ution) and fuzzy comprehensive evaluation, or using intelligent algorithms such as random forest and neural network. Existing studies mostly divide power quality limit range requirements into different levels according to national standards, and apply evaluation methods for grading evaluation, or improve relevant evaluation methods.
[0004] At present, the research on power quality assessment is mainly focused on power quality indicators such as voltage deviation and three-phase imbalance in the power system direction, and less on power quality indicators from the user's perspective. At the same time, the standards for power quality classification are still subjective, and are generally divided equally within the limit range. Secondly, different load types have different emphases on different power quality indicators, which will affect the comprehensive evaluation of power quality to a certain extent, but the impact of the emphasis on power quality under load types is less considered. Summary of the invention
[0005] The main purpose of this application is to provide a method for evaluating the power quality of a new energy power station connected to the grid, a computer program product and an electronic device, so as to at least solve the problem of inaccurate power quality evaluation in the prior art.
[0006] In order to achieve the above-mentioned purpose, according to one aspect of the present application, a method for evaluating the grid-connected power quality of a new energy power station is provided, comprising: obtaining grid data of the power grid to be evaluated, and determining an evaluation boundary, the grid data comprising the network topology relationship of the power grid to be evaluated, basic parameters of the equipment in the grid, load data in the grid, grid connection points of new energy power stations in the grid, and new energy capacity in the grid, and the evaluation boundary comprising an evaluation object, an evaluation cycle, and a monitoring window; constructing an evaluation index system of the power grid to be evaluated based on the power system dimension and the user perception dimension according to the grid data and the evaluation boundary, the evaluation index system comprising multiple evaluation indicators; determining the subjective weight and objective weight of the evaluation index, and determining the combined weight of the evaluation index according to the subjective weight and the objective weight; modifying the evaluation index according to the load type of the power grid to be evaluated to obtain a target evaluation index; and evaluating the power grid to be evaluated according to the target evaluation index and the combined weight.
[0007] Optionally, the evaluation index system includes multiple power system evaluation indicators and multiple user perception evaluation indicators. According to the power grid data and the evaluation boundary, an evaluation index system of the power grid to be evaluated based on the power system dimension and the user perception dimension is constructed, including: determining the power system evaluation indicators according to the power grid data and the evaluation boundary, and the power system evaluation indicators include voltage deviation, frequency deviation, voltage total harmonic distortion rate, three-phase imbalance, voltage fluctuation and voltage sag; determining the user perception evaluation indicators according to the power grid data and the evaluation boundary, and the user perception evaluation indicators include user satisfaction, number of power outage perceptions, power outage perception time and perception of power quality problems.
[0008] Optionally, the evaluation cycle includes a plurality of monitoring windows, and determining the power system evaluation index according to the power grid data and the evaluation boundary includes: using the formula Determine the voltage deviation, where U i represents the actual voltage value of the evaluation point in the i-th monitoring window, U N represents the nominal voltage corresponding to the evaluation point, T represents the total number of the monitoring windows in the evaluation period, i represents the sequence number of the monitoring window, and U (%) represents the voltage deviation; using the formula Determine the frequency deviation, where f i represents the grid frequency of the evaluation point in the i-th monitoring window, f N represents the standard frequency corresponding to the evaluation point, and F(%) represents the frequency deviation; using the formula Determine the voltage total harmonic distortion rate, where, represents the root mean square value of the hth harmonic current at the evaluation point in the i-th monitoring window, represents the RMS value of the fundamental current at the evaluation point in the i-th monitoring window, H represents the highest harmonic order, THD u Represents the total harmonic distortion rate of the voltage; using the formula Determine the three-phase unbalance, where ΔI maxi represents the maximum difference between two phases of the three-phase current at the evaluation point in the i-th monitoring window, I avgi represents the average value of the three-phase current at the evaluation point in the i-th monitoring window, ε i Represents the three-phase unbalance; using the formula The voltage fluctuation is determined, wherein represents the maximum value of the square root mean value of the voltage at the evaluation point in the i-th monitoring window, represents the minimum value of the voltage root mean square value of the evaluation point in the i-th monitoring window, d represents the voltage fluctuation; using the formula Determine the voltage sag, where A represents the number of short-term voltage interruptions during the evaluation period, D represents the number of days during which short-term voltage interruptions occur during the evaluation period, and D T represents the total number of days in the evaluation period, and SARFI represents the voltage sag.
[0009] Optionally, determining the user perception evaluation index according to the power grid data and the evaluation boundary includes: using the formula Determine the user satisfaction, where C s is the user satisfaction, G k is the score of the kth user at the evaluation point for the power supply quality of the power grid to be evaluated within the evaluation period, N represents the number of users at the evaluation point, and k is the sequence number of the user at the evaluation point; using the formula Determine the power outage detection times, where CAIFI is the power outage detection times, c j represents the number of users at the evaluation point experiencing power outage at the jth time, and M represents the total number of power outages during the evaluation period; using the formula Determine the power outage perception time, where CAIDI is the power outage perception time, t j is the power outage time of the evaluation point during the i-th power outage; using the formula Determine the power quality problem perception, where N e For the power quality problem perception, O u represents the total number of complaints and feedbacks about voltage quality from users at the evaluation point during the evaluation period, O srepresents the total number of complaint tickets and feedbacks on power supply quality from users at the evaluation point during the evaluation period, O c It represents the sum of the total number of complaint tickets and the total number of feedback from users at the evaluation point during the evaluation period, and σ represents the preset margin factor.
[0010] Optionally, determining the subjective weight and the objective weight of the evaluation index includes: using an ordinal relationship analysis method to calculate the subjective weight; and using a grey correlation analysis method to calculate the objective weight.
[0011] Optionally, determining the combined weight of the evaluation index according to the subjective weight and the objective weight includes: using the formula Determine the combined weight, where W a represents the combined weight of the ath evaluation index, W pa represents the subjective weight of the a-th evaluation indicator, W ra represents the objective weight of the a-th evaluation indicator, a represents the sequence number of the evaluation indicator, and n represents the total number of the evaluation indicators.
[0012] Optionally, according to the load type of the power grid to be evaluated, the evaluation index is modified to obtain a target evaluation index, including: standardizing the user perception evaluation index to obtain a standard user perception evaluation index; determining the sensitivity factor of the evaluation index using a grey correlation analysis method according to the load type and the standard user perception evaluation index; standardizing the evaluation index to obtain a standard evaluation index; and determining the target evaluation index based on the sensitivity factor and the standard evaluation index.
[0013] Optionally, evaluating the power grid to be evaluated according to the target evaluation index and the combined weight includes: using the formula Determine the comprehensive score of the evaluation object, where C b represents the comprehensive score of the bth evaluation object, z′ ab represents the ath target evaluation indicator of the bth evaluation object, a represents the serial number of the target evaluation indicator, b represents the serial number of the evaluation object, and W a represents the combined weight of the ath evaluation object, and n represents the total number of the target evaluation indicators; and the power grid to be evaluated is evaluated according to the comprehensive score.
[0014] According to another aspect of the present application, a computer program product is provided, comprising computer instructions, which, when executed by a processor, implement any one of the methods for evaluating the grid-connected power quality of a new energy power station.
[0015] According to another aspect of the present application, an electronic device is provided, comprising: one or more processors, a memory, and one or more programs, wherein the one or more programs are stored in the memory and are configured to be executed by the one or more processors, and the one or more programs include a method for executing any one of the methods for evaluating the grid-connected power quality of a new energy power station.
[0016] By applying the technical solution of the present application, the grid data of the grid to be evaluated is first obtained, and the evaluation boundary is determined. Then, based on the grid data and the evaluation boundary, an evaluation index system of the grid to be evaluated based on the power system dimension and the user perception dimension is constructed. The evaluation index system includes multiple evaluation indicators. Then, the subjective weight and objective weight of the evaluation index are determined. Based on the subjective weight and the objective weight, the combined weight of the evaluation index is determined. Then, based on the load type of the grid to be evaluated, the evaluation index is corrected to obtain the target evaluation index. Finally, based on the target evaluation index and the combined weight, the grid to be evaluated is evaluated. Compared with the problem of inaccurate power quality assessment in the prior art, the present application constructs a power quality assessment index system for the power grid to be assessed based on the two dimensions of power system and power consumption perception, thereby ensuring that the constructed assessment index system is relatively comprehensive and accurate, and determines the subjective weight and objective weight of the assessment index, and determines the combined weight according to the objective weight and the subjective weight, thereby ensuring that the combined weight of the assessment index is relatively accurate, and then corrects the assessment index according to the load type of the power grid to be assessed to obtain the target assessment index, thereby ensuring that the target assessment index is relatively accurate, and finally, the power grid to be assessed is assessed according to the target assessment index and the combined weight, thereby ensuring that the assessment of the power grid to be assessed is relatively comprehensive and accurate. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The drawings constituting part of the present application are used to provide a further understanding of the present application. The exemplary embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:
[0018] Figure 1 A hardware structure block diagram of a mobile terminal for performing a method for evaluating the quality of grid-connected power of a new energy power station provided in an embodiment of the present application is shown;
[0019] Figure 2 A schematic diagram of a flow chart of a method for evaluating the quality of grid-connected power of a new energy power station provided according to an embodiment of the present application is shown;
[0020] Figure 3 A schematic diagram showing power quality dimension scores, user perception dimension scores and comprehensive scores corresponding to four different evaluation points provided according to an embodiment of the present application is shown;
[0021] Figure 4A schematic diagram of power quality dimension indicators corresponding to four different evaluation points provided according to an embodiment of the present application is shown;
[0022] Figure 5 A schematic diagram of user perception dimension indicators corresponding to four different evaluation points provided according to an embodiment of the present application is shown.
[0023] The above drawings include the following reference numerals:
[0024] 102, processor; 104, memory; 106, transmission device; 108, input and output devices. DETAILED DESCRIPTION
[0025] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0026] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.
[0027] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0028] As introduced in the background technology, the power quality assessment in the prior art is inaccurate. To solve the above problem, the embodiments of the present application provide a method, a computer program product and an electronic device for assessing the power quality of a new energy power station connected to the grid.
[0029] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0030] The method embodiments provided in the embodiments of the present application can be executed in a mobile terminal, a computer terminal or a similar computing device. Taking running on a mobile terminal as an example, Figure 1 1 is a hardware structure block diagram of a mobile terminal of a method for evaluating the quality of grid-connected power of a new energy power station according to an embodiment of the present invention. Figure 1 As shown, the mobile terminal may include one or more ( Figure 1 Only one is shown in the figure) a processor 102 (the processor 102 may include but is not limited to a processing device such as a microprocessor MCU or a programmable logic device FPGA) and a memory 104 for storing data, wherein the mobile terminal may also include a transmission device 106 and an input / output device 108 for communication functions. It can be understood by those skilled in the art that Figure 1 The structure shown is only for illustration and does not limit the structure of the mobile terminal. Figure 1 More or fewer components as shown, or with Figure 1 Different configurations are shown.
[0031] The memory 104 can be used to store computer programs, for example, software programs and modules of application software, such as the computer program corresponding to the method for evaluating the quality of grid-connected power of a new energy power station in the embodiment of the present invention. The processor 102 executes various functional applications and data processing by running the computer program stored in the memory 104, that is, to implement the above method. The memory 104 may include a high-speed random access memory, and may also include a non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some instances, the memory 104 may further include a memory remotely arranged relative to the processor 102, and these remote memories may be connected to the mobile terminal via a network. Examples of the above networks include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof. The transmission device 106 is used to receive or send data via a network. The above network specific examples may include a wireless network provided by a communication provider of the mobile terminal. In one example, the transmission device 106 includes a network adapter (Network Interface Controller, referred to as NIC), which can be connected to other network devices through a base station so as to communicate with the Internet. In one example, the transmission device 106 may be a radio frequency (RF) module, which is used to communicate with the Internet wirelessly.
[0032] In this embodiment, a method for evaluating the grid-connected power quality of a new energy power station running on a mobile terminal, a computer terminal or a similar computing device is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described may be executed in an order different from that shown here.
[0033] Figure 2 1 is a flow chart of a method for evaluating the quality of grid-connected power of a new energy power station according to an embodiment of the present application. Figure 2 As shown, the method comprises the following steps:
[0034] Step S201, obtaining grid data of the grid to be evaluated and determining an evaluation boundary, wherein the grid data includes the network topology of the grid to be evaluated, basic parameters of the equipment in the grid, load data in the grid, grid connection points of new energy power stations in the grid, and new energy capacity in the grid, and the evaluation boundary includes an evaluation object, an evaluation period, and a monitoring window;
[0035] Step S202: constructing an evaluation index system of the power grid to be evaluated based on the power system dimension and the user perception dimension according to the power grid data and the evaluation boundary, wherein the evaluation index system includes multiple evaluation indicators;
[0036] Step S203, determining the subjective weight and the objective weight of the above evaluation indicators, and determining the combined weight of the above evaluation indicators according to the above subjective weight and the above objective weight;
[0037] Step S204, modifying the above evaluation index according to the load type of the above power grid to be evaluated to obtain a target evaluation index;
[0038] Step S205: evaluating the power grid to be evaluated according to the target evaluation index and the combined weight.
[0039] Through the above embodiment, the grid data of the power grid to be evaluated is first obtained, and the evaluation boundary is determined. Then, according to the grid data and the evaluation boundary, an evaluation index system of the power grid to be evaluated based on the power system dimension and the user perception dimension is constructed. The evaluation index system includes multiple evaluation indicators. Then, the subjective weight and objective weight of the evaluation indicator are determined, and the combined weight of the evaluation indicator is determined based on the subjective weight and the objective weight. Then, according to the load type of the power grid to be evaluated, the evaluation indicator is corrected to obtain the target evaluation indicator. Finally, according to the target evaluation indicator and the combined weight, the power grid to be evaluated is evaluated. Compared with the problem of inaccurate power quality assessment in the prior art, the present application constructs a power quality assessment index system for the power grid to be assessed based on the two dimensions of power system and power consumption perception, ensuring that the constructed assessment index system is relatively comprehensive and accurate, and determines the subjective weight and objective weight of the assessment index, and determines the combined weight according to the objective weight and the subjective weight, avoiding the weight distortion caused by subjective judgment and poor data quality, and ensuring that the combined weight of the assessment index is relatively accurate. Then, according to the load type of the power grid to be assessed, the assessment index is corrected to obtain the target assessment index, ensuring that the target assessment index is relatively accurate. Finally, the power grid to be assessed is assessed according to the target assessment index and the combined weight, ensuring that the assessment of the power grid to be assessed is relatively comprehensive and accurate.
[0040] Specifically, the method for evaluating the power quality of a new energy power station connected to the grid in the present application can quantitatively evaluate the power quality level after the new energy is connected to the grid, and support the management and improvement of power quality.
[0041] In an optional scheme, the above-mentioned evaluation index system includes multiple power system evaluation indicators and multiple user perception evaluation indicators. According to the above-mentioned power grid data and the above-mentioned evaluation boundary, an evaluation index system of the above-mentioned power grid to be evaluated based on the power system dimension and the user perception dimension is constructed, including: according to the above-mentioned power grid data and the above-mentioned evaluation boundary, the above-mentioned power system evaluation indicators are determined, and the above-mentioned power system evaluation indicators include voltage deviation, frequency deviation, voltage total harmonic distortion rate, three-phase unbalance, voltage fluctuation and voltage sag; according to the above-mentioned power grid data and the above-mentioned evaluation boundary, the above-mentioned user perception evaluation indicators are determined, and the above-mentioned user perception evaluation indicators include user satisfaction, power outage perception number, power outage perception time and power quality problem perception. In this embodiment, the evaluation index system includes multiple power system evaluation indicators and multiple user perception evaluation indicators, and the power system evaluation indicators include voltage deviation, frequency deviation, voltage total harmonic distortion rate, three-phase unbalance, voltage fluctuation and voltage sag. The user perception evaluation indicators include user satisfaction, power outage perception number, power outage perception time and power quality problem perception. By combining these 10 evaluation indicators for evaluation, it is further guaranteed that the evaluation of the power grid to be evaluated is more accurate.
[0042] Specifically, the above evaluation index system has a three-level structure. The power system dimension mainly considers the quality of electricity provided to users by the power supplier, and mainly measures whether the electrical characteristics such as voltage, current, and frequency are within the deviation limits specified by the state. Six evaluation indicators are proposed to reflect common power quality problems, including voltage deviation, frequency deviation, voltage total harmonic distortion rate, three-phase imbalance, voltage fluctuation, and voltage sag; the user perception dimension mainly considers the perception of power quality events such as power outages, low voltage, frequency instability, and voltage flicker as the power user. For power outage perception, two indicators, namely the number of power outage perceptions and the power outage perception time, are proposed to reflect the number and duration of power outages. In addition, two evaluation indicators, namely user satisfaction and power quality problem perception, are proposed to reflect user satisfaction and the number of other power quality problems.
[0043] In other embodiments, the evaluation cycle includes a plurality of monitoring windows, and determining the power system evaluation index according to the power grid data and the evaluation boundary includes: using the formula Determine the above voltage deviation, where U i It represents the actual voltage value of the evaluation point in the i-th monitoring window, U N represents the nominal voltage corresponding to the above evaluation point, T represents the total number of the above monitoring windows in the above evaluation period, i represents the sequence number of the above monitoring window, and U (%) represents the above voltage deviation; using the formula Determine the above frequency deviation, where f i represents the grid frequency of the above evaluation point in the i-th monitoring window, f N represents the standard frequency corresponding to the above evaluation point, and F(%) represents the above frequency deviation; using the formula Determine the above voltage total harmonic distortion rate, where, represents the RMS value of the hth harmonic current at the above evaluation point in the i-th monitoring window, represents the RMS value of the fundamental current at the above evaluation point in the i-th monitoring window, H represents the highest harmonic order, THD u Represents the total harmonic distortion rate of the above voltage; using the formula Determine the above three-phase unbalance, where ΔI maxi It represents the maximum difference between the two phases of the three-phase current at the above evaluation point in the i-th monitoring window, I avgi represents the average value of the three-phase current at the above evaluation point in the i-th monitoring window, ε i Indicates the above three-phase unbalance; using the formula Determine the above voltage fluctuations, where represents the maximum value of the square root mean value of the voltage at the above evaluation point in the i-th monitoring window, represents the minimum value of the voltage RMS value at the evaluation point in the i-th monitoring window, and d represents the voltage fluctuation. Determine the voltage sag, where A represents the number of short-term voltage interruptions during the evaluation period, D represents the number of days during the evaluation period when short-term voltage interruptions occur, and D T Indicates the total number of days in the above evaluation period, and SARFI indicates the above voltage sag. In this embodiment, a specific formula is used to determine the six power system evaluation indicators of voltage deviation, frequency deviation, voltage total harmonic distortion rate, three-phase unbalance, voltage fluctuation and voltage sag, which ensures that the obtained power system evaluation indicators are relatively accurate, thereby further ensuring that the subsequent evaluation of the power grid to be evaluated is relatively accurate.
[0044] Specifically, the evaluation point represents a node in the network topology of the power grid to be evaluated.
[0045] Specifically, the voltage deviation refers to the degree of deviation of the actual operating voltage value of the grid connection point or the evaluation point from the rated voltage value, which is expressed as the average voltage deviation U(%) of the evaluation point during the evaluation period. The evaluation period can be divided into monitoring windows according to the actual situation according to time lengths such as 10s, 1min, 15min or 1h. The frequency deviation refers to the degree of deviation of the actual operating frequency of the grid connection point or the evaluation point from the standard frequency, i.e. 50Hz, which is expressed as the average frequency deviation F(%) of the evaluation point during the evaluation period. Harmonics can be measured by harmonic voltage or harmonic current. This method selects voltage indicators to characterize the severity of harmonics, and uses the average voltage total harmonic distortion rate THD of the evaluation point during the evaluation period. u The three-phase unbalance is caused by the amplitude or relative asymmetry of voltage and current, and is expressed as the three-phase unbalance ε of the evaluation point in the evaluation period. i To measure the degree of three-phase imbalance. Voltage fluctuation is represented by the peak change amplitude d of the voltage root mean square value at the evaluation point within the evaluation period. Voltage sag refers to the phenomenon that the power frequency voltage root mean square value of a certain point in the power system suddenly drops to 0.1pu~0.9pu and returns to normal after a short duration of 10ms~1min. It is represented by SARFI, the main quantitative indicator reflecting the frequency of voltage sag (short-term interruption) in a certain system or a single evaluation point within a specific time.
[0046] In some other optional solutions, the user perception evaluation index is determined based on the power grid data and the evaluation boundary, including: using the formula Determine the above user satisfaction, where C s For the above user satisfaction, G k is the score of the kth user at the evaluation point within the evaluation period for the power supply quality of the above-mentioned power grid to be evaluated, N represents the number of users at the above-mentioned evaluation point, and k is the sequence number of the user at the above-mentioned evaluation point; using the formula Determine the power outage detection times, where CAIFI is the power outage detection times, c j represents the number of users at the jth power outage at the above evaluation point, and M represents the total number of power outages during the above evaluation period; using the formula Determine the power outage perception time, where CAIDI is the power outage perception time, t j is the power outage time of the above evaluation point at the jth power outage; using the formula Determine the above power quality problem perception, where N e To perceive the above power quality issues, O u represents the total number of complaints and feedbacks about voltage quality from users at the above evaluation points during the above evaluation period, O s represents the total number of complaints and feedbacks about power supply quality from users at the above evaluation points during the above evaluation period, O c represents the sum of the total number of complaint work orders and the total number of feedback from users at the above evaluation point during the above evaluation period, and σ represents a preset margin factor. In this embodiment, a specific formula is used to determine the four user perception evaluation indicators of user satisfaction, power outage perception number, power outage perception time, and power quality problem perception, which ensures that the obtained user perception evaluation indicators are relatively accurate, thereby further ensuring that the subsequent evaluation of the power grid to be evaluated is relatively accurate.
[0047] Specifically, according to the routine user satisfaction survey of the power grid company, user satisfaction C s The indicator reflects the user's comprehensive score for the power supply quality of the power company. The user's perception of power outages is the most intuitive and clear. This application uses two indicators, CAIFI, the number of power outages for users at the assessment point during the assessment period, and SAIDI, the power outage time for users, to reflect the user's perception of power outages. In addition to power outages, three-phase imbalance and low voltage problems are also power quality problems that low-voltage users perceive more obviously. The ratio N of the number of user complaints or feedback related to voltage quality and power supply quality at the assessment point during the assessment period to the total number of complaint tickets and feedback during the assessment period is used. e Represents users’ perception of the frequency of power quality issues.
[0048] In the actual application process, those skilled in the art can set the above margin factor according to the empirical value, or obtain it through multiple experiments, and this application does not impose specific restrictions on this. Specifically, for power quality problems such as harmonic pollution and short-term frequency deviation, it is difficult for users to intuitively perceive them, and the time complaints or feedback should be less than the actual number of occurrences. In this application, the margin factor is 1.2.
[0049] In some other optional schemes, determining the subjective weight and objective weight of the above evaluation index includes: using the sequence relationship analysis method to calculate the above subjective weight; using the gray correlation analysis method to calculate the above objective weight. In this embodiment, the sequence relationship analysis method is used to calculate the subjective weight, which ensures that the obtained subjective weight is more accurate, and the gray correlation analysis method is used to calculate the objective weight, which ensures that the obtained objective weight is more accurate, thereby further ensuring that the subsequent combined weight is more accurate.
[0050] Specifically, the subjective weight adopts the ordinal relationship analysis method to calculate the weight according to the relative importance of the evaluation indicators. It is an improvement of the AHP (Analytic Hierarchy Process) hierarchical analysis method. It does not need to build a judgment matrix and perform consistency verification. The calculation steps are as follows: 1) Determine the ordinal relationship of the importance of evaluation indicators: Experts rank the importance of each evaluation indicator according to relevant judgment criteria or work experience, and obtain I1>I2>…>I n-1 >I n , n is the total number of evaluation indicators. 2) Quantify the importance of adjacent evaluation indicators: define the relative importance of adjacent evaluation indicators as v a , whose value is assigned by experts based on experience or judgment criteria. The judgment criteria can be found in Table 1. 3) Subjective weight calculation: The weight W of the last evaluation indicator in the order relationship n Calculated as follows: The weights of other evaluation indicators are calculated step by step from the least important indicator, and the formula is as follows: n-1 =v n W n .
[0051] Table 1
[0052] <![CDATA[v a Value]]> meaning 1 <![CDATA[Evaluation Index I a-1 and I a are equally important]]> 1.2 <![CDATA[Evaluation Index I a-1 Ratio I a Slightly more important]]> 1.4 <![CDATA[Evaluation Index I a-1 than I a is more important]]> 1.6 <![CDATA[Evaluation Index I a-1 Ratio I a Significantly important]]> 1.8 <![CDATA[Evaluation Index I a-1 Ratio I a Extremely Important]]>
[0053] Specifically, the objective weight is calculated using the grey correlation analysis method. The grey correlation analysis method is based on the similarity or difference between the development trends of various factors, namely the "grey correlation", and its correlation can be used as the objective weight. The calculation steps are as follows: 1) Determine the parent sequence: Assuming that there are n evaluation indicators and m evaluation objects, the parent sequence is the reference sequence. Generally, the optimal value of each evaluation indicator can be taken. When analyzing the correlation between other evaluation indicators and a key evaluation indicator, the value of this key evaluation indicator can be taken as the reference sequence, expressed as X0={X 10 , X 20 , …, X a0} T 2) Constructing the calculation matrix: The calculation matrix is formed by the parent sequence and the reference sequence of the evaluation index value. Among them, x abIndicates the ath evaluation index value of the bth evaluation object. 3) Data positive and standardized processing: Indicators can be divided into four categories: extremely large, extremely small, interval and intermediate. Generally, indicators are processed into extremely large indicators, that is, the larger the indicator value, the better the indicator. Among them, the smaller the index value of the extremely small indicator, the better the indicator is. The range method is used for positive processing: Interval indicators are the best within a certain interval. Assuming that the best interval is [e, f], the forward processing is performed according to the following formula: A = max{e-min{x a},max{x a}-f}, The intermediate indicator is the best at a certain value. Assume that its optimal value is x best , and perform forward processing according to the following formula: A = max{|x a -x best |}, After the data matrix is normalized, it is normalized to eliminate the dimension effect: Among them, z ab Represents the standardized index value of the ath evaluation index of the bth evaluation object. 4) Calculate the correlation coefficient and correlation degree: Calculate the correlation coefficient and correlation degree according to the standardized matrix: Among them, ξ ab It represents the correlation coefficient corresponding to the ath evaluation indicator of the bth evaluation object, that is, the factor z in the standardized matrix ab The corresponding correlation coefficient, ρ represents the resolution coefficient, which is generally between (0, 1] and usually takes 0.5, r a Represents the correlation of the ath evaluation indicator. 5) After the indicator correlation is normalized, the objective weight is obtained:
[0054] In some other exemplary embodiments, the combined weight of the evaluation indicators is determined based on the subjective weight and the objective weight, including: using the formula Determine the above combination weights, where W a represents the above combined weight of the ath evaluation index, W pa represents the subjective weight of the a-th evaluation indicator, W ra represents the objective weight of the ath evaluation indicator, a represents the serial number of the evaluation indicator, and n represents the total number of the evaluation indicators. In this embodiment, the combination weight is calculated using a specific formula, which further ensures that the obtained combination weight is more accurate, thereby further ensuring that the subsequent evaluation of the power grid to be evaluated is more accurate.
[0055] In other embodiments, the above-mentioned evaluation index is modified according to the load type of the above-mentioned power grid to be evaluated to obtain the target evaluation index, including: standardizing the above-mentioned user perception evaluation index to obtain the standard user perception evaluation index; determining the sensitivity factor of the above-mentioned evaluation index by using the grey correlation analysis method according to the above-mentioned load type and the above-mentioned standard user perception evaluation index; standardizing the above-mentioned evaluation index to obtain the standard evaluation index; determining the above-mentioned target evaluation index according to the sensitivity factor and the above-mentioned standard evaluation index. In this embodiment, the user perception evaluation index is standardized to obtain the standard user perception evaluation index, the sensitivity factor of the evaluation index is determined by using the grey correlation analysis method according to the load type and the standard user perception evaluation index, the evaluation index is standardized to obtain the standard evaluation index, and the target evaluation index is determined according to the sensitivity factor and the standard evaluation index, which ensures that the obtained target evaluation index is relatively accurate, thereby further ensuring that the subsequent evaluation of the power grid to be evaluated is relatively accurate.
[0056] Specifically, the sensitivity factor of each evaluation index is calculated, the grey correlation evaluation matrix is improved, the main load type labels of the evaluation points are extracted, and the correlation coefficients with each evaluation index are calculated using the standardized mean of the user perception evaluation index as the reference parent sequence as the sensitivity factor to form a sensitivity factor matrix, which is multiplied with the standardized index matrix (the matrix after the evaluation index is standardized) to obtain the improved grey correlation evaluation matrix (i.e., the target evaluation index). The evaluation matrix after positive and standardized processing is: Among them, z ab represents the standardized value of the ath indicator of the bth evaluation object; the sensitivity factor matrix is: Among them, ξ ab It represents the correlation coefficient of the bth evaluation object to the ath evaluation index when the standardized mean of the user perception evaluation index is used as the reference sequence, that is, the sensitivity factor; the improved evaluation matrix is:
[0057] In some further exemplary embodiments, the above-mentioned power grid to be evaluated is evaluated according to the above-mentioned target evaluation index and the above-mentioned combined weight, including: using the formula Determine the comprehensive score of the above evaluation objects, where C b represents the above comprehensive score of the bth evaluation object, z′ ab represents the ath target evaluation index of the bth evaluation object, a represents the serial number of the target evaluation index, b represents the serial number of the evaluation object, W arepresents the above-mentioned combined weight of the a-th evaluation object, and n represents the total number of the above-mentioned target evaluation indicators; according to the above-mentioned comprehensive score, the above-mentioned power grid to be evaluated is evaluated. In this embodiment, a specific formula is used to determine the comprehensive score of the evaluation object, which ensures that the obtained comprehensive score is relatively accurate, and the evaluation of the power grid to be evaluated is performed according to the comprehensive score, which further ensures that the evaluation is relatively accurate.
[0058] Specifically, z′ ab Represents the improved evaluation matrix value of the a-th evaluation indicator of the b-th evaluation object (i.e., the a-th target evaluation indicator).
[0059] Specifically, this application aims at the current situation that the grid-connected power quality assessment of new energy power stations has insufficient consideration of the emphasis on power quality indicators for different user types and power quality factors from the user's perspective, and establishes a comprehensive index system for grid-connected power quality assessment of new energy power stations that considers the two dimensions of power supply quality on the power system side and power consumption perception on the user side, and then applies the ordinal relationship analysis method-grey correlation method to combine and weight the evaluation indicators, calculates the sensitivity factor of the evaluation object for each evaluation indicator based on the main load type label of each evaluation point, improves the grey correlation evaluation matrix, calculates the comprehensive score of each evaluation object, scientifically and quantitatively evaluates the grid-connected power quality level of new energy power stations, and gives subsequent power quality management and improvement direction suggestions based on the analysis of the evaluation results. The method proposed in this application further considers the user's power consumption on the basis of power quality. The different emphasis on power quality indicators of different users establishes a comprehensive index system for grid-connected power quality assessment of new energy power stations and improves the evaluation matrix based on load type labels, and is not limited to the weighting method and evaluation method selected in this application, and has high applicability and practicality.
[0060] In order to enable those skilled in the art to more clearly understand the technical solution of the present application, the implementation process of the method for evaluating the grid-connected power quality of a new energy power station of the present application will be described in detail below in combination with specific embodiments.
[0061] Example
[0062] Specifically, in order to verify the applicability and applicability of the evaluation method for the grid-connected power quality of new energy power stations in this application, the S distribution network line in a certain province and city was taken as an example to carry out the evaluation of the grid-connected power quality of new energy. There are a total of 17 switch stations and distribution stations on the line with a capacity of 12920kVA, all of which are special transformers.
[0063] 1) Obtain the grid data of the grid to be evaluated and determine the evaluation boundary
[0064] The line is connected to four distributed photovoltaics, each with a power scale of 500kW. The grid connection point is a 10kV switch station or distribution station. The corresponding assessment points are numbered B1, B2, B3, and B4. Among them, B2, B3, and B4 are newly installed photovoltaics in October 2023 and will be officially put into use at the end of 2023.
[0065] The evaluation period is 91 days in the first quarter of 2024, and the monitoring window is divided into days. The detailed information of users and loads at the evaluation point is shown in Table 2 below. The load type label is determined by the main load type at the evaluation point. For example, more than 85% of users at point B1 belong to residential electricity, mainly supplying the first and second phases of a residential community, so the load type label is residential community.
[0066] Table 2
[0067] Evaluation Points Distribution transformer capacity (kVA) Number of users Load type label B1 2520 396 Residential area B2 1850 119 Office Building B3 1890 322 Residential area B4 3430 529 High-tech Industrial Park
[0068] 2) Evaluation indicators and weight calculation
[0069] Based on the changes in the measured values of voltage, frequency, etc. during the monitoring period, the indicator value of each evaluation point is calculated according to the indicator definition, as shown in Table 3 below.
[0070] Table 3
[0071]
[0072]
[0073] When applying the ordinal relationship analysis method, the ordinal relationship between the evaluation indicators is U(%)>C s >d>ε i >SARFI>SAIDI>CAIFI>THD u >F(%)>N e , and their relative importances are 1.3, 1.1, 1.2, 1.1, 1.2, 1, 1.2, 1.1 and 1.2. When the objective weight is calculated by the grey correlation analysis method, the optimal situation of each evaluation index is used as the reference parent sequence, and the obtained weight values are shown in Table 4 below.
[0074] Table 4
[0075] Evaluation indicators Subjective weight Objective weight Combination weight Voltage deviation 0.184 0.102 0.139 Frequency Deviation 0.061 0.094 0.077 Voltage total harmonic distortion 0.068 0.1 0.084 Three-phase unbalance 0.107 0.095 0.103 Voltage fluctuations 0.128 0.094 0.112 Voltage sag 0.097 0.104 0.102 Customer satisfaction 0.141 0.103 0.123 Power outage detection times 0.081 0.103 0.093 Power outage detection time 0.081 0.103 0.093 Power quality problem perception 0.051 0.103 0.074
[0076] 3) Calculate the sensitivity factor of each evaluation index and improve the grey correlation evaluation matrix (according to the load type of the power grid to be evaluated, modify the evaluation index to obtain the target evaluation index)
[0077] The standardized mean of user perception evaluation indicators {0.038, 0.264, 0.024, 0.293} is used as the reference mother sequence, and the correlation coefficient between the reference sequence and each evaluation indicator is obtained to characterize the sensitivity relationship between the load type and the evaluation indicator, and to modify the evaluation matrix. The sensitivity factor matrix is: The revised evaluation matrix is:
[0078] 4) Evaluation and analysis
[0079] The power quality dimension (power system dimension) score of the evaluation object, the user perception dimension score and the comprehensive score are as follows: Figure 3 As shown. Figure 3 From the evaluation results, it can be seen that the comprehensive score of evaluation point B1 is the highest, about 80 points, followed by B2, B3, and B4, among which B3 and B4 have lower scores, less than 66 points. In-depth evaluation of the two dimensions of power quality and user perception, the score of B2 evaluation point in the power quality dimension is higher, followed by B1, and B3 and B4 have lower scores; in the user perception dimension, B1 has a higher score, followed by B3, and B2 and B4 have lower scores. In summary, point B1 should focus on improving the power quality dimension indicators; B2 should focus on improving the user perception dimension indicators; B3 and B4 have low scores in both dimensions, so the two dimensions should be improved simultaneously. Considering that the improvement of power quality indicators will improve the user perception dimension indicators to a certain extent, the focus is still on improving the power quality dimension indicators.
[0080] In-depth analysis at the indicator level can be conducted to analyze the degree of proximity between each evaluation indicator and the optimal value. The larger the correlation coefficient, the closer the evaluation indicator is to the optimal value. Power quality management and improvement can be carried out for the disadvantaged evaluation indicators at each evaluation point to effectively improve the overall power quality level.
[0081] Power quality dimension indicators (power system evaluation indicators) such as Figure 4 As shown, the voltage total harmonic distortion rate index at point B1 is poor; the voltage sag and voltage fluctuation index at point B2 are poor; the frequency deviation, voltage fluctuation and three-phase imbalance index at point B3 are poor; the voltage sag, frequency deviation, voltage deviation and voltage total harmonic distortion rate index at point B4 are poor.
[0082] Analysis of user perception dimension indicators (user perception evaluation indicators) Figure 5 As shown, the user perception dimension indicators at point B1 are all good; the two indicators of power outage perception times and power outage perception time at point B2 are poor; the power quality problem perception indicator at point B3 is relatively poor; the user satisfaction and power quality problem perception indicators at point B4 are poor.
[0083] In summary, point B1 should focus on harmonic control, point B2 should focus on improving voltage sag and voltage fluctuation, reducing the frequency and impact time of power outages, point B3 should focus on improving frequency deviation and three-phase imbalance, and at the same time improving the quality of power supply services, and point B4 should focus on controlling harmonics, improving frequency deviation, and improving the quality of power supply voltage and user satisfaction with the quality of power supply.
[0084] This embodiment relates to a specific method for evaluating the quality of grid-connected power of a new energy power station, comprising the following steps:
[0085] Step S1: Obtain the grid data of the grid to be evaluated and determine the evaluation boundary. The grid data includes the network topology of the grid to be evaluated, basic parameters of the equipment in the grid, load data in the grid, grid connection points of new energy power stations in the grid, and new energy capacity in the grid. The evaluation boundary includes the evaluation object, evaluation period, and monitoring window.
[0086] Step S2: According to the power grid data and the evaluation boundary, an evaluation index system of the power grid to be evaluated based on the power system dimension and the user perception dimension is constructed. The evaluation index system includes multiple power system evaluation indicators and multiple user perception evaluation indicators. The power system evaluation indicators include voltage deviation, frequency deviation, voltage total harmonic distortion rate, three-phase imbalance, voltage fluctuation and voltage sag. The user perception evaluation indicators include user satisfaction, power outage perception number, power outage perception time and power quality problem perception.
[0087] Step S3: using the ordinal relationship analysis method to calculate the subjective weight, and using the grey correlation analysis method to calculate the objective weight;
[0088] Step S4: Determine the combined weight of the evaluation index according to the subjective weight and the objective weight;
[0089] Step S5: According to the load type of the power grid to be evaluated, the evaluation index is modified to obtain the target evaluation index;
[0090] Step S6: Evaluate the power grid to be evaluated according to the target evaluation index and the combined weight.
[0091] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and that, although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0092] The present application also provides a computer program product, including computer instructions, which, when executed by a processor, at least implement the following method steps:
[0093] Optionally, the above-mentioned evaluation index system includes multiple power system evaluation indicators and multiple user perception evaluation indicators. According to the above-mentioned power grid data and the above-mentioned evaluation boundaries, an evaluation index system of the above-mentioned power grid to be evaluated based on the power system dimension and the user perception dimension is constructed, including: according to the above-mentioned power grid data and the above-mentioned evaluation boundaries, the above-mentioned power system evaluation indicators are determined, and the above-mentioned power system evaluation indicators include voltage deviation, frequency deviation, voltage total harmonic distortion rate, three-phase imbalance, voltage fluctuation and voltage sag; according to the above-mentioned power grid data and the above-mentioned evaluation boundaries, the above-mentioned user perception evaluation indicators are determined, and the above-mentioned user perception evaluation indicators include user satisfaction, number of power outage perceptions, power outage perception time and perception of power quality problems.
[0094] Optionally, the evaluation cycle includes a plurality of monitoring windows, and determining the power system evaluation index according to the power grid data and the evaluation boundary includes: using the formula Determine the above voltage deviation, where U i It represents the actual voltage value of the evaluation point in the i-th monitoring window, U N represents the nominal voltage corresponding to the above evaluation point, T represents the total number of the above monitoring windows in the above evaluation period, i represents the sequence number of the above monitoring window, and U (%) represents the above voltage deviation; using the formula Determine the above frequency deviation, where f i represents the grid frequency of the above evaluation point in the i-th monitoring window, f N represents the standard frequency corresponding to the above evaluation point, and F(%) represents the above frequency deviation; using the formula Determine the above voltage total harmonic distortion rate, where, represents the RMS value of the hth harmonic current at the above evaluation point in the i-th monitoring window, represents the RMS value of the fundamental current at the above evaluation point in the i-th monitoring window, H represents the highest harmonic order, THD u Represents the total harmonic distortion rate of the above voltage; using the formula Determine the above three-phase unbalance, where ΔI maxi It represents the maximum difference between the two phases of the three-phase current at the above evaluation point in the i-th monitoring window, I avgi represents the average value of the three-phase current at the above evaluation point in the i-th monitoring window, ε i Indicates the above three-phase unbalance; using the formula Determine the above voltage fluctuations, where represents the maximum value of the square root mean value of the voltage at the above evaluation point in the i-th monitoring window, represents the minimum value of the voltage RMS value at the evaluation point in the i-th monitoring window, and d represents the voltage fluctuation. Determine the voltage sag, where A represents the number of short-term voltage interruptions during the evaluation period, D represents the number of days during the evaluation period when short-term voltage interruptions occur, and D T represents the total number of days in the above assessment period and SARFI represents the above voltage sag.
[0095] Optionally, determining the user perception evaluation index according to the power grid data and the evaluation boundary includes: using the formula Determine the above user satisfaction, where C s For the above user satisfaction, G k is the score of the kth user at the evaluation point within the evaluation period for the power supply quality of the above-mentioned power grid to be evaluated, N represents the number of users at the above-mentioned evaluation point, and k is the sequence number of the user at the above-mentioned evaluation point; using the formula Determine the power outage detection times, where CAIFI is the power outage detection times, c j represents the number of users at the jth power outage at the above evaluation point, and M represents the total number of power outages during the above evaluation period; using the formula Determine the power outage perception time, where CAIDI is the power outage perception time, t j is the power outage time of the above evaluation point at the jth power outage; using the formula Determine the above power quality problem perception, where N e To perceive the above power quality issues, O u represents the total number of complaints and feedbacks about voltage quality from users at the above evaluation points during the above evaluation period, O s represents the total number of complaints and feedbacks about power supply quality from users at the above evaluation points during the above evaluation period, O c It represents the sum of the total number of complaint tickets and the total number of feedback from users at the above evaluation points during the above evaluation period, and σ represents the preset margin factor.
[0096] Optionally, determining the subjective weight and objective weight of the above evaluation index includes: using an ordinal relationship analysis method to calculate the above subjective weight; and using a grey correlation analysis method to calculate the above objective weight.
[0097] Optionally, determining the combined weight of the evaluation indicators according to the subjective weight and the objective weight includes: using the formula Determine the above combination weights, where W a represents the above combined weight of the ath evaluation index, W pa represents the subjective weight of the a-th evaluation indicator, W rarepresents the objective weight of the ath evaluation indicator, a represents the sequence number of the evaluation indicator, and n represents the total number of the evaluation indicators.
[0098] Optionally, according to the load type of the power grid to be evaluated, the above-mentioned evaluation index is corrected to obtain a target evaluation index, including: standardizing the above-mentioned user perception evaluation index to obtain a standard user perception evaluation index; according to the above-mentioned load type and the above-mentioned standard user perception evaluation index, using the grey correlation analysis method to determine the sensitivity factor of the above-mentioned evaluation index; standardizing the above-mentioned evaluation index to obtain a standard evaluation index; determining the above-mentioned target evaluation index based on the above-mentioned sensitivity factor and the above-mentioned standard evaluation index.
[0099] Optionally, the above-mentioned power grid to be evaluated is evaluated according to the above-mentioned target evaluation index and the above-mentioned combined weight, including: using the formula Determine the comprehensive score of the above evaluation objects, where C b represents the above comprehensive score of the bth evaluation object, z′ ab represents the ath target evaluation index of the bth evaluation object, a represents the serial number of the target evaluation index, b represents the serial number of the evaluation object, W a represents the above-mentioned combined weight of the a-th evaluation object, and n represents the total number of the above-mentioned target evaluation indicators; based on the above-mentioned comprehensive score, the above-mentioned power grid to be evaluated is evaluated.
[0100] An embodiment of the present application also provides an electronic device, comprising: one or more processors, a memory, and one or more programs, wherein the one or more programs are stored in the memory and are configured to be executed by the one or more processors, and the one or more programs include methods for executing any one of the above-mentioned methods for evaluating the grid-connected power quality of a new energy power station.
[0101] Obviously, those skilled in the art should understand that the above modules or steps of the present invention can be implemented by a general computing device, they can be concentrated on a single computing device, or distributed on a network composed of multiple computing devices, they can be implemented by a program code executable by a computing device, so that they can be stored in a storage device and executed by the computing device, and in some cases, the steps shown or described can be executed in a different order than here, or they can be made into individual integrated circuit modules, or multiple modules or steps therein can be made into a single integrated circuit module for implementation. Thus, the present invention is not limited to any specific combination of hardware and software.
[0102] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.
[0103] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0104] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0105] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0106] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.
[0107] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.
[0108] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.
[0109] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.
[0110] From the above description, it can be seen that the above embodiments of the present application achieve the following technical effects:
[0111] In the evaluation method for the grid-connected power quality of a new energy power station of the present application, firstly, the grid data of the grid to be evaluated is obtained, and the evaluation boundary is determined. Then, according to the grid data and the evaluation boundary, an evaluation index system of the grid to be evaluated based on the power system dimension and the user perception dimension is constructed. The evaluation index system includes multiple evaluation indicators. Then, the subjective weight and the objective weight of the evaluation index are determined. According to the subjective weight and the objective weight, the combined weight of the evaluation index is determined. Then, according to the load type of the grid to be evaluated, the evaluation index is corrected to obtain the target evaluation index. Finally, according to the target evaluation index and the combined weight, the grid to be evaluated is evaluated. Compared with the problem of inaccurate power quality assessment in the prior art, the present application constructs a power quality assessment index system for the power grid to be assessed based on the two dimensions of power system and power consumption perception, thereby ensuring that the constructed assessment index system is relatively comprehensive and accurate, and determines the subjective weight and objective weight of the assessment index, and determines the combined weight according to the objective weight and the subjective weight, thereby ensuring that the combined weight of the assessment index is relatively accurate, and then corrects the assessment index according to the load type of the power grid to be assessed to obtain the target assessment index, thereby ensuring that the target assessment index is relatively accurate, and finally, the power grid to be assessed is assessed according to the target assessment index and the combined weight, thereby ensuring that the assessment of the power grid to be assessed is relatively comprehensive and accurate.
[0112] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A method for evaluating the quality of grid-connected power of a new energy power station, characterized in that: include: Obtaining grid data of the grid to be evaluated and determining an evaluation boundary, wherein the grid data includes a network topology relationship of the grid to be evaluated, basic parameters of equipment in the grid, load data in the grid, grid connection points of new energy power stations in the grid, and new energy capacity in the grid, and the evaluation boundary includes an evaluation object, an evaluation period, and a monitoring window; According to the power grid data and the evaluation boundary, construct an evaluation index system of the power grid to be evaluated based on the power system dimension and the user perception dimension, wherein the evaluation index system includes multiple evaluation indicators; Determining the subjective weight and the objective weight of the evaluation index, and determining the combined weight of the evaluation index based on the subjective weight and the objective weight; According to the load type of the power grid to be evaluated, the evaluation index is modified to obtain a target evaluation index; The power grid to be evaluated is evaluated according to the target evaluation index and the combined weight.
2. The method for evaluating the quality of grid-connected power of a new energy power station according to claim 1, characterized in that: The evaluation index system includes multiple power system evaluation indexes and multiple user perception evaluation indexes. According to the power grid data and the evaluation boundary, an evaluation index system of the power grid to be evaluated based on the power system dimension and the user perception dimension is constructed, including: Determining the power system evaluation index according to the power grid data and the evaluation boundary, wherein the power system evaluation index includes voltage deviation, frequency deviation, voltage total harmonic distortion rate, three-phase imbalance, voltage fluctuation and voltage sag; The user perception evaluation index is determined according to the power grid data and the evaluation boundary, and the user perception evaluation index includes user satisfaction, power outage perception number, power outage perception time and power quality problem perception.
3. The method for evaluating the quality of grid-connected power of a new energy power station according to claim 2, characterized in that: The evaluation cycle includes a plurality of monitoring windows, and determining the power system evaluation index according to the power grid data and the evaluation boundary includes: Using the formula Determine the voltage deviation, where U i represents the actual voltage value of the evaluation point in the i-th monitoring window, U N represents the nominal voltage corresponding to the evaluation point, T represents the total number of the monitoring windows in the evaluation period, i represents the sequence number of the monitoring window, and U (%) represents the voltage deviation; Using the formula Determine the frequency deviation, where f i represents the grid frequency of the evaluation point in the i-th monitoring window, f N represents the standard frequency corresponding to the evaluation point, and F(%) represents the frequency deviation; Using the formula Determine the voltage total harmonic distortion rate, where, represents the root mean square value of the hth harmonic current at the evaluation point in the i-th monitoring window, represents the RMS value of the fundamental current at the evaluation point in the i-th monitoring window, H represents the highest harmonic order, THD u Indicates the total harmonic distortion rate of the voltage; Using the formula Determine the three-phase unbalance, where ΔI maxi represents the maximum difference between two phases of the three-phase current at the evaluation point in the i-th monitoring window, I avgi represents the average value of the three-phase current at the evaluation point in the i-th monitoring window, ε i Indicates the three-phase unbalance degree; Using the formula The voltage fluctuation is determined, wherein represents the maximum value of the square root mean value of the voltage at the evaluation point in the i-th monitoring window, represents the minimum value of the square root mean value of the voltage at the evaluation point in the i-th monitoring window, and d represents the voltage fluctuation; Using the formula Determine the voltage sag, where A represents the number of short-term voltage interruptions during the evaluation period, D represents the number of days during which short-term voltage interruptions occur during the evaluation period, and D T represents the total number of days in the evaluation period, and SARFI represents the voltage sag.
4. The method for evaluating the quality of grid-connected power of a new energy power station according to claim 2, characterized in that: Determining the user perception evaluation index according to the power grid data and the evaluation boundary includes: Using the formula Determine the user satisfaction, where C s is the user satisfaction, G k is the score of the kth user at the evaluation point within the evaluation period for the power supply quality of the power grid to be evaluated, N represents the number of users at the evaluation point, and k is the sequence number of the user at the evaluation point; Using the formula Determine the power outage detection times, where CAIFI is the power outage detection times, c j represents the number of users at the evaluation point experiencing the jth power outage, and M represents the total number of power outages occurring during the evaluation period; Using the formula Determine the power outage perception time, where CAIDI is the power outage perception time, t j is the power outage time of the evaluation point during the jth power outage; Using the formula Determine the power quality problem perception, where N e For the power quality problem perception, O u represents the total number of complaints and feedbacks about voltage quality from users at the evaluation point during the evaluation period, O s represents the total number of complaints and feedbacks about power supply quality from users at the evaluation point during the evaluation period, O c It represents the sum of the total number of complaint tickets and the total number of feedback from users at the evaluation point during the evaluation period, and σ represents the preset margin factor.
5. The method for evaluating the quality of grid-connected power of a new energy power station according to claim 1, characterized in that: Determine the subjective weight and objective weight of the evaluation indicators, including: Adopting the ordinal relationship analysis method to calculate the subjective weight; The objective weight is calculated by using grey relational analysis method.
6. The method for evaluating the quality of grid-connected power of a new energy power station according to claim 1, characterized in that: Determining the combined weight of the evaluation index according to the subjective weight and the objective weight includes: Using the formula Determine the combination weight, where W a represents the combined weight of the ath evaluation index, W pa represents the subjective weight of the a-th evaluation indicator, W ra represents the objective weight of the a-th evaluation indicator, a represents the sequence number of the evaluation indicator, and n represents the total number of the evaluation indicators.
7. The method for evaluating the quality of grid-connected power of a new energy power station according to claim 2, characterized in that: According to the load type of the power grid to be evaluated, the evaluation index is modified to obtain a target evaluation index, including: Standardizing the user perception evaluation index to obtain a standard user perception evaluation index; According to the load type and the standard user perception evaluation index, a sensitivity factor of the evaluation index is determined by using a grey correlation analysis method; Standardizing the evaluation index to obtain a standard evaluation index; The target evaluation index is determined according to the sensitivity factor and the standard evaluation index.
8. The method for evaluating the quality of grid-connected power of a new energy power station according to claim 1, characterized in that: The step of evaluating the power grid to be evaluated according to the target evaluation index and the combined weight includes: Using the formula Determine the comprehensive score of the evaluation object, where C b represents the comprehensive score of the bth evaluation object, z′ ab represents the ath target evaluation indicator of the bth evaluation object, a represents the sequence number of the target evaluation indicator, b represents the sequence number of the evaluation object, and W a represents the combined weight of the a-th evaluation object, and n represents the total number of the target evaluation indicators; The power grid to be evaluated is evaluated according to the comprehensive score.
9. A computer program product comprising computer instructions, characterized in that When the computer instructions are executed by the processor, the method for evaluating the grid-connected power quality of a new energy power station as described in any one of claims 1 to 8 is implemented.
10. An electronic device, characterized in that: include: One or more processors, a memory, and one or more programs, wherein the one or more programs are stored in the memory and are configured to be executed by the one or more processors, and the one or more programs include a method for executing the evaluation method of the grid-connected power quality of a new energy power station as described in any one of claims 1 to 8.
Citation Information
Cited By
Intelligent detection system for electric energy quality of resident area
CN119379116A