Equipment maintenance task scheduling method and device, computer equipment, storage medium and computer program product

Through the automated equipment maintenance task schedule method, combined with the dependencies and process duration in the work order, the target planning time is generated, which solves the problem of inefficiency of traditional manual dependence and improves the processing efficiency and resource utilization of maintenance tasks.

CN118982345APending Publication Date: 2024-11-19SHENZHEN COMTOP INFORMATION TECH
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411138786.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

Traditional equipment maintenance tasks scheduled to rely on manual experience, resulting in inefficiency, time-consuming and waste of human resources.

Method used

By obtaining equipment maintenance work orders, determining the target process and dependencies, combining the schedule mode and process duration, automatically generating the target plan time to avoid conflicts and delays, and improving resource allocation efficiency.

Benefits of technology

It improves the scheduling efficiency of equipment maintenance tasks, reduces manual intervention, ensures reasonable arrangement of tasks and reasonable allocation of resources, and reduces maintenance costs and delay risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118982345A_ABST
    Figure CN118982345A_ABST
Patent Text Reader

Abstract

The invention relates to an equipment maintenance task scheduling method and device, computer equipment, a storage medium and a computer program product. The method comprises the following steps: acquiring an equipment maintenance work order corresponding to a to-be-processed equipment maintenance task; determining a target process in the equipment maintenance work order; the target process is used for representing a process containing a dependency relationship in the equipment maintenance work order; determining a first target plan time of the equipment maintenance work order and a second target plan time of the target process according to the scheduling mode of the equipment maintenance work order and the dependency relationship and the process duration of the target process; and generating a target task scheduling result of the to-be-processed equipment maintenance task according to the first target plan time and the second target plan time. By adopting the method, the scheduling efficiency of the equipment maintenance task can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of computer technology, and in particular to a method, device, computer equipment, computer-readable storage medium, and computer program product for scheduling equipment maintenance tasks. Background Art

[0002] With the development of industrial automation and intelligence, in order to improve the processing efficiency of equipment maintenance tasks, it is crucial to schedule equipment maintenance tasks.

[0003] In traditional technology, when scheduling equipment maintenance tasks, the scheduling method generally relies on manual experience; however, this scheduling method that relies on manual experience is cumbersome and requires a lot of time and manpower, resulting in low scheduling efficiency of equipment maintenance tasks. Summary of the invention

[0004] Based on this, it is necessary to provide an equipment maintenance task scheduling method, device, computer equipment, computer-readable storage medium and computer program product that can improve the scheduling efficiency of equipment maintenance tasks in response to the above technical problems.

[0005] In a first aspect, the present application provides a method for scheduling equipment maintenance tasks, comprising:

[0006] Obtain the equipment maintenance work order corresponding to the pending equipment maintenance task;

[0007] Determine a target process in the equipment maintenance work order; the target process is used to represent a process in the equipment maintenance work order that contains a dependency relationship;

[0008] According to the scheduling mode of the equipment maintenance work order, the dependency relationship of the target process and the process duration, determine the first target planning time of the equipment maintenance work order and the second target planning time of the target process;

[0009] A target task scheduling result of the pending equipment maintenance task is generated according to the first target planning time and the second target planning time.

[0010] In one embodiment, generating a target task scheduling result of the pending equipment maintenance task according to the first target planning time and the second target planning time includes:

[0011] Determine the remaining processes in the equipment maintenance work order; the remaining processes are used to represent the processes in the equipment maintenance work order other than the target process;

[0012] Obtaining the third target planned time of the remaining processes;

[0013] A target task scheduling result of the pending equipment maintenance task is generated according to the first target planned time, the second target planned time and the third target planned time.

[0014] In one embodiment, generating a target task scheduling result of the pending equipment maintenance task according to the first target planned time, the second target planned time and the third target planned time includes:

[0015] Obtaining a first identifier of the equipment maintenance work order, a second identifier of the target process, and a third identifier of the remaining processes;

[0016] A target task scheduling result of the pending equipment maintenance task is generated according to the first identifier, the second identifier, the third identifier, the first target planned time, the second target planned time, and the third target planned time.

[0017] In one embodiment, determining the first target planned time of the equipment maintenance work order and the second target planned time of the target process according to the scheduling mode of the equipment maintenance work order, the dependency relationship of the target process and the process duration includes:

[0018] Query the correspondence between the scheduling mode and the initial time to obtain the initial time corresponding to the scheduling mode of the equipment maintenance work order;

[0019] According to the initial time, the dependency relationship of the target process and the process duration, a first target planned time of the equipment maintenance work order and a second target planned time of the target process are determined.

[0020] In one embodiment, after determining the target process in the equipment maintenance work order, the method further includes:

[0021] Verifying the dependency relationship of the target process to obtain a verification result;

[0022] Determining the first target planned time of the equipment maintenance work order and the second target planned time of the target process according to the scheduling mode of the equipment maintenance work order, the dependency relationship of the target process and the process duration includes:

[0023] When the verification result meets the preset verification result, the first target planned time of the equipment maintenance work order and the second target planned time of the target process are determined according to the scheduling mode of the equipment maintenance work order, the dependency relationship and process duration of the target process.

[0024] In one embodiment, after generating the target task scheduling result of the pending equipment maintenance task according to the first target planning time and the second target planning time, the method further includes:

[0025] Determining a target terminal associated with the equipment maintenance task to be processed;

[0026] The target task scheduling result is sent to the target terminal.

[0027] In a second aspect, the present application also provides a device for scheduling equipment maintenance tasks, including:

[0028] A work order acquisition module is used to obtain the equipment maintenance work order corresponding to the equipment maintenance task to be processed;

[0029] A process determination module, used to determine the target process in the equipment maintenance work order; the target process is used to represent the process in the equipment maintenance work order that contains a dependency relationship;

[0030] A time determination module, used to determine a first target planned time of the equipment maintenance work order and a second target planned time of the target process according to a scheduling mode of the equipment maintenance work order, a dependency relationship of the target process and a process duration;

[0031] A result generation module is used to generate a target task scheduling result of the pending equipment maintenance task according to the first target planning time and the second target planning time.

[0032] In a third aspect, the present application further provides a computer device, including a memory and a processor, wherein the memory stores a computer program, and when the processor executes the computer program, the following steps are implemented:

[0033] Obtain the equipment maintenance work order corresponding to the pending equipment maintenance task;

[0034] Determine a target process in the equipment maintenance work order; the target process is used to represent a process in the equipment maintenance work order that contains a dependency relationship;

[0035] According to the scheduling mode of the equipment maintenance work order, the dependency relationship of the target process and the process duration, determine the first target planning time of the equipment maintenance work order and the second target planning time of the target process;

[0036] A target task scheduling result of the pending equipment maintenance task is generated according to the first target planning time and the second target planning time.

[0037] In a fourth aspect, the present application further provides a computer-readable storage medium having a computer program stored thereon, wherein when the computer program is executed by a processor, the following steps are implemented:

[0038] Obtain the equipment maintenance work order corresponding to the pending equipment maintenance task;

[0039] Determine a target process in the equipment maintenance work order; the target process is used to represent a process in the equipment maintenance work order that contains a dependency relationship;

[0040] According to the scheduling mode of the equipment maintenance work order, the dependency relationship of the target process and the process duration, determine the first target planning time of the equipment maintenance work order and the second target planning time of the target process;

[0041] A target task scheduling result of the pending equipment maintenance task is generated according to the first target planning time and the second target planning time.

[0042] In a fifth aspect, the present application further provides a computer program product, including a computer program, which implements the following steps when executed by a processor:

[0043] Obtain the equipment maintenance work order corresponding to the pending equipment maintenance task;

[0044] Determine a target process in the equipment maintenance work order; the target process is used to represent a process in the equipment maintenance work order that contains a dependency relationship;

[0045] According to the scheduling mode of the equipment maintenance work order, the dependency relationship of the target process and the process duration, determine the first target planning time of the equipment maintenance work order and the second target planning time of the target process;

[0046] A target task scheduling result of the pending equipment maintenance task is generated according to the first target planning time and the second target planning time.

[0047] The above-mentioned equipment maintenance task scheduling method, device, computer equipment, storage medium and computer program product first obtain the equipment maintenance work order corresponding to the equipment maintenance task to be processed, and then determine the process containing the dependency relationship in the equipment maintenance work order as the target process in the equipment maintenance work order. Then, according to the scheduling mode of the equipment maintenance work order, the dependency relationship and process duration of the target process, the first target planned time of the equipment maintenance work order and the second target planned time of the target process are determined. Finally, according to the first target planned time and the second target planned time, the target task scheduling result of the equipment maintenance task to be processed is generated. In this way, in the process of scheduling equipment maintenance tasks, by combining the dependencies, process duration and scheduling mode in the equipment maintenance work order, the target planning time of the equipment maintenance work order and the target process can be reasonably arranged, avoiding conflicts and delays between equipment maintenance tasks, so that the resources required for equipment maintenance tasks can be better allocated, which is conducive to improving the processing efficiency of equipment maintenance tasks; moreover, the entire process does not require human intervention, avoiding the cumbersome scheduling method that relies on manual experience, which requires a lot of time and manpower, resulting in low scheduling efficiency of equipment maintenance tasks, thereby improving the scheduling efficiency of equipment maintenance tasks. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] In order to more clearly illustrate the technical solutions in the embodiments of the present application or related technologies, the drawings required for use in the embodiments of the present application or related technical descriptions will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0049] Figure 1 A schematic diagram of a process flow of a method for scheduling equipment maintenance tasks in one embodiment;

[0050] Figure 2 A schematic diagram of the relationship between a maintenance work order and its process in an embodiment;

[0051] Figure 3 A schematic diagram of the process relationship from completion to start in one embodiment;

[0052] Figure 4 A schematic diagram of the process relationship from start to start in one embodiment;

[0053] Figure 5 A schematic diagram of a process relationship from completion to completion in one embodiment;

[0054] Figure 6 A schematic diagram of the process relationship from start to finish in one embodiment;

[0055] Figure 7 A schematic diagram of the relationship between work orders and processes in one embodiment;

[0056] Figure 8 A schematic diagram of a flow chart of a method for scheduling equipment maintenance tasks in another embodiment;

[0057] Fig. 9 A schematic diagram of a work order process interface in one embodiment;

[0058] Fig.10 A schematic diagram of a Gantt chart of a work order process scheduling effect in an embodiment;

[0059] Fig.11 A schematic diagram of a work order process relationship graphical interface in one embodiment;

[0060] Fig.12 It is a structural block diagram of a device for scheduling equipment maintenance tasks in one embodiment;

[0061] Fig.13 FIG. 4 is a diagram showing the internal structure of a computer device in one embodiment. DETAILED DESCRIPTION

[0062] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0063] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data must comply with relevant regulations.

[0064] In an exemplary embodiment, Figure 1 As shown, a method for scheduling equipment maintenance tasks is provided. This embodiment uses the method applied to a server as an example for illustration; it can be understood that the method can also be applied to a terminal, and can also be applied to a system including a terminal and a server, and is implemented through the interaction between the terminal and the server. Among them, the terminal can be but is not limited to various personal computers, laptops, smart phones and tablets; the server can be implemented as an independent server or a server cluster composed of multiple servers. In this embodiment, the method includes the following steps:

[0065] Step S101, obtaining an equipment maintenance work order corresponding to the equipment maintenance task to be processed.

[0066] The pending equipment maintenance tasks refer to equipment maintenance tasks that need to be processed.

[0067] Among them, the equipment maintenance task refers to the task information corresponding to restoring the equipment to normal operation.

[0068] Among them, the equipment maintenance work order refers to the table information that records the equipment maintenance related information. It should be noted that the equipment maintenance work order includes multiple processes, such as Figure 2 shown.

[0069] Exemplarily, the server obtains multiple candidate equipment maintenance tasks; then, the server determines the importance corresponding to each candidate equipment maintenance task; then, the server selects the candidate equipment maintenance task with the greatest importance from each candidate equipment maintenance task as the equipment maintenance task to be processed; then, the server parses the equipment maintenance task to be processed to obtain parsed information; then, the server determines the importance corresponding to each piece of parsed information, and extracts the parsed information with a corresponding importance greater than a preset importance from each piece of parsed information as the key parsed information; then, the server combines the key parsed information in a preset format to obtain an equipment maintenance work order corresponding to the equipment maintenance task to be processed.

[0070] Step S102, determining a target process in the equipment maintenance work order; the target process is used to indicate a process in the equipment maintenance work order that contains a dependency relationship.

[0071] The target process is used to represent the process containing dependency relationships in the equipment maintenance work order.

[0072] Among them, dependency relationships are used to represent the relationship between processes, also known as basic process relationships, including finish to start, start to start, finish to finish, start to finish, etc. It should be noted that in the equipment maintenance process management, the two processes that will be connected using the above dependency relationships are called the preceding process and the following process. The preceding process refers to the process that controls the start time of the following process, and the following process refers to the process controlled by the preceding process.

[0073] Among them, finish to start is used to indicate that the subsequent process can only start after the previous process is completed, such as Figure 3 shown.

[0074] Among them, start to start is used to indicate that the subsequent process can only start after the previous process starts, such as Figure 4 shown.

[0075] Among them, finish to finish is used to indicate that the previous process can be completed only after the later process is completed, such as Figure 5 shown.

[0076] Among them, start to finish is used to indicate that the subsequent process can be completed after the previous process starts, such as Figure 6 shown.

[0077] It should be noted that during the equipment maintenance preparation process, users are allowed to establish appropriate relationships between processes based on actual maintenance task requirements, such as Figure 7 shown.

[0078] Exemplarily, the server obtains all processes in the equipment maintenance work order; then, the server extracts the processes containing dependencies from each process, and uses these processes as target processes in the equipment maintenance work order.

[0079] Step S103, determining the first target planned time of the equipment maintenance work order and the second target planned time of the target process according to the scheduling mode of the equipment maintenance work order, the dependency relationship of the target process and the process duration.

[0080] Among them, the scheduling mode is used to characterize the scheduling algorithm of equipment maintenance work orders, including forward scheduling, backward scheduling and immediate scheduling.

[0081] The process duration refers to the time taken to process the target process. It should be noted that the process duration is also called the process duration.

[0082] The first target planned time refers to the planned start time and the planned end time of the equipment maintenance work order.

[0083] The second target planned time refers to the planned start time and the planned end time of the target process.

[0084] Exemplarily, the server determines the planned start time and planned end time of the equipment maintenance work order, as well as the planned start time and planned end time of the target process based on the scheduling pattern of the equipment maintenance work order, the dependency relationship of the target process, and the process duration; then, the server uses the planned start time and planned end time of the equipment maintenance work order as the first target planned time of the equipment maintenance work order, and uses the planned start time and planned end time of the target process as the second target planned time of the target process.

[0085] Step S104, generating a target task scheduling result for the equipment maintenance task to be processed according to the first target planned time and the second target planned time.

[0086] Among them, the target task scheduling result is used to represent the task scheduling status of the pending equipment maintenance tasks, such as the Gantt chart of the pending equipment maintenance tasks.

[0087] Exemplarily, the server obtains parameter information associated with the equipment maintenance task to be processed (such as work group, process number, process name, process duration, process relationship, etc.); then, the server combines the parameter information, the first target planned time and the second target planned time to obtain combined information; then, the server constructs a Gantt chart of the equipment maintenance task to be processed based on the combined information as the target task scheduling result of the equipment maintenance task to be processed.

[0088] In the above-mentioned equipment maintenance task scheduling method, the equipment maintenance work order corresponding to the equipment maintenance task to be processed is first obtained, and then the process containing the dependency relationship in the equipment maintenance work order is determined as the target process in the equipment maintenance work order. Then, according to the scheduling mode of the equipment maintenance work order, the dependency relationship and process duration of the target process, the first target planned time of the equipment maintenance work order and the second target planned time of the target process are determined. Finally, according to the first target planned time and the second target planned time, the target task scheduling result of the equipment maintenance task to be processed is generated. In this way, in the process of scheduling the equipment maintenance task, by combining the dependency relationship, process duration and scheduling mode in the equipment maintenance work order, the target planned time of the equipment maintenance work order and the target process can be reasonably arranged, avoiding conflicts and delays between equipment maintenance tasks, so that the resources required for equipment maintenance tasks can be better allocated, which is conducive to improving the processing efficiency of equipment maintenance tasks; moreover, the whole process does not require manual intervention, avoiding the defect that the scheduling method relying on manual experience is cumbersome, requires a lot of time and manpower, and leads to low scheduling efficiency of equipment maintenance tasks, thereby improving the scheduling efficiency of equipment maintenance tasks.

[0089] In an exemplary embodiment, the above step S104 generates a target task scheduling result for the equipment maintenance task to be processed based on the first target planned time and the second target planned time, and specifically includes the following contents: determining the remaining processes in the equipment maintenance work order; the remaining processes are used to represent the processes in the equipment maintenance work order other than the target process; obtaining the third target planned time for the remaining processes; generating a target task scheduling result for the equipment maintenance task to be processed based on the first target planned time, the second target planned time and the third target planned time.

[0090] Among them, the remaining processes are used to represent the processes other than the target process in the equipment maintenance work order.

[0091] Among them, the third target planned time refers to the planned start time and planned end time of the remaining processes.

[0092] Exemplarily, the server obtains the processes other than the target process in the equipment maintenance work order as the remaining processes in the equipment maintenance work order; then, the server obtains the preset planned start time of the remaining processes as the planned start time of the remaining processes, and obtains the preset planned end time of the remaining processes as the planned end time of the remaining processes; then, the server uses the planned start time and the planned end time of the remaining processes as the third target planned time for the remaining processes; then, the server generates a target task scheduling result for the equipment maintenance task to be processed based on the first target planned time, the second target planned time and the third target planned time.

[0093] In this embodiment, by determining the remaining processes in the equipment maintenance work order, all work links in the maintenance task can be fully considered, avoiding the omission of some maintenance steps, which is beneficial to improving the integrity and reliability of the target task scheduling results of the equipment maintenance tasks to be processed.

[0094] In an exemplary embodiment, a target task scheduling result for the equipment maintenance task to be processed is generated based on the first target planned time, the second target planned time and the third target planned time, specifically including the following contents: obtaining the first identifier of the equipment maintenance work order, the second identifier of the target process and the third identifier of the remaining processes; generating a target task scheduling result for the equipment maintenance task to be processed based on the first identifier, the second identifier, the third identifier, the first target planned time, the second target planned time and the third target planned time.

[0095] The first identifier refers to the work order number of the equipment maintenance work order.

[0096] The second identifier refers to the process number of the target process.

[0097] The third identifier refers to the process number of the remaining process.

[0098] Exemplarily, the server obtains a first identifier of the equipment maintenance work order, a second identifier of the target process, and a third identifier of the remaining processes as identification information associated with the equipment maintenance task to be processed; then, the server obtains parameter information associated with the equipment maintenance task to be processed (such as work group, process name, process duration, process relationship, etc.); then, the server combines the identification information and parameter information associated with the equipment maintenance task to be processed, as well as the first target planned time, the second target planned time, and the third target planned time according to a preset combination rule to obtain combined information; finally, the server constructs a Gantt chart of the equipment maintenance task to be processed based on the combined information as the target task scheduling result of the equipment maintenance task to be processed.

[0099] In this embodiment, the target task scheduling results generated by combining the identification and time information can more accurately reflect the position and time arrangement of each specific process in the entire maintenance task, which is conducive to improving the reliability of scheduling, and thus improving the accuracy of determining the target task scheduling results of the equipment maintenance task to be processed.

[0100] In an exemplary embodiment, the above step S103 determines the first target planned time of the equipment maintenance work order and the second target planned time of the target process according to the scheduling mode of the equipment maintenance work order, as well as the dependency and process duration of the target process, and specifically includes the following contents: querying the correspondence between the scheduling mode and the initial time to obtain the initial time corresponding to the scheduling mode of the equipment maintenance work order; determining the first target planned time of the equipment maintenance work order and the second target planned time of the target process according to the initial time, as well as the dependency and process duration of the target process.

[0101] Among them, the corresponding relationship between the scheduling mode and the initial time is used to characterize the association information between the scheduling mode and the initial time. For example, when the scheduling mode is forward scheduling, the initial time corresponding to the scheduling mode is the preset planned start time of the equipment maintenance work order; when the scheduling mode is backward scheduling, the initial time corresponding to the scheduling mode is the preset planned end time of the equipment maintenance work order; when the scheduling mode is current scheduling, the initial time corresponding to the scheduling mode is the current time.

[0102] Exemplarily, the server queries the correspondence between the scheduling pattern and the initial time based on the scheduling pattern of the equipment maintenance work order, and obtains the initial time corresponding to the scheduling pattern of the equipment maintenance work order as the initial time of the equipment maintenance work order; then, the server determines the planned start time and planned end time of the equipment maintenance work order, as well as the planned start time and planned end time of the target process based on the initial time, as well as the dependency relationship and process duration of the target process; then, the server uses the planned start time and planned end time of the equipment maintenance work order as the first target planned time of the equipment maintenance work order, and uses the planned start time and planned end time of the target process as the second target planned time of the target process.

[0103] For example, when the scheduling mode of the equipment maintenance work order is forward scheduling, the correspondence between the scheduling mode and the initial time is queried to obtain the initial time corresponding to the scheduling mode of the equipment maintenance work order as the initial time of the equipment maintenance work order; then, the server determines the total duration of all target processes based on the dependency relationship and process duration of the target process, and determines the planned end time of the equipment maintenance work order based on the initial time and the total duration; then, the server uses the preset planned start time and planned end time as the first target planned time of the equipment maintenance work order.

[0104] Furthermore, the initial time is used as the planned start time of the first target process among all target processes, and based on the process length of the first target process, the planned end time of the first target process can be determined, and then the planned start time and planned end time of the first target process are both used as the second target planned time of the first target process.

[0105] Furthermore, assuming that the second target process is the subsequent process of the first target process, according to the dependency relationship, the planned end time of the first target process is used as the planned start time of the second target process. Similarly, the planned start time and planned end time of all target processes are determined as the second target planned time of all target processes.

[0106] In this embodiment, by querying the correspondence between the scheduling pattern and the initial time, the initial time matching the scheduling pattern of the equipment maintenance work order is obtained, which is beneficial to improving the accuracy of determining the first target planned time and the second target planned time, and provides a reliable basis for determining the subsequent target task scheduling results.

[0107] In an exemplary embodiment, the above step S102, after determining the target process in the equipment maintenance work order, specifically includes the following contents: verifying the dependency relationship of the target process to obtain a verification result.

[0108] Then, the above step S103 determines the first target planned time of the equipment maintenance work order and the second target planned time of the target process according to the scheduling mode of the equipment maintenance work order, as well as the dependency relationship and process duration of the target process, and specifically includes the following contents: when the verification result meets the preset verification result, the first target planned time of the equipment maintenance work order and the second target planned time of the target process are determined according to the scheduling mode of the equipment maintenance work order, as well as the dependency relationship and process duration of the target process.

[0109] The verification result is used to characterize the verification status of the dependency relationship of the target process, such as whether an infinite loop occurs between different processes.

[0110] The preset verification result refers to a pre-set verification result, for example, there is no infinite loop between different processes.

[0111] Exemplarily, the server verifies the dependency of the target process and obtains a verification result corresponding to the dependency of the target process; then, when the verification result meets the preset verification result, the server determines the first target planned time of the equipment maintenance work order and the second target planned time of the target process based on the scheduling mode of the equipment maintenance work order, the dependency of the target process and the process duration; when the verification result does not meet the preset verification result, the server generates an alarm message corresponding to the verification result and sends the alarm message to the terminal associated with the target process.

[0112] In this embodiment, by verifying the dependency relationship of the target process, possible errors or unreasonableness can be discovered in advance, ensuring the accuracy of the dependency relationship, thereby improving the reliability of the subsequently generated planned time, and further reducing conflicts in process time scheduling caused by dependency errors.

[0113] In an exemplary embodiment, the above step S104, after generating the target task scheduling result of the equipment maintenance task to be processed according to the first target planned time and the second target planned time, specifically includes the following contents: determining the target terminal associated with the equipment maintenance task to be processed; and sending the target task scheduling result to the target terminal.

[0114] The target terminal refers to the terminal corresponding to the maintenance personnel associated with the equipment maintenance task to be processed.

[0115] Exemplarily, the server determines the terminal associated with the equipment maintenance work order as the target terminal associated with the equipment maintenance task to be processed; then, the server obtains the terminal address information of the target terminal, and sends the target task scheduling result to the target terminal through the terminal address information.

[0116] Furthermore, after receiving the target task scheduling result, the target terminal processes the pending equipment maintenance task according to the target task scheduling result.

[0117] In this embodiment, by sending the target task scheduling results of the equipment maintenance tasks to be processed to a specific target terminal, different members of the maintenance team can synchronously understand the task scheduling through their respective terminals, which facilitates communication and collaboration between different members of the maintenance team and improves the collaborative work efficiency of the entire team.

[0118] In an exemplary embodiment, Figure 8 As shown, a method for scheduling equipment maintenance tasks is provided, which is described by taking the method applied to a server as an example, and specifically includes the following steps:

[0119] Step S801, obtaining the equipment maintenance work order corresponding to the equipment maintenance task to be processed.

[0120] Step S802, determining a target process in the equipment maintenance work order; the target process is used to indicate a process in the equipment maintenance work order that contains a dependency relationship.

[0121] Step S803, verify the dependency relationship of the target process to obtain a verification result.

[0122] Step S804, when the verification result meets the preset verification result, query the corresponding relationship between the scheduling mode and the initial time to obtain the initial time corresponding to the scheduling mode of the equipment maintenance work order.

[0123] Step S805, determining the first target planned time of the equipment maintenance work order and the second target planned time of the target process according to the initial time, the dependency relationship of the target process and the process duration.

[0124] Step S806, determining the remaining processes in the equipment maintenance work order; the remaining processes are used to represent the processes in the equipment maintenance work order except the target process.

[0125] Step S807, obtaining the third target planning time for the remaining processes.

[0126] Step S808, obtaining the first identifier of the equipment maintenance work order, the second identifier of the target process, and the third identifiers of the remaining processes.

[0127] Step S809, generating a target task scheduling result for the equipment maintenance task to be processed according to the first identifier, the second identifier, the third identifier, the first target planned time, the second target planned time and the third target planned time.

[0128] In the above-mentioned equipment maintenance task scheduling method, in the process of scheduling equipment maintenance tasks, by combining the dependency relationship, process duration and scheduling mode in the equipment maintenance work order, the target planning time of the equipment maintenance work order and the target process can be reasonably arranged, thereby avoiding conflicts and delays between equipment maintenance tasks, so that the resources required for equipment maintenance tasks can be better allocated, which is conducive to improving the processing efficiency of equipment maintenance tasks; moreover, the entire process does not require human intervention, avoiding the cumbersome scheduling method that relies on manual experience, which requires a lot of time and manpower, resulting in low scheduling efficiency of equipment maintenance tasks, thereby improving the scheduling efficiency of equipment maintenance tasks.

[0129] In an exemplary embodiment, in order to more clearly illustrate the equipment maintenance task scheduling method provided by the embodiment of the present application, the equipment maintenance task scheduling method is specifically described below with a specific embodiment. In one embodiment, the present application also provides a process scheduling rule based on the operation duration during the equipment maintenance process. In the process of scheduling the equipment maintenance task, the equipment maintenance work order corresponding to the pending equipment maintenance task is first obtained, and then the process containing the dependency relationship in the equipment maintenance work order is determined as the target process in the equipment maintenance work order. Then, according to the scheduling mode of the equipment maintenance work order, the dependency relationship and process duration of the target process, the first target planned time of the equipment maintenance work order and the second target planned time of the target process are determined. Finally, according to the first target planned time and the second target planned time, the target task scheduling result of the pending equipment maintenance task is generated. Specifically including the following contents:

[0130] 1. System technical solution.

[0131] Design a multi-layer architecture system including user interface, database, and work order process scheduling engine. The user interface allows users to input and maintain data such as work order plan start time, process information, process duration, and the relationship between processes. The database is used to store work order process information, process relationship, and work order process scheduling results. The scheduling engine is responsible for performing logical operations based on process relationship and work order start time to generate work order process operation plan. The system provides a graphical interactive window for previewing the scheduling results, and users can review and adjust.

[0132] 2. Define the relationship between work order processes.

[0133] In common work task management information systems, the four basic process relationships commonly used include Finish-to-Start (FS), Start-to-Start (SS), Finish-to-Finish (FF), and Start-to-Finish (FF). In equipment maintenance process management, the above commonly used process relationships will be used, and the two processes that establish a connection relationship are called the previous process and the next process.

[0134] Predecessor Operation: Predecessor operation controls the start time of the subsequent operation.

[0135] Successor Operation: Successor operation is controlled by the predecessor operation.

[0136] Finish-to-Start (FS): If two processes establish a FS dependency, the latter process can only start after the former process is completed, such as Figure 3 shown.

[0137] Start-to-Start (SS): If two processes establish a SS type dependency, the subsequent process can only start after the previous process starts, such as Figure 4 shown.

[0138] Finish-to-Finish (FF): If two processes establish a FF type dependency, the previous process can be completed only after the latter process is completed, such as Figure 5 shown.

[0139] Start-to-Finish (SF): If two processes establish a SF type dependency, the subsequent process can be completed after the previous process starts, such as Figure 6 shown.

[0140] During the equipment maintenance preparation process, users are allowed to establish appropriate relationships between processes based on actual maintenance task requirements, such as Figure 7 shown.

[0141] 3. Maintain basic scheduling information.

[0142] Users can input detailed information of each process through the user interface. Parameters related to process scheduling include work order planned start time, work order planned end time, shift, process number and name, process duration, and process relationship.

[0143] The system provides three scheduling algorithms: forward scheduling, backward scheduling, and immediate scheduling. In the forward scheduling mode, the scheduling of the work order process will be calculated based on the work order's planned start time. In the backward scheduling mode, the scheduling of the work order process will be calculated based on the work order's planned end time.

[0144] The team master data contains the team's work calendar, daily working hours, rest time and other information, which will be incorporated into the calculation logic of process scheduling.

[0145] The process number and name are displayed in the graphical scheduling interface to provide a more friendly system operation interaction.

[0146] The duration of an operation represents the duration of completing the operation, which affects the planned start time and planned end time of the operation. Combined with the dependency relationship maintained between operations, the duration of an operation also affects the planned start time or planned end time of the associated operations.

[0147] The relationship between processes can be maintained in each process or in the graphical interactive interface, such as Fig. 9 shown.

[0148] 4. Scheduling algorithm development.

[0149] The system provides three scheduling algorithms: forward scheduling, backward scheduling and immediate scheduling.

[0150] In the forward scheduling algorithm, the scheduling of the work order process will be calculated based on the planned start time of the work order. The planned end time of the last process of the work order will be calculated while considering relevant factors such as the process duration and process relationship, and this planned end time will be used as the planned end time of the work order.

[0151] In the backward scheduling algorithm, the scheduling of the work order process will be calculated based on the planned end time of the work order. The planned start time of the first process of the work order will be calculated while considering relevant factors such as the process duration and process relationship, and this planned start time will be used as the planned start time of the work order.

[0152] In the immediate scheduling algorithm, the work order processes are scheduled based on the current system time. The planned start time of the first process is the current system time. The planned end time of the last process of the work order is calculated by considering relevant factors such as process duration and process relationship, and this planned completion time is used as the planned completion time of the work order.

[0153] In actual maintenance operations, operators do not always maintain dependencies for all processes. In a work order, if the process dependencies maintained between some processes are valid, for those processes that do not establish dependencies with other processes, the system will assume that its planned start time is independent, that is, the same as the planned start time of the work order. When the operator deletes all dependencies in the work order process, the system will not schedule the work order process, but will manage the progress of the work order based on the planned start and planned end time of the work order.

[0154] These scheduling algorithms can generate optimal or feasible process operation plans based on the dependencies between processes, process duration, shifts, and work order start or end times. The algorithms can handle parallel and sequential processes to ensure the rationality and efficiency of process execution.

[0155] After the system schedule is completed, the operator can view the schedule effect through the Gantt chart interface. The Gantt chart supports display in three time unit dimensions: hourly, daily, and weekly. Fig.10 shown.

[0156] 5. User interaction and feedback mechanism.

[0157] The premise of scheduling work order processes is to maintain the basic information of the maintained work order processes, such as the shift, duration, and process dependencies. After maintaining the basic information of the work order processes, the operator can click the "Process Scheduling" button to perform the process scheduling operation. The process scheduling logic will check the validity of the process dependencies to avoid infinite loops between different processes. If an error is found, the system will give a clear message reminder. At the end of scheduling, the system will update the planned start time and planned end time of each process, as well as the planned start and planned end time of the work order.

[0158] After the work order process scheduling is completed, the operator can click the "Process Diagram" button to enter the graphical interactive interface, in which the effect diagram after process scheduling can be previewed and the dependency relationship between processes can be modified.

[0159] In addition, operators can preview and review the work order process scheduling effect by clicking the "Gantt Chart" button, such as Fig.11 shown.

[0160] In the above-mentioned embodiment, in the process of scheduling equipment maintenance tasks, by combining the dependency, process duration and scheduling mode in the equipment maintenance work order, it is possible to reasonably arrange the target planning time of the equipment maintenance work order and the target process, thereby avoiding conflicts and delays between equipment maintenance tasks, thereby better allocating the resources required for the equipment maintenance tasks, which is conducive to improving the processing efficiency of equipment maintenance tasks; moreover, the entire process does not require manual intervention, avoiding the defect of low scheduling efficiency of equipment maintenance tasks caused by the method of scheduling relying on manual experience, which is cumbersome and requires a lot of time and manpower, thereby improving the scheduling efficiency of equipment maintenance tasks. At the same time, the process scheduling rules based on the operation duration in the equipment maintenance process realize the refined progress management of the maintenance operation process level, which will help the business department optimize the allocation of maintenance resources, enhance team collaboration, reduce maintenance costs and continuously improve the maintenance process management; through the maintenance work order process dependencies and detailed planning information, maintenance managers can intuitively understand the dependencies between processes, which helps to more reasonably allocate human, material and financial resources to ensure that key tasks are executed with priority; task scheduling provides a clear view of the maintenance work order process, and all team members can understand the start and end conditions of the maintenance work order work, the maintenance tasks and progress requirements of their respective responsibilities, which helps coordination and communication between team members, ensures that team members can work together, reduce misunderstandings and conflicts, and ensure that resources are allocated when needed. Available when needed, it can avoid idleness and waste of resources, and enhance the transparency of team work, thereby improving overall work efficiency; for some complex maintenance operations, such as equipment shutdown overhaul or technical transformation, the clarification of maintenance work order process dependencies can help managers identify potential risk points, plan countermeasures in advance, and reduce the possibility of delays; during the execution of maintenance operations, the work order process scheduling can quickly adapt to changes, such as task delays or advances. By adjusting the schedule of related tasks, the impact of changes can be clearly and intuitively seen, helping management make faster and more accurate decisions and reducing the risk of overall delays in maintenance work; the definition of equipment maintenance work order process dependencies helps identify key quality control points and ensure that quality problems can be discovered and corrected in a timely manner during task execution. And by analyzing the results of task scheduling, deficiencies in the maintenance operation management process can be identified to promote continuous improvement of processes and methods.

[0161] It should be understood that, although the various steps in the flowcharts involved in the above-mentioned embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above-mentioned embodiments can include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily to be carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.

[0162] Based on the same inventive concept, the embodiment of the present application also provides an equipment maintenance task scheduling device for implementing the equipment maintenance task scheduling method involved above. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme recorded in the above method, so the specific limitations in one or more equipment maintenance task scheduling device embodiments provided below can refer to the limitations of the equipment maintenance task scheduling method above, and will not be repeated here.

[0163] In an exemplary embodiment, Fig.12 As shown, a device for scheduling equipment maintenance tasks is provided, including: a work order acquisition module 1201, a process determination module 1202, a time determination module 1203 and a result generation module 1204, wherein:

[0164] The work order acquisition module 1201 is used to acquire the equipment maintenance work order corresponding to the equipment maintenance task to be processed.

[0165] The process determination module 1202 is used to determine the target process in the equipment maintenance work order; the target process is used to indicate the process in the equipment maintenance work order that contains a dependency relationship.

[0166] The time determination module 1203 is used to determine the first target planned time of the equipment maintenance work order and the second target planned time of the target process according to the scheduling mode of the equipment maintenance work order, the dependency relationship of the target process and the process duration.

[0167] The result generation module 1204 is used to generate a target task scheduling result for the equipment maintenance task to be processed according to the first target planned time and the second target planned time.

[0168] In an exemplary embodiment, the result generation module 1204 is also used to determine the remaining processes in the equipment maintenance work order; the remaining processes are used to represent the processes in the equipment maintenance work order other than the target process; obtain the third target planned time for the remaining processes; and generate the target task scheduling result for the equipment maintenance task to be processed based on the first target planned time, the second target planned time and the third target planned time.

[0169] In an exemplary embodiment, the result generation module 1204 is also used to obtain the first identifier of the equipment maintenance work order, the second identifier of the target process and the third identifier of the remaining processes; based on the first identifier, the second identifier, the third identifier, the first target planned time, the second target planned time and the third target planned time, generate the target task scheduling result of the equipment maintenance task to be processed.

[0170] In an exemplary embodiment, the time determination module 1203 is also used to query the correspondence between the scheduling mode and the initial time, and obtain the initial time corresponding to the scheduling mode of the equipment maintenance work order; according to the initial time, the dependency relationship and process duration of the target process, determine the first target planned time of the equipment maintenance work order and the second target planned time of the target process.

[0171] In an exemplary embodiment, the equipment maintenance task scheduling device further includes a relationship verification module for verifying the dependency relationship of the target process to obtain a verification result.

[0172] In an exemplary embodiment, the time determination module 1203 is also used to determine the first target planned time of the equipment maintenance work order and the second target planned time of the target process according to the scheduling mode of the equipment maintenance work order, the dependency relationship and process duration of the target process when the verification result meets the preset verification result.

[0173] In an exemplary embodiment, the device for scheduling equipment maintenance tasks further includes a result sending module, which is used to determine a target terminal associated with the equipment maintenance task to be processed; and send the target task scheduling result to the target terminal.

[0174] Each module in the above-mentioned equipment maintenance task scheduling device can be implemented in whole or in part by software, hardware and a combination thereof. Each of the above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory in the computer device in the form of software, so that the processor can call and execute the operations corresponding to each of the above modules.

[0175] In an exemplary embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as shown in FIG. Fig.13As shown. The computer device includes a processor, a memory, an input / output interface (Input / Output, referred to as I / O) and a communication interface. Among them, the processor, the memory and the input / output interface are connected through a system bus, and the communication interface is connected to the system bus through the input / output interface. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store data such as equipment maintenance work orders and target processes. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a method for scheduling equipment maintenance tasks is implemented.

[0176] Those skilled in the art will understand that Fig.13 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.

[0177] In an exemplary embodiment, a computer device is further provided, including a memory and a processor, wherein a computer program is stored in the memory, and the processor implements the steps in the above-mentioned method embodiments when executing the computer program.

[0178] In an exemplary embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the steps in the above-mentioned method embodiments are implemented.

[0179] In an exemplary embodiment, a computer program product is provided, including a computer program, and when the computer program is executed by a processor, the steps in the above method embodiments are implemented.

[0180] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in this application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetoresistive random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but are not limited to this.

[0181] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0182] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.

Claims

1. A method for scheduling equipment maintenance tasks, characterized in that: The method comprises: Obtain the equipment maintenance work order corresponding to the pending equipment maintenance task; Determine a target process in the equipment maintenance work order; the target process is used to represent a process in the equipment maintenance work order that contains a dependency relationship; According to the scheduling mode of the equipment maintenance work order, the dependency relationship of the target process and the process duration, determine the first target planning time of the equipment maintenance work order and the second target planning time of the target process; A target task scheduling result of the pending equipment maintenance task is generated according to the first target planned time and the second target planned time.

2. The method according to claim 1, characterized in that Generating a target task scheduling result of the pending equipment maintenance task according to the first target planning time and the second target planning time includes: Determine the remaining processes in the equipment maintenance work order; the remaining processes are used to represent the processes in the equipment maintenance work order other than the target process; Obtaining the third target planned time of the remaining processes; A target task scheduling result of the pending equipment maintenance task is generated according to the first target planned time, the second target planned time and the third target planned time.

3. The method according to claim 2, characterized in that The generating a target task scheduling result of the pending equipment maintenance task according to the first target planned time, the second target planned time and the third target planned time includes: Obtaining a first identifier of the equipment maintenance work order, a second identifier of the target process, and a third identifier of the remaining processes; A target task scheduling result of the pending equipment maintenance task is generated according to the first identifier, the second identifier, the third identifier, the first target planned time, the second target planned time, and the third target planned time.

4. The method according to claim 1, characterized in that: Determining the first target planned time of the equipment maintenance work order and the second target planned time of the target process according to the scheduling mode of the equipment maintenance work order, the dependency relationship of the target process and the process duration includes: Query the correspondence between the scheduling mode and the initial time to obtain the initial time corresponding to the scheduling mode of the equipment maintenance work order; According to the initial time, the dependency relationship of the target process and the process duration, a first target planned time of the equipment maintenance work order and a second target planned time of the target process are determined.

5. The method according to claim 1, characterized in that After determining the target process in the equipment maintenance work order, the method further includes: Verifying the dependency relationship of the target process to obtain a verification result; Determining the first target planned time of the equipment maintenance work order and the second target planned time of the target process according to the scheduling mode of the equipment maintenance work order, the dependency relationship of the target process and the process duration includes: When the verification result meets the preset verification result, the first target planned time of the equipment maintenance work order and the second target planned time of the target process are determined according to the scheduling mode of the equipment maintenance work order, the dependency relationship and process duration of the target process.

6. The method according to any one of claims 1 to 5, characterized in that After generating the target task scheduling result of the pending equipment maintenance task according to the first target planned time and the second target planned time, the method further includes: Determining a target terminal associated with the equipment maintenance task to be processed; The target task scheduling result is sent to the target terminal.

7. A device for scheduling equipment maintenance tasks, characterized in that: The device comprises: A work order acquisition module is used to obtain the equipment maintenance work order corresponding to the equipment maintenance task to be processed; A process determination module, used to determine a target process in the equipment maintenance work order; the target process is used to represent a process in the equipment maintenance work order that contains a dependency relationship; A time determination module, used to determine a first target planned time of the equipment maintenance work order and a second target planned time of the target process according to a scheduling mode of the equipment maintenance work order, a dependency relationship of the target process and a process duration; A result generation module is used to generate a target task scheduling result of the pending equipment maintenance task according to the first target planning time and the second target planning time.

8. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 6 are implemented.

9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 6 are implemented.

10. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 6 are implemented.

Citation Information

Cited By

  • Power operation management method and system based on violation identification

    CN120410134A