Hydrogen production equipment optimization method based on grid-connected wind-light-hydrogen integrated system

By using system simulation and optimization constraint algorithms, the problem of selecting hydrogen production equipment caused by the intermittency of wind and solar energy was solved, achieving efficient and economical configuration of the hydrogen production system and improving energy utilization and the accuracy of equipment selection.

CN118983858AInactive Publication Date: 2024-11-19四川电力设计咨询有限责任公司
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411064090.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-11-19
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In grid-connected green electricity hydrogen production projects, the intermittency and volatility of wind and solar energy make it difficult for hydrogen production equipment to adapt to frequent changes in energy input, leading to inappropriate equipment size selection, which may result in wasted investment or increased operating costs, as well as low energy utilization.

Method used

Through system operation simulation, combined with optimization constraint algorithms, restrictive boundary conditions are set, hydrogen production equipment configuration is optimized, and hourly precise matching of wind and solar power generation and electricity load is achieved. Automated model calculations are used to select equipment.

Benefits of technology

It improves the economy and efficiency of hydrogen production systems, reduces power curtailment, promotes the use of renewable energy, reduces human error, shortens the design cycle, and improves the reliability and accuracy of equipment configuration.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118983858A_ABST
    Figure CN118983858A_ABST
Patent Text Reader

Abstract

The invention relates to a hydrogen production equipment optimization method based on a grid-connected wind-light-hydrogen integrated system. The method comprises the following steps: S1, determining an annual hydrogen production demand Qh of a wind-light-hydrogen production integrated project; s2, analyzing wind energy resources and solar energy resources of the wind-solar hydrogen production integrated project; s3, setting restrictive boundary conditions x, y, alpha and beta; s4, initializing each set value; inputting and simulating annual 8760h hourly generating capacity E < total > (t), and setting restrictive boundary conditions x, y, alpha and beta; setting the number of sets of simulation hydrogen production system equipment to be N; and the optimal set number N of the hydrogen production equipment is calculated through optimization constraint algorithm iterative calculation. Through system operation analogue simulation, system optimal configuration under different external conditions is explored, and a technical foundation is laid for preempting green hydrogen in advance under the large background that a new energy consumption forekeeping system, a green evidence system and industrial decarburization come out.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of new energy power system simulation, and in particular to a method for optimizing hydrogen production equipment based on a grid-connected wind-solar-hydrogen integrated system. Background Art

[0002] Hydrogen energy is a carbon-free green energy and a highly potential secondary energy source. It will occupy an important position in the future energy system. The "Medium- and Long-Term Plan for the Development of the Hydrogen Energy Industry" (2021-2035) points out that the hydrogen energy industry is a strategic emerging industry and a key development direction for future industries. It clarifies the energy attributes of hydrogen, proposes the basic principles for the development of the hydrogen energy industry and the goals of each stage of development, and deploys important measures to promote the high-quality development of the hydrogen energy industry; hydrogen energy is an important part of the future national energy system and an important carrier for energy users to achieve green and low-carbon transformation; the hydrogen energy industry is a strategic emerging industry and a key development direction for future industries; in areas rich in wind, solar and hydropower resources, carry out renewable energy hydrogen production demonstrations, gradually expand the scale of demonstrations, and explore seasonal energy storage and grid peaking; by 2030, a relatively complete hydrogen energy industry technology innovation system, clean energy hydrogen production and supply system will be formed, the industrial layout will be reasonable and orderly, and renewable energy hydrogen production will be widely used, which will strongly support the realization of the carbon peak target.

[0003] However, in green electricity hydrogen production projects that can be connected to the grid, wind and solar energy are intermittent and volatile, which requires hydrogen production equipment to have good adaptability to cope with frequent changes in energy input; it is necessary to select appropriate hydrogen production equipment based on the scale of the project and the expected hydrogen production; if the equipment is too small, it will not be able to meet the demand; if it is too large, it may lead to waste of investment and increased operating costs. The purchase cost, operating cost and maintenance cost of hydrogen production equipment all need to be considered comprehensively. Expensive equipment may bring huge pressure on initial investment, while low-cost equipment may incur higher costs in subsequent operation and maintenance.

[0004] In green electricity hydrogen production projects that can be connected to the grid, the intermittent and volatile characteristics of wind and solar energy cannot be underestimated, which requires hydrogen production equipment to have good adaptability to cope with frequent changes in energy input; energy input is unstable, and hydrogen production equipment may have energy surplus and energy shortage at times; for example, when the sun is bright and the wind is strong, the energy is abundant, but when it is cloudy and windless, the energy may drop sharply. This uncertainty requires hydrogen production equipment to quickly adjust its working state, produce hydrogen efficiently when energy is abundant, operate stably when energy is scarce, or store energy for backup. Summary of the invention

[0005] The technical problem to be solved by the present invention is to provide a method for optimizing hydrogen production equipment based on a grid-connected wind-solar-hydrogen integrated system. Through system operation simulation, the optimal configuration of the system under different external conditions is explored, laying a technical foundation for seizing the green hydrogen initiative under the backdrop of the new energy consumption quota system, the green certificate system, and industrial decarbonization.

[0006] The technical solution adopted by the present invention to solve its technical problem is:

[0007] A method for optimizing hydrogen production equipment based on a grid-connected wind-solar-hydrogen integrated system comprises the following steps:

[0008] S1. Determine the annual hydrogen production demand Q of the wind-solar hydrogen production integration project h ;

[0009] S1.1. Calculate the annual hydrogen production electricity E total_EC ,as follows:

[0010] E total_EC =E SEC .Q h (one)

[0011] In formula (1), E SEC is the comprehensive electricity consumption for hydrogen production;

[0012] S1.2. Obtain the actual operating power P of the hydrogen production system h-work (t), minimum power P h-min and the maximum power P h-max ;

[0013] S1.3, when the wind and solar power generation does not meet the minimum power operation of the hydrogen production system, that is, E total (t)<P h-min , the hydrogen production equipment stops, and the safety power E of the hydrogen production system equipment and auxiliary systems is maintained sa (t);

[0014] S1.4. Simulate and calculate the total hydrogen production system scale C h , Hourly power consumption of hydrogen production system E h (t) and the annual electricity load SumE of the hydrogen production system h (t);

[0015] S2. Analyze the wind and solar energy resources in the wind-solar hydrogen production integration project;

[0016] S2.1. Obtain the construction scale of new energy and calculate the total installed capacity of new energy as C total ,as follows:

[0017] C total =C wind +C pv (two)

[0018] In formula (II), C wind is the scale of wind power; C pv For photovoltaic scale;

[0019] S2.2. Simulate the typical annual hourly power generation of new energy power generation system, build the hourly power model of new energy power generation system; calculate the hourly power generation E of coupled wind and solar power throughout the year total (t), as follows:

[0020] E total (t) = E wind (t)+E pv (t)(iii)

[0021] In formula (III), E wind (t) is the hourly power generation of the wind power generation system; E pv (t) is the hourly power generation of the photovoltaic power generation system;

[0022] S2.3. Calculate the total electricity generation of new energy Sum E total (t), as follows:

[0023] Sum E total (t)=ΣE total (t)=ΣE wind (t)+ΣE pv (t)(IV)

[0024] S2.4. If the electricity is not used, the hourly abandoned electricity is calculated as E w (t), as follows:

[0025] E w (t) = E total (t)-P h-work (t)-E AGCPO (t)(V)

[0026] In formula (5), P h-work (t) is the actual operating power of the hydrogen production system; E AGCPO (t) Connecting the surplus electricity to the Internet;

[0027] S2.5. Calculate the total annual abandoned electricity and record it as SumE w (t), as follows:

[0028] SumE w (t)=Σmax(E total (t)-P h-work (t)-E AGCPO (t), 0)(vi)

[0029] S3, setting restrictive boundary conditions x, y, α, β;

[0030] S3.1, based on the grid-connected wind and solar integrated hydrogen production project, when SumE total (t) not exceeding E total_EC When x times, the boundary condition is set, that is, Sum E total (t) / E total_EC ≤x

[0031] S3.2, based on the grid-connected wind and solar integrated hydrogen production project, when C max_gird_CP No more than C total When the percentage of y is reached, the boundary condition is set, that is, C max_gird_CP / C total ≤y;

[0032] S3.3, based on the grid-connected wind and solar integrated hydrogen production project, to meet the annual grid-connected electricity Sum E AGCPO (t) SumE total (t) percentage limit value α, set boundary conditions, Sum E AGCPO (t) / Sum E total (t)≤α;

[0033] S3.4, based on the grid-connected wind and solar integrated hydrogen production project, to meet the annual grid electricity Sum E AEC (t) Proportion of the total annual power load of the project Sum E total (t) percentage limit value β, set boundary conditions, Sum E AEC (t) / Sum E total (t)≤β;

[0034] S4, initializing various setting values;

[0035] Input simulated annual 8760h hourly power generation E total (t), set restrictive boundary conditions x, y, α, β; set the number of simulated hydrogen production system equipment to N; calculate the optimal number of hydrogen production equipment N through iterative calculation of the optimization constraint algorithm.

[0036] In step S1.2, the P h-min ≤P h-work (t)≤P h-max .

[0037] In step S1.4, the annual electricity load of the hydrogen production system is SumE h (t) = hourly power consumption of hydrogen production system E h (t).

[0038] In step S4, the steps of calculating the preferred number N of hydrogen production equipment are as follows:

[0039] 1. Take N as the number of actual hydrogen production equipment in operation as an integer, N = n, n + 1...;

[0040] 2. The starting value of N is C total (1-y) / P h The value of is rounded up to the integer value;

[0041] 3. When calculating the value N, the following restrictions apply:

[0042]

[0043] In the above formula, C max_gird_cp is the maximum power transmission of renewable energy power generation; S16, Sum E AGCPO (t) is the annual grid-connected electricity; SumE total (t) is the electricity generated by renewable energy, SumE AGCPO (t)=ΣmaxE AGCPO (t);

[0044] When N takes the value of n and satisfies any and all of the above restrictions, the operation ends;

[0045] When N takes the value n, which does not meet all the above constraints, it returns to recalculate, and N takes the value n+1 until all the constraints are met;

[0046] 4. After optimization calculation, the optimal number of equipment configurations for the hydrogen production system is output.

[0047] The beneficial effects of the present invention are:

[0048] 1. Through its customization capabilities, it can adapt to the unique needs of grid-connected wind-solar (green electricity) hydrogen production integrated projects. By deeply analyzing the characteristics of wind and solar resources at the project site, it can achieve hourly and precise matching of wind and photovoltaic power generation and power load, ensuring that the selection of the hydrogen production system not only meets actual needs, but also has high economy and efficiency.

[0049] 2. By introducing the optimization constraint algorithm and carefully setting the boundary conditions of restrictive factors, the redundant steps in the calculation process are effectively reduced and the optimization iteration process is accelerated. This algorithm not only ensures the scientific nature of the calculation results, but also significantly improves the calculation speed, providing strong support for the rapid advancement of the project.

[0050] 3. Through model calculation, the utilization rate of new energy is improved, and the power abandonment due to excess power generation is effectively reduced; it not only brings significant economic benefits to the project, but also promotes the full utilization of renewable energy, helps to alleviate the energy crisis and reduce environmental pollution.

[0051] 4. By converting the complex hydrogen production system configuration process into an automated model calculation, it does not rely on the traditional design method that relies on manual calculation and judgment; this not only greatly reduces the errors caused by human factors, but also significantly shortens the design cycle and improves the reliability and accuracy of the hydrogen production equipment configuration; at the same time, it also provides designers with more accurate data support, which helps to make more scientific decisions. BRIEF DESCRIPTION OF THE DRAWINGS

[0052] Figure 1 It is a schematic diagram of the process of the present invention;

[0053] Figure 2 This is the load simulation curve of photovoltaic and wind power generation for 8760 hours throughout the year;

[0054] Figure 3 This is a simulation curve of power generation and hydrogen production load for 8760 hours throughout the year. DETAILED DESCRIPTION

[0055] The present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0056] Implementation 1

[0057] like Figure 1 As shown, a method for optimizing hydrogen production equipment based on a grid-connected wind-solar-hydrogen integrated system comprises the following steps:

[0058] S1. Determine the annual hydrogen production demand Q of the wind-solar hydrogen production integration project h and rated hydrogen production power P h ;

[0059] S1.1. Calculate the annual hydrogen production electricity (power consumption of hydrogen production system) E total_EC ,as follows:

[0060] E total_EC =E SEC Q h (one)

[0061] In formula (1), E SEC It is the comprehensive electricity consumption per unit of hydrogen production of the hydrogen production system;

[0062] S1.2. Obtain the actual operating power P of the hydrogen production system h-work (t), minimum power P h-min and the maximum power P h-max ;

[0063] S1.3, when the wind and solar power generation does not meet the minimum power operation of the hydrogen production system, that is, E total (t)<P h-min , the hydrogen production equipment stops, and the safety power (power consumption of the safety power supply) of the important equipment and auxiliary systems of the hydrogen production system is maintained.sa (t);

[0064] S1.4. Simulate and calculate the total hydrogen production system scale C h , Hourly power consumption of hydrogen production system E h (t) and the annual electricity load SumE of the hydrogen production system h (t);

[0065] S2. Analyze the wind and solar energy resources in the wind-solar hydrogen production integration project;

[0066] S2.1. Obtain the construction scale of new energy (wind power generation system and photovoltaic power generation system) and calculate the total installed capacity of new energy as C total ,as follows:

[0067] C total =C wind +C pv (two)

[0068] In formula (II), C wind is the scale of wind power; C pv For photovoltaic scale;

[0069] S2.2. Simulate the typical annual hourly power generation of new energy power generation systems (wind power generation systems and photovoltaic power generation systems), build an hourly power model of new energy power generation systems; calculate the hourly power generation E of the coupled wind and solar power throughout the year total (t), as follows:

[0070] E total (t) = E wind (t)+E pv (t)(iii)

[0071] In formula (III), E wind (t) is the hourly power generation of the wind power generation system; E pv (t) is the hourly power generation of the photovoltaic power generation system;

[0072] S2.3. Calculate the total electricity generation of new energy Sum E total (t), as follows:

[0073] Sum E total (t)=ΣE total (t)=ΣE wind (t)+ΣE pv (t)(IV)

[0074] S2.4. If the electricity is not connected to the grid or is not used, the hourly abandoned electricity is calculated as E w (t), as follows:

[0075] E w (t) = Etotal (t)-P h-work (t)-E AGCPO (t)(V)

[0076] In formula (5), P h-work (t) is the actual operating power of the hydrogen production system; E AGCPO (t) Connecting the surplus electricity to the Internet;

[0077] S2.5. Calculate the total annual abandoned electricity and record it as SumE w (t), as follows:

[0078] SumE w (t)=Σmax(E total (t)-P h-work (t)-E AGCPO (t), 0)(vi)

[0079] S3, setting restrictive boundary conditions x, y, α, β;

[0080] S3.1, based on the grid-connected wind and solar integrated hydrogen production project, when SumE total (t) not exceeding E total_EC x times, set the boundary conditions, that is, SumE total (t) / E total_EC ≤x

[0081] S3.2, based on the grid-connected wind and solar integrated hydrogen production project, when C max_gird_CP No more than C total When the percentage of y is reached, the boundary condition is set, that is, C max_gird_CP / C total ≤y;

[0082] When E total (t)-E h When (t)>0, the surplus power is connected to the grid E AGCPO (t); when E total (t)-E h When (t)≤0, the electricity generated by renewable energy is used for the hydrogen production system; E h (t)≤C h 1, 1 means 1 hour;

[0083] S3.3, based on the grid-connected wind and solar integrated hydrogen production project, to meet the annual grid-connected electricity Sum E AGCPO (t) SumE total (t) percentage limit value α, set boundary conditions, SumE AGCPO (t) / SumE total (t)≤α;

[0084] S3.4, based on the grid-connected wind and solar integrated hydrogen production project, to meet the annual grid electricity SumE AEC (t) accounts for the total annual power load of the project SumE total (t) percentage limit value β, set boundary conditions, Sum E AEC (t) / SumE total (t)≤β;

[0085] When E total (t)<P h-min When the electricity E is needed during this period AEC (t); SumE AEC (t) is the sum of IF(E total (t)<P h-min , E sa (t), E total (t)≥P h-min , 0);

[0086] S4, initializing various setting values;

[0087] Input simulated annual 8760h hourly power generation E total (t), set restrictive boundary conditions x, y, α, β; set the number of simulated hydrogen production system equipment to N; calculate the optimal number of hydrogen production equipment N through iterative calculation of the optimization constraint algorithm.

[0088] In step S1.2, the P h-min ≤P h-work (t)≤P h-max .

[0089] In step S1.4, the hydrogen production system is fitted to run the annual electricity load SumE h (t) = hourly power consumption of hydrogen production system E h (t).

[0090] In step S4, the steps of calculating the preferred number N of hydrogen production equipment are as follows:

[0091] 1. Take N as the number of actual hydrogen production equipment in operation as an integer, N = n, n + 1...;

[0092] 2. The starting value of N is C total (1-y) / P h The value of is rounded up to the integer value;

[0093] 3. When calculating the value N, the following restrictions apply:

[0094]

[0095] In the above formula, C max_gird_cpis the maximum power transmission of renewable energy power generation; S16, Sum E AGCPO (t) is the annual grid-connected electricity; SumE total (t) is the electricity generated by renewable energy, SumE AGCPO (t)=ΣmaxE AGCPO (t);

[0096] When N takes the value of n and satisfies any and all of the above restrictions, the operation ends;

[0097] When N takes the value n, which does not meet all the above constraints, it returns to recalculate, and N takes the value n+1 until all the constraints are met;

[0098] 4. After optimization calculation, the optimal number of equipment configurations for the hydrogen production system is output.

[0099] Through its customization capabilities, it can adapt to the unique needs of grid-connected wind-solar (green electricity) integrated hydrogen production projects. By deeply analyzing the characteristics of wind and solar resources at the project site, it can achieve hourly and precise matching of wind and photovoltaic power generation and power load, ensuring that the selection of the hydrogen production system not only meets actual needs but also has a high degree of economy and efficiency.

[0100] By introducing an optimization constraint algorithm and carefully setting restrictive factor boundary conditions, we effectively reduced redundant steps in the calculation process and accelerated the optimization iteration process. This algorithm not only ensures the scientific nature of the calculation results, but also significantly improves the calculation speed, providing strong support for the rapid advancement of the project.

[0101] Through model calculation, the utilization rate of new energy has been improved and the power abandonment due to excess power generation has been effectively reduced; it has not only brought significant economic benefits to the project, but also promoted the full utilization of renewable energy, helped alleviate the energy crisis and reduce environmental pollution.

[0102] By converting the complex hydrogen production system configuration process into an automated model calculation, it does not rely on the traditional design method that relies on manual calculation and judgment; this not only greatly reduces the errors caused by human factors, but also significantly shortens the design cycle and improves the reliability and accuracy of the hydrogen production equipment configuration; at the same time, it also provides designers with more accurate data support, which helps to make more scientific decisions.

[0103] It can solve the problem of modeling the power data curves of the wind power generation system and the photovoltaic power generation system in the grid-connected wind-solar integrated hydrogen production project. By optimizing the constraint method and setting the boundary conditions that meet the various restrictive requirements of the local regulations for grid-connected projects, the algorithm automatically performs multiple iterative calculations, constantly approaches and finally locks in the optimal equipment configuration plan that meets all the constraints. It not only reflects the scientificity and rigor of the calculation method, but also significantly improves the efficiency and accuracy of equipment selection. The equipment selection problem of the green electricity hydrogen production system has been fundamentally solved. The selected equipment can not only accurately match the actual needs of the system, but also maximize the use of wind and solar resources while meeting the requirements of the power grid, thereby improving the overall operation efficiency and economy of the system. In addition, it also reduces the difficulty and error of manual selection, providing a strong guarantee for the rapid advancement and smooth implementation of the project.

[0104] Implementation 2

[0105] The selection of hydrogen production equipment requires precise matching of the project scale and expected hydrogen production, which is a decision-making process that requires weighing multiple factors. If the equipment is too small, it will not be able to achieve the expected output and meet demand, affecting project advancement and operations. If the equipment is too large, it may be able to meet or even exceed demand in the short term, but in the long run it will result in wasted investment and rising operating costs.

[0106] Taking large-scale industrial green electricity hydrogen production projects as an example, if equipment is too small, it will be difficult to meet the hydrogen production demand even if it operates at full capacity, which will hinder the operation of the downstream industrial chain; if oversized equipment is selected, huge investment will be required when purchasing it, and the energy consumption, depreciation, personnel management and other costs in subsequent daily operations will also increase significantly.

[0107] In addition, the cost factors such as the purchase, operation and maintenance of hydrogen production equipment need to be comprehensively considered; in the early stage, expensive high-end equipment will bring investment pressure. Although the performance and quality are excellent, the price may make the budget tight. Although low-priced equipment has a small initial investment, it may consume high energy and parts are easily damaged during operation and maintenance, resulting in increased costs.

[0108] Therefore, a method for optimizing hydrogen production equipment based on a grid-connected wind-solar-hydrogen integrated system is adopted as follows:

[0109] (1) Determine the annual hydrogen production demand Q of the wind-solar hydrogen production integration project h =14000t; the unit comprehensive electricity consumption of hydrogen production system is recorded as E SEC =5.2kwh / Nm 3 , the rated hydrogen production power is P h =5MW / 1000Nm 3 / h.

[0110] (2)E total_EC =E SEC Q h =7.62×108 kwh.

[0111] (3) Analyze the wind and solar energy resources in the wind-solar hydrogen production integration project; determine the construction scale of new energy (wind power generation system and photovoltaic power generation system); the total installed capacity of new energy is recorded as C total =460MW, wind power scale is recorded as C wind =230MW, the photovoltaic scale is recorded as C pv =230MW.

[0112] (4) Simulate the hourly power generation of a typical year of a new energy power generation system (wind power generation system and photovoltaic power generation system) and construct an hourly power model of the new energy power generation system. Figure 2 shown.

[0113] (5) Total annual electricity generation from renewable energy sources Sum E total (t)=ΣE total (t) = 9.01 × 10 8 kwh.

[0114] (6) According to local policies, the maximum transmission power of renewable energy generation is C max_gird_CP =184MW.

[0115] (7) Based on the grid-connected wind-solar integrated hydrogen production project, the relevant policy regulations of the project site stipulate that the amount of renewable energy power generation shall not exceed x times the hydrogen production power load, x = 1.2, Sum E total (t) / E total_EC =1.18≤1.2.

[0116] (8) Based on the grid-connected wind-solar integrated hydrogen production project, the local power grid meets the requirement that the maximum wind-solar power transmission power does not exceed a percentage y of the total installed capacity of new energy supporting the project, y = 40%.

[0117] (9) Based on the grid-connected wind-solar integrated hydrogen production project, the annual grid-connected electricity volume percentage limit α of the annual total power generation shall be met in the relevant regulations of the project site, and α≤20%.

[0118] (10) Based on the grid-connected wind-solar integrated hydrogen production project, the relevant policy regulations of the project site stipulate that the percentage limit value β of the annual off-grid electricity volume to the annual total power load of the project shall be met, β≤10%.

[0119] (11) Initialize various set values ​​and input the hourly power generation E for 8760 hours throughout the year total (t), set the number of simulated hydrogen production system equipment as N; calculate the optimal number of hydrogen production equipment N = 30 sets (minimum number) through iterative calculation of optimization constraint algorithm; power generation E total (t) and hydrogen production load P h-work(t) The 8760 load model is as follows Figure 3 shown.

[0120] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various changes and variations. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for optimizing hydrogen production equipment based on a grid-connected wind-solar-hydrogen integrated system. Features: The following steps are involved: S1. Determine the annual hydrogen production demand Q of the wind-solar hydrogen production integration project h ; S1.

1. Calculate the annual hydrogen production electricity E total_EC ,as follows: E total_EC =E SEC Q h (one) In formula (1), E SEC is the comprehensive electricity consumption for hydrogen production; S1.

2. Obtain the actual operating power P of the hydrogen production system h-work (t), minimum power P h-min and the maximum power P h-max ; S1.3, when the wind and solar power generation does not meet the minimum power operation of the hydrogen production system, that is, E total (t)<P h-min , the hydrogen production equipment stops, and the safety power E of the hydrogen production system equipment and auxiliary systems is maintained sa (t); S1.

4. Simulate and calculate the total hydrogen production system scale C h , Hourly power consumption of hydrogen production system E h (t) and the annual electricity load SumE of the hydrogen production system h (t); S2. Analyze the wind and solar energy resources in the wind-solar hydrogen production integration project; S2.

1. Obtain the construction scale of new energy and calculate the total installed capacity of new energy as C total ,as follows: C total =C wind +C pv (two) In formula (II), C wind is the scale of wind power; C pv For photovoltaic scale; S2.

2. Simulate the typical annual hourly power generation of new energy power generation system, build the hourly power model of new energy power generation system; calculate the hourly power generation E of coupled wind and solar power throughout the year total (t), as follows: E total E(t) = E wind E(t) + E pv E(t) (III) In formula (III), E wind (t) is the hourly power generation of the wind power generation system; E pv (t) is the hourly power generation of the photovoltaic power generation system; S2.

3. Calculate the total electricity generation of new energy Sum E total (t), as follows: Sum E total (t) = ΣE total (t) = ΣE wind (t) + ΣE pv (t) (Four) S2.

4. If the electricity is not used, the hourly abandoned electricity is calculated as E w (t), as follows: E w E(t) total P(t) h-work E(t) AGCPO t (Five) In formula (5), P h-work (t) is the actual operating power of the hydrogen production system; E AGCPO (t) Connecting the surplus electricity to the Internet; S2.

5. Calculate the total annual abandoned electricity and record it as SumE w (t), as follows: SumE w (t) = Σmax(E total (t) - P h-work (t) - E AGCPO (t), 0) (Six) S3, setting restrictive boundary conditions x, y, α, β; S3.1, based on the grid-connected wind and solar integrated hydrogen production project, when Sum E total (t) not exceeding E total_EC When x times, the boundary condition is set, that is, Sum E total (t) / E total_EC ≤x S3.2, based on the grid-connected wind and solar integrated hydrogen production project, when C max_gird_CP No more than C total When the percentage of y is reached, the boundary condition is set, that is, C max_gird_CP / C total ≤y; S3.3, based on the grid-connected wind and solar integrated hydrogen production project, to meet the annual grid-connected electricity Sum E AGCPO (t) Sum E total (t) percentage limit value α, set boundary conditions, Sum E AGCPO (t) / Sum E total (t)≤α; S3.4, based on the grid-connected wind and solar integrated hydrogen production project, to meet the annual grid electricity Sum E AEC (t) Total annual electricity load of the project Sum E total (t) percentage limit value β, set boundary conditions, Sum E AEC (t) / Sum E total (t)≤β; S4, initializing various setting values; Input simulated annual 8760h hourly power generation E total (t), set restrictive boundary conditions x, y, α, β; set the number of simulated hydrogen production system equipment to N; calculate the optimal number of hydrogen production equipment N through iterative calculation of the optimization constraint algorithm.

2. A method for optimizing hydrogen production equipment based on a grid-connected wind-solar-hydrogen integrated system as claimed in claim 1, Features: In step S1.2, the P h-min ≤P h-work (t)≤P h-max .

3. A method for optimizing hydrogen production equipment based on a grid-connected wind-solar-hydrogen integrated system as claimed in claim 1, Features: In step S1.4, the annual electricity load of the hydrogen production system is SumE h (t) = hourly power consumption of hydrogen production system E h (t).

4. A method for optimizing hydrogen production equipment based on a grid-connected wind-solar-hydrogen integrated system as claimed in claim 1, Features: In step S4, the steps of calculating the preferred number N of hydrogen production equipment are as follows:

1. Take N as the number of actual hydrogen production equipment in operation as an integer, N = n, n + 1...; 2. The starting value of N is C total (1-y) / P h The value of is rounded up to the integer value; 3. When calculating the value N, the following restrictions apply: In the above formula, C max_gird_cp is the maximum power transmission of renewable energy power generation; S16, Sum E AGCPO (t) is the annual grid-connected electricity; SumE total (t) is the electricity generated by renewable energy, SumE AGCPO (t)=ΣmaxE AGCPO (t); When N takes the value of n and satisfies any and all of the above restrictions, the operation ends; When N takes the value n, which does not meet all the above constraints, it returns to recalculate, and N takes the value n+1 until all the constraints are met; 4. After calculation, the optimal number of equipment configurations for the output hydrogen production system is selected.

Citation Information

Patent Citations

  • Volume optimization matching method for wind-solar-storage complementary hydrogen production system

    CN115275994A

  • Wind-solar hydrogen production integrated planning production simulation method and system and storage medium

    CN118229121A