Brand new network maintenance method for use of HPLC (High Performance Liquid Chromatography) network in photovoltaic project

By reducing the transmission of management messages in the HPLC network and using statistical methods of service messages and beacon frames to calculate the communication success rate, the problem that the HPLC network in the photovoltaic power station cannot meet the real-time requirements is solved, and the large-scale photovoltaic power station network is realized Stability and widespread promotion.

CN118984291APending Publication Date: 2024-11-19QINGDAO LIANZHONGXIN CLOUD TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411264658.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-10
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

HPLC communication networks in photovoltaic power stations occupy physical channels because the transmission of management messages occupies physical channels, resulting in delay or failure of scheduling messages, which cannot meet the real-time needs of photovoltaic power stations. The existing technology can only be used in small-scale networks and cannot be promoted on a large scale. .

Method used

Delete the sending of discovery list messages, communication success rate reporting messages and heartbeat detection messages, use the statistical methods of service messages and beacon frames to calculate the communication success rate, and make proxy changes through proxy changes to reduce the sending of management messages. Quantity to ensure network communication stability.

Benefits of technology

Significantly reduce the conflict between business messages and management messages in photovoltaic power station systems, improve network scale, and realize the widespread promotion of HPLC networks in large-scale photovoltaic power stations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118984291A_ABST
    Figure CN118984291A_ABST
Patent Text Reader

Abstract

The invention provides a brand-new network maintenance method when an HPLC (High Performance Liquid Chromatography) network is used in a photovoltaic project, which comprises the brand-new network maintenance method of the HPLC network: under the condition that a discovery list message, a communication success rate report message and a heartbeat detection message are deleted, a communication success rate statistical method and a network maintenance method are carried out by adopting an msdu serial number mode; a new communication success rate periodic statistical method and a new communication success rate calculation method; the invention relates to a reserved field extension method of a beacon frame load field. Through the technical scheme of the invention, the sending number of the HPLC network maintenance messages is effectively reduced, because the sending of the discovery list message, the communication success rate report message and the heartbeat detection message is deleted, the conflict between the photovoltaic project service message and the HPLC network management message can be greatly reduced, and the user experience is improved. Therefore, the network scale of the photovoltaic project can be improved, and large-scale popularization of the HPLC network in the photovoltaic project is facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of communication networks, and in particular to a new network maintenance method when an HPLC network is used in a photovoltaic project. Background Art

[0002] The State Grid has introduced the broadband power line carrier communication (HPLC) protocol. With its mature use in the procurement system, it has been able to meet the use needs of the procurement business. The mature HPLC communication network can be promoted to photovoltaic power stations. Before the HPLC communication network was available, photovoltaic power stations used traditional twisted pair cables to communicate through the MODBUS protocol, which required additional laying of twisted pair cables dedicated to communication for data transmission. When the HPLC communication network is promoted to photovoltaic power stations, the cost of laying twisted pair cables can be saved, while meeting communication needs. This is quite intuitive for reducing the cost of photovoltaic power stations.

[0003] On the other hand, the HPLC communication network has also put forward new requirements during its use in photovoltaic power stations. There are differences between the business data interaction process of photovoltaic power stations and the data interaction process of the procurement system. The photovoltaic power station system has relatively high requirements for the timeliness of data communication.

[0004] The HPLC communication network is maintained mainly by using the discovery list messages, communication success rate reporting messages, proxy change messages, and heartbeat detection messages in the management messages. At the end of each routing cycle, each node will calculate the communication success rate with the neighboring nodes based on the number of discovery lists received from the neighboring nodes, and determine whether to change the proxy based on the communication success rate, thereby ensuring the stability of network communication. At the same time, the proxy node will initiate the sending of heartbeat detection messages every two routing cycles to ensure that the CCO can correctly perceive the online status of each STA node.

[0005] The management messages introduced above will occupy the physical communication channel when they are sent, which will cause the dispatch message sending of the photovoltaic power station to be delayed or fail, thus failing to meet the system requirements of the photovoltaic power station. The current solution is to reduce the amount of data sent by the above management messages, that is, to extend the sending cycle of the management messages while keeping the routing cycle unchanged. However, there is still a certain probability of data collision, which can only basically meet the use requirements of small-scale photovoltaic systems and cannot be promoted for large-scale use. When the number of nodes in a single photovoltaic power station system network increases, even if the sending cycle of the management message of each node is delayed, due to the large number of network nodes, the total number of management messages is still large, resulting in the failure to meet the real-time requirements of the photovoltaic power station system.

[0006] The existing technical solutions can only be used in small-scale networks (within 20 STA nodes) and cannot be used in large-scale networks (within 30 to 100 nodes). As a result, HPLC communication network technology cannot be widely promoted in photovoltaic power station systems.

[0007] Based on the HPLC communication protocol, the patent of the present invention deletes the sending of discovery list messages, communication success rate reporting messages, and heartbeat detection messages, retains the proxy change messages, and adopts the method described in the present invention to maintain the HPLC network to meet the network communication needs. In this way, the impact of HPLC network management messages on the sending and receiving of photovoltaic system business messages is reduced to the greatest extent, and at the same time, the network communication performance of the photovoltaic system will not be affected.

[0008] The present invention adopts a new method for calculating the communication success rate between HPLC network nodes, that is, each node in the network maintains the stability of network communication by adopting a statistical method for each neighbor node service message and beacon frame. When the communication success rate between a certain node and its agent is lower than a set threshold, the agent is changed through an agent change message. By reducing the number of management messages sent in this way, the conflict between the photovoltaic power station system scheduling message and the network management message can be greatly reduced, thereby meeting the use requirements of the on-site large-scale photovoltaic power station network. Further, the HPLC communication network technology can be widely promoted in the photovoltaic power station system. Summary of the invention

[0009] In order to make up for the shortcomings of the prior art, the present invention provides a new network maintenance method when the HPLC network is used in a photovoltaic project. In the use network, the maintenance of the HPLC network needs to calculate the communication success rate between the node and the neighboring node based on the reception of the discovery list, and perform proxy changes based on the set communication success rate threshold, so as to maintain the stable communication of the network. This method of calculating the communication success rate by the discovery list requires the periodic sending of the discovery list message. When the discovery list message is sent, the service message of the node cannot be sent.

[0010] In the use scenario of photovoltaic power stations, business messages are divided into scheduling messages and non-scheduling messages. These two messages need to be sent through CCO. After receiving the business message, STA parses the message and performs corresponding processing. Scheduling messages have strict timeliness requirements, requiring that the scheduling message sent by CCO be sent to each STA node within the specified time. If a STA node is sending a discovery list during this process, the scheduling message sent by CCO will be delayed or fail to send. From the business level, the sending success rate of scheduling messages cannot be less than 99.9%. Therefore, based on this special requirement, it is necessary to reduce the number of discovery lists sent by each STA node, so as to reduce the probability of conflict between the scheduling message sent by CCO and the discovery list message sent by a certain STA node. Reducing the number of discovery lists sent by each STA node means increasing the sending cycle duration of the discovery list sent by each STA node. However, a longer discovery list sending cycle will lead to poor responsiveness of network communication maintenance. That is, once the network has poor communication effect, the time for calculating the communication success rate through the discovery list will be longer, which will lead to a longer time for proxy changes, resulting in a longer time for unsatisfactory network communication effect, thereby increasing the response time of network communication maintenance, and ultimately causing poor stability of network communication.

[0011] In short, the discovery list messages used to maintain the network in the mining network will affect the sending success rate of photovoltaic business scheduling messages, including communication success rate reporting messages, proxy change messages, and heartbeat detection messages. These management messages are also sent periodically and will also affect the sending success rate of photovoltaic scheduling messages. In order to solve this problem, the present invention provides a new network maintenance method for HPLC network of photovoltaic power station, so that the communication stability of the network can meet the system usage requirements.

[0012] The present invention is implemented by the following technical solution: a new network maintenance method when an HPLC network is used in a photovoltaic project, specifically comprising the following steps: Step S1: After the HPLC network is established, each node analyzes and processes the sof frame received from the neighbor node; determines whether it is an agent change message or a business message. If it is an agent change message, the message needs to be parsed and then processed accordingly; if it is a business message, the msdu sequence number of the sof frame received from the neighbor node is saved in the corresponding node information in the neighbor table; if it is other types of messages, the corresponding message parsing process is performed, otherwise the sof frame processing flow is exited; S2: After the HPLC network is established, each node analyzes and processes the beacon frames received from neighboring nodes. S3: Each node in the network performs communication success rate statistics and proxy change judgment; S4: Each node repeats steps S1 to S3 to perform HPLC network maintenance to ensure that the network communication performance can meet the needs of the photovoltaic project.

[0013] As a preferred solution, step S2 specifically includes the following steps: Step S2-1: beacon frame transmission rules and reserved field extension method of beacon frame payload field: STA nodes are divided into proxy nodes and discovery nodes. Each node will receive two or three beacons among central beacons, proxy beacons and discovery beacons when receiving beacons. In each beacon period, the CCO first sends a central beacon, and the proxy node sends a proxy beacon. These two types of beacons will be sent in each beacon period. The discovery node sends a discovery beacon in accordance with at least two discovery beacon frames within a 170-second time period, that is, each node will send a beacon frame once within 100 seconds; the duration of each beacon period in the photovoltaic project is set to 10 seconds, and each node will receive a complete beacon frame from a neighbor node once every 10 beacon periods. There are 7 bytes of reserved fields in the beacon frame payload field. Two bytes are taken out to add the number of service messages sent by the node in the current most recent 10 beacon periods; since the beacon frame contains a beacon period count value, when the beacon period count value is an integer multiple of 10, it is considered to be a network communication success rate statistical period; Step S2-1: When the communication success rate statistical cycle time expires, each node in the network will determine that the communication success rate of the neighbor node is set to T by setting the latest msdu sequence number saved in the received neighbor node service message to Tm, setting the msdu sequence number of the previous communication success rate statistical cycle to Tn, and setting the number of service messages sent in the current communication success rate statistical cycle in the received neighbor node beacon frame to Bc. The calculation formula is: T=(|Tm – Tn|) / Bc; each node will make an agent change judgment when the routing cycle time expires. The routing cycle of the photovoltaic project is set to 300 seconds. Three T values ​​will be calculated in one routing cycle and saved in the corresponding node information of the neighbor list for agent change judgment.

[0014] As a preferred solution, step S3 specifically includes the following steps: when the routing cycle time expires, each node performs communication success rate statistics and agent change judgment. When each routing cycle time expires, each node has calculated and saved the three communication success rate values ​​of each neighboring node, and calculates the average of the three communication success rates of the proxy node and compares it with the set communication success rate threshold to determine whether to change the proxy. If the communication success rate of the proxy node of the node is lower than the set communication success rate threshold, it is necessary to select a node with a communication success rate greater than the communication success rate threshold from the neighboring nodes as the new proxy node and initiate the proxy change process, otherwise the proxy remains unchanged.

[0015] Due to the adoption of the above technical scheme, the present invention has the following beneficial effects compared with the prior art: the present invention can effectively reduce the number of HPLC network maintenance messages sent, because the present invention deletes the sending of discovery list messages, communication success rate reporting messages and heartbeat detection messages, thereby greatly reducing the conflict between photovoltaic project business messages and HPLC network management messages, thereby increasing the network scale of photovoltaic projects, and facilitating the large-scale promotion of HPLC networks in photovoltaic projects.

[0016] Additional aspects and advantages of the present invention will become apparent from the following description or may be learned by practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which: Figure 1 A processing flow chart for each node receiving a sof frame from a neighboring node; Figure 2 A processing flow chart for each node receiving a beacon frame from a neighboring node; Figure 3 Statistics of communication success rate and agent change judgment flow chart for each node. DETAILED DESCRIPTION

[0018] In order to more clearly understand the above-mentioned purpose, features and advantages of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.

[0019] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways different from those described herein. Therefore, the protection scope of the present invention is not limited to the specific embodiments disclosed below.

[0020] In the HPLC communication network of the present invention, neither CCO nor STA sends discovery list messages, and STA in the network does not send communication success rate reporting messages and heartbeat indication messages. CCO and STA both perform network communication performance and node on-line detection by counting service messages and beacon frames of neighboring nodes to determine whether proxy change is required. When proxy change is required, proxy change operation is performed by sending proxy change messages. CCO and STA calculate the communication success rate with each neighboring node by counting service messages and beacon frames, and detect whether the STA node is online.

[0021] Combine the following Figures 1 to 3A new network maintenance method when the HPLC network according to an embodiment of the present invention is used in a photovoltaic project is specifically described.

[0022] like Figures 1 to 3 As shown, the present invention proposes a new network maintenance method when an HPLC network is used in a photovoltaic project, which specifically includes the following steps: Step S1: After the HPLC network is established, each node analyzes and processes the sof frame received from the neighbor node; determines whether it is an agent change message or a business message. If it is an agent change message, the message needs to be parsed and then processed accordingly; if it is a business message, the msdu sequence number of the sof frame received from the neighbor node is saved in the corresponding node information in the neighbor table; if it is other types of messages, the corresponding message parsing process is performed, otherwise the sof frame processing flow is exited; Figure 1 A flow chart of this step is given; S2: After the HPLC network is established, each node analyzes and processes the beacon frames received from neighboring nodes; specifically, the following steps are included: Step S2-1: beacon frame transmission rules and reserved field extension method of beacon frame payload field: Since STA nodes are divided into proxy nodes and discovery nodes, each node will receive two or three beacons of central beacon, proxy beacon and discovery beacon when receiving beacons. In each beacon period, the CCO first sends the central beacon, and the proxy node sends the proxy beacon. These two types of beacons will be sent in each beacon period. The discovery node does not send the discovery beacon in every beacon period, but will follow the principle of sending at least two discovery beacon frames within a 170-second time period, that is, each node will send a beacon frame once within 100 seconds; the duration of each beacon period in the photovoltaic project is set to 10 seconds, so each node can completely receive the beacon frame of the neighbor node once every 10 beacon periods. There is a 7-byte reserved field in the beacon frame payload field. Take out two bytes to add the number of service messages sent by the node in the current most recent 10 beacon periods; Since the beacon frame contains the beacon period count value, when the beacon period count value is an integer multiple of 10, it is considered to be a network communication success rate statistical period; Step S2-1: When the communication success rate statistical cycle time expires, each node in the network will determine that the communication success rate of the neighbor node is set to T by setting the latest msdu sequence number saved in the service message of the received neighbor node to Tm, setting the msdu sequence number of the previous communication success rate statistical cycle to Tn, and setting the number of service messages sent in the current communication success rate statistical cycle in the beacon frame of the received neighbor node to Bc. The calculation formula is: T=(|Tm – Tn|) / Bc; each node will make an agent change judgment when the routing cycle time expires. The routing cycle of the photovoltaic project is set to 300 seconds, so 3 T values ​​will be calculated in one routing cycle and saved in the corresponding node information of the neighbor list for agent change judgment;.

[0023] S3: Each node in the network performs communication success rate statistics and proxy change judgment; specifically includes the following steps: each node performs communication success rate statistics and proxy change judgment when the routing cycle time expires. As described in step S2, when each routing cycle time expires, each node has calculated and saved the three communication success rate values ​​of each neighboring node, and calculates the average of the three communication success rates of the proxy node and compares it with the set communication success rate threshold to determine whether to change the proxy. If the communication success rate of the proxy node of the node is lower than the set communication success rate threshold, it is necessary to select a node with a communication success rate greater than the communication success rate threshold from the neighboring nodes as the new proxy node and initiate the proxy change process, otherwise the proxy remains unchanged. Figure 3 The judgment process of agent change is given.

[0024] S4: Each node repeats steps S1 to S3 to perform HPLC network maintenance to ensure that the network communication performance can meet the needs of the photovoltaic project.

[0025] In the description of the present invention, the term "plurality" refers to two or more than two. Unless otherwise clearly defined, the orientation or positional relationship indicated by the terms "upper" and "lower" is based on the orientation or positional relationship shown in the drawings. It is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it cannot be understood as a limitation of the present invention; the terms "connection", "installation", "fixation", etc. should be understood in a broad sense. For example, "connection" can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected or indirectly connected through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0026] In the description of this specification, the description of the terms "one embodiment", "some embodiments", "specific embodiments", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0027] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A new network maintenance method for HPLC network used in photovoltaic projects, characterized by , specifically including the following steps: Step S1: After the HPLC network is established, each node analyzes and processes the sof frame received from the neighbor node; determines whether it is an agent change message or a business message. If it is an agent change message, the message needs to be parsed and then processed accordingly; if it is a business message, the msdu sequence number of the sof frame received from the neighbor node is saved in the corresponding node information in the neighbor table; if it is other types of messages, the corresponding message parsing process is performed, otherwise the sof frame processing flow is exited; S2: After the HPLC network is established, each node analyzes and processes the beacon frames received from neighboring nodes. S3: Each node in the network performs communication success rate statistics and proxy change judgment; S4: Each node repeats steps S1 to S3 to perform HPLC network maintenance to ensure that the network communication performance can meet the needs of the photovoltaic project.

2. A new network maintenance method for a HPLC network when used in a photovoltaic project according to claim 1, characterized in that , the step S2 specifically includes the following steps: Step S2-1: beacon frame transmission rules and reserved field extension method of beacon frame payload field: STA nodes are divided into proxy nodes and discovery nodes. Each node will receive two or three beacons among central beacons, proxy beacons and discovery beacons when receiving beacons. In each beacon period, the CCO first sends a central beacon, and the proxy node sends a proxy beacon. These two types of beacons will be sent in each beacon period. The discovery node sends a discovery beacon in accordance with at least two discovery beacon frames within a 170-second time period, that is, each node will send a beacon frame once within 100 seconds; the duration of each beacon period in the photovoltaic project is set to 10 seconds, and each node will receive a complete beacon frame from a neighbor node once every 10 beacon periods. There are 7 bytes of reserved fields in the beacon frame payload field. Two bytes are taken out to add the number of service messages sent by the node in the current most recent 10 beacon periods; Since the beacon frame contains a beacon period count value, when the beacon period count value is an integer multiple of 10, it is considered to be a network communication success rate statistical period; Step S2-1: When the communication success rate statistical cycle time expires, each node in the network will determine that the communication success rate of the neighbor node is set to T by setting the latest msdu sequence number saved in the service message of the received neighbor node to Tm, setting the msdu sequence number of the previous communication success rate statistical cycle to Tn, and setting the number of service messages sent in the current communication success rate statistical cycle in the beacon frame of the received neighbor node to Bc. The calculation formula is: T=(|Tm – Tn|) / Bc; each node will make an agent change judgment when the routing cycle time expires. The routing cycle of the photovoltaic project is set to 300 seconds. Three T values ​​will be calculated in one routing cycle and saved in the corresponding node information of the neighbor list for agent change judgment.

3. A new network maintenance method for a HPLC network when used in a photovoltaic project according to claim 1, characterized in that ,The step S3 specifically includes the following steps: each node performs communication success rate statistics and agent change judgment when the routing cycle time expires. When each routing cycle time expires, each node has calculated and saved the three communication success rate values ​​of each neighboring node, and calculates the average value of the three communication success rates of the proxy node and compares it with the set communication success rate threshold to determine whether to change the proxy. If the communication success rate of the proxy node of the node is lower than the set communication success rate threshold, it is necessary to select a node with a communication success rate greater than the communication success rate threshold from the neighboring nodes as the new proxy node and initiate the proxy change process, otherwise the proxy remains unchanged.