Energy-saving coating and recycling all-in-one machine and operation cost calculation method

By introducing a heat pump heat exchange system and waste heat recovery structure into the coating machine, secondary heat exchange of high-temperature waste gas is solved, and the problem of the coating machine consumes additional energy and heating fresh air is achieved, which has achieved significant energy savings and cost reduction.

CN118988674AInactive Publication Date: 2024-11-22广东鹏锦智能装备股份有限公司
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411051614.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-01
Publication Date
2024-11-22
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During operation, conventional coating machines require additional energy to heat fresh air to meet temperature requirements, resulting in a significant increase in production operation costs.

Method used

The energy-saving coating and recycling machine is adopted, combining the heat pump heat exchange system and waste heat recovery structure, and the high-temperature waste gas is exchanged through the heat pump system to reduce energy consumption, and provide an operating cost calculation method to evaluate the cost difference between the two heating methods. .

Benefits of technology

It effectively reduces energy consumption, reduces production costs, and helps designers make quick decisions through detailed cost calculation methods, achieving significant energy saving effects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118988674A_ABST
    Figure CN118988674A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of coating and recycling equipment, in particular to an energy-saving coating and recycling all-in-one machine and an operation cost calculation method, and the all-in-one machine comprises a plurality of coating and recycling all-in-one units and a heat pump heat exchange system connected with the coating and recycling all-in-one units; the coating and recycling integrated unit comprises a coating oven structure and a waste heat recycling structure connected with the coating oven structure; the waste heat recovery structure comprises a waste heat exchange assembly, a fresh air assembly and a gas heat exchange conveying header pipe. The heat pump heat exchange system comprises a plurality of heat pump heat exchange units, each heat pump heat exchange unit comprises a heat pump heat exchange structure connected with the gas heat exchange conveying header pipe, the heat pump heat exchange system is connected with a heat pump total input pipeline and a total heat pump output pipeline, and the heat pump total input pipeline and the heat pump total output pipeline are connected to the coating oven structure. And through secondary heat recovery, the gas which is about to return to the coating oven structure is heated again, so that the energy consumption can be effectively reduced, and the production cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of coating and recycling equipment, and in particular to an energy-saving all-in-one coating and recycling machine and a method for calculating operating costs. Background Art

[0002] The coating machine will release a large amount of high-temperature exhaust gas during operation, which cannot be discharged into the environment without proper treatment. Figure 1 As shown in the figure, the conventional coating machine system is equipped with a waste heat recovery module, which exchanges heat between the discharged high-temperature exhaust gas and the fresh air. The exhaust gas after heat exchange will be filtered and then discharged to the outside, while the heated fresh air will be sent back to the coating machine for recycling. However, this conventional coating machine heat recovery adopts single-stage heat recovery. Although the temperature of the fresh air after heat exchange is increased, it is still difficult to meet the temperature requirements of the coating machine when it is working. Therefore, the system also needs to consume a large amount of natural gas to heat the fresh air. In the continuous production process, the large consumption of energy will lead to a significant increase in production and operation costs. Summary of the invention

[0003] In order to improve the problem in the related art that the coating machine needs to consume a lot of extra energy to heat the fresh air, the present invention provides an energy-saving coating and recycling all-in-one machine and an operating cost calculation method.

[0004] On the one hand, the present application provides an energy-saving coating and recovery integrated machine, including a plurality of coating and recovery integrated units and a heat pump heat exchange system connected to the coating and recovery integrated units; the coating and recovery integrated unit includes a coating oven structure and a waste heat recovery structure connected to the coating oven structure; the waste heat recovery structure includes a waste heat exchange component, a fresh air component connected to the waste heat exchange component, and a gas heat exchange transport main pipe connected to the waste heat exchange component; the heat pump heat exchange system includes a plurality of heat pump heat exchange units, the heat pump heat exchange unit includes a heat pump heat exchange structure connected to the gas heat exchange transport main pipe, the heat pump heat exchange system is connected to a heat pump main input pipeline and a total heat pump output pipeline, and the heat pump main input pipeline and the heat pump main output pipeline are connected to the coating oven structure.

[0005] Furthermore, the coating oven structure includes a coating oven body and a coating return air structure connected to the coating oven body; the coating return air structure includes a coating circulation fan connected to the coating oven body and a coating return air duct connected to the coating circulation fan, the coating return air duct is provided with a coating heat exchanger and an auxiliary heater, and the heat pump total input pipe and the heat pump total output pipe are connected to the coating heat exchanger.

[0006] Furthermore, the heat pump main input pipeline is provided with a medium storage tank and a medium circulation pump, the heat pump main input pipeline is connected to a plurality of heat pump input branches, the plurality of heat pump input branches are connected one-to-one to a plurality of the heat pump heat exchange units, and the heat pump input branch is provided with an input regulating valve.

[0007] Furthermore, the waste heat exchange component includes an air-to-air heat exchanger, which is connected to a gas input pipeline and a gas return pipeline; the gas input pipeline is connected to the coating oven body, and the gas return pipeline is connected to the coating oven structure; the gas heat exchange transport main pipe is connected to the air-to-air heat exchanger.

[0008] Furthermore, the gas heat exchange transport main pipe includes a plurality of gas heat exchange branch pipes, and the plurality of gas heat exchange branch pipes are connected to the plurality of heat pump heat exchange units one by one; and the gas heat exchange branch pipes are provided with gas heat exchange air valves.

[0009] Furthermore, the fresh air component includes a fan connected to the air-to-air heat exchanger and a filter, and the filter is located between the fan and the air-to-air heat exchanger.

[0010] On the other hand, the present application provides a method for calculating the operating cost of the above energy-saving coating and recycling integrated machine, comprising the following steps:

[0011] S1: sequentially obtain preset parameters of a plurality of coating and recycling integrated units;

[0012] S2: Calculate the total heating load Q1 of the coating and recovery integrated unit when only natural gas is used for heating according to the preset parameters; Calculate the heating load Q3 of natural gas when the coating and recovery integrated unit uses a heat pump heat exchange system according to the preset parameters, and the heating load provided by the heat pump heat exchange system is Q2 = Q1-Q3;

[0013] S3: Obtain the natural gas consumption cost c1 and the electricity consumption cost c2, and obtain the average low-grade calorific value H of natural gas z , natural gas utilization rate η z , and the heating capacity COP of the heat pump unit;

[0014] S4: Calculate the total natural gas consumption M of the coating and recycling integrated unit when only natural gas is used for heating z1 , and the electricity consumption when heating using a heat pump heat exchange system N 20 And natural gas consumption M z2 ; Calculate the heating operation cost C of the coating and recycling integrated unit when it is heated only by natural gas 11 And the heating operation cost C when using the heat pump heat exchange system 21 ;

[0015] S5: Obtain the installed power and number of fans in the coating and recycling integrated unit, and calculate the fan operating cost C of the fan operating energy consumption in the corresponding cases. 12 and C 22 ;

[0016] S6: When the total accounting time in a year is H hours, the total operating cost TC1 when only natural gas is used and the total operating cost TC2 when the heat pump unit is used are calculated respectively, and TC1 is used as a benchmark to compare with TC2 to calculate and obtain the energy saving ratio Δη.

[0017] Furthermore, the preset parameters include the single-section circulation air volume F of the nth coating and recycling integrated unit. i , Single section average exhaust air volume F o , exhaust air temperature T, operating density ρ, fresh air temperature t of waste heat recovery structure, heat exchange efficiency η, difference between oven drying temperature ΔT and exhaust air temperature, and maximum return air temperature T of oven heated by heat pump unit r .

[0018] Furthermore, the total heating loads Q1 and Q3 satisfy the following formula:

[0019] Q1=1.009n(F i ρ i ΔT+F o ρ o (Tt)(1-η)) / 3600

[0020] Q3=1.009n(F i ρ i (T+ΔT-min(Tr,T+ΔT))+F o ρ o (T-min(Tr,T))) / 3600

[0021] Where: i =353.1 / (273.15+T+ΔT)

[0022] ρ o =353.1 / (273.15+T).

[0023] Furthermore, the total natural gas consumption M z1 , power consumption N 20 、Natural gas consumption M z2 , Heating operation cost C 11 and C 21 Satisfies the following formula:

[0024] M z1 =3600Q1 / (H z η z )

[0025] N 20 =Q2 / COP

[0026] M z2 =3600Q3 / (Hη z )

[0027] C 11 =M z1 c1

[0028] C 21 =N 20 c2+M z2 c1.

[0029] Furthermore, the fan operation cost C 12 and C 22 Satisfies the following formula:

[0030] C 12 =n 11 N 11 +n 12 N 12 +n 13 N 13 +n 14 N 14

[0031] C 22 =n 21 N 21 +n 22 N 22 +n 23 N 23 +n 24 N 24

[0032] Among them, N 11 、N 12 、N 13 and N 14 The installed power of the circulation fan, external exhaust fan, exhaust fan and fresh air fan in the coating and recycling integrated unit when only natural gas is used for heating;

[0033] n 11 、n 12 、n 13 and n 14 The installed quantity of circulation fans, external exhaust fans, exhaust fans and fresh air fans in the coating and recycling integrated unit when only natural gas is used for heating;

[0034] N 21 、N 22 、N 23 and N 24The installed power of the circulation fan, external exhaust fan, exhaust fan and fresh air fan when the coating and recycling integrated unit adopts a heat pump heat exchange system;

[0035] n 21 、n 22 、n 23 and n 24 The installed quantity of circulation fan, external exhaust fan, exhaust fan and fresh air fan when the coating recovery integrated unit adopts heat pump heat exchange system.

[0036] Compared with the prior art, the present invention has the following advantages:

[0037] 1. The energy-saving coating and recycling integrated machine of the present invention is provided with a heat pump heat exchange system, which is connected to the coating oven structure. After the high-temperature exhaust gas passes through the waste heat recovery structure, it enters the heat pump heat exchange system for secondary heat exchange, that is, the heat in the high-temperature exhaust gas is recovered again. The heat pump heat exchange system recovers the heat of the high-temperature exhaust gas and then conducts it back to the coating oven structure through the heat pump total output pipeline through the medium, and the gas that will return to the coating oven structure is heated again. The heated reflux gas only needs to consume lower energy to heat up to the specified temperature, effectively reducing energy consumption and thus reducing production costs.

[0038] 2. The operation cost calculation method of the present invention obtains several key preset parameters and uses these preset parameters to calculate the heating operation cost C under two conditions. 11 and C 21 , and calculate the fan operating cost C in the two cases 12 and C 22 , through C 11 , C 21 , C 12 and C 22 The total operating cost TC1 when only natural gas is used and the total operating cost TC2 when a heat pump unit is used can be quickly calculated, thereby helping designers to quickly obtain cost information for decision making. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0040] Figure 1 It is a structural schematic diagram of a coating and recycling integrated machine in the prior art;

[0041] Figure 2This is a schematic diagram of the structure of the energy-saving coating and recycling integrated machine according to the first embodiment of the present application;

[0042] Figure 3 This is a schematic structural diagram of a coating oven structure in Example 1 of the present application;

[0043] Figure 4 This is a schematic diagram of the structure of the waste heat recovery structure in Example 1 of the present application;

[0044] Figure 5 This is a schematic diagram of the structure of the heat pump heat exchange system in Example 1 of the present application;

[0045] Figure 6 This is a schematic diagram of the steps of the operating cost calculation method of Example 2 of the present application.

[0046] Description of reference numerals:

[0047] 1. Coating recovery integrated unit; 11. Coating oven structure; 111. Coating oven body; 112. Coating return air structure; 1121. Coating circulation fan; 1122. Coating return air duct; 1123. Coating heat exchanger; 1124. Auxiliary heater; 12. Waste heat recovery structure; 121. Waste heat heat exchange component; 1211. Gas-to-gas heat exchanger; 1212. Gas input pipeline; 122. Fresh air component; 1221. Fresh air fan; 1222. Filter; 1 23. Gas heat exchange transport main pipe; 1231. Gas heat exchange branch pipe; 1232. Gas heat exchange air valve; 2. Heat pump heat exchange system; 21. Heat pump heat exchange unit; 211. Heat pump heat exchange structure; 2111. Heat pump heat exchanger; 2112. First heat exchanger; 2113. Second heat exchanger; 22. Heat pump main input pipeline; 221. Medium storage tank; 222. Medium circulation pump; 223. Heat pump input branch pipe; 2231. Input regulating valve; 23. Heat pump output branch pipe. DETAILED DESCRIPTION

[0048] In order to make the above-mentioned purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the present application. However, the present application can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present application, so the present application is not limited by the specific embodiments disclosed below.

[0049] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0050] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "upper", "lower", "left", "right" and similar expressions used herein are for illustrative purposes only and are not intended to be the only implementation method.

[0051] Embodiment 1

[0052] like Figure 1 As shown, the conventional coating machine system is equipped with a single-stage waste heat recovery module, which exchanges heat between the discharged high-temperature exhaust gas and fresh air. The exhaust gas after heat exchange will be filtered and then discharged to the outside, while the heated fresh air will be sent back to the coating machine for recycling. Although the temperature of the fresh air after heat exchange is increased, it is still difficult to meet the temperature requirements of the coating machine when it is working, and a large amount of energy is required to heat it.

[0053] Reference Figure 2 On the one hand, the present application provides an energy-saving coating and recycling integrated machine, including a plurality of coating and recycling integrated units 1 and a heat pump heat exchange system 2. The plurality of coating and recycling integrated units 1 are connected to the heat pump heat exchange system 2, and the high-temperature exhaust gas is recycled once in the coating and recycling integrated unit 1 and then continues to enter the heat pump heat exchange system 2 for recycling again. The heat pump heat exchange system 2 recycles the heat of the high-temperature exhaust gas, thereby achieving the purpose of reducing energy consumption.

[0054] Reference Figure 2 and Figure 3Specifically, taking a single coating and recovery integrated unit 1 as an example, the coating and recovery integrated unit 1 includes a coating oven structure 11 and a waste heat recovery structure 12 connected to the coating oven structure 11. The coating oven structure 11 includes a coating oven body 111 and a coating return air structure 112 disposed on the coating oven body 111. In this embodiment, the coating return air structure 112 includes a coating circulation fan 1121 connected to the coating oven body 111 and a coating return air duct 1122 connected to the coating circulation fan 1121. The coating return air duct 1122 is used to transport all high-temperature gases returning to the coating oven. One end of the coating return air duct 1122 is connected to one end of the coating oven body 111, and the other end of the coating return air duct 1122 is connected to the other end of the coating oven body 111.

[0055] The coating return air duct 1122 is provided with a coating heat exchanger 1123 and an auxiliary heater 1124. The coating heat exchanger 1123 is used to connect with the heat pump heat exchange system 2 to heat the return gas. The auxiliary heater 1124 is used to further heat the heated return gas. The auxiliary heater 1124 is connected to an external auxiliary heating system, which can be a natural gas heating system. Since the coating heat exchanger 1123 is provided, the coating heat exchanger 1123 can perform heat recovery through the heat pump heat exchange system 2 to perform secondary heating on the return gas. Therefore, the heater only needs to consume less energy to raise the temperature of the return gas to a specified value, which can effectively reduce energy consumption.

[0056] Reference Figure 2 and Figure 4 The waste heat recovery structure 12 includes a waste heat heat exchange component 121 and a fresh air component 122 connected to the waste heat heat exchange component 121. The waste heat exchange component 121 includes an air-to-air heat exchanger 1211, which is used to achieve heat exchange between fresh air and high-temperature exhaust gas. The coating oven body 111 is provided with an external exhaust fan, and the air-to-air heat exchanger 1211 has four connection ports, one of which is connected to a gas input pipeline 1212, and the gas input pipeline 1212 is connected to the external exhaust fan of the coating oven body 111. The external exhaust fan extracts the gas in the coating oven body 111 to flow into the air-to-air heat exchanger 1211; another interface of the air-to-air heat exchanger 1211 is connected to the fresh air component 122, and the fresh air component 122 includes a fan connected to the air-to-air heat exchanger 1211 and a filter 1222, and the filter 1222 is located between the fan and the air-to-air heat exchanger 1211. The other two connection ports of the gas-to-gas heat exchanger 1211 are respectively connected to a gas return pipe and a gas heat exchange transport main pipe 123 . The gas return pipe is connected to the coating circulation fan 1121 , and the gas heat exchange transport main pipe 123 is connected to the heat pump heat exchange system 2 .

[0057] The coating oven body 111 continuously generates high-temperature exhaust gas during operation. The high-temperature exhaust gas is extracted by the external exhaust fan and enters the gas-to-gas heat exchanger 1211 through the gas input pipe 1212. At the same time, the fresh air fan 1221 inputs the fresh air into the gas-to-gas heat exchanger 1211. The fresh air and the high-temperature exhaust gas exchange heat in the gas-to-gas heat exchanger 1211, so that the temperature of the fresh air increases. The fresh air with the increased temperature enters the coating circulation fan 1121 through the gas return pipe, and the high-temperature exhaust gas after heat exchange enters the heat pump heat exchange system 2 through the gas heat exchange transport main pipe 123 for heat recovery again.

[0058] Reference Figure 2 and Figure 5 The heat pump heat exchange system 2 includes a plurality of heat pump heat exchange units 21 connected to the waste heat recovery structure 12, and the plurality of heat pump heat exchange units 21 are connected to a heat pump total input pipeline 22 and a heat pump total output pipeline. Specifically, taking a single heat pump heat exchange unit 21 as an example, the heat pump heat exchange unit 21 includes a heat pump heat exchange structure 211, and the heat pump heat exchange structure 211 includes a heat pump heat exchanger 2111. The heat pump heat exchanger 2111 has a first heat exchanger 2112 and a second heat exchanger 2113. The first heat exchanger 2112 is connected to the gas-to-gas heat exchanger 1211 of the waste heat recovery structure 12 through a gas heat exchange transport main pipe 123. The gas heat exchange transport main pipe 123 includes a plurality of gas heat exchange branch pipes 1231, and the plurality of gas heat exchange branch pipes 1231 are connected one-to-one to the first heat exchanger 2112 of the plurality of heat pump heat exchange units 21, and the gas heat exchange branch pipes 1231 are provided with gas heat exchange air valves 1232; the second heat exchanger 2113 is connected to the heat pump main input pipeline 22 and the heat pump main output pipeline, and the heat pump input pipeline and the heat pump output pipeline are connected to the coating heat exchanger 1123. The heat pump main input pipeline 22 is provided with a plurality of heat pump input branch pipes 223, which are connected one-to-one to the inlet of the second heat exchanger 2113, and the heat pump input branch pipes 223 are provided with an input regulating valve 2231 for controlling the flow rate; the heat pump main output pipeline includes a plurality of heat pump output branch pipes 23, which are connected one-to-one to the outlet of the second heat exchanger 2113.

[0059] By such arrangement, the high-temperature exhaust gas after heat exchange in the gas-to-gas heat exchanger 1211 will enter the heat pump heat exchange unit 21. The first heat exchanger 2112 recovers the heat of the high-temperature exhaust gas and conducts it to the second heat exchanger 2113 through the heat pump heat exchanger 2111. There is a heat-conducting medium in the heat pump main input pipeline 22 and the heat pump output main pipeline. The heat-conducting medium can be water or oil. The second heat exchanger 2113 conducts heat to the heat-conducting medium in the heat pump input pipeline and the heat pump output pipeline. After the heat-conducting medium is heated, it is transported to the coating heat exchanger 1123 through the heat pump output pipeline. The coating heat exchanger 1123 conducts the heat of the heat-conducting medium to the reflux gas in the coating return air pipeline 1122, so that the reflux gas is heated. At the same time, the temperature of the high-temperature exhaust gas passing through the first heat exchanger 2112 has been reduced to the emission standard, and the exhaust gas can be discharged after filtering.

[0060] In addition, in order to facilitate the control of the flow of the heat-conducting medium, the heat pump main input pipeline 22 is provided with a medium storage tank 221 and a medium circulation pump 222. The medium storage tank 221 is a high-temperature storage tank, which is used to temporarily store the heat-conducting medium, and the medium circulation pump 222 is used to control the transmission amount and transmission efficiency of the heat-conducting medium. By providing the medium storage tank 221 and the medium circulation pump 222, the heat-conducting medium can be effectively controlled, and then the high-temperature heat exchanger can be effectively and conveniently controlled.

[0061] When multiple coating and recovery integrated units 1 are provided, the heat pump heat exchange system 2 is provided with multiple heat pump heat exchange units 21 correspondingly, and the high-temperature exhaust gas generated by the multiple coating and recovery integrated units 1 is uniformly refluxed to the multiple heat pump heat exchange units 21 for heat exchange through the gas heat transport main pipe, so that a large amount of high-temperature exhaust gas can be heat exchanged at the same time to ensure production efficiency. In addition, in the heat pump type coating and recovery integrated machine of the present application, each coating and recovery integrated unit 1 is provided with a coating oven structure 11 and a corresponding waste heat recovery structure 12, and the waste heat recovery structure 12 can be provided above or to the side of the corresponding coating oven structure 11 to achieve the effect of streamlining the structure, thereby effectively reducing the footprint of the equipment.

[0062] Embodiment 2

[0063] Reference Figure 6 On the other hand, when designing a coating and recycling machine, in order to consider the operating cost, it is necessary to estimate the operating cost of the coating and recycling machine after design. If the modules or units of each section of the coating and recycling machine are collected, it will take a lot of manpower and cost. Therefore, in order to quickly calculate the operating cost of the coating and recycling machine. The present application provides an operating cost calculation method applicable to the above-mentioned energy-saving coating and recycling machine, comprising the following steps:

[0064] S1: sequentially obtain preset parameters of a plurality of coating and recycling integrated units;

[0065] Specifically, the preset parameters include the single-section circulation air volume F of the nth coating and recycling integrated unit. i (m 3 / h), single section average exhaust air volume F o (m 3 / h), exhaust temperature T (℃), working density ρ (kg / m 3 ), the fresh air temperature t(℃) of the waste heat recovery structure, the heat exchange efficiency η(℃), the difference between the oven drying temperature ΔT(℃) and the exhaust air temperature, and the maximum return air temperature T of the oven heated by the heat pump unit r (℃).

[0066] S2: Calculate the total heating load Q1 of the coating and recovery integrated unit when only natural gas is used for heating according to the preset parameters; Calculate the heating load Q3 of natural gas when the coating and recovery integrated unit uses a heat pump heat exchange system according to the preset parameters, and the heating load provided by the heat pump heat exchange system is Q2 = Q1-Q3;

[0067] Specifically, when only natural gas is used for heating, the entire heating load Q1 (kW) is provided by natural gas. When a heat pump heat exchange system is used, the entire heating load is provided by both the heat pump heat exchange system and natural gas, that is, the partial heating load Q2 (kW) provided by the heat pump heat exchange system plus the partial heating load Q3 (kW) provided by natural gas is the total heating load.

[0068] The total heating load Q1 and the partial heating load Q3 provided by natural gas satisfy the following formula:

[0069] Q1=1.009n(F i ρ i ΔT+F o ρ o (Tt)(1-η)) / 3600

[0070] Q3=1.009n(F i ρ i (T+ΔT-min(T r ,T+ΔT))+F o ρ o (T-min(T r ,T))) / / 3600where:ρ i =353.1 / (273.15+T+ΔT)

[0071] ρ o =353.1 / (273.15+T).

[0072] Q1, Q2 and Q3 can be calculated by the above formula.

[0073] S3: Obtain the natural gas consumption cost c1 and the electricity consumption cost c2, and obtain the average low-grade calorific value H of natural gas z , natural gas utilization rate η z , and the heating capacity COP of the heat pump unit;

[0074] Specifically, the natural gas consumption cost c1 (yuan / m 3 ) is the price of natural gas, and the electricity consumption cost c2 (yuan / kWh) is the price of electricity. The average low-grade calorific value of natural gas H z (kJ / kg), natural gas utilization rate η z , and the heating capacity COP of the heat pump unit can be obtained through measurement.

[0075] S4: Calculate the total natural gas consumption M of the coating and recycling integrated unit when only natural gas is used for heating z1 , and the electricity consumption when heating using a heat pump heat exchange system N 20 And natural gas consumption M z2 ; Calculate the heating operation cost C of the coating and recycling integrated unit when it is heated only by natural gas 11 And the heating operation cost C when using the heat pump heat exchange system 21 ;

[0076] Specifically, the total natural gas consumption M z1 (m 3 / h), power consumption N 20 (kW), natural gas consumption M z2 (m 3 / h), heating operation cost C 11 (yuan / h) and C 21 (yuan / h) satisfies the following formula:

[0077] M z1 =3600Q1 / (H z η z )

[0078] N 20 =Q2 / COP

[0079] M z2 =3600Q3 / (Hη z )

[0080] C 11 =M z1 c1

[0081] C 21 =N 20 c2+M z2 c1.

[0082] S5: Obtain the installed power and number of fans in the coating and recycling integrated unit, and calculate the fan operating cost C of the fan operating energy consumption in the corresponding cases. 12 and C 22 ;

[0083] Specifically, in this embodiment, there are four types of fans: a circulation fan and an external exhaust fan in the coating oven structure; and an external exhaust fan and a circulation fan in the waste heat recovery structure.

[0084] In the case of using only natural gas for heating, it is assumed that the power of the circulating fan and the external exhaust fan in the coating oven structure are N 11 (kW), N 12 (kW), the installed capacity is n 11 (Taiwan), n 12 (unit); In the waste heat recovery structure, the power of the exhaust fan and the fresh air fan are N 13 (kW), N 14 (kW), and the installed capacity is n 13 (Taiwan), n 14 (tower).

[0085] In the case of using a heat pump heat exchange system and natural gas heating, it is assumed that the power of the circulating fan and the external exhaust fan in the coating oven structure are N 21 (kW), N 22 (kW), and the installed capacity is n 21 (Taiwan), n 22 (unit); The power of exhaust fan and fresh air fan in the waste heat recovery structure is N 23 (kW), N 24 (kW), the installed capacity is n 23 (Taiwan), n 24 (tower).

[0086] The fan operating cost C 12 and C 22 Satisfies the following formula:

[0087] C 12 =n 11 N 11 +n 12 N 12 +n 13 N 13 +n 14 N 14

[0088] C 22 =n 21 N 21 +n 22 N 22 +n23 N 23 +n 24 N 24

[0089] That is, the above formula can quickly calculate the fan operating cost C under two conditions. 12 and C 22 .

[0090] S6: When the total accounting time in a year is H hours, the total operating cost TC1 when only natural gas is used and the total operating cost TC2 when the heat pump unit is used are calculated respectively, and TC1 is used as a benchmark to compare with TC2 to calculate and obtain the energy saving ratio Δη.

[0091] Specifically, in this embodiment, the total accounting time for one year is H hours, and TC1 (10,000 yuan / year) and TC2 (10,000 yuan / year) can be calculated based on the total accounting time:

[0092] TC1=(C 11 +C 12 )H / 10000

[0093] TC2=(C 21 +C 22 )H / 10000

[0094] At the same time, the energy saving ratio Δη=(TC1-TC2) / TC1 can be calculated based on TC1 and TC2.

[0095] The following provides a specific calculation example of this embodiment:

[0096] (1) Calculate reference value

[0097] Serial number project Reference value Remark 1 Average low-grade calorific value of natural gas (kJ / kg) 35544 2 Natural gas utilization rate (%) 85 3 <![CDATA[Natural gas consumption cost (yuan / m 3 )]]> 4.3 4 Electricity consumption cost (yuan / kWh) 0.6 5 Heating capacity of heat pump unit COP 1.8 Heating capacity / total input electrical power 6 Waste heat recovery heat exchange efficiency (%) 85 7 Maximum heating temperature of heat pump unit (℃) 120 8 Difference between drying temperature and exhaust temperature of coating oven (℃) 15 9 Total accounting time per year (h) 7000

[0098] (2) Reference values ​​for double-layer coating oven operating conditions:

[0099] Serial number project Heating with natural gas only Heat pump heat exchange system 1 Coating oven sections 24 24 2 <![CDATA[Single-section circulating air volume (m 3 / h)]]> 14000 14000 3 <![CDATA[Average external exhaust air volume per section (m 3 / h)]]> 50800 50800 4 Drying temperature(℃) 125 125 5 Exhaust air temperature(℃) 110 110 6 Fresh air temperature (℃) 25 25

[0100] (3) Reference values ​​for installed power and quantity of wind turbines:

[0101] Serial number project Heating with natural gas only Heat pump heat exchange system 1 Installed power of circulating fan (kW) 15 18.5 2 Number of circulating fans installed (units) 24 24 3 External exhaust fan installed power (kW) 5.5 5.5 4 Number of external exhaust fans installed (units) 24 24 5 Exhaust fan installed power (kW) 45 —— 6 Exhaust fan installed quantity (unit) 2 —— 7 Fresh air fan installed power (kW) 45 2.2 8 Number of fresh air fans installed (units) 2 24

[0102] (4) Calculation results:

[0103]

[0104]

[0105] According to the calculation results, it can be concluded that under this use case, the coating recycling machine using a heat pump heat exchange system will save 21.92% compared to the coating recycling machine using only natural gas heating, thereby helping designers to make quick decisions, comparisons and optimizations, eliminating the complicated process of collecting data from each module and system for summary calculations, and saving a lot of manpower and material resources. It is understandable that the calculated energy saving effect will vary mainly due to the different operating conditions of the coating oven and the cost of natural gas and electricity.

[0106] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0107] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be construed as limiting the scope of the patent application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent application shall be subject to the attached claims.

Claims

1. An energy-saving coating and recycling machine. It is characterized in that The invention comprises a plurality of coating and recovery integrated units (1) and a heat pump heat exchange system (2) connected to the coating and recovery integrated units (1); the coating and recovery integrated units (1) comprise a coating oven structure (11) and a waste heat recovery structure (12) connected to the coating oven structure (11); the waste heat recovery structure (12) comprises a waste heat heat exchange component (121), a fresh air component (122) connected to the waste heat heat exchange component (121), and a waste heat recovery component (122) connected to the waste heat heat exchange component (121). The heat pump heat exchange system (2) comprises a plurality of heat pump heat exchange units (21), each heat pump heat exchange unit (21) comprises a heat pump heat exchange structure (211) connected to the gas heat exchange transport main pipe (121), the heat pump heat exchange system (2) is connected to a heat pump main input pipeline (22) and a heat pump main output pipeline, and the heat pump main input pipeline (22) and the heat pump main output pipeline are connected to the coating oven structure (11).

2. The energy-saving coating and recycling integrated machine according to claim 1, It is characterized in that The coating oven structure (11) comprises a coating oven body (111) and a coating return air structure (112) connected to the coating oven body (111); the coating return air structure (112) comprises a coating circulation fan (1121) connected to the coating oven body (111) and a coating return air duct (1122) connected to the coating circulation fan (1121); the coating return air duct (1122) is provided with a coating heat exchanger (1123) and an auxiliary heater (1124); the heat pump main input pipe (22) and the heat pump main output pipe are connected to the coating heat exchanger (1123).

3. The energy-saving coating and recycling integrated machine according to claim 2, It is characterized in that The heat pump main input pipeline (22) is provided with a medium storage tank (221) and a medium circulation pump (222), the heat pump main input pipeline (22) is connected to a plurality of heat pump input branch pipes (223), the plurality of heat pump input branch pipes (223) are connected to a plurality of heat pump heat exchange units (21) in a one-to-one correspondence, and the heat pump input branch pipes (223) are provided with an input regulating valve (2231).

4. The energy-saving coating and recycling integrated machine according to claim 2 or 3, It is characterized in that The waste heat exchange component (121) comprises an air-to-air heat exchanger (1211), and the air-to-air heat exchanger (1211) is connected to a gas input pipeline (1212) and a gas return pipeline; the gas input pipeline (1212) is connected to the coating oven body (111), and the gas return pipeline is connected to the coating oven structure (11); the gas heat exchange transport main pipe (123) is connected to the air-to-air heat exchanger (1211).

5. The energy-saving coating and recycling integrated machine according to claim 4, It is characterized in that The gas heat exchange transport main pipe (123) comprises a plurality of gas heat exchange branch pipes (1231), and the plurality of gas heat exchange branch pipes (1231) are connected to a plurality of heat pump heat exchange units (21) in a one-to-one correspondence; the gas heat exchange branch pipes (1231) are provided with gas heat exchange air valves (1232).

6. The energy-saving coating and recycling integrated machine according to claim 4, It is characterized in that The fresh air component (122) comprises a fan connected to the air-to-air heat exchanger (1211) and a filter (1222), wherein the filter (1222) is located between the fan and the air-to-air heat exchanger (1211).

7. A method for calculating the operating cost of the energy-saving coating and recycling machine according to any one of claims 1 to 6, It is characterized in that The steps include: S1: sequentially obtain preset parameters of a plurality of coating and recycling integrated units; S2: Calculate the total heating load Q of the coating and recycling integrated unit when only natural gas is used for heating according to the preset parameters 1 ; Calculate the heating load Q of the natural gas when the coating and recycling integrated unit uses a heat pump heat exchange system according to the preset parameters 3 , then the heating load provided by the heat pump heat exchange system is Q 2 =Q 1 -Q 3 ; S3: Get the natural gas consumption cost c 1 and electricity consumption cost c 2 , obtain the average low-grade calorific value of natural gas Hz and the utilization rate of natural gas η z , and the heating capacity COP of the heat pump unit; S4: Calculate the total natural gas consumption M of the coating and recycling integrated unit when only natural gas is used for heating z1 , and the electricity consumption when heating using a heat pump heat exchange system N 20 And natural gas consumption M z2 ; Calculate the heating operation cost C of the coating and recycling integrated unit when it is heated only by natural gas 11 And the heating operation cost C when using the heat pump heat exchange system 21 ; S5: Obtain the installed power and number of fans in the coating and recycling integrated unit, and calculate the fan operating cost C of the fan operating energy consumption in the corresponding cases. 12 and C 22 ; S6: Calculate the total operating cost TC when only natural gas is used, assuming that the total accounting time in a year is H hours. 1 And the total operating cost TC when using a heat pump unit 2 , with TC 1 As the benchmark and TC 2 Compare, calculate and obtain the energy saving ratio Δη.

8. A method for calculating operating costs according to claim 7, It is characterized in that The preset parameters include the single-section circulation air volume F of the nth coating and recycling integrated unit. i , Single section average exhaust air volume F o , exhaust air temperature T, operating density ρ, fresh air temperature t of waste heat recovery structure, heat exchange efficiency η, difference between oven drying temperature ΔT and exhaust air temperature, and maximum return air temperature T of oven heated by heat pump unit r .

9. A method for calculating operating costs according to claim 8, It is characterized in that The total heating load Q 1 and Q 3 Satisfies the following formula: Q 1 =1.009n(F i r i ΔT+F o r o (Tt)(1-h)) / 3600 Q 3 =1.009n(F i ρ i (T+ΔT-min(T r ,T+ΔT))+F o ρ o (T-min(T r ,T))) / 3600 Where: i =353.1 / (273.15+T+ΔT) r o = 353.1 / (273.15+T).

10. A method for calculating operating costs according to claim 9, It is characterized in that The total natural gas consumption M z1 , power consumption N 20 、Natural gas consumption M z2 , Heating operation cost C 11 and C 21 Satisfies the following formula: M z1 =3600Q 1 / (H z or z ) N2 0 =Q 2 / COP M z2 =3600Q 3 / (Hη z ) C 11 =M z1 c 1 C 21 =N2 0 c 2 +M z2 c 1 。 11. A method for calculating operating costs according to claim 8, It is characterized in that The fan operating cost C 12 and C 22 Satisfies the following formula: C 12 =n 11 N 11 +n 12 N 12 +n 13 N 13 +n 14 N 14 C 22 =n 21 N 21 +n 22 N 22 +n 23 N 23 +n 24 N 24 Among them, N 11 、N 12 、N 13 and N 14 The installed power of the circulation fan, external exhaust fan, exhaust fan and fresh air fan in the coating and recycling integrated unit when only natural gas is used for heating; n 11 、n 12 、n 13 and n 14 The installed quantity of circulation fans, external exhaust fans, exhaust fans and fresh air fans in the coating and recycling integrated unit when only natural gas is used for heating; N 21 、N 22 、N 23 and N 24 The installed power of the circulation fan, external exhaust fan, exhaust fan and fresh air fan when the coating and recycling integrated unit adopts a heat pump heat exchange system; n 21 、n 22 、n 23 and n 24 The installed quantity of circulation fan, external exhaust fan, exhaust fan and fresh air fan when the coating recovery integrated unit adopts heat pump heat exchange system.

Citation Information

Patent Citations

  • Distributed energy system modeling and running optimization method considering hot water pipe network

    CN106447529A