An automated production line for tinning and casting of conductive beams of anode plates

By designing anode plate conductive crossbeam tin casting automation production line, the problems of unstable manual handling and manipulator grasping in the existing technology are solved, and the precise positioning and automated production of conductive crossbeams are achieved, and the production efficiency and product quality are improved.

CN118989311BActive Publication Date: 2025-02-11SHENYANG JINSHUANGYUAN NEW MATERIAL TECH CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411495577.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-10-25
Publication Date
2025-02-11
Estimated Expiration
2044-10-25

AI Technical Summary

Technical Problem

The prior art has manual handling, unstable manipulation of the anode plate conductive beam, complex casting process and high labor intensity during the processing of the anode plate conductive beam, which affects the automation production efficiency and product quality.

Method used

An automated production line for tin-hanging casting of anode plate conductive beam is designed, including operating robots, copper tray conveying devices, tool conversion workstations, positioning and grinding platforms and automated casting molds to adjust the position of copper trays, positioning and clamping of conductive beams. Solid, automated casting and storage of finished products.

Benefits of technology

It realizes precise positioning and stable clamping of conductive cross beams, automates the tin hanging and casting process, reduces labor intensity, improves operational safety and product quality, and is suitable for efficient automated production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118989311B_ABST
    Figure CN118989311B_ABST
Patent Text Reader

Abstract

An automated production line for tinning and casting of conductive beams of anode plates belongs to the technical field of anode plate processing for wet electrolytic zinc, and solves the problems of high labor intensity, low production efficiency, disadvantageous for automated production, and poor applicability in the prior art. It includes an operating manipulator, a copper bar conveying device is arranged around the operating manipulator and within the grabbing range of the manipulator, a tool conversion workstation is arranged on the side of the copper bar conveying device, a positioning and polishing platform is arranged on the side of the tool conversion workstation, a casting mold is arranged on the side of the positioning and polishing platform, a finished beam storage car is arranged on the side of the casting mold, and a tinning furnace and a lead melting furnace are arranged between the copper bar conveying device and the finished beam storage car. It has a reasonable design, compact structure, accurate positioning and stable clamping of the conductive beam, strong applicability, and can meet the use requirements of multiple cross-processes, low labor intensity, high operation safety, stable product quality, and is conducive to efficient automated production.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of anode plate processing for wet electrolytic zinc, and in particular relates to an automated production line for tinning and casting of anode plate conductive beams. Background Art

[0002] The conductive crossbeam of the anode plate consists of a copper bar (also called a copper rod) and a lead layer. The cross section of the copper bar is rectangular, and the lead layer is directly wrapped around the copper bar. Only a small part of the copper bar end is exposed to the outside for contact with the busbar and conduction. The production of the conductive crossbeam of the anode plate includes pickling of the copper bar (deoxidation), tinning of the copper bar (the purpose is to strengthen the combination of copper and lead), casting of the copper bar with lead water in the molding cavity, and cleaning of non-standard burrs and polishing of conductive contacts after cooling and forming. At present, the transportation of copper bars in the processing process is mostly carried out manually, and some conventional conveying devices cannot adjust the position of the copper bar, which affects the grasping of the robot and is not conducive to automated production. In addition, some cleaning liquid will remain on the surface of the copper bar after pickling. When tinning in the tinning furnace later, it often causes tin water to splash and scald the operator.

[0003] Moreover, the conventional operating tools used in conjunction with the existing manipulators have poor stability in clamping the conductive beam, and cannot meet the requirements of multiple cross-processes, which is not conducive to efficient automated production. In addition, after the casting of the beam copper bar is completed, the treatment of the casting nozzle, flash burrs, conductive contacts, etc. is all done by manual positioning and operation, such as chopping the nozzle with a kitchen knife, scraping the flash burrs with a knife, and grinding the contacts on both sides with an angle grinder, and it also involves handling and turning over. This traditional method is labor-intensive and has low operating efficiency due to the heavy weight of the copper bar and the temperature of the lead water used for casting is above 300 degrees. At the same time, the existing working platform cannot adapt to the external dimensions of the beam after tinning and the beam after lead casting (beams at different processing stages) at the same time, and has poor practicality. In addition, during the movement of the copper bar during the tinning process, the position of the beam ear often shifts, and there is a lack of effective correction mechanism on the existing working platform.

[0004] In addition, the existing casting process is: the copper bar of the beam that has been tinned in advance is placed in a fixed casting cavity by manual clamping and carrying, and the cavity needs to be turned and clamped manually; at the same time, the casting of molten lead needs to rely on manual scooping of molten lead from the lead pot and then slowly pouring it into the mold cavity, and the weight of each spoonful of high-temperature molten lead (the melting point of lead is about 300 degrees Celsius) ranges from 10 to 40 kilograms, and even some conductive beams of certain structures need to be scooped twice to complete the casting. In the existing operation method, the physical energy consumption is very huge during the process of opening and closing the mold and removing the conductive beam, and the production efficiency is low. Not only does the casting time take a long time, but also, after casting, the uniformity of the lead layer wrapped around the outside of the copper bar of the beam is poor, which affects the product quality.

[0005] Therefore, it is necessary to improve the operation method and device of tinning and casting of the anode plate conductive beam in the prior art. Summary of the invention

[0006] The present invention aims at the above-mentioned problems and provides a method for adjusting the placement of the copper busbar on the conveying device. The conductive crossbeam is accurately positioned and stably clamped, and the position of the crossbeam ear can be corrected. The present invention has strong applicability, can meet the needs of using multiple processes in a cross-cutting manner, can automatically open and close the mold cavity and flip the mold, has low labor intensity and high operation safety, the lead layer wrapped around the outside of the crossbeam copper busbar after casting is uniform, the product quality is stable, and it is conducive to the efficient automated production of the anode plate conductive crossbeam tinning casting automated production line.

[0007] The technical solution adopted by the present invention is: the automated production line for tinning and casting of the conductive beam of the anode plate includes an operating manipulator arranged in the middle, and is characterized in that: a copper bar conveying device for transporting the copper bar of the beam is arranged around the operating manipulator and within the grasping range of the manipulator, a tool conversion workstation for centrally placing various operating tools used in conjunction with the manipulator is arranged on the side of the copper bar conveying device, a positioning and polishing platform for positioning and polishing the conductive beam in processing is arranged on the side of the tool conversion workstation, a material receiving vehicle for recovering the polished and cut materials is arranged below the positioning and polishing platform, a casting mold for casting the copper bar with molten lead is arranged on the side of the positioning and polishing platform, and a finished beam storage vehicle is arranged on the side of the casting mold; and a tinning furnace for tinning the copper bar and a lead melting furnace for holding molten lead are arranged in sequence between the copper bar conveying device and the finished beam storage vehicle and within the grasping range of the manipulator, and dust removal and exhaust outlets are respectively arranged above the lead melting furnace and the tinning furnace.

[0008] The copper bar conveying device includes a conveying frame, on which are provided two groups of conveying chains arranged along the conveying direction of the crossbeam, the conveying chains are arranged in a ring shape on the left and right sides of the upper part of the conveying frame, the front ends of the two groups of conveying chains are feeding ends, the driven sprockets at the rear ends of the two groups of conveying chains are connected by a synchronous rotating shaft, and one of the driven sprockets is connected to the driving sprocket through a transmission chain, and the rotating shaft of the driving sprocket is connected to the output end of the conveying motor arranged on the conveying frame; the left and right sides of the front part of the conveying frame are respectively provided with vertically arranged parallel return lifting cylinders, and the middle part of the conveying frame and between the two groups of conveying chains are also provided with a copper bar centering mechanism for correcting the position of the crossbeam copper bar; a baking lamp for high-temperature heating the outer surface of the crossbeam copper bar is provided above the conveying frame and within the entire transmission range of the conveying chain. During the transportation of the crossbeam copper bar, the baking lamp above the conveyor frame is used to dry the cleaning acid remaining on the crossbeam copper bar, effectively avoiding the splashing phenomenon of the subsequent crossbeam copper bar during the tinning process in the tinning furnace.

[0009] The copper bar centering mechanism includes a centering support connecting plate, on which two parallel centering sliding rails are arranged, and a centering sliding seat is arranged on the centering sliding rail. The lower side of the centering sliding seat is connected to the centering sliding rail by sliding blocks, and the upper side of the centering sliding seat is provided with a vertically arranged centering gripper lifting cylinder, and the upper end of the telescopic rod of the centering gripper lifting cylinder is provided with a lifting lug gripper for correcting the position of the crossbeam copper bar through the crossbeam lifting lug; and the centering sliding seat is also connected to the pulley at the output end of the centering motor through an annular centering transmission belt. The centering motor is used to drive the annular centering transmission belt to reciprocate, thereby driving the centering sliding seat to reciprocate on the centering sliding rail, and at the same time, the lifting lug gripper is driven to rise and fall through the extension and contraction of the centering gripper lifting cylinder, and is in contact with the crossbeam lifting lug, so as to adjust the position of the crossbeam copper bar on the conveying chain after it has been parallelly reset.

[0010] A photoelectric detection sensor for controlling the lifting cylinder is arranged in front of the parallel return lifting cylinder and between the two groups of conveying chains. The photoelectric detection sensor is fixedly connected to the conveying frame through a connecting frame. The photoelectric detection sensor located in front of the two parallel return lifting cylinders is used to sense the copper bar of the beam conveyed on the conveying chain, and then the parallel return lifting cylinders on the left and right sides are raised according to the moving position of the copper bar of the beam, so that the copper bar of the beam is parallel returned; after parallel return, the parallel return lifting cylinder is retracted and the copper bar of the beam is continued to be conveyed.

[0011] A grating detection sensor for detecting the position of the beam lug is arranged in front of the copper bar centering mechanism and between the two groups of conveyor chains, and the grating detection sensor is fixedly connected to the conveyor frame through a connecting frame. The grating detection sensor located in front of the copper bar centering mechanism is used to sense the position of the beam lug on the copper bar after parallel return, so as to center and position the copper bar through the lug gripper of the copper bar centering mechanism according to the deviation of the beam lug position.

[0012] The tool conversion workstation comprises a workstation bearing support frame, a tool bearing platform is arranged on the upper part of the workstation bearing support frame, a plurality of tool support blocks are arranged on the tool bearing platform, tool positioning pins are arranged on the tool support blocks, and tool placement spaces are arranged between every two tool support blocks, and each tool placement space on the tool bearing platform is respectively provided with a beam clamping tool for clamping a conductive beam, a molten lead pouring tool for lead water casting, a nozzle cutting tool for cutting a casting nozzle, and a grinding tool for trimming the shape of the beam, and the nozzle cutting tool and the grinding tool are respectively arranged in each tool placement space on the tool bearing platform. The placement positions on the tool carrier are also provided with tool placement openings for unifying the tool grabbing height; the nozzle cutting tool includes a manipulator quick-change disk, and tool positioning holes for cooperating with tool positioning pins are symmetrically provided on both sides of the manipulator quick-change disk, and a cutting connection block is provided on the lower side of the manipulator quick-change disk, and a cutting motor is fixedly provided on the cutting connection block, and a cutting wheel is provided at the output end of the cutting motor; the grinding tool includes a manipulator quick-change disk, and a grinding connection block is provided on the lower side of the manipulator quick-change disk, and a grinding motor is fixedly provided on the grinding connection block, and a grinding wheel is provided at the output end of the grinding motor. The nozzle cutting tool is connected or separated from the operating manipulator through the manipulator quick-change disk, and then the cutting wheel at the output end of the cutting motor on the cutting connection block is used to cut the casting nozzle of the conductive beam after the lead water is cast; and the grinding tool is connected or separated from the operating manipulator by the manipulator quick-change disk, and the shape of the conductive beam after the lead water is cast and cut is trimmed by the grinding wheel at the output end of the grinding motor on the grinding connection block.

[0013] The crossbeam clamping tool comprises a connecting bent rod, a manipulator quick-change disk for connecting to an operating manipulator is arranged on the upper side of the rear portion of the connecting bent rod, and tool positioning holes for cooperating and engaging with tool positioning pins on the tool support block are symmetrically arranged on both sides of the manipulator quick-change disk; a clamping connection block is arranged at the front end of the connecting bent rod, a crossbeam lifting hook is fixedly arranged at the lower end of the clamping connection block, a vertically arranged crossbeam clamping pressure rod is arranged above the crossbeam lifting hook, the middle portion of the crossbeam clamping pressure rod is fixedly connected to the pressure rod connecting plate, and the The upper end of the beam clamping pressure rod is slidably connected to the pressure rod guide sleeve provided on the clamping connection block, and the pressure rod connecting plate is also connected to the telescopic rod at the lower end of the pressure rod cylinder vertically provided on the clamping connection block; and the rear end of the connecting bent rod is also provided with a counterweight block for maintaining the balance of the tool; the molten lead pouring tool includes a connecting bent rod, a manipulator quick-change plate is provided on the upper side of the rear of the connecting bent rod, a pouring connection block is provided at the front end of the connecting bent rod, a molten lead holding spoon is fixedly provided at the lower part of the pouring connection block, and a counterweight block is provided at the rear end of the connecting bent rod. The crossbeam clamping tool is connected or separated from the operating manipulator by using the manipulator quick-change plate, and the pressure rod connecting plate and the two groups of crossbeam clamping pressure rods thereon are driven by the pressure rod cylinder to reciprocate and rise and fall along the pressure rod guide sleeve, and then the lower end of the crossbeam clamping pressure rod is used to cooperate and clamp with the crossbeam lifting hook to firmly clamp the conductive crossbeam, so as to facilitate the flexible transportation of the conductive crossbeam. At the same time, the robot quick-change plate is used to connect or separate the molten lead pouring tool from the operating robot, and the molten lead is filled by the molten lead filling spoon at the bottom of the pouring connection block connected to the front end of the bending rod, so as to cast the copper bar placed in the molding cavity with molten lead.

[0014] The positioning and polishing platform includes a platform bearing support frame, a beam placing platform is arranged on the upper part of the platform bearing support frame, and beam positioning blocks for positioning and placing the conductive beam during the processing are respectively arranged at both ends of the upper side of the beam placing platform, and beam clamping mechanisms are arranged on the rear sides of the beam positioning blocks, and the clamping parts of the beam clamping mechanisms are located above the corresponding beam positioning blocks; two groups of symmetrically arranged lifting ear positioning and clamping mechanisms are arranged between the beam positioning blocks at both ends of the beam placing platform, and a material dropping chute for connecting to the material receiving port of the material receiving vehicle is arranged between the two groups of lifting ear positioning and clamping mechanisms and on the front side of the middle part of the beam placing platform, a side positioning block for positioning the end part of the conductive beam is also arranged at one end of the beam placing platform, and a rear positioning block is arranged on the rear side of the middle part of the beam placing platform. The rear positioning block is used to position the rear side of the middle part of the tinned beam placed on the beam positioning block; and when a lead-cast beam is placed on the beam positioning block, the lead-cast beam is supported by the rear positioning block located below the lead-cast beam, thereby improving the reliability of the device.

[0015] The beam positioning block includes a block base, the lower part of the block base is fixedly connected to the beam placement platform, the upper part of the block base is provided with an opening, and the opening is provided with a narrow positioning groove for placing the tinned beam and a wide positioning groove for placing the lead cast beam in sequence from bottom to top, and the wide positioning groove and the narrow positioning groove are connected to each other; the ear positioning clamping mechanism includes a two-way telescopic cylinder fixedly arranged on the beam placement platform, the cylinder telescopic rods on both sides of the two-way telescopic cylinder are arranged along the extension direction of the beam, and the ends of the cylinder telescopic rods on both sides are respectively provided with cylinder rod connecting blocks, the upper part of the cylinder rod connecting block and the upper part of the two-way telescopic cylinder are provided with ear positioning clamping blocks, and an ear positioning space is provided between the two ear positioning clamping blocks; the upper side of the ear positioning clamping block is also provided with a beam avoidance notch whose size is larger than the width of the beam. The tinned beam is positioned and placed in the narrow positioning groove of the beam positioning block, and then after the beam clamping mechanism presses and fixes the tinned beam, the position of the beam lifting lug on the beam is corrected by the lifting lug positioning clamping mechanism; at the same time, the wider, lead-cast beam can be positioned and placed in the wide positioning groove of the beam positioning block, so that after the beam clamping mechanism presses and fixes the lead-cast beam, the casting nozzle is cut and the shape of the beam is trimmed by the nozzle cutting tool and the grinding tool. In addition, when the tinned beam is placed on the beam positioning block, the position of the beam lifting lug on the beam is corrected by the lifting lug positioning clamping blocks provided on the cylinder rod connecting blocks at the ends of the cylinder telescopic rods on both sides; when the lead-cast beam is placed on the beam positioning block, the position of the beam lifting lug is positioned and clamped by the lifting lug positioning clamping blocks on both sides, which is convenient for cutting and grinding.

[0016] The beam clamping mechanism includes a beam clamping cylinder vertically arranged at the rear side of the beam positioning block, the driving end of the upper part of the beam clamping cylinder is connected to the beam clamping swing rod, and the front end of the beam clamping swing rod is provided with a beam clamping block. The beam clamping swing rod is driven to swing back and forth by the beam clamping cylinder, and then the beam clamping block at the front end of the beam clamping swing rod is used to press and fix the beam positioned in the beam positioning block, so as to facilitate the subsequent operations such as correcting the position of the beam lifting lug, cutting the casting nozzle and trimming the beam shape.

[0017] The casting mold includes a mold frame, a bearing lower template is arranged on the upper part of the mold frame, the lower side of the bearing lower template is hinged to the lower mold hinged seat arranged on the mold frame, and a mold flipping hydraulic cylinder is arranged between the bearing lower template and the mold frame, the fixed end of the mold flipping hydraulic cylinder is hinged to the front side of the mold frame, and the telescopic end of the mold flipping hydraulic cylinder is hinged to the flip cylinder hinged ear plate arranged on the rear side of the bearing lower template; an upper flipping template is arranged above the bearing lower template, and the left and right ends of the upper flipping template are respectively connected to the two ends of the bearing lower template through an opening and closing guide connecting plate, and an upper mold opening and closing hydraulic cylinder is respectively arranged between the opening and closing guide connecting plate and the end of the bearing lower template; mold pouring ports are also respectively arranged at corresponding positions in the middle of the front side of the upper flipping template and the bearing lower template, and a mold fastening mechanism is arranged between the bearing lower template and the upper flipping template.

[0018] The flip upper template includes an upper template body, an upper mold casting cavity is arranged on the lower side of the upper template body, the mold casting port is located on the front side of the upper mold casting cavity, the opening and closing guide connecting plates are respectively arranged on the left and right ends of the upper template body, the upper end of the opening and closing guide connecting plate is fixedly connected to the end of the upper template body, and the lower end of the opening and closing guide connecting plate is movably connected to the end of the bearing lower template; the bearing lower template includes a lower template body, a lower mold casting cavity is arranged on the upper side of the lower template body, the mold casting port is located on the front side of the lower mold casting cavity, and the lower mold A lower mold hinged ear plate for hinged connection with a lower mold hinged seat is arranged on the lower side of the plate body; the lower end of the upper mold opening and closing hydraulic cylinder is hinged to the end of the lower mold body, and the upper end of the upper mold opening and closing hydraulic cylinder is hinged to the opening and closing hydraulic cylinder hinge portion arranged on the upper end of the opening and closing guide connecting plate; connecting plate sliding guide columns are fixedly arranged on the left and right ends of the lower mold body and above the position hinged to the lower end of the upper mold opening and closing hydraulic cylinder, and correspondingly, a connecting plate guide groove for matching and connecting with the connecting plate sliding guide column is also arranged on the lower part of the opening and closing guide connecting plate. A separable assembly structure of an upper mold pouring cavity of a flipping upper mold and a lower mold pouring cavity of a bearing lower mold is used to form a mold cavity for subsequent lead molten casting of the copper bar, and to facilitate the removal of the beam casting after the casting is completed; at the same time, the bearing lower mold is rotatably set on a lower mold hinge seat set on the upper part of the mold frame through a lower mold hinged ear plate, and the flipping position of the bearing lower mold is controlled by a mold flipping hydraulic cylinder; and, in the process of linear extension and contraction of the upper mold opening and closing hydraulic cylinder, the fixed connecting plate sliding guide column and the connecting plate guide groove on the opening and closing guide connecting plate are used to cooperate and guide, so that the flipping upper mold can be flipped and opened relative to the bearing lower mold, so that when the flipping upper mold and the bearing lower mold are opened, the tinned beam is positioned and placed in the lower mold pouring cavity; when the flipping upper mold and the bearing lower mold are closed, lead water is poured into through the mold pouring port.

[0019] The mold fastening mechanism includes mold fastening claws located at the front and rear sides of the bearing lower template, the middle part of the mold fastening claws is connected to the bearing lower template through the fastening claw hinge seat, and the lower ends of the two mold fastening claws at the front and rear sides and corresponding positions are connected to the telescopic end of the fastening hydraulic cylinder arranged below the bearing lower template through the fastening driving connecting rod, and the fastening hydraulic cylinder is connected to the bearing lower template through the fastening connecting frame; accordingly, the positions on the flip upper template that contact the fastening parts of the upper ends of each mold fastening claw are respectively provided with fastening claw clamping parts. The mold fastening claws hinged to the fastening driving connecting rod are driven to swing back and forth around the rotating axis of the fastening claw hinge seat by the telescopic movement of the fastening hydraulic cylinder below the bearing lower template, and then the fastening parts at the upper ends of each mold fastening claw are matched with the fastening claw clamping parts on the flip upper template to make the closed connection between the flip upper template and the bearing lower template more tight, which is beneficial to the subsequent lead water casting.

[0020] A casting ejection block for ejecting the beam casting is movably arranged in the lower mold casting cavity, and the lower end of the casting ejection block is connected to the telescopic end of the casting ejection hydraulic cylinder vertically arranged at the lower side of the lower mold body. When the tinned beam is cast in the casting cavity, the casting ejection hydraulic cylinder is extended to lift the casting ejection block in the lower mold casting cavity, and then the beam casting is ejected upward between the opened flip upper mold and the bearing lower mold, which is convenient for the subsequent grabbing and moving of the beam casting.

[0021] Beneficial effects of the present invention: Since the present invention adopts an operating manipulator arranged in the middle, a copper bar conveying device for conveying the copper bar of the beam is arranged around the operating manipulator and within the grasping range of the manipulator, a tool conversion workstation for centrally placing various operating tools used in conjunction with the manipulator is arranged on the side of the copper bar conveying device, a positioning and polishing platform for positioning and polishing the conductive beam being processed is arranged on the side of the tool conversion workstation, a material receiving vehicle is arranged below the positioning and polishing platform, a casting mold for lead casting of the copper bar is arranged on the side of the positioning and polishing platform, and a finished beam storage vehicle is arranged on the side of the casting mold; the copper bar conveying device and the finished beam are connected to each other. There are tinning furnaces and lead melting furnaces arranged in sequence between the storage vehicles and within the grabbing range of the manipulator. Dust removal and exhaust vents are arranged above the lead melting furnace and the tinning furnace respectively. Therefore, the design is reasonable and the structure is compact. The placement of the copper busbar on the conveying device can be adjusted. The conductive beam is accurately positioned and stably clamped, and the position of the beam lifting lug can be corrected. It has strong applicability and can meet the needs of multiple cross-processes. It can automatically open and close the mold cavity and flip the mold. It has low labor intensity and high operation safety. The lead layer wrapped on the outside of the beam copper busbar after casting is uniform, and the product quality is stable, which is conducive to efficient automated production; it saves 5 to 8 operators. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a structural schematic diagram of the present invention.

[0023] Figure 2 yes Figure 1 A structural schematic diagram of the copper bar conveying device in FIG.

[0024] Figure 3 yes Figure 2 A-direction view (the crossbeam copper bar has been delivered into place).

[0025] Figure 4 yes Figure 2 A structural schematic diagram of the copper busbar centering mechanism.

[0026] Figure 5 yes Figure 1 A structural diagram of a tool conversion workstation in FIG.

[0027] Figure 6 yes Figure 5 A structural schematic diagram of a tool carrier in FIG.

[0028] Figure 7 yes Figure 5 A structural schematic diagram of a beam clamping tool in FIG.

[0029] Figure 8 yes Figure 5 A structural schematic diagram of a molten lead pouring tool.

[0030] Fig. 9 yes Figure 5 A structural schematic diagram of a nozzle cutting tool.

[0031] Fig.10 yes Figure 5 A structural schematic diagram of a grinding tool in FIG.

[0032] Fig.11 yes Figure 1 A structural schematic diagram of the positioning and grinding platform.

[0033] Fig.12 yes Fig.11 B view.

[0034] Fig.13 yes Fig.11 A schematic diagram of a connection structure between a beam positioning block and a beam clamping mechanism.

[0035] Fig.14 yes Fig.11 A structural schematic diagram of the lifting ear positioning clamping mechanism.

[0036] Fig.15 is Fig.11The schematic diagram of an implementation method of setting a tinned crossbeam on a positioning and polishing platform and correcting the position of the crossbeam lug on the crossbeam is shown.

[0037] Fig.16 is Fig.11 The schematic diagram of an implementation method of setting a lead-cast beam on a positioning and polishing platform, cutting a casting nozzle and trimming the shape of the beam is shown.

[0038] Fig.17 yes Figure 1 A structural schematic diagram of a casting mold.

[0039] Fig.18 yes Fig.17 C-direction view.

[0040] Fig.19 yes Fig.17 A schematic diagram of a connection structure between the load-bearing lower template and the mold fastening mechanism.

[0041] Fig. 20 yes Fig.19 D-direction view.

[0042] Fig.21 yes Fig.17 A schematic diagram of a connection structure between a flip upper template and an opening and closing guide connecting plate.

[0043] Fig. 22 yes Fig.21 E-direction view.

[0044] Fig.23 yes Fig.17 A schematic diagram of a usage state in which the upper mold opening and closing hydraulic cylinder drives the flipping upper mold plate and the bearing lower mold plate to close each other, and the mold fastening mechanism fastens the upper and lower mold plates.

[0045] Explanation of the numbers in the figure: 1 operating manipulator, 2 copper bar conveying device, 3 beam copper bar, 4 tool conversion workstation, 5 positioning and grinding platform, 6 conductive beam in processing, 7 material receiving car, 8 casting mold, 9 finished beam storage car, 10 tinning furnace, 11 lead melting furnace, 12 dust removal exhaust vent, 13 conveyor frame, 14 driving sprocket, 15 conveying motor, 16 transmission chain, 17 driven sprocket, 18 conveyor chain, 19 synchronous shaft, 20 copper bar stop block, 21 photoelectric detection sensor, 22 parallel return lifting cylinder, 23 grating detection sensor, 24 copper bar centering mechanism, 25 beam lifting ear, 26 centering support connecting plate, 27 centering sliding rail, 28 centering sliding seat, 29 centering transmission belt, 30 centering motor, 31 centering gripper lifting cylinder, 32 lifting ear gripper, 33 workstation bearing support frame, 34 tool bearing platform, 35 tool support block, 36 beam clamping tool, 37 molten lead pouring tool, 38 nozzle cutting tool, 39 grinding tool, 40 tool placement space, 41 tool placement opening, 42 tool positioning pin, 43 connecting bent rod, 44 manipulator quick change plate, 45 tool positioning hole, 46 counterweight block, 47 clamping connection block, 48 beam lifting hook, 49 beam clamping pressure rod, 50 pressure rod connecting plate, 51 pressure rod guide sleeve, 52 pressure rod cylinder, 53 protective cover, 54 pouring connection block, 55 molten lead filling spoon, 56 cutting connection block, 57 cutting motor, 58 cutting wheel, 5 9 grinding connection block, 60 grinding motor, 61 grinding wheel, 62 platform bearing support frame, 63 beam placement platform, 64 beam positioning block, 65 beam clamping mechanism, 66 lifting ear positioning clamping mechanism, 67 rear positioning block, 68 side positioning block, 69 blanking chute, 70 block base, 71 narrow positioning groove, 72 wide positioning groove, 73 beam clamping cylinder, 74 beam clamping swing rod, 75 beam clamping pressure block, 76 two-way telescopic cylinder, 77 cylinder rod connecting block, 78 lifting ear positioning clamping block, 79 beam avoidance gap, 80 lifting ear positioning space, 81 beam after tinning, 82 beam after lead casting, 83 casting nozzle, 84 mold frame, 85 bearing lower template, 86 lower mold hinge seat, 8 7 mold flip hydraulic cylinder, 88 flip upper template, 89 opening and closing guide connecting plate, 90 upper mold opening and closing hydraulic cylinder, 91 mold pouring port, 92 mold fastening mechanism, 93 casting ejection hydraulic cylinder, 94 lower template body, 95 lower mold hinged ear plate, 96 connecting plate sliding guide column, 97 lower mold pouring cavity, 98 casting ejection block, 99 fastening connecting frame, 100 fastening hydraulic cylinder, 101 fastening driving connecting rod, 102 mold fastening claw, 103 fastening claw articulated seat, 104 flip cylinder articulated ear plate, 105 upper template body, 106 upper mold pouring cavity, 107 connecting plate guide slide, 108 opening and closing hydraulic cylinder hinge part, 109 fastening claw clamping part, 110 upper mold weight reduction structure, 111 strengthening connecting plate. DETAILED DESCRIPTION

[0046] according to Figures 1 to 23The specific structure of the present invention is described in detail. The anode plate conductive beam tinning and casting automated production line includes an operating manipulator 1 arranged in the middle, and a copper bar conveying device 2 for conveying the copper bar 3 of the beam is arranged around the operating manipulator 1 and within the grasping range of the manipulator; a tool conversion workstation 4 for centrally placing various operating tools used in conjunction with the manipulator is arranged on the side of the copper bar conveying device 2; a positioning and polishing platform 5 for positioning and polishing the conductive beam 6 in processing is arranged on the side of the tool conversion workstation 4, and a material receiving vehicle 7 for recovering the polished and cut materials is arranged below the positioning and polishing platform 5; a casting mold 8 for lead water casting of the copper bar is arranged on the side of the positioning and polishing platform 5; a finished beam storage vehicle 9 is arranged on the side of the casting mold 8. In addition, between the copper bar conveying device 2 and the finished beam storage vehicle 9, and within the grasping range of the manipulator, a tinning furnace 10 for tinning the copper bar and a lead melting furnace 11 for holding molten lead for casting are sequentially arranged; dust removal and exhaust ports 12 are respectively arranged above the lead melting furnace 11 and the tinning furnace 10. The copper bar conveying device 2, the tool conversion workstation 4, the positioning and polishing platform 5, the casting mold 8, the finished beam storage vehicle 9, the lead melting furnace 11 and the tinning furnace 10 are sequentially arranged in a ring around the periphery of the operating manipulator 1 in the middle.

[0047] The copper bar conveying device 2 includes a conveying frame 13, on which two groups of conveying chains 18 arranged along the conveying direction of the beam are arranged. The conveying chains 18 are arranged in a ring shape on the left and right sides of the upper part of the conveying frame 13; the front ends of the two groups of conveying chains 18 are the feeding ends of the copper bars 3 of the beams conveyed thereon. The driven sprockets 17 at the rear ends of the two groups of conveying chains 18 are connected by a synchronous rotating shaft 19, and one of the driven sprockets 17 is connected to the driving sprocket 14 through a transmission chain 16, and the rotating shaft of the driving sprocket 14 is connected to the output end of the conveying motor 15 arranged on the conveying frame 13. A baking lamp for high-temperature heating the outer surface of the copper bars 3 of the beams is arranged above the conveying frame 13 and within the entire conveying range of the conveying chains 18. Furthermore, during the conveying process of the crossbeam copper bar 3, the cleaning acid remaining on the crossbeam copper bar 3 is dried by the baking lamp above the conveyor frame 13, effectively avoiding the splashing phenomenon of the subsequent crossbeam copper bar 3 during the tinning process in the tinning furnace 10. In addition, copper bar stop blocks 20 are respectively arranged on the left and right sides of the rear of the conveyor frame 13; the copper bar stop blocks 20 arranged at the rear of the conveying direction of the conveyor chain 18 are used to position and stop the crossbeam copper bar 3 that has been paralleled and corrected, so as to facilitate the subsequent operation of the manipulator 1 to grab.

[0048] The left and right sides of the front part of the conveyor frame 13 of the copper bar conveying device 2 are respectively provided with vertically arranged parallel return lifting cylinders 22. In front of the parallel return lifting cylinders 22 and between the two groups of conveying chains 18, a photoelectric detection sensor 21 for controlling the lifting cylinder is provided, and the photoelectric detection sensor 21 is fixedly connected to the conveyor frame 13 through a connecting frame. Thus, the beam copper bar 3 conveyed on the conveying chain 18 is sensed by the photoelectric detection sensor 21 located in front of the two parallel return lifting cylinders 22, so that the parallel return lifting cylinders 22 on the left and right sides are raised according to the moving position of the beam copper bar 3, so that the beam copper bar 3 is parallel returned. After parallel return, the parallel return lifting cylinders 22 are retracted and the beam copper bar 3 is continued to be conveyed.

[0049] A copper bar centering mechanism 24 is also provided between the two groups of conveying chains 18 and the middle part of the conveying frame 13 of the copper bar conveying device 2. The copper bar centering mechanism 24 uses a cross beam lifting lug 25 to correct the position of the cross beam copper bar 3. The copper bar centering mechanism 24 includes a centering support connecting plate 26. Two parallel centering sliding rails 27 are provided on the centering support connecting plate 26. A centering sliding seat 28 is provided on the centering sliding rail 27. The lower side of the centering sliding seat 28 is slidably connected to the centering sliding rail 27 through a sliding block. A vertically arranged centering gripper lifting cylinder 31 is provided on the upper side of the centering sliding seat 28. A lifting lug gripper 32 for correcting the position of the cross beam copper bar 3 through the cross beam lifting lug 25 is provided at the upper end of the telescopic rod of the centering gripper lifting cylinder 31. In addition, the centering sliding seat 28 is also connected to the pulley at the output end of the centering motor 30 through an annular centering transmission belt 29. A grating detection sensor 23 for detecting the position of the beam lug 25 is provided in front of the copper bar centering mechanism 24 and between the two groups of conveying chains 18; and the grating detection sensor 23 is fixedly connected to the conveying frame 13 through a connecting frame. Further, the grating detection sensor 23 located in front of the copper bar centering mechanism 24 is used to sense the position of the beam lug 25 on the beam copper bar 3 after parallel return; it can be understood that, according to specific use needs, only one of the lugs can be used to center the position. Thus, according to the deviation of the position of the beam lug 25, the centering motor 30 is used to drive the annular centering transmission belt 29 to reciprocate, so as to drive the centering sliding seat 28 to reciprocate on the centering sliding track 27; at the same time, the lug gripper 32 is driven to rise and fall and contact the beam lug 25 through the extension and contraction of the centering gripper lifting cylinder 31, so as to adjust the position of the beam copper bar 3 on the conveying chain 18 after parallel return.

[0050] Moreover, the tool conversion workstation 4 includes a workstation bearing support frame 33, and a horizontally arranged tool bearing platform 34 is arranged on the upper part of the workstation bearing support frame 33. Four groups (two in each group) of tool support blocks 35 are arranged on the tool bearing platform 34, and tool positioning pins 42 for fixing the positions of various tools are arranged on the tool support blocks 35; and tool placement spaces 40 are also arranged between the two tool support blocks 35 of each group. In each tool placement space 40 on the tool bearing platform 34, a beam clamping tool 36 for clamping a conductive beam, a molten lead pouring tool 37 for lead casting, a nozzle cutting tool 38 for cutting a casting nozzle 83, and a grinding tool 39 for trimming the shape of the beam are respectively arranged. At the same time, at the placement positions of the nozzle cutting tool 38 and the grinding tool 39 on the tool bearing platform 34, tool placement openings 41 for unifying the tool grabbing height and facilitating the operation of the manipulator 1 to grab the tool are also respectively arranged.

[0051] The beam clamping tool 36 on the tool conversion workstation 4 is composed of a connecting curved rod 43. A manipulator quick-change plate 44 for connecting to the operating manipulator 1 is provided on the upper side of the rear of the connecting curved rod 43. Tool positioning holes 45 for cooperating with tool positioning pins 42 on the tool support block 35 are symmetrically provided on both sides of the manipulator quick-change plate 44. A clamping connection block 47 is provided at the front end of the connecting curved rod 43. A beam lifting hook 48 is fixedly provided at the lower end of the clamping connection block 47; and a counterweight block 46 for maintaining the balance of the tool is provided at the rear end of the connecting curved rod 43. Two groups of vertically arranged beam clamping pressure rods 49 are also provided above the beam lifting hooks 48. The middle parts of the two groups of beam clamping pressure rods 49 are fixedly connected to the pressure rod connecting plate 50, and the upper ends of the beam clamping pressure rods 49 are respectively slidably connected to the pressure rod guide sleeves 51 provided on the clamping connection block 47. Moreover, the pressure rod connecting plate 50 is also connected to the telescopic rod at the lower end of the pressure rod cylinder 52 vertically arranged on the clamping connection block 47. Thus, the crossbeam clamping tool 36 is connected or separated from the operating manipulator 1 by the manipulator quick change plate 44, and the pressure rod connecting plate 50 and the two groups of crossbeam clamping pressure rods 49 thereon are driven by the pressure rod cylinder 52 to reciprocate and rise and fall along the pressure rod guide sleeve 51, and then the lower end of the crossbeam clamping pressure rod 49 is clamped with the crossbeam lifting hook 48 to firmly clamp and carry the conductive crossbeam. In addition, a protective cover 53 is provided on the clamping connection block 47, the outside of the pressure rod cylinder 52 and the pressure rod guide sleeve 51, so as to effectively protect the pressure rod cylinder 52 and the pressure rod guide sleeve 51 by the protective cover 53, so as to ensure the reliability of the use of the crossbeam clamping tool 36.

[0052] The molten lead pouring tool 37 on the tool conversion workstation 4 is composed of a connecting curved rod 43, a manipulator quick-change plate 44 is provided on the upper side of the rear of the connecting curved rod 43, and tool positioning holes 45 for engaging with the tool positioning pins 42 are symmetrically provided on both sides of the manipulator quick-change plate 44. A pouring connection block 54 is provided at the front end of the connecting curved rod 43, a molten lead holding spoon 55 is fixedly provided at the lower part of the pouring connection block 54, and a counterweight block 46 is provided at the rear end of the connecting curved rod 43. Then, the molten lead pouring tool 37 is connected or separated from the operating manipulator 1 by the manipulator quick-change plate 44, and the molten lead is held by the molten lead holding spoon 55 at the lower part of the pouring connection block 54 at the front end of the connecting curved rod 43, so as to cast the copper bar placed in the molding cavity with molten lead.

[0053] The sprue cutting tool 38 on the tool conversion workstation 4 includes a manipulator quick-change disk 44, and tool positioning holes 45 for cooperating with the tool positioning pins 42 are symmetrically arranged on both sides of the manipulator quick-change disk 44. A cutting connection block 56 is arranged on the lower side of the manipulator quick-change disk 44, and a cutting motor 57 is fixedly arranged on the cutting connection block 56. A cutting wheel 58 is arranged at the output end of the cutting motor 57; the sprue cutting tool 38 is connected or separated from the operating manipulator 1 through the manipulator quick-change disk 44, and then the cutting wheel 58 at the output end of the cutting motor 57 on the cutting connection block 56 is used to cut the casting sprue 83 on the conductive beam after the lead water is cast. In addition, the grinding tool 39 includes a manipulator quick-change disk 44, and tool positioning holes 45 for cooperating with the tool positioning pins 42 are symmetrically arranged on both sides of the manipulator quick-change disk 44. A grinding connection block 59 is arranged on the lower side of the manipulator quick-change disk 44, and a grinding motor 60 is fixedly arranged on the grinding connection block 59, and a grinding wheel 61 is arranged at the output end of the grinding motor 60; thereby, the manipulator quick-change disk 44 is used to connect or separate the grinding tool 39 from the operating manipulator 1, and the grinding wheel 61 at the output end of the grinding motor 60 on the grinding connection block 59 is used to trim the shape of the conductive beam after lead casting and cutting (for example, burrs on the beam and conductive contact parts).

[0054] At the same time, the positioning and polishing platform 5 includes a platform bearing support frame 62, and a horizontally arranged beam placement platform 63 is arranged on the upper part of the platform bearing support frame 62. The two ends of the upper side of the beam placement platform 63 are respectively provided with beam positioning blocks 64 for positioning and placing the conductive beams during the processing. The beam positioning block 64 is composed of a block base 70, the lower part of the block base 70 is fixedly connected to the upper side of the beam placement platform 63, and the upper part of the block base 70 is provided with an opening; the opening of the block base 70 is provided with a narrow positioning groove 71 for placing the tinned beam 81 and a wide positioning groove 72 for placing the lead-cast beam 82, from bottom to top, in sequence, and the wide positioning groove 72 is connected to the narrow positioning groove 71. Then, the tinned beam 81 is positioned and placed in the narrow positioning groove 71 of the beam positioning block 64, so that after the beam clamping mechanism 65 presses and fixes the tinned beam 81, the position of the beam lifting lug 25 on the beam is corrected by the lifting lug positioning clamping mechanism 66. At the same time, the wider lead-cast beam 82 can be positioned and placed in the wide positioning groove 72 of the beam positioning block 64, so that after the beam clamping mechanism 65 presses and fixes the lead-cast beam 82, the casting nozzle 83 is cut by the nozzle cutting tool 38 and the grinding tool 39 and the shape of the beam is trimmed.

[0055] The rear side of the block base 70 of the beam positioning block 64 of the positioning and polishing platform 5 is provided with a beam clamping mechanism 65, which includes a beam clamping cylinder 73 vertically arranged at the rear side of the block base 70, the driving end of the upper part of the beam clamping cylinder 73 is connected to the beam clamping swing rod 74, and the front end of the beam clamping swing rod 74 is provided with a beam clamping block 75; at the same time, the beam clamping block 75 of the beam clamping mechanism 65 is located above the corresponding beam positioning block 64 (the placed beam). Thus, the beam clamping swing rod 74 is driven to swing back and forth by the beam clamping cylinder 73, and then the beam clamping block 75 at the front end of the beam clamping swing rod 74 is used to press and fix the beam positioned in the beam positioning block 64, so as to facilitate the subsequent operations such as the position correction of the beam lifting lug 25, the cutting of the casting nozzle 83 and the trimming of the beam shape.

[0056] Two sets of symmetrically arranged lifting ear positioning clamping mechanisms 66 are arranged on the beam placement platform 63 of the positioning and polishing platform 5 and between the beam positioning clamping blocks 64 at both ends. The lifting ear positioning clamping mechanism 66 is composed of a two-way telescopic cylinder 76 fixedly arranged on the beam placement platform 63, and the cylinder telescopic rods on both sides of the two-way telescopic cylinder 76 are arranged along the extension direction of the beam. In addition, cylinder rod connecting blocks 77 are respectively arranged at the ends of the cylinder telescopic rods on both sides; lifting ear positioning clamping blocks 78 are arranged on the upper part of the cylinder rod connecting blocks 77 and above the two-way telescopic cylinder 76; and a lifting ear positioning space 80 is arranged between the two lifting ear positioning clamping blocks 78. The upper side of the lifting ear positioning clamping blocks 78 is also provided with beam avoidance notches 79 whose size is larger than the beam width. When the tinned crossbeam 81 is placed on the crossbeam positioning block 64, the position of the crossbeam lifting lug 25 on the crossbeam is corrected by using the lifting lug positioning clamping blocks 78 provided on the cylinder rod connecting blocks 77 at the ends of the cylinder telescopic rods on both sides. In addition, when the lead-cast crossbeam 82 is placed on the crossbeam positioning block 64, the position of the crossbeam lifting lug 25 is positioned and clamped by the lifting lug positioning clamping blocks 78 on both sides, which is convenient for cutting and grinding.

[0057] One end of the beam placement platform 63 of the positioning and polishing platform 5 is provided with a side positioning block 68 for positioning the end of the conductive beam, and a rear positioning block 67 is also provided at the rear side of the middle of the beam placement platform 63. Thus, the end of the conductive beam is positioned by the side positioning block 68, and the rear side of the middle of the tinned beam 81 placed on the beam positioning block 64 is positioned by the rear positioning block 67. Moreover, when the lead-cast beam 82 is placed on the beam positioning block 64, the rear positioning block 67 located below the lead-cast beam 82 (because the lead-cast beam 82 is placed at a higher position on the beam positioning block 64 and the beam is wide, so the rear positioning block 67 will be located below the beam at this time) is used to assist in supporting the lead-cast beam 82, thereby improving the reliability of the device. In addition, a material drop chute 69 for connecting to the material receiving port of the material receiving vehicle 7 is provided between the two sets of lifting ear positioning and clamping mechanisms 66 and on the front side of the middle of the beam placement platform 63 .

[0058] Furthermore, the casting mold 8 includes a mold frame 84, and a lower mold bearing template 85 is disposed on the upper part of the mold frame 84, and a lower mold hinged ear plate 95 on the lower side of the lower mold bearing template 85 is hinged to a lower mold hinged seat 86 disposed on the mold frame 84. Furthermore, a mold flipping hydraulic cylinder 87 for driving the mold to flip as a whole is disposed between the lower mold bearing template 85 and the mold frame 84, and a fixed end of the mold flipping hydraulic cylinder 87 is hinged to the front side of the mold frame 84, and a telescopic end of the mold flipping hydraulic cylinder 87 is hinged to a flipping cylinder hinged ear plate 104 disposed on the rear side of the lower mold bearing template 85, so that after casting, the mold flipping hydraulic cylinder 87 is used to control the flipping of the closed mold, thereby allowing the molten lead to fully flow in the casting cavity and evenly wrap around the outside of the crossbeam copper bar 3. At the same time, a flip upper template 88 is arranged above the supporting lower template 85. The left and right ends of the flip upper template 88 are movably connected to the connecting plate sliding guide columns 96 at both ends of the supporting lower template 85 through opening and closing guide connecting plates 89, and upper template opening and closing hydraulic cylinders 90 for driving the flip upper template 88 to move are also arranged between the opening and closing guide connecting plates 89 and the ends of the supporting lower template 85.

[0059] The flip upper template 88 of the casting mold 8 is composed of an upper template body 105, and an upper mold pouring cavity 106 is arranged on the lower side of the upper template body 105 (the side in contact with the lower template 85), and a mold pouring port 91 is arranged in the middle of the front side of the upper mold pouring cavity 106, and the opening and closing guide connecting plates 89 are respectively arranged on the left and right ends of the upper template body 105, and the upper end of the opening and closing guide connecting plate 89 is fixedly connected to the end of the upper template body 105, and the lower end of the opening and closing guide connecting plate 89 is movably connected to the connecting plate sliding guide column 96 at the end of the lower template 85 through the connecting plate guide groove 107; and then, through the separable assembly structure of the upper mold pouring cavity 106 of the flip upper template 88 and the lower mold pouring cavity 97 of the lower template 85, a mold cavity for subsequent lead water casting of the copper bar is formed, and it is convenient to remove the beam casting after the casting is completed. In addition, an upper die weight reduction structure 110 is provided on the upper side of the upper die plate body 105, and reinforcing connecting plates 111 are provided between the two ends of the upper die weight reduction structure 110 and the upper end of the opening and closing guide connecting plate 89. Thus, the upper die weight reduction structure 110 is used to effectively reduce the weight of the upper die plate body 105, so as to facilitate the flexible control of the flipping upper die plate 88; at the same time, the strength of the connection structure between the upper die plate body 105 and the opening and closing guide connecting plates 89 on both sides is improved by reinforcing the connecting plates 111.

[0060] The lower mold plate 85 of the casting mold 8 is composed of a lower mold plate body 94, and a lower mold pouring cavity 97 is provided on the upper side of the lower mold plate body 94 (the side in contact with the flip upper mold plate 88), and a mold pouring port 91 corresponding to the pouring port of the upper mold pouring cavity 106 is provided in the middle of the front side of the lower mold pouring cavity 97; and a lower mold hinged ear plate 95 for hinged connection with the lower mold hinged seat 86 is provided on the lower side of the lower mold plate body 94. At the same time, the lower end of the upper mold opening and closing hydraulic cylinder 90 is hinged to the end of the lower mold plate body 94, and the upper end of the upper mold opening and closing hydraulic cylinder 90 is hinged to the opening and closing hydraulic cylinder hinge 108 provided at the upper end of the opening and closing guide connecting plate 89. Then, the lower mold plate 85 is rotated and set on the lower mold hinged seat 86 provided on the upper part of the mold frame 84 through the lower mold hinged ear plate 95, and the flip position of the lower mold plate 85 is controlled by the mold flip hydraulic cylinder 87. At the same time, the mold cavity for subsequent lead casting of the copper bar is formed by the separable assembly structure of the lower mold casting cavity 97 carrying the lower mold plate 85 and the upper mold casting cavity 106 of the flip upper mold plate 88. In addition, the opening and closing action of the flip upper mold plate 88 is driven by the extension and contraction of the upper mold opening and closing hydraulic cylinder 90.

[0061] The left and right ends of the lower mold body 94 of the bearing lower mold 85 of the casting mold 8 and the upper part of the position hinged with the lower end of the upper mold opening and closing hydraulic cylinder 90 are respectively fixed with connecting plate sliding guide pillars 96; correspondingly, the lower part of the opening and closing guide connecting plate 89 is also provided with a connecting plate guide slot 107 for matching and connecting with the connecting plate sliding guide pillars 96. Therefore, in the process of linear extension and contraction of the upper mold opening and closing hydraulic cylinder 90, the upper mold 88 can be turned over and opened relative to the bearing lower mold 85 by using the matching guidance of the fixed connecting plate sliding guide pillars 96 and the connecting plate guide slot 107 on the opening and closing guide connecting plate 89; when the upper mold 88 and the bearing lower mold 85 are opened, the tinned crossbeam 81 is positioned and placed in the lower mold casting cavity 97; and when the upper mold 88 and the bearing lower mold 85 are closed, lead water is poured through the mold pouring port 91. In addition, two groups of casting ejection blocks 98 for ejecting the crossbeam casting are movably arranged in the lower mold casting cavity 97, and the lower ends of the casting ejection blocks 98 are respectively connected to the telescopic ends of the casting ejection hydraulic cylinders 93 arranged vertically on the lower side of the lower template body 94; and then, after the tinned crossbeam 81 is cast in the casting cavity, the casting ejection hydraulic cylinders 93 are extended to lift the casting ejection blocks 98 in the lower mold casting cavity 97, so as to assist in ejecting the crossbeam casting upward between the opened flip upper template 88 and the bearing lower template 85, so as to facilitate the subsequent grasping and moving of the crossbeam casting.

[0062] Two sets of mold fastening mechanisms 92 are provided between the bearing lower template 85 and the flip upper template 88 of the casting mold 8 to make the closure of the upper and lower templates more secure; the two sets of mold fastening mechanisms 92 are symmetrically arranged on the left and right sides of the mold pouring port 91. The mold fastening mechanism 92 includes mold fastening claws 102 located on the front and rear sides of the bearing lower template 85, and the middle of the mold fastening claws 102 is connected to the front side of the lower template body 94 of the bearing lower template 85 through the fastening claw hinge seat 103. In addition, the lower ends of the two mold fastening claws 102 at the front and rear sides and corresponding positions are connected to the telescopic ends of the fastening hydraulic cylinder 100 vertically arranged below the bearing lower template 85 through the fastening driving connecting rod 101, and the fastening hydraulic cylinder 100 is connected to the lower side of the lower template body 94 through the fastening connecting frame 99. Correspondingly, a clamping claw clamping portion 109 is respectively provided on the upper template body 105 of the flipping upper template 88 at the position in contact with the clamping portion of the upper end of each mold clamping claw 102; and then, by extending and retracting the clamping hydraulic cylinder 100 below the bearing lower template 85, the mold clamping claw 102 hinged to the clamping drive connecting rod 101 is driven to swing back and forth around the rotating axis of the clamping claw hinge seat 103, so as to utilize the clamping portion of the upper end of each mold clamping claw 102 and the clamping claw clamping portion 109 on the flipping upper template 88 to make the closed connection between the flipping upper template 88 and the bearing lower template 85 more secure, which is beneficial to the subsequent molten lead casting.

[0063] When the anode plate conductive beam tinning and casting automated production line is in use, first, the beam clamping tool 36 and the molten lead pouring tool 37 are respectively placed in the tool placement space 40 between the two groups of tool support blocks 35 of the tool conversion workstation 4, and the tool positioning pins 42 on the tool support blocks 35 are used to position the tools; then, the nozzle cutting tool 38 and the grinding tool 39 are respectively placed in the tool placement space 40 between the other two groups of tool support blocks 35, and the cutting connection block 56 and the grinding connection block 59 on the lower side of the manipulator quick change plate 44 are passed through the corresponding tool placement openings 41 on the tool carrier table 34, thereby unifying the grabbing heights of each tool, so as to facilitate the operation of the manipulator 1 to quickly and accurately grab the required tools.

[0064] Then, the copper bar 3 of the beam that has been pickled and cleaned is placed at the feeding end of the front part of the two groups of conveying chains 18 of the copper bar conveying device 2, and the conveying motor 15 drives the driving sprocket 14 to rotate, and drives the two groups of conveying chains 18 to rotate synchronously through the transmission chain 16, the driven sprocket 17 and the synchronous shaft 19, so that the copper bar 3 of the beam moves to the rear of the conveying device. When the photoelectric detection sensor 21 senses the copper bar 3 of the beam conveyed on the conveying chain 18, the parallel return lifting cylinders 22 on the left and right sides are raised, and the parallel return lifting cylinders 22 on both sides are used to stop and return the copper bar 3 to parallel position. After parallel return, the parallel return lifting cylinders 22 on both sides are retracted to continue to convey the copper bar 3 of the beam to the rear. Afterwards, the grating detection sensor 23 is used to sense the position of the beam lug 25 on the beam copper bar 3 after it has been paralleled and returned to its original position, so that the lug gripper 32 of the copper bar centering mechanism 24 can be used to center and position the beam copper bar 3 according to the deviation of the position of the beam lug 25. In addition, the copper bar stop block 20 arranged at the rear of the conveying direction of the conveying chain 18 is used to position and stop the beam copper bar 3 that has been paralleled and corrected to be centered, so as to facilitate the subsequent operation of the manipulator 1 to grab it. At the same time, during the entire process of the beam copper bar 3 being transported on the conveying device, the baking lamp above the conveyor frame 13 is used to dry the cleaning acid remaining on the beam copper bar 3 to avoid splashing of the subsequent beam copper bar 3 during the tinning process in the tinning furnace 10.

[0065] After the crossbeam copper bar 3 moves into position on the copper bar conveying device 2, the manipulator 1 is operated. The free end ofThe crossbeam clamping tool 36 on the tool conversion workstation 4 is connected to the manipulator quick-change plate 44, and the pressure rod cylinder 52 drives the pressure rod connecting plate 50 and the two groups of crossbeam clamping pressure rods 49 thereon to move downward along the pressure rod guide sleeve 51, and then the lower end of the crossbeam clamping pressure rod 49 is used to cooperate with the crossbeam lifting hook 48 to clamp the crossbeam copper bar 3 on the copper bar conveying device 2 firmly; then, the robot 1 is operated to place the crossbeam copper bar 3 clamped thereon into the tinning furnace 10 for tinning treatment to enhance the bonding ability of copper and lead in the subsequent lead water casting process. Afterwards, the robot 1 is operated to position the tinned beam 81 (conductive beam 6 in processing) on ​​the beam positioning blocks 64 on both sides of the positioning and polishing platform 5 and in the narrow positioning groove 71 at a lower position, and the end of the tinned beam 81 is positioned by the side positioning block 68, and the rear positioning block 67 is used to position the rear side of the middle of the tinned beam 81 placed on the beam positioning block 64. Then, the beam clamping cylinder 73 is used to drive the beam clamping swing rod 74 to swing, so that the tinned beam 81 in the narrow positioning groove 71 is pressed and fixed by the beam clamping pressing block 75 at the front end of the beam clamping swing rod 74. Subsequently, the position of the beam lifting lug 25 on the beam is corrected for the second time by using the lifting lug positioning clamping block 78 provided on the cylinder rod connecting block 77 at the end of the cylinder telescopic rod on both sides of the lifting lug positioning clamping mechanism 66.

[0066] After the second correction of the beam ear 25 on the tinned beam 81 is completed, the upper mold opening and closing hydraulic cylinder 90 of the casting mold 8 is extended to make the flip upper template 88 flip upward relative to the bearing lower template 85, thereby opening the mold cavity. After that, the beam clamping mechanism 65 of the positioning and polishing platform 5 is released, and the manipulator 1 is operated to position the corrected tinned beam 81 in the lower mold casting cavity 97 of the bearing lower template 85. Then, the upper mold opening and closing hydraulic cylinder 90 is retracted to make the flip upper template 88 flip downward and close with the bearing lower template 85; and the clamping hydraulic cylinder 100 below the bearing lower template 85 is used to drive the mold clamping claw 102 to rotate, so that the clamping part at the upper end of the mold clamping claw 102 is matched with the clamping claw clamping part 109 on the flip upper template 88, so that the closed connection between the flip upper template 88 and the bearing lower template 85 is more tightened. After the upper flipping template 88 and the lower supporting template 85 are closed and fastened to each other, the mold flipping hydraulic cylinder 87 is used to control the upper and lower templates in the closed state to flip upward together around the rotating axis of the lower mold hinge seat 86, so that the mold pouring port 91 of the template faces upward to facilitate the pouring of molten lead. At the same time, the operating manipulator 1 puts the crossbeam clamping tool 36 back to the tool conversion workstation 4, and the free end of the operating manipulator 1 is connected to the manipulator quick change plate 44 of the molten lead pouring tool 37 to hold molten lead through the molten lead holding spoon 55 at the lower part of the pouring connection block 54 connected to the front end of the bending rod 43, and then the copper bar placed in the mold cavity of the casting mold 8 is cast with molten lead. Then, the operating manipulator 1 uses the molten lead pouring tool 37 to scoop molten lead in the lead melting furnace 11, and pours molten lead into the mold cavity composed of the upper mold pouring cavity 106 and the lower mold pouring cavity 97 through the mold pouring port 91 of the casting mold 8. Furthermore, after casting, the mold flipping hydraulic cylinder 87 is used to control the flipping of the closed mold, so that the molten lead can fully flow in the casting cavity and evenly wrap around the outside of the crossbeam copper bar 3 through the flipping movement of the mold, thereby ensuring product quality.

[0067] After the tinned beam 81 is cast in the closed casting mold 8, the mold flipping hydraulic cylinder 87 flips the flipping upper template 88 and the bearing lower template 85 back to the initial horizontal arrangement position, and releases the mold fastening mechanism 92; then, the flipping upper template 88 is opened upward by the upper mold opening and closing hydraulic cylinder 90. At the same time, the operating manipulator 1 puts the molten lead pouring tool 37 back to the tool conversion workstation 4, and the free end of the operating manipulator 1 is connected to the beam clamping tool 36 on the tool conversion workstation 4 again, and then the lead-cast beam 82 is taken out from the opened casting mold 8. In addition, when taking out the lead-cast beam 82, the casting ejection hydraulic cylinder 93 can be extended to lift the casting ejection block 98 in the lower mold casting cavity 97 of the bearing lower template 85, thereby assisting in ejecting the beam casting upward, which is convenient for grabbing and moving the lead-cast beam 82.

[0068] Subsequently, the robot 1 is operated to position the cast-lead beam 82 (the conductive beam 6 being processed) on the beam positioning blocks 64 on both sides of the positioning and polishing platform 5 and in the higher wide positioning groove 72 (after cast-lead, the width of the beam increases), and the end of the cast-lead beam 82 is positioned by the side positioning block 68, and the rear positioning block 67 located below is used to assist in supporting the cast-lead beam 82, and the ear positioning clamping blocks 78 on both sides are used to position and clamp the beam ears 25, and the beam clamping mechanism 65 is used to press and fix the cast-lead beam 82. After that, the operating manipulator 1 puts the beam clamping tool 36 back to the tool conversion workstation 4 again, and connects the free end of the operating manipulator 1 to the manipulator quick-change disk 44 of the nozzle cutting tool 38, so as to use the cutting wheel 58 at the output end of the cutting motor 57 on the cutting connection block 56 to cut the casting nozzle 83 on the beam 82 after the lead casting; the cut casting nozzle 83 will slide into the receiving vehicle 7 through the blanking chute 69. After the casting nozzle 83 is cut, the free end of the operating manipulator 1 is connected to the manipulator quick-change disk 44 of the grinding tool 39 on the tool conversion workstation 4, so as to grind and trim the shape of the conductive beam after the lead casting and cutting through the grinding wheel 61 at the output end of the grinding motor 60 on the grinding connection block 59. After the conductive beam is polished and trimmed, the beam clamping mechanism 65 of the positioning and polishing platform 5 is released, and the free end of the operating manipulator 1 is connected to the beam clamping tool 36 on the tool conversion workstation 4 again, and then the processed conductive beam is placed on the finished beam storage cart 9.

[0069] Repeat the above copper bar conveying device 2 to transport the pickled and cleaned beam copper bar 3, operate the robot 1 to place the beam copper bar 3 in the tinning furnace 10 for tinning, operate the robot 1 to position the tinned beam 81 on the positioning and polishing platform 5 for secondary correction of the position of the beam lifting ear 25, operate the robot 1 to place the corrected tinned beam 81 into the casting mold 8, operate the robot 1 to use the molten lead pouring tool 37 to cast the copper bar in the casting mold 8 with lead water, operate the robot 1 to place the lead-cast beam 82 on the positioning and polishing platform 5 to cut the casting nozzle 83 and trim the shape of the beam, and operate the robot 1 to place the processed conductive beams on the finished beam storage cart 9, thereby reducing labor intensity, improving production efficiency and operation safety, and stabilizing the quality of finished products.

Claims

1. An automated production line for tinning and casting conductive beams of anode plates, comprising an operating manipulator (1) arranged in the middle, characterized in that: A copper bar conveying device (2) for conveying the copper bar (3) of the crossbeam is arranged around the operating manipulator (1) and within the grasping range of the manipulator. A tool conversion workstation (4) for centrally placing various operating tools used in conjunction with the manipulator is arranged on the side of the copper bar conveying device (2). A positioning and polishing platform (5) for positioning and polishing the conductive crossbeam (6) being processed is arranged on the side of the tool conversion workstation (4). A material receiving vehicle (7) for recovering the polished and cut materials is arranged below the positioning and polishing platform (5). ), a casting mold (8) for casting molten lead on the copper bar is arranged on the side of the positioning and polishing platform (5), and a finished beam storage vehicle (9) is arranged on the side of the casting mold (8); and a tinning furnace (10) for tinning the copper bar and a lead melting furnace (11) for containing molten lead are arranged in sequence between the copper bar conveying device (2) and the finished beam storage vehicle (9) and within the grasping range of the manipulator, and dust removal and exhaust ports (12) are respectively arranged above the lead melting furnace (11) and the tinning furnace (10); the copper bar The conveying device (2) comprises a conveying frame (13), on which two groups of conveying chains (18) are arranged along the conveying direction of the crossbeam. The conveying chains (18) are arranged in a ring shape on the left and right sides of the upper part of the conveying frame (13). The front ends of the two groups of conveying chains (18) are feeding ends. The driven sprockets (17) at the rear ends of the two groups of conveying chains (18) are connected via a synchronous rotating shaft (19), and one of the driven sprockets (17) is connected to the driving sprocket (14) via a transmission chain (16). The driving sprocket (14) ) is connected to the output end of a conveying motor (15) arranged on a conveying frame (13); vertically arranged parallel return lifting cylinders (22) are respectively arranged on the left and right sides of the front part of the conveying frame (13); a copper bar centering mechanism (24) for correcting the position of the crossbeam copper bar (3) is also arranged in the middle of the conveying frame (13) and between the two groups of conveying chains (18); a baking lamp for high-temperature heating the outer surface of the crossbeam copper bar (3) is arranged above the conveying frame (13) and within the entire conveying range of the conveying chain (18).

2. The automated production line for tinning and casting of anode plate conductive beams according to claim 1 is characterized by: The copper bar centering mechanism (24) comprises a centering support connecting plate (26), on which two parallel centering sliding rails (27) are arranged, and on which a centering sliding seat (28) is arranged, and the lower side of the centering sliding seat (28) is slidably connected to the centering sliding rail (27) via a sliding block, and the upper side of the centering sliding seat (28) is provided with a vertically arranged centering gripper lifting cylinder (31), and the upper end of the telescopic rod of the centering gripper lifting cylinder (31) is provided with a lifting lug gripper (32) for correcting the position of the crossbeam copper bar (3) via a crossbeam lifting lug (25); and the centering sliding seat (28) is also connected to a pulley at the output end of the centering motor (30) via an annular centering transmission belt (29).

3. The automated production line for tinning and casting of anode plate conductive beams according to claim 1 is characterized by: The tool conversion workstation (4) comprises a workstation bearing support frame (33), a tool bearing platform (34) is arranged on the upper part of the workstation bearing support frame (33), a plurality of tool support blocks (35) are arranged on the tool bearing platform (34), tool positioning pins (42) are arranged on the tool support blocks (35), and a tool placement space (40) is arranged between every two tool support blocks (35), and each tool placement space (40) on the tool bearing platform (34) is respectively provided with a beam clamping tool (36) for clamping a conductive beam, a molten lead pouring tool (37) for lead water casting, a nozzle cutting tool (38) for cutting a casting nozzle (83), and a grinding tool (39) for trimming the shape of the beam, and the nozzle cutting tool (38) and the grinding tool (39) are arranged on the tool bearing platform (34). Tool placement openings (41) for unifying the tool grabbing height are also provided at the placement positions on the table (34); the nozzle cutting tool (38) comprises a manipulator quick-change disk (44), tool positioning holes (45) for cooperating and engaging with the tool positioning pins (42) are symmetrically provided on both sides of the manipulator quick-change disk (44), a cutting connection block (56) is provided on the lower side of the manipulator quick-change disk (44), a cutting motor (57) is fixedly provided on the cutting connection block (56), and a cutting wheel (58) is provided at the output end of the cutting motor (57); the grinding tool (39) comprises a manipulator quick-change disk (44), a grinding connection block (59) is provided on the lower side of the manipulator quick-change disk (44), a grinding motor (60) is fixedly provided on the grinding connection block (59), and a grinding wheel (61) is provided at the output end of the grinding motor (60).

4. The automated production line for tinning and casting of anode plate conductive beams according to claim 3 is characterized by: The crossbeam clamping tool (36) comprises a connecting bent rod (43), the upper side of the rear portion of the connecting bent rod (43) is provided with a manipulator quick-change plate (44) for connecting to an operating manipulator (1), and tool positioning holes (45) for engaging with tool positioning pins (42) on a tool support block (35) are symmetrically provided on both sides of the manipulator quick-change plate (44); a clamping connection block (47) is provided at the front end of the connecting bent rod (43), a crossbeam lifting hook (48) is fixedly provided at the lower end of the clamping connection block (47), a crossbeam clamping pressure rod (49) arranged vertically is provided above the crossbeam lifting hook (48), the middle portion of the crossbeam clamping pressure rod (49) is fixedly connected to the pressure rod connecting plate (50), and the crossbeam The upper end of the clamping pressure rod (49) is slidably connected to a pressure rod guide sleeve (51) provided on the clamping connection block (47), and the pressure rod connection plate (50) is also connected to a telescopic rod at the lower end of a pressure rod cylinder (52) vertically provided on the clamping connection block (47); and a counterweight block (46) for maintaining the balance of the tool is also provided at the rear end of the connecting curved rod (43); the molten lead pouring tool (37) comprises a connecting curved rod (43), a manipulator quick-change plate (44) is provided on the upper side of the rear part of the connecting curved rod (43), a pouring connection block (54) is provided at the front end of the connecting curved rod (43), a molten lead containing spoon (55) is fixedly provided at the lower part of the pouring connection block (54), and a counterweight block (46) is provided at the rear end of the connecting curved rod (43).

5. The automated production line for tinning and casting of anode plate conductive beams according to claim 1 is characterized by: The positioning and polishing platform (5) comprises a platform bearing support frame (62), a beam placement platform (63) is arranged on the upper part of the platform bearing support frame (62), beam positioning blocks (64) for positioning and placing the conductive beams during the processing are arranged at both ends of the upper side of the beam placement platform (63), and the rear sides of the beam positioning blocks (64) are each provided with a beam clamping mechanism (65), and the clamping part of the beam clamping mechanism (65) is located above the corresponding beam positioning block (64); the beam placement platform (63) is provided with a plurality of crossbeam positioning blocks (64) and a plurality of crossbeam positioning blocks (64) are provided with a plurality of crossbeam positioning blocks (64). Two groups of symmetrically arranged lifting ear positioning clamping mechanisms (66) are arranged on the platform (63) between the beam positioning clamping blocks (64) at both ends; a material drop chute (69) for connecting to a material receiving port of a material receiving vehicle (7) is arranged between the two groups of lifting ear positioning clamping mechanisms (66) and on the front side of the middle of the beam placement platform (63); a side positioning stopper (68) for positioning the end of the conductive beam is also arranged at one end of the beam placement platform (63); and a rear positioning stopper (67) is arranged on the rear side of the middle of the beam placement platform (63).

6. The automated production line for tinning and casting of anode plate conductive beams according to claim 5, characterized in that: The crossbeam positioning block (64) comprises a block base (70), the lower part of the block base (70) is fixedly connected to the crossbeam placement platform (63), the upper part of the block base (70) is provided with an opening, and the opening is provided with a narrow positioning groove (71) for placing the crossbeam (81) after tinning and a wide positioning groove (72) for placing the crossbeam (82) after lead casting, from bottom to top, and the wide positioning groove (72) and the narrow positioning groove (71) are connected to each other; the lifting ear positioning clamping mechanism (66) comprises a fixing device fixedly provided on the crossbeam placement platform (63); 3) on a two-way telescopic cylinder (76), the cylinder telescopic rods on both sides of the two-way telescopic cylinder (76) are arranged along the extension direction of the cross beam, and the ends of the cylinder telescopic rods on both sides are respectively provided with cylinder rod connecting blocks (77), the upper part of the cylinder rod connecting block (77) and the upper part of the two-way telescopic cylinder (76) are both provided with a lifting ear positioning clamping block (78), and a lifting ear positioning space (80) is provided between the two lifting ear positioning clamping blocks (78); the upper side of the lifting ear positioning clamping block (78) is also provided with a cross beam avoidance notch (79) whose size is larger than the cross beam width.

7. The automated production line for tinning and casting of anode plate conductive beams according to claim 1 is characterized by: The casting mold (8) comprises a mold frame (84), the upper part of which is provided with a bearing lower template (85), the lower side of which is hinged to a lower mold hinge seat (86) provided on the mold frame (84), and a mold turning hydraulic cylinder (87) is provided between the bearing lower template (85) and the mold frame (84), the fixed end of which is hinged to the front side of the mold frame (84), and the telescopic end of which is hinged to a turning cylinder hinge ear plate (104) provided on the rear side of the bearing lower template (85); An upper flip template (88) is arranged above the lower template (85); the left and right ends of the upper flip template (88) are movably connected to the two ends of the bearing lower template (85) through opening and closing guide connecting plates (89), and upper mold opening and closing hydraulic cylinders (90) are arranged between the opening and closing guide connecting plates (89) and the ends of the bearing lower template (85); mold pouring ports (91) are also arranged at corresponding positions in the middle of the front sides of the upper flip template (88) and the bearing lower template (85), and a mold fastening mechanism (92) is arranged between the bearing lower template (85) and the upper flip template (88).

8. The automated production line for tinning and casting of anode plate conductive beams according to claim 7, characterized in that: The flip upper template (88) comprises an upper template body (105), an upper mold pouring cavity (106) is arranged on the lower side of the upper template body (105), the mold pouring port (91) is located at the front side of the upper mold pouring cavity (106), the opening and closing guide connecting plates (89) are respectively arranged at the left and right ends of the upper template body (105), the upper end of the opening and closing guide connecting plates (89) is fixedly connected to the end of the upper template body (105), and the lower end of the opening and closing guide connecting plates (89) is movably connected to the end of the bearing lower template (85); the bearing lower template (85) comprises a lower template body (94), a lower mold pouring cavity (97) is arranged on the upper side of the lower template body (94), the mold pouring port (91) is located at the front side of the upper mold pouring cavity (97), and the opening and closing guide connecting plates (89) are respectively arranged at the left and right ends of the upper template body (105). 7), the lower side of the lower template body (94) is provided with a lower mold hinge ear plate (95) for being hinged to the lower mold hinge seat (86); the lower end of the upper mold opening and closing hydraulic cylinder (90) is hinged to the end of the lower template body (94), and the upper end of the upper mold opening and closing hydraulic cylinder (90) is hinged to the opening and closing hydraulic cylinder hinge part (108) provided at the upper end of the opening and closing guide connecting plate (89); the left and right ends of the lower template body (94) and the upper part of the position hinged to the lower end of the upper mold opening and closing hydraulic cylinder (90) are respectively fixed with connecting plate sliding guide pillars (96), and correspondingly, the lower part of the opening and closing guide connecting plate (89) is also provided with a connecting plate guide groove (107) for matching and connecting with the connecting plate sliding guide pillar (96).

9. The automated production line for tinning and casting of anode plate conductive beams according to claim 7, characterized in that: The mold fastening mechanism (92) comprises mold fastening claws (102) located at the front and rear sides of the bearing lower template (85), the middle parts of the mold fastening claws (102) are connected to the bearing lower template (85) through fastening claw hinge seats (103), and the lower ends of the two mold fastening claws (102) at the front and rear sides and at corresponding positions are connected to the telescopic ends of the fastening hydraulic cylinder (100) arranged below the bearing lower template (85) through fastening drive connecting rods (101), and the fastening hydraulic cylinder (100) is connected to the bearing lower template (85) through a fastening connecting frame (99); accordingly, fastening claw clamping parts (109) are respectively provided at positions on the flip upper template (88) that contact the fastening parts of the upper ends of each mold fastening claw (102).

Citation Information

Patent Citations

  • Negative plate repairing production line

    CN117300648A

  • Copper bar tin hanging device

    CN211848103U

  • Automatic casting equipment for anode plate

    CN220760993U