Construction method for dismantling non-solid box girder of ramp
By erecting a bracket under the non-solid box girder on the ramp, removing the paving layer and anti-collision wall, and dividing it into three parts for cutting and lifting, the problems of box girder slip and heavy weight in traditional demolition methods are solved, and the problem of box girder slippage and weight in the traditional demolition method is achieved. The safe and efficient dismantling process reduces mechanical demand and costs.
Patent Information
- Application Number
- CN202411140664.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-20
- Publication Date
- 2024-11-22
AI Technical Summary
In traditional ramp demolition projects, box girders are heavy and easy to slip after cutting, resulting in high mechanical configuration requirements, large site impact and high cost.
A full bracket is set up under the non-solid box girder, the ramp paving layer and anti-collision wall are removed, divided into three parts and lifted and removed through a car crane to ensure that the box girder does not slip and reduce the weight of the single block.
Effectively prevent the box beam from sliding horizontally and vertically, reduce mechanical configuration requirements, and reduce site occupation and cost.
Smart Images

Figure CN118997029A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of demolition construction of old ramps, and in particular to a construction method for demolishing a non-solid box beam of a ramp. Background Art
[0002] With the rapid development of modern construction industry, some buildings need to be demolished due to planning changes. Some of these projects are difficult to construct using existing conventional construction technologies and have a greater impact on the surrounding areas.
[0003] In traditional ramp demolition projects, most construction units use the method of horizontal cutting to remove the box beam. However, the weight of a single box beam cut horizontally is large, requiring a larger truck crane to lift and remove it, and it is easy to slip vertically during removal.
[0004] In view of the shortcomings of ramp removal in the prior art, those skilled in the art have been looking for solutions. Summary of the invention
[0005] The purpose of the present invention is to provide a construction method for dismantling a non-solid box girder of a ramp, which can ensure that the box girder will not slip horizontally and vertically during dismantling, and can also greatly reduce the weight of a single cut block, reduce mechanical configuration requirements, reduce the impact of site constraints and save costs.
[0006] In order to solve the above technical problems, the present invention provides a construction method for removing a non-solid box girder of a ramp, and the construction method for removing a non-solid box girder of a ramp comprises:
[0007] S1: erect full support under the non-solid box girder;
[0008] S2: Remove the ramp surface pavement;
[0009] S3: Cut and remove the crash wall;
[0010] S4: Divide the non-solid box girder into three parts, cut the three parts in batches, and use a truck crane to lift and remove them.
[0011] Optionally, in the construction method for removing a non-solid box girder of a ramp, step S1 comprises:
[0012] The full-hall support is set up with a horizontal distance of 0.6m, a vertical distance of 1.8m and a step distance of 2m;
[0013] Connect the wall ties of the full-height bracket to the column piers.
[0014] Optionally, in the construction method for removing a non-solid box girder of a ramp, step S2 comprises:
[0015] A small pickaxe machine is used to chisel away the ramp pavement layer in a demolition construction sequence from high to low.
[0016] Optionally, in the construction method for removing a non-solid box girder of a ramp, step S3 comprises:
[0017] Use a drilling machine to open cutting process holes and lifting process holes on the crash wall;
[0018] Use a wire saw to cut the crash wall.
[0019] Optionally, in the construction method for removing the non-solid box girder of the ramp, the process of using a drilling machine to open a cutting process hole and a hoisting process hole on the crash barrier includes:
[0020] A cutting process hole is horizontally opened close to the top plate surface of the non-solid box beam, and the diameter of the cutting process hole is 60mm;
[0021] Two lifting process holes are opened, and the diameter of each lifting process hole is 100mm.
[0022] Optionally, in the construction method for removing the non-solid box girder of the ramp, the cutting of the crash barrier by using a rope saw includes:
[0023] The length of a single cutting block is 6000mm.
[0024] Optionally, in the construction method for removing a non-solid box girder of a ramp, step S4 comprises:
[0025] Marking cutting lines on non-solid box beams;
[0026] The non-solid box girder is cut into five pieces according to the cutting line, including: two A box girder tops, one B box girder crossbeam and two C box girder bottoms;
[0027] Use a truck crane to lift and remove from top to bottom.
[0028] In the construction method for removing the non-solid box girder of the ramp provided by the present invention, the construction method includes: S1: erecting a full-height support under the non-solid box girder; S2: breaking the ramp surface pavement layer; S3: cutting and removing the crash barrier; S4: dividing the non-solid box girder into three parts, cutting the three parts in batches, and using a car crane to lift and remove them. By dividing the non-solid box girder into three parts and cutting the three parts in batches, it is ensured that the box girder will not slip horizontally and vertically during removal, and the weight of a single cut block can be greatly reduced, the mechanical configuration requirements can be reduced, the impact of site constraints can be reduced, and costs can be saved. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] The above and other objects, features and advantages of the present disclosure will become more apparent through a more detailed description of exemplary embodiments of the present disclosure in conjunction with the accompanying drawings, wherein like reference numerals generally represent like components throughout the exemplary embodiments of the present disclosure.
[0030] Figure 1 is a schematic diagram of a non-solid box girder divided into three parts in one embodiment of the present invention;
[0031] Figure 2 is a cross-sectional view of the arrangement of the dividing lines on a non-solid box girder in one embodiment of the present invention;
[0032] Figure 3 It is a cross-sectional view of a non-solid box beam buckle rack support in one embodiment of the present invention;
[0033] Figure 4 It is a flow chart of a construction method for dismantling a non-solid box girder of a ramp in one embodiment of the present invention.
[0034] In the figure:
[0035] 1-Non-solid box girder; 2-Full-frame support. DETAILED DESCRIPTION
[0036] The construction method for removing the non-solid box girder of the ramp proposed by the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. The advantages and features of the present invention will become clearer according to the following description and claims. It should be noted that the accompanying drawings are all in a very simplified form and are not in precise proportions, and are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the present invention.
[0037] Please refer to Figures 1 to 4 , the construction method for removing the non-solid box girder of the ramp includes:
[0038] First, please refer to Figure 3 , execute step S1, set up a full-height bracket 2 under the non-solid box beam 1.
[0039] Wherein, step S1 comprises:
[0040] S11, set up full-hall support 2 with horizontal distance of 0.6m, vertical distance of 1.8m and step distance of 2m;
[0041] S12, connecting the wall connecting piece of the full-height bracket 2 with the column pier.
[0042] Next, step S2 is executed to remove the ramp surface pavement layer. Specifically, in step S2, a small pickaxe is used to chisel away the ramp surface pavement layer in a demolition construction sequence from high to low.
[0043] Next, step S3 is performed to cut and remove the anti-collision wall.
[0044] Wherein, step S3 comprises:
[0045] S31. Use a drilling machine to open cutting process holes and lifting process holes on the crash barrier; specifically, open a cutting process hole horizontally close to the top plate surface of the non-solid box girder, and the diameter of the cutting process hole is 60mm; open two lifting process holes, and the diameter of each lifting process hole is 100mm.
[0046] S32, using a rope saw to cut the anti-collision wall. In this embodiment, the length of a single cutting block is preferably 6000 mm.
[0047] Next, please refer to Figure 1 and Figure 2 , execute step S4, divide the non-solid box girder 1 into three parts, cut the three parts in batches, and use a truck crane to lift and remove them.
[0048] Wherein, step S4 comprises:
[0049] S41, divide the cutting line on the non-solid box beam 1 (such as Figure 2 shown);
[0050] S42, cutting the non-solid box beam 1 into five pieces according to the cutting line (such as Figure 1 As shown), it includes: two A box beam tops, one B box beam cross beam and two C box beam bottoms;
[0051] S43, use a truck crane to remove from top to bottom, i.e. first remove the top of box beam A, then remove the cross beam of box beam B, and finally remove the bottom of box beam C.
[0052] Dividing the non-solid box girder into five pieces along the cutting line not only ensures that the box girder will not slip horizontally and vertically during dismantling, but also greatly reduces the weight of each cut piece, reduces mechanical configuration requirements, reduces the impact of site constraints and saves costs.
[0053] It can be understood that the above examples are merely examples listed for a better understanding of the technical solutions of the embodiments of the present application, and are not intended to be the sole limitation to the embodiments.
[0054] It should be noted that, for the sake of simplicity of description, the aforementioned method embodiments are all expressed as a series of action combinations, but those skilled in the art should know that the present application is not limited to the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously.
[0055] In summary, in the construction method for dismantling the non-solid box girder of the ramp provided by the present invention, by dividing the non-solid box girder into three parts and cutting the three parts in batches, it is ensured that the box girder will not slip horizontally and vertically during dismantling, and the weight of the cut blocks can be greatly reduced, the requirements for mechanical configuration can be reduced, the impact of site constraints can be reduced, and costs can be saved.
[0056] The above description is only a description of the preferred embodiments of the present invention, and is not intended to limit the scope of the present invention. Any changes or modifications made by a person skilled in the art in the field of the present invention based on the above disclosure shall fall within the scope of protection of the claims.
Claims
1. A construction method for removing a non-solid box girder of a ramp, characterized in that: include: S1: erect full support under the non-solid box girder; S2: Remove the ramp surface pavement; S3: Cut and remove the crash wall; S4: Divide the non-solid box girder into three parts, cut the three parts in batches, and use a truck crane to lift and remove them.
2. The construction method for removing a non-solid box girder of a ramp as claimed in claim 1, characterized in that: Step S1 includes: The full-hall support is set up with a horizontal distance of 0.6m, a vertical distance of 1.8m and a step distance of 2m; Connect the wall ties of the full-height bracket to the column piers.
3. The construction method for removing a non-solid box girder of a ramp according to claim 1, characterized in that: Step S2 includes: A small pickaxe machine is used to chisel away the ramp pavement layer in a demolition construction sequence from high to low.
4. The construction method for removing a non-solid box girder of a ramp as claimed in claim 1, characterized in that: Step S3 includes: Use a drilling machine to open cutting process holes and lifting process holes on the crash wall; Use a wire saw to cut the crash wall.
5. The construction method for removing a non-solid box girder of a ramp as claimed in claim 4, characterized in that: The process of using a drilling machine to open cutting process holes and hoisting process holes on the anti-collision wall includes: A cutting process hole is horizontally opened close to the top plate surface of the non-solid box beam, and the diameter of the cutting process hole is 60mm; Two lifting process holes are opened, and the diameter of each lifting process hole is 100mm.
6. The construction method for removing a non-solid box girder of a ramp as claimed in claim 4, characterized in that: The method of cutting the anti-collision wall by using a wire saw comprises: The length of a single cutting block is 6000mm.
7. The construction method for removing a non-solid box girder of a ramp as claimed in claim 1, characterized in that: Step S4 includes: Marking cutting lines on non-solid box beams; The non-solid box girder is cut into five pieces according to the cutting line, including: two A box girder tops, one B box girder crossbeam and two C box girder bottoms; Use a truck crane to lift and remove from top to bottom.