Construction method for sector pile of covered and excavated station
By using prefabricated filling formwork and steel cages in the construction of fan piles at the cover excavation station, the problems of difficulty in removing excess fan piles and waste of concrete are solved, the construction progress and structural strength are improved, and the safety of retaining piles is ensured.
Patent Information
- Application Number
- CN202411457622.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-18
- Publication Date
- 2024-11-22
AI Technical Summary
In the existing method of fan-shaped pile construction of cover excavation stations, the removal of excess fan-shaped piles is difficult, concrete waste is severe, construction progress is slow, and the overall structural strength and safety are affected.
The prefabricated filling formwork method is used to isolate the excess fan-shaped piles through the steel cage and the soft filling module, reduce the concrete pouring amount, and install and position it in the pile foundation hole to ensure the integrity and structural strength of the useful fan-shaped piles.
It reduces the overcontamination of concrete of fan-shaped piles, reduces the mechanical cost and noise pollution of removing excess fan-shaped piles, improves the construction progress and pile strength, and ensures the safety performance of retaining piles.
Smart Images

Figure CN118997178A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of subway station construction, and in particular to a method for constructing fan-shaped piles in a cover-and-cut station. Background Art
[0002] When using the cover-excavation construction method, the foundation pit retaining piles have two functions: one is to serve as the vertical support of the cover-excavation top plate, and the other is to serve as the slope protection piles and retaining piles of the foundation pit. Based on its dual role, the fan-shaped pile structure product is introduced in the design.
[0003] Compared with open excavation, cover excavation construction has limited application of large machinery and a longer overall construction period. The construction of fan-shaped piles is a key process for the speed of cover excavation top plate construction. The traditional construction process of fan-shaped piles is exactly the same as that of bored cast-in-place piles. However, after the pouring is completed, a part of the fan-shaped pile body cannot provide support, which also affects the next structural construction. When the foundation pit is excavated, the excess fan-shaped pile body needs to be cut off with an excavator cold chisel or rope saw. This process is not only uneconomical, but also causes the pile facade to be uneven, and often even destroys the integrity of the remaining fan-shaped pile body, thereby affecting the safety and quality of the fan-shaped pile body as a retaining pile. The existing construction process of fan-shaped piles can be summarized as follows: First, the redundant fan-shaped piles not only waste concrete, but also occupy the construction space of the cover excavation top slab, so they must be chiseled out; Secondly, the concrete grade of the retaining piles is C35, which has high strength. It is difficult to break the redundant fan-shaped piles with an excavator, which wastes a lot of time. Finally, there is no working gap between the redundant pile and the useful pile, and the useful pile is often damaged during chiseling, which reduces the strength of the useful pile and affects the safety performance of the useful pile as a retaining pile; a large amount of noise is generated during the chiseling of the redundant pile.
[0004] The existing construction method of using simple bamboo plywood to isolate the space facilitates the separation of the concrete to be broken and the original concrete by restricting the flow direction of the concrete, but does not consider the overall structural strength of the pile. Summary of the invention
[0005] The purpose of this application is to provide a method for constructing fan-shaped piles for a covered and excavated station, which reduces the overconsumption of concrete for forming the fan-shaped piles by using prefabricated filling templates, reduces the difficulty of breaking the fan-shaped piles, speeds up the overall construction progress, and at the same time can enhance the structural strength of the entire pile forming process, avoid damage to the solid pile part of the fan-shaped pile body, maintain the integrity of the pile foundation, and ensure the safety of the foundation pit.
[0006] In order to achieve the above object, the present invention provides a method for constructing fan-shaped piles of a cover-and-cut station, comprising the following steps: After the pile foundation pit of the retaining pile is explored, the pile foundation holes are drilled according to the pile foundation points that have been determined and accepted; Processing a steel cage for the retaining pile, the steel cage comprising a useful fan-shaped pile body steel cage of a semicircular wheel frame, and a steel cage corresponding to the redundant fan-shaped pile body; A soft filling module of a semi-cylindrical solid structure is prepared according to the elevation of the useful fan-shaped pile body, and the soft filling module is installed and fixed in the steel cage, and the soft filling module corresponds to the redundant fan-shaped pile body of the retaining pile; Install and position the steel cage with the soft filling module fixed in place in the pile foundation hole, and pour the retaining pile concrete; After the top cap beam is constructed on the top of the useful fan-shaped pile body, the foundation pit is excavated; After excavating the foundation pit, remove the soft filling modules of the redundant sector piles to complete the construction of the sector piles of the cover-excavation station.
[0007] In an optional embodiment, the soft filling module is installed on the top of the steel cage, and the steel cage also includes a cylindrical retaining pile main body steel cage, and the useful fan-shaped pile body steel cage and the steel cage are relatively arranged on both sides of the top of the retaining pile main body steel cage.
[0008] In an optional embodiment, the useful fan-shaped pile body steel cage includes peripheral main bars, isolation main bars and D-shaped stirrups, the peripheral main bars and the isolation main bars are arranged in a semicircle on the cross-section of the steel cage through the stirrups, the retaining pile body steel cage includes retaining pile main bars, the retaining pile main bars constitute the peripheral main bars of the useful fan-shaped pile body steel cage, and at least a portion of the top of the retaining pile main bars extends into the steel cage of the soft filling module for positioning the soft filling module.
[0009] In an optional embodiment, the steel cage includes cage main bars, the cage main bars are connected to the retaining pile main bars, and the cage main bars are evenly spaced on the semicircular periphery of the steel cage, a plurality of cage stirrups are spaced apart in the length direction of the steel cage, and the isolation main bars, the cage main bars and the cage stirrups constitute the installation space of the soft filling module.
[0010] In an optional embodiment, the soft filling module includes a polystyrene foam column with a semicircular cross-section, the polystyrene foam column includes a regular template arc surface and a template plane, the template plane is installed toward the fan-shaped pile body steel cage, and the template arc surface faces the back soil side of the retaining pile.
[0011] In an optional embodiment, a module bottom plate and a module top plate are fixedly connected to the steel cage, the soft filling module is fixed between the module bottom plate and the module top plate, and the module bottom plate and the module top plate are fixed to the steel cage by fixing steel bars and plate-sealing wires; An isolation plate is provided on the back-soil side of the useful sector-shaped pile body reinforcement cage, and the isolation plate is fixed to the useful sector-shaped pile body reinforcement cage by isolation plate iron wire; The template plane is arranged in close contact with the isolation plate, and both side surfaces of the isolation plate are coated with a release agent.
[0012] In an optional embodiment, the top of the useful sector-shaped pile body reinforcement cage is connected to two positioning bars above the ground, and the plane defined by the two positioning bars is parallel to the plane of the sector-shaped pile body.
[0013] In an optional embodiment, the pouring of the retaining pile concrete includes three stages, namely, the pouring stage from the bottom of the pile foundation hole to 1.5m above the pile bottom of the retaining pile, the pouring stage from 1.5m above the pile bottom of the retaining pile to the pile bottom of the fan-shaped pile, and the pouring stage of the fan-shaped pile; During the pouring stage from the bottom of the pile foundation hole to 1.5m above the pile bottom of the retaining pile, the concrete conduit is inserted 30-60cm above the pile bottom. The amount of concrete poured at one time is enough to bury the conduit in the concrete for more than 1m, and the pouring speed is 1m³ / min; During the pouring stage from 1.5m above the bottom of the retaining pile to the bottom of the fan-shaped pile, the amount of concrete poured at one time is sufficient to ensure that the depth of the conduit buried in the concrete is 2-4m, and the pouring speed is 0.75m³ / min; During the pouring stage of the fan-shaped pile, the pouring speed is 0.5m³ / min.
[0014] In an optional implementation, when removing the redundant soft filling modules of the sector-shaped piles, the soft filling modules more than 1 m above the cover excavation top plate are removed.
[0015] In an optional embodiment, the volume of the soft filling module is larger than the volume of the useful sector-shaped pile body, and both sides of the template plane on the soft filling module protrude 5 cm from both sides of the docking surface of the useful sector-shaped pile body.
[0016] The method for constructing fan-shaped piles for cover-and-cut stations disclosed in the present invention reduces the over-consumption of concrete in the fan-shaped piles and the mechanical cost for removing redundant fan-shaped pile bodies, reduces noise pollution, ensures the quality of useful fan-shaped pile bodies, enables useful fan-shaped pile bodies to meet design requirements, and achieves the safety requirements of retaining piles, and shortens the construction period of the top slab of the cover-and-cut station. At the same time, the filling and installation of soft filling modules in the steel cage of the retaining piles can ensure the structural strength of the entire retaining pile during the casting construction process. The combination of the cast concrete of the useful fan-shaped pile body and the soft filling module can reduce the difficulty of disassembling the soft filling module under the premise of ensuring the strength of the entire pile, thereby greatly improving the quality of the fan-shaped piles and the construction conditions.
[0017] Other features and advantages of the present application will be described in detail in the subsequent detailed description. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0019] Figure 1 It is a schematic diagram of the process of the construction method of the fan-shaped piles of the cover and excavation station in this application; Figure 2 It is a schematic diagram of the structure of the steel cage of the retaining pile, the useful fan-shaped pile body steel cage and the steel cage; Figure 3 for Figure 2 Schematic diagram of the top view structure.
[0020] icon: 1- Useful fan-shaped pile reinforcement cage; 11- Peripheral main reinforcement; 12- Isolation main reinforcement; 13- Stirrups; 14- Positioning reinforcement; 2-reinforcement cage; 21-cage main reinforcement; 22-cage stirrups; 23-module bottom plate; 24-module top plate; 3-soft filling module; 31-polystyrene foam column; 4-main steel cage; 41-main reinforcement of retaining piles; 5-Isolation board. DETAILED DESCRIPTION
[0021] In order to make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all of the embodiments. The components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various different configurations.
[0022] In the description of this application, it should be noted that the terms "inside", "outside", etc. indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, or the orientation or positional relationship in which the product of the application is usually placed when in use, which is only for the convenience of describing this application and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on this application. In addition, the terms "first", "second", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.
[0023] In the description of this application, it should also be noted that, unless otherwise clearly specified and limited, the terms "disposed" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0024] The method for constructing sector piles for cut-and-cover stations in the present application is mainly used in the process of constructing sector piles during the process of cut-and-cover stations. Specifically, necessary and easily removable modules are provided to fill the space before pouring, occupying the excess sector pile bodies that need to be removed, thereby facilitating the subsequent stripping of the excess sector pile bodies from the useful sector pile bodies, and facilitating the construction of sector piles for cut-and-cover stations.
[0025] In the description of the technical solution of the present application, the useful sector-shaped pile body refers to the sector-shaped pile part of the pile, and the redundant sector-shaped pile body refers to the filling module that needs to be peeled off.
[0026] See also Figure 1 The fan-shaped pile construction method of the cover-and-cut station shown includes the following steps: After the pile foundation pit of the retaining pile is explored, the pile foundation holes are drilled according to the pile foundation points that have been determined and accepted; Processing a steel cage for retaining piles, the steel cage comprises a useful fan-shaped pile body steel cage 1 of a semicircular wheel frame, and a steel cage 2 corresponding to a redundant fan-shaped pile body; A semi-cylindrical solid structure soft filling module 3 is prepared according to the elevation of the useful fan-shaped pile body, and the soft filling module 3 is installed and fixed in the steel cage 2, and the soft filling module 3 corresponds to the redundant fan-shaped pile body of the retaining pile; The steel cage after the soft filling module 3 is installed and fixed is installed and positioned in the pile foundation hole, and the retaining pile concrete is poured; After the top cap beam is constructed on the top of the useful fan-shaped pile body, the foundation pit is excavated; After the foundation pit is excavated, the soft filling modules 3 of the redundant sector pile bodies are removed to complete the construction of the sector piles of the cover excavation station.
[0027] By setting up the soft filling module 3, it is possible to avoid the need to remove the amount of concrete poured in the pile body at a later stage, thereby reducing the overconsumption of concrete. The soft filling module 3 is easy to dismantle, which reduces the mechanical cost of dismantling the redundant fan-shaped pile body, while reducing noise pollution and improving the living environment around the construction site. At the same time, through the combination of the soft filling module 3 with the useful fan-shaped pile body concrete during the concrete pouring process, the overall structural strength of the retaining pile can be improved. Combined with the easy-to-dismantle characteristics of the soft filling module 3, damage to the useful fan-shaped pile body is avoided, the quality of the fan-shaped pile is guaranteed, and the useful fan-shaped pile body meets the design requirements and reaches the safety requirements of its retaining pile. At the same time, the angle of easy dismantling shortens the construction period of the subsequent cover and excavation of the station roof.
[0028] The method for constructing fan-shaped piles for covered and excavated stations of the present invention is suitable for one-time pile construction of underwater bored piles, and is also suitable for filling and demolition construction of fan-shaped piles and special-shaped pile foundations of municipal foundation projects.
[0029] See also Figure 2-Figure 3 The steel cage comprises a useful fan-shaped pile body steel cage 1 of a semicircular wheel frame, which is mainly used to form a fan-shaped pile structure of a useful fan-shaped pile body.
[0030] The soft filling module 3 mainly plays an effective shaping role and is arranged opposite to the useful fan-shaped pile body reinforcement cage 1, that is, the poured fan-shaped pile. The semi-cylindrical solid structure of the soft filling module 3 can resist the pressure of concrete and reduce the extrusion deformation of the concrete.
[0031] By setting up the steel cage 2, the soft filling module 3 can be limited in the cage space relative to the useful fan-shaped pile steel cage 1, preventing the soft filling module 3 from being pushed out of the air by buoyancy and shear force during pile foundation drilling and underwater concrete pouring, causing the soft filling module 3 to occupy excess space of the fan-shaped pile to be removed.
[0032] After the top cap beam is constructed on the top of the useful fan-shaped pile body, the foundation pit is excavated, which is conducive to the removal of the soft filling module 3 of the redundant fan-shaped pile body after the foundation pit excavation, and the subsequent top plate construction of the cover and excavation station.
[0033] After excavating the foundation pit, the soft filling modules 3 of the redundant sector pile bodies are removed to expose the cast sector piles, thus completing the construction of the sector piles of the cover-and-cut station, and then further carrying out the construction of the subsequent structures of the cover-and-cut station.
[0034] In one specific embodiment, the soft filling module 3 is installed on the top of the reinforcement cage of the retaining pile, that is, the redundant fan-shaped pile bodies that need to be removed and the fan-shaped piles of the useful fan-shaped pile bodies corresponding to the soft filling module 3 are arranged on the top of the retaining pile, and the cylindrical body of the retaining pile is at the bottom of the soft filling module 3 and the fan-shaped pile.
[0035] Based on this, the steel cage also includes a cylindrical retaining pile main body steel cage 4, a fan-shaped pile body steel cage 1 and a steel cage 2 are relatively arranged on both sides of the top of the retaining pile main body steel cage 4.
[0036] In view of the structural angle of the fan-shaped pile, a fan-shaped pile body steel cage 1 includes outer main bars 11, isolation main bars 12 and D-shaped stirrups 13. The outer main bars 11 and the isolation main bars 12 are arranged in a semicircular shape on the cross section of the steel cage through the stirrups 13, which can facilitate the formation of a fan-shaped pile with a semicircular cross section during the concrete pouring process.
[0037] The main function of the isolation main reinforcement 12 is to fix the isolation plate 5 so that the module plane of the semi-cylindrical structure soft filling module 3 fits on the isolation plate 5. During the pouring process, the isolation main reinforcement 12 can form the structural reinforcement of the fan-shaped pile, and at the same time, the isolation plate 5 can be used to isolate the soft filling module 3 from the fan-shaped pile concrete structure, which is beneficial to the subsequent demolition.
[0038] The D-shaped stirrups 13 can connect the outer main reinforcement 11 and the isolation main reinforcement 12 to ensure the structural strength of the fan-shaped pile reinforcement cage.
[0039] In order to connect the fan-shaped pile and the retaining pile into an integral structure and ensure the structural strength of the fan-shaped pile, the retaining pile main steel cage 4 includes retaining pile main reinforcement 41. Furthermore, the retaining pile main reinforcement 41 includes main reinforcement arranged on the periphery of the retaining pile main steel cage 4. At the same time, the retaining pile main reinforcement 41 constitutes the outer main reinforcement 11 of the fan-shaped pile body steel cage 1, that is, after pouring, the lower retaining pile body can be combined with the fan-shaped pile body to ensure the structural stability of the pile.
[0040] From the perspective of the installation of the soft filling module 3, at least a portion of the top of the main reinforcement 41 of the retaining pile extends into the steel cage 2 of the soft filling module 3, and the extended portion of the outer main reinforcement 11 forms an enclosed space for the steel end, which is used to position the soft filling module 3, so that the soft filling module 3 can be quickly and conveniently installed in the steel cage 2.
[0041] The enclosed space formed by the steel cage 2 is mainly used to meet the position limiting requirements of the soft filling module 3, so there is no need to set too many steel bars.
[0042] Specifically, the steel cage 2 includes main cage bars 21, which are connected to the main reinforcement 41 of the retaining pile extending into the steel cage 2, and the main cage bars 21 are evenly spaced on the semicircular periphery of the steel cage 2 to form the blocking reinforcement on the periphery. In this embodiment, it can be specifically arranged according to the volume of the soft filling module 3, and can be three or four, to prevent the soft filling module 3 from running out of the gap in the side.
[0043] In order to enhance the limiting effect of the soft filling module 3 in the axial direction, a plurality of cage stirrups 22 are further arranged at intervals in the length direction of the steel cage 2 and the cage main reinforcement 21. The cage stirrups 22 and the cage main reinforcement 21 constitute the specific structure of the steel cage 2, so that the isolation main reinforcement 12, the cage main reinforcement 21 and the cage stirrups 22 constitute the installation space of the soft filling module 3, so that the soft filling module 3 is fixed in the steel cage 2.
[0044] When the pile foundation concrete is poured, the soft filling module 3 occupies the extra space of the fan-shaped pile body and is enclosed in the foundation of the fan-shaped pile.
[0045] The soft filling module 3 in the present invention is mainly used to play a good shaping role. The soft filling module 3 used for shaping needs to be made of lightweight materials for easy installation, and should have sufficient rigidity to ensure that its deformation can be controlled during underwater concrete pouring. It should also ensure that the material itself has sufficient stability to avoid it from being too tightly bonded to the concrete after the pile foundation is poured, and it cannot be successfully chiseled out later.
[0046] From this perspective, the soft filling module 3 preferably uses a material with good plasticity, high shear resistance and easy disassembly. Specifically, the material of the soft filling module 3 in the present application is polystyrene foam. Furthermore, the soft filling module 3 includes a polystyrene foam column 31 with a semicircular cross-section.
[0047] Polystyrene foam has the characteristics of low quality, low price, low water absorption and simple molding process. It is prefabricated in the processing process. The polystyrene foam columns 31 are all customized in the processing plant and cut into fan-shaped columns of suitable sizes according to the pile diameter. The column length is generally processed into 2m / section, and some 1m / section and 0.5m / section fan-shaped foam columns are appropriately processed as adjustment sections.
[0048] The polystyrene foam column 31 includes a regular template arc surface and a template plane, the template plane is installed toward the fan-shaped pile body reinforcement cage and fits with the isolation plate 5, and the template arc surface faces the back soil side of the retaining pile. This arrangement can facilitate the formation of the fan-shaped pile and the removal of the polystyrene foam column 31 after the foundation pit is excavated.
[0049] The density of the polystyrene foam column 31 is about 30kg / m³. In one specific application example, the density of water in the pile hole is greater than 1000kg / m³, and the density of underwater concrete is greater than 2500kg / m³. The density of the polystyrene foam column 31 is much smaller than the density of water and underwater concrete. When the steel cage is lowered and underwater concrete is poured, the buoyancy generated is very likely to push the foam column out of the pile body. Therefore, measures must be taken to fix the polystyrene foam column on the steel cage to ensure its firmness even when underwater concrete is poured.
[0050] In addition to the positioning of the soft filling module 3 by the above-mentioned steel cage 2, on its basis, a module bottom plate 23 and a module top plate 24 are fixedly connected to the steel cage, and the soft filling module 3 is fixed between the module bottom plate 23 and the module top plate 24. A template with a fan-shaped surface slightly larger than the fan-shaped surface of the soft filling module 3 is made by using 15 mm thick bamboo plywood in advance, which serves as the module bottom plate 23 and the module top plate 24 respectively.
[0051] By using 10mm thick bamboo plywood as the isolation plate 5 between the useful fan-shaped pile body and the redundant fan-shaped pile body, during the installation process, the module bottom plate 23 is installed on the steel cage, and it is firmly fixed with 2 Φ25mm fixing steel bars and several 10# plate sealing wires; then the isolation plate 5 is installed and fixed on the useful fan-shaped pile steel cage 1 with 10# wire; the polystyrene foam columns 31 as the finalized ones are placed in sequence and tied firmly with 10# wire.
[0052] After the polystyrene foam column 31 is installed, three steel bars with the same diameter as the main reinforcement 41 of the retaining pile are used as fixed main reinforcements on the side of the polystyrene foam column 31 to form the cage main reinforcement 21.
[0053] Then, cage stirrups 22 are made of Φ20mm steel bars every 2m in the length direction and welded to the cage main bars 21. Finally, the module capping plate 24 is installed on the top and fixed firmly with 2 Φ25mm fixed steel bars and several 10# capping wires. In this way, a steel cage 2 is made for the shaped module of the polystyrene foam column 31, and the module capping plate 24, the isolation plate 5, the polystyrene foam column 31 and the module bottom plate 23 are fixed on the steel cage of the retaining pile.
[0054] Furthermore, the isolation plate 5 is arranged on the back-soil side of the useful fan-shaped pile body reinforcement cage 1, and the isolation plate 5 is fixed to the useful fan-shaped pile body reinforcement cage 1 through the isolation plate 5 wire, so that the polystyrene foam column 31 is installed on the back-soil side, which is convenient for its removal after the foundation pit is excavated.
[0055] The template plane is arranged in contact with the soil-receiving side plate surface of the isolation plate 5 , and both side plate surfaces of the isolation plate 5 are coated with a release agent.
[0056] The isolation board 5 has two functions. First, it is used to isolate the polystyrene foam column 31 of the shaping module from the useful fan-shaped pile body; second, when removing the redundant fan-shaped pile body, the isolation board 5 can effectively separate from the useful fan-shaped pile body. Compared with when the release agent is not applied, it is more difficult for the isolation board 5 to be separated from the concrete of the useful fan-shaped pile body. After the release agent is applied to both sides of the isolation board 5, the shaping module and the isolation board 5 can be smoothly removed from the concrete of the fan-shaped pile.
[0057] In this application, a shaping module of a polystyrene foam column 31 is used, and the material of the shaping module is polystyrene foam. If the fan-shaped surface is not parallel to the foundation pit surface, the exposed plane of the useful fan-shaped pile body will form a certain angle with the foundation pit surface, and the removal of the redundant fan-shaped pile body will cause great trouble to the crown beam construction. Secondly, in order to make the crown beam better, the useful fan-shaped pile body needs to be partially broken, which will reduce the cross-section of the solid pile part, reduce the designed bending bearing capacity, and increase the risk of the foundation pit.
[0058] Therefore, it is necessary to position and install the useful sector-shaped pile reinforcement cage 1 so that the exposed plane of the useful sector-shaped pile body is parallel to the foundation pit surface, thereby reducing the removal damage to the useful sector-shaped pile body when removing the redundant sector-shaped pile body.
[0059] Based on this, two positioning bars 14 above the ground are connected to the top of the useful fan-shaped pile steel cage 1 to position the steel cage when it is lowered into the pile foundation hole. The plane determined by the two positioning bars 14 is parallel to the plane of the fan-shaped pile body. After the casting is completed, the plane of the useful fan-shaped pile body can be parallel and on the excavation surface of the foundation pit, thereby minimizing the demolition of the fan-shaped pile.
[0060] The density of the polystyrene foam column 31 in the present invention is about 30kg / m³, the density of water in the pile foundation hole is greater than 1000kg / m³, and the density of underwater concrete is greater than 2500kg / m³. The density of the polystyrene foam column 31 is much smaller than the density of water and underwater concrete. When pouring underwater concrete, there is a large impact force on the foam column, so the concrete pouring speed needs to be controlled.
[0061] After the polystyrene foam column 31 is installed on one side of the redundant sector-shaped pile body, concrete pouring can only be carried out on one side of the useful sector-shaped pile body. When the diameter of the retaining pile is 1.2m, the steel cage space on one side of the useful sector-shaped pile body is about 400mm. In order to prevent the conduit from being stuck by the steel cage, a φ250mm conduit is selected for concrete pouring, and the position of the pipe clamp is about φ300mm.
[0062] When the diameter of the retaining pile is 1.5m, the space for the steel cage on one side of the fan-shaped pile body is about 500mm. In order to prevent the conduit from being stuck by the steel cage, a φ300mm conduit can be used for concrete pouring, and the position of the pipe clamp is about φ350mm.
[0063] From the perspective of pouring in steps and stages, the pouring of retaining pile concrete includes three stages, namely, the pouring stage from the bottom of the pile foundation hole to 1.5m above the bottom of the retaining pile, the pouring stage from 1.5m above the bottom of the retaining pile to the bottom of the fan-shaped pile, and the pouring stage of the fan-shaped pile.
[0064] First, during the pouring stage from the bottom of the pile foundation hole to 1.5m above the bottom of the retaining pile, the concrete conduit is inserted to a height of 30-60cm above the pile bottom. The hopper must store enough concrete for one pouring to meet the initial pouring of concrete when the conduit is buried more than 1m in the concrete, to avoid slurry overflow in the pipe due to the lower end of the conduit not being buried in the concrete, which may lead to pouring failure.
[0065] It allows a large amount of concrete to be violently flushed to the bottom of the hole through the mud in the conduit under its own weight, which can flush away the sediment at the bottom of the hole, ensure a good combination between the pile end of the retaining pile and the stratum, and improve the pile quality and pile end bearing capacity. The first pouring volume of a 1.2m diameter pile foundation is about 3m³, and the first pouring volume of a 1.5m diameter pile foundation is about 4m³, and the pouring speed is 1m³ / min; Secondly, during the pouring stage from 1.5m above the pile bottom of the retaining pile to the pile bottom of the fan-shaped pile, the buried depth of the conduit should be controlled at 2-4m, and the pouring speed and the conduit lifting speed should be slowed down compared with the normal pile foundation pouring. The pouring speed is reduced from 1m³ / min to 0.75m³ / min to control the shear force on the fixed module polystyrene foam column 31 when the mud is pressed back during concrete pouring. The conduit lifting should be slow and uniform to avoid excessive lifting at one time.
[0066] The last step is pouring the fan-shaped pile concrete. Here, the polystyrene foam column 31 of the finalized module is formally filled in the concrete. The density of the concrete is greater than the impact force of the mud. The pouring speed should be slower, from 0.75m³ / min to 0.5m³ / min, and the condition of the finalized module should be observed at any time.
[0067] The fan-shaped piles have two functions: one is to serve as the vertical support of the excavation top plate, and the other is to serve as the slope protection piles and retaining piles of the foundation pit. Therefore, the redundant fan-shaped piles need to be removed to provide construction space for the lower crown beam and the excavation top plate. According to experience, the redundant fan-shaped piles only need to be removed to about 1m above the top plate, which can meet the subsequent construction space, reduce the removal volume and indirectly reduce the damage to the useful fan-shaped piles.
[0068] In order to avoid encroachment of retaining piles, the retaining piles should generally be extended a certain distance outside the foundation pit. The amount of extension is determined by the machinery and equipment, the construction experience of the machinery operator, the on-site geological conditions and the length of the pile foundation.
[0069] When the length of the pile foundation in the gravel stratum is about 25m, the amount of expansion is 10cm, and when the length of the pile foundation is about 35m, the amount of expansion is 15cm. By making the size of the polystyrene foam column 31 of the shaping module 5cm larger than the useful fan-shaped pile surface, the polystyrene foam column 31 can be installed more firmly, and basically maintain the original size after being squeezed by concrete, which can effectively control the excess consumption of concrete.
[0070] The fan-shaped pile construction method for covered and cut stations in this application has been well applied in the construction of covered and cut top slab retaining piles at Wuhouci Station and Gaoshengqiao Station of the Phase III Project of Chengdu Metro Line 10.
[0071] The number of fan-shaped piles at Gaoshengqiao Station and Wuhouci Station totals 796. The depth of the foundation pit at Wuhouci Station is about 26.7m, the depth of the retaining piles inserted into the bottom plate is 5m, the total length of the pile is 31.7m, and the fan-shaped part of the pile top is 6m to 7.5m long. In the process of fan-shaped pile formation, the installation and fixing process of the soft filling module 3 is simple and convenient, with strong on-site operability, which can effectively reduce the amount of concrete used; after the foundation pit is excavated, the soft filling module 3 of the semi-cylindrical solid structure is broken, and the efficiency is significantly improved compared with the full concrete breaking.
[0072] Since the polystyrene foam column 31 is light in material, the breaking height of the fan-shaped pile can be reduced on site according to the working space required for the construction work, which further reduces the workload and further speeds up the overall construction progress of the cover excavation top plate.
[0073] Through the mature application of the fan-shaped pile construction method, we have not only improved work efficiency and saved costs, but also improved the side appearance quality and structural strength of the fan-shaped piles, and comprehensively saved energy consumption in processes such as concrete transportation and pile foundation removal.
[0074] The role of the fixed module combination is, on the one hand, to save concrete, and on the other hand, to reduce the difficulty of chiseling out excess fan-shaped piles in the later stage and save the number of machine shifts. In addition, after removing the excess fan-shaped piles, the flatness of the sides of the useful fan-shaped piles can be maintained, which is convenient for the later construction of the crown beam, waterproofing and top plate structure.
[0075] The module capping plate 24 is preferably located at the top of the fan-shaped pile. The isolation plate 5 needs to leave a protective layer thickness of the useful fan-shaped pile body on the soil side, and the soil side needs to be close to the shaping module to facilitate the separation of the useful fan-shaped pile body from the shaping module.
[0076] In specific operations, fixed steel bars are strictly set on the module bottom plate 23 and the module top plate 24, with no less than 2 Φ25mm steel bars above and below; cage stirrups 22 for reinforcement are strictly set on the skeleton steel bars, and the steel bar specifications shall not be less than Φ20mm@2m.
[0077] Sealing plates are set on the upper and lower parts of the finalized module as required, and the elevation of the bottom sealing plate is located at the top of the circular pile.
[0078] Check the welding quality of stirrups 13 and main reinforcement of steel cage at each location, and make sure the welding length meets the specification requirements.
[0079] Because the lengths of the fan-shaped piles are different, it is necessary to calculate the materials used for each pile in advance according to the pile number, and make a material usage ledger, including the length and combination of the shaping module, the length and combination of the isolation board 5, the size of the top and bottom sealing plates, the length of the suspension bar, the length of the positioning bar 14, the size and quantity of the reinforcing stirrups 13, etc. After the steel cage and the shaping module are fixed, they can be hoisted and placed in the hole only after three inspections.
[0080] It should be noted that, in the absence of conflict, the features in the embodiments of this application may be combined with each other.
[0081] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A method for constructing fan-shaped piles for a cover-and-cut station, characterized in that: The following steps are involved: After the pile foundation pit of the retaining pile is explored, the pile foundation holes are drilled according to the pile foundation points that have been determined and accepted; Processing a steel cage for the retaining pile, the steel cage comprising a useful fan-shaped pile body steel cage of a semicircular wheel frame, and a steel cage corresponding to the redundant fan-shaped pile body; A soft filling module of a semi-cylindrical solid structure is prepared according to the elevation of the useful fan-shaped pile body, and the soft filling module is installed and fixed in the steel cage, and the soft filling module corresponds to the redundant fan-shaped pile body of the retaining pile; Install and position the steel cage with the soft filling module fixed in place in the pile foundation hole, and pour the retaining pile concrete; After the top cap beam is constructed on the top of the useful fan-shaped pile body, the foundation pit is excavated; After excavating the foundation pit, remove the soft filling modules of the redundant sector piles to complete the construction of the sector piles of the cover-excavation station.
2. The method for constructing fan-shaped piles for a cover-and-cut station according to claim 1, characterized in that: The soft filling module is installed on the top of the steel cage, and the steel cage also includes a cylindrical retaining pile main body steel cage. The useful fan-shaped pile body steel cage and the steel cage are relatively arranged on both sides of the top of the retaining pile main body steel cage.
3. The method for constructing fan-shaped piles for a cover-and-cut station according to claim 2, characterized in that: The useful fan-shaped pile body steel cage includes peripheral main bars, isolation main bars and D-shaped stirrups, the peripheral main bars and the isolation main bars are arranged in a semicircle on the cross-section of the steel cage through the stirrups, the retaining pile main body steel cage includes retaining pile main bars, the retaining pile main bars constitute the peripheral main bars of the useful fan-shaped pile body steel cage, and at least a part of the top of the retaining pile main bars extends into the steel cage of the soft filling module for positioning the soft filling module.
4. The method for constructing fan-shaped piles for a cover-and-cut station according to claim 3, characterized in that: The steel cage includes main cage bars, which are connected to the main bars of the retaining piles, and the main cage bars are evenly spaced on the semicircular periphery of the steel cage. A plurality of cage stirrups are arranged at intervals in the length direction of the steel cage. The isolation main bars, the main cage bars and the cage stirrups constitute the installation space of the soft filling module.
5. The method for constructing fan-shaped piles for a cover-and-cut station according to claim 3, characterized in that: The soft filling module includes a polystyrene foam column with a semicircular cross-section, and the polystyrene foam column includes a regular template arc surface and a template plane. The template plane is installed toward the fan-shaped pile body reinforcement cage, and the template arc surface faces the back soil side of the retaining pile.
6. The method for constructing fan-shaped piles for a cover-and-cut station according to claim 5, characterized in that: The steel cage is fixedly connected with a module bottom plate and a module top plate, the soft filling module is fixed between the module bottom plate and the module top plate, and the module bottom plate and the module top plate are fixed to the steel cage by fixing steel bars and plate-sealing wires; An isolation plate is provided on the back-soil side of the useful sector-shaped pile body reinforcement cage, and the isolation plate is fixed to the useful sector-shaped pile body reinforcement cage by isolation plate iron wire; The template plane is arranged in close contact with the isolation plate, and both side surfaces of the isolation plate are coated with a release agent.
7. The method for constructing fan-shaped piles for a cover-and-cut station according to claim 5, characterized in that: The top of the useful fan-shaped pile body reinforcement cage is connected with two positioning bars above the ground, and the plane defined by the two positioning bars is parallel to the plane of the fan-shaped pile body.
8. The method for constructing fan-shaped piles for a cover-and-cut station according to claim 5, characterized in that: The pouring of retaining pile concrete includes three stages, namely, the pouring stage from the bottom of the pile foundation hole to 1.5m above the pile bottom of the retaining pile, the pouring stage from 1.5m above the pile bottom of the retaining pile to the pile bottom of the fan-shaped pile, and the pouring stage of the fan-shaped pile; During the pouring stage from the bottom of the pile foundation hole to 1.5m above the pile bottom of the retaining pile, the concrete conduit is inserted 30-60cm above the pile bottom. The amount of concrete poured at one time is enough to bury the conduit in the concrete for more than 1m, and the pouring speed is 1m³ / min; During the pouring stage from 1.5m above the bottom of the retaining pile to the bottom of the fan-shaped pile, the amount of concrete poured at one time is sufficient to ensure that the depth of the conduit buried in the concrete is 2-4m, and the pouring speed is 0.75m³ / min; During the pouring stage of the fan-shaped pile, the pouring speed is 0.5m³ / min.
9. The method for constructing fan-shaped piles for a cover-and-cut station according to claim 5, characterized in that: When removing the soft filling modules of redundant sector-shaped piles, remove the soft filling modules more than 1m above the cover excavation top plate.
10. The method for constructing fan-shaped piles for a cover-and-cut station according to claim 1, characterized in that: The volume of the soft filling module is larger than the volume of the useful sector-shaped pile body, and both sides of the template plane on the soft filling module protrude 5 cm from both sides of the useful sector-shaped pile body docking surface.
Citation Information
Cited By
Variable cross-section cast-in-place pile structure and construction method
CN121272897A