Power transmission line iron tower assembling construction device and construction method under complex terrain conditions
By using structures such as base support rods, fixed sleeves and lifting hydraulic rods in the tower assembly construction device of power transmission line, the problems of unstable and low safety of construction platforms under complex terrain are solved, and better fixation effect and flexibility are achieved sex.
Patent Information
- Application Number
- CN202411317621.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-20
- Publication Date
- 2024-11-22
AI Technical Summary
Under complex terrain conditions, the positioning effect of the tower assembly construction device of existing transmission lines is poor, resulting in unstable construction platform, low safety and insufficient flexibility, and ineffective adjustment.
A device including a construction platform, installation groove and opening groove is designed to ensure platform stability through base support rods, fixed sleeves and positioning rod structures, and adjust the lifting platform height and guardrail position through lifting hydraulic rods and electric push rods. Improve flexibility and security.
Effectively fix the construction platform in complex terrain, avoid dumping risks, improve safety, and adjust the lifting platform and guardrail according to construction needs to enhance the flexibility and safety of the device.
Smart Images

Figure CN118997440A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of iron tower assembly construction, and in particular relates to an assembly construction device and a construction method for an iron tower of a power transmission line under complex terrain conditions. Background Art
[0002] Transmission line towers are generally three-dimensional truss structures formed by hundreds or even thousands of steel towers connected by bolts or rivets. Their cross-sections are mostly square or rectangular, and the cross-section gradually decreases from bottom to top. Each side is a plane truss. Transmission line towers are tower structures used to support and overhead wires, lightning conductors and other accessories. They are tall structures that keep a specified safety distance between wires and wires, wires and towers, wires and lightning conductors, and wires and the ground or cross-over objects. According to their shapes, they are generally divided into five types: wine glass type, cat head type, upper character type, dry character type and barrel type. According to their uses, they are divided into: tension towers, straight towers, corner towers, transposition towers (towers for changing the phase position of wires), terminal towers and spanning towers, etc. According to the uses of towers in transmission lines, they can be divided into straight towers, tension towers, corner towers, transposition towers, spanning towers and terminal towers. Straight pole towers and tension pole towers should be set up in the straight section of the line, corner pole towers should be set up at the turning point of the transmission line, and higher crossing pole towers should be set up on both sides of the crossed span. In order to balance the impedance of the three conductors, transposition pole towers should be set up at a certain distance. Terminal pole towers should be set up at the connection between the transmission line and the substation structure. Steel structure assembly is the on-site hoisting process and its preparation steps. It is to assemble and hoist the various components of large components on the flat ground, or to hoist simple components into place after they are transported to the site.
[0003] In the prior art, the positioning effect of the construction device is poor in complex terrain. When performing construction operations, the device platform is prone to instability, which can easily cause the device platform to topple over, resulting in poor safety. At the same time, the existing device platform is inconvenient to adjust and has poor flexibility. Summary of the invention
[0004] The purpose of the present invention is to provide a transmission line iron tower assembly construction device and a construction method under complex terrain conditions, so as to solve the existing problem that synchronous adjustment with the growth of tree trunks is impossible.
[0005] To solve the above technical problems, the present invention is achieved through the following technical solutions: The present invention is a transmission line tower assembly construction device under complex terrain conditions, comprising a construction platform, an installation groove and an open groove. The peripheral sides of the lower surface of the construction platform are welded with base support rods, the installation grooves are arranged on one surface of the base support rods, the interior of the installation grooves is embedded with connecting shafts, the peripheral side surfaces of the connecting shafts are embedded with rotating parts, the rotating parts and the peripheral side surfaces of the connecting shafts are rotatably matched, the lower surfaces of the rotating parts are welded with fixing sleeves, the interior of the fixing sleeves is embedded with positioning rods, the peripheral side surfaces of one end of the positioning rods are slidably matched with the interior of the fixing sleeves, and the open grooves are arranged on the upper surface of the construction platform, so that the construction platform can also ensure a good fixing effect under complex terrain conditions, avoid instability during construction, avoid the risk of tipping over of the construction platform, and improve the safety of the device when in use.
[0006] Furthermore, the other end of the positioning rod extends to the outside of the fixing sleeve, a surface of the positioning rod is provided with a plurality of threaded holes, a surface of the fixing sleeve is embedded with a positioning bolt, and one end of the positioning bolt passes through a surface of the fixing sleeve.
[0007] Furthermore, one end of the positioning bolt is threadedly engaged with the threaded hole, the peripheral side surface of the positioning bolt is slidingly engaged with the fixing sleeve, and the fixing sleeve and the positioning rod are arranged inside the installation groove.
[0008] Furthermore, two connecting rods are welded to the lower surface of the construction platform, and the two connecting rods are respectively arranged on both sides of the lower surface of the opening groove. A base plate is welded on the lower surface of the two connecting rods, and two lifting hydraulic rods are embedded on the upper surface of the base plate. The two lifting hydraulic rods are arranged relative to each other, which is convenient for adjusting the height of the lifting platform, thereby facilitating the adjustment of the position of the lifting platform and the transported tower assembly according to construction requirements, thereby improving the flexibility of the device when used.
[0009] Furthermore, one end of the two lifting hydraulic rods extends to the top of the construction platform through the open groove, a lifting platform is welded on the upper surface of the two lifting hydraulic rods, guardrail rods are welded on the sides of the upper surface of the construction platform, a first guardrail is welded on the upper surface of the guardrail rods, and two guide rods are welded on both sides of the lower surface of the first guardrail.
[0010] Furthermore, the two guide rods are arranged opposite to each other, one end of the guide rod is welded to the upper surface of the construction platform, the peripheral sides of the guide rods are equipped with guide plates, the guide plates are respectively welded to the two relative surfaces of the lifting platform, and the guide plates are slidably matched with the peripheral sides of the guide rods.
[0011] Furthermore, electric push rods are welded on the circumferential sides of the upper surface of the first guardrail, so as to facilitate adjusting the second guardrail to a suitable position according to the height of the construction workers, and the second guardrail is welded on the upper surface of the electric push rod.
[0012] Furthermore, the construction method of the transmission line tower assembly construction device under complex terrain conditions comprises the following steps: Step 1: First, move the construction platform to the construction position, and then after the base support rod lands, pull out the fixing sleeve and positioning rod inside the installation slot and rotate them to a suitable angle; Step 2: Then, the positioning rod is plugged and fixed to the ground through the sliding fit between the positioning rod and the inside of the fixing sleeve, and the positions of the positioning rod and the fixing sleeve are fixed through the positioning bolts and threaded holes to ensure the stability of the tower assembly when it is lifted; Step 3: The construction workers then stand on the lifting platform to carry out construction work. When construction work at different heights and tower components need to be hoisted, the height of the lifting platform is adjusted through the lifting hydraulic rod, and the sliding between the guide plate and the guide rod is coordinated to facilitate the construction work of the construction workers and the transportation of the tower components to the place; Step 4: Finally, the first guardrail and the second guardrail are used to protect the construction workers when working at high altitudes. At the same time, the electric push rod is used to adjust the second guardrail to a suitable position according to the height of the construction workers. The present invention has the following beneficial effects: 1. The present invention uses the base support rod, the fixing sleeve and the positioning rod structure to ensure a good fixing effect of the construction platform under complex terrain conditions, avoid instability during the construction process, avoid the risk of the construction platform tipping over, and improve the safety of the device when in use.
[0013] 2. The present invention facilitates the adjustment of the height of the lifting platform through the lifting hydraulic rod structure, thereby facilitating the adjustment of the position of the lifting platform and the transported tower components according to construction requirements, thereby improving the flexibility of the device when used. At the same time, the electric push rod structure facilitates the adjustment of the second guardrail to a suitable position according to the height of the construction workers.
[0014] Of course, any product implementing the present invention does not necessarily need to achieve all of the advantages described above at the same time. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for describing the embodiments are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0016] Figure 1 It is a structural schematic diagram of a transmission line tower assembly construction device under complex terrain conditions of the present invention; Figure 2It is a rear view structural schematic diagram of the transmission line tower assembly construction device under complex terrain conditions of the present invention; Figure 3 It is a right side structural schematic diagram of the power transmission line tower assembly construction device under complex terrain conditions of the present invention; Figure 4 It is a front structural schematic diagram of a transmission line tower assembly construction device under complex terrain conditions of the present invention; Figure 5 It is a schematic diagram of the top view of the structure of the power transmission line tower assembly construction device under complex terrain conditions of the present invention; Figure 6 It is a schematic diagram of the bottom structure of the transmission line tower assembly construction device under complex terrain conditions of the present invention.
[0017] In the accompanying drawings, the components represented by the reference numerals are listed as follows: 1. Construction platform; 2. Base support rod; 3. Installation groove; 4. Coupling; 5. Rotating part; 6. Fixed sleeve; 7. Positioning rod; 8. Threaded hole; 9. Positioning bolt; 10. Open groove; 11. Connecting rod; 12. Bottom plate; 13. Lifting hydraulic rod; 14. Lifting platform; 15. Guardrail rod; 16. First guardrail; 17. Guide rod; 18. Guide plate; 19. Electric push rod; 20. Second guardrail. DETAILED DESCRIPTION
[0018] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0019] In the description of the present invention, it should be understood that the terms "upper", "middle", "outer", "inner" and the like indicating directions or positional relationships are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the components or elements referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as limiting the present invention.
[0020] See also Figure 1-Figure 6As shown, the present invention is a transmission line tower assembly construction device under complex terrain conditions, including a construction platform 1, a mounting groove 3 and an open groove 10. The lower surface of the construction platform 1 is welded with a base support rod 2, the mounting groove 3 is arranged on a surface of the base support rod 2, and the interior of the mounting groove 3 is embedded with a connecting shaft 4. The side surfaces of the connecting shaft 4 are embedded with rotating parts 5, and the rotating parts 5 are rotatably matched with the side surfaces of the connecting shaft 4. A fixing sleeve 6 is welded on the lower surface of the rotating part 5, and a positioning rod 7 is embedded in the fixing sleeve 6. The side surface of one end of the positioning rod 7 is slidably matched with the interior of the fixing sleeve 6. The open groove 10 is arranged on the upper surface of the construction platform 1, so that the construction platform 1 can also ensure a good fixing effect under complex terrain conditions, avoid instability during construction, avoid the risk of tipping over of the construction platform 1, and improve the safety of the device when in use.
[0021] The other end of the positioning rod 7 extends to the outside of the fixed sleeve 6. A plurality of threaded holes 8 are provided on one surface of the positioning rod 7. A positioning bolt 9 is embedded on one surface of the fixed sleeve 6. One end of the positioning bolt 9 passes through a surface of the fixed sleeve 6. One end of the positioning bolt 9 is threadedly engaged with the threaded hole 8. The side surface of the positioning bolt 9 is slidably engaged with the fixed sleeve 6. The fixed sleeve 6 and the positioning rod 7 are arranged inside the mounting groove 3.
[0022] Two connecting rods 11 are welded to the lower surface of the construction platform 1, and the two connecting rods 11 are respectively arranged on both sides of the lower surface of the opening groove 10. A bottom plate 12 is welded to the lower surface of the two connecting rods 11, and two lifting hydraulic rods 13 are installed on the upper surface of the bottom plate 12. The two lifting hydraulic rods 13 are arranged relatively to each other, which is convenient for adjusting the height of the lifting platform 14, thereby facilitating the adjustment of the position of the lifting platform 14 and the transported tower components according to construction requirements, thereby improving the flexibility of the device when used.
[0023] One end of the two lifting hydraulic rods 13 extends to the top of the construction platform 1 through the open groove 10, and a lifting platform 14 is welded to the upper surface of the two lifting hydraulic rods 13. Guardrail rods 15 are welded to the sides of the upper surface of the construction platform 1. The first guardrail 16 is welded to the upper surface of the guardrail rod 15, and two guide rods 17 are welded to both sides of the lower surface of the first guardrail 16.
[0024] Two guide rods 17 are arranged opposite to each other, and one end of the guide rod 17 is welded to the upper surface of the construction platform 1. Guide plates 18 are installed on the sides of the guide rods 17. The guide plates 18 are respectively welded to the two opposite surfaces of the lifting platform 14. The guide plates 18 and the sides of the guide rods 17 are slidably matched. Electric push rods 19 are welded on the sides of the upper surface of the first guardrail 16 to facilitate adjusting the second guardrail 20 to a suitable position according to the height of the construction workers. The second guardrail 20 is welded on the upper surface of the electric push rod 19.
[0025] The construction method of the transmission line tower assembly construction device under complex terrain conditions comprises the following steps: Step 1: First, move the construction platform 1 to the construction position, and then after the base support rod 2 lands, pull out the fixing sleeve 6 and the positioning rod 7 inside the installation groove 3 and rotate them to a suitable angle; Step 2: Then, the positioning rod 7 is plugged and fixed to the ground through the sliding fit between the positioning rod 7 and the inside of the fixing sleeve 6, and the positions of the positioning rod 7 and the fixing sleeve 6 are fixed through the positioning bolts 9 and the threaded holes 8 to ensure the stability of the tower assembly when it is lifted; Step 3: The construction personnel then stand on the lifting platform 14 to perform construction work. When construction work at different heights and tower components need to be hoisted, the lifting platform 14 is adjusted in height through the lifting hydraulic rod 13, and the sliding between the guide plate 18 and the guide rod 17 is coordinated, so as to facilitate the construction work of the construction personnel and the transportation of the tower components to the place; Step 4: Finally, the first guardrail 16 and the second guardrail 20 are used to protect the construction workers when working at high altitudes. At the same time, the electric push rod 19 is used to adjust the second guardrail 20 to a suitable position according to the height of the construction workers.
[0026] See also Figure 1-Figure 6 As shown, the present invention is a transmission line tower assembly construction device under complex terrain conditions, and its use method is as follows: through the base support rod 2, the fixing sleeve 6 and the positioning rod 7 structure, the construction platform 1 can also ensure a good fixing effect under complex terrain conditions, avoid instability during the construction process, avoid the danger of the construction platform 1 tipping over, and improve the safety of the device when in use; through the lifting hydraulic rod 13 structure, it is convenient to adjust the height of the lifting platform 14, so as to facilitate the adjustment of the position of the lifting platform 14 and the transported tower components according to construction requirements, thereby improving the flexibility of the device when in use, and at the same time, through the electric push rod 19 structure, it is convenient to adjust the second guardrail 20 to a suitable position according to the height of the construction personnel.
[0027] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0028] The preferred embodiments of the present invention disclosed above are only used to help illustrate the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to the specific implementation methods described. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.
Claims
1. A transmission line tower assembly construction device under complex terrain conditions, comprising a construction platform (1), a mounting groove (3) and an opening groove (10), characterized in that: The construction platform (1) is welded with a base support rod (2) on the circumferential side of the lower surface, the installation groove (3) is arranged on a surface of the base support rod (2), a connecting shaft (4) is installed inside the installation groove (3), a rotating member (5) is installed on the circumferential side of the connecting shaft (4), the rotating member (5) and the circumferential side of the connecting shaft (4) are rotatably engaged, a fixing sleeve (6) is welded on the lower surface of the rotating member (5), a positioning rod (7) is installed inside the fixing sleeve (6), the circumferential side of one end of the positioning rod (7) is slidably engaged with the inside of the fixing sleeve (6), and the opening groove (10) is arranged on the upper surface of the construction platform (1).
2. The power transmission line tower assembly construction device under complex terrain conditions according to claim 1, characterized in that: The other end of the positioning rod (7) extends to the outside of the fixed sleeve (6), a surface of the positioning rod (7) is provided with a plurality of threaded holes (8), a surface of the fixed sleeve (6) is embedded with a positioning bolt (9), and one end of the positioning bolt (9) passes through a surface of the fixed sleeve (6).
3. The power transmission line tower assembly construction device under complex terrain conditions according to claim 2, characterized in that: One end of the positioning bolt (9) is threadedly engaged with the threaded hole (8), and the peripheral side surface of the positioning bolt (9) is slidingly engaged with the fixing sleeve (6). The fixing sleeve (6) and the positioning rod (7) are arranged inside the installation groove (3).
4. The power transmission line tower assembly construction device under complex terrain conditions according to claim 1, characterized in that: Two connecting rods (11) are welded to the lower surface of the construction platform (1), and the two connecting rods (11) are respectively arranged on both sides of the lower surface of the opening groove (10). A bottom plate (12) is welded to the lower surface of the two connecting rods (11), and two lifting hydraulic rods (13) are installed on the upper surface of the bottom plate (12). The two lifting hydraulic rods (13) are arranged opposite to each other.
5. The power transmission line tower assembly construction device under complex terrain conditions according to claim 4, characterized in that: One end of the two lifting hydraulic rods (13) extends to the top of the construction platform (1) through the opening groove (10), and a lifting platform (14) is welded to the upper surface of the two lifting hydraulic rods (13). Guardrail rods (15) are welded to the sides of the upper surface of the construction platform (1), and a first guardrail (16) is welded to the upper surface of the guardrail rod (15). Two guide rods (17) are welded to both sides of the lower surface of the first guardrail (16).
6. The power transmission line tower assembly construction device under complex terrain conditions according to claim 5, characterized in that: The two guide rods (17) are arranged opposite to each other, one end of the guide rod (17) is welded to the upper surface of the construction platform (1), and the side surfaces of the guide rods (17) are each equipped with guide plates (18). The guide plates (18) are respectively welded to the two opposite surfaces of the lifting platform (14), and the guide plates (18) are slidably matched with the side surfaces of the guide rods (17).
7. The power transmission line tower assembly construction device under complex terrain conditions according to claim 5, characterized in that: Electric push rods (19) are welded to the circumferential sides of the upper surface of the first guardrail (16), and a second guardrail (20) is welded to the upper surface of the electric push rod (19).
8. The construction method of the power transmission line tower assembly construction device under complex terrain conditions according to claims 1-7 comprises the following steps: Step 1: first move the construction platform (1) to the construction position, and then after the base support rod (2) lands, pull out the fixing sleeve (6) and the positioning rod (7) inside the installation groove (3) and rotate them to a suitable angle; Step 2: Then, the positioning rod (7) is plugged and fixed to the ground through the sliding fit between the positioning rod (7) and the interior of the fixing sleeve (6), and the positions of the positioning rod (7) and the fixing sleeve (6) are fixed through the positioning bolts (9) and the threaded holes (8) to ensure the stability of the tower assembly when it is lifted; Step 3: The construction personnel then stand on the lifting platform (14) to carry out construction work. When construction work at different heights and tower components need to be hoisted, the lifting platform (14) is adjusted in height by the lifting hydraulic rod (13), and the sliding between the guide plate (18) and the guide rod (17) is coordinated, so as to facilitate the construction work of the construction personnel and the transportation of the tower components to the desired location; Step 4: Finally, the first guardrail (16) and the second guardrail (20) are used to protect the construction workers when they are working at high altitudes. At the same time, the electric push rod (19) is used to adjust the second guardrail (20) to a suitable position according to the height of the construction workers.