Concrete structure repairing system based on cementing material

Through the concrete structure restoration system based on gelling materials, the flaw detection, identification and retest modules are used to determine the position to be repaired and the fluidity of the gel material, the problems of difficulty in penetration of repair fluid and poor bonding of carbon fibers in the prior art are solved, and the problems of difficulty in penetration of repair fluid and poor carbon fiber bonding in the prior art are improved. Durability and restoration effect of concrete structures.

CN118997532APending Publication Date: 2024-11-22HEBEI UNIV OF SCI & TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411130556.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-16
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

In the prior art, the repair liquid cannot fully penetrate into concrete cracks, resulting in cavity problems, carbon fibers are difficult to maintain and have poor bonding with concrete, resulting in a shortening of the remediation cycle after repair, reducing the durability of the concrete structure.

Method used

The concrete structure restoration system based on gelling materials is adopted, including flaw detection module, identification module, retest module and repair module. By detecting, identifying and retesting the target structure, adjusting the initial detection results according to the degree of damage, removing the damaged position, and configuration. Fill the gel material to ensure that the fluidity of the gel material is suitable for the position to be repaired, and improve the targetedness and durability of the repair.

Benefits of technology

It effectively improves the utilization rate of gel materials and the durability of concrete structure restoration, avoids material waste, improves the targeted nature of repair, prevents gel materials from being unable to completely fill the broken positions, and enhances repair performance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118997532A_ABST
    Figure CN118997532A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of concrete repairing, in particular to a concrete structure repairing system based on a cementing material, which comprises a flaw detection module, an identification module, a retest module and a repairing module.The shape of a to-be-repaired position is identified and judged, and the to-be-repaired position is shaped according to the degree of structural damage; therefore, the area which cannot continue to work can be accurately judged, the fluidity of the gel material filling the area is determined according to the shape of the area which cannot continue to work, the area is filled, the utilization rate of the gel material is effectively improved, and meanwhile the durability of concrete structure repairing is effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of concrete repair, and in particular to a concrete structure repair system based on cementitious materials. Background Art

[0002] In recent years, the development of concrete structures has been extremely rapid, from the research, development and promotion of new materials and new technologies to the construction of engineering structures.

[0003] After years or even decades of use, concrete structures will inevitably need to be repaired or patched for various reasons so that they can continue to serve mankind.

[0004] Based on this, existing technologies have provided some relatively mature directions:

[0005] Chinese patent authorization announcement number CN105565690B discloses a self-dissolving self-repairing system for concrete cracks and its preparation method, the system includes a self-dissolving repair carrier and a self-dissolving protective film coated on the surface of the self-dissolving repair carrier, and the self-dissolving repair carrier is also loaded with a repair agent; during preparation, the self-dissolving repair carrier is prepared by a sol-gel method and subjected to a pore expansion treatment; the self-dissolving repair carrier after pore expansion is immersed in a repair agent solution, centrifuged, and the upper clear liquid is removed, and the bottom repair carrier is washed and vacuum dried to obtain a self-dissolving repair carrier loaded with a repair agent; the self-dissolving repair carrier loaded with a repair agent is immersed in a self-dissolving protective film solution, so that the self-dissolving protective film is fully coated on the surface of the self-dissolving repair carrier loaded with a repair agent. Compared with the prior art, the invention combines the advantages of the mineral self-repairing method and the microcapsule self-repairing method to prepare a self-dissolving carrier self-repairing system for self-repairing of cracks in cement-based material structures.

[0006] Chinese patent application publication number CN117684588A discloses a vegetation restoration method and restoration device for steep rock slopes, and discloses a vegetation restoration method and restoration device that makes the water conduction and water retention of steep rock slopes more uniform through a porous drip irrigation head and a multi-layer water-conducting and water-retaining fiber net, and monitors the humidity of the multi-layer water-conducting and water-retaining fiber net in real time through multiple humidity sensors to realize automatic irrigation, which can improve the vegetation coverage rate of steep rock slopes. It is characterized in that it consists of a water-conducting fiber net skeleton, a multi-layer water-conducting and water-retaining fiber net, a drip irrigation water delivery pipe, a connecting wire, a porous drip irrigation head, a laying fixed ring and a drip irrigation hole, the four corners of the water-conducting fiber net skeleton are respectively connected to the corresponding laying fixed rings, the multi-layer water-conducting and water-retaining fiber net is laid on the water-conducting fiber net skeleton, the multi-layer water-conducting and water-retaining fiber net is connected to the water-conducting fiber net skeleton through multiple connecting wires, and the drip irrigation water delivery pipe is placed on the multi-layer water-conducting and water-retaining fiber net.

[0007] It can be seen that the above technical solution has the following problems:

[0008] (1) The repair fluid cannot completely penetrate into the concrete cracks due to excessive surface tension during the repair process, resulting in cavities at the repair location;

[0009] (2) Carbon fiber is difficult to maintain and has poor bonding with concrete, which results in a shortened repair cycle after repair. Summary of the invention

[0010] To this end, the present invention provides a concrete structure repair system based on cementitious materials, which is used to overcome the problems in the prior art that the repair liquid cannot completely penetrate into the concrete cracks due to excessive surface tension during the repair process, resulting in cavities at the repair location, and the carbon fiber is difficult to maintain and has poor bonding with concrete, resulting in a shortened repair cycle after repair, which in turn leads to reduced durability of the concrete structure repair.

[0011] To achieve the above object, the present invention provides a concrete structure repair system based on cementitious materials, comprising:

[0012] A flaw detection module, which is used to perform flaw detection on the target structure and form corresponding preliminary detection results;

[0013] An identification module, which is connected to the flaw detection module and is used to determine the corresponding damage degree according to the flaw detection result;

[0014] A retest module, connected to the flaw detection module and the identifier, for testing the target structure in a preset retest mode, and adjusting the initial test result of the target result according to the damage degree to form the flaw detection result;

[0015] The repair module is connected to the retest module and is used to repair the concrete structure according to the flaw detection result;

[0016] Wherein, the preset retest method is to test the structural strength of the target structure.

[0017] Furthermore, the repair module includes:

[0018] A demolition device is used to demolish the preset damaged position of the target structure according to the flaw detection results to form a position to be repaired;

[0019] A configuration unit, which is used to configure a plurality of gel materials with preset fluidity according to the damaged position;

[0020] A model unit, connected to the demolition device and the configuration unit, for sorting the gel materials filled into the positions to be repaired according to the fluidity, and forming a corresponding repair table;

[0021] A filler connected to the model unit, configured to configure gel materials of various fluidities corresponding to the repair table, and fill the position to be repaired according to the repair table;

[0022] The flaw detection result includes the damaged appearance and damage degree of the target structure; the damaged position includes the damaged outer surface of the target structure and the corresponding broken structure.

[0023] Furthermore, the slope removal device removes the target structure according to the flaw detection result and the damage degree, and forms a corresponding position to be repaired;

[0024] Wherein, the position to be repaired includes a portion of the target structure having a strength lower than the standard strength, including a damaged surface of the target structure and a damaged body separated from the main body in the target structure;

[0025] The standard strength is the design strength of the target structure.

[0026] Furthermore, the identification module includes:

[0027] An internal identifier, for determining a corresponding damaged body according to the preliminary exploration result and the integrity of the target structure;

[0028] A surface identifier is used to determine the damaged surface of the target structure according to the appearance of the target structure.

[0029] Furthermore, the flaw detection module performs flaw detection on the target structure, and a damage depth threshold is provided in the flaw detection module, wherein:

[0030] If the damage depth is less than the damage depth threshold, the flaw detection module determines that the main structure of the target structure is not damaged, and uses the initial detection result of the target structure as the damage degree, and records the damage degree as surface damage;

[0031] If the damage depth is not less than the damage depth threshold, the flaw detection module outputs the corresponding depth as the initial detection result;

[0032] The damage depth threshold is the minimum thickness of the steel bar protective layer.

[0033] Furthermore, the internal identifier re-probes the target structure according to the initial detection result to determine the damaged body of the target structure, wherein:

[0034] If the steel bars of the target structure are corroded, the internal identifier determines that the damaged body is the steel bars;

[0035] If the steel bars of the target structure are not corroded, the internal identifier determines that the damaged body is concrete.

[0036] Furthermore, the identification module determines the damage degree of the corresponding target structure according to the damaged body and the damaged surface, wherein:

[0037] If the damaged body of the target structure is a steel bar, the identification module outputs the damage result as structural damage;

[0038] If the damaged body of the target structure is concrete, the recognition module outputs the damage result as the surface damage.

[0039] Furthermore, the retest module rebounds the corresponding position of the target structure according to the damage degree, and compares the retest result of the preset retest method with the standard result.

[0040] If the retest result of the target structure is less than the standard result, the retest module determines that the target structure is damaged, and the identification module determines the main body of the damage to the target structure.

[0041] Furthermore, the demolition device removes concrete of the target structure with structural damage to the surface of the steel bars;

[0042] For the target structure with surface damage, corresponding concrete that has mechanical fatigue in the target structure is removed;

[0043] The model unit records the portion of the target structure that is dismantled by the demolition device as the damaged position.

[0044] Further, when generating the repair table, the model unit determines the fluidity of the gel material according to the minimum spacing of the gaps at the damaged position;

[0045] Wherein, the mobility is negatively correlated with the minimum spacing, and the model unit is provided with a maximum mobility threshold, a standard mobility and a minimum mobility threshold;

[0046] The maximum mobility threshold corresponds to the minimum spacing;

[0047] The standard fluidity is the standard fluidity corresponding to the gel material;

[0048] The minimum fluidity corresponds to the maximum surface tension of the gel material, which is related to the aggregate ratio of the gel material.

[0049] Compared with the prior art, the beneficial effect of the present invention lies in that the shape of the position to be repaired is identified and judged, and the position to be repaired is shaped according to the degree of structural damage, so that the area where the work cannot continue can be accurately judged, and the fluidity of the gel material filling the area is determined according to the shape of the area where the work cannot continue, and the area is filled, which effectively improves the utilization rate of the gel material and the durability of the concrete structure repair.

[0050] Furthermore, by conducting NDT on the structure to be repaired and reviewing the NDT results, the parts of the structure to be repaired that actually need to be repaired are determined, and the target structure is reasonably dismantled according to the parts that actually need to be repaired. This effectively avoids the misjudgment of the structural strength due to the intact appearance of the structure to be repaired, and further improves the durability of the concrete structure repair.

[0051] Furthermore, by detecting the surface and interior of the concrete structure to be repaired, the actual repair needs of the structure can be determined, which not only avoids material waste, but also improves the targetedness of the structural repair, thereby further improving the durability of the concrete structure repair.

[0052] Furthermore, by identifying the damaged body, the part with reduced compressive strength is determined, which effectively improves the targeted identification of the structure and further improves the durability of the concrete structure repair.

[0053] Furthermore, by judging the damaged position, the fluidity of the gel material is determined, which effectively prevents the gel material from being unable to completely fill the broken position, while improving the repair performance of the gel material, thereby further improving the durability of the concrete structure repair. BRIEF DESCRIPTION OF THE DRAWINGS

[0054] Figure 1 It is a structural schematic diagram of a concrete structure repair system based on cementitious materials of the present invention;

[0055] Figure 2 It is a structural schematic diagram of the repair module of the present invention;

[0056] Figure 3 This is a schematic diagram of the structure of the concrete to be repaired according to an embodiment of the present invention;

[0057] Figure 4 is a cross-sectional view of the concrete to be repaired according to an embodiment of the present invention;

[0058] Among them: 1, steel bars; 2, damaged cracks; 3, structure to be repaired; 4, steel bar protective layer; 41, vertical steel bar protective layer; 42, horizontal steel bar protective layer. DETAILED DESCRIPTION

[0059] In order to make the objects and advantages of the present invention more clearly understood, the present invention is further described below in conjunction with embodiments; it should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0060] The preferred embodiments of the present invention are described below with reference to the accompanying drawings. It should be understood by those skilled in the art that these embodiments are only used to explain the technical principles of the present invention and are not intended to limit the protection scope of the present invention.

[0061] It should be noted that, in the description of the present invention, terms such as "up", "down", "left", "right", "inside" and "outside" indicating directions or positional relationships are based on the directions or positional relationships shown in the drawings. This is merely for the convenience of description and does not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it cannot be understood as a limitation on the present invention.

[0062] In addition, it should be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0063] See also Figure 1 As shown, it is a structural schematic diagram of the concrete structure repair system based on cementitious materials of the present invention, comprising:

[0064] A flaw detection module, which is used to detect flaws in the target structure and form corresponding preliminary detection results;

[0065] An identification module, which is connected to the flaw detection module and is used to determine the corresponding damage degree according to the flaw detection result;

[0066] A retest module, which is connected to the flaw detection module and the identifier, is used to test the target structure in a preset retest mode, and adjust the initial test result of the target result according to the degree of damage to form a flaw detection result;

[0067] A repair module, which is connected to the retest device and is used to repair the concrete structure according to the flaw detection results;

[0068] Among them, the preset retest method is to test the structural strength of the target structure.

[0069] In implementation, the preset retest method has different retest methods for different target structures. For target structures with lower structural strength, the structure can be tested by knocking with a preset strength, and for target structures with higher structural strength, the structural strength can be tested by rebounding.

[0070] It is understandable that the above test method is not exclusive, and it is sufficient as long as it can test the structural strength.

[0071] The shape of the position to be repaired is identified and judged, and the position to be repaired is shaped according to the degree of structural damage, so that the area where work cannot continue can be accurately judged, and the fluidity of the gel material filling the area is determined according to the shape of the area where work cannot continue, and the area is filled, which effectively improves the utilization rate of the gel material and the durability of the concrete structure repair.

[0072] See also Figure 2 As shown, it is a schematic diagram of the structure of the repair module of the present invention, including:

[0073] A demolition device is used to demolish the preset damaged position of the target structure according to the flaw detection results to form a position to be repaired;

[0074] A configuration unit, which is used to configure a plurality of gel materials with preset fluidity according to the damaged position;

[0075] A model unit, which is connected to the demolition device and the configuration unit, and is used to sort the gel materials filled into the position to be repaired according to fluidity and form a corresponding repair table;

[0076] A filler connected to the model unit, configured to configure gel materials of various fluidities corresponding to the repair table, and fill the position to be repaired according to the repair table;

[0077] Among them, the flaw detection results include the damaged appearance and damage degree of the target structure; the damaged location includes the damaged outer surface of the target structure and the corresponding broken structure.

[0078] In one embodiment, the slope removal device removes the target structure according to the flaw detection results and the degree of damage, and forms a corresponding position to be repaired;

[0079] The location to be repaired includes a portion of the target structure having a strength lower than the standard strength, including a damaged surface of the target structure and a damaged body separated from the main body in the target structure;

[0080] The standard strength is the design strength of the target structure.

[0081] By conducting NDT on the structure to be repaired and reviewing the NDT results, the parts of the structure to be repaired that actually need to be repaired are determined, and the target structure is reasonably dismantled according to the parts that actually need to be repaired. This effectively avoids the misjudgment of the structural strength due to the intact appearance of the structure to be repaired, and further improves the durability of the concrete structure repair.

[0082] In one embodiment, the identification module includes:

[0083] An internal identifier, which is used to determine the corresponding damaged body according to the initial exploration results and the integrity of the target structure;

[0084] A surface identifier is used to determine the damaged surface of the target structure based on the appearance of the target structure.

[0085] In one embodiment, the flaw detection module performs flaw detection on the target structure, and a damage depth threshold is set in the flaw detection module, wherein:

[0086] If the damage depth is less than the damage depth threshold, the flaw detection module determines that the main structure of the target structure is not damaged, and uses the initial detection result of the target structure as the damage degree, and records the damage degree as surface damage;

[0087] If the damage depth is not less than the damage depth threshold, the flaw detection module will output the corresponding depth as the initial detection result;

[0088] Among them, the damage depth threshold is the minimum thickness of the steel bar protective layer.

[0089] By detecting the surface and interior of the concrete structure to be repaired, the actual repair needs of the structure can be determined, which not only avoids material waste, but also improves the targetedness of the structural repair, thereby further improving the durability of the concrete structure repair.

[0090] In one embodiment, the internal identifier re-probes the target structure based on the initial detection result to determine the damaged body of the target structure, wherein:

[0091] If the steel bars of the target structure are corroded, the internal identifier determines that the damaged body is the steel bar;

[0092] If the steel bars of the target structure are not corroded, the internal identifier determines that the damaged body is concrete.

[0093] It is understandable that when the steel bars are exposed to the external environment, the steel bars in the reinforced concrete structure will be completely corroded by the external environment due to oxidation. Therefore, when the steel bars at any position are corroded, the damaged body in the reinforced concrete structure can be set as the steel bars.

[0094] In one embodiment, the recognition module determines the damage degree of the corresponding target structure according to the damaged body and the damaged surface, wherein:

[0095] If the damaged body of the target structure is steel bars, the recognition module outputs the damage results as structural damage;

[0096] If the damaged body of the target structure is concrete, the recognition module outputs the damage result as surface damage.

[0097] By identifying the damaged body, the part with reduced compressive strength is determined, which effectively improves the targeted identification of the structure and further improves the durability of the concrete structure repair.

[0098] In one embodiment, the retest module rebounds the corresponding position of the target structure according to the degree of damage, and compares the retest result of the preset retest method with the standard result.

[0099] If the retest result of the target structure is less than the standard result, the retest module determines that the target structure is damaged, and the identification module determines the damaged subject of the target structure.

[0100] In one embodiment, the demolition device removes concrete of a target structure with structural damage to the surface of steel bars;

[0101] For a target structure with surface damage, corresponding concrete in the target structure that has mechanical fatigue is removed;

[0102] The model unit records the portion of the target structure demolished by the demolition device as the damaged position.

[0103] In one embodiment, when generating the repair table, the model unit determines the fluidity of the gel material according to the minimum spacing of the gaps at the damaged location;

[0104] Among them, the mobility is negatively correlated with the minimum spacing, and the model unit is set with a maximum mobility threshold, a standard mobility and a minimum mobility threshold;

[0105] The maximum mobility threshold corresponds to the minimum spacing;

[0106] The standard fluidity is the standard fluidity corresponding to the gel material;

[0107] The minimum fluidity corresponds to the maximum surface tension of the gel material, which is related to the aggregate ratio of the gel material.

[0108] By judging the damaged position, the fluidity of the gel material is determined, which effectively prevents the gel material from being unable to completely fill the broken position, while improving the repair performance of the gel material, thereby further improving the durability of the concrete structure repair.

[0109] See also Figure 3 As shown, it is a schematic diagram of the structure of the concrete to be repaired according to an embodiment of the present invention. In the figure, a damaged crack 2 through which a steel bar 1 can be seen appears on a cubic concrete structure. The structure is recorded as a structure to be repaired 3, and the concrete covering the outside of the steel bar 1 is a steel bar protective layer 4;

[0110] See also Figure 4 As shown, it is a cross-sectional view of the concrete to be repaired according to an embodiment of the present invention. In the figure, the steel bar 1 can be observed inside the damaged crack 2, and the steel bar protective layer 4 of the structure to be repaired 3 covering the outside of the steel bar 1 can be decomposed into a vertical steel bar protective layer 41 and a horizontal steel bar protective layer 42 according to the direction;

[0111] In practice, the smaller one of the vertical steel bar protection layer 41 and the horizontal steel bar protection layer 42 is used as the damage depth threshold for measurement and flaw detection.

[0112] If the farthest section of the damaged crack 2 is at the rear side of the steel bar 1, that is, the cross section of the steel bar 1 is completely exposed to the air, the recognition unit determines that the damage depth exceeds the damage depth preset and demolishes the structure 3 to be repaired.

[0113] In practice, the gel material for the above concrete structure comprises:

[0114] Gel materials: cement (Portland cement, aluminate cement, sulphoaluminate cement, etc.), fly ash, mineral powder, microsilica fume, etc.;

[0115] Expansive components: gypsum, calcium sulfoaluminate, calcium oxide, calcium sulfoaluminate-calcium oxide (HCSA);

[0116] Depending on the environment of the structure to be repaired, the options are:

[0117] Early strength components: such as sodium sulfate, lithium chloride, lithium carbonate;

[0118] Water reducing components: such as naphthalene water reducing agent, melamine water reducing agent, polycarboxylic acid water reducing agent and other water reducing agents;

[0119] Preferably, the gel material has a mass ratio of:

[0120] Portland cement (C42.5): 40 mesh sand: 80 mesh sand: 100 mesh sand: CSA expansion agent (mainly anhydrous calcium aluminum sulfate) = 40: 30: 15: 14: 1

[0121] For environments that require early strength, early strength agents can be added;

[0122] For environments that require rapid drying, water reducing agents can be added;

[0123] It can be understood that the above formula further subdivides the aggregate, which can effectively increase the surface tension of the gel material after mixing with water;

[0124] When using the above materials, 16% water should be added and stirred.

[0125] So far, the technical solutions of the present invention have been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is easy for those skilled in the art to understand that the protection scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principle of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present invention.

[0126] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A concrete structure repair system based on cementitious materials, characterized in that: It has a repair module, including: A demolition device is used to demolish the preset damaged position of the target structure according to the flaw detection results to form a position to be repaired; A configuration unit, which is used to configure a plurality of gel materials with preset fluidity according to the damaged position; A model unit, connected to the demolition device and the configuration unit, for sorting the gel materials filled into the positions to be repaired according to the fluidity of the gel materials, and forming a corresponding repair table; A filler connected to the model unit, configured to configure a gel material with fluidity corresponding to the repair table, and fill the position to be repaired according to the repair table; The flaw detection result includes the damaged appearance and damage degree of the target structure; the damaged position includes the damaged outer surface of the target structure and the corresponding broken structure.

2. The cementitious material-based concrete structure repair system according to claim 1, characterized in that: include: A flaw detection module, which is used to perform flaw detection on the target structure and form corresponding preliminary detection results; An identification module, which is connected to the flaw detection module and is used to determine the corresponding damage degree according to the flaw detection result; A retest module, connected to the flaw detection module and the identifier, for testing the target structure in a preset retest mode, and adjusting the initial test result of the target result according to the damage degree to form the flaw detection result; The repair module is connected to the retest module and is used to repair the concrete structure according to the flaw detection result; Wherein, the preset retest method is to test the structural strength of the target structure.

3. The cementitious material-based concrete structure repair system according to claim 2, characterized in that: The slope removal device removes the target structure according to the flaw detection result and the damage degree, and forms a corresponding position to be repaired; Wherein, the position to be repaired includes a portion of the target structure having a strength lower than the standard strength, including a damaged surface of the target structure and a damaged body separated from the main body in the target structure; The standard strength is the design strength of the target structure.

4. The cementitious material-based concrete structure repair system according to claim 2, characterized in that: The identification module comprises: An internal identifier, for determining a corresponding damaged body according to the preliminary exploration result and the integrity of the target structure; A surface identifier is used to determine the damaged surface of the target structure according to the appearance of the target structure.

5. The cementitious material-based concrete structure repair system according to any one of claims 3 or 4, characterized in that: The flaw detection module performs flaw detection on the target structure, and a damage depth threshold is set in the flaw detection module, wherein: If the damage depth is less than the damage depth threshold, the flaw detection module determines that the main structure of the target structure is not damaged, and uses the initial detection result of the target structure as the damage degree, and records the damage degree as surface damage; If the damage depth is not less than the damage depth threshold, the flaw detection module outputs the corresponding depth as the initial detection result; The damage depth threshold is the minimum thickness of the steel bar protective layer.

6. The cementitious material-based concrete structure repair system according to claim 5, characterized in that: The internal identifier re-probes the target structure according to the initial detection result to determine the damaged body of the target structure, wherein: If the steel bars of the target structure are corroded, the internal identifier determines that the damaged body is the steel bars; If the steel bars of the target structure are not corroded, the internal identifier determines that the damaged body is concrete.

7. The cementitious material-based concrete structure repair system according to claim 6, characterized in that: The recognition module determines the damage degree of the corresponding target structure according to the damaged body and the damaged surface, wherein: If the damaged body of the target structure is a steel bar, the identification module outputs the damage result as structural damage; If the damaged body of the target structure is concrete, the recognition module outputs the damage result as the surface damage.

8. The cementitious material-based concrete structure repair system according to claim 7, characterized in that: The retest module rebounds the corresponding position of the target structure according to the damage degree, and compares the retest result of the preset retest method with the standard result. If the retest result of the target structure is less than the standard result, the retest module determines that the target structure is damaged, and the identification module determines the main body of the damage to the target structure.

9. The cementitious material-based concrete structure repair system according to claim 8, characterized in that: The demolition device removes concrete of the target structure with structural damage to the surface of the steel bars; For the target structure with surface damage, corresponding concrete that has mechanical fatigue in the target structure is removed; The model unit records the portion of the target structure that is dismantled by the demolition device as the damaged position.

10. The cementitious material-based concrete structure repair system according to claim 9, characterized in that: When generating the repair table, the model unit determines the fluidity of the gel material according to the minimum spacing of the gaps at the damaged position; Wherein, the mobility is negatively correlated with the minimum spacing, and the model unit is provided with a maximum mobility threshold, a standard mobility and a minimum mobility threshold; The maximum mobility threshold corresponds to the minimum spacing; The standard fluidity is the standard fluidity corresponding to the gel material; The minimum fluidity corresponds to the maximum surface tension of the gel material, which is related to the aggregate ratio of the gel material.