Inertial navigation technology-based anchor rod control method of miner-bolter

By combining inertial navigation technology with pre-planned routes and data processing, the automated positioning and attitude control of the anchor bolts of the tunneling and anchoring machine are achieved, solving the problems of low efficiency of manual positioning and insufficient accuracy of satellite navigation in traditional tunneling and anchoring machines, and improving construction accuracy and automation level.

CN118997809AInactive Publication Date: 2024-11-22CHINA AEROSPACE TECH CO LTD (HANGZHOU)
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411104161.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-13
Publication Date
2024-11-22
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Traditional anchor bolt installation relies on manual positioning, which is inefficient and has limited accuracy. In complex underground environments, satellite navigation systems have difficulty in accurate positioning, affecting construction accuracy and automation levels.

Method used

By employing inertial navigation technology in conjunction with a pre-planned construction route, the control center and drive system enable automatic positioning and attitude control of the anchor bolt construction points. The inertial navigation module and data processing center generate anchor bolt condition information for real-time feedback and adjustment.

Benefits of technology

Achieving high-precision, automated anchor installation in complex underground environments improves construction efficiency and safety, reduces manual intervention, and optimizes construction management and adaptability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118997809A_ABST
    Figure CN118997809A_ABST
Patent Text Reader

Abstract

The invention discloses an inertial navigation technology-based anchor rod control method for a miner. The method comprises the following steps: a control center obtains a pre-collected construction route and generates an anchor rod construction point; issuing a construction route and the anchor rod construction point to a driving system of the driving anchor machine when the driving anchor machine is judged to reach the initial position point; the driving system of the dig-anchor machine controls the dig-anchor machine to advance along the construction route, controls the dig-anchor machine to install the anchor rod when the dig-anchor machine reaches the anchor rod construction point, and uploads the actual installation position of the anchor rod to the control center; the inertial navigation module sends the collected installation posture of the bolter miner to the control center. By combining the pre-planned construction route and the inertial navigation technology, accurate positioning in a complex underground environment can be achieved, it can be guaranteed that the anchor miner advances efficiently and accurately along the preset route even under the condition that GPS signals are poor, and the positioning accuracy and operation efficiency of anchor rod installation are remarkably improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of mining operations, and in particular to an anchor rod control method for an anchor driller based on inertial navigation technology. Background Art

[0002] In the construction process of modern coal mines and other underground projects, anchor drills, as key equipment, undertake the dual tasks of rapid excavation and immediate support, which is crucial to improving work efficiency and ensuring construction safety. The anchor installation operation of traditional anchor drills often relies on manual positioning and manual operation, which is not only inefficient, but also has limited accuracy and is easily affected by human factors, resulting in unstable support quality. In addition, complex underground environments, such as signal obstruction and changes in tunnel curvature, pose challenges to precise positioning systems based on satellite navigation (such as GPS), affecting construction accuracy and automation levels.

[0003] As an autonomous navigation method, inertial navigation technology does not rely on external signals and can provide continuous position and attitude information in environments with poor or missing GPS signals, becoming one of the key technologies to improve the intelligence level of anchor miners. However, how to effectively integrate inertial navigation technology into the operation process of anchor miners to achieve precise control of anchor installation and real-time feedback of working condition information is the main direction of current technical improvement. Summary of the invention

[0004] To solve the above technical problems, the present invention provides a bolt control method for bolting machine based on inertial navigation technology. In order to have a basic understanding of some aspects of the disclosed embodiments, a simple summary is given below. This summary is not a general review, nor is it intended to identify key / important components or describe the scope of protection of these embodiments. Its only purpose is to present some concepts in a simple form as a preface to the detailed description that follows.

[0005] The present invention adopts the following technical solution:

[0006] The present invention provides a bolt control method for an anchor miner based on inertial navigation technology, comprising the following steps:

[0007] The control center obtains the pre-collected construction route and generates anchor construction points according to the construction route;

[0008] The GPS module sends the collected real-time position of the bolter to the control center;

[0009] The control center determines whether the anchor digger has reached the starting point of the construction route according to the real-time position of the anchor digger, and when it is determined that the anchor digger has reached the starting point, sends the construction route and the anchor construction point to the anchor digger drive system;

[0010] The driving system of the anchor digger controls the anchor digger to move along the construction route, controls the anchor digger to install the anchor when reaching the anchor construction point, and uploads the actual installation position of the anchor to the control center;

[0011] The inertial navigation module sends the collected installation posture of the bolter to the control center;

[0012] The control center binds the actual installation position of the anchor rod and the installation posture of the bolter corresponding to the actual installation position of the anchor rod to generate anchor rod working condition information.

[0013] Furthermore, the anchor bolt control method for an anchor miner based on inertial navigation technology further includes the following steps:

[0014] The control center sends the generated anchor working condition information to the data processing center;

[0015] The data processing center generates a data checklist based on the bolt working condition information and feeds it back to the control center, wherein the data checklist includes: the deviation value between the actual installation position of the bolt and the designed position of the bolt, and the difference value between the installation posture of the bolt digging machine and the designed posture of the bolt digging machine;

[0016] The control center sends the data checklist to the bolter driving system;

[0017] The bolter driving system controls the installation posture of the bolter when the bolter is located at the next bolt construction point according to the received data check list.

[0018] Furthermore, the installation posture of the anchor miner includes: a pitch angle, a roll angle and a heading angle.

[0019] Furthermore, the process of the data processing center generating a data checklist according to the anchor working condition information includes:

[0020] Get the direction vector of the anchor design position

[0021]

[0022] The two end points of the anchor design position are P d1 (x d1 ,y d1 ,z d1 ) and P d2 (x d2 ,y d2 ,z d2 );

[0023] Get the direction vector of the actual installation position of the anchor

[0024]

[0025] Among them, the two endpoints of the actual installation position of the anchor are P a1 (x a1 ,y a1 ,z a1 ) and P a2 (x a2 ,y a2 ,z a2 );

[0026] Get the design center point Cd of the anchor design position and the actual center point Ca of the anchor actual installation position:

[0027]

[0028] Get the deviation vector between the actual center point Ca and the designed center point Cd

[0029]

[0030] The deviation vector Model It is used as the deviation value between the actual installation position of the anchor rod and the designed position of the anchor rod.

[0031] Furthermore, the process of the data processing center generating a data checklist according to the anchor working condition information also includes:

[0032] Get the pitch angle of the bolter design posture d 、Roll angle d and heading angle Yaw d , and the pitch angle of the bolter installation posture a 、Roll angle a and heading angle Yaw a ;

[0033] Get the pitch angle difference ΔPitch=Pitch a -Pitch b , roll angle difference ΔRoll=Roll a -Roll b , heading angle difference ΔYaw=Yaw a -Yaw b ;

[0034] If the difference is positive, the installation posture is ahead of the design posture;

[0035] If the difference is negative, the installation posture lags behind the design posture.

[0036] Furthermore, the anchor digger driving system controls the anchor digger installation posture when the anchor digger is located at the next anchor construction point according to the received data verification table. When the difference between the anchor digger installation posture and the anchor digger design posture is within the set threshold, the anchor digger driving system controls the anchor digger installation posture when the anchor digger is located at the next anchor construction point to be the same as the installation posture when the anchor digger is located at the previous anchor construction point.

[0037] Furthermore, the anchor miner driving system controls the anchor miner to adjust its posture by controlling an actuator on the anchor miner; wherein the actuator includes a hydraulic cylinder and a servo motor.

[0038] The beneficial effects brought by the present invention are:

[0039] Improve construction accuracy and efficiency: By combining the pre-planned construction route with inertial navigation technology, the present invention can achieve accurate positioning in complex underground environments. Even when the GPS signal is poor, it can ensure that the anchor driller can be advanced efficiently and accurately along the predetermined route, significantly improving the positioning accuracy and operation efficiency of anchor installation.

[0040] Enhanced automation: Automatically control the bolter to reach the bolting construction site and automatically install the bolts, reducing the reliance on manual intervention, reducing the labor intensity of operators, and improving the consistency and safety of the construction process;

[0041] Optimize construction management: By uploading the actual installation position and corresponding installation posture of the anchor rod to the control center in real time, the system can instantly generate anchor rod working condition information, providing detailed data support for construction management and quality monitoring, and facilitating subsequent analysis, evaluation and decision-making;

[0042] Improve construction flexibility and adaptability: This method is not restricted by external signals, which improves the adaptability of equipment under various complex geological conditions, especially in underground spaces with severe signal shielding. It can ensure uninterrupted construction activities and enhance the stability and reliability of the overall construction project. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0044] Figure 1 The present invention is a flowchart of a bolter control method for a bolter digging machine based on inertial navigation technology. DETAILED DESCRIPTION

[0045] The embodiments of the present invention are described in detail below in conjunction with the accompanying drawings. It should be clear that the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0046] like Figure 1 As shown, in some illustrative embodiments, a bolt control method for a bolter digging machine based on inertial navigation technology is provided, comprising the following steps:

[0047] 101: The control center obtains the pre-collected construction route and generates anchor construction points according to the construction route.

[0048] The control center is responsible for supervising and managing the construction process. The pre-collected construction route refers to a series of coordinate points obtained through measurement and planning according to design requirements before construction.

[0049] Anchor construction points refer to the specific locations where holes need to be drilled and anchors need to be planted during the actual construction process. The control center will generate detailed anchor construction point coordinates based on the construction route through specific software or calculation methods. These coordinates accurately indicate where each anchor should be planted to ensure the stability and safety of the engineering structure.

[0050] 102: The GPS module sends the collected real-time position of the bolter to the control center.

[0051] The GPS module equipped with the bolter digger continuously collects the real-time location information of the bolter digger. This information includes longitude, latitude, altitude and timestamp, and the collected location information is expressed in a navigation information protocol, format or other standard format.

[0052] The real-time position of the bolter miner is sent to a control center, usually via wireless communication such as radio waves, Wi-Fi or mobile network data transmission. The control center can be a central control room or a mobile control unit on site.

[0053] 103: The control center determines whether the anchor miner has reached the starting point of the construction route according to the real-time position of the anchor miner. If it is determined that the anchor miner has reached the starting point, step 104 is performed.

[0054] In order to determine whether the anchor miner has reached the starting position, the control center will set a position accuracy range, which can be fixed or dynamically adjusted according to construction requirements.

[0055] The GPS module on the anchor miner will continuously provide the real-time location information of the anchor miner. After receiving the real-time location information, the control center will compare it with the starting location point. The comparison process includes checking whether the real-time latitude and longitude, altitude and other parameters of the anchor miner match the parameters of the starting location point within the set accuracy range.

[0056] If the real-time position of the anchor miner is within the accuracy range of the starting position, the control center will determine that the anchor miner has reached the starting position of the construction route, and once it is determined that the anchor miner has reached the starting position, the control center will issue an instruction to the anchor miner to start construction.

[0057] 104: The control center sends the construction route and anchor construction points to the anchor mining machine drive system.

[0058] 105: The anchor digger driving system controls the anchor digger to move along the construction route, controls the anchor digger to install the anchor when reaching the anchor construction point, and uploads the actual installation position of the anchor to the control center.

[0059] When the anchor miner reaches the predetermined anchor construction point, the control system will send a signal indicating that the anchor miner has reached the location for installing the anchor. At this time, the anchor drill of the anchor miner will start under the command of the control system and begin to install the anchor. This process includes drilling holes, placing anchors, grouting, etc. As the anchors are installed, the anchor miner will upload the actual installation location information to the control center for monitoring and recording.

[0060] 106: The inertial navigation module sends the collected installation posture of the anchor mining machine to the control center, wherein the installation posture of the anchor mining machine includes: pitch angle, roll angle and heading angle.

[0061] Pitch angle: refers to the inclination angle of the bolter body around the longitudinal axis (front and back direction), with a positive value indicating that the machine head is facing upward and a negative value indicating that the machine head is facing downward. This data is very important for ensuring the horizontality of the excavation face and the vertical installation of the anchor bolt.

[0062] Roll angle: describes the tilt of the machine body around the horizontal axis (left and right direction), with positive values ​​indicating that the right side is lifted and negative values ​​indicating that the left side is lifted. Controlling the roll angle helps maintain the stability of the bolter miner on complex terrain and the straightness of the excavation path.

[0063] Heading angle: indicates the rotation angle of the machine body relative to the initial or true north direction, which is used to indicate the direction of travel of the bolter. An accurate heading angle is essential for following the preset construction route. The control parameters have been refined to make the attitude control of the bolter more refined, further improving the accuracy and construction flexibility of bolt installation.

[0064] 107: The control center binds the actual installation position of the anchor rod and the installation posture of the anchor mining machine corresponding to the actual installation position of the anchor rod to generate the anchor rod working condition information.

[0065] The control center creates a data record that maps the actual installation position of each bolt to the specific posture of the bolter when it was installed. Through this binding, the control center can generate bolt condition information, which combines the bolt installation position and the posture data of the bolter, providing a complete record for subsequent monitoring and evaluation.

[0066] By analyzing this information, engineers can evaluate whether the bolts are correctly installed according to the design requirements and whether the attitude of the bolter has affected the installation quality of the bolts. If problems are found in the bolt installation or the attitude of the bolter needs to be adjusted, the control center can issue corresponding adjustment instructions based on the bolt working condition information to optimize the bolt support effect.

[0067] The full-process automated control of the anchor drill from path planning to automatic bolt installation is realized, and the inertial navigation is used to ensure high-precision positioning in an environment without GPS signals. This significantly improves construction efficiency, reduces manual operation errors, enhances construction safety, and ensures the accuracy and consistency of bolt installation.

[0068] 108: The control center sends the generated anchor working condition information to the data processing center.

[0069] 109: The data processing center generates a data verification table based on the anchor working condition information and feeds it back to the control center, wherein the data verification table includes: the deviation value between the actual installation position of the anchor and the designed position of the anchor, and the difference value between the installation posture of the anchor digging machine and the designed posture of the anchor digging machine.

[0070] The process of the data processing center generating a data checklist based on the anchor working condition information includes:

[0071] Get the direction vector of the anchor design position

[0072]

[0073] The two end points of the anchor design position are P d1 (x d1 ,y d1 ,z d1 ) and P d2 (x d2 ,y d2 ,z d2 );

[0074] Get the direction vector of the actual installation position of the anchor

[0075]

[0076] Among them, the two endpoints of the actual installation position of the anchor are P a1 (x a1 ,y a1 ,z a1 ) and P a2 (x a2 ,y a2 ,z a2 );

[0077] Get the design center point Cd of the anchor design position and the actual center point Ca of the anchor actual installation position:

[0078]

[0079] Get the deviation vector between the actual center point Ca and the designed center point Cd

[0080]

[0081] The deviation vector Model As the deviation value between the actual installation position of the anchor rod and the designed position of the anchor rod, the construction deviation is quantified, which is convenient for data analysis and subsequent automatic adjustment, and improves the controllability of the construction process and the traceability of data;

[0082] Get the pitch angle of the bolter design posture d 、Roll angle d and heading angle Yaw d , and the pitch angle of the bolter installation posture a 、Roll angle a and heading angle Yaw a ;

[0083] Get the pitch angle difference ΔPitch=Pitch a -Pitch b , roll angle difference ΔRoll=Roll a -Roll b , heading angle difference ΔYaw=Yaw a -Yaw b ;

[0084] If the difference is positive, the installation posture is ahead of the design posture;

[0085] If the difference is negative, the installation posture lags behind the design posture.

[0086] It helps the system to quickly identify and classify posture deviations, provides a clear basis for automatic posture adjustment, and enhances the system's self-correction capabilities.

[0087] 110: The control center sends the data checklist to the anchor digger driving system, and the anchor digger driving system controls the installation posture of the anchor digger when the anchor digger is located at the next anchor construction point according to the received data checklist.

[0088] By introducing a data processing center to generate a data checklist, a real-time feedback and correction mechanism is implemented during the construction process. Construction deviations can be discovered and corrected in a timely manner, ensuring construction quality and improving the reliability and stability of the overall construction project.

[0089] The anchor digger drive system controls the anchor digger in the installation posture of the anchor digger when it is located at the next anchor construction point according to the received data verification table. When the difference between the installation posture of the anchor digger and the design posture of the anchor digger is within the set threshold, the anchor digger drive system controls the anchor digger to be located at the next anchor construction point so that the installation posture of the anchor digger is the same as that of the previous anchor construction point.

[0090] The association between the attitude difference value and the control strategy of the bolter and miner was established, and the adaptive adjustment of attitude control was realized. The construction continuity and consistency were maintained when the attitude deviation was small, unnecessary adjustments were reduced, and the construction efficiency and stability were further improved.

[0091] The driving system of the bolter digger controls the bolter digger to adjust its posture by controlling the actuator on the bolter digger; the actuator includes a hydraulic cylinder and a servo motor.

[0092] Anchor digger is a kind of equipment used in the process of tunneling in coal mines. It integrates the two functions of excavation and bolting support to improve work efficiency and ensure operation safety. The drive system of the anchor digger is its core part, which is responsible for providing power and controlling the various actions of the anchor digger. In the drive system of the anchor digger, the actuator is the part that realizes specific actions. They adjust the posture of the anchor digger and perform other related operations according to the instructions of the control system. The drive system of the anchor digger adjusts the posture of the anchor digger by controlling these actuators, such as hydraulic cylinders and servo motors, such as changing the pitch angle, yaw angle and rotation angle of the anchor digger to adapt to different tunnel conditions and operation requirements.

[0093] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed by the present invention should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims

1. A bolter control method for bolting machine based on inertial navigation technology, characterized in that: The steps include: The control center obtains the pre-collected construction route and generates anchor construction points according to the construction route; The GPS module sends the collected real-time position of the bolter to the control center; The control center determines whether the anchor digger has reached the starting point of the construction route according to the real-time position of the anchor digger, and when it is determined that the anchor digger has reached the starting point, sends the construction route and the anchor construction point to the anchor digger drive system; The driving system of the anchor digger controls the anchor digger to move along the construction route, controls the anchor digger to install the anchor when reaching the anchor construction point, and uploads the actual installation position of the anchor to the control center; The inertial navigation module sends the collected installation posture of the bolter to the control center; The control center binds the actual installation position of the anchor rod and the installation posture of the bolter corresponding to the actual installation position of the anchor rod to generate anchor rod working condition information.

2. The bolter control method for bolting machine based on inertial navigation technology according to claim 1 is characterized in that: The following steps are also included: The control center sends the generated anchor working condition information to the data processing center; The data processing center generates a data checklist based on the bolt working condition information and feeds it back to the control center, wherein the data checklist includes: the deviation value between the actual installation position of the bolt and the designed position of the bolt, and the difference value between the installation posture of the bolt digging machine and the designed posture of the bolt digging machine; The control center sends the data checklist to the bolter driving system; The bolter driving system controls the installation posture of the bolter when the bolter is located at the next bolt construction point according to the received data check list.

3. The bolt control method for bolting machine based on inertial navigation technology according to claim 2 is characterized in that: The installation posture of the anchor miner includes: a pitch angle, a roll angle and a heading angle.

4. The bolting control method for bolting machine based on inertial navigation technology according to claim 3 is characterized in that: The process of the data processing center generating a data checklist according to the anchor working condition information includes: Get the direction vector of the anchor design position The two end points of the anchor design position are P d1 (x d1 ,y d1 ,z d1 ) and P d2 (x d2 ,y d2 ,z d2 ); Get the direction vector of the actual installation position of the anchor Among them, the two endpoints of the actual installation position of the anchor are P a1 (x a1 ,y a1 ,z a1 ) and P a2 (x a2 ,y a2 ,z a2 ); Get the design center point Cd of the anchor design position and the actual center point Ca of the anchor actual installation position: Get the deviation vector between the actual center point Ca and the designed center point Cd The deviation vector Model It is used as the deviation value between the actual installation position of the anchor rod and the designed position of the anchor rod.

5. The bolt control method for bolting machine based on inertial navigation technology according to claim 4 is characterized in that: The process of the data processing center generating a data checklist according to the anchor working condition information also includes: Get the pitch angle of the bolter design posture d 、Roll angle d and heading angle Yaw d , and the pitch angle Pitch of the bolter installation posture a 、Roll angle a and heading angle Yaw a ; Get the pitch angle difference ΔPitch=Pitch a -Pitch b , roll angle difference ΔRoll=Roll a -Roll b , heading angle difference ΔYaw=Yaw a -Yaw b ; If the difference is positive, the installation posture is ahead of the design posture; If the difference is negative, the installation posture lags behind the design posture.

6. The bolt control method for bolting machine based on inertial navigation technology according to claim 5 is characterized in that: The anchor digger driving system controls the anchor digger in the installation posture of the anchor digger when the anchor digger is located at the next anchor construction point according to the received data verification table. When the difference between the installation posture of the anchor digger and the design posture of the anchor digger is within the set threshold, the anchor digger driving system controls the anchor digger in the installation posture of the anchor digger when the anchor digger is located at the next anchor construction point to be the same as the installation posture of the anchor digger when the anchor digger is located at the previous anchor construction point.

7. The bolting control method for bolting machine based on inertial navigation technology according to claim 6 is characterized in that: The driving system of the bolter digger controls the bolter digger to adjust its posture by controlling the actuator on the bolter digger; the actuator includes a hydraulic cylinder and a servo motor.