Construction robot positioning method, device and equipment based on sliding rail and laser, storage medium and product

Through the construction robot positioning method based on slide rails and lasers, three-dimensional positioning is achieved using horizontal guide rails, vertical guide rails and laser ranging components, the problem of high positioning costs in the existing technology is solved, and high-precision and efficient construction positioning is achieved.

CN119001728APending Publication Date: 2024-11-22TONGJI UNIV +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411077791.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-07
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The existing mobile robot positioning scheme is costly, including automatic tracking total stations and infrared motion capture equipment, resulting in high cost of positioning construction robots.

Method used

The construction robot positioning method based on slide rails and lasers is adopted. Through horizontal guide rails, vertical guide rails and laser ranging components, the high-precision positioning of construction robots in three-dimensional space is achieved, reducing equipment costs.

Benefits of technology

It significantly reduces the cost of positioning of construction robots, improves positioning accuracy and efficiency, adapts to various construction environments, simplifies equipment installation and maintenance, and reduces preparation time and operation complexity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119001728A_ABST
    Figure CN119001728A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of robot construction, in particular to a construction robot positioning method, device and equipment based on a sliding rail and laser, a storage medium and a product. The method comprises the following steps: determining the displacement of a to-be-positioned construction robot in a first direction according to the displacement of a sliding block of a horizontal guide rail; determining the displacement of the to-be-positioned construction robot in a second direction according to the displacement of the sliding block of the vertical guide rail; determining the displacement of the to-be-positioned construction robot in a third direction based on the laser ranging assembly; and determining a target position according to the displacement of the to-be-positioned construction robot in the first direction, the displacement of the to-be-positioned construction robot in the second direction, the displacement of the to-be-positioned construction robot in the third direction and a preset initial calibration variable. According to the method, high-precision positioning of the construction robot in a three-dimensional space is achieved by using the horizontal guide rail, the vertical guide rail and the laser ranging assembly, the cost of the guide rail and the laser ranging assembly is far lower than that of an automatic tracking total station and infrared motion capture equipment in the prior art, and the cost is remarkably reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of robot construction technology, and in particular to a construction robot positioning method, device, equipment, storage medium and product based on slide rails and lasers. Background Art

[0002] With the rapid development of the field of robot on-site construction, the demand for on-site positioning is also increasing. The equipment constructed on-site is usually a lightweight mobile robot that relies on a positioning system to achieve processing accuracy. One of the existing mobile robot positioning solutions is to use an automatic tracking total station. The principle is as follows: a total station needs to be placed on the construction site, and 1 to 3 prism targets will be installed on the end of the mobile robot's tool. The total station tracks and locates the position of the target in real time, thereby deriving the spatial position of the mobile robot. The other is through infrared motion capture equipment. This technology requires at least 4 high-precision infrared cameras to be pre-deployed at the re-positioning site to track and locate reflective point targets in real time. The cost of the above two existing solutions is relatively high.

[0003] Therefore, how to reduce the cost of construction robot positioning has become a technical problem that needs to be solved urgently.

[0004] The above contents are only used to assist in understanding the technical solution of the present application and do not constitute an admission that the above contents are prior art. Summary of the invention

[0005] The main purpose of this application is to provide a construction robot positioning method, device, equipment, storage medium and product based on slide rails and lasers, aiming to solve the technical problem of how to reduce the positioning cost of construction robots.

[0006] To achieve the above-mentioned purpose, the present application provides a construction robot positioning method based on slide rails and lasers, which is used for a construction robot positioning device based on slide rails and lasers. The device includes a horizontal guide rail, a vertical guide rail and a laser receiver. The sliders of the horizontal guide rail and the vertical guide rail are both provided with laser emitting components. The vertical guide rail is also provided with a laser ranging component. The light beam emitted by the laser emitting component is projected onto the center of the projection panel of the laser receiving component. The laser receiving component is fixed to the construction robot to be positioned. The method includes the following steps:

[0007] Determining the displacement of the construction robot to be positioned in the first direction according to the displacement of the slider of the horizontal guide rail;

[0008] Determining the displacement of the construction robot to be positioned in the second direction according to the displacement of the slider of the vertical guide rail;

[0009] Based on the laser ranging component, determining the displacement of the construction robot to be positioned in the third direction;

[0010] The target position is determined according to the displacement of the construction robot to be positioned in the first direction, the displacement in the second direction, the displacement in the third direction and the preset initial calibration variables.

[0011] In one embodiment, before the step of determining the displacement of the construction robot to be positioned in the first direction according to the displacement of the slider of the horizontal guide rail, the step further includes:

[0012] Obtain total construction data;

[0013] Determine the length data, width data and height data of the construction area according to the total construction data;

[0014] The direction corresponding to the maximum value among the length data, the width data and the height data is used as the third direction.

[0015] In one embodiment, two projection panels and two visual cameras are provided on the laser receiving element, and the visual cameras are respectively aimed at the projection panels. Before the step of determining the displacement of the construction robot to be positioned in the first direction according to the displacement of the slider of the horizontal guide rail, the method further includes:

[0016] After the laser emitting element emits a light beam, acquiring a light spot image taken by the visual camera;

[0017] Based on a preset image processing algorithm, determining the position of the light spot in the light spot image in the corresponding projection panel;

[0018] If the position is not at the center of the projection panel, the light beam emitted by the corresponding laser emitting element is adjusted so that the light spot is at the center of the projection panel.

[0019] In one embodiment, the laser emitting element is provided with a rotating base and the light beam emitted by the laser emitting element is perpendicular to the movement direction of the corresponding guide rail. If the position is not at the center of the projection panel, the step of adjusting the light beam emitted by the corresponding laser emitting element so that the light spot is projected at the center of the projection panel includes:

[0020] If the position is not at the center of the projection panel, comparing the position with the center of the projection panel to determine an offset of the position from the center;

[0021] According to the offset, determining the adjustment angle and adjustment direction of the corresponding laser emitting element;

[0022] Based on the adjustment angle and the adjustment direction, the rotating base is controlled to rotate so that the light spot is projected onto the center of the projection panel.

[0023] In one embodiment, the step of determining the target position according to the displacement of the construction robot to be positioned in the first direction, the displacement in the second direction, the displacement in the third direction and the preset initial calibration variable comprises:

[0024] Performing geometric transformation on the displacement of the construction robot to be positioned in the first direction, the displacement in the second direction, and the displacement in the third direction to obtain a relative horizontal position, a relative vertical position, and a relative height position;

[0025] Determining an absolute horizontal position according to the relative horizontal position and an initial horizontal position in the preset calibration variable;

[0026] Determining an absolute vertical position according to the relative vertical position and an initial vertical position in the preset calibration variable;

[0027] Determining an absolute height position according to the relative height position and an initial height position in the preset calibration variable;

[0028] The absolute horizontal position, the absolute vertical position, and the absolute height position are used as the target position.

[0029] In one embodiment, the method further comprises:

[0030] Collecting current environmental data in real time, and preprocessing the current environmental data to obtain preprocessed environmental data, wherein the preprocessing includes one or more of denoising, outlier filtering, and smoothing;

[0031] constructing an environmental change model based on the preprocessed environmental data;

[0032] Based on the environmental change model, determining the error source and error degree of the target position;

[0033] generating a compensation strategy based on the error source and the error degree;

[0034] Based on the compensation strategy, device parameters are adjusted.

[0035] In addition, to achieve the above purpose, the present application also proposes a construction robot positioning device based on a slide rail and a laser, and the construction robot positioning device based on a slide rail and a laser comprises:

[0036] A first displacement determination module, used to determine the displacement of the construction robot to be positioned in a first direction according to the displacement of the slider of the horizontal guide rail;

[0037] A second displacement determination module, used to determine the displacement of the construction robot to be positioned in a second direction according to the displacement of the slider of the vertical guide rail;

[0038] A third displacement determination module, used to determine the displacement of the construction robot to be positioned in a third direction based on the laser ranging component;

[0039] The target position determination module is used to determine the target position according to the displacement of the construction robot to be positioned in the first direction, the displacement in the second direction, the displacement in the third direction and the preset initial calibration variables.

[0040] In addition, to achieve the above-mentioned purpose, the present application also proposes a construction robot positioning device based on slide rails and lasers, the device comprising: a memory, a processor, and a construction robot positioning program based on slide rails and lasers stored in the memory and executable on the processor, the construction robot positioning program based on slide rails and lasers being configured to implement the steps of the construction robot positioning method based on slide rails and lasers as described above.

[0041] In addition, to achieve the above-mentioned purpose, the present application also proposes a storage medium, on which a construction robot positioning program based on slide rails and lasers is stored. When the construction robot positioning program based on slide rails and lasers is executed by a processor, the steps of the construction robot positioning method based on slide rails and lasers as described above are implemented.

[0042] In addition, to achieve the above-mentioned purpose, the present application also proposes a computer program product, which includes a computer program, and when the computer program is executed by a processor, it implements the steps of the construction robot positioning method based on slide rails and lasers as described above.

[0043] The present application determines the displacement of the construction robot to be positioned in the first direction according to the displacement of the slider of the horizontal guide rail; determines the displacement of the construction robot to be positioned in the second direction according to the displacement of the slider of the vertical guide rail; determines the displacement of the construction robot to be positioned in the third direction based on the laser ranging component; determines the target position according to the displacement of the construction robot to be positioned in the first direction, the displacement in the second direction, the displacement in the third direction and the preset initial calibration variables. The present application realizes high-precision positioning of the construction robot in three-dimensional space by using horizontal guide rails, vertical guide rails and laser ranging components. The cost of the guide rails and laser ranging components is much lower than that of the automatic tracking total station and infrared motion capture equipment in the prior art, which significantly reduces the cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] Figure 1 This is a flow chart of the first embodiment of the positioning method for a construction robot based on a slide rail and a laser of the present application;

[0045] Figure 2 This is a schematic diagram of a sub-process in the second embodiment of the positioning method for a construction robot based on a slide rail and a laser of the present application;

[0046] Figure 3 This is a schematic diagram of a sub-process in the third embodiment of the positioning method for a construction robot based on a slide rail and a laser of the present application;

[0047] Figure 4 This is a schematic diagram of the structure of the horizontal guide rail and the vertical guide rail in an embodiment of the positioning method of the construction robot based on the slide rail and the laser of the present application;

[0048] Figure 5 This is a schematic diagram of the structure of a laser receiver in an embodiment of a construction robot positioning method based on a slide rail and a laser in this application;

[0049] Figure 6 This is a schematic diagram of the positioning of a construction robot in an embodiment of the positioning method of a construction robot based on a slide rail and a laser of the present application;

[0050] Figure 7 This is a schematic diagram of the module structure of a construction robot positioning device based on a slide rail and a laser according to an embodiment of the present application;

[0051] Figure 8 This is a schematic diagram of the equipment structure of the hardware operating environment involved in the construction robot positioning method based on slide rails and lasers in the embodiment of the present application.

[0052] The realization of the purpose, functional features and advantages of this application will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0053] It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0054] In order to better understand the technical solution of the present application, a detailed description will be given below in conjunction with the accompanying drawings and specific implementation methods.

[0055] It should be noted that with the rapid development of the field of robot on-site construction, the demand for on-site positioning is also increasing. The equipment constructed on-site is usually a lightweight mobile robot that relies on the positioning system to achieve processing accuracy. One of the existing mobile robot positioning solutions is to use an automatic tracking total station. The principle is as follows: a total station needs to be placed on the construction site, and 1 to 3 prism targets will be installed at the end of the tool of the mobile robot. The total station tracks and locates the position of the target in real time, thereby deriving the spatial position of the mobile robot. The other is through infrared motion capture equipment. This technology requires at least 4 high-precision infrared cameras to be pre-deployed on the re-positioning site to track and locate reflective point targets in real time. The cost of the above two existing solutions is relatively high. Therefore, how to reduce the cost of construction robot positioning has become a technical problem that needs to be solved urgently.

[0056] The main solution of the present application is: to determine the displacement of the construction robot to be positioned in the first direction according to the displacement of the slider of the horizontal guide rail; to determine the displacement of the construction robot to be positioned in the second direction according to the displacement of the slider of the vertical guide rail; to determine the displacement of the construction robot to be positioned in the third direction based on the laser ranging component; to determine the target position according to the displacement of the construction robot to be positioned in the first direction, the displacement in the second direction, the displacement in the third direction and the preset initial calibration variables.

[0057] The present application achieves high-precision positioning of a construction robot in three-dimensional space by using horizontal guide rails, vertical guide rails and laser ranging components. The cost of the guide rails and laser ranging components is much lower than that of the automatic tracking total station and infrared motion capture equipment in the prior art, which significantly reduces the cost.

[0058] It should be noted that the execution subject of the method of this embodiment can be a computing service device with data processing, network communication and program running functions, or it can be the above-mentioned construction robot positioning device based on slide rails and lasers with the same or similar functions. This embodiment and the following embodiments will be described by taking the construction robot positioning device based on slide rails and lasers as an example.

[0059] Based on this, the first embodiment of the construction robot positioning method based on slide rails and lasers is proposed. Please refer to Figure 1 , Figure 1 This is a flow chart of the first embodiment of the positioning method for a construction robot based on slide rails and lasers of the present application.

[0060] In this embodiment, the construction robot positioning method based on slide rails and lasers is used for a construction robot positioning device based on slide rails and lasers, the device includes a horizontal guide rail, a vertical guide rail and a laser receiver, the sliders of the horizontal guide rail and the vertical guide rail are both provided with laser emitting components, the vertical guide rail is also provided with a laser ranging component, the light beam emitted by the laser emitting component is projected onto the center of the projection panel of the laser receiving component, the laser receiving component is fixed to the construction robot to be positioned, and the method includes the following steps:

[0061] S1: determining the displacement of the construction robot to be positioned in a first direction according to the displacement of the slider of the horizontal guide rail;

[0062] S2: determining the displacement of the construction robot to be positioned in the second direction according to the displacement of the slider of the vertical guide rail;

[0063] S3: Based on the laser ranging component, determining the displacement of the construction robot to be positioned in the third direction;

[0064] It should be noted that the horizontal guide rail refers to the guide rail system used to measure the horizontal displacement of the construction robot. The vertical guide rail refers to the guide rail system used to measure the vertical displacement of the construction robot. The laser receiver is a device installed on the construction robot, which is used to receive laser signals to assist in positioning. The laser transmitter is a device installed on the horizontal and vertical guide rail sliders, which emits a laser beam to measure displacement. The laser ranging assembly is a device fixed on the vertical guide rail, which calculates the distance by measuring the time difference of the laser beam reflection. The projection panel is installed on the laser receiver, which is used to receive the laser beam to form a light spot to help the visual camera determine the position.

[0065] Specifically, when the construction robot moves, the slider on the horizontal rail will move with it. By measuring the displacement of the slider, the displacement of the construction robot in the first direction (usually the horizontal direction) can be determined. The length of the horizontal rail is 2 to 4 meters, and a laser scanning tracking device is installed on the rail slider. The laser scanning device includes a rotatable laser, and the plane of the laser rotation sweep is perpendicular to the direction of movement of the rail. The measurement of the slider position can reflect the displacement of the target object in the sliding direction. When the construction robot moves in the second direction (usually the vertical direction), the slider on the vertical rail will move with it. By measuring the displacement of the slider, the displacement of the construction robot in the second direction can be determined. The vertical rail structure is similar to the horizontal rail, with a length of 2 to 3 meters, and has a laser scanning device and a laser ranging function. The measurement of the slider position can reflect the displacement of the target object in the height direction. The laser ranging component is fixed on the vertical rail, and the distance of the construction robot in the third direction (usually the depth direction) is calculated by emitting a laser and measuring the time difference of the laser reflection back. The laser ranging component can measure the distance between the laser receiver and the laser transmitter in real time, reflecting the displacement of the target object in the depth direction.

[0066] Furthermore, by measuring the displacement of the sliders of the horizontal and vertical guide rails, combined with the laser ranging components, the high-precision positioning of the construction robot in three-dimensional space can be achieved, ensuring the accurate execution of construction tasks and improving construction efficiency and quality. Compared with traditional high-precision positioning equipment (such as automatic tracking total stations and infrared motion capture equipment), the use of guide rail systems and laser ranging components significantly reduces equipment costs, and equipment, installation and maintenance costs are greatly reduced, making it suitable for a wide range of applications. The system has a simple structure, including horizontal guide rails, vertical guide rails and laser ranging components. It is easy to install and debug, quickly deploy, reduce preparation time and operation complexity, and does not require specialized technicians. The guide rail system can be flexibly arranged according to the construction site to adapt to various space and task requirements, improve the practicality and efficiency of the system, and adapt to a variety of complex construction environments.

[0067] By combining horizontal rails, vertical rails and laser ranging components, high-precision three-dimensional positioning is achieved, significantly reducing the positioning cost of construction robots. The system has a simple structure, is easy to deploy and use, can flexibly adapt to different construction environments, ensures efficient and accurate execution of construction tasks, and solves the high cost problem of traditional high-precision positioning systems.

[0068] S4: Determine a target position according to the displacement of the construction robot to be positioned in the first direction, the displacement in the second direction, the displacement in the third direction and preset initial calibration variables.

[0069] It should be noted that the initial calibration variables refer to the displacement values ​​of the construction robot in the X, Y, and Z directions recorded when the system is initially set up.

[0070] Specifically, during the system installation and initial setup phase, the construction robot and positioning equipment are initially calibrated. The displacement data of the construction robot at the initial position is recorded, and these data will be used as the initial calibration variables. When the construction robot starts to move, the slider displacement sensor on the horizontal guide rail measures its displacement in the first direction (horizontal direction) in real time. At the same time, the slider displacement sensor on the vertical guide rail measures its displacement in the second direction (vertical direction) in real time. The laser ranging component measures the displacement of the construction robot in the third direction (height direction) in real time by emitting laser and measuring the reflection time difference. The real-time measured displacement data in the X, Y, and Z directions are combined with the initial calibration variables for data processing and position calculation.

[0071] Furthermore, the relative displacement of the construction robot relative to the initial position is calculated based on the displacement data measured in real time. These relative displacements reflect the current position change of the construction robot. The relative displacement data is combined with the initial calibration variables to determine the absolute position of the construction robot in three-dimensional space. In this way, the current displacement data can be converted into specific spatial coordinates. The final target position is the absolute position of the construction robot in the X, Y, and Z directions, expressed as a specific point in three-dimensional space.

[0072] Optionally, the calculated target position is fed back to the construction robot control system to ensure that the construction robot can be adjusted and controlled according to the real-time position. If the construction robot is found to deviate from the predetermined path or position, it can be corrected and optimized in real time by adjusting the position of the horizontal and vertical guide rail sliders and adjusting the parameters of the laser ranging component.

[0073] Through the above specific process, the construction robot can achieve high-precision three-dimensional positioning in a complex construction environment. The system can not only measure and calculate displacement data in real time, but also determine the absolute position in combination with the initial calibration variables, and perform dynamic adjustment and optimization, effectively solving the high cost problem of traditional high-precision positioning systems.

[0074] This embodiment determines the displacement of the construction robot to be positioned in the first direction according to the displacement of the slider of the horizontal guide rail; determines the displacement of the construction robot to be positioned in the second direction according to the displacement of the slider of the vertical guide rail; determines the displacement of the construction robot to be positioned in the third direction based on the laser ranging component; determines the target position according to the displacement of the construction robot to be positioned in the first direction, the displacement in the second direction, the displacement in the third direction and the preset initial calibration variables. This embodiment achieves high-precision positioning of the construction robot in three-dimensional space by using horizontal guide rails, vertical guide rails and laser ranging components. The cost of the guide rails and laser ranging components is much lower than that of the automatic tracking total station and infrared motion capture equipment in the prior art, which significantly reduces the cost.

[0075] Based on the above first embodiment, a second embodiment of the positioning method of a construction robot based on a slide rail and a laser is proposed. Figure 2 , Figure 2 This is a schematic diagram of a sub-process in the second embodiment of the construction robot positioning method based on slide rails and lasers of the present application.

[0076] like Figure 2 As shown, in this embodiment, before step S1, the following steps are also included:

[0077] S1a: Obtain total construction data;

[0078] S1b: Determine the length data, width data and height data of the construction area according to the total construction data;

[0079] S1c: The direction corresponding to the maximum value among the length data, the width data and the height data is taken as the third direction.

[0080] It should be noted that the total construction data includes comprehensive data such as the size of the construction area, terrain features, and obstacle locations. Length data refers to the length of the longest side of the construction area. Width data refers to the width of the second longest side of the construction area. Height data refers to the vertical height of the construction area, the distance from the ground to the highest point. The third direction refers to the direction with the largest value among length, width, and height, because the displacement in this direction is the largest, it needs to be monitored and accurately measured.

[0081] Specifically, before construction begins, collect relevant data of the entire construction area. These data include information such as the overall size of the construction area, terrain features, and obstacle locations. These data can be obtained through on-site measurements, design drawings, geographic information system (GIS) data, etc. Analyze the total construction data collected and extract the key size information of the construction area. Determine the longest side of the construction area, record its length, determine the second longest side of the construction area, record its width, and determine the height of the construction area, i.e., the vertical distance from the ground to the highest point. It should be noted that the positioning method provided in this application is generally applied to long strip space areas, and the prefabricated building construction carried by the construction robot is usually a long strip component (such as a beam, a plate, a wall, etc.) with a scale not greater than 20 meters. In the three directions of length, width and height, generally only one direction has a size greater than 5 meters, and such a component size can be completed in the long strip workspace.

[0082] Furthermore, the extracted length, width and height data are compared to find the maximum value. The direction corresponding to the maximum value is selected as the third direction, because the displacement in this direction is the largest, and the laser ranging method needs to be used for precise positioning.

[0083] By acquiring and analyzing the total construction data, determining the length, width, and height of the construction area, and selecting the direction corresponding to the maximum value as the third direction, the accuracy and efficiency of the construction robot positioning system can be effectively optimized. This process ensures that the system achieves optimal measurement and control in key directions, reduces resource waste, and reduces costs. In particular, the use of laser ranging in longer directions can achieve high-precision positioning, while simplifying the measurement equipment in other directions, further reducing overall costs. Ultimately, this method ensures the efficient and accurate operation of the construction robot, solves the problem of the high cost of traditional high-precision positioning systems, and provides a low-cost, high-efficiency positioning solution for construction robots.

[0084] Based on the above first embodiment, in this embodiment, two projection panels and two visual cameras are provided on the laser receiving element, and the visual cameras are respectively aimed at the projection panels. Before step S1, the following is also included:

[0085] SA1: After the laser emitting element emits a light beam, a light spot image captured by the visual camera is obtained;

[0086] SA2: Determine the position of the light spot in the light spot image in the corresponding projection panel based on a preset image processing algorithm;

[0087] SA3: If the position is not at the center of the projection panel, adjust the light beam emitted by the corresponding laser emitting element so that the light spot is at the center of the projection panel.

[0088] Step SA3 includes:

[0089] SA31: If the position is not at the center of the projection panel, compare the position with the center of the projection panel to determine an offset of the position from the center;

[0090] SA32: Determine the adjustment angle and adjustment direction of the corresponding laser emitting element according to the offset;

[0091] SA33: Based on the adjustment angle and the adjustment direction, control the rotating base to rotate so that the light spot is projected onto the center of the projection panel.

[0092] It should be noted that the visual camera is a camera device installed on the laser receiver, which is used to capture the image of the light spot on the projection panel. The projection panel is installed on the plane of the laser receiver, which is used to receive the laser beam to form a light spot and help the visual camera determine the position. The image processing algorithm is used to analyze the image captured by the visual camera and determine the specific position of the light spot on the projection panel. The rotating base is a rotatable device on which the laser emitter is installed, which is used to adjust the laser emission direction.

[0093] Specifically, the laser emitter is installed on the sliders of the horizontal and vertical guide rails to emit a precise laser beam. The laser beam is projected onto the projection panel of the laser receiver on the construction robot to form a light spot. A visual camera is installed on the laser receiver and aimed at the projection panel. The visual camera captures the light spot image on the projection panel in real time. After the laser emitter emits the light beam, the visual camera captures the light spot image on the projection panel and transmits the image data to the system.

[0094] The light spot image transmitted by the visual camera is processed using a preset image processing algorithm. The image processing algorithm analyzes the light spot image and determines the specific position of the light spot on the projection panel. The position is expressed in coordinate form, reflecting the offset of the light spot relative to the center of the projection panel. The detected light spot position is compared with the center position of the projection panel to determine the offset of the light spot. Based on the offset of the light spot, the angle and direction of the laser emitter that needs to be adjusted are calculated. The laser emitter is installed on a rotating base, and the laser emission direction is changed by adjusting the angle of the rotating base. Ensure that the light spot moves to the center of the projection panel by gradually fine-tuning the angle of the laser emitter.

[0095] By adjusting the emission direction of the laser emitter in real time, the position of the light spot is always in the center of the projection panel, which improves the positioning accuracy, can respond and adjust in real time, adapt to the dynamic changes of the construction site, and ensure that the construction robot always operates in the correct position. The use of visual cameras and image processing algorithms for precise positioning reduces the dependence on complex and expensive equipment and reduces the overall cost of the system. Automatic adjustment of the laser emission angle reduces manual intervention and improves overall operational efficiency and accuracy. After the laser emitter emits a light beam, the light spot image is captured by a visual camera, and the light spot position is determined based on the image processing algorithm. If the light spot is not in the center of the projection panel, the laser emission angle is automatically adjusted to ensure that the light spot is accurately aligned with the center position. This process improves positioning accuracy, enhances the system's adaptability to dynamic environments, and reduces costs.

[0096] This embodiment determines the displacement of the construction robot to be positioned in the first direction according to the displacement of the slider of the horizontal guide rail; determines the displacement of the construction robot to be positioned in the second direction according to the displacement of the slider of the vertical guide rail; determines the displacement of the construction robot to be positioned in the third direction based on the laser ranging component; determines the target position according to the displacement of the construction robot to be positioned in the first direction, the displacement in the second direction, the displacement in the third direction and the preset initial calibration variables. This embodiment achieves high-precision positioning of the construction robot in three-dimensional space by using horizontal guide rails, vertical guide rails and laser ranging components. The cost of the guide rails and laser ranging components is much lower than that of the automatic tracking total station and infrared motion capture equipment in the prior art, which significantly reduces the cost.

[0097] Based on the above second embodiment, a third embodiment of the positioning method of a construction robot based on a slide rail and a laser is proposed. Figure 3 , Figure 3 This is a schematic diagram of a sub-process in the third embodiment of the construction robot positioning method based on slide rails and lasers of the present application.

[0098] In this embodiment, step S4 includes:

[0099] S41: geometrically transforming the displacement of the construction robot to be positioned in the first direction, the displacement in the second direction, and the displacement in the third direction to obtain a relative horizontal position, a relative vertical position, and a relative height position;

[0100] S42: determining an absolute horizontal position according to the relative horizontal position and an initial horizontal position in the preset calibration variable;

[0101] S43: determining an absolute vertical position according to the relative vertical position and the initial vertical position in the preset calibration variable;

[0102] S44: determining an absolute height position according to the relative height position and the initial height position in the preset calibration variable;

[0103] S45: Taking the absolute horizontal position, the absolute vertical position and the absolute height position as the target position.

[0104] It should be noted that the relative position refers to the displacement relative to the initial position, which is used to reflect the current position change. The absolute position refers to the specific position obtained by combining the relative position with the initial position, which represents the actual position in three-dimensional space. Geometric transformation refers to the process of converting the measured data into a unified relative position through geometric calculation.

[0105] Specifically, the currently measured relative horizontal position is added to the initial horizontal position to determine the absolute position of the construction robot in the X direction. This process converts the relative displacement data into an absolute position to ensure the accurate positioning of the construction robot. The currently measured relative vertical position is added to the initial vertical position to determine the absolute position of the construction robot in the Y direction. This process ensures the accurate positioning of the construction robot in the vertical direction. The currently measured relative height position is added to the initial height position to determine the absolute position of the construction robot in the Z direction. This process ensures the accurate positioning of the construction robot in the height direction. The absolute positions of the construction robot in the three directions of X, Y, and Z are obtained through the above steps, and these absolute positions together constitute the target position of the construction robot. The determined target position is used for the path planning and real-time control of the construction robot to ensure that it performs construction operations according to the predetermined trajectory and position.

[0106] Through geometric transformation and initial calibration, the accuracy and uniformity of displacement data in all directions are ensured, and the overall positioning accuracy is improved. The initial calibration variables and relative displacement data are used for position determination, which simplifies the calculation process and reduces error accumulation. Based on the determination of absolute position, the position and trajectory of the construction robot can be adjusted in real time to ensure the accurate execution of the construction task. Compared with the traditional complex high-precision positioning system, this method realizes an efficient and low-cost positioning solution by simplifying equipment and algorithms. By geometrically transforming the displacement of the construction robot in the X, Y, and Z directions and combining it with the initial calibration variables, its absolute position in three-dimensional space is determined. This process ensures high-precision positioning of the construction robot, simplifies calculations, improves real-time adjustment capabilities, and reduces overall costs, providing an efficient and accurate construction positioning solution.

[0107] Based on the above second embodiment, in this embodiment, it further includes:

[0108] SB1: collecting current environment data in real time, and preprocessing the current environment data to obtain preprocessed environment data, wherein the preprocessing includes one or more of denoising, outlier filtering, and smoothing;

[0109] SB2: constructing an environmental change model based on the preprocessed environmental data;

[0110] SB3: Determine the error source and error degree of the target position based on the environmental change model;

[0111] SB4: generating a compensation strategy based on the error source and the error degree;

[0112] SB5: Adjust device parameters based on the compensation strategy.

[0113] It should be noted that denoising refers to removing noise from environmental data through filtering and other technologies to improve data quality. Outlier filtering refers to identifying and removing abnormal extreme values ​​in the data set to prevent them from affecting the data analysis results. Smoothing refers to smoothing the data to eliminate drastic fluctuations in a short period of time and make the data more stable. The environmental change model is a mathematical or statistical model built based on environmental data, which is used to describe and predict the changing laws of environmental parameters. Error sources refer to various environmental factors that affect the positioning accuracy of construction robots. Compensation strategies are measures formulated for identified error sources to reduce or eliminate errors caused by environmental changes.

[0114] Specifically, deploy a variety of sensors (such as temperature sensors, humidity sensors, light sensors, etc.) at the construction site to collect environmental data in real time. The sensors transmit the collected current environmental data to the system for processing. Remove noise from the data through algorithms to ensure the accuracy of environmental data. Identify and filter out outliers to prevent extreme data from affecting the results. Smooth the environmental data to eliminate short-term drastic fluctuations and obtain stable environmental parameters. Analyze the preprocessed environmental data to extract the laws and characteristics of environmental changes. Use machine learning or statistical methods to build an environmental change model based on the preprocessed environmental data. This model can predict the changing trend of environmental parameters.

[0115] Furthermore, the environmental factors that affect the positioning accuracy of the construction robot (such as temperature changes, humidity changes, light changes, etc.) are identified through the environmental change model. The degree of influence of each error source on the target position is quantified, and the specific error value of each error source is determined. According to the error analysis results, compensation strategies are formulated for each error source. These strategies may include adjusting measurement parameters, calibrating equipment, compensation calculations, etc. Optimize the compensation strategy to ensure that it can effectively reduce or eliminate the errors caused by environmental changes. Apply the compensation strategy to the control system of the construction robot and adjust the parameters of related equipment. For example, adjust the calibration parameters of the laser ranging component, change the sampling frequency of the sensor, etc. Monitor environmental data in real time and dynamically adjust equipment parameters to ensure that the construction robot always operates in the optimal state.

[0116] By identifying and compensating for errors caused by environmental changes, the construction robot can always maintain high-precision positioning. Dynamically adjust equipment parameters to adapt to environmental changes and improve system stability and reliability. Effectively compensate for environmental errors, reduce construction interruptions and adjustment time, and improve overall construction efficiency. Reduce positioning errors caused by environmental changes and reduce equipment maintenance and correction costs.

[0117] By collecting and preprocessing environmental data in real time, building an environmental change model, identifying error sources and generating compensation strategies, it is possible to dynamically adjust equipment parameters to ensure that construction robots maintain high-precision positioning in a changing environment. This improves system stability and efficiency, optimizes the construction process, and reduces operating costs, providing an effective dynamic environmental compensation solution for construction robots.

[0118] This embodiment determines the displacement of the construction robot to be positioned in the first direction according to the displacement of the slider of the horizontal guide rail; determines the displacement of the construction robot to be positioned in the second direction according to the displacement of the slider of the vertical guide rail; determines the displacement of the construction robot to be positioned in the third direction based on the laser ranging component; determines the target position according to the displacement of the construction robot to be positioned in the first direction, the displacement in the second direction, the displacement in the third direction and the preset initial calibration variables. This embodiment achieves high-precision positioning of the construction robot in three-dimensional space by using horizontal guide rails, vertical guide rails and laser ranging components. The cost of the guide rails and laser ranging components is much lower than that of the automatic tracking total station and infrared motion capture equipment in the prior art, which significantly reduces the cost.

[0119] For example, in order to help understand the technical concept or technical principle of the above-mentioned embodiment of the construction robot positioning method based on the slide rail and the laser, please refer to Figure 4-Figure 6 , Figure 4 This is a schematic diagram of the horizontal guide rail and vertical guide rail structure in one embodiment of the construction robot positioning method based on slide rails and lasers in this application. Figure 5This is a schematic diagram of the structure of a laser receiver in one embodiment of a construction robot positioning method based on slide rails and lasers in this application. Figure 6 This is a schematic diagram of construction robot positioning in one embodiment of a construction robot positioning method based on slide rails and lasers of the present application.

[0120] like Figure 4-Figure 6 As shown in the figure, the horizontal laser tracking rail (horizontal rail) is 2 to 4 meters long, and a laser scanning tracking device is installed on the rail slider. The laser scanning tracking device mainly includes a rotatable laser, and the plane of the laser rotation sweep is perpendicular to the movement direction of the rail. The laser tracking rail emits a laser beam, and by adjusting the sliding and rotation angles of the rail, the laser is irradiated on the target object. The sliding distance of the rail reflects the position of the target object in the sliding direction. The structural composition of the vertical laser tracking rail (vertical rail) is the same as that of the horizontal laser tracking rail, and the length of the rail, that is, the height, is 2 to 3 meters. At the same time, its laser tracking scanning device has a laser ranging function. In addition to reflecting the height of the target object through the sliding distance of the rail, it also reflects the distance of the target object based on the laser ranging information.

[0121] The laser receiver is installed at the end of the mechanical arm of the mobile construction robot (construction robot) as a target tracked by the laser. It mainly consists of two visual cameras, two laser projection panels, a processor, a power supply, and communication lines. The split laser tracking rail emits two laser beams, which are projected onto the projection panel to form a light spot. The light spot is observed by the visual camera, which feeds back the position to the laser tracking rail and guides it to increase the laser emission angle so that the laser irradiates the center of the projection panel.

[0122] The main process of positioning the construction robot includes: laying out horizontal laser tracking rails and vertical laser tracking rails at the construction site. The mobile robot is at the construction site, and the laser receiver is installed at the end. The laser scanning device of the laser tracking rail is manually controlled to irradiate the laser beam onto the laser receiver. The mobile robot is constructed at the construction site (such as extrusion 3D printing), and the end is kept to perform only translational movement, that is, the orientation of the laser receiver remains basically unchanged (with the help of acceleration and magnetic field sensors) to ensure that the laser receiver can always receive the laser beam. The movement of the laser tracking rail is guided according to the position of the light spot, and the translation position of the laser scanning device and the angle of the laser emission are automatically adjusted. Real-time tracking is achieved through feedback adjustment to ensure that the laser spot is always irradiated on the preset center of the receiving panel of the laser receiving device, thereby achieving real-time tracking. At the same time, the vertical laser tracking rail has a laser ranging function to measure the distance of the laser receiver in real time. In the real-time tracking process of the previous step, three variables (the sliding position X of the horizontal rail, the sliding height H of the vertical rail, and the distance D from the laser rangefinder to the laser receiver) and one initially calibrated variable (the sliding position X0 of the horizontal rail) are obtained in real time. These variables constitute a geometric model, and by calculating and solving the geometry, the relative position of the laser receiver can be obtained by converting X, D, and H into X, Y, and Z.

[0123] This embodiment determines the displacement of the construction robot to be positioned in the first direction according to the displacement of the slider of the horizontal guide rail; determines the displacement of the construction robot to be positioned in the second direction according to the displacement of the slider of the vertical guide rail; determines the displacement of the construction robot to be positioned in the third direction based on the laser ranging component; determines the target position according to the displacement of the construction robot to be positioned in the first direction, the displacement in the second direction, the displacement in the third direction and the preset initial calibration variables. This embodiment achieves high-precision positioning of the construction robot in three-dimensional space by using horizontal guide rails, vertical guide rails and laser ranging components. The cost of the guide rails and laser ranging components is much lower than that of the automatic tracking total station and infrared motion capture equipment in the prior art, which significantly reduces the cost.

[0124] The present application also provides a construction robot positioning device based on a slide rail and a laser, please refer to Figure 7 , Figure 7 The module structure diagram of the construction robot positioning device based on the slide rail and the laser in the embodiment of the present application, the construction robot positioning device based on the slide rail and the laser includes:

[0125] A first displacement determination module 701 is used to determine the displacement of the construction robot to be positioned in a first direction according to the displacement of the slider of the horizontal guide rail;

[0126] A second displacement determination module 702, used to determine the displacement of the construction robot to be positioned in a second direction according to the displacement of the slider of the vertical guide rail;

[0127] A third displacement determination module 703, used to determine the displacement of the construction robot to be positioned in a third direction based on the laser ranging component;

[0128] The target position determination module 704 is used to determine the target position according to the displacement of the construction robot to be positioned in the first direction, the displacement in the second direction, the displacement in the third direction and the preset initial calibration variables.

[0129] The slide rail and laser-based construction robot positioning device provided in the embodiment of the present application adopts the slide rail and laser-based construction robot positioning method in the above embodiment, which can solve the technical problem of how to reduce the cost of construction robot positioning. Compared with the prior art, the beneficial effects of the slide rail and laser-based construction robot positioning device provided in the embodiment of the present application are the same as the beneficial effects of the slide rail and laser-based construction robot positioning method provided in the above embodiment, and the other technical features of the slide rail and laser-based construction robot positioning device are the same as the features disclosed in the above embodiment method, which will not be repeated here.

[0130] The present application provides a construction robot positioning device based on a slide rail and a laser, and the construction robot positioning device based on a slide rail and a laser includes: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the construction robot positioning method based on the slide rail and the laser in the above-mentioned embodiment.

[0131] Reference below Figure 8 , which shows a schematic diagram of the structure of a construction robot positioning device based on a slide rail and a laser suitable for implementing the embodiment of the present application. The construction robot positioning device based on a slide rail and a laser in the embodiment of the present application may include but is not limited to mobile terminals such as mobile phones, laptop computers, digital broadcast receivers, PDAs (Personal Digital Assistants), PADs (Portable Application Descriptions), PMPs (Portable Media Players), vehicle-mounted terminals (such as vehicle-mounted navigation terminals), etc., and fixed terminals such as digital TVs, desktop computers, etc. Figure 8 The slide rail and laser-based construction robot positioning device shown is merely an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.

[0132] like Figure 8 As shown, the construction robot positioning device based on the slide rail and laser may include a processing device 1001 (such as a central processing unit, a graphics processor, etc.), which can perform various appropriate actions and processes according to the program stored in the read-only memory (ROM: Read Only Memory) 1002 or the program loaded from the storage device 1003 to the random access memory (RAM: Random Access Memory) 1004. In RAM1004, various programs and data required for the operation of the construction robot positioning device based on the slide rail and laser are also stored. The processing device 1001, ROM1002 and RAM1004 are connected to each other through a bus 1005. An input / output (I / O) interface 1006 is also connected to the bus. Typically, the following systems can be connected to the I / O interface 1006: input devices 1007 including, for example, a touch screen, a touchpad, a keyboard, a mouse, an image sensor, a microphone, an accelerometer, a gyroscope, etc.; output devices 1008 including, for example, a liquid crystal display (LCD), a speaker, a vibrator, etc.; storage devices 1003 including, for example, a magnetic tape, a hard disk, etc.; and communication devices 1009. The communication device 1009 can allow the slide rail and laser-based construction robot positioning device to communicate wirelessly or wired with other devices to exchange data. Although the slide rail and laser-based construction robot positioning device with various systems is shown in the figure, it should be understood that it is not required to implement or have all the systems shown. More or fewer systems may be implemented or have alternatively.

[0133] In particular, according to the embodiments disclosed in the present application, the process described above with reference to the flowchart can be implemented as a computer software program. For example, the embodiments disclosed in the present application include a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a program code for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from a network through a communication device, or installed from a storage device 1003, or installed from a ROM 1002. When the computer program is executed by the processing device 1001, the above-mentioned functions defined in the method of the embodiment disclosed in the present application are executed.

[0134] The slide rail and laser-based construction robot positioning device provided by the present application adopts the slide rail and laser-based construction robot positioning method in the above-mentioned embodiment, which can solve the technical problem of how to reduce the cost of construction robot positioning. Compared with the prior art, the beneficial effects of the slide rail and laser-based construction robot positioning device provided by the present application are the same as the beneficial effects of the slide rail and laser-based construction robot positioning method provided in the above-mentioned embodiment, and the other technical features of the slide rail and laser-based construction robot positioning device are the same as the features disclosed in the previous embodiment method, which will not be repeated here.

[0135] It should be understood that the various parts disclosed in this application can be implemented by hardware, software, firmware or a combination thereof. In the description of the above embodiments, specific features, structures, materials or characteristics can be combined in any one or more embodiments or examples in a suitable manner.

[0136] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

[0137] The present application provides a computer-readable storage medium having computer-readable program instructions (ie, computer programs) stored thereon, and the computer-readable program instructions are used to execute the construction robot positioning method based on slide rails and lasers in the above-mentioned embodiment.

[0138] The computer-readable storage medium provided in the present application may be, for example, a USB flash drive, but is not limited to electrical, magnetic, optical, electromagnetic, infrared, or semiconductor systems, systems or devices, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In this embodiment, the computer-readable storage medium may be any tangible medium containing or storing a program that can be used by or in combination with an instruction execution system, system or device. The program code contained on the computer-readable storage medium may be transmitted using any appropriate medium, including but not limited to: wires, optical cables, RF (Radio Frequency), etc., or any suitable combination of the above.

[0139] The above-mentioned computer-readable storage medium may be included in the construction robot positioning device based on the slide rail and the laser; or it may exist independently without being assembled into the construction robot positioning device based on the slide rail and the laser.

[0140] The computer-readable storage medium carries one or more programs. When the one or more programs are executed by the construction robot positioning device based on the slide rail and the laser, the construction robot positioning device based on the slide rail and the laser determines the displacement of the construction robot to be positioned in the first direction according to the displacement of the slider of the horizontal guide rail; determines the displacement of the construction robot to be positioned in the second direction according to the displacement of the slider of the vertical guide rail; determines the displacement of the construction robot to be positioned in the third direction based on the laser ranging component; determines the target position according to the displacement of the construction robot to be positioned in the first direction, the displacement in the second direction, the displacement in the third direction and the preset initial calibration variables. The computer program code for performing the operation of the present application can be written in one or more programming languages ​​or a combination thereof, and the programming languages ​​include object-oriented programming languages ​​such as Java, Smalltalk, C++, and conventional procedural programming languages ​​such as "C" language or similar programming languages. The program code can be executed completely on the user's computer, partially on the user's computer, as an independent software package, partially on the user's computer and partially on a remote computer, or completely on a remote computer or server. In the case of a remote computer, the remote computer can be connected to the user's computer through any type of network, including a Local Area Network (LAN) or a Wide Area Network (WAN), or it can be connected to an external computer (for example, through the Internet using an Internet service provider).

[0141] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present application. In this regard, each square box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, the program segment or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two square boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.

[0142] The modules involved in the embodiments described in this application may be implemented by software or hardware, wherein the name of the module does not constitute a limitation on the unit itself in some cases.

[0143] The readable storage medium provided by the present application is a computer-readable storage medium, which stores computer-readable program instructions (i.e., computer programs) for executing the above-mentioned construction robot positioning method based on slide rails and lasers, and can solve the technical problem of how to reduce the cost of construction robot positioning. Compared with the prior art, the beneficial effects of the computer-readable storage medium provided by the present application are the same as the beneficial effects of the construction robot positioning method based on slide rails and lasers provided by the above-mentioned embodiments, and will not be repeated here.

[0144] An embodiment of the present application provides a computer program product, including a computer program, which, when executed by a processor, implements the steps of the above-mentioned construction robot positioning method based on slide rails and lasers.

[0145] The computer program product provided in this application can solve the technical problem of how to reduce the cost of positioning a construction robot. Compared with the prior art, the beneficial effects of the computer program product provided in the embodiment of this application are the same as the beneficial effects of the positioning method of a construction robot based on a slide rail and a laser provided in the above embodiment, and will not be repeated here.

[0146] The above are only preferred embodiments of the present application, and are not intended to limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the present application specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent processing scope of the present application.

Claims

1. A construction robot positioning method based on a slide rail and a laser, used for a construction robot positioning device based on a slide rail and a laser, characterized in that: The device comprises a horizontal guide rail, a vertical guide rail and a laser receiver. The sliders of the horizontal guide rail and the vertical guide rail are both provided with a laser emitter. The vertical guide rail is also provided with a laser distance measuring component. The light beam emitted by the laser emitter is projected onto the center of the projection panel of the laser receiver. The laser receiver is fixed to the construction robot to be positioned. The method comprises: Determining the displacement of the construction robot to be positioned in the first direction according to the displacement of the slider of the horizontal guide rail; Determining the displacement of the construction robot to be positioned in the second direction according to the displacement of the slider of the vertical guide rail; Based on the laser ranging component, determining the displacement of the construction robot to be positioned in the third direction; The target position is determined according to the displacement of the construction robot to be positioned in the first direction, the displacement in the second direction, the displacement in the third direction and the preset initial calibration variables.

2. The method according to claim 1, characterized in that Before the step of determining the displacement of the construction robot to be positioned in the first direction according to the displacement of the slider of the horizontal guide rail, the method further includes: Obtain total construction data; Determine the length data, width data and height data of the construction area according to the total construction data; The direction corresponding to the maximum value among the length data, the width data and the height data is used as the third direction.

3. The method according to claim 1, characterized in that The laser receiving element is provided with two projection panels and two visual cameras, and the visual cameras are respectively aimed at the projection panels. Before the step of determining the displacement of the construction robot to be positioned in the first direction according to the displacement of the slider of the horizontal guide rail, the method further includes: After the laser emitting element emits a light beam, acquiring a light spot image taken by the visual camera; Based on a preset image processing algorithm, determining the position of the light spot in the light spot image in the corresponding projection panel; If the position is not at the center of the projection panel, the light beam emitted by the corresponding laser emitting element is adjusted so that the light spot is at the center of the projection panel.

4. The method according to claim 3, characterized in that The laser emitting element is provided with a rotating base and the light beam emitted by the laser emitting element is perpendicular to the movement direction of the corresponding guide rail. If the position is not at the center of the projection panel, the step of adjusting the light beam emitted by the corresponding laser emitting element so that the light spot is projected at the center of the projection panel includes: If the position is not at the center of the projection panel, comparing the position with the center of the projection panel to determine an offset of the position from the center; According to the offset, determining the adjustment angle and adjustment direction of the corresponding laser emitting element; Based on the adjustment angle and the adjustment direction, the rotating base is controlled to rotate so that the light spot is projected onto the center of the projection panel.

5. The method according to claim 1, characterized in that The step of determining the target position according to the displacement of the construction robot to be positioned in the first direction, the displacement in the second direction, the displacement in the third direction and the preset initial calibration variables comprises: Performing geometric transformation on the displacement of the construction robot to be positioned in the first direction, the displacement in the second direction, and the displacement in the third direction to obtain a relative horizontal position, a relative vertical position, and a relative height position; Determining an absolute horizontal position according to the relative horizontal position and an initial horizontal position in the preset calibration variable; Determining an absolute vertical position according to the relative vertical position and an initial vertical position in the preset calibration variable; Determining an absolute height position according to the relative height position and an initial height position in the preset calibration variable; The absolute horizontal position, the absolute vertical position, and the absolute height position are used as the target position.

6. The method according to claim 2, characterized in that The method further comprises: Collecting current environmental data in real time, and preprocessing the current environmental data to obtain preprocessed environmental data, wherein the preprocessing includes one or more of denoising, outlier filtering, and smoothing; constructing an environmental change model based on the preprocessed environmental data; Based on the environmental change model, determining the error source and error degree of the target position; generating a compensation strategy based on the error source and the error degree; Based on the compensation strategy, device parameters are adjusted.

7. A construction robot positioning device based on a slide rail and a laser, characterized in that: The device comprises: A first displacement determination module, used to determine the displacement of the construction robot to be positioned in a first direction according to the displacement of the slider of the horizontal guide rail; A second displacement determination module, used to determine the displacement of the construction robot to be positioned in a second direction according to the displacement of the slider of the vertical guide rail; A third displacement determination module, used to determine the displacement of the construction robot to be positioned in a third direction based on the laser ranging component; The target position determination module is used to determine the target position according to the displacement of the construction robot to be positioned in the first direction, the displacement in the second direction, the displacement in the third direction and the preset initial calibration variables.

8. A computer device, characterized in that: The device includes: a memory, a processor, and a slide rail and laser-based construction robot positioning program stored in the memory and executable on the processor, wherein the slide rail and laser-based construction robot positioning program is configured to implement the steps of the slide rail and laser-based construction robot positioning method as described in any one of claims 1 to 6.

9. A storage medium, characterized in that: The storage medium stores a slide rail and laser-based construction robot positioning program, and when the slide rail and laser-based construction robot positioning program is executed by the processor, the steps of the slide rail and laser-based construction robot positioning method as described in any one of claims 1 to 6 are implemented.

10. A computer program product, characterized in that The computer program product includes a computer program, and when the computer program is executed by a processor, the steps of the construction robot positioning method based on slide rails and lasers as described in any one of claims 1 to 6 are implemented.

Citation Information

Cited By

  • Control method and artificial intelligence experiment system

    CN121354556A