Calculation method and system for predicting subsidence basin in mining area, medium and program product
Through the hierarchical fusion strategy of the probability integral method and the timing analysis method of interference synthetic aperture radar, combined with threshold and weight weighting, the problem of low calculation accuracy in subsidence basins in mining areas is solved, and high-precision subsidence basin evaluation and governance support is achieved.
Patent Information
- Application Number
- CN202411031236.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-07-30
AI Technical Summary
The existing mining subsidence basin calculation methods are not accurate, the level measurement data is sparse and insufficiently representative, and radar interference measurement is prone to meteorological noise, resulting in unreliable reference for the management of subsidence basin in mining area.
The hierarchical fusion strategy of probability integral method and interference synthetic aperture radar timing analysis method is adopted. By setting up upper and lower thresholds and weighted fusion, high-precision level measurement and high-density radar data are extracted, combining the average value of the starting position and the stop line position. , maximum deformation gradient and average absolute error, build a ground settlement prediction model to achieve a fine evaluation of the subsidence basin in the mining area.
It improves the accuracy and spatial resolution of the subsidence basin prediction in the mining area, overcomes the limitations of traditional methods, provides a detailed assessment of the subsidence conditions in the entire mining area, and supports more effective governance measures.
Smart Images

Figure CN119004360A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of mining area depression calculation technology, and in particular to a calculation method, system, medium and program product for predicting mining area subsidence basins. Background Art
[0002] For a long time, coal mining has ensured energy security and supported rapid economic and social development, but it has also caused serious land subsidence, ecological degradation and development constraints. Therefore, promoting industrial transformation and upgrading through comprehensive management of coal mining subsidence areas is an inevitable choice for the sustainable development of resource-based cities.
[0003] However, the key factor of comprehensive management is to obtain the calculation results of the prediction of the subsidence basin in the mining area. There are currently two main methods for calculating the subsidence basin in the mining area: one is to use the data obtained from leveling and use the probability integral model for inversion calculation. This method arranges leveling points in the mining area, measures the changes in the elevation of each point over time, and then establishes a subsidence prediction model based on the probability integral theory to calculate the subsidence basin of the entire mining area. Another method is to use synthetic aperture radar to obtain radar images of the mining area, generate deformation interference maps through differential interferometry processing, and then use time series analysis methods such as permanent scatterers to calculate the subsidence of the mining area at different periods.
[0004] However, there are still some problems that need to be solved. For example, although the leveling measurement has high accuracy, the layout of the observation points is limited by terrain, personnel and other conditions. The data obtained are relatively sparse and not representative enough, and it is impossible to accurately depict the entire subsidence of the entire mining area. Although radar interferometry can obtain high-density deformation observations, meteorological noise is easily mixed into the calculation results, which reduces the accuracy. In short, the calculation accuracy of the commonly used mining area subsidence basin calculation methods is not high, and the reference for the treatment of mining area subsidence basins is unreliable. Summary of the invention
[0005] The present application provides a calculation method, system, medium and program product for predicting subsidence basins in mining areas, which are used to improve the accuracy of prediction of subsidence basins in mining areas and facilitate the management of subsidence basins in mining areas.
[0006] In the first aspect, the present application provides a calculation method for predicting a subsidence basin in a mining area, including: Obtaining a first calculation result and a second calculation result of the prediction of the subsidence basin in the mining area to be calculated, wherein the first calculation result is obtained by calculating the leveling data using the probability integral method, and the second calculation result is obtained by calculating the synthetic aperture radar image data using the interferometric synthetic aperture radar time series analysis method; The first calculation result and the second calculation result are merged according to the prediction rule to obtain the final calculation result of the subsidence basin prediction of the mining area to be calculated; The prediction rules include: Extracting data not lower than the upper critical threshold from the first calculation result as part of the data of the final calculation result; Extracting data not higher than the lower critical threshold from the second calculation result as part of the data of the final calculation result; The third data higher than the lower critical threshold is extracted from the first calculation result, and the fourth data lower than the upper critical threshold is extracted from the second calculation result; the third data and the fourth data are weightedly fused according to the set first weight and second weight as part of the data of the final calculation result, and the sum of the first weight and the second weight is one.
[0007] In the above embodiment, in view of the differences in the subsidence amplitudes in different regions, a hierarchical fusion strategy is adopted to more reasonably give play to the advantages of each data. The subsidence center area is often severely deformed, which has exceeded the detection saturation range of radar interferometry, but it happens to be the advantage of high-precision leveling. By setting the upper threshold, the data of large subsidence in the first calculation result is preferentially extracted and included in the final result. In contrast, the surface settlement in the marginal area of the mining area is relatively mild, falling within the optimal sensitivity range of radar measurement. By setting the lower threshold, the data of small deformation can be extracted from the second calculation result, which can maximize the effective monitoring range and fully depict the spatial form of the entire subsidence basin without increasing the difficulty and cost of artificial measurement point layout. For the medium subsidence in the transition zone, the reliability of a single data is reduced because it does not meet the high credibility conditions of leveling and radar analysis results at the same time. At this time, by extracting data between the upper and lower thresholds from the two types of results respectively, and weighted averaging them with a certain weight, they can verify each other to a certain extent, reduce their respective accidental errors, and make the calculation results of the subsidence in the transition zone more robust. Through the above-mentioned hierarchical and progressive fusion calculation, the final mining area subsidence prediction result can overcome the limitations of traditional methods, and can give a subsidence distribution with high accuracy and high spatial resolution in the central area, transition area and marginal area, thereby realizing a detailed assessment of the subsidence condition of the entire mining area and facilitating the management of the mining area subsidence basin.
[0008] In combination with some embodiments of the first aspect, before the step of fusing the first calculation result and the second calculation result according to the prediction rule to obtain the final calculation result of the prediction of the mining area subsidence basin to be calculated, the method further includes: The average result of the first probability integral result and the second probability integral result is determined as the upper critical threshold, the first probability integral result is obtained by calculating the starting position of the working face using the probability integral method, and the second probability integral result is obtained by calculating the stop mining line position using the probability integral method; The maximum deformation gradient of the interferometric synthetic aperture radar time series analysis method is determined as the lower critical threshold; The mean absolute errors of the interferometric synthetic aperture radar timing analysis method and the probability integration method are calculated respectively; The inverse proportional calculation results of the mean absolute errors of the interferometric synthetic aperture radar timing analysis method and the probability integration method are determined as the first weight and the second weight.
[0009] In the above embodiment, the starting position and the stop line position are the starting point and end point of the subsidence process, representing the formation process of the entire subsidence basin. The average value of the two is taken as the upper threshold, and the data of the large subsidence in the first calculation result is extracted and included in the final result, which ensures the accurate control of the key risk area. The maximum deformation gradient reflects the "extreme value" of the subsidence within the coverage of the radar image, corresponding to the area with the most serious subsidence. Using this as the lower threshold can ensure that the delineated weak subsidence area will not contain too severe deformation, and can maximize the expansion of the effective monitoring range. The mean absolute error is an important indicator to measure the degree of deviation between the model prediction results and the actual observation values. The smaller the MAE, the closer the calculation results of the method are to the actual situation, and the higher the reliability. By calculating the MAE of the InSAR time series analysis and the probability integration method respectively, the accuracy of the two methods can be quantitatively compared, providing an objective basis for the subsequent weighted fusion. This weight determination method based on error evaluation avoids the uncertainty of subjective experience judgment, making the fusion process more scientific and credible.
[0010] In conjunction with some embodiments of the first aspect, in some embodiments, the step of determining the maximum deformation gradient of the interferometric synthetic aperture radar timing analysis method as the lower critical threshold specifically includes: Obtain the maximum deformation gradient of the interferometric synthetic aperture radar timing analysis method; Determine whether the maximum deformation gradient is greater than a preset observation threshold; If it is not greater than, the maximum deformation gradient is determined as the lower critical threshold; If it is greater than, the maximum deformation gradient that has been verified to be problem-free is selected from the historical data of the mining area subsidence basin prediction to be calculated and determined as the lower critical threshold.
[0011] In the above embodiment, by obtaining the maximum deformation gradient of the interferometric synthetic aperture radar time series analysis method and comparing it with the preset observation threshold, it is possible to determine whether the current radar data is seriously affected by factors such as season and coherence. If the observation threshold is not exceeded, the maximum gradient is directly used as the lower threshold to form a transition interval between the upper threshold. If the deformation gradient of the radar method is abnormally large, a more reliable maximum gradient value is selected from the historical verification data to avoid distortion of the transition zone range. This adaptive adjustment strategy improves the rationality of edge area data screening.
[0012] In conjunction with some embodiments of the first aspect, in some embodiments, the maximum deformation gradient is: In the formula, Dmax is the maximum deformation gradient, γ is the wavelength of synthetic aperture radar image data, n The number of images used for the interferometric synthetic aperture radar time series analysis method.
[0013] In the above embodiment, the maximum deformation gradient of the mining area can be directly estimated according to the parameters of the SAR data (wavelength, number of images) through this formula.
[0014] In combination with some embodiments of the first aspect, in some embodiments, after the step of fusing the first calculation result and the second calculation result according to the prediction rule to obtain the final calculation result of the mining area subsidence basin to be calculated, the method further includes: constructing a ground subsidence prediction model for predicting the mining area subsidence basin to be calculated; the ground subsidence prediction model is: S ∞ =S A +S B In the formula, S A is the settlement of clay or silt, α is the soil compression coefficient, e0 is the original porosity of the soil, Δp is the average additional stress imposed on the soil by the water level change, H is the calculated soil thickness, S B is the settlement of sand, S ∞ is the final settlement of the soil layer.
[0015] In the above embodiment, the ground settlement of clay, silt, sand and other soil layers can be estimated. The model takes into account multiple influencing factors such as the compressibility (compression coefficient) of the soil layer, the original porosity, and the additional stress caused by the water level change, and can more comprehensively simulate the deformation law of the soil layer, and then combine them to obtain the final ground settlement.
[0016] In combination with some embodiments of the first aspect, in some embodiments, after the step of fusing the first calculation result and the second calculation result according to the prediction rule to obtain the final calculation result of the mining area subsidence basin to be calculated, the method further includes: constructing a ground subsidence prediction model for the mining area subsidence basin to be calculated; the ground subsidence prediction model is: S t =S ∞ U In the formula, S t is the land subsidence after time t, S ∞ is the final settlement of the soil layer, U is the degree of consolidation, N is the time factor, C v is the consolidation coefficient, and H is the calculated soil layer thickness.
[0017] In the above embodiment, the evolution of mining area subsidence over time can be predicted. The model introduces parameters such as time factor and consolidation coefficient, which can describe the dynamic characteristics of the subsidence process. Through this model, the cumulative settlement after a specific time can be estimated and the development trend of subsidence can be judged, which is of great significance for predicting future subsidence risks and formulating phased prevention and control measures.
[0018] In combination with some embodiments of the first aspect, in some embodiments, after the step of fusing the first calculation result and the second calculation result according to the prediction rule to obtain the final calculation result of the mining area subsidence basin to be calculated, the method further includes: constructing a ground subsidence prediction model for the mining area subsidence basin to be calculated; the ground subsidence prediction model is: S s =I s Δh=I' s ΔhH S C =I C Δh=I' C ΔhH In the formula, S s S is the rebound of the soil layer with a thickness of H when the water level rises by Δh. C is the settlement of the soil layer with a thickness of H when the water level drops by Δh, I s is the unit deformation during the water level rise period, I C is the unit deformation during the water level drop period, I' s is the unit deformation variable during the water level rise period, I' C is the unit deformation variable during the water level drop period, Δh s is the rise of water level in Δh time, Δh C is the water level rise within Δh, ΔS s Corresponding to Δh s The change of soil layer under C is the value corresponding to Δh C The amount of soil layer change below.
[0019] In the above embodiment, the elastic rebound and plastic compression deformation of the soil layer during the water level rise and fall process can be comprehensively considered. The model introduces the unit deformation variable of the water level rise period and the drop period, which can distinguish the influence of the direction of water level change on the soil layer deformation. By calculating the rebound amount and settlement amount separately, the vertical displacement of the ground caused by water level fluctuation can be estimated more accurately, and the precision of settlement prediction can be improved.
[0020] In a second aspect, an embodiment of the present application provides a computing system for predicting a subsidence basin in a mining area, the system comprising: one or more processors and a memory; The memory is coupled to one or more processors, and is used to store computer program code, which includes computer instructions. One or more processors call the computer instructions to enable the computing system for predicting subsidence basins in a mining area to execute the method described in the first aspect and any possible implementation of the first aspect.
[0021] In a third aspect, an embodiment of the present application provides a computer program product comprising instructions, which, when executed on a server, enables the server to execute the method described in the first aspect and any possible implementation of the first aspect.
[0022] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium comprising instructions. When the instructions are executed on a computing system for predicting a mining subsidence basin, the computing system for predicting a mining subsidence basin executes the method described in the first aspect and any possible implementation method of the first aspect.
[0023] It can be understood that the computing system for predicting mining subsidence basins provided in the second aspect, the computer program product provided in the third aspect, and the computer storage medium provided in the fourth aspect are all used to execute the computing method for predicting mining subsidence basins provided in the embodiment of the present application. Therefore, the beneficial effects that can be achieved can refer to the beneficial effects in the corresponding method, which will not be repeated here.
[0024] One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages: 1. The calculation method for predicting the subsidence basin in the mining area provided by the present application adopts a hierarchical fusion strategy for the differences in the subsidence amplitudes in different regions, which can more reasonably give play to the advantages of each data. The subsidence center area is often severely deformed, which has exceeded the detection saturation range of radar interferometry, but it happens to be the advantage of high-precision leveling. By setting the upper threshold, the data of large subsidence in the first calculation result is preferentially extracted and included in the final result. In contrast, the surface settlement in the marginal area of the mining area is relatively mild, falling within the optimal sensitivity range of radar measurement. By setting the lower threshold, the data of small deformation can be extracted from the second calculation result, which can maximize the effective monitoring range and fully depict the spatial form of the entire subsidence basin without increasing the difficulty and cost of artificial measurement point layout. For the medium subsidence in the transition zone, the reliability of a single data is reduced because it does not meet the high credibility conditions of leveling and radar analysis results at the same time. At this time, by extracting data between the upper and lower thresholds from the two types of results respectively, and weighted averaging them with a certain weight, they can verify each other to a certain extent, reduce their respective accidental errors, and make the calculation results of the subsidence in the transition zone more robust. Through the above-mentioned hierarchical and progressive fusion calculation, the final mining area subsidence results can overcome the limitations of traditional methods, and can provide subsidence distribution with high accuracy and high spatial resolution in the central area, transition area and marginal area, thereby achieving a detailed assessment of the subsidence conditions of the entire mining area and facilitating the management of the mining area subsidence basin.
[0025] 2. The calculation method for predicting the subsidence basin in the mining area provided by this application, the starting position and the stop line position are the starting point and end point of the subsidence process, representing the formation process of the entire subsidence basin, taking the average value of the two as the upper threshold, extracting the data of the large subsidence in the first calculation result and incorporating it into the final result, ensures the accurate control of the key risk area, and the maximum deformation gradient reflects the "extreme value" of the subsidence within the coverage of the radar image, corresponding to the area with the most serious subsidence. Using this as the lower threshold, it can be ensured that the delineated weak subsidence area will not contain too drastic deformation, and the effective monitoring range can be expanded to the greatest extent. The mean absolute error is an important indicator to measure the degree of deviation between the model prediction results and the actual observation values. The smaller the MAE, the closer the calculation results of the method are to the actual situation, and the higher the reliability. By calculating the MAE of the InSAR time series analysis and the probability integration method respectively, the accuracy of the two methods can be quantitatively compared, providing an objective basis for the subsequent weighted fusion. This weight determination method based on error evaluation avoids the uncertainty of subjective experience judgment, making the fusion process more scientific and credible.
[0026] 3. The calculation method for predicting mining subsidence basins provided in this application can determine whether the current radar data is seriously affected by factors such as season and coherence by obtaining the maximum deformation gradient of the interferometric synthetic aperture radar time series analysis method and comparing it with the preset observation threshold. If the observation threshold is not exceeded, the maximum gradient is directly used as the lower threshold to form a transition interval between the upper threshold. If the deformation gradient of the radar method is abnormally large, a more reliable maximum gradient value is selected from the historical verification data to avoid distortion in the transition zone. This adaptive adjustment strategy improves the rationality of marginal area data screening. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 A flow chart of the calculation method for predicting mining subsidence basins provided in this application.
[0028] Figure 2 Schematic diagram for understanding the calculation method for predicting mining subsidence basins provided in this application.
[0029] Figure 3 Another flowchart of the calculation method for predicting mining subsidence basins provided in this application.
[0030] Figure 4 A schematic diagram of a physical device of a computing system for predicting mining subsidence basins provided in this application. DETAILED DESCRIPTION
[0031] The terms used in the following embodiments of the present application are only for the purpose of describing specific embodiments, and are not intended to be used as limitations to the present application. As used in the specification and appended claims of the present application, the singular expressions "one", "a kind of", "said", "above", "the" and "this" are intended to also include plural expressions, unless there is a clear indication to the contrary in the context. It should also be understood that the term "and / or" used in the present application refers to any or all possible combinations comprising one or more listed items.
[0032] In the following, the terms "first" and "second" are used for descriptive purposes only and are not to be understood as suggesting or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features, and in the description of the embodiments of the present application, unless otherwise specified, "plurality" means two or more.
[0033] The following is a description of the calculation method for predicting the subsidence basin in the mining area in this embodiment: like Figure 1 As shown, Figure 1 A flow chart of the calculation method for predicting mining subsidence basins provided in this application.
[0034] S101, obtaining a first calculation result and a second calculation result of the prediction of the subsidence basin of the mining area to be calculated, wherein the first calculation result is obtained by calculating the leveling data using the probability integral method, and the second calculation result is obtained by calculating the synthetic aperture radar image data using the interferometric synthetic aperture radar time series analysis method.
[0035] The prediction of subsidence basin in the mining area to be calculated refers to the coal mining affected area that needs to be monitored and calculated for subsidence, which is usually manifested as a concave area that is approximately circular or elliptical.
[0036] The probability integral method is a classic coal mining subsidence prediction model based on random medium theory. By performing probability integral on the mined rock layer, the subsidence amount at any position on the surface can be calculated. Leveling data is the surface elevation change data obtained using precision measuring equipment such as levels, which can directly reflect the vertical displacement of subsidence.
[0037] InSAR time series analysis (interferometric synthetic aperture radar time series analysis method) can obtain the time series deformation information of the mining area surface by differential interferometry processing of multi-scene SAR images (synthetic aperture radar image data) and invert the spatiotemporal evolution of subsidence. SAR image data is a microwave remote sensing image collected by radar satellites or airborne SAR sensors, which contains surface reflection characteristics and deformation information.
[0038] refer to Figure 2 , Figure 2 Schematic diagram for understanding the calculation method for predicting mining subsidence basins provided in this application.
[0039] When conducting mining area subsidence monitoring and calculation, two different technical means are first used to obtain data on the same mining area subsidence basin to be calculated, and the leveling data and SAR image data are obtained respectively. The leveling data are then processed by the probability integral method to obtain the expected subsidence amount of the subsidence basin (the first calculation result). The InSAR time series analysis method is used to process the SAR image data to obtain the InSAR detection results of the mining area subsidence.
[0040] It should be noted that, in some embodiments, the calculation method of the mining area subsidence basin in the present application is different from the traditional method. The leveling data obtained in the present application is only a part of the normal leveling data. In other words, the number of points can be reduced when leveling points are arranged in the mining area, especially at the edge of the subsidence basin. Leveling points can be omitted. The adjustment of this point arrangement strategy is based on the characteristics of the method of the present application. In the subsequent calculation steps, only the leveling data of the central area and the transition area are selected, so the workload can be greatly reduced and the measurement efficiency can be improved.
[0041] In other embodiments, in order to further optimize the point arrangement scheme, the density of level points in different areas can be reasonably adjusted according to the spatial distribution characteristics of the subsidence. Specifically, the density of level points arranged in the central area of the subsidence basin is greater than that in the transition area. This is because the subsidence deformation in the central area is severe and requires a higher observation frequency to characterize it, so as to improve the accuracy of the final calculation results of the subsidence basin in the mining area to be calculated. In the transition area, since the subsidence deformation is relatively slow, appropriately reducing the density of level points can save manpower and material resources while ensuring the measurement accuracy.
[0042] Similarly, in the calculation method for predicting mining subsidence basins in the present application, when using the InSAR time series analysis method for deformation monitoring, appropriate SAR data can also be selected in a targeted manner, and the focus can be on the relatively accurate transition zones and edge zones in the SAR data. The SAR images of these areas can be selectively processed, and the relevant differential interference phase can be extracted. Time series inversion can be performed to obtain detailed spatiotemporal evolution information of surface deformation and reduce computing resources.
[0043] S102, fusing the first calculation result and the second calculation result according to the prediction rule to obtain the final calculation result of the subsidence basin prediction of the mining area to be calculated, The prediction rules include: Extracting data not lower than the upper critical threshold from the first calculation result as part of the data of the final calculation result; Extracting data not higher than the lower critical threshold from the second calculation result as part of the data of the final calculation result; The third data higher than the lower critical threshold is extracted from the first calculation result, and the fourth data lower than the upper critical threshold is extracted from the second calculation result; the third data and the fourth data are weightedly fused according to the set first weight and second weight as part of the data of the final calculation result, and the sum of the first weight and the second weight is one.
[0044] The upper critical threshold represents the upper limit of the amount of subsidence. Subsidence exceeding this value is considered to be severe and usually occurs near the center of the subsidence. The lower critical threshold refers to the lower limit of the amount of subsidence. Subsidence below this value is considered to be weak and usually occurs in the marginal area of the subsidence basin.
[0045] refer to Figure 2 Therefore, the mining subsidence basin can be divided into the central area, transition area and marginal area through the upper critical threshold and the lower critical threshold.
[0046] After obtaining the preliminary calculation results of the probability integral method and InSAR time series analysis, it is necessary to further fuse the two results in order to obtain more comprehensive and accurate subsidence monitoring results. Since the two methods differ in principle, accuracy, resolution, etc., direct superposition may introduce large deviations, so it is necessary to design reasonable fusion rules. According to the spatial differentiation characteristics of subsidence, the subsidence can be classified by using the upper and lower critical thresholds, and the data of strong subsidence areas (higher than the upper critical value), weak subsidence areas (lower than the lower critical value) and medium subsidence areas (between the two thresholds) can be extracted. Considering that the overall reliability of the probability integral results is higher, and the InSAR results are more advantageous in local deformation monitoring, the strong subsidence and weak subsidence data can be extracted from the two results respectively and directly used to construct the final results; for the medium subsidence in the transition zone, the weighted average method is used for fusion to combine the advantages of the two methods. By reasonably setting the first and second weights, the relative contribution of the two methods in the fusion results can be adjusted to improve the overall calculation accuracy. The final subsidence calculation results can reflect the overall shape of the subsidence basin at the macro level and depict the subtle changes in local subsidence at the micro level, providing a reliable basis for the assessment and prevention of coal mining subsidence disasters.
[0047] In some embodiments, optionally, upper and lower critical thresholds are manually set according to the general rules of coal mining subsidence in mining areas combined with previous experience and measured data analysis, and then different levels of subsidence are extracted from the two calculation results respectively, and the strong subsidence and weak subsidence data are directly spliced, and the medium subsidence data is weighted averaged, and the weight coefficient is manually adjusted to make the fusion result consistent with the actual situation; it is understandable that other methods can also be used, which are not limited here.
[0048] It can be seen that the hierarchical fusion strategy can more reasonably give play to the advantages of each data in view of the differences in the subsidence amplitude in different regions. The central area of the subsidence is often severely deformed, which has exceeded the detection saturation range of radar interferometry, but it happens to be the advantage of high-precision leveling. By setting the upper threshold, the data of large subsidence in the first calculation result is preferentially extracted and included in the final result. In contrast, the surface subsidence in the marginal area of the mining area is relatively mild, falling within the optimal sensitivity range of radar measurement. By setting the lower threshold to extract the data of small deformation from the second calculation result, the effective monitoring range can be expanded to the greatest extent, and the spatial morphology of the entire subsidence basin can be fully portrayed without increasing the difficulty and cost of artificial measurement point layout. For the medium subsidence in the transition zone, the reliability of a single data is reduced because it does not meet the high credibility conditions of leveling and radar analysis results at the same time. At this time, by extracting data between the upper and lower thresholds from the two types of results respectively, and weighted averaging them with a certain weight, they can verify each other to a certain extent, reduce their respective accidental errors, and make the calculation results of the subsidence in the transition zone more robust. Through the above-mentioned hierarchical and progressive fusion calculation, the final mining area subsidence results can overcome the limitations of traditional methods, and can provide subsidence distribution with high accuracy and high spatial resolution in the central area, transition area and marginal area, thereby achieving a detailed assessment of the subsidence conditions of the entire mining area and facilitating the management of the mining area subsidence basin.
[0049] In the above embodiments, the calculation method for predicting subsidence basins in mining areas is mainly introduced. However, in actual mining area management and disaster prevention, it is far from enough to simply calculate the subsidence basins that have occurred. In order to better guide mining work and land reclamation planning, it is also necessary to further predict the evolution trend of mining subsidence basins in the future, that is, to predict the subsequent ground subsidence. This is of great significance for assessing the environmental impact of mining activities, optimizing mining plans, and formulating disaster prevention and control measures. Therefore, after obtaining the calculation results of the prediction of mining subsidence basins, this application also provides three specific ground subsidence prediction methods to achieve accurate prediction of future subsidence in mining areas.
[0050] In some embodiments, after step S102, the method further includes: constructing a ground subsidence prediction model for the mining area subsidence basin to be calculated; the ground subsidence prediction model is: S ∞ =S A +S B In the formula, S A is the settlement of clay or silt, α is the soil compression coefficient, e0 is the original porosity of the soil, Δp is the average additional stress imposed on the soil by the water level change, H is the calculated soil thickness, S B is the settlement of sand, S∞ is the final settlement of the soil layer.
[0051] It can be seen that the ground settlement of clay, silt, sand and other soil layers can be estimated. The model takes into account multiple influencing factors such as the compressibility of the soil layer (compression coefficient), the original porosity, and the additional stress caused by water level changes. It can simulate the deformation law of the soil layer more comprehensively, and then combine them to obtain the final ground settlement.
[0052] In some embodiments, after step S102, the method further includes: constructing a ground subsidence prediction model for the mining area subsidence basin to be calculated; the ground subsidence prediction model is: S t =S ∞ U In the formula, S t is the land subsidence after time t, S ∞ is the final settlement of the soil layer, U is the degree of consolidation, N is the time factor, C v is the consolidation coefficient, and H is the calculated soil layer thickness.
[0053] It can be seen that the model introduces parameters such as time factor and consolidation coefficient to predict the evolution of mining area subsidence over time, which can describe the dynamic characteristics of the subsidence process. Through this model, the cumulative settlement after a specific time can be estimated and the development trend of subsidence can be judged, which is of great significance for predicting future subsidence risks and formulating phased prevention and control measures.
[0054] It should be noted that this embodiment is applicable to the case where the water level rise and fall has been stable and unchanged, and when the water level rise and fall is still changing, it is applicable to the next embodiment.
[0055] In some embodiments, after step S102, the method further includes: constructing a ground subsidence prediction model for the mining area subsidence basin to be calculated; the ground subsidence prediction model is: S s =I s Δh=I' s ΔhH S C =I C Δh=I' C ΔhH In the formula, S s S is the rebound of the soil layer with a thickness of H when the water level rises by Δh. C is the settlement of the soil layer with a thickness of H when the water level drops by Δh, I s is the unit deformation during the water level rise period, IC is the unit deformation during the water level drop period, I' s is the unit deformation variable during the water level rise period, I' C is the unit deformation variable during the water level drop period, Δh s is the rise of water level in Δh time, Δh C is the water level rise within Δh, ΔS s is the value corresponding to Δh s The change of soil layer under C is the value corresponding to Δh C The amount of soil layer change below.
[0056] It can be seen that the elastic rebound and plastic compression deformation of the soil layer during the rise and fall of the water level are comprehensively considered. The model introduces the unit deformation variable of the water level rise period and the fall period, which can distinguish the influence of the direction of water level change on the deformation of the soil layer. By calculating the rebound amount and settlement amount separately, the vertical displacement of the ground caused by water level fluctuation can be estimated more accurately, and the precision of settlement prediction can be improved.
[0057] In a specific embodiment, Figure 3 As shown, Figure 3 Another flowchart of the calculation method for predicting mining subsidence basins provided in this application.
[0058] S301, obtaining a first calculation result and a second calculation result of the prediction of the subsidence basin in the mining area to be calculated, wherein the first calculation result is obtained by calculating the leveling data using the probability integral method, and the second calculation result is obtained by calculating the synthetic aperture radar image data using the interferometric synthetic aperture radar time series analysis method.
[0059] The principles and processes of the relevant steps have been described in detail in step S101 and will not be repeated here.
[0060] S302. Determine the average result of the first probability integration result and the second probability integration result as the upper critical threshold, the first probability integration result is obtained by calculating the starting position of the working face using the probability integration method, and the second probability integration result is obtained by calculating the stop mining line position using the probability integration method.
[0061] The starting position of the working face usually refers to the position where the coal mining activity begins, and the subsidence at this position is relatively small. The stop line position refers to the position where the coal mining activity of the working face ends, and the subsidence at this position is usually close to the maximum value.
[0062] After obtaining the calculation results of the probability integral method, it is necessary to further determine the upper threshold of the subsidence classification to provide a basis for the subsequent result fusion. By calculating the subsidence at the starting position of the working face mining and the stop mining line position respectively, generally speaking, the subsidence at the starting position of the working face is relatively small, while the subsidence at the stop mining line position is close to the maximum value. In order to reasonably divide the strong subsidence area, the subsidence at the two characteristic positions can be arithmetic averaged to obtain the upper critical threshold.
[0063] In some embodiments, the estimated result of the probability integral at the starting position of the strike working face is 400 mm, and the estimated result of the probability integral at the stop mining line position is 300 mm, and the average value of the two, 350 mm, is taken as the upper critical threshold for fusion.
[0064] S303: Determine the maximum deformation gradient of the interferometric synthetic aperture radar timing analysis method as a lower critical threshold.
[0065] The maximum deformation gradient reflects the "extreme value" of subsidence within the coverage area of the radar image, corresponding to the area with the most serious subsidence.
[0066] In the marginal area of the subsidence basin, the surface subsidence rate is slow due to the distance from the mining area, and the deformation time series is relatively gentle. Therefore, the maximum deformation gradient obtained by InSAR time series analysis can be used as the lower critical threshold, that is, the subsidence below this rate is divided into the marginal area. This can be used as the lower threshold to ensure that the demarcated marginal area does not contain too severe deformation.
[0067] In some embodiments, the maximum deformation gradient is: In the formula, D max is the maximum deformation gradient, γ is the wavelength of synthetic aperture radar image data, n The number of images used for the interferometric synthetic aperture radar time series analysis method.
[0068] It can be seen that through this formula, the maximum deformation gradient of the mining area can be directly estimated according to the parameters of SAR data (wavelength, number of images).
[0069] In other embodiments, some observation images are taken in summer, and the image coherence is low and the quality is poor, resulting in the maximum deformation that can be monitored by InSAR in actual observation being much smaller than the maximum deformation gradient.
[0070] Therefore, in some other embodiments, step S303 may be replaced by: S3031. Obtaining the maximum deformation gradient of an interferometric synthetic aperture radar timing analysis method; S3032, determining whether the maximum deformation gradient is greater than a preset observation threshold; S3033, if it is not greater than, determining the maximum deformation gradient as the lower critical threshold; S3034. If it is greater than, the maximum deformation gradient that has been verified to be problem-free is selected from the historical data of the prediction of the mining area subsidence basin to be calculated and determined as the lower critical threshold.
[0071] It should be noted that the maximum deformation gradient that has been verified to be problem-free is selected from the historical data of the mining area subsidence basin monitoring to be calculated. The "verified problem-free" data here usually refers to the data that has been used normally in previous actual calculations and the results are reliable. In general, these data mainly come from SAR images in spring, autumn and winter, because the surface conditions in these periods are relatively stable and the atmospheric effects are also small, which is more conducive to obtaining high-quality differential interferometry results. It should be noted that the selected maximum deformation gradient should be less than or equal to the maximum deformation actually monitored by InSAR technology in the mining area.
[0072] In other embodiments, if there is no available historical monitoring data for the mining area to be calculated, or if there is a lack of verified reliable maximum deformation gradient value in the historical data, the preset observation threshold is directly selected as the lower critical threshold.
[0073] It can be seen that by obtaining the maximum deformation gradient of the interferometric synthetic aperture radar time series analysis method and comparing it with the preset observation threshold, it is possible to determine whether the current radar data is seriously affected by factors such as season and coherence. If it does not exceed the observation threshold, the maximum gradient is directly used as the lower threshold to form a transition interval between the upper threshold. If the deformation gradient of the radar method is abnormally large, a more reliable maximum gradient value is selected from the historical verification data to avoid distortion in the transition zone. This adaptive adjustment strategy improves the rationality of edge area data screening.
[0074] S304, respectively calculating the mean absolute errors of the interferometric synthetic aperture radar timing analysis method and the probability integration method.
[0075] It should be noted that the mean absolute error of the InSAR time series analysis method and the mean absolute error of the probability integration method represent the accuracy of the InSAR time series analysis method and the probability integration method, respectively; In some embodiments, the error of the InSAR timing analysis method is calculated using a multi-baseline interferometric configuration (InSAR) height measurement error equation; The multi-baseline interferometry configuration utilizes radar images at multiple different angles and can improve the accuracy and reliability of elevation measurement by increasing the diversity of observation angles.
[0076] Error=f(σ φ ,B,λ,L,θ) In the formula, σ φis the standard deviation of the interference phase, B is the baseline length, λ is the radar wavelength, L is the distance from the radar to the target, and θ is the incident angle.
[0077] In some embodiments, variable-step Simpsen double integral is used to calculate the accuracy of the probability integration method; Simpsen's rule is a numerical integration method used to approximate the calculation of definite integrals; variable-step Simpsen's rule is a variant thereof that improves the accuracy of integration by adaptively adjusting the step size; in the timing analysis method, it may be necessary to calculate the cumulative effects of some variables over time through integration; using variable-step Simpsen double integral can effectively calculate these effects and reduce the error of numerical integration.
[0078] In other embodiments, the calculation results of the interferometric synthetic aperture radar timing analysis method and the probability integration method and the corresponding actual observation values are obtained respectively. Then, for each method, the mean absolute error is calculated respectively, and the mean absolute error of the interferometric synthetic aperture radar timing analysis method and the probability integration method can be calculated in advance. Once these error values are determined, they can be directly used in subsequent analysis and applications.
[0079] Of course, other methods may also be used to calculate the mean absolute error of the interferometric synthetic aperture radar timing analysis method and the probability integration method, which are not limited here.
[0080] S305: Determine the inverse proportional calculation results of the mean absolute errors of the interferometric synthetic aperture radar timing analysis method and the probability integration method as the first weight and the second weight.
[0081] By calculating the mean absolute error of InSAR time series analysis and probability integration method respectively, the prediction accuracy of the two methods can be compared. Generally speaking, the smaller the mean absolute error, the closer the prediction result is to the actual situation, and the higher the credibility of the method.
[0082] The inverse of the two error values is used as the initial weight, which is normalized so that the sum of the weights is 1, thereby obtaining the final fusion weight.
[0083] S306: The first calculation result and the second calculation result are merged according to the prediction rules to obtain the final calculation result of the subsidence basin prediction of the mining area to be calculated. The prediction rules include: Extracting data not lower than the upper critical threshold from the first calculation result as part of the data of the final calculation result; Extracting data not higher than the lower critical threshold from the second calculation result as part of the data of the final calculation result; The third data higher than the lower critical threshold is extracted from the first calculation result, and the fourth data lower than the upper critical threshold is extracted from the second calculation result; the third data and the fourth data are weightedly fused according to the set first weight and second weight as part of the data of the final calculation result, and the sum of the first weight and the second weight is one.
[0084] The principles and processes of the relevant steps have been described in detail in step S102 and will not be repeated here.
[0085] It can be seen that the starting position and the stop line position are the starting point and end point of the subsidence process, representing the formation process of the entire subsidence basin. The average value of the two is taken as the upper threshold, and the data of the large subsidence in the first calculation result is extracted and included in the final result, which ensures the accurate control of the key risk area. The maximum deformation gradient reflects the "extreme value" of the subsidence within the coverage of the radar image, corresponding to the area with the most serious subsidence. Using this as the lower threshold can ensure that the delineated weak subsidence area will not contain too drastic deformation, and can maximize the expansion of the effective monitoring range. The mean absolute error is an important indicator to measure the degree of deviation between the model prediction results and the actual observation values. The smaller the MAE, the closer the calculation results of the method are to the actual situation and the higher the reliability. By calculating the MAE of the InSAR time series analysis and probability integration method respectively, the accuracy of the two methods can be quantitatively compared, providing an objective basis for the subsequent weighted fusion. This weight determination method based on error evaluation avoids the uncertainty of subjective experience judgment, making the fusion process more scientific and credible.
[0086] The following are device embodiments of the present application, which can be used to execute the method embodiments of the present application. For details not disclosed in the device embodiments of the present application, please refer to the method embodiments of the present application.
[0087] The present application also discloses a computing system for predicting subsidence basins in mining areas. Figure 4 , which is a schematic diagram of a physical device of a computing system for predicting mining subsidence basins provided in this application. The computer 400 may include: at least one processor 401 , at least one network interface 404 , a user interface 403 , a memory 405 , and at least one communication bus 402 .
[0088] The communication bus 402 is used to realize the connection and communication between these components.
[0089] The user interface 403 may include a display screen (Display) and a camera (Camera), and the optional user interface 403 may also include a standard wired interface and a wireless interface.
[0090] The network interface 404 may optionally include a standard wired interface or a wireless interface (such as a WI-FI interface).
[0091] Among them, the processor 401 may include one or more processing cores. The processor 401 uses various interfaces and lines to connect various parts in the entire server, and executes various functions of the server and processes data by running or executing instructions, programs, code sets or instruction sets stored in the memory 405, and calling data stored in the memory 405. Optionally, the processor 401 can be implemented in at least one hardware form of digital signal processing (Digital Signal Processing, DSP), field programmable gate array (Field-Programmable Gate Array, FPGA), and programmable logic array (Programmable Logic Array, PLA). The processor 401 can integrate one or more combinations of a central processing unit (Central Processing Unit, CPU), a graphics processor (Graphics Processing Unit, GPU) and a modem. Among them, the CPU mainly processes the operating system, user interface and application programs; the GPU is responsible for rendering and drawing the content to be displayed on the display screen; the modem is used to process wireless communications. It can be understood that the above-mentioned modem may not be integrated into the processor 401, and it can be implemented by a single chip.
[0092] Among them, the memory 405 may include a random access memory (Random Access Memory, RAM) and may also include a read-only memory (Read-Only Memory). Optionally, the memory 405 includes a non-transitory computer-readable storage medium. The memory 405 can be used to store instructions, programs, codes, code sets or instruction sets. The memory 405 may include a program storage area and a data storage area, wherein the program storage area may store instructions for implementing an operating system, instructions for at least one function (such as a touch function, a sound playback function, an image playback function, etc.), instructions for implementing the above-mentioned various method embodiments, etc.; the data storage area may store data involved in the above-mentioned various method embodiments, etc. The memory 405 may optionally be at least one storage device located away from the aforementioned processor 401. Refer to Figure 4 The memory 405 as a computer storage medium may include an operating system, a network communication module, a user interface module, and an application program for calculating a mining subsidence basin.
[0093] exist Figure 4In the computer 400 shown, the user interface 403 is mainly used to provide an input interface for the user and obtain the data input by the user; and the processor 401 can be used to call the application program for calculating the subsidence basin in the mining area stored in the memory 405. When executed by one or more processors 401, the computer 400 executes one or more of the methods described in the above embodiments. It should be noted that for the aforementioned method embodiments, for the sake of simple description, they are all expressed as a series of action combinations, but those skilled in the art should know that the present application is not limited by the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also know that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required for the present application.
[0094] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0095] In the several embodiments provided in this application, it should be understood that the disclosed devices can be implemented in other ways. For example, the device embodiments described above are only schematic, such as the division of units, which is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some service interfaces, and the indirect coupling or communication connection of devices or units can be electrical or other forms.
[0096] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0097] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0098] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable memory. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, which is stored in a memory and includes several instructions for a computer device (which can be a personal computer, server or network device, etc.) to perform all or part of the steps of the various embodiments of the present application. The aforementioned memory includes: various media that can store program codes, such as USB flash drives, mobile hard drives, magnetic disks or optical disks.
[0099] The above is only an exemplary embodiment of the present disclosure and cannot be used to limit the scope of the present disclosure. That is, any equivalent changes and modifications made according to the teachings of the present disclosure are still within the scope of the present disclosure. After considering the disclosure of the specification and the truth of practice, those skilled in the art will easily think of other embodiments of the present disclosure.
[0100] This application is intended to cover any variation, use or adaptation of the present disclosure, which follows the general principles of the present disclosure and includes common knowledge or customary technical means in the art not described in the present disclosure. The description and examples are to be regarded as exemplary only, and the scope and spirit of the present disclosure are defined by the claims.
Claims
1. The calculation method for predicting the subsidence basin in the mining area is characterized by: include: Obtaining a first calculation result and a second calculation result of a subsidence basin in a mining area to be calculated, wherein the first calculation result is obtained by calculating leveling data using a probability integral method, and the second calculation result is obtained by calculating synthetic aperture radar image data using an interferometric synthetic aperture radar time series analysis method; The first calculation result and the second calculation result are merged according to the prediction rule to obtain the final calculation result of the prediction of the subsidence basin of the mining area to be calculated; The prediction rules include: Extract data not lower than an upper critical threshold from the first calculation result as part of the data of the final calculation result; extract data not higher than a lower critical threshold from the second calculation result as part of the data of the final calculation result; extract third data higher than the lower critical threshold from the first calculation result, and extract fourth data lower than the upper critical threshold from the second calculation result; and use the result of weighted fusion of the third data and the fourth data according to the set first weight and second weight as part of the data of the final calculation result, wherein the sum of the first weight and the second weight is one.
2. The calculation method for predicting mining subsidence basins according to claim 1, characterized in that: Before the step of fusing the first calculation result and the second calculation result according to the prediction rule to obtain the final calculation result of the prediction of the mining area subsidence basin to be calculated, the method further includes: Determine the average result of the first probability integration result and the second probability integration result as the upper critical threshold, wherein the first probability integration result is obtained by calculating the starting position of the working face using the probability integration method, and the second probability integration result is obtained by calculating the stop mining line position using the probability integration method; Determining the maximum deformation gradient of the interferometric synthetic aperture radar timing analysis method as a lower critical threshold; Calculating the mean absolute errors of the interferometric synthetic aperture radar timing analysis method and the probability integration method respectively; The inverse proportional calculation results of the mean absolute errors of the interferometric synthetic aperture radar timing analysis method and the probability integration method are determined as the first weight and the second weight.
3. The calculation method for predicting mining subsidence basins according to claim 1, characterized in that: The step of determining the maximum deformation gradient of the interferometric synthetic aperture radar timing analysis method as the lower critical threshold specifically includes: Obtaining the maximum deformation gradient of the interferometric synthetic aperture radar timing analysis method; Determine whether the maximum deformation gradient is greater than a preset observation threshold; If not, the maximum deformation gradient is determined as the lower critical threshold; If it is greater than, the maximum deformation gradient that has been verified to be problem-free is selected from the historical data of the mining area subsidence basin to be calculated and determined as the lower critical threshold.
4. The calculation method for predicting mining subsidence basins according to claim 2 or 3, characterized in that: The maximum deformation gradient is: In the formula, D max is the maximum deformation gradient, γ is the wavelength of the synthetic aperture radar image data, n is the number of images used in the interferometric synthetic aperture radar time series analysis method.
5. The calculation method for predicting mining subsidence basins according to claim 1, characterized in that: After the step of fusing the first calculation result and the second calculation result according to the prediction rule to obtain the final calculation result of the prediction of the mining area subsidence basin to be calculated, the method further includes: Construct a ground subsidence prediction model for the mining area subsidence basin to be calculated; the ground subsidence prediction model is: S ∞ =S A +S B In the formula, S A is the settlement of clay or silt, α is the soil compression coefficient, e0 is the original porosity of the soil, Δp is the average additional stress imposed on the soil by the water level change, H is the calculated soil thickness, S B is the settlement of sand, S ∞ is the final settlement of the soil layer.
6. The calculation method for predicting mining subsidence basins according to claim 5, characterized in that: After the step of fusing the first calculation result and the second calculation result according to the prediction rule to obtain the final calculation result of the prediction of the mining area subsidence basin to be calculated, the method further includes: Construct a ground subsidence prediction model for the mining area subsidence basin to be calculated; the ground subsidence prediction model is: S t =S ∞ U In the formula, S t is the land subsidence after time t, S ∞ is the final settlement of the soil layer, U is the degree of consolidation, N is the time factor, C v is the consolidation coefficient, and H is the calculated soil layer thickness.
7. The calculation method for predicting mining subsidence basins according to claim 1, characterized in that: After the step of fusing the first calculation result and the second calculation result according to the prediction rule to obtain the final calculation result of the prediction of the mining area subsidence basin to be calculated, the method further includes: Construct a ground subsidence prediction model for the mining area subsidence basin to be calculated; the ground subsidence prediction model is: S s =I s Δh=I’ s ΔhH S C =I C Δh=I’ C ΔhH In the formula, S s S is the rebound of the soil layer with a thickness of H when the water level rises by Δh. C is the settlement of the soil layer with a thickness of H when the water level drops by Δh, I s is the unit deformation during the water level rise period, I C is the unit deformation during the water level drop period, I' s is the unit deformation variable during the water level rise period, I' C is the unit deformation variable during the water level drop period, Δh s is the rise of water level in Δh time, Δh C is the water level rise within Δh, ΔS s is the value corresponding to Δh s The change of soil layer under the C is the value corresponding to Δh C The amount of soil layer change below.
8. A computing system for predicting subsidence basins in mining areas, characterized in that: include: one or more processors and memory; The memory is coupled to the one or more processors, and the memory is used to store computer program codes, wherein the computer program codes include computer instructions, and the one or more processors call the computer instructions to enable the computing system for predicting mining subsidence basins to execute the method described in any one of claims 1-7.
9. A computer-readable storage medium comprising instructions, characterized in that: When the instructions are executed on a computing system for predicting a mining area subsidence basin, the computing system for predicting a mining area subsidence basin executes the method according to any one of claims 1 to 7.
10. A computer program product, characterized in that When the computer program product is run on a computing system for predicting a mining area subsidence basin, the computing system for predicting a mining area subsidence basin executes the method according to any one of claims 1 to 7.
Citation Information
Patent Citations
Method for obtaining mining area earth surface three-dimensional deformation fields through single interferometric synthetic aperture radar (InSAR) interference pair
CN102927934A
Method for monitoring and resolving three-dimensional ground surface deformation of industrial and mining area by means of multi-source SAR image
CN106526590A
D-InSAR and UAV photogrammetry fusion method based on coal mining surface subsidence characteristics