Underbridge space planning method and system, product and medium

The spatial data under the bridge is obtained through image sensors, the planning threshold is calculated and compared with other spaces in the database, and the planning scheme is determined based on the greening rate and the proportion of pedestrian crossings. The problem of inefficient space planning under the existing bridge is solved, and the rapid and Flexible planning scheme generation to adapt to the needs of complex urban environments.

CN119004596APending Publication Date: 2024-11-22SUZHOU PLANNING & DESIGN RES INST CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411024018.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-29
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The existing under-bridge space planning methods are inefficient and require frequent field surveys and data collection, resulting in long planning time and inflexible plans to adapt to the special needs of complex urban environments.

Method used

Use image sensors to obtain space data under the bridge, calculate the planning threshold and determine whether planning is needed. If the threshold is high, obtain flow and air quality data, compare it with other spaces in the database, find similar spaces as reference, and combine greening rate and crosswalk proportion. , determine the location of the pedestrian crossing and make overall plans to generate a fast planning plan.

Benefits of technology

The efficiency of space planning under the bridge is improved, the design and modification time is reduced, and the generated planning scheme is more suitable for actual needs, and can better utilize space resources, taking into account the ecological environment and people's flow.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119004596A_ABST
    Figure CN119004596A_ABST
Patent Text Reader

Abstract

The invention discloses an under-bridge space planning method and system, a product and a medium, and relates to the field of space planning, and the method comprises the steps: firstly, receiving the image and area data of a target under-bridge space, calculating a planning threshold value to judge whether planning is needed, if the planning threshold value is greater than the threshold value, obtaining flow and air quality data, and comparing with other spaces under the bridge in the database, finding out the most similar space as a reference, determining the placement position of the pedestrian crossing according to the greening rate of the reference space and the proportion of the pedestrian crossing in combination with the pedestrian flow data of the target space, and performing overall planning, so that a planning scheme can be quickly generated, the design and modification time is shortened, and the planning efficiency is improved. And the under-bridge space planning efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of space planning, and in particular to a method, system, product and medium for planning space under a bridge. Background Art

[0002] With the acceleration of urbanization, urban land resources are becoming increasingly scarce, and how to make full use of existing space has become an important issue facing urban planners. In this context, the rational use and planning of under-bridge space, as a common but often neglected area in cities, has attracted more and more attention.

[0003] In the relevant technology, at present, the planning of the space under the bridge usually adopts a combination of field investigation and design. The planners obtain the basic information of the space under the bridge, such as area, surrounding environment, etc. through field investigation, and then formulate the planning scheme based on experience and relevant specifications.

[0004] However, this approach requires re-collection of data and analysis each time the space under the bridge is planned, resulting in low planning efficiency. Summary of the invention

[0005] The present application provides a method, system, product and medium for planning space under a bridge, which are used to improve the efficiency of planning space under a bridge.

[0006] In a first aspect, the present application provides a method for planning a space under a bridge, which is applied to a space under a bridge planning system. The method includes: receiving a spatial image of a target space under a bridge and area data of the target space under a bridge sent by an image sensor; detecting a planning threshold in the spatial image, wherein the planning threshold is calculated by the idle rate of the target space under a bridge, the clearance height of the target space under a bridge, the available width of the target space under a bridge, and the flow of people around the target space under a bridge, wherein the idle rate is the ratio of the area of ​​the soil part in the spatial image to the total area of ​​the target space under a bridge; if the idle rate is greater than a preset threshold, the flow data and air quality data of the target space under a bridge are obtained. obtain area data, flow data and historical air quality data of other spaces under bridges in a preset space under bridge database, and calculate the target similarity between the target space under bridge and the other spaces under bridge, the similarity being calculated from the area data, the flow data and the air quality data; take the space under bridge with the greatest similarity as the first space under bridge, and obtain the greening rate data and the proportion of the pedestrian crossing area of ​​the first space under bridge; determine the placement position of the pedestrian crossing according to the pedestrian flow data of the target space under bridge, and plan the target space under bridge according to the greening rate data, the proportion of the pedestrian crossing area and the placement position to obtain a preset planning scheme.

[0007] By adopting the above technical solution, firstly, the image and area data of the target space under the bridge are received, and the planning threshold is calculated to determine whether planning is needed. If the planning threshold is greater than the threshold, the flow and air quality data are obtained and compared with other spaces under the bridge in the database to find the most similar space as a reference. According to the greening rate and the proportion of pedestrian crossings in the reference space, combined with the pedestrian flow data of the target space, the location of the pedestrian crossing is determined and the overall planning is carried out. The planning scheme can be quickly generated, which reduces the design and modification time and improves the efficiency of the space planning under the bridge.

[0008] In combination with some embodiments of the first aspect, in some embodiments, the step of calculating the target similarity between the target under-bridge space and the other under-bridge spaces specifically includes: setting the weights of the area data, the flow data and the air quality data to obtain the area weight, the flow weight and the air quality weight, the sum of the area weight, the flow weight and the air quality weight being 1; calculating the area similarity based on the area data of the target under-bridge space and the area data of the other under-bridge spaces, the flow similarity based on the flow data of the target under-bridge space and the flow data of the other under-bridge spaces, and the air quality similarity based on the air quality data of the target under-bridge space and the historical air quality data of the other under-bridge spaces; calculating the target similarity based on the area weight, the flow weight, the air quality weight, the area similarity, the flow similarity and the air quality similarity.

[0009] By adopting the above technical solution, a multi-dimensional weight allocation method is used when calculating the similarity between the target underbridge space and other underbridge spaces. First, the weights of the area, flow and air quality data are set to ensure that the importance of these three factors is reasonably balanced. Then, the similarities of these three dimensions are calculated separately. Finally, the weights and the similarities of each dimension are comprehensively considered to obtain the final target similarity. Multi-dimensional weighted calculation can better find truly similar underbridge spaces, thereby improving the applicability and effectiveness of the planning scheme.

[0010] In combination with some embodiments of the first aspect, in some embodiments, the step of determining the placement position of the crosswalk based on the pedestrian flow data of the target space under the bridge specifically includes: constructing a pedestrian flow direction heat map based on the pedestrian flow data of the target space under the bridge, the thermal value of the pedestrian flow direction heat map representing the size of the pedestrian flow; identifying the direction of the largest pedestrian flow on the heat map; calculating the angle between the pedestrian flow direction and the main axis of the bridge in the target space under the bridge; selecting the pedestrian flow direction with the angle being a preset angle as the direction of the crosswalk, and determining the placement position of the crosswalk based on the direction and the free position of the target space under the bridge.

[0011] By adopting the above technical solution, we first construct a heat map of the direction of pedestrian flow to identify the direction with the largest pedestrian flow, then calculate the angle between this direction and the main axis of the bridge, select a suitable angle as the direction of the crosswalk, and finally determine the specific placement position based on the vacant position. This method makes full use of the pedestrian flow data and scientifically determines the optimal position and direction of the crosswalk through visualization and quantitative analysis. This method can better adapt to the actual pedestrian flow situation and improve the efficiency and safety of the use of crosswalks.

[0012] In combination with some embodiments of the first aspect, in some embodiments, the step of planning the target space under the bridge according to the greening rate data, the proportion of the pedestrian crossing area and the installation position to obtain a preset planning scheme specifically includes: calculating the newly added greening area in the target space under the bridge according to the greening rate data; calculating the pedestrian crossing area in the target space under the bridge according to the proportion of the pedestrian crossing area; determining the pedestrian crossing position corresponding to the pedestrian crossing area in the vacant position in the target space under the bridge according to the installation position; using the remaining position of the specific position as the greening position corresponding to the vacant newly added greening area, and determining the preset planning scheme according to the pedestrian crossing position and the greening position.

[0013] By adopting the above technical scheme, firstly, the newly added green area is calculated according to the greening rate data to ensure that the greening coverage reaches the expected goal. At the same time, the specific pedestrian crossing area is calculated using the proportion of the pedestrian crossing area to ensure the adequacy of the pedestrian passage. Combined with the placement position determined above, the specific position of the pedestrian crossing in the vacant position can be accurately located, and the remaining space can be allocated to the newly added green area, balancing the greening and traffic needs. By considering the effective use of space, taking into account the ecological environment and the needs of pedestrian traffic, the utilization efficiency of the space under the bridge is improved through precise calculation and reasonable layout.

[0014] In combination with some embodiments of the first aspect, in some embodiments, after the step of detecting a planning threshold in the spatial image, the planning threshold is calculated by the vacancy rate of the target space under the bridge, the clearance height of the target space under the bridge, and the available width of the target space under the bridge, and the vacancy rate is the ratio of the area of ​​the soil part in the spatial image to the total area of ​​the target space under the bridge, the method also includes: if the planning threshold is not greater than a preset threshold, determining the target greening rate, greening position, target pedestrian crossing area ratio and target pedestrian crossing placement position of the target space under the bridge according to the spatial image; integrating the target greening rate, the greening position, the target pedestrian crossing area ratio and the target pedestrian crossing placement position into a target planning scheme; and adding the target planning scheme to a preset bridge space database.

[0015] By adopting the above technical solution, when it is detected that the planning threshold of the space is not greater than the preset threshold, the greening rate, greening location, pedestrian crossing area ratio and placement position of the target space are automatically analyzed according to the spatial image. These key data are integrated into the target planning scheme and automatically added to the preset underbridge space database. By continuously accumulating and updating data, the planning algorithm and decision-making basis can be continuously optimized.

[0016] In combination with some embodiments of the first aspect, in some embodiments, after the step of adding the target planning scheme to a preset underbridge space database, the method further includes: comparing the status of green plants in the space image with the good green plant images in the preset green plant database to obtain a green plant maintenance score; if the green plant maintenance score is lower than the preset score, sending an improvement message to the client.

[0017] By adopting the above technical solution, after the target planning scheme is added to the database, the status of green plants in the spatial image is automatically evaluated. By comparing with the good green plant images in the preset green plant database, the green plant maintenance score can be objectively calculated. When the score is lower than the preset standard, a prompt message will be actively sent to the client to remind relevant personnel to perform greening maintenance in time. The automated monitoring and early warning mechanism improves the management efficiency of the greening of the space under the bridge, and ensures the continued good status of the greening of the space under the bridge through real-time monitoring and timely feedback.

[0018] In combination with some embodiments of the first aspect, in some embodiments, after planning the target underbridge space according to the greening rate data, the pedestrian crossing area ratio and the installation location to obtain a preset planning scheme, the method also includes: sending the preset planning scheme to the target client.

[0019] By adopting the above technical solution, efficient transmission and real-time sharing of underbridge space planning schemes are achieved. After completing the planning of the target underbridge space, the preset planning scheme is automatically sent to the target client, allowing relevant decision makers and executors to quickly obtain the latest planning information.

[0020] In a second aspect, an embodiment of the present application provides a bridge space planning system, which includes: one or more processors and a memory; the memory is coupled to the one or more processors, the memory is used to store computer program code, the computer program code includes computer instructions, and the one or more processors call the computer instructions to enable the bridge space planning system to execute the method described in the first aspect and any possible implementation method of the first aspect.

[0021] In a third aspect, an embodiment of the present application provides a computer program product comprising instructions. When the above-mentioned computer program product is run on an underbridge space planning system, the above-mentioned underbridge space planning system executes the method described in the first aspect and any possible implementation method of the first aspect.

[0022] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium, comprising instructions. When the instructions are executed on a bridge space planning system, the bridge space planning system executes the method described in the first aspect and any possible implementation method of the first aspect.

[0023] It can be understood that the bridge space planning system provided in the second aspect, the computer program product provided in the third aspect, and the computer storage medium provided in the fourth aspect are all used to execute the method provided in the embodiment of the present application. Therefore, the beneficial effects that can be achieved can refer to the beneficial effects in the corresponding method, which will not be repeated here.

[0024] One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages: 1. This application first receives the image and area data of the target space under the bridge, calculates the planning threshold to determine whether planning is needed, and if the planning threshold is greater than the threshold, obtains the flow and air quality data, and compares it with other spaces under the bridge in the database to find the most similar space as a reference. According to the greening rate and the proportion of pedestrian crossings in the reference space, combined with the pedestrian flow data of the target space, the location of the pedestrian crossing is determined and overall planning is carried out. The planning scheme can be quickly generated, which reduces the design and modification time and improves the efficiency of the space planning under the bridge.

[0025] 2. This application first constructs a heat map of pedestrian flow direction to identify the direction with the largest pedestrian flow, then calculates the angle between this direction and the main axis of the bridge, selects a suitable angle as the direction of the crosswalk, and finally determines the specific placement location based on the vacant space. This method makes full use of the pedestrian flow data and scientifically determines the optimal location and direction of the crosswalk through visualization and quantitative analysis. This method can better adapt to actual pedestrian flow conditions and improve the efficiency and safety of crosswalk use.

[0026] 3. This application first calculates the newly added green area based on the greening rate data to ensure that the greening coverage reaches the expected goal. At the same time, the specific pedestrian crossing area is calculated using the proportion of the pedestrian crossing area to ensure the adequacy of the pedestrian passage. Combined with the placement position determined above, the specific position of the pedestrian crossing in the vacant position can be accurately located, and the remaining space can be allocated to the newly added green area, balancing the greening and traffic needs. By considering the effective use of space, the ecological environment and the needs of pedestrian traffic are taken into account. Through precise calculation and reasonable layout, the utilization efficiency of the space under the bridge is improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a flow chart of a method for planning under-bridge space in an embodiment of the present application; Figure 2 is another flow chart of the method for planning the space under the bridge in the embodiment of the present application; Figure 3 It is a schematic diagram of the structure of a physical device of the underbridge space planning system in an embodiment of the present application. DETAILED DESCRIPTION

[0028] The terms used in the following embodiments of the present application are only for the purpose of describing specific embodiments, and are not intended to be used as limitations to the present application. As used in the specification of the present application, the singular expressions "one", "a kind of", "above", "the" and "this" are intended to also include plural expressions, unless there is a clear indication to the contrary in the context. It should also be understood that the term "and / or" used in the present application refers to any or all possible combinations comprising one or more of the listed items.

[0029] In the following, the terms "first" and "second" are used for descriptive purposes only and are not to be understood as suggesting or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features, and in the description of the embodiments of the present application, unless otherwise specified, "plurality" means two or more.

[0030] For ease of understanding, the application scenarios of the embodiments of the present application are introduced below.

[0031] In the rapidly developing city A, viaducts, highways and high-speed rail lines crisscross, creating a large number of small underbridge spaces. These spaces are usually about 10-15 square meters in size, scattered and large in number. According to statistics, there are more than 5,000 such small underbridge spaces in City A, with a total area of ​​60,000 square meters. However, most of these spaces are idle, which not only wastes precious urban resources, but also easily accumulates garbage and breeds public security problems.

[0032] In order to improve planning efficiency, City A tried to use an auxiliary design software to assist in planning these small underbridge spaces. The software allows planners to enter basic parameters (such as area, surrounding environment type, etc.), and then choose the most appropriate one from several preset options. For example, for a 12-square-meter underbridge space located near a residential area, the software would recommend planning it as a small green area or bicycle parking spot. However, this method soon revealed serious flaws: first, the software could not automatically obtain real-time data, and manual field measurement and input of data for each space were required, which was still very time-consuming for thousands of small spaces; second, the preset schemes were too simplistic and could not adapt to the complex urban environment and the special needs of different locations; finally, due to the lack of a comprehensive analysis of the surrounding environment, many planning schemes were found to be inconsistent with actual needs after implementation. For example, a space planned as a green area was difficult for plants to grow due to insufficient light, while a space planned as a bicycle parking spot had a very low usage rate due to the lack of bicycle lanes in the surrounding area.

[0033] After adopting the underbridge space planning method of this application, the planning efficiency of small underbridge spaces in City A has been significantly improved. Take an 11-square-meter space under the C viaduct in District B as an example: First, the system automatically receives spatial images and precise area data through micro-sensors installed on the viaduct, and detects that the planning threshold of the space is as high as 95%, far exceeding the preset 60% planning threshold. The system then automatically obtains the average daily passenger flow (about 200 people) and real-time air quality data (the average PM2.5 value is 42μg / m³). The system quickly matches the most similar planned space in the database-a similar underbridge space located in District D of the same city, with a greening rate of 60% and a pedestrian crossing ratio of 40%.

[0034] Based on the real-time pedestrian flow data, the system generates a heat map and determines that the main direction of pedestrian flow is at a 30-degree angle to the bridge axis. Based on this data, the system generates a planning scheme within 20 minutes: the 11-square-meter space is divided into a 6.6-square-meter (60%) green area and a 4.4-square-meter (40%) crosswalk. The green area is designed as a small three-dimensional green wall, which can maximize the greening effect of the limited space without obstructing the pedestrian's sight. The crosswalk is optimized according to the main direction of pedestrian flow detected to ensure the convenience and safety of pedestrians.

[0035] This plan not only improves planning efficiency, but also has high feasibility because it fully considers local actual conditions. The entire planning process does not require on-site inspections, saving time and human resources. In addition, since the system can continuously monitor space usage, it can be dynamically adjusted based on actual usage data in the future to further optimize space utilization efficiency.

[0036] For ease of understanding, the following describes the process of the method provided by this implementation in combination with the above scenario. Figure 1 , which is a flow chart of the underbridge space planning method in an embodiment of the present application.

[0037] S101, receiving a spatial image of a target space under a bridge and area data of the target space under a bridge sent by an image sensor; The image sensor refers to a device for collecting images, such as a camera. The target underbridge space refers to the area under a specific bridge that needs to be planned. The spatial image is used to represent the visual presentation of the target underbridge space. The area data refers to the plane size information of the target underbridge space.

[0038] Specifically, when planning a space under a bridge, the system first needs to obtain basic information about the space. Through image sensors installed under or around the bridge, the system can receive real-time images of the target space under the bridge. At the same time, the system also receives the area data of the target space under the bridge that has been measured or calculated in advance. These data provide basic information for subsequent analysis and planning.

[0039] In some embodiments, the data sent by the image sensor can be received in a variety of ways: Optionally, the system can set up a special data receiving module, which establishes a direct data connection with the image sensor and receives the image and area data collected by the sensor in real time. After preliminary processing, the received data is stored in the temporary storage area of ​​the system for subsequent use; Optionally, the system can periodically obtain the data uploaded by the image sensor from the remote server through the network interface. The system sets a scheduled task to send a data request to the server at regular intervals to obtain the latest spatial image and area data, and save the data to the local database. It is understandable that other methods can also be used to receive and store data, such as manual uploading through a mobile device, etc., which are not limited here.

[0040] S102, detecting a planning threshold in the spatial image, where the planning threshold is calculated based on the vacancy rate of the target space under the bridge, the clearance height of the target space under the bridge, the available width of the target space under the bridge, and the flow of people around the target space under the bridge, where the vacancy rate is the ratio of the area of ​​the soil part in the spatial image to the total area of ​​the target space under the bridge; When calculating the planning threshold, the four most critical parameters to consider are the space availability, the height and width of the space, the flow of people around the space, and the flow of people in the space itself. The availability directly determines the planning potential of the space, the height and width of the space determine the adaptability of the space to various functions, and the flow of people represents the use demand of the space.

[0041] Among them, the idle rate refers to the proportion of the unused area in the target bridge space to the total area, which is obtained by calculating the ratio of the area in the soil state in the spatial image to the total area. The clearance height refers to the vertical height of the target bridge space from the ground to the bottom of the bridge, which can be measured on-site using laser radar and other equipment. The available width refers to the width of the space that can be used for functional layout in the target bridge space. The maximum continuous width that can be used is calculated by analyzing the spatial image excluding structures such as pillars. The flow of people refers to the statistical data of the flow of people in the surrounding area of ​​the target bridge space.

[0042] In order to make reasonable calculations, weights are set for each parameter to ensure that they are properly reflected in the comprehensive score. Specifically, the space status score S1 is calculated first, which is the weighted sum of the vacancy rate, headroom and available width according to the set weights. Then, the pedestrian flow score S2 is calculated, which is the weighted sum of the surrounding pedestrian flow and the own pedestrian flow.

[0043] Finally, the space status score and the traffic score are combined according to a certain balance coefficient to obtain the planning threshold S3. If this planning threshold S3 exceeds the preset threshold, it indicates that the space needs functional planning.

[0044] In some embodiments, the detection of planning thresholds can be achieved in a variety of ways: Optionally, the system integrates image processing and sensor technology to obtain parameters. Use image algorithms to calculate the idle rate, set up laser radar to obtain the clearance height, analyze the image to obtain the available width, and install infrared sensors to collect the flow of people.

[0045] Optionally, the system connects with the city monitoring department to obtain parameters. Obtain target area images from the monitoring department to calculate the vacancy rate, obtain laser radar scanning data to calculate the clearance height and available width, and obtain the crowd statistics of the intelligent monitoring system. It can be understood that the method of obtaining each parameter can be flexible and diverse, and is not limited here.

[0046] It is understandable that, in some embodiments, this step may also include the following: If the planning threshold exceeds the set maximum threshold, it indicates that the planning potential of the target underbridge space is large, and more diversified functional planning and utilization can be considered in addition to greening and pedestrian passages. The system can detect the environmental conditions around the target space. If the monitoring results show that there are adjacent residential areas, the system can use "residential area" as a keyword for matching and searching in the preset planning scheme database to obtain functional planning schemes for the spaces around the residential areas, such as planning leisure and sports activity areas. If the detection results show that there are commercial areas with large traffic in the surrounding environment, the system can use "commercial area" as a keyword for fuzzy matching in the preset database to obtain functional planning schemes for the spaces around the commercial areas, such as planning temporary parking areas or fast charging stations. By detecting and analyzing the surrounding environment, the planning scheme can be more in line with the actual situation.

[0047] S103: If the planning threshold is greater than a preset threshold, the flow data and air quality data of the target underbridge space are obtained; The preset threshold value refers to the planning threshold judgment standard preset by the system, which is used to determine whether further planning is required. Traffic flow data refers to the number of vehicles and pedestrians passing through the target bridge space. Air quality data is used to indicate the degree of air pollution in the target bridge space, including but not limited to PM2.5, PM10, sulfur dioxide, nitrogen dioxide and other indicators.

[0048] Specifically, when the system detects that the planning threshold of the target underbridge space exceeds the preset threshold, it indicates that there is a large unused area in the space and that it has the potential for planning. At this point, the system will further collect traffic data and air quality data of the space to comprehensively evaluate the current status and potential uses of the space. Traffic data can reflect the activities of people and vehicles in the area, while air quality data can help determine whether the space is suitable for planning for certain specific purposes, such as setting up green or leisure areas.

[0049] In some embodiments, the acquisition of traffic data and air quality data can be achieved in a variety of ways: Optionally, the system can collect data in real time through a sensor network installed around the space under the bridge. First, deploy vehicle flow and pedestrian flow detectors to record the number of vehicles and pedestrians passing through the space; second, install air quality monitoring equipment to collect various air quality indicators in real time; finally, transmit the collected data to the central processing system via a wireless network. Optionally, the system can use the city big data platform to obtain relevant information. First, connect with the data system of the traffic management department to obtain historical traffic flow data in the area; second, obtain air quality data for a recent period of time from the public data platform of the environmental monitoring department; finally, integrate these data into the system's database for subsequent analysis. It is understandable that other methods can also be used to obtain traffic and air quality data, such as through drone inspections or satellite remote sensing and other technologies, which are not limited here.

[0050] S104, obtaining area data, flow data and historical air quality data of other spaces under bridges in a preset space under bridge database, and calculating target similarity between the target space under bridge and the other spaces under bridge, wherein the similarity is calculated from the area data, the flow data and the air quality data; The preset underbridge space database refers to a data set pre-established by the system that contains information related to multiple underbridge spaces. Other underbridge spaces refer to underbridge spaces that have been planned or have reference value, except for the target underbridge space. Historical air quality data refers to the air quality monitoring records of other underbridge spaces over a period of time. Target similarity is used to indicate the degree of similarity between the target underbridge space and other underbridge spaces in terms of various indicators.

[0051] Specifically, after obtaining the basic data of the target underbridge space, the system needs to find a suitable reference case to guide planning. First, the system accesses the preset underbridge space database and extracts the relevant data of other underbridge spaces stored therein. Then, the system compares the data of the target underbridge space with the data of other underbridge spaces in the database and calculates the similarity between them. This similarity is calculated by comprehensively considering multiple factors such as area, flow rate and air quality, and can fully reflect the similarity between different underbridge spaces.

[0052] In some embodiments, similarity calculation can be achieved in a variety of ways: Optionally, the system can use the weighted Euclidean distance method to calculate similarity. First, the area data, flow data, and air quality data are standardized separately; second, a weight is assigned to each data type to reflect its importance in the similarity calculation; then, the weighted Euclidean distance between the target underbridge space and each other underbridge space in various indicators is calculated; finally, the distance is converted into similarity, the smaller the distance, the higher the similarity. Optionally, the system can use the cosine similarity method. First, the data of each underbridge space is constructed into a multidimensional vector; second, the cosine value of the angle between the target underbridge space vector and each other underbridge space vector is calculated; then, the cosine value is sorted according to the size of the cosine value, the closer the cosine value is to 1, the higher the similarity; finally, several underbridge spaces with the highest similarity are selected as reference cases.

[0053] S105, taking the bridge space with the greatest similarity as the first bridge space, and obtaining greening rate data and pedestrian crossing area ratio of the first bridge space; Among them, the bridge space with the greatest similarity refers to the bridge space calculated in the previous step, which is closest to the various indicators of the target bridge space. The first bridge space refers to the bridge space selected as the main reference object. The greening rate data refers to the proportion of greening area to the total area under the bridge, which is used to indicate the ecological environment level of the space under the bridge. The proportion of pedestrian crossing area refers to the proportion of pedestrian crossing area in the total area under the bridge, which is an important indicator used to reflect the convenience of pedestrian passage.

[0054] Specifically, after completing the similarity calculation, the system needs to select the most suitable underbridge space case for reference. First, the system will sort the calculated similarities and select the underbridge space with the highest similarity as the first underbridge space. This first underbridge space is considered to be the closest to the target underbridge space conditions, and its planning scheme may be the most valuable for reference. Next, the system will further obtain the specific planning data of this first underbridge space, including greening rate data and the proportion of pedestrian crossing area. These data will serve as an important reference for the subsequent planning of the target underbridge space.

[0055] In some embodiments, the selection and data acquisition of the first underbridge space can be achieved in a variety of ways: Optionally, the system can use a sorting and screening method. First, all calculated similarities are sorted from large to small; second, the underbridge space with the highest similarity in the sorting results is selected as the first underbridge space; then, the preset underbridge space database is accessed to extract detailed information of the first underbridge space; finally, the greening rate data and the proportion of pedestrian crossing area are extracted from it. Optionally, the system can use a multi-round screening method. First, a similarity threshold is set to filter out multiple underbridge spaces with similarities higher than the threshold; second, the greening rate and the proportion of pedestrian crossing area of ​​these underbridge spaces are evaluated, and the one with the best comprehensive performance is selected as the first underbridge space; then, the identification information of the first underbridge space is recorded; finally, the greening rate data and the proportion of pedestrian crossing area are extracted from the database according to the identification information. It can be understood that other methods can also be used to select the first underbridge space and obtain relevant data, such as through expert system evaluation or screening in combination with other additional conditions, which are not limited here.

[0056] S106. Determine the location of the crosswalk according to the pedestrian flow data of the target space under the bridge, and plan the target space under the bridge according to the greening rate data, the area ratio of the crosswalk and the location to obtain a preset planning scheme.

[0057] Among them, the pedestrian flow data represents the pedestrian traffic in different areas and directions of the target bridge space. The placement of the pedestrian crossing refers to the specific location and direction of the pedestrian crossing planned in the bridge space. The preset planning scheme refers to the preliminary bridge space utilization plan formulated based on various data and reference cases.

[0058] Specifically, after obtaining the key data of the reference case, the system began to formulate a specific planning scheme for the target underbridge space. First, the system analyzed the pedestrian flow data of the target underbridge space, determined the areas with dense pedestrian flow and the main direction of travel, and planned the optimal location of the crosswalk accordingly. Then, the system referred to the greening rate and the proportion of the crosswalk area in the space under the first bridge, and combined with the actual situation of the space under the target bridge, determined the distribution and area of ​​the greening area, as well as the specific size of the crosswalk. Finally, the system integrated these planning elements to form a complete preset planning scheme, including the layout of functional areas such as green areas, pedestrian walkways, and rest areas.

[0059] In some embodiments, the formulation of the planning scheme can be achieved in a variety of ways: Optionally, the system can use a template matching method. First, a heat map is generated based on the pedestrian flow data to identify areas with dense pedestrian flow; second, the heat map is matched with the preset pedestrian crossing template to determine the optimal pedestrian crossing location; then, according to the greening rate of the reference case, the greening area is planned in the remaining space; finally, an overall planning map is generated according to the layout of each functional area. Optionally, the system can use an intelligent optimization algorithm. First, the space under the bridge is divided into several grid units; second, the optimization objective function is set according to the pedestrian flow data, the greening rate requirements and the pedestrian crossing area ratio; then, the genetic algorithm or the particle swarm optimization algorithm is used to optimize the allocation of the functions of each grid unit; finally, a detailed planning scheme is generated based on the optimization results. It can be understood that other methods can also be used to formulate planning schemes, such as combining virtual reality technology for three-dimensional simulation planning, etc., which are not limited here.

[0060] After combining the above scenarios, the following is a more detailed description of the process of the method provided by this implementation. Figure 2 , is another flow chart of the underbridge space planning method in an embodiment of the present application.

[0061] S201, receiving a spatial image of a target space under a bridge and area data of the target space under the bridge sent by an image sensor.

[0062] It can be understood that this step is similar to step S101 and will not be described in detail here.

[0063] S202, detecting a planning threshold in the spatial image, wherein the planning threshold is calculated based on the idle rate of the target space under the bridge, the clearance height of the target space under the bridge, and the available width of the target space under the bridge, wherein the idle rate is the ratio of the area of ​​the soil portion in the spatial image to the total area of ​​the target space under the bridge.

[0064] It can be understood that this step is similar to step S102 and will not be described in detail here.

[0065] S203: If the planned threshold is greater than a preset threshold, the flow data and air quality data of the target underbridge space are obtained.

[0066] It can be understood that this step is similar to step S103 and will not be described in detail here.

[0067] S204. Set the weights of the area data, the flow data, and the air quality data to obtain an area weight, a flow weight, and an air quality weight, the sum of which is 1.

[0068] When calculating the similarity of the space under the bridge, it is necessary to consider the weight of the data of each indicator on the result. The area weight, flow weight and air quality weight represent the weight of area data, flow data and air quality data in the similarity calculation respectively. In order to perform weighted calculation, the sum of the three weights must be 1.

[0069] Specifically, the system needs to pre-set the weights of area, flow, and air quality data according to their different importance in similarity calculations. Generally speaking, the weight of area data may be larger, the weight of flow data is in the middle, and the weight of air quality data is smaller. For example, the area weight can be set to 0.6, the flow weight to 0.3, and the air quality weight to 0.1, so that the sum of the three is 1. In this way, when calculating the similarity of the space under the bridge in the future, different indicators will have different influences.

[0070] For example, considering that area size is very important in physical planning, the area weight can be set to 0.7, the flow weight to 0.2, and the air quality weight to 0.1 to express the maximum influence of area data on similarity judgment.

[0071] S205. Based on the area similarity between the area data of the target space under the bridge and the area data of the other spaces under the bridge, based on the flow similarity between the flow data of the target space under the bridge and the flow data of the other spaces under the bridge, and based on the air quality similarity between the air quality data of the target space under the bridge and the historical air quality data of the other spaces under the bridge.

[0072] Area similarity refers to the degree of similarity calculated by comparing the area data of the spaces under the two bridges. Flow similarity refers to the degree of similarity calculated by comparing the flow data of the spaces under the two bridges. Air quality similarity refers to the degree of similarity calculated by comparing the air quality data of the spaces under the two bridges.

[0073] Specifically, the system needs to calculate the numerical similarity of the target underbridge space and other underbridge spaces in terms of area, flow, and air quality. The area similarity is obtained by comparing the areas of the two spaces, the flow similarity is obtained by comparing the flow data, and the air quality similarity is obtained by comparing the air quality index. The calculation method can use algorithms such as correlation coefficient and Euclidean distance.

[0074] For example, the area of ​​target space A is 10 square meters, and the area of ​​space B is 9.5 square meters. Through the correlation coefficient algorithm, it can be calculated that the area correlation coefficient between the two is 0.95, that is, the area similarity is 0.95; the correlation coefficient of the average daily flow data of target space A and space B is 0.85, that is, the flow similarity is 0.85; the correlation coefficient of the PM2.5 concentration historical data of the two spaces is 0.80, that is, the air quality similarity is 0.80.

[0075] S206: Calculate target similarity based on the area weight, the flow weight, the air quality weight, the area similarity, the flow similarity and the air quality similarity Area weight, flow weight, and air quality weight respectively represent the weights of area, flow, and air quality data in similarity calculation. Area similarity, flow similarity, and air quality similarity respectively represent the similarity between the target underbridge space and other underbridge spaces in terms of area, flow, and air quality data. Target similarity is an evaluation index for the overall similarity between the target underbridge space and other underbridge spaces.

[0076] Specifically, the system needs to comprehensively consider various weights and similarities, and use a weighted calculation method to obtain the target similarity between the target underbridge space and other underbridge spaces. The calculation formula is: target similarity = area weight area similarity + flow weight flow similarity + air quality weight * air quality similarity. In this way, by adjusting different weights, the different effects of various factors on the overall similarity can be reasonably reflected.

[0077] For example, if the area weight is 0.6, the flow weight is 0.3, and the air quality weight is 0.1; the area similarity is 0.9, the flow similarity is 0.8, and the air quality similarity is 0.7. Then the target similarity = 0.60.9 + 0.30.8 + 0.1*0.7 = 0.86. This means that after considering various factors, the overall similarity between the target underbridge space and the other underbridge spaces is 0.86.

[0078] S207: The space under the bridge with the greatest similarity is used as the first space under the bridge, and the greening rate data and the ratio of the pedestrian crossing area of ​​the first space under the bridge are obtained.

[0079] It can be understood that this step is similar to step S105 and will not be described in detail here.

[0080] S208. Construct a heat map of the direction of human flow according to the human flow data of the target underbridge space. The heat value of the heat map of the direction of human flow indicates the magnitude of human flow.

[0081] The flow data is the statistics of the flow of people in different directions under the target bridge. The heat map of the flow direction directly reflects the distribution of people in the space through the heat distribution. The heat value indicates the amount of people flow, and the larger the heat value, the more people flow.

[0082] Specifically, the system needs to construct a distribution map of the flow of people in different directions in the target underbridge space in the form of a heat map based on the collected data on the flow of people in different directions. Different color areas on the heat map represent the high and low flow of people, so as to clearly and intuitively reflect the distribution of people in the space. The heat map can provide a reference for determining the location of the pedestrian passage.

[0083] For example, the system generates a heat map based on the traffic statistics of the target bridge space for one month. The red areas in the map indicate the areas with the largest daily traffic, which are also the areas that need to be prioritized when determining the location of the pedestrian passage.

[0084] S209: Identify the direction with the largest flow of people on the heat map.

[0085] The direction with the largest flow of people refers to the direction of travel with the highest flow intensity on the heat map of the flow of people in the space under the target bridge.

[0086] Specifically, the system needs to further identify the direction and area where the flow of people is most densely distributed based on the heat map of the flow of people generated in the previous step. Image processing technology can be used to extract the contours of the heat map to determine the main direction of distribution of the flow of people. The purpose of this step is to determine the main direction of travel of the flow of people and provide a basis for setting the location and direction of the pedestrian passage.

[0087] For example, by analyzing the heat map, the system identifies that there is an obvious area of ​​high thermal value between the north-south entrance and exit, and determines that this direction has the largest flow of people and is the main pedestrian direction.

[0088] S210, calculating the angle between the direction of the pedestrian flow and the main axis of the bridge in the target space under the bridge.

[0089] The main axis of the bridge is the central axis of the entire length of the bridge. The angle is calculated to determine the relative relationship between the main pedestrian direction and the bridge direction in order to design the best direction for the pedestrian passage.

[0090] Specifically, the system needs to calculate the angle between the main travel direction identified in the previous step and the bridge main axis data obtained in advance. The calculation method can be solved using vector inner product operation. After obtaining the angle, it can be determined whether the main travel direction is parallel or perpendicular to the bridge direction.

[0091] For example, if the angle between the main pedestrian direction and the bridge axis is calculated to be 35°, it means that there is a certain angle between the main pedestrian direction and the bridge direction, but it is neither perpendicular nor completely parallel. This parameter will guide the setting of the pedestrian passage.

[0092] S211, selecting the pedestrian flow direction with the angle being the preset angle as the direction of the crosswalk.

[0093] The preset angle is the angle between the ideal pedestrian direction and the bridge axis pre-specified by the system. The purpose of this step is to select the direction of pedestrian flow that best meets the expected direction as the orientation of the pedestrian passage based on the actual angle calculated.

[0094] Specifically, the system will compare the calculated actual angle with the preset optimal angle, and select the pedestrian flow direction closest to the preset value as the basis for determining the direction of the pedestrian passage. This can ensure that the direction of the pedestrian passage meets the overall planning needs.

[0095] For example, if the preset angle is 90°, the main flow direction of the 85° angle calculated in the above example is determined as the direction of the pedestrian passage because it is the direction closest to 90°. If there are multiple directions close to the preset angle, the direction with the largest flow of people is selected.

[0096] S212: Determine the location of the crosswalk according to the orientation and the free space under the target bridge.

[0097] The orientation is the direction of the determined crosswalk. The vacant space is the unused area under the target bridge. The placement location is the specific location of the crosswalk under the bridge.

[0098] Specifically, after determining the orientation of the crosswalk, the system also needs to select the best location for the crosswalk based on the actual vacancy of the space under the bridge. The orientation of the crosswalk and the space boundary restrictions are mainly considered, and the crosswalk is placed in an area that meets the requirements in the vacant position.

[0099] For example, if the orientation of the crosswalk is determined to be at a 95° angle to the bridge, the system will retrieve the distribution of free areas in this direction and select a vacant space with a width and length that meets the requirements and does not conflict with existing facilities to place the crosswalk. This allows for the rational use of space resources.

[0100] S213. Calculate the newly added greening area in the space under the target bridge according to the greening rate data.

[0101] The greening rate data is the reference greening area ratio of the first bridge under the space. The newly added greening area is calculated based on the greening rate requirements to calculate the size of the newly added greening area in the target bridge under the space.

[0102] Specifically, the system will calculate the size of the additional green coverage area required in the target space based on the greening rate data of the first selected space under the bridge and the total area of ​​the target space under the bridge. The additional green area will become an important parameter for the greening planning of the target space under the bridge.

[0103] For example, if the greening rate of the space under the first bridge is 30%, and the vacant area of ​​the target space is 10 square meters, the newly added greening area is calculated to be 3 square meters. This means that 3 square meters of greening area needs to be added to the target space.

[0104] S214. Calculate the area of ​​the pedestrian crossing in the space under the target bridge according to the ratio of the pedestrian crossing area.

[0105] The pedestrian crossing area ratio is the ratio of the pedestrian crossing area of ​​the first bridge underpass to the total area. Based on this ratio, the area that the pedestrian crossing needs to occupy in the target bridge underpass can be calculated.

[0106] Specifically, the system can use the pedestrian crossing ratio data of the first bridge underpass space, combined with the total area of ​​the target space, to calculate the area that the pedestrian crossing needs to cover in the target space. This parameter can be used to guide the design of pedestrian passages.

[0107] For example, if the pedestrian crossing under the first bridge accounts for 15% of the space and the target space is 10 square meters, the pedestrian crossing area needs to be planned as 1.5 square meters. S215. Determine the position of the crosswalk corresponding to the crosswalk area in an empty position in the space under the target bridge according to the placement position.

[0108] The placement location is the specific location of the determined crosswalk. The crosswalk area is the area that the crosswalk needs to occupy, which is calculated. The crosswalk location is determined by the specific distribution location of the crosswalk in the vacant location according to the area requirements.

[0109] Specifically, after the placement location is determined, the system will plan a specific crosswalk location that meets the expected crosswalk area in the vacant area around the location. According to the crosswalk area requirements, the surrounding space resources are reasonably utilized to achieve the effect of full connection and reasonable area.

[0110] For example, if the area of ​​the pedestrian crossing is calculated to be 300 square meters and the location is in the east area of ​​the space under the bridge, the system will select a roughly rectangular area with an area of ​​about 300 square meters from the free space in the area as the specific location of the pedestrian crossing.

[0111] S216: The remaining position of the specific position is used as the greening position corresponding to the vacant new greening area, and a preset planning scheme is determined according to the pedestrian crossing position and the greening position.

[0112] After the location of the pedestrian crossing is determined, the remaining free positions in the space can be used to plan green areas. These positions are integrated into the greening positions corresponding to the newly added green area. Finally, the system will integrate the positions of the pedestrian passage and the greening area to form a complete planning scheme for the space under the bridge.

[0113] Specifically, the system will count the remaining vacant locations outside the pedestrian crossings and use them as the greening locations for the newly added green areas. After determining the respective location distributions of the pedestrian passages and green areas, the system will integrate the location information of the two into a planning drawing to form an overall functional zoning plan for the space under the bridge as a preset planning scheme.

[0114] For example, the space outside the pedestrian walkway can be planned as green space such as flower beds and lawns, which can be integrated with the layout of the pedestrian walkway to generate a preset planning scheme.

[0115] S217: If the planning threshold is not greater than a preset threshold, determine the target greening rate, greening position, target pedestrian crossing area ratio, and target pedestrian crossing placement position of the target underbridge space according to the spatial image.

[0116] If the planning threshold of the target underbridge space is low, it means that the space utilization rate is high and other cases cannot be directly referenced. At this time, the system needs to determine the planning parameters based on the target space itself. The system will check the space image to determine the greening rate, greening location, pedestrian crossing ratio, and pedestrian crossing location of the target underbridge space.

[0117] Specifically, when the planning threshold is not high, the system will analyze the spatial image in detail, determine the current greening distribution, calculate the target greening rate, check the distribution of vacant land, determine the optional location of new greening, analyze pedestrian paths, and set the target crosswalk ratio and location. These parameters will become the goals of subsequent space transformation and carry out customized planning.

[0118] For example, after analyzing the current spatial image, the target greening rate was determined to be 30%, and a new greening area was set up in the vacant space in the southeast corner. The target pedestrian crossing rate was 20%, and pedestrian crossings were set up along the north-south direction.

[0119] S218. Integrate the target greening rate, the greening location, the target pedestrian crossing area ratio and the target pedestrian crossing placement location into a target planning solution.

[0120] The target greening ratio is the target proportion of green area under the bridge space determined based on the current situation analysis. The greening location is the specific location of the planned new green area. The target pedestrian crossing ratio is the proportion of pedestrian passage area to the total area set according to planning requirements. The pedestrian crossing location is the detailed location of the pedestrian passage.

[0121] Specifically, after determining the above-mentioned planning parameters of the target underbridge space, the system needs to integrate them to generate a target planning scheme. The scheme includes the proportion and location distribution of green areas, the proportion and detailed direction of pedestrian passages, etc., which is a customized planning layout for the target space.

[0122] For example, the system integrates factors such as the target greening rate of 30%, the newly added green area in the southeast corner, the pedestrian walkway ratio of 20%, and the location of the pedestrian walkways set along the north-south direction into a customized planning scheme for the target underbridge space.

[0123] S219, adding the target planning scheme to the preset underbridge space database.

[0124] The preset database stores various reference-worthy underbridge space planning cases. Customized target planning schemes can also be added to enrich the database content and serve as a reference for subsequent planning of other spaces.

[0125] Specifically, the system will enter the customized planning scheme generated according to the actual situation of the target underbridge space into the database and save it together with the existing general planning cases. The customized scheme contains the specific location information of the space for reference. Adding it to the database can provide more diverse scheme sample selection for subsequent planning.

[0126] For example, the customized planning scheme for the target underbridge space with ID "GX0023" and related location, area and other information are entered into the "Planning Case" table in the database and saved as a new planning case record.

[0127] S220: Compare the green plant status in the spatial image with the good green plant images in the preset green plant database to obtain a green plant maintenance score. The green plant status is the growth status of various green plants in the target bridge space. The preset green plant database contains good growth pattern pictures of different green plants. The green plant maintenance score can reflect the maintenance level of green plants in the target space.

[0128] Specifically, the system uses computer vision technology to compare and analyze the images of green plants in the target space with standard plant images in the database, evaluate the growth status of the plants in the target space, and calculate the score of green plant maintenance. This can evaluate the quality of space greening management and provide a reference for subsequent maintenance.

[0129] For example, the system compares images of "potted foliage plants" with those in the database. If a condition score of 60 is given for similar plants in the target space, it will use this score as the maintenance score for that type of plant, indicating that the maintenance is acceptable but there is room for improvement.

[0130] S221. If the green plant maintenance score is lower than the preset score, a prompt message is sent to the client.

[0131] The green plant maintenance score is generated by comparing the previous steps and reflects the score of the green plant maintenance quality in the target space. The preset score is the qualified benchmark score of green plant maintenance preset by the system. Sending a prompt message to the client means that when the maintenance score is lower than the benchmark score, the system sends a warning message to the client responsible for maintenance.

[0132] Specifically, the system will compare the calculated green plant maintenance score with the preset maintenance qualified benchmark score in the database. If the maintenance score is lower than this benchmark score, it means that there is a problem with the maintenance of the green plants under the target bridge. At this time, the system will automatically generate maintenance reminder information and actively send it to the client user responsible for maintaining the greening through an application program or other means. This can serve as a timely reminder.

[0133] For example, if the preset benchmark score is 70 points, and the maintenance score of the target space is 60 points, which is lower than the required level, the system will actively push the message "The vegetation maintenance score of the bridge space is 60 points, please check the greening, and replenish water and fertilizer in time" to the maintenance party so that they can optimize the maintenance measures.

[0134] S222: Send the preset planning solution to the target client.

[0135] The preset planning scheme is the final underbridge space utilization planning scheme generated by the system based on various data. Sending to the target client means sending the planning scheme in the form of a digital file to the user who needs to obtain the planning scheme.

[0136] Specifically, after the system calculates the preset planning scheme for the target underbridge space, it needs to be sent to the relevant responsible personnel in the form of a digital document so that they can understand the planning and design of the space and provide feedback. The system will actively push the planning scheme file to the client device of the target user through the network as an email attachment, simplifying the acquisition process.

[0137] For example, the system will send the preset planning scheme including space functional zoning, greening layout and other contents in the form of a PDF document to the project manager's email client, so that they can view the planning scheme file on their computer or mobile phone and adjust and optimize it as needed.

[0138] The following describes the underbridge space planning system in the embodiment of the present invention from the perspective of hardware processing. Figure 3 , which is a schematic diagram of the structure of a physical device of the under-bridge space planning system in an embodiment of the present application.

[0139] It should be noted that Figure 3 The structure of the underbridge space planning system shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present invention.

[0140] like Figure 3As shown, the underbridge space planning system includes a central processing unit (CPU) 301, which can perform various appropriate actions and processes according to the program stored in the read-only memory (ROM) 302 or the program loaded from the storage part 308 to the random access memory (RAM) 303, such as executing the method described in the above embodiment. In RAM 303, various programs and data required for system operation are also stored. CPU 301, ROM 302 and RAM 303 are connected to each other through bus 304. Input / output (I / O) interface 305 is also connected to bus 304.

[0141] The following components are connected to the I / O interface 305: an input section 306 including an audio input device, a button switch, etc.; an output section 307 including a liquid crystal display (LCD) and an audio output device, an indicator light, etc.; a storage section 308 including a hard disk, etc.; and a communication section 309 including a network interface card such as a LAN (Local Area Network) card, a modem, etc. The communication section 309 performs communication processing via a network such as the Internet. A drive 310 is also connected to the I / O interface 305 as needed. A removable medium 311, such as a magnetic disk, an optical disk, a magneto-optical disk, a semiconductor memory, etc., is installed on the drive 310 as needed so that a computer program read therefrom is installed into the storage section 308 as needed.

[0142] In particular, according to an embodiment of the present invention, the process described above with reference to the flowchart can be implemented as a computer software program. For example, an embodiment of the present invention includes a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a computer program for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from a network through the communication part 309, and / or installed from a removable medium 311. When the computer program is executed by the central processing unit (CPU) 301, various functions defined in the present invention are performed.

[0143] It should be noted that specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM), a flash memory, an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination thereof. In the present invention, a computer-readable storage medium may be any tangible medium containing or storing a program that may be used by or in combination with an instruction execution system, apparatus, or device.

[0144] The flowcharts and block diagrams in the accompanying drawings illustrate the possible architecture, functions and operations of the systems, methods and computer program products according to various embodiments of the present invention. Each box in the flowchart or block diagram may represent a module, a program segment, or a part of a code, and the above-mentioned module, program segment, or a part of a code contains one or more executable instructions for implementing the specified logical functions. It should also be noted that in some alternative implementations, the functions marked in the box may also occur in an order different from that marked in the accompanying drawings.

[0145] Specifically, the underbridge space planning system of this embodiment includes a processor and a memory. The memory stores a computer program. When the computer program is executed by the processor, the underbridge space planning method provided in the above embodiment is implemented.

[0146] As another aspect, the present invention further provides a computer-readable storage medium, which may be included in the underbridge space planning system described in the above embodiment; or may exist independently without being assembled into the underbridge space planning system. The above storage medium carries one or more computer programs, and when the above one or more computer programs are executed by a processor of the underbridge space planning system, the underbridge space planning system implements the underbridge space planning method provided in the above embodiment.

[0147] As described above, the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present application.

[0148] As used in the above embodiments, the term "when..." may be interpreted to mean "if..." or "after..." or "in response to determining..." or "in response to detecting...", depending on the context. Similarly, the phrases "upon determining..." or "if (the stated condition or event) is detected" may be interpreted to mean "if determining..." or "in response to determining..." or "upon detecting (the stated condition or event)" or "in response to detecting (the stated condition or event)", depending on the context.

[0149] Those skilled in the art can understand that to implement all or part of the processes in the above-mentioned embodiments, the processes can be completed by computer programs to instruct related hardware, and the programs can be stored in computer-readable storage media. When the programs are executed, they can include the processes of the above-mentioned method embodiments. The aforementioned storage media include: ROM or random access memory RAM, magnetic disk or optical disk and other media that can store program codes.

Claims

1. A method for planning space under a bridge, characterized in that: Applied to the underbridge space planning system, the method comprises: receiving a spatial image of a target space under a bridge and area data of the target space under a bridge sent by an image sensor; Detecting a planning threshold in the spatial image, wherein the planning threshold is calculated based on the vacancy rate of the target space under the bridge, the clearance height of the target space under the bridge, the available width of the target space under the bridge, and the flow of people around the target space under the bridge, wherein the vacancy rate is the ratio of the area of ​​the soil part in the spatial image to the total area of ​​the target space under the bridge; If the planning threshold is greater than a preset threshold, the flow data and air quality data of the target underbridge space are obtained; Acquire area data, flow data, and historical air quality data of other underbridge spaces in a preset underbridge space database, and calculate target similarity between the target underbridge space and the other underbridge spaces, wherein the similarity is calculated from the area data, the flow data, and the air quality data; The bridge space with the greatest similarity is used as the first bridge space, and the greening rate data and the pedestrian crossing area ratio of the first bridge space are obtained; The placement position of the pedestrian crossing is determined according to the pedestrian flow data of the target space under the bridge, and the target space under the bridge is planned according to the greening rate data, the area ratio of the pedestrian crossing and the placement position to obtain a preset planning scheme.

2. The method according to claim 1, characterized in that The step of calculating the target similarity between the target under-bridge space and the other under-bridge spaces specifically includes: Setting weights of the area data, the flow data, and the air quality data to obtain an area weight, a flow weight, and an air quality weight, wherein the sum of the area weight, the flow weight, and the air quality weight is 1; Based on the area similarity between the area data of the target under-bridge space and the area data of the other under-bridge spaces, based on the flow similarity between the flow data of the target under-bridge space and the flow data of the other under-bridge spaces, and based on the air quality similarity between the air quality data of the target under-bridge space and the historical air quality data of the other under-bridge spaces; The target similarity is calculated according to the area weight, the flow weight, the air quality weight, the area similarity, the flow similarity and the air quality similarity.

3. The method according to claim 1, characterized in that The step of determining the placement position of the crosswalk according to the pedestrian flow data of the target underbridge space specifically includes: Constructing a heat map of the direction of human flow according to the human flow data of the target underbridge space, wherein the heat value of the heat map of the direction of human flow indicates the magnitude of human flow; Identifying the direction with the largest flow of people on the heat map; Calculating the angle between the direction of the pedestrian flow and the main axis of the bridge in the target underbridge space; Selecting the direction of pedestrian flow with the angle being the preset angle as the direction of the crosswalk; The placement position of the pedestrian crossing is determined according to the orientation and the free position of the target under-bridge space.

4. The method according to claim 1, characterized in that The step of planning the target underbridge space according to the greening rate data, the pedestrian crossing area ratio and the placement position to obtain a preset planning scheme specifically includes: Calculate the newly added green area in the space under the target bridge according to the greening rate data; Calculate the pedestrian crossing area in the space under the target bridge according to the pedestrian crossing area ratio; Determine the position of the crosswalk corresponding to the crosswalk area in the free position in the space under the target bridge according to the placement position; The remaining position of the specific location is used as the greening position corresponding to the vacant new greening area, and a preset planning scheme is determined according to the pedestrian crossing position and the greening position.

5. The method according to any one of claims 1 to 4, characterized in that: After the step of detecting a planning threshold in the spatial image, wherein the planning threshold is calculated based on the vacancy rate of the target space under the bridge, the clearance height of the target space under the bridge, the available width of the target space under the bridge, and the flow of people around the target space under the bridge, and the vacancy rate is the ratio of the area of ​​the soil part in the spatial image to the total area of ​​the target space under the bridge, the method further includes: If the planning threshold is not greater than the preset threshold, determining the target greening rate, greening position, target crosswalk area ratio and target crosswalk placement position of the target underbridge space according to the spatial image; Integrate the target greening rate, the greening location, the target pedestrian crossing area ratio and the target pedestrian crossing placement location into a target planning scheme; The target planning scheme is added to the preset underbridge space database.

6. The method according to claim 5, characterized in that After the step of adding the target planning scheme into the preset underbridge space database, the method further comprises: Comparing the green plant status in the spatial image with the good green plant images in a preset green plant database to obtain a green plant maintenance score; If the green plant maintenance score is lower than the preset score, a prompt message is sent to the client.

7. The method according to any one of claims 1 to 4, characterized in that: After the step of planning the target underbridge space according to the greening rate data, the pedestrian crossing area ratio and the placement position to obtain a preset planning scheme, the method further includes: The preset planning scheme is sent to the target client.

8. A bridge space planning system, characterized in that: The under-bridge space planning system includes: one or more processors and a memory; the memory is coupled to the one or more processors, the memory is used to store computer program code, the computer program code includes computer instructions, and the one or more processors call the computer instructions to enable the under-bridge space planning system to execute the method described in any one of claims 1-7.

9. A computer-readable storage medium comprising instructions, characterized in that: When the instruction is executed on the under-bridge space planning system, the under-bridge space planning system is caused to execute the method according to any one of claims 1 to 7.

10. A computer program product, characterized in that When the computer program product runs on a bridge space planning system, the bridge space planning system is enabled to execute the method according to any one of claims 1 to 7.

Citation Information

Cited By

  • Geographic information system (GIS) and big data fused territorial space planning implementation method and system

    CN120013169A

  • Land space planning implementation method and system fusing GIS and big data

    CN120013169B