Management system and method for intelligent building supervision engineering project
Through the multi-party collaboration and data processing module of the smart building supervision project management system, the problems of difficulties and frequent disputes in the project construction are solved, and the rapid discovery and dispute resolution of problems are achieved, and the accuracy of supervision is improved. Convenience.
Patent Information
- Application Number
- CN202410958032.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-17
- Publication Date
- 2024-11-22
AI Technical Summary
During the construction of engineering projects, there is difficulty in collaborative operation between multiple project parties, resulting in inadequate supervision and frequent disputes. The traditional supervision system cannot discover problems in a timely and accurate manner, affecting the quality and safety of the project.
Design a management system for smart building supervision engineering projects, including multi-party collaboration modules, data collection modules, data processing modules, dispute resolution modules and reporting modules, to realize unified platform operation of data of all parties, problem upload and cross-comparison, dispute handling and Report illegal and irregular situations.
Through unified platform and data processing, problems can be quickly discovered, supervision accuracy and convenience are improved, engineering construction is promoted, disputes are reduced, and supervision effect is enhanced.
Smart Images

Figure CN119006223A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of construction engineering, and in particular to a management system and method for smart building supervision engineering projects. Background Art
[0002] Engineering supervision refers to a professional service activity in which a supervision unit with relevant qualifications, entrusted by Party A, monitors Party B's engineering construction on behalf of Party A in accordance with the state-approved engineering project construction documents, laws and regulations related to engineering construction, engineering construction supervision contracts and other engineering construction contracts. Engineering supervision is a paid engineering consulting service; it is entrusted by Party A; the main basis for supervision is laws, regulations, technical standards, relevant contracts and documents; the principles of supervision are law-abiding, honest, fair and scientific; the purpose of supervision is to ensure the quality and safety of engineering construction, improve the level of engineering construction, and give full play to the investment benefits.
[0003] In the process of project construction, one project will involve multiple project parties, and one project supervisor often needs to supervise multiple projects. At this time, there will be problems in the coordinated operation between the various project parties, which may easily lead to inadequate supervision and disputes between multiple project parties, which will inevitably affect the construction and quality of the project; and, for the traditional project supervision, the project-related data it can receive is highly one-sided, and due to the large workload of supervision, it is impossible to timely and accurately discover the problems between the projects, which leads to omissions in supervision, which is not conducive to the development of project supervision. Based on the above reasons, the present invention proposes a management system and method for smart building supervision projects. Summary of the invention
[0004] 1. Technical issues to be resolved
[0005] In view of the deficiencies of the prior art, the present invention is provided with a multi-party collaboration module, which can realize unified platform operation for different project parties in the process of engineering project construction, so that the supervisor can supervise each project party based on the same platform; and by providing a data collection module and a data processing module, each project party can upload its own related data and upload problems through the data collection module, and then firstly connect the data uploaded by each project party based on the data processing module, and cross-compare the connected data with the relevant data between each project party, so that the problem on the project party can be quickly found, which is convenient for the supervisor to review the project party and improve the accuracy of the data, and can also be based on the problems generated by each project party, based on the dispute resolution module to process the problems generated by the project party, so that the problems generated by the project party can be solved during the project, which can not only promote the progress of engineering construction, but also further improve the role and convenience of supervision; in addition, the present invention is also provided with a reporting module, and each project party can report the illegal and irregular behaviors generated in the process of engineering project construction through the reporting module, and verify the reported content through the supervisor or a third party, so as to effectively improve the effect of supervision.
[0006] (II) Technical solution
[0007] To achieve the above object, the present invention provides the following technical solution: a management system for smart building supervision engineering projects, comprising:
[0008] The multi-party collaboration module is used to achieve collaboration among all parties in the construction process of the project, ensuring that all parties involved in the project can work together;
[0009] The data collection module is used to enable all parties involved in the construction of the project to upload existing problems and project-related data of all parties to the system, and to perform classification operations based on the data collected by the system;
[0010] The data processing module is used to automatically analyze and process the classified problems and data of each project party, and can also realize the problem handling operation based on the supervisor;
[0011] The dispute resolution module is used to handle the disputes between the parties.
[0012] The reporting module enables all parties involved in the project to report any illegal or irregular issues that arise during the construction of the project.
[0013] Preferably, the multi-party collaboration module includes a central platform, a multi-party login unit and a data compatibility unit;
[0014] The central platform provides a central platform that can be participated by multiple parties during the construction of the project, thereby ensuring that all parties of the project can communicate efficiently on the central platform;
[0015] The multi-party login unit is used to realize the login use of the engineering project party, and can set a specified number of accounts according to the data of the project party, and provide different login methods for different engineering project parties;
[0016] The data compatibility unit is used to achieve compatibility between logins and system usages of different devices, and can also achieve compatible operations on the data of each project party.
[0017] Preferably, the data collection module comprises a question uploading unit, a data uploading unit, a data classification unit and a data storage unit;
[0018] The problem uploading unit is used for all parties of the project to upload problems generated during the construction process, including uploading text information, uploading image information and uploading video information;
[0019] The data uploading unit is used by all parties of the engineering project to upload the engineering-related data;
[0020] The data classification unit is used to classify the problems and data uploaded by all parties of the project, and can classify the problems into several types: construction-related problems, technology-related problems, contract-related problems, safety-related problems, cost-related problems and dispute problems;
[0021] The data storage unit is used to perform classified storage operations on the classified problem data and establish a database of related types.
[0022] Preferably, the data processing module includes a construction data analysis unit, a technical data analysis unit, a contract data analysis unit, a safety data analysis unit, a cost data analysis unit and a supervision review unit;
[0023] The construction data analysis unit connects the construction data of all parties in the project, and then analyzes the construction progress and quality of the project based on the connected data to obtain the automatic processing results of the construction data about all parties in the project and the construction problem information;
[0024] The technical data analysis unit analyzes and processes the technical problems generated by the project parties during the engineering construction process based on the technical requirements in the project database, and provides efficient technical solutions;
[0025] The contract data analysis unit analyzes the contract performance of the project parties and reminds or warns the project party that fails to perform the contract in a timely manner;
[0026] The safety data analysis unit is used to verify, display, improve and punish safety issues on the upper side of each project party and safety issues discovered by the supervisor during the construction process;
[0027] The cost data analysis unit is used to analyze and process the cost situation of all parties in the project, and to make additional investment or replace the project party based on facts for the project party that exceeds the budget cost;
[0028] The supervisor review unit is used for the supervisor to supervise and directly review the processing operations within the above units, which facilitates the supervisor's supervision operations on the engineering projects and the project parties.
[0029] Preferably, according to a management system for smart building supervision engineering projects as described in claim 1, it is characterized in that: the dispute resolution unit includes a dispute classification unit, a remote conference unit, an on-site communication unit, a dispute intervention unit and a dispute recording unit;
[0030] The dispute classification unit classifies and processes various disputes uploaded to the system, including disputes between project parties, disputes between construction personnel and project parties, and other disputes;
[0031] The remote conference unit provides a platform for remote conference communication between different engineering parties, which is used for dispute communication operations when offline communication is inconvenient;
[0032] The on-site communication unit is used to provide a suitable time and venue for the parties to the dispute, and to perform on-site communication operations based on the presence of relevant supervision personnel;
[0033] The dispute intervention unit is used to supervise or intervene in the dispute resolution process by a third party, thereby promoting the smooth resolution of disputes and the correct resolution of disputes;
[0034] The dispute recording unit is used to record the entire process of the dispute.
[0035] Preferably, the reporting unit includes a violation reporting unit, a violation reporting unit, an evidence uploading unit and a supervision unit;
[0036] The illegal reporting unit is used to report illegal acts of various project parties of the project;
[0037] The violation reporting unit is used to report violations of various project parties;
[0038] The evidence uploading unit is used to upload and collect evidence of violations and illegal acts of various project parties;
[0039] The supervision unit is used to verify the authenticity of the uploaded and collected evidence, and perform various processing operations based on the verified structure, including non-processing, penalty processing and litigation processing.
[0040] A management method for a management system of a smart building supervision project, comprising the following steps:
[0041] S1: Count all the project parties involved in the engineering construction process, and distribute accounts to each project party through the multi-party collaboration module. Each project party logs in to the management system based on the distributed account;
[0042] S2: During the construction process, each project party uploads the problems encountered and the construction data completed by the project party to the management system through the data collection module;
[0043] S3: Classify and connect the data information uploaded by each project party through the data processing module to complete the project automation supervision results based on multi-party data;
[0044] S4: Use the dispute resolution module to resolve disputes arising from various projects during the project construction process and complete project dispute resolution measures;
[0045] S5: Each project party can report any illegal or irregular situations that occur during the construction process. The system will assign supervision personnel to verify the illegal and irregular behaviors and take corresponding measures.
[0046] Preferably, the processing and analysis of data information in step 3 includes the following steps:
[0047] S11: Based on the data information uploaded by all parties of the project, data collection and connection are carried out on the construction planning, construction cost, construction progress, construction consumption and construction quality process of the project;
[0048] S12: Based on the serialized data information, the data of related project parties are mutually verified to obtain the data of projects that exceed the budget and do not meet the specifications;
[0049] S13: Based on the data of the project party that does not meet the specifications, the project party will be further audited through the supervisor. If the audit result is reasonable, it will not be reported to the system for supervision. If the monitoring is unreasonable, it will be reported to the system for supervision on behalf of the supervisor.
[0050] Preferably, the handling of disputes in step 4 includes the following steps:
[0051] S21: By classifying the types of disputes, the management system generates a dispute resolution plan under the guidance of the supervisor and sends the plan to both parties of the dispute. If both parties accept the resolution plan, the dispute is terminated and the dispute resolution result is recorded;
[0052] S22: If both parties or one party does not accept the solution, the management system will handle the dispute through remote conference and on-site communication according to the actual needs of both parties. If the communication between the two parties is completed, the dispute is terminated and the dispute resolution result is recorded;
[0053] S23: If both parties or one party cannot complete the dispute communication, the supervisor and a third party with legal authority will directly intervene to complete the dispute resolution and record it.
[0054] (III) Beneficial effects
[0055] Compared with the prior art, the present invention provides a management system and method for smart building supervision engineering projects, which have the following beneficial effects: the present invention can realize unified platform operation for different project parties in the process of engineering project construction by setting up a multi-party collaboration module, which is convenient for the supervisor to perform supervision operations on each project party based on the same platform; and by setting up a data collection module and a data processing module, each project party can upload its own related data and upload problems through the data collection module, and then firstly connect the data uploaded by each project party based on the data processing module, and cross-compare the connected data with the relevant data between each project party, so that the problem on the project party can be quickly found, which is convenient for the supervisor to review the project party and improve the accuracy of the data, and can also be based on the problems generated by each project party, based on the dispute resolution module to perform processing operations, so that the problems generated by the project party can be solved during the project, which can not only promote the progress of engineering construction, but also further improve the role and convenience of supervision; in addition, the present invention is also provided with a reporting module, and each project party can report the illegal and irregular behaviors generated in the process of engineering project construction through the reporting module, and verify the reported content through the supervisor or a third party, effectively improving the effect of supervision. BRIEF DESCRIPTION OF THE DRAWINGS
[0056] Figure 1 is a system structure diagram of the present invention;
[0057] Figure 2 The figure is a flow chart of the method of the present invention. DETAILED DESCRIPTION
[0058] In order to better understand the purpose, structure and function of the present invention, in order to realize intelligent engineering supervision, the present invention is provided with a multi-party collaboration module, which can realize unified platform operation for different project parties in the process of engineering project construction, so that the supervisor can perform supervision operations on each project party based on the same platform; and by providing a data collection module and a data processing module, each project party can upload its own related data and upload problems through the data collection module, and then firstly connect the data uploaded by each project party based on the data processing module, and cross-compare the connected data with the relevant data between each project party, so that the problem on the project party can be quickly found, which is convenient for the supervisor to review the project party and improve the accuracy of the data, and can also be based on the problems generated by each project party, based on the dispute resolution module to perform processing operations, so that the problems generated by the project party can be solved during the project, which can not only promote the progress of engineering construction, but also further improve the role and convenience of supervision; in addition, the present invention is also provided with a reporting module, and each project party can report the illegal and irregular behaviors generated in the process of engineering project construction through the reporting module, and verify the reported content through the supervisor or a third party, effectively improving the effect of supervision. The present invention further describes in detail a management system and method for smart building supervision engineering projects.
[0059] refer to Figure 1-2 , the present invention: a management system for smart building supervision engineering projects, comprising:
[0060] The multi-party collaboration module is used to achieve collaboration among all parties in the construction process of the project, ensuring that all parties involved in the project can work together;
[0061] Specifically, the multi-party collaboration module includes a central platform, a multi-party login unit and a data compatibility unit;
[0062] The central platform provides a central platform that can be participated by multiple parties during the construction of the project, thereby ensuring that all parties of the project can communicate efficiently on the central platform;
[0063] The multi-party login unit is used to realize the login use of the engineering project party, and can set a specified number of accounts according to the data of the project party, and provide different login methods for different engineering project parties;
[0064] The data compatibility unit is used to achieve compatibility between logins and system usages of different devices, and can also achieve compatible operations on the data of each project party.
[0065] The data collection module is used to enable all parties involved in the construction of the project to upload existing problems and project-related data of all parties to the system, and to perform classification operations based on the data collected by the system;
[0066] Specifically, the data collection module includes a question uploading unit, a data uploading unit, a data classification unit and a data storage unit;
[0067] The problem uploading unit is used for all parties of the project to upload problems generated during the construction process, including uploading text information, uploading image information and uploading video information;
[0068] The data uploading unit is used by all parties of the engineering project to upload the engineering-related data;
[0069] The data classification unit is used to classify the problems and data uploaded by all parties of the project, and can classify the problems into several types: construction-related problems, technology-related problems, contract-related problems, safety-related problems, cost-related problems and dispute problems;
[0070] The data storage unit is used to perform classified storage operations on the classified problem data and establish a database of related types.
[0071] The data processing module is used to automatically analyze and process the classified problems and data of each project party, and can also realize the problem handling operation based on the supervisor;
[0072] Specifically, the data processing module includes a construction data analysis unit, a technical data analysis unit, a contract data analysis unit, a safety data analysis unit, a cost data analysis unit and a supervision review unit;
[0073] The construction data analysis unit connects the construction data of all parties in the project, and then analyzes the construction progress and quality of the project based on the connected data to obtain the automatic processing results of the construction data about all parties in the project and the construction problem information;
[0074] The technical data analysis unit analyzes and processes the technical problems generated by the project parties during the engineering construction process based on the technical requirements in the project database, and provides efficient technical solutions;
[0075] The contract data analysis unit analyzes the contract performance of the project parties and reminds or warns the project party that fails to perform the contract in a timely manner;
[0076] The safety data analysis unit is used to verify, display, improve and punish safety issues on the upper side of each project party and safety issues discovered by the supervisor during the construction process;
[0077] The cost data analysis unit is used to analyze and process the cost situation of all parties in the project, and to make additional investment or replace the project party based on facts for the project party that exceeds the budget cost;
[0078] The supervisor review unit is used for the supervisor to supervise and directly review the processing operations within the above units, which facilitates the supervisor's supervision operations on the engineering projects and the project parties.
[0079] The dispute resolution module is used to handle the disputes between the parties.
[0080] Specifically, the dispute resolution unit includes a dispute classification unit, a remote conference unit, an on-site communication unit, a dispute intervention unit and a dispute recording unit;
[0081] The dispute classification unit classifies and processes various disputes uploaded to the system, including disputes between project parties, disputes between construction personnel and project parties, and other disputes;
[0082] The remote conference unit provides a platform for remote conference communication between different engineering parties, which is used for dispute communication operations when offline communication is inconvenient;
[0083] The on-site communication unit is used to provide a suitable time and venue for the parties to the dispute, and to perform on-site communication operations based on the presence of relevant supervision personnel;
[0084] The dispute intervention unit is used to supervise or intervene in the dispute resolution process by a third party, thereby promoting the smooth resolution of disputes and the correct resolution of disputes;
[0085] The dispute recording unit is used to record the entire process of the dispute.
[0086] The reporting module enables all parties involved in the project to report any illegal or irregular issues that arise during the construction of the project;
[0087] Specifically, the reporting unit includes a violation reporting unit, a violation reporting unit, an evidence uploading unit and a supervision unit;
[0088] The illegal reporting unit is used to report illegal acts of various project parties of the project;
[0089] The violation reporting unit is used to report violations of various project parties;
[0090] The evidence uploading unit is used to upload and collect evidence of violations and illegal acts of various project parties;
[0091] The supervision unit is used to verify the authenticity of the uploaded and collected evidence, and perform various processing operations based on the verified structure, including non-processing, penalty processing and litigation processing.
[0092] A management method for a management system of a smart building supervision project, comprising the following steps:
[0093] S1: Count all the project parties involved in the engineering construction process, and distribute accounts to each project party through the multi-party collaboration module. Each project party logs in to the management system based on the distributed account;
[0094] S2: During the construction process, each project party uploads the problems encountered and the construction data completed by the project party to the management system through the data collection module;
[0095] S3: Classify and connect the data information uploaded by each project party through the data processing module to complete the project automation supervision results based on multi-party data;
[0096] Specifically, the processing and analysis of data information includes the following steps:
[0097] S11: Based on the data information uploaded by all parties of the project, data collection and connection are carried out on the construction planning, construction cost, construction progress, construction consumption and construction quality process of the project;
[0098] S12: Based on the serialized data information, the data of related project parties are mutually verified to obtain the data of projects that exceed the budget and do not meet the specifications;
[0099] S13: Based on the data of the project party that does not meet the specifications, the project party will be further audited through the supervisor. If the audit result is reasonable, it will not be reported to the system for supervision. If the monitoring is unreasonable, it will be reported to the system for supervision on behalf of the supervisor.
[0100] S4: Use the dispute resolution module to resolve disputes arising from various projects during the project construction process and complete project dispute resolution measures;
[0101] Specifically, the handling of disputes includes the following steps:
[0102] S21: By classifying the types of disputes, the management system generates a dispute resolution plan under the guidance of the supervisor and sends the plan to both parties of the dispute. If both parties accept the resolution plan, the dispute is terminated and the dispute resolution result is recorded;
[0103] S22: If both parties or one party does not accept the solution, the management system will handle the dispute through remote conference and on-site communication according to the actual needs of both parties. If the communication between the two parties is completed, the dispute is terminated and the dispute resolution result is recorded;
[0104] S23: If both parties or one party cannot complete the dispute communication, the supervisor and a third party with legal authority will directly intervene to complete the dispute resolution and record it.
[0105] S5: Each project party can report any illegal or irregular situations that occur during the construction process. The system will assign supervision personnel to verify the illegal and irregular behaviors and take corresponding measures.
[0106] It is to be understood that the present invention is described by some embodiments, and it is known to those skilled in the art that various changes or equivalent substitutions may be made to these features and embodiments without departing from the spirit and scope of the present invention. In addition, under the teachings of the present invention, these features and embodiments may be modified to adapt to specific circumstances and materials without departing from the spirit and scope of the present invention. Therefore, the present invention is not limited by the specific embodiments disclosed herein, and all embodiments falling within the scope of the claims of this application are within the scope of protection of the present invention.
Claims
1. A management system for smart building supervision projects, characterized in that: include: The multi-party collaboration module is used to achieve collaboration among all parties in the construction process of the project, ensuring that all parties involved in the project can work together; The data collection module is used to enable all parties involved in the construction of the project to upload existing problems and project-related data of all parties to the system, and to perform classification operations based on the data collected by the system; The data processing module is used to automatically analyze and process the classified problems and data of each project party, and can also realize the problem handling operation based on the supervisor; The dispute resolution module is used to handle the disputes between the parties. The reporting module enables all parties involved in the project to report any illegal or irregular issues that arise during the construction of the project.
2. A management system for smart building supervision projects according to claim 1, characterized in that: The multi-party collaboration module includes a central platform, a multi-party login unit and a data compatibility unit; The central platform provides a central platform that can be participated by multiple parties during the construction of the project, thereby ensuring that all parties of the project can communicate efficiently on the central platform; The multi-party login unit is used to realize the login use of the engineering project party, and can set a specified number of accounts according to the data of the project party, and provide different login methods for different engineering project parties; The data compatibility unit is used to achieve compatibility between logins and system usages of different devices, and can also achieve compatible operations on the data of each project party.
3. A management system for smart building supervision projects according to claim 1, characterized in that: The data collection module includes a question uploading unit, a data uploading unit, a data classification unit and a data storage unit; The problem uploading unit is used for all parties of the project to upload problems generated during the construction process, including uploading text information, uploading image information and uploading video information; The data uploading unit is used by all parties of the engineering project to upload the engineering-related data; The data classification unit is used to classify the problems and data uploaded by all parties of the project, and can classify the problems into several types: construction-related problems, technology-related problems, contract-related problems, safety-related problems, cost-related problems and dispute problems; The data storage unit is used to perform classified storage operations on the classified problem data and establish a database of related types.
4. A management system for smart building supervision engineering projects according to claim 1, characterized in that: The data processing module includes a construction data analysis unit, a technical data analysis unit, a contract data analysis unit, a safety data analysis unit, a cost data analysis unit and a supervision review unit; The construction data analysis unit connects the construction data of all parties in the project, and then analyzes the construction progress and quality of the project based on the connected data to obtain the automatic processing results of the construction data about all parties in the project and the construction problem information; The technical data analysis unit analyzes and processes the technical problems generated by the project parties during the engineering construction process based on the technical requirements in the project database, and provides efficient technical solutions; The contract data analysis unit analyzes the contract performance of the project parties and reminds or warns the project party that fails to perform the contract in a timely manner; The safety data analysis unit is used to verify, display, improve and punish safety issues on the upper side of each project party and safety issues discovered by the supervisor during the construction process; The cost data analysis unit is used to analyze and process the cost situation of all parties in the project, and to make additional investment or replace the project party based on facts for the project party that exceeds the budget cost; The supervisor review unit is used for the supervisor to supervise and directly review the processing operations within the above units, which facilitates the supervisor's supervision operations on the engineering projects and the project parties.
5. The management system for smart building supervision engineering projects according to claim 1 is characterized by: The dispute resolution unit includes a dispute classification unit, a remote conference unit, an on-site communication unit, a dispute intervention unit and a dispute recording unit; The dispute classification unit classifies and processes various disputes uploaded to the system, including disputes between project parties, disputes between construction personnel and project parties, and other disputes; The remote conference unit provides a platform for remote conference communication between different engineering parties, which is used for dispute communication operations when offline communication is inconvenient; The on-site communication unit is used to provide a suitable time and venue for the parties to the dispute, and to perform on-site communication operations based on the presence of relevant supervision personnel; The dispute intervention unit is used to supervise or intervene in the dispute resolution process by a third party, thereby promoting the smooth resolution of disputes and the correct resolution of disputes; The dispute recording unit is used to record the entire process of the dispute.
6. A management system for smart building supervision engineering projects according to claim 1, characterized in that: The reporting unit includes a violation reporting unit, a violation reporting unit, an evidence uploading unit and a supervision unit; The illegal reporting unit is used to report illegal acts of various project parties of the project; The violation reporting unit is used to report violations of various project parties; The evidence uploading unit is used to upload and collect evidence of violations and illegal acts of various project parties; The supervision unit is used to verify the authenticity of the uploaded and collected evidence, and perform various processing operations based on the verified structure, including non-processing, penalty processing and litigation processing.
7. A management method for a management system for a smart building supervision project according to any one of claims 1 to 6, characterized in that: The following steps are involved: S1: Count all the project parties involved in the engineering construction process, and distribute accounts to each project party through the multi-party collaboration module. Each project party logs in to the management system based on the distributed account; S2: During the construction process, each project party uploads the problems encountered and the construction data completed by the project party to the management system through the data collection module; S3: Classify and connect the data information uploaded by each project party through the data processing module to complete the project automation supervision results based on multi-party data; S4: Use the dispute resolution module to resolve disputes arising from various projects during the project construction process and complete project dispute resolution measures; S5: Each project party can report any illegal or irregular situations that occur during the construction process. The system will assign supervision personnel to verify the illegal and irregular behaviors and take corresponding measures.
8. A management method for a management system for a smart building supervision project according to claim 7, characterized in that: The processing and analysis of data information in step 3 includes the following steps: S11: Based on the data information uploaded by all parties of the project, data collection and connection are carried out on the construction planning, construction cost, construction progress, construction consumption and construction quality process of the project; S12: Based on the serialized data information, the data of related project parties are mutually verified to obtain the data of projects that exceed the budget and do not meet the specifications; S13: Based on the data of the project party that does not meet the specifications, the project party will be further audited through the supervisor. If the audit result is reasonable, it will not be reported to the system for supervision. If the monitoring is unreasonable, it will be reported to the system for supervision on behalf of the supervisor.
9. The management method of a management system for a smart building supervision project according to claim 7, characterized in that: The handling of disputes in step 4 includes the following steps: S21: By classifying the types of disputes, the management system generates a dispute resolution plan under the guidance of the supervisor and sends the plan to both parties of the dispute. If both parties accept the resolution plan, the dispute is terminated and the dispute resolution result is recorded; S22: If both parties or one party does not accept the solution, the management system will handle the dispute through remote conference and on-site communication according to the actual needs of both parties. If the communication between the two parties is completed, the dispute is terminated and the dispute resolution result is recorded; S23: If both parties or one party cannot complete the dispute communication, the supervisor and a third party with legal authority will directly intervene to complete the dispute resolution and record it.