Construction monitoring method, device and equipment of bridge building machine and storage medium

Through image acquisition and sensor data analysis, combined with the bridge construction image and sensor data of key structural parts, early warning information is generated, which solves the problems of low manual monitoring efficiency and poor accuracy, and achieves efficient and accurate monitoring of bridge construction.

CN119006919AInactive Publication Date: 2024-11-22CHINA CONSTR THIRD ENG BUREAU GRP CO LTD +1
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411145353.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-20
Publication Date
2024-11-22
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The construction monitoring of existing bridge builders mainly relies on artificial visual operations, which is inefficient and highly subjective, resulting in easy omission of monitoring and maintenance and inaccurate judgments.

Method used

The image acquisition device is used to obtain the construction image of the bridge building machine, and the construction behavior characteristics are obtained through feature extraction, and the early warning judgment is made compared with the standard construction characteristics; at the same time, sensors are collected in key structural parts for analysis, and early warning information is generated based on the results of the two .

Benefits of technology

It improves the accuracy and efficiency of construction behavior judgments, and achieves timely and accurate monitoring and abnormal feedback on the construction of bridge construction machines.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119006919A_ABST
    Figure CN119006919A_ABST
Patent Text Reader

Abstract

The invention discloses a construction monitoring method and device for a bridge building machine, electronic equipment and a storage medium, and the method comprises the steps: obtaining a construction image, collected by an image collection device, of the bridge building machine, carrying out the feature extraction of the construction image, and obtaining the construction behavior features of construction behaviors contained in the construction image; standard construction characteristics are obtained, early warning judgment is carried out according to the standard construction characteristics and the construction behavior characteristics, and a first judgment result is obtained; acquiring sensor data acquired by a sensor arranged on a key structure part of the construction object, and performing analysis and early warning judgment according to the sensor data to obtain a second judgment result; when it is determined that safety early warning is triggered according to the first judgment result and / or the second judgment result, corresponding early warning information is generated and fed back.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of monitoring and management of bridge-building machines, and in particular to a construction monitoring method, device, electronic equipment and storage medium for a bridge-building machine. Background Art

[0002] During the construction process of the bridge-building machine, the construction situation needs to be monitored in real time to ensure the construction safety of the bridge-building machine. At present, the monitoring mainly relies on manual inspection and monitoring, such as manual visual operation, to determine whether the bridge-building machine is operating in a standardized and safe manner. However, this method is inefficient and the human judgment is highly subjective, which leads to easy omissions in monitoring and maintenance and inaccurate monitoring judgments. Summary of the invention

[0003] The purpose of the embodiments of the present application is to provide a construction monitoring method, device, electronic device and storage medium for a bridge-building machine, so as to solve the technical problems in the related art that human judgment leads to low monitoring efficiency and inaccurate judgment.

[0004] In a first aspect, an embodiment of the present application provides a construction monitoring method for a bridge construction machine, comprising:

[0005] Taking the construction image of the bridge construction machine acquired by the image acquisition device, and performing feature extraction on the construction image to obtain the construction behavior features of the construction behavior contained in the construction image;

[0006] Acquire standard construction features, and perform early warning determination based on the standard construction features and the construction behavior features to obtain a first determination result;

[0007] Acquire sensor data collected by sensors installed on key structural parts of the construction object, and perform analysis and early warning determination based on the sensor data to obtain a second determination result;

[0008] When it is determined that a safety warning is triggered according to the first determination result and / or the second determination result, corresponding warning information is generated for feedback.

[0009] In a second aspect, an embodiment of the present application provides a construction monitoring device for a bridge construction machine, comprising:

[0010] An image acquisition module is used to acquire a construction image of the bridge construction machine acquired by the image acquisition device, and perform feature extraction on the construction image to obtain construction behavior features of the construction behavior contained in the construction image;

[0011] A first determination module is used to obtain standard construction features, and perform early warning determination based on the standard construction features and the construction behavior features to obtain a first determination result;

[0012] A second determination module is used to obtain sensor data collected by sensors installed on key structural parts of the construction object, and to analyze and make early warning determinations based on the sensor data to obtain a second determination result;

[0013] The judgment and warning module is used to generate corresponding warning information for feedback when it is determined that a safety warning is triggered according to the first judgment result and / or the second judgment result.

[0014] In a third aspect, an embodiment of the present application provides an electronic device, comprising a processor, a memory, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps in any one of the above-mentioned methods for monitoring the construction of a bridge-building machine when executing the computer program.

[0015] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps in the construction monitoring method of a bridge-building machine described in any one of the above items are implemented.

[0016] The embodiments of the present application provide a construction monitoring method, device, electronic device and storage medium for a bridge-building machine. When monitoring the construction of the bridge-building machine, the construction image of the bridge-building machine acquired by the set image acquisition device is obtained, and the feature extraction of the construction image is performed to obtain the construction behavior characteristics of the current construction behavior of the bridge-building machine. Then, the obtained construction behavior characteristics are compared with the standard construction characteristics of the bridge-building machine to obtain a first judgment result, which is used to determine whether the behavior of the bridge-building machine during the construction process is normal. At the same time, sensor data collected by sensors set on key structural parts of the construction object is obtained, and then a second judgment result is obtained by analyzing and processing the sensor data to determine whether the construction object has structural abnormalities. Finally, when it is determined that the safety warning is triggered according to the first judgment result and the second judgment result, the corresponding warning information is generated for feedback. It is achieved that in the process of monitoring the construction situation of the bridge-building machine, by acquiring the construction image that records the construction behavior of the bridge-building machine, the current construction behavior characteristics are obtained to determine whether the construction behavior of the bridge-building machine is normal, thereby improving the accuracy and efficiency of judging whether the construction behavior is normal. At the same time, corresponding sensors are set on the key structural parts of the construction object to determine whether the construction object is normal through sensor data. The construction object can be monitored in real time, and feedback can be given in time when structural abnormalities occur, thereby improving timely and accurate monitoring of the construction situation of the bridge-building machine and abnormal feedback. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a flow chart of a construction monitoring method of a bridge construction machine provided in an embodiment of the present application;

[0018] Figure 2 This is a flowchart of the steps for determining whether the construction sequence is correct provided in an embodiment of the present application;

[0019] Figure 3 is a flowchart of the steps of obtaining the first determination result provided in an embodiment of the present application;

[0020] Figure 4 It is a structural schematic diagram of a construction monitoring device for a bridge-building machine provided in an embodiment of the present application;

[0021] Figure 5 is a structural schematic diagram of an electronic device provided in an embodiment of the present application;

[0022] Figure 6 This is another structural schematic diagram of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0024] It should be understood that the various steps described in the method embodiments of the present disclosure may be performed in different orders and / or in parallel. In addition, the method embodiments may include additional steps and / or omit the steps shown. The scope of the present disclosure is not limited in this respect.

[0025] The term "including" and its variations used herein are open inclusions, i.e., "including but not limited to". The term "based on" means "based at least in part on". The term "one embodiment" means "at least one embodiment"; the term "another embodiment" means "at least one additional embodiment"; the term "some embodiments" means "at least some embodiments". The relevant definitions of other terms will be given in the following description.

[0026] In the related art, when monitoring the construction status of the bridge-building machine, it mainly relies on manual inspection and monitoring, such as manual visual operation, to determine whether the bridge-building machine is operating in a standardized and safe manner. However, this method is inefficient and human judgment is highly subjective, which leads to easy omissions in monitoring and maintenance and inaccurate monitoring judgments.

[0027] In order to solve the technical problems existing in the related art, the present application embodiment provides a construction monitoring method for a bridge construction machine, see Figure 1 , Figure 1It is a flow chart of a construction monitoring method for a bridge-building machine provided in an embodiment of the present application, and the method includes steps 101 to 104.

[0028] Step 101, obtaining a construction image of a bridge construction machine acquired by an image acquisition device, and performing feature extraction on the construction image to obtain construction behavior features of the construction behavior contained in the construction image.

[0029] In one embodiment, during the construction process of the bridge-building machine, the image acquisition device is used to acquire the construction image of the bridge-building machine, and then the construction image is feature-processed to obtain the construction behavior features of the construction behavior contained in the construction image. During the construction process of the bridge-building machine, the image acquisition device is used to acquire and analyze the construction situation of the bridge-building machine to determine whether there are any abnormal construction situations during the construction process of the bridge-building machine, such as non-standard construction, including but not limited to incorrect construction sequence, pouring speed, pouring sequence, and vibration conditions.

[0030] Exemplarily, the image acquisition device provided for image acquisition is used to monitor the construction behavior of the bridge-building machine, specifically, to monitor the pouring behavior of the bridge-building machine, and to determine whether there is any abnormality in the construction behavior of the bridge-building machine by acquiring and analyzing the video or image, for example, an error in the pouring sequence is an abnormality, an error in the pouring speed is an abnormality, an error in the vibration uniformity is an abnormality, etc.

[0031] In actual applications, cameras are installed in key operating areas of the bridge-building machine, and then the cameras are triggered to collect images by timing or acquisition events, and the images and / or videos of the construction site are collected in real time by the cameras to record the construction operation process of the bridge-building machine. For example, the images of the concrete pouring process during the construction of the bridge-building machine are collected in real time by the cameras, including the pouring sequence, pouring speed, vibration conditions, etc. Through the combined work of various cameras, the construction conditions of the bridge-building machine during the construction process are photographed or videotaped, and then the obtained images or videos are analyzed and processed to determine whether the construction of the bridge-building machine is normal.

[0032] Furthermore, when performing feature extraction to obtain construction behavior features, it includes: classifying the construction images based on the construction behaviors to obtain a number of image sets, wherein each image set corresponds to a construction behavior, and a construction job includes a number of construction behaviors; performing image analysis processing on each image in the image set to obtain construction behavior features corresponding to each construction behavior contained in the construction image.

[0033] Specifically, when performing image acquisition, the image acquisition device may capture multiple construction behaviors, such as a bridge-building machine performing pouring and vibrating behaviors at the same time. Therefore, after obtaining the construction images captured by the image acquisition device, the obtained construction images are classified based on the construction behaviors to obtain several image sets, wherein each image set corresponds to a construction behavior, and one construction operation includes several construction behaviors.

[0034] Exemplarily, when the image acquisition device collects and acquires images, the acquired images may contain one construction behavior or may contain multiple behavior features. When only one construction behavior is contained, the construction image is analyzed and processed to determine the construction behavior contained in the construction image to complete the classification processing of the construction image.

[0035] When a construction image contains multiple construction behaviors, the number of construction behaviors contained in the construction image is identified, and then the image is copied based on the determined number of construction behaviors. The obtained image is then further processed and classified according to the construction behaviors to obtain several image sets.

[0036] For example, if construction image 1 contains three construction behaviors, then firstly, image copying and other processing are performed on construction image 1 to obtain a total of three construction images 1 (including construction image 1 itself and two copied images), namely construction image 1, construction image 1-1 and construction image 1-2. Then, the three construction images 1 are matched one-to-one with the three construction behaviors, and the corresponding relationship obtained can be: construction image 1 corresponds to construction behavior 1, construction image 1-1 corresponds to construction behavior 2 and construction image 1-2 corresponds to construction behavior 3. Of course, the corresponding relationship is not unique, as long as there is a one-to-one correspondence. Then, the construction image is processed according to the corresponding construction behavior. Taking "construction image 1 corresponds to construction behavior 1" as an example, at this time, recognition processing is performed in construction image 1 to determine the image features corresponding to construction behavior 1. At this time, image enhancement processing can be performed on the image features, and the information in the image that does not correspond to construction behavior 1 can be blurred or weakened, so that when feature extraction is performed on construction image 1, only the construction behavior features corresponding to construction behavior 1 can be extracted. By processing construction images containing multiple construction behaviors in this way, each construction behavior of the bridge-building machine during the construction process can be better identified and analyzed to determine whether there are any violations in the bridge-building machine during the construction process.

[0037] When extracting features from construction images, it includes: determining the behavior labels of the image set, and performing denoising and enhancement processing on each image in the image set to obtain a processed image set; extracting features from each image in the processed image set according to the behavior labels, and calculating behavior features based on the extracted features to obtain construction behavior features of each construction behavior contained in the image set.

[0038] Exemplarily, the behavior label of the image set is determined, and each image in each image set is denoised and enhanced to obtain a processed image set, and then features are extracted for each image in the processed image set according to the behavior label, and behavior features are calculated based on the extracted features to obtain construction behavior features of the construction behaviors contained in each image set.

[0039] In the actual processing process, the obtained construction image may contain not only multiple construction behaviors, but also certain noise, such as non-construction behavior information. At this time, denoising is used to improve the image quality. At the same time, the image contrast can be enhanced by histogram equalization, contrast stretching, etc., thereby improving the characteristics of the construction behavior in the image.

[0040] When extracting the construction behavior features in the construction image, since the construction of the bridge construction machine is a dynamic process, it is necessary to combine multiple construction images for analysis and calculation to obtain the construction behavior features. Taking the pouring speed in the pouring behavior as an example, by identifying and tracking the edge changes of the pouring area in the construction image, the speed of edge expansion per unit time is calculated, and the current pouring speed of the bridge construction machine is obtained. For example, the image set of the pouring behavior contains 5 construction images, namely image 1, image 2, image 3, image 4 and image 5. By analyzing image 1 and image 2, image 2 and image 3, image 3 and image 4, and image 4 and image 5, taking the analysis of image 1 and image 2 as an example, the edge information of the pouring area in image 1 and the edge information of the pouring area in image 2 are identified, and the time information of image 1 and image 2 is determined. By comparing the edge information of the pouring area, the pouring amount in the interval time between image 1 and image 2 can be determined, and then the pouring speed from image 1 to image 2 can be determined. Using the same processing method, four casting speeds can be obtained. At this time, the casting speed of the bridge construction machine in the time period from image 1 to image 5 can be obtained by average calculation.

[0041] Similarly, when the construction behavior characteristic is the vibration uniformity in the vibration behavior, the vibration uniformity can be obtained by analyzing the texture characteristics of the casting area, such as the distribution and change of the gray value.

[0042] Furthermore, when the construction images are classified and processed to obtain the construction behaviors and construction behavior characteristics of the bridge-building machine during the construction process for subsequent analysis and judgment, the specific construction sequence of the bridge-building machine can also be determined to determine whether the construction sequence is correct. Figure 2 , Figure 2 It is a flow chart of the steps for determining whether the construction sequence is correct provided in an embodiment of the present application, wherein the steps include steps 201 to 207.

[0043] Step 201, determining the construction work performed by the bridge construction machine, and obtaining the standard behavior sequence of each construction behavior included in the construction work;

[0044] Step 202, obtaining time information of the construction image, and obtaining the instantaneous behavior sequence corresponding to the construction image according to the time information based on the time sequence relationship;

[0045] Step 203, based on the construction behavior, the immediate behavior sequence is compared with the standard behavior sequence, and when it is determined that the immediate behavior sequence is consistent with the standard behavior sequence, it is determined whether the bridge construction machine is operating normally.

[0046] Specifically, after the construction images are classified and processed to obtain several image sets, since one image set corresponds to one construction behavior and one construction job includes several construction behaviors, the construction behavior corresponding to the image set and the actual construction sequence of each construction behavior will be compared with the standard construction sequence to determine whether the current construction sequence is correct.

[0047] Exemplarily, when making a comparative judgment, the construction work performed by the bridge-building machine is first determined, and the standard behavior sequence of the behaviors of each construction party included in the construction work is obtained. Then, the time information of the construction image is obtained, and based on the time relationship, the instant behavior sequence corresponding to the construction image is obtained according to the time information. Then, the obtained instant behavior sequence and the standard behavior sequence are compared to determine whether the construction sequence of the construction behaviors is consistent, so as to determine whether the bridge-building machine is operating normally. If the sequence is consistent, the operation is determined to be normal, otherwise, the operation is determined to be abnormal.

[0048] In the actual operation process, the bridge-building machine has a certain sequence when performing different operations or different behaviors, such as mixing and vibrating before pouring. An incorrect construction sequence may cause safety hazards. Therefore, the correct operation sequence is very necessary. At this time, by obtaining the construction operations of the bridge-building machine in advance, the standard behavior sequence of the bridge-building machine in the operation process can be determined. The standard behavior sequence can be set when configuring the construction operations for the bridge-building machine, or it can be automatically generated according to the construction operations using a related neural network model.

[0049] For the collected construction images, there is corresponding time information to indicate the time when the construction images were collected. By analyzing and processing the construction images collected at different times, the specific conditions of different construction behaviors at different times can be determined. By acquiring the time information of the construction images and then analyzing and processing based on the time sequence, the immediate behavior sequence of each construction behavior can be obtained. Since the obtained standard behavior sequence includes the sequence of all construction behaviors of the bridge construction machine, and the obtained immediate behavior sequence may be the sequence of some construction behaviors, when making a comparison, the immediate behavior sequence and the standard time sequence are compared based on the construction behavior to determine whether the immediate behavior sequence is correct.

[0050] In fact, the construction work of the bridge-building machine has the same construction behavior at different stages or times, such as pouring at both position 1 and position 2, and in the entire construction work performed by the bridge-building machine, in order to perform comparison processing more accurately, when comparing the immediate behavior sequence with the standard behavior sequence based on the construction behavior, the current position information of the bridge-building machine is obtained, and the comparison area is determined in the standard behavior sequence based on the current position information, and then a reference for comparison with the immediate behavior sequence is determined in the comparison area.

[0051] For example, the standard behavior sequence is: behavior 1-behavior 2-behavior 3-behavior 4-behavior 1-behavior 2-behavior 3-behavior 1-behavior 2-behavior 3-behavior 4-behavior 1-behavior 2-behavior 3-behavior 4 behavior 5..., and the correspondence between the position during construction and the standard behavior sequence is: position 1 (behavior 1-behavior 2-behavior 3-behavior 4)-position 2 (behavior 1-behavior 2-behavior 3)-position 3 (behavior 1-behavior 2-behavior 3-behavior 4)-position 4 (behavior 1-behavior 2-behavior 3-behavior 4 behavior 5)-position 5 (......)..., at this time, when obtaining the current position information of the bridge-building machine for judgment, it is determined to be in position 2, then when comparing, the standard behavior sequence obtained is: position 2 (behavior 1-behavior 2-behavior 3).

[0052] If the immediate behavior sequence determined at this time is any one of behavior 1-behavior 2, behavior 2-behavior 3, behavior 1-behavior 2-behavior 3, then the order is determined to be correct. If there is only one construction behavior determined at this time, which is any one of behavior 1, behavior 2 and behavior 3, it is necessary to obtain the current state of the bridge-building machine and make further judgments based on the completion of the operation to determine the adjacent previous state or behavior of the bridge-building machine, and then determine whether the order of the current construction behavior and the adjacent previous state or behavior is correct. If the previous state is moving to position 2, then when the current construction behavior is behavior 1, the order is determined to be correct, otherwise it is determined that the order is wrong. Similarly, when the previous behavior is determined to be behavior 1, the order is determined to be correct when the current construction behavior is behavior 2. Accordingly, when the previous behavior is behavior 2, the current construction behavior is behavior 3, which is the correct order.

[0053] It should be noted that when the previous behavior is behavior 3, the bridge-building machine needs to move to position 3 to work again. Then, when the construction image of the bridge-building machine is collected, the movement information of the bridge-building machine can be determined, including the moving speed, moving direction (whether moving to position 3), etc., by determining the relative position relationship between position 3 and position 2, and combining the movement information to determine whether the current movement behavior is correct, and then determine whether the bridge-building machine is operating normally. Among them, when the moving speed is in the set range and the moving direction is the direction of moving to position 3, it is determined that the operation is normal, otherwise it is abnormal.

[0054] Step 102, obtaining standard construction features, and performing early warning determination based on the standard construction features and construction behavior features to obtain a first determination result.

[0055] In one embodiment, when determining whether the construction process of the bridge-building machine is normal, the collected construction images are analyzed and processed to determine whether the construction of the bridge-building machine has any abnormal behaviors such as violations. Specifically, the standard construction features are obtained, and then the construction behavior features obtained by analyzing and processing the construction images are compared with the standard construction features for early warning judgment to obtain a first judgment result, wherein the first judgment result is used to indicate whether the construction behavior of the bridge-building machine has any abnormal behaviors such as violations.

[0056] Exemplarily, the standard construction characteristics are the construction characteristics of the bridge-building machine when it completes various construction behaviors in the standard construction process. By comparing the current construction behavior characteristics with the standard construction characteristics, it is determined whether the current construction behavior of the bridge-building machine is normal.

[0057] Further, when the first judgment result is obtained by performing early warning judgment according to the standard construction characteristics, referring to Figure 3 , Figure 3 It is a flowchart diagram of the steps of obtaining the first determination result provided in an embodiment of the present application, wherein step 301 to step 303.

[0058] Step 301, querying according to the bridge-building machine and the construction work to obtain the standard construction behavior data currently corresponding to the bridge-building machine;

[0059] Step 302, extracting features from the standard construction behavior data to obtain standard construction features;

[0060] Step 303: Calculate the similarity between the construction behavior feature and the standard construction feature, and compare the obtained similarity value with the similarity threshold to obtain a first determination result.

[0061] Specifically, a query is performed based on the bridge-building machine and the construction work to obtain the standard construction behavior data currently corresponding to the bridge-building machine, and feature extraction is performed on the standard construction behavior data to obtain standard construction features. Then, the similarity between the construction behavior features and the standard construction features is calculated, and the obtained similarity is compared with a similarity threshold to obtain a first judgment result, wherein the first judgment result includes normal behavior and abnormal behavior.

[0062] For example, there are certain differences between different bridge-building machines, so even if the same construction work is performed, there may be certain differences in the identification construction behavior data. Therefore, by querying according to the identification information of the bridge-building machine and the operation identification of the construction work, the standard construction behavior data corresponding to the current bridge-building machine can be obtained, such as specific casting speed values, vibration uniformity values, etc., and then feature extraction is used to obtain standard construction features that can be calculated and compared, and then similarity calculations can be performed to determine whether the current construction behavior features meet the construction requirements.

[0063] In fact, when calculating the similarity between construction behavior characteristics and standard construction characteristics, taking the pouring speed as an example, it is possible to directly determine whether the current pouring speed is within the standard pouring speed. If it is, it is normal, otherwise it is abnormal. Taking vibration uniformity as an example, the obtained indicator data (such as the standard deviation or coefficient of variation of the gray value) can also be compared with the normal range. If it is within the normal range, it is normal, otherwise it is abnormal.

[0064] Step 103, obtaining sensor data collected by sensors installed on key structural parts of the construction object, and performing analysis and early warning judgment based on the sensor data to obtain a second judgment result.

[0065] In one embodiment, when monitoring a bridge-building machine, in addition to monitoring the construction behavior of the bridge-building machine, the construction results are also monitored and analyzed to ensure that the construction results meet actual needs. Therefore, during the monitoring process, sensor data collected by sensors installed on key structural parts of the construction object are obtained, and then analysis and early warning judgment are performed based on the obtained sensor data to obtain a second judgment result.

[0066] Exemplarily, stress, displacement and other sensors are installed on key structures, and the displacement, temperature, stress and other physical parameters of the key structures are monitored in real time through the sensors. For example, displacement sensors and temperature sensors are installed on key parts of the bridge (such as beams, columns, joints, etc.), and the data collected by the sensors is used to determine whether the bridge is safe during the construction process. Therefore, when making an early warning judgment, it includes: obtaining sensor data collected by sensors installed on key structural parts of the construction object, wherein the sensor data includes displacement data and temperature data; determining whether the key structural parts of the construction object are abnormal based on the displacement data and temperature data, and obtaining a second judgment result.

[0067] By analyzing the data collected by the sensors, it is possible to determine whether the key structures of the bridge are damaged or deformed, and to predict possible safety hazards. According to historical data and engineering requirements, reasonable warning thresholds are set, such as displacement range, temperature range, etc. The displacement and temperature changes of key structures are monitored in real time through sensors to determine whether there is damage or deformation. For example, when a crack appears in a part of the bridge, the displacement and temperature data of that part will change, and then a safety warning can be issued for the bridge.

[0068] Step 104: when it is determined that a safety warning is triggered according to the first determination result and / or the second determination result, corresponding warning information is generated for feedback.

[0069] In one embodiment, after obtaining the first determination result and the second determination result, it is determined whether a safety warning is triggered, that is, whether a warning and feedback are required. Then, when it is determined that a safety warning is triggered, corresponding warning information is generated for feedback processing.

[0070] Specifically, when subsequent processing is performed based on the first judgment result and the second judgment result, it includes: when a behavior is determined to be in violation according to the first judgment result or a structural part is determined to be abnormal according to the second judgment result, the illegal behavior or abnormal part is determined, and early warning information is generated based on the illegal behavior or abnormal part for feedback.

[0071] Exemplarily, the first judgment result is used to determine whether the construction behavior of the bridge-building machine is standardized, and the second judgment result is used to determine whether the construction object (such as a bridge) is safe during the construction process. Therefore, when processing according to the first judgment result and the second judgment result, if it is determined that there is a violation according to the first judgment result or if it is determined that there is an abnormal part according to the second judgment result, a safety warning is triggered. At this time, warning feedback will be required so that the operating personnel can deal with the abnormal situation in a timely manner, such as standardizing behavior, monitoring the bridge, etc., to ensure the safety of construction.

[0072] Furthermore, when subsequent processing is performed based on the first judgment result and the second judgment result, it also includes: when the behavior is determined to be normal according to the first judgment result, and the structural part is determined to be normal according to the second judgment result, the current risk score of the bridge construction machine is calculated according to the first judgment result and the second judgment result, and when the current risk score is greater than the score threshold, early warning information is generated for feedback.

[0073] Exemplarily, when both the first judgment result and the second judgment result are determined to be normal, the current risk score of the bridge construction machine will be calculated in combination with the first judgment result and the second judgment result, and then further judgment will be made based on the current risk score. When the current risk score is greater than the score threshold, early warning information is generated for feedback, otherwise no early warning and feedback processing is required.

[0074] When calculating the risk score, when processing the first judgment result, the difference between the operation image and the standard operation process image is compared through image recognition technology to calculate the difference score S.

[0075] Where S = ∑(I operation -I standard ) 2 , I operation is the current operation image, I standard It is the operation image obtained by the standard operation flow.

[0076] When processing the second determination result, image processing technology is used to detect whether there are cracks or deformations on the surface of the structure, so as to evaluate the completeness of the bridge structure and obtain a crack detection result C.

[0077] Wherein, C = number of crack pixels / total number of pixels.

[0078] Finally, when performing safety scoring, the safety risk score R of the bridge-building machine is calculated by combining the sensor data analysis and image analysis results.

[0079] Where R = w1×S+w2×C+w3×S sensor , w1, w2, w3 are weight coefficients, and the sum is 1, S sensor It is the result of sensor data analysis.

[0080] When processing according to the obtained safety risk score, if R exceeds the preset threshold, a safety warning will be triggered. At this time, the corresponding warning information will be generated for feedback to notify the construction team to conduct inspection and maintenance.

[0081] Furthermore, when monitoring the construction of the bridge construction machine, the warning information obtained can be divided into different types, such as meteorological warning, geological warning, equipment failure warning, etc. At the same time, the warning information can also be divided into different levels, according to the urgency and potential impact range of the warning information, it can be divided into different levels (such as level 1, level 2, level 3, etc.), so as to take different response measures for different levels of warning information.

[0082] Once the warning information is detected, the system will immediately release the information to the terminal devices of relevant personnel, such as mobile phones and tablets. The information can be released in various forms such as text messages, APP push, and email to ensure that the warning information can be quickly delivered to all relevant personnel. For construction personnel, reminders can be given through on-site broadcasts, warning lights, warning signs, etc.; for management personnel and emergency rescue teams, real-time communication can be carried out through telephone calls, video conferences, etc.

[0083] At the same time, when generating early warning information, corresponding emergency plans can also be generated based on potential problems or actual problems. For example, detailed emergency plans can be generated for early warning information of different types and levels to facilitate faster safety processing.

[0084] In addition, during the monitoring process, image recognition technology can be used to automatically detect operators' violations, such as not wearing a safety helmet or not wearing a seat belt.

[0085] In summary, the present application discloses a construction monitoring method for a bridge-building machine. When monitoring the construction of the bridge-building machine, the construction image of the bridge-building machine acquired by the set image acquisition device is obtained, and the feature of the construction image is extracted to obtain the construction behavior characteristics of the current construction behavior of the bridge-building machine. Then, the obtained construction behavior characteristics are compared with the standard construction characteristics of the bridge-building machine to obtain a first judgment result, which is used to determine whether the behavior of the bridge-building machine during the construction process is normal. At the same time, sensor data collected by sensors set on key structural parts of the construction object is obtained, and then the second judgment result is obtained by analyzing and processing the sensor data to determine whether the construction object has structural abnormalities. Finally, when it is determined that the safety warning is triggered according to the first judgment result and the second judgment result, the corresponding warning information is generated for feedback. It is achieved that in the process of monitoring the construction situation of the bridge-building machine, by acquiring the construction image that records the construction behavior of the bridge-building machine, the current construction behavior characteristics are obtained to determine whether the construction behavior of the bridge-building machine is normal, thereby improving the accuracy and efficiency of judging whether the construction behavior is normal. At the same time, corresponding sensors are set on the key structural parts of the construction object to determine whether the construction object is normal through sensor data. The construction object can be monitored in real time, and feedback can be given in time when structural abnormalities occur, thereby improving timely and accurate monitoring of the construction situation of the bridge-building machine and abnormal feedback.

[0086] According to the method described in the above embodiment, this embodiment will be further described from the perspective of the construction monitoring device of the bridge-building machine. The construction monitoring device of the bridge-building machine can be implemented as an independent entity or integrated into an electronic device, such as a terminal. The terminal may include a mobile phone, a tablet computer, etc.

[0087] See also Figure 4 , Figure 4 Schematic diagram of a construction monitoring device for a bridge-building machine provided in an embodiment of the present application. Figure 4 As shown, the construction monitoring device 400 of the bridge construction machine provided in the embodiment of the present application includes:

[0088] The image acquisition module 401 is used to acquire the construction image of the bridge construction machine acquired by the image acquisition device, and perform feature extraction on the construction image to obtain the construction behavior features of the construction behavior contained in the construction image;

[0089] The first determination module 402 is used to obtain standard construction features, and perform early warning determination based on the standard construction features and construction behavior features to obtain a first determination result;

[0090] The second determination module 403 is used to obtain sensor data collected by sensors installed on key structural parts of the construction object, and perform analysis and early warning determination based on the sensor data to obtain a second determination result;

[0091] The judgment and warning module 404 is used to generate corresponding warning information for feedback when it is determined that a safety warning is triggered according to the first judgment result and / or the second judgment result.

[0092] In one embodiment, the image acquisition module 401 is further used for:

[0093] The construction images are classified based on the construction behaviors to obtain several image sets, where each image set corresponds to one construction behavior, and one construction operation includes several construction behaviors;

[0094] Image analysis processing is performed on each image in the image set to obtain construction behavior features corresponding to each construction behavior contained in the construction image.

[0095] In one embodiment, the image acquisition module 401 is further used for:

[0096] Determine the construction work performed by the bridge construction machine and obtain the standard behavior sequence of each construction behavior included in the construction work;

[0097] Acquire the time information of the construction image, and obtain the instantaneous behavior sequence corresponding to the construction image according to the time information based on the temporal relationship;

[0098] The immediate behavior sequence is compared with the standard behavior sequence based on the construction behavior, and when it is determined that the immediate behavior sequence is consistent with the standard behavior sequence, it is determined whether the bridge construction machine is operating normally.

[0099] In one embodiment, the image acquisition module 401 is further used for:

[0100] Determine the behavior label of the image set, and perform denoising and enhancement processing on each image in the image set to obtain a processed image set;

[0101] Feature extraction is performed on each image in the processed image set according to the behavior label, and behavior feature calculation is performed based on the extracted features to obtain the construction behavior feature of each construction behavior contained in the image set.

[0102] In one embodiment, the first determination module 402 is further configured to:

[0103] Query according to the bridge-building machine and construction work to obtain the standard construction behavior data currently corresponding to the bridge-building machine;

[0104] Extract features from standard construction behavior data to obtain standard construction features;

[0105] The similarity between the construction behavior feature and the standard construction feature is calculated, and the obtained similarity value is compared with the similarity threshold to obtain a first determination result.

[0106] In one embodiment, the second determination module 403 is further configured to:

[0107] Acquiring sensor data collected by sensors installed on key structural parts of the construction object, wherein the sensor data includes displacement data and temperature data;

[0108] Based on the displacement data and the temperature data, it is determined whether a critical structural part of the construction object is abnormal, and a second determination result is obtained.

[0109] In one embodiment, the determination warning module 404 is further configured to:

[0110] When the behavior is determined to be illegal according to the first determination result or the structural part is determined to be abnormal according to the second determination result, the illegal behavior or abnormal part is determined, and early warning information is generated according to the illegal behavior or abnormal part for feedback;

[0111] When the behavior is determined to be normal according to the first judgment result, and the structural part is determined to be normal according to the second judgment result, the current risk score of the bridge-building machine is calculated according to the first judgment result and the second judgment result, and a warning message is generated for feedback when the current risk score is greater than the score threshold.

[0112] Also, see Figure 5 , Figure 5 is a schematic diagram of the structure of an electronic device provided in an embodiment of the present application, and the electronic device may be a mobile terminal such as a smart phone, a tablet computer, or the like. Figure 5 As shown, the electronic device 500 includes a processor 501 and a memory 502. The processor 501 is electrically connected to the memory 502.

[0113] The processor 501 is the control center of the electronic device 500. It uses various interfaces and lines to connect various parts of the entire electronic device. It executes various functions of the electronic device 500 and processes data by running or loading applications stored in the memory 502 and calling data stored in the memory 502, thereby monitoring the electronic device 500 as a whole.

[0114] In this embodiment, the processor 501 in the electronic device 500 will load the instructions corresponding to the processes of one or more applications into the memory 502 according to the following steps, and the processor 501 will run the application stored in the memory 502, thereby implementing any step in the construction monitoring method of the bridge construction machine provided in the above embodiment.

[0115] The electronic device 500 can implement the steps in any embodiment of the construction monitoring method of the bridge-building machine provided in the embodiments of the present application. Therefore, it can achieve the beneficial effects that can be achieved by any construction monitoring method of the bridge-building machine provided in the embodiments of the present application. Please see the previous embodiments for details and will not be repeated here.

[0116] See also Figure 6 , Figure 6 is another structural schematic diagram of an electronic device provided in an embodiment of the present application, such as Figure 6 As shown, Figure 6 The specific structural block diagram of the electronic device provided in the embodiment of the present application is shown, and the electronic device can be used to implement the construction monitoring method of the bridge construction machine provided in the above embodiment. The electronic device 600 can be a mobile terminal such as a smart phone or a laptop computer.

[0117] The RF circuit 610 is used to receive and send electromagnetic waves, realize the mutual conversion between electromagnetic waves and electrical signals, and thus communicate with a communication network or other devices. The RF circuit 610 may include various existing circuit elements for performing these functions, such as antennas, radio frequency transceivers, digital signal processors, encryption / decryption chips, user identity module (SIM) cards, memories, etc. The RF circuit 610 can communicate with various networks such as the Internet, corporate intranets, wireless networks, or communicate with other devices through wireless networks. The above-mentioned wireless networks may include cellular telephone networks, wireless local area networks, or metropolitan area networks. The above-mentioned wireless networks can use various communication standards, protocols and technologies, including but not limited to Global System for Mobile Communication (GSM), Enhanced Data GSM Environment (EDGE), Wideband Code Division Multiple Access (WCDMA), Code Division Multiple Access (CDMA), Time Division Multiple Access (TDMA), Wireless Fidelity (Wi-Fi) (such as Institute of Electrical and Electronics Engineers standards IEEE 802.11a, IEEE 802.11b, IEEE802.11g and / or IEEE802.11n), Voice over Internet Protocol (VoIP), Worldwide Interoperability for Microwave Access (Wi-Max), other protocols for email, instant messaging and short messages, and any other suitable communication protocols, even those that have not yet been developed.

[0118] The memory 620 can be used to store software programs and modules, such as the program instructions / modules corresponding to the construction monitoring method of the bridge-building machine in the above-mentioned embodiment. The processor 680 executes various functional applications and the construction monitoring method of the bridge-building machine by running the software programs and modules stored in the memory 620.

[0119] The memory 620 may include a high-speed random access memory, and may also include a non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some examples, the memory 620 may further include a memory remotely arranged relative to the processor 680, and these remote memories may be connected to the electronic device 600 via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0120] The input unit 630 can be used to receive uploaded digital or character information, and generate keyboard, mouse, joystick, optical or trackball signal input related to user settings and function control. Specifically, the input unit 630 may include a touch-sensitive surface 631 and other input devices 632. The touch-sensitive surface 631, also known as a touch display screen or touchpad, can collect user touch operations on or near it (such as operations performed by users using fingers, styluses, or any other suitable objects or accessories on or near the touch-sensitive surface 631), and drive corresponding connection devices according to a pre-set program. Optionally, the touch-sensitive surface 631 may include a touch detection device and a touch controller. Among them, the touch detection device detects the user's touch orientation, detects the signal brought by the touch operation, and transmits the signal to the touch controller; the touch controller receives the touch information from the touch detection device, converts it into touch point coordinates, and then sends it to the processor 680, and can receive and execute commands sent by the processor 680. In addition, the touch-sensitive surface 631 can be implemented in various types such as resistive, capacitive, infrared, and surface acoustic wave. In addition to the touch-sensitive surface 631, the input unit 630 may further include other input devices 632. Specifically, the other input devices 632 may include, but are not limited to, one or more of a physical keyboard, function keys (such as volume control keys, switch keys, etc.), a trackball, a mouse, a joystick, and the like.

[0121] The display unit 640 can be used to display information input by the user or information provided to the user and various graphical user interfaces of the electronic device 600, which can be composed of graphics, text, icons, videos and any combination thereof. The display unit 640 may include a display panel 641, and optionally, the display panel 641 may be configured in the form of LCD (Liquid Crystal Display), OLED (Organic Light-Emitting Diode), etc. Further, the touch-sensitive surface 631 may cover the display panel 641, and when the touch-sensitive surface 631 detects a touch operation on or near it, it is transmitted to the processor 680 to determine the type of the touch event, and then the processor 680 provides corresponding visual output on the display panel 641 according to the type of the touch event. Although in the figure, the touch-sensitive surface 631 and the display panel 641 are implemented as two independent components to implement input and output functions, in some embodiments, the touch-sensitive surface 631 and the display panel 641 can be integrated to implement input and output functions.

[0122] The electronic device 600 may also include at least one sensor 650, such as a light sensor, a motion sensor, and other sensors. Specifically, the light sensor may include an ambient light sensor and a proximity sensor, wherein the ambient light sensor may adjust the brightness of the display panel 641 according to the brightness of the ambient light, and the proximity sensor may generate an interrupt when the flip cover is closed or closed. As a type of motion sensor, the gravity acceleration sensor can detect the magnitude of acceleration in each direction (generally three axes), and can detect the magnitude and direction of gravity when stationary. It can be used for applications that identify the posture of the mobile phone (such as horizontal and vertical screen switching, related games, magnetometer posture calibration), vibration recognition related functions (such as pedometer, tapping), etc.; as for other sensors such as gyroscopes, barometers, hygrometers, thermometers, infrared sensors, etc. that can also be configured in the electronic device 600, they will not be repeated here.

[0123] The audio circuit 660, the speaker 661, and the microphone 662 can provide an audio interface between the user and the electronic device 600. The audio circuit 660 can transmit the electrical signal converted from the received audio data to the speaker 661, which is converted into a sound signal for output; on the other hand, the microphone 662 converts the collected sound signal into an electrical signal, which is received by the audio circuit 660 and converted into audio data, and then the audio data is output to the processor 680 for processing, and then sent to another terminal through the RF circuit 610, or the audio data is output to the memory 620 for further processing. The audio circuit 660 may also include an earplug jack to provide communication between an external headset and the electronic device 600.

[0124] The electronic device 600 can help the user receive requests, send information, etc. through the transmission module 670 (such as a Wi-Fi module), which provides the user with wireless broadband Internet access. Although the transmission module 670 is shown in the figure, it is understandable that it is not a necessary component of the electronic device 600 and can be omitted as needed without changing the essence of the invention.

[0125] The processor 680 is the control center of the electronic device 600. It uses various interfaces and lines to connect various parts of the entire mobile phone. By running or executing software programs and / or modules stored in the memory 620, and calling data stored in the memory 620, it executes various functions of the electronic device 600 and processes data, thereby monitoring the electronic device as a whole. Optionally, the processor 680 may include one or more processing cores; in some embodiments, the processor 680 may integrate an application processor and a modem processor, wherein the application processor mainly processes the operating system, user interface, and application programs, etc., and the modem processor mainly processes wireless communications. It can be understood that the above-mentioned modem processor may not be integrated into the processor 680.

[0126] The electronic device 600 also includes a power supply 690 (such as a battery) for supplying power to various components. In some embodiments, the power supply can be logically connected to the processor 680 through a power management system, so that the power management system can manage charging, discharging, and power consumption management. The power supply 690 can also include any components such as one or more DC or AC power supplies, recharging systems, power failure detection circuits, power converters or inverters, and power status indicators.

[0127] Although not shown, the electronic device 600 also includes a camera (such as a front camera, a rear camera), a Bluetooth module, etc., which will not be described in detail here. Specifically in this embodiment, the display unit of the electronic device is a touch screen display, and the mobile terminal also includes a memory, and one or more programs, wherein one or more programs are stored in the memory, and are configured to be executed by one or more processors to implement any step of the construction monitoring method of the bridge construction machine provided in the above embodiment.

[0128] In specific implementation, the above modules can be implemented as independent entities, or can be arbitrarily combined and implemented as the same or several entities. The specific implementation of the above modules can be found in the previous method embodiments, which will not be repeated here.

[0129] Those skilled in the art can understand that all or part of the steps in the various methods of the above embodiments can be completed by instructions, or by controlling related hardware through instructions, and the instructions can be stored in a computer-readable storage medium and loaded and executed by a processor. To this end, an embodiment of the present application provides a storage medium, which stores multiple instructions, and when the instructions are executed by the processor, any step in the construction monitoring method of the bridge construction machine provided in the above embodiments can be implemented.

[0130] The storage medium may include: a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, etc.

[0131] Since the instructions stored in the storage medium can execute the steps in any embodiment of the construction monitoring method for the bridge-building machine provided in the embodiments of the present application, the beneficial effects that can be achieved by any construction monitoring method for the bridge-building machine provided in the embodiments of the present application can be achieved. Please see the previous embodiments for details and will not be repeated here.

[0132] The above is a detailed introduction to a construction monitoring method, device, electronic device and storage medium for a bridge-building machine provided in the embodiments of the present application. Specific examples are used in this article to illustrate the principles and implementation methods of the present application. The description of the above embodiments is only used to help understand the method and its core idea of ​​the present application. At the same time, for those skilled in the art, according to the idea of ​​the present application, there will be changes in the specific implementation methods and application scopes. In summary, the content of this specification should not be understood as a limitation on the present application. Moreover, for those of ordinary skill in the art, without departing from the principles of the present application, several improvements and modifications can be made, and these improvements and modifications are also regarded as the protection scope of the present application.

Claims

1. A construction monitoring method for a bridge construction machine, characterized in that: include: Acquire a construction image of the bridge construction machine acquired by an image acquisition device, and perform feature extraction on the construction image to obtain construction behavior features of the construction behavior contained in the construction image; Acquire standard construction features, and perform early warning determination based on the standard construction features and the construction behavior features to obtain a first determination result; Acquire sensor data collected by sensors installed on key structural parts of the construction object, and perform analysis and early warning determination based on the sensor data to obtain a second determination result; When it is determined that a safety warning is triggered according to the first determination result and / or the second determination result, corresponding warning information is generated for feedback.

2. The method according to claim 1, characterized in that The extracting features of the construction image to obtain construction behavior features of the construction behavior contained in the construction image includes: Classifying the construction images based on the construction behaviors to obtain a plurality of image sets, wherein each image set corresponds to a construction behavior, and a construction operation includes a plurality of construction behaviors; Image analysis processing is performed on each image in the image set to obtain construction behavior features corresponding to each construction behavior contained in the construction image.

3. The method according to claim 2, characterized in that Before performing image analysis processing on each image in the image set to obtain a construction behavior feature corresponding to each construction behavior contained in the construction image, the method further includes: Determine the construction work performed by the bridge-building machine, and obtain the standard behavior sequence of each construction behavior included in the construction work; Acquire time information of the construction image, and obtain the instantaneous behavior sequence corresponding to the construction image according to the time information based on a temporal relationship; The instant behavior sequence is compared with the standard behavior sequence based on the construction behavior, and when it is determined that the instant behavior sequence is consistent with the standard behavior sequence, it is determined whether the bridge-building machine is operating normally.

4. The method according to claim 2, characterized in that The performing image analysis processing on each image in the image set to obtain a construction behavior feature corresponding to each construction behavior contained in the construction image includes: Determine a behavior label of the image set, and perform denoising and enhancement processing on each image in the image set to obtain a processed image set; Feature extraction is performed on each image in the processed image set according to the behavior label, and behavior feature calculation is performed based on the extracted features to obtain the construction behavior feature of each construction behavior included in the image set.

5. The method according to claim 3, characterized in that The acquiring of the standard construction features and performing early warning determination according to the standard construction features and the construction behavior features to obtain a first determination result includes: Querying the bridge-building machine and the construction work to obtain standard construction behavior data currently corresponding to the bridge-building machine; Extracting features from the standard construction behavior data to obtain standard construction features; The similarity between the construction behavior feature and the standard construction feature is calculated, and the obtained similarity value is compared with a similarity threshold to obtain a first determination result.

6. The method according to claim 1, characterized in that The obtaining of sensor data collected by sensors disposed on key structural parts of the construction object, and performing analysis and early warning determination based on the sensor data to obtain a second determination result includes: Acquire sensor data collected by sensors installed on key structural parts of the construction object, wherein the sensor data includes displacement data and temperature data; According to the displacement data and the temperature data, it is determined whether a key structural part of the construction object is abnormal, and a second determination result is obtained.

7. The method according to claim 1, characterized in that When it is determined that a safety warning is triggered according to the first determination result and / or the second determination result, generating corresponding warning information for feedback includes: When the behavior is determined to be illegal according to the first determination result or the structural part is determined to be abnormal according to the second determination result, the illegal behavior or abnormal part is determined, and early warning information is generated according to the illegal behavior or the abnormal part for feedback; When the behavior is determined to be normal according to the first judgment result, and the structural part is determined to be normal according to the second judgment result, the current risk score of the bridge-building machine is calculated according to the first judgment result and the second judgment result, and when the current risk score is greater than the score threshold, warning information is generated for feedback.

8. A construction monitoring device for a bridge-building machine, characterized in that: include: An image acquisition module is used to acquire a construction image of the bridge construction machine acquired by the image acquisition device, and perform feature extraction on the construction image to obtain construction behavior features of the construction behavior contained in the construction image; A first determination module is used to obtain standard construction features, and perform early warning determination based on the standard construction features and the construction behavior features to obtain a first determination result; A second determination module is used to obtain sensor data collected by sensors installed on key structural parts of the construction object, and to analyze and make early warning determinations based on the sensor data to obtain a second determination result; The judgment and warning module is used to generate corresponding warning information for feedback when it is determined that a safety warning is triggered according to the first judgment result and / or the second judgment result.

9. An electronic device, characterized in that: The electronic device comprises a processor, a memory, and a computer program stored in the memory and executable on the processor, and the processor implements the steps in the method according to any one of claims 1 to 7 when executing the computer program.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps in the method according to any one of claims 1 to 7 are implemented.

Citation Information

Patent Citations

  • Intelligent monitoring device, system and method for bridge construction

    CN115243119A

  • Safety monitoring method and system for realizing bridge construction

    CN117876969A

  • Data processing method and device, electronic equipment and computer readable storage medium

    CN118262406A

  • Construction site monitoring method and device based on image analysis, and readable storage medium

    WO2020019673A1