Intelligent inspection management system for digital power distribution network
By marking critical points on the electronic map and generating inspection areas, dividing sub-regions, collecting and analyzing distribution network data, and identifying abnormal areas, the problem of low inspection efficiency of distribution networks in the existing technology is solved, and power distribution is realized The network's efficient and intelligent inspection and stable operation.
Patent Information
- Application Number
- CN202411100402.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-12
- Publication Date
- 2024-11-22
AI Technical Summary
During data collection and analysis, the existing intelligent inspection system for distribution networks has a large number of equipment and lines and is messy in the form of data calculation, which increases the probability of errors and cannot accurately and timely detect abnormal phenomena, reducing management efficiency.
Adopt the intelligent inspection management system of the digital distribution network, and generate inspection areas by marking critical points on the electronic map, extracting sequence characteristics and segmenting sub-regions, planning inspection routes, collecting comprehensive distribution parameters, calculating inspection management coefficients, and identifying abnormalities. and formulate management instructions.
It realizes accurate regional segmentation of the distribution network, reduces the amount of inspection data, improves the efficiency of intelligent inspection, ensures the stable operation of the distribution network, and enhances management efficiency.
Smart Images

Figure CN119010344A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of distribution network inspection management, and more specifically, to a digital distribution network intelligent inspection management system. Background Art
[0002] Under the background of new power system construction, the operation mode of distribution network is more intelligent. By enhancing the digitization of inspection, the all-round state perception capability of the distribution network of the new power system in the operation, maintenance and service stages can be comprehensively improved. Due to the different types and locations of various equipment and lines in the distribution network system, in order to realize the intelligent inspection operation of the digital distribution network system in a timely and accurate manner, it is necessary to accurately detect the operating status of the distribution network system, so as to provide a management basis for subsequent intelligent inspections.
[0003] The patent application with reference publication number CN116128259A discloses a distribution network management system and method, which enables inspection personnel to perform high-efficiency, low-intensity, and low-difficulty inspection work even in complex and dense inspection points including power grids or gas pipeline networks. From the perspective of global resource allocation, the location of the inspection personnel is determined through the terminal, thereby providing planning for inspection routes for several inspection personnel, fully considering the objective indicators required in the inspection process of distribution network management, and ensuring that the inspection personnel can easily and efficiently perform inspections according to the inspection plan given by the server;
[0004] The prior art has the following deficiencies:
[0005] The existing distribution network system usually collects and analyzes the overall operating status data of the distribution network area during intelligent inspection. Since the distribution network area contains a large number of devices and lines and their types are complex, the overall collection and analysis method will result in a large amount of data calculation and increase the probability of data calculation errors. As a result, it is impossible to accurately and timely discover abnormal phenomena in the distribution network area, and it is impossible to formulate targeted optimization measures based on the abnormal phenomena, resulting in unstable operating status of the subsequent distribution network system, which reduces the management efficiency of the power management department in intelligent inspection of the distribution network.
[0006] In view of this, the present invention proposes a digital distribution network intelligent inspection and management system to solve the above problems. Summary of the invention
[0007] In order to overcome the above-mentioned defects of the prior art and to achieve the above-mentioned purpose, the present invention provides the following technical solutions: a digital distribution network intelligent inspection management system, applied to an inspection management platform, comprising:
[0008] The inspection area generation module is used to mark critical points on the electronic map and draw regional boundary lines based on the critical points to generate inspection areas;
[0009] Inspection route planning module, which is used to extract the sequence features of critical points, divide the inspection area into sub-areas according to the sequence features, and plan the inspection route. The sequence features include high-voltage power distribution, medium-voltage power distribution, low-voltage power distribution and load power distribution;
[0010] The management coefficient calculation module is used to collect the comprehensive power distribution parameters of the sub-area and calculate the inspection management coefficient of the sub-area based on the comprehensive power distribution parameters. The comprehensive power distribution parameters include abnormal current frequency, over-limit power interval value and operating temperature rise rate;
[0011] The abnormal identification and selection module is used to compare the inspection management system with the inspection management threshold, identify the abnormal area from the sub-area, and control the sub-area to select the corresponding regional power distribution state according to the number of the abnormal area;
[0012] The management instruction formulation module is used to identify the adjustment parameters of abnormal areas and formulate inspection management instructions based on the adjustment parameters.
[0013] Further, the critical point marking method includes:
[0014] The geographical location of the distribution network to be inspected is inquired through the positioning system, and an electronic map matching the geographical location of the distribution network to be inspected is selected from the database;
[0015] Mark the four boundaries of the electronic map one by one to obtain four map boundaries;
[0016] Identify the attribute states of all the power distribution equipment and power distribution lines on the electronic map one by one, and record the power distribution equipment and power distribution lines whose attribute states are consistent with the attribute states of the distribution network to be inspected as target power distribution equipment and target power distribution lines;
[0017] Mark the locations of the target power distribution equipment and the target power distribution lines to obtain i critical points;
[0018] Methods for generating inspection areas include:
[0019] The distances from i critical points to the four map boundaries are measured in sequence using a scale, and the critical point corresponding to the minimum value of the distance to the four map boundaries is recorded as the target critical point, thereby obtaining four target critical points;
[0020] Combine the target critical point and the map boundary corresponding to the minimum distance into a set to obtain four point and line sets;
[0021] Draw straight lines parallel to the map boundaries in the corresponding point-line set through the four target critical points respectively to obtain four area boundary lines;
[0022] On the electronic map, the area outside the area enclosed by the four area dividing lines is eliminated, and the remaining area is recorded as the inspection area.
[0023] Furthermore, the sub-region segmentation method includes:
[0024] The data corresponding to the power distribution sequence of i critical points are queried one by one through the technical parameter table to obtain i sequence data;
[0025] Identify the semantics contained in i sequence data through natural language processing technology to obtain i sequence semantics;
[0026] The sequence data with sequence semantics of high voltage, medium voltage, low voltage and load are recorded as high voltage distribution, medium voltage distribution, low voltage distribution and load distribution;
[0027] The critical points of the sequence characteristics of high voltage distribution, medium voltage distribution, low voltage distribution and load distribution are recorded as high voltage critical point, medium voltage critical point, low voltage critical point and load critical point respectively;
[0028] Draw closed characteristic lines outside the high pressure critical point, the medium pressure critical point, the low pressure critical point and the load critical point respectively to obtain four characteristic lines;
[0029] The inspection area is segmented based on the four characteristic lines to obtain four sub-areas.
[0030] Furthermore, the inspection route planning method includes:
[0031] Mark the sequence characteristics of the four sub-areas one by one, and start numbering with 1, and number the sub-areas with sequence characteristics of high voltage distribution, medium voltage distribution, low voltage distribution and load distribution in ascending order;
[0032] A blank route map is constructed, and four inspection stations are marked in the route map, which are respectively recorded as the first inspection station, the second inspection station, the third inspection station, and the fourth inspection station;
[0033] According to the numbering from small to large, the four sub-areas are sequentially imported into the first inspection station, the second inspection station, the third inspection station and the fourth inspection station to generate an inspection route.
[0034] Furthermore, the method for obtaining the abnormal current frequency includes:
[0035] Randomly select equal amounts of distribution equipment and distribution lines in s sub-areas as inspection points, s∈(1, 2, 3, 4), and obtain p inspection points;
[0036] The current sensors are used to measure the real-time current values of p inspection points one by one to obtain p real-time current values;
[0037] Record the time when p real-time current values are greater than the preset current lower limit value for the first time respectively, and obtain p starting time;
[0038] After p starting moments, when the real-time current value no longer exceeds the preset current lower limit value within the preset current inspection time, the last time the real-time current value exceeds the preset current lower limit value is recorded to obtain p ending moments;
[0039] The duration between the p starting moments and the p ending moments is recorded as the abnormal duration, and p abnormal durations are obtained;
[0040] Count the number of times that the real-time current value is greater than the preset current lower limit value within p abnormal time lengths one by one to obtain p abnormal current values;
[0041] Compare the p abnormal current values with the p abnormal durations in sequence to obtain p sub-frequencies;
[0042] The expression of sub-frequency is:
[0043]
[0044] Where PL zsp is the sub-frequency of the p-th inspection point in the s-th sub-area, DL ycsp is the abnormal current value of the pth inspection point in the sth sub-area, SC ycsp is the abnormal duration of the pth inspection point in the sth sub-area;
[0045] Remove the maximum and minimum values of the sub-frequencies, accumulate the remaining p-2 sub-frequencies and calculate the average to obtain s abnormal current frequencies;
[0046] The expression of abnormal current frequency is:
[0047]
[0048] Where PL dls is the abnormal current frequency of the sth sub-region, PL zsa is the sub-frequency of the a-th inspection point in the s-th sub-area.
[0049] Furthermore, the method for obtaining the over-limit power interval value includes:
[0050] A1: Use power sensors to detect the real-time operating power of p inspection points and obtain p real-time power values;
[0051] A2: Query the standard operating power value of the sub-area through the technical parameter table, and record the real-time power value that is greater than the standard operating power value as the over-limit power value;
[0052] A3: Query the time when two consecutive over-limit power values appear in p inspection points through the timestamp, obtain the first time and the second time, and record the time between the first time and the second time as the over-limit time, and obtain p over-limit time;
[0053] A4: Repeat step A3 w times to obtain w overtimes, and then add up the w overtimes and calculate the average to obtain p valid time periods.
[0054] The expression of effective duration is:
[0055]
[0056] In the formula, SC yxsp is the effective duration of the pth inspection point in the sth sub-area, SC cxspb is the bth overlimit duration of the pth inspection point in the sth sub-area;
[0057] A5: Accumulate the p effective durations and calculate the average to obtain s over-limit power interval values;
[0058] The expression of the excess power interval value is:
[0059]
[0060] In the formula, JG CXS is the excess power interval value of the sth sub-area, SC yxsc is the effective duration of the cth inspection point in the sth sub-area.
[0061] Furthermore, the method for obtaining the operating temperature rise rate includes:
[0062] The real-time working temperature of p inspection points is detected by the temperature sensor in real time to obtain p real-time temperature values;
[0063] The moment when the p real-time temperature values first reach the preset temperature lower limit is recorded as the rising start moment, the moment when the p real-time temperature values first reach the preset temperature upper limit is recorded as the rising end moment, and the time from the rising start moment to the rising end moment is recorded as the rising duration, to obtain p rising durations;
[0064] After subtracting the preset temperature upper limit value from the preset temperature lower limit value, the values are compared with the p rising time periods to obtain p sub-rising rates;
[0065] The expression of the sub-rise rate is:
[0066]
[0067] Where, SG lsp is the sub-area rise rate of the p-th inspection point in the s-th sub-area, WD sx is the preset temperature upper limit, WD xx is the preset temperature lower limit, SC sgsp is the rising time of the pth inspection point in the sth sub-area;
[0068] The p sub-increase rates are accumulated and averaged to obtain the standard increase rate, and the x sub-increase rates greater than the standard increase rate are accumulated and averaged to obtain the operating temperature increase rate;
[0069] The expression of operating temperature rise rate is:
[0070]
[0071] In the formula, SG wds is the operating temperature rise rate of the sth sub-area, SG lsd is the sub-area rise rate of the d-th inspection point in the s-th sub-area.
[0072] Furthermore, the expression of the inspection management coefficient is:
[0073]
[0074] In the formula, GL xss is the inspection management coefficient of the s-th sub-area, σ1, σ2, σ3 are weight factors, and σ1, σ2, σ3 are all greater than 0;
[0075] Methods for identifying abnormal areas include:
[0076] The inspection management coefficient GL of the s sub-areas xss One by one with the preset inspection management threshold GL yz Compare;
[0077] When GL xss Greater than or equal to GL yz When , no abnormal area is identified;
[0078] When GL xss Smaller than GL yz When , the sth sub-region is identified as an abnormal region, and v abnormal regions are obtained;
[0079] The regional power distribution status includes normal power distribution status and shutdown maintenance status;
[0080] The selection methods for normal power distribution state and shutdown maintenance state include:
[0081] Record the numbers of the v abnormal regions as abnormal numbers, obtain v abnormal numbers, and record the minimum value of the abnormal numbers as the target number;
[0082] When the target number is 1, the sub-areas with control numbers 1, 2, 3, and 4 are all in shutdown maintenance state;
[0083] When the target number is 2, the sub-area with the control number 1 selects the normal power distribution state, and the sub-areas with the control numbers 2, 3, and 4 all select the shutdown maintenance state;
[0084] When the target number is 3, the sub-areas with control numbers 1 and 2 select the normal power distribution state, and the sub-areas with control numbers 3 and 4 both select the shutdown maintenance state;
[0085] When the target number is 4, the sub-areas with control numbers 1, 2 and 3 select the normal power distribution state, and the sub-area with control number 4 selects the shutdown maintenance state.
[0086] Further, the identification method of the adjustment parameter includes:
[0087] Comparing the abnormal current frequency in the abnormal area with a preset frequency safety value, and when the abnormal current frequency is greater than the preset frequency safety value, identifying the abnormal current frequency as an adjustment parameter;
[0088] Comparing the over-limit power interval value in the abnormal area with a preset interval safety value, and identifying the over-limit power interval value as an adjustment parameter when the over-limit power interval value is less than the preset interval safety value;
[0089] The operating temperature increase rate in the abnormal area is compared with a preset increase safety value, and when the operating temperature increase rate is greater than the preset increase safety value, the operating temperature increase rate is identified as an adjustment parameter.
[0090] Furthermore, the inspection management instructions include instructions for reducing abnormal current frequency, increasing over-limit power interval value, and reducing operating temperature rise rate:
[0091] The method for formulating the abnormal current frequency reduction instruction, the over-limit power interval value increase instruction and the operating temperature rise rate reduction instruction includes:
[0092] When the adjustment parameter is abnormal current frequency, an instruction to reduce the abnormal current frequency is formulated;
[0093] When the adjustment parameter is an over-limit power interval value, an instruction to increase the over-limit power interval value is formulated;
[0094] When the adjustment parameter is the operating temperature increase rate, an instruction to reduce the operating temperature increase rate is formulated.
[0095] The technical effects and advantages of the digital distribution network intelligent inspection management system of the present invention are as follows:
[0096] The present invention marks critical points on an electronic map, draws regional boundaries according to the critical points, generates inspection areas, extracts sequence features of critical points, divides the inspection areas into sub-areas according to the sequence features, plans inspection routes, collects comprehensive power distribution parameters of the sub-areas, calculates inspection management coefficients of the sub-areas based on the comprehensive power distribution parameters, compares the inspection management system with the inspection management threshold, identifies abnormal areas from the sub-areas, controls the sub-areas to select corresponding regional power distribution states according to the numbers of the abnormal areas, identifies adjustment parameters of the abnormal areas, and formulates inspection management instructions according to the adjustment parameters. Compared with the prior art, the present invention can accurately extract sequence features of the inspection areas corresponding to the distribution network, and divide the inspection areas into sub-areas according to the sequence features. After the sub-areas are divided, the inspection routes are planned, which achieves the inspection effect of breaking the inspection area into parts, reduces the amount of inspection data in each sub-area, and improves the intelligent inspection efficiency of the sub-areas. At the same time, the inspection management coefficient of the sub-area can be calculated in combination with the comprehensive distribution parameters, so as to accurately calculate and estimate the distribution operation status of each sub-area. At the same time, the inspection area of the distribution network can be optimized and adjusted in a targeted manner according to the sequence characteristics of the abnormal area, so that the distribution network can be maintained in a normal and stable operating state, thereby providing a good foundation for the subsequent intelligent inspection operation of the distribution network, creating a safe and reliable inspection environment for the intelligent inspection of the distribution network, and enhancing the management efficiency of the power management department for the intelligent inspection of the distribution network. BRIEF DESCRIPTION OF THE DRAWINGS
[0097] Figure 1 A schematic diagram of a module of a digital distribution network intelligent inspection management system provided in the first embodiment of the present invention;
[0098] Figure 2 A flowchart of a digital distribution network intelligent inspection management method provided in Embodiment 2 of the present invention. DETAILED DESCRIPTION
[0099] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0100] Example 1: Please refer to Figure 1 As shown, the digital distribution network intelligent inspection management system described in this embodiment is applied to the inspection management platform, including:
[0101] The inspection area generation module marks critical points on the electronic map and draws regional boundaries based on the critical points to generate inspection areas;
[0102] Critical points refer to points on the electronic map that can represent the locations of the distribution equipment and distribution lines corresponding to the distribution network to be inspected, that is, the locations of each component equipment and line in the distribution network to be inspected can be represented, and the critical points can be used as the basis for subsequent inspection areas;
[0103] Methods for marking critical points include:
[0104] The geographical location of the distribution network to be inspected is inquired through the positioning system, and an electronic map matching the geographical location of the distribution network to be inspected is selected from the database;
[0105] Mark the four boundaries of the electronic map one by one to obtain four map boundaries;
[0106] Identify the attribute status of all the power distribution equipment and power distribution lines on the electronic map one by one, and record the power distribution equipment and power distribution lines whose attribute status is consistent with the attribute status of the distribution network to be inspected as target power distribution equipment and target power distribution lines; the attribute status is suitable for the numerical representation of the power distribution equipment, power distribution lines and the power supply lines to which the distribution network to be inspected belongs, so as to represent the power distribution equipment, power distribution lines and distribution network to be inspected of different power supply lines separately, so as to facilitate the accurate correspondence of the power distribution equipment, power distribution lines and distribution network to be inspected on the same power supply line;
[0107] The locations of the target power distribution equipment and the target power distribution lines are marked to obtain i critical points.
[0108] The inspection area refers to the geographical location of the equipment and power supply lines corresponding to the distribution network to be inspected, which can comprehensively represent the geographical location of the components associated with the distribution network to be inspected, thereby providing accurate inspection location data for subsequent intelligent inspection of the distribution network to be inspected;
[0109] Methods for generating inspection areas include:
[0110] The distances from i critical points to the four map boundaries are measured in sequence using a scale, and the critical point corresponding to the minimum value of the distance to the four map boundaries is recorded as the target critical point, thereby obtaining four target critical points;
[0111] The target critical point and the map boundary corresponding to the minimum distance are combined into a set to obtain four point-line sets; the line set refers to a set containing a critical point and a map boundary respectively, that is, a target critical point and the corresponding map boundary are combined one by one, and the target critical point and the map boundary can be summarized one by one;
[0112] Draw straight lines parallel to the map boundaries in the corresponding point-line set through the four target critical points respectively to obtain four area boundary lines;
[0113] On the electronic map, the area outside the area enclosed by the four area dividing lines is eliminated, and the remaining area is recorded as the inspection area.
[0114] It should be noted that after the inspection area is obtained, there is no one-to-one correspondence in position and relationship between the distribution equipment and distribution lines contained in the inspection area, and they are all in their original working state, so that the distribution equipment and distribution lines in the inspection area can accurately represent the actual situation of the distribution network to be inspected.
[0115] The inspection route planning module extracts the sequence features of critical points, divides the inspection area into sub-areas based on the sequence features, and plans the inspection route;
[0116] The sequence feature refers to the inspection order of the distribution equipment and distribution lines corresponding to each critical point in the distribution network to be inspected, which can represent the distribution sequence corresponding to each critical point and serve as the basis for the subsequent planning of the inspection route.
[0117] Sequence characteristics include high-voltage distribution, medium-voltage distribution, low-voltage distribution and load distribution; high-voltage distribution refers to the inspection sequence of distribution equipment and distribution lines at the front end of the distribution network, medium-voltage distribution refers to the inspection sequence of distribution equipment and distribution lines at the middle of the distribution network, low-voltage distribution refers to the inspection sequence of distribution equipment and distribution lines at the back end of the distribution network, and load distribution refers to the inspection sequence of distribution equipment and distribution lines at the output of the distribution network;
[0118] Since there are many types of distribution network related components included in the inspection area, and the geographical locations of different related equipment and lines may be far away or of mixed types, in order to subdivide the inspection area with a large overall area and mixed types, it is necessary to divide the inspection area into sub-areas according to sequence characteristics, which can serve as the basis for subsequent distribution network inspection management and facilitate accurate planning of inspection routes in the future;
[0119] The sub-region segmentation methods include:
[0120] The data corresponding to the power distribution sequence of i critical points are queried one by one through the technical parameter table to obtain i sequence data; the sequence value is used to represent the data of the power distribution sequence of the critical points in the distribution network to be inspected, thereby initially representing the sequence of each power distribution equipment and distribution line in the inspection area;
[0121] The semantics contained in i sequence data are identified through natural language processing technology to obtain i sequence semantics; sequence semantics refers to a phrase that can concisely and accurately represent sequence data, which is convenient for subsequent extraction and processing of sequence features;
[0122] The sequence data with sequence semantics of high voltage, medium voltage, low voltage and load are recorded as high voltage distribution, medium voltage distribution, low voltage distribution and load distribution;
[0123] The critical points of the sequence characteristics of high voltage distribution, medium voltage distribution, low voltage distribution and load distribution are recorded as high voltage critical point, medium voltage critical point, low voltage critical point and load critical point respectively;
[0124] Draw closed characteristic lines outside the high pressure critical point, the medium pressure critical point, the low pressure critical point and the load critical point respectively to obtain four characteristic lines;
[0125] The inspection area is segmented based on the four characteristic lines to obtain four sub-areas.
[0126] The inspection route refers to the position sequence of the inspection path of the distribution network to be inspected during the intelligent inspection process, which can be used to specify the inspection sequence of the sub-areas, so that the distribution network to be inspected can be intelligently inspected according to the pre-set inspection route;
[0127] Inspection route planning methods include:
[0128] Mark the sequence characteristics of the four sub-areas one by one, and start numbering with 1, and number the sub-areas with sequence characteristics of high voltage distribution, medium voltage distribution, low voltage distribution and load distribution in ascending order;
[0129] A blank route map is constructed, and four inspection stations are marked in the route map, which are respectively recorded as the first inspection station, the second inspection station, the third inspection station, and the fourth inspection station; the route map refers to a blank route without inspection sequence planning, and serves as the planning basis for subsequent inspection routes, while the inspection station is the smallest component unit of the route map, and is used to provide the sub-area with a spatial location for import;
[0130] According to the numbering from small to large, the four sub-areas are sequentially imported into the first inspection station, the second inspection station, the third inspection station and the fourth inspection station to generate an inspection route;
[0131] It should be noted that when the inspection route is constructed, the inspection route can represent the order of the intelligent inspection positions of the distribution network to be inspected, and serve as the basis for subsequent data collection and inspection scheduling management in the sub-area, so that sub-areas with the same sequence characteristics can be collected centrally and accurately, avoiding data collection chaos in the sub-area, and greatly improving the inspection efficiency of distribution equipment and distribution lines in the sub-area.
[0132] The management coefficient calculation module collects the comprehensive power distribution parameters of the sub-area and calculates the inspection management coefficient of the sub-area based on the comprehensive power distribution parameters;
[0133] Comprehensive distribution parameters refer to the diversified data of the distribution equipment and distribution lines contained in the sub-area that may change during the inspection process. They can represent the inspection status of the sub-area in terms of data, and serve as a basis for subsequent judgment of whether the sub-area has abnormal distribution network operation, thereby helping to calculate the inspection management coefficient.
[0134] Comprehensive power distribution parameters include abnormal current frequency, over-limit power interval value and operating temperature rise rate;
[0135] The abnormal current frequency refers to the number of times the abnormal current occurs in the distribution equipment and distribution lines in the sub-area per unit time, which can be used to indicate the number of abnormal currents in the sub-area. The greater the abnormal current frequency, the more times the abnormal current occurs in the distribution equipment and distribution lines in the sub-area per unit time, and the worse the inspection status of the distribution equipment and distribution lines corresponding to the sub-area, and the smaller the inspection management coefficient;
[0136] The methods for obtaining abnormal current frequency include:
[0137] Randomly select equal amounts of distribution equipment and distribution lines in s sub-areas as inspection points, s∈(1, 2, 3, 4), and obtain p inspection points;
[0138] The current sensors are used to measure the real-time current values of p inspection points one by one to obtain p real-time current values;
[0139] Record the time when p real-time current values are greater than the preset current lower limit for the first time, and obtain p starting times; the preset current lower limit refers to the lowest operating current in the distribution equipment and distribution lines that can have a negative impact on its operating state, and serves as the minimum value for identifying and judging the operating current as an abnormal current, and can also play an auxiliary limiting role in marking subsequent starting times, thereby effectively ensuring the statistical accuracy of the abnormal duration;
[0140] After p starting moments, when the real-time current value no longer exceeds the preset current lower limit value within the preset current inspection time, the last time the real-time current value exceeds the preset current lower limit value is recorded to obtain p ending moments;
[0141] The duration between the p starting moments and the p ending moments is recorded as the abnormal duration, and p abnormal durations are obtained;
[0142] Count the number of times that the real-time current value is greater than the preset current lower limit value within p abnormal time lengths one by one to obtain p abnormal current values;
[0143] Compare the p abnormal current values with the p abnormal durations in sequence to obtain p sub-frequencies;
[0144] The expression of sub-frequency is:
[0145]
[0146] Where PL zsp is the sub-frequency of the p-th inspection point in the s-th sub-area, DL ycsp is the abnormal current value of the sth inspection point in the sth sub-area, SC ycsp is the abnormal duration of the pth inspection point in the sth sub-area;
[0147] Remove the maximum and minimum values of the sub-frequencies, accumulate the remaining p-2 sub-frequencies and calculate the average to obtain s abnormal current frequencies;
[0148] The expression of abnormal current frequency is:
[0149]
[0150] Where PL dls is the abnormal current frequency of the sth sub-region, PL zsa is the sub-frequency of the a-th inspection point in the s-th sub-area.
[0151] The over-limit power interval value refers to the interval duration when the operating power of the distribution equipment and distribution lines in the sub-area exceeds the standard operating power, which can be used to indicate the interval duration when the excess operating power occurs in the sub-area. The larger the over-limit power interval value, the longer the interval duration when the operating power of the distribution equipment and distribution lines in the sub-area exceeds the standard operating power, and the better the inspection status of the distribution equipment and distribution lines corresponding to the sub-area, and the greater the inspection management coefficient;
[0152] Methods for obtaining the over-limit power interval value include:
[0153] A1: Detect the real-time operating power values of p inspection points through power sensors to obtain p real-time power values;
[0154] A2: Query the standard operating power value of the sub-area through the technical parameter table, and record the real-time power value that is greater than the standard operating power value as the over-limit power value; the standard operating power value refers to the maximum operating power of the power distribution equipment and the power distribution line under normal operating conditions, which can limit the upper limit of the operating power of the power distribution equipment and the power distribution line, so as to accurately identify the over-limit power value;
[0155] A3: Query the time when two consecutive over-limit power values appear in p inspection points through the timestamp, obtain the first time and the second time, and record the time between the first time and the second time as the over-limit time, and obtain p over-limit time;
[0156] A4: Repeat step A3 w times to obtain w overtimes, and then add up the w overtimes and calculate the average to obtain p valid time periods.
[0157] The expression of effective duration is:
[0158]
[0159] In the formula, SC yxsp is the effective duration of the pth inspection point in the sth sub-area, SC cxspb is the bth overlimit duration of the pth inspection point in the sth sub-area;
[0160] A5: Accumulate the p effective durations and calculate the average to obtain s over-limit power interval values;
[0161] The expression of the excess power interval value is:
[0162]
[0163] In the formula, JG CXS is the excess power interval value of the sth sub-area, SC yxsc is the effective duration of the cth inspection point in the sth sub-area.
[0164] The operating temperature rise rate refers to the rate of increase of the operating temperature of the distribution equipment and distribution lines in the sub-area per unit time, which can be used to represent the increase of the operating temperature in the sub-area. The greater the operating temperature rise rate, the greater the rate of increase of the operating temperature of the distribution equipment and distribution lines in the sub-area per unit time, the worse the inspection status of the distribution equipment and distribution lines corresponding to the sub-area, and the smaller the inspection management coefficient;
[0165] Methods for obtaining the operating temperature rise rate include:
[0166] The real-time working temperature of p inspection points is detected by the temperature sensor in real time to obtain p real-time temperature values;
[0167] The moment when p real-time temperature values reach the preset temperature lower limit for the first time is recorded as the rising start moment, the moment when p real-time temperature values reach the preset temperature upper limit for the first time is recorded as the rising end moment, and the duration from the rising start moment to the rising end moment is recorded as the rising duration, and p rising durations are obtained; the preset temperature lower limit and the preset temperature upper limit refer to the lowest operating temperature and the highest operating temperature of the power distribution equipment and the power distribution line, respectively, when the operating state thereof can be negatively affected, so that the abnormal operating temperature range of the power distribution equipment and the power distribution line can be limited, thereby improving the accuracy of the operating temperature monitoring range;
[0168] After subtracting the preset temperature upper limit value from the preset temperature lower limit value, the values are compared with the p rising time periods to obtain p sub-rising rates;
[0169] The expression of the sub-rise rate is:
[0170]
[0171] In the formula, SG lsp is the sub-area rise rate of the p-th inspection point in the s-th sub-area, WD sx is the preset temperature upper limit, WD XX is the preset temperature lower limit, SC sgsp is the rising time of the pth inspection point in the sth sub-area;
[0172] The p sub-increase rates are accumulated and averaged to obtain the standard increase rate, and the x sub-increase rates greater than the standard increase rate are accumulated and averaged to obtain the operating temperature increase rate;
[0173] The expression of operating temperature rise rate is:
[0174]
[0175] In the formula, SG wds is the operating temperature rise rate of the sth sub-area, SG lsd is the sub-area rise rate of the d-th inspection point in the s-th sub-area.
[0176] After obtaining the comprehensive power distribution parameters, the inspection management coefficient can be calculated based on the comprehensive power distribution parameters, so that the inspection management coefficient can represent the good or bad current operating status of each sub-area and serve as the numerical basis for subsequent inspection management, thereby ensuring that the distribution network to be inspected can perform accurate and efficient inspection management operations in the future;
[0177] The expression of the inspection management coefficient is:
[0178]
[0179] In the formula, GLxss is the inspection management coefficient of the s-th sub-area, σ1, σ2, σ3 are weight factors, and σ1, σ2, σ3 are all greater than 0;
[0180] Among them, σ1+σ2+σ3=1, for example, σ1 is 0.42, σ2 is 0.33, and σ3 is 0.25; it should be noted that σ1, σ2, and σ3 are intended to adjust the proportion of abnormal current frequency, excessive power interval value, and operating temperature rise rate in the inspection management coefficient, so that the influence of abnormal current frequency, excessive power interval value, and operating temperature rise rate on the size of the inspection management coefficient can maintain a relatively balanced state, thereby ensuring the accuracy of the inspection management coefficient.
[0181] The abnormal identification and selection module compares the inspection management system with the inspection management threshold, identifies the abnormal area from the sub-area, and controls the sub-area to select the corresponding regional power distribution state according to the number of the abnormal area;
[0182] After the inspection management coefficient of the sub-area is obtained, the inspection management coefficient can be compared with the preset inspection management threshold, and according to the comparison result, the abnormal area can be identified from the sub-area. At this time, the abnormal area can be regarded as the area where the distribution network is prone to operation failure during operation, and as the object of intelligent inspection management of the distribution network;
[0183] Methods for identifying abnormal areas include:
[0184] The inspection management coefficient GL of the s sub-areas xss One by one with the preset inspection management threshold GL yz Comparison; The preset inspection management threshold refers to the minimum value of the inspection management coefficient when the sub-area is not identified as an abnormal area, so that it can be used as a numerical basis for abnormal area identification and can accurately identify the sub-area in the distribution network to be inspected;
[0185] When GL xss Greater than or equal to GL yz When , it means that the inspection management coefficient of the s-th sub-area is greater than or equal to the preset inspection management threshold. At this time, the operation status of the s-th sub-area is good, and no abnormal area is identified;
[0186] When GL xss Smaller than GL yz When , it means that the inspection management coefficient of the s-th sub-area is less than the preset inspection management threshold. At this time, the operation status of the s-th sub-area is poor, and the s-th sub-area is identified as an abnormal area, and v abnormal areas are obtained;
[0187] When an abnormal area is identified, it means that there is a sub-area with a poor operating status in the sub-area of the distribution network to be inspected. At this time, it is necessary to identify the number of the abnormal area and select the corresponding regional power distribution state according to the sequence characteristics corresponding to the number of the abnormal area, so that the regional power distribution state can optimize the power distribution control of the sub-area;
[0188] The regional power distribution status includes normal power distribution status and shutdown maintenance status; the normal power distribution status means that the sub-area is in a normal operating state, realizing normal power distribution of the power distribution equipment and distribution lines, and the shutdown maintenance status means that the sub-area is in an emergency shutdown state, realizing the shutdown maintenance of the power distribution equipment and distribution lines;
[0189] The selection methods for normal power distribution state and shutdown maintenance state include:
[0190] Record the numbers of the v abnormal regions as abnormal numbers, obtain v abnormal numbers, and record the minimum value of the abnormal numbers as the target number;
[0191] When the target number is 1, it means that the number of the abnormal area is 1, and the abnormal area corresponds to the front-end high-voltage part of the distribution network to be inspected. At this time, all sub-areas need to be shut down for maintenance, so the four sub-areas are controlled to select the shutdown maintenance state;
[0192] When the target number is 2, it means that the number of the abnormal area is 2, and the abnormal area corresponds to the middle-end medium-voltage part of the distribution network to be inspected. At this time, the abnormal area and the sub-areas at the back end need to be shut down for maintenance. Then the sub-area with the control number 1 selects the normal power distribution state, and the sub-areas with the control numbers 2, 3 and 4 all select the shutdown maintenance state;
[0193] When the target number is 3, it means that the number of the abnormal area is 3, and the abnormal area corresponds to the rear low-voltage part of the distribution network to be inspected. At this time, the sub-areas of the abnormal area and the load part need to be shut down for maintenance. Then the sub-areas with control numbers 1 and 2 select the normal distribution state, and the sub-areas with control numbers 3 and 4 both select the shutdown maintenance state;
[0194] When the target number is 4, it means that the number of the abnormal area is 4, and the abnormal area corresponds to the load part of the distribution network to be inspected. At this time, the abnormal area needs to be shut down for maintenance. The sub-areas with control numbers 1, 2 and 3 select the normal distribution state, and the sub-area with control number 4 selects the shutdown maintenance state.
[0195] The management instruction formulation module identifies the adjustment parameters of abnormal areas and formulates inspection management instructions based on the adjustment parameters;
[0196] When the abnormal area is identified and the corresponding sub-area is controlled to select the corresponding regional power distribution state, the adjustment parameter can be identified from the comprehensive power distribution parameters of the abnormal area, so that the adjustment parameter can be used as a parameter that can affect the sub-area to be identified as an abnormal area, and as an object for subsequent formulation of inspection management instructions;
[0197] Methods for identifying tuning parameters include:
[0198] The abnormal current frequency in the abnormal area is compared with the preset frequency safety value; the preset frequency safety value refers to the maximum value of the abnormal current frequency of the sub-area when it is not identified as an abnormal area, which can limit the maximum value of the abnormal current frequency under normal circumstances; the preset frequency safety value is obtained by collecting the maximum values of the abnormal current frequencies of a large number of sub-areas in history when they are not identified as abnormal areas and calculating their average value;
[0199] When the abnormal current frequency is greater than the preset frequency safety value, it means that the abnormal current frequency of the abnormal area is greater than the maximum value of the abnormal current frequency when it is not identified as an abnormal area, and the abnormal current frequency is identified as an adjustment parameter;
[0200] The over-limit power interval value in the abnormal area is compared with the preset interval safety value; the preset interval safety value refers to the minimum value of the over-limit power interval value when the sub-area is not identified as an abnormal area, that is, the minimum value of the over-limit power interval value under normal circumstances is limited; the preset interval safety value is obtained by collecting a large number of historical minimum values of the over-limit power interval values of the sub-areas when they are not identified as abnormal areas, and then calculating the average value;
[0201] When the excess power interval value is less than the preset interval safety value, it means that the excess power interval value of the abnormal area is less than the minimum value of the excess power interval value when it is not identified as an abnormal area, and the excess power interval value is identified as an adjustment parameter;
[0202] The operating temperature increase rate in the abnormal area is compared with a preset increase safety value; the preset increase safety value refers to the maximum value of the operating temperature increase rate of the sub-area when it is not identified as an abnormal area, which can limit the maximum value of the operating temperature increase rate under normal circumstances; the preset increase safety value is obtained by collecting the maximum values of the operating temperature increase rates of a large number of sub-areas in history when they are not identified as abnormal areas and calculating their average value;
[0203] When the operating temperature increase rate is greater than the preset increase safety value, it means that the operating temperature increase rate of the abnormal area is greater than the maximum value of the operating temperature increase rate when it is not identified as an abnormal area, and the operating temperature increase rate is identified as an adjustment parameter.
[0204] Inspection management instructions refer to instructions that can be formulated based on adjustment parameters to adjust the comprehensive distribution parameters in the abnormal area accordingly, so that the abnormal distribution equipment and distribution lines in the abnormal area can be optimized and adjusted, so that the abnormal area can be in a normal state again, avoiding negative impacts on the intelligent inspection of the distribution network to be inspected, and ensuring that the distribution network to be inspected can be quickly, efficiently and safely intelligently inspected;
[0205] Inspection management instructions include instructions for reducing abnormal current frequency, increasing over-limit power interval value, and reducing operating temperature rise rate;
[0206] The method for formulating the abnormal current frequency reduction instruction, the over-limit power interval value increase instruction and the operating temperature rise rate reduction instruction includes:
[0207] When the adjustment parameter is the abnormal current frequency, it means that the abnormal current frequency in the abnormal area will have a negative impact on the state of the area, and an instruction to reduce the abnormal current frequency is formulated;
[0208] When the adjustment parameter is the over-limit power interval value, it means that the over-limit power interval value in the abnormal area will have a negative impact on the state of the area, and an instruction to increase the over-limit power interval value is formulated;
[0209] When the adjustment parameter is the operating temperature increase rate, it means that the operating temperature increase rate in the abnormal area will have a negative impact on the state of the area, and an instruction to reduce the operating temperature increase rate is formulated.
[0210] When instructions for reducing abnormal current frequency, increasing excess power interval value and reducing operating temperature rise rate are formulated, they can be used as instructions for optimizing and adjusting the distribution network to be inspected, so that the distribution network to be inspected can eliminate abnormal phenomena in the distribution network to be inspected under the guidance of the instructions for reducing abnormal current frequency, increasing excess power interval value and reducing operating temperature rise rate, so as to ensure that the adjustment parameters in the distribution network to be inspected can be repaired, thereby ensuring that the distribution network to be inspected can perform normal intelligent inspection operations.
[0211] In this embodiment, by marking critical points on an electronic map and drawing regional boundaries based on the critical points, an inspection area is generated, the sequence characteristics of the critical points are extracted, the inspection area is divided into sub-areas according to the sequence characteristics, and the inspection route is planned, the comprehensive power distribution parameters of the sub-areas are collected, and the inspection management coefficient of the sub-area is calculated based on the comprehensive power distribution parameters, the inspection management system is compared with the inspection management threshold, the abnormal area is identified from the sub-area, and according to the number of the abnormal area, the sub-area is controlled to select the corresponding regional power distribution state, the adjustment parameters of the abnormal area are identified, and the inspection management instruction is formulated according to the adjustment parameters; compared with the prior art, the sequence characteristics of the inspection area corresponding to the distribution network can be accurately extracted, and the inspection area can be divided into sub-areas according to the sequence characteristics, and the inspection route is planned, the comprehensive power distribution parameters of the sub-areas are collected, and the inspection management coefficient of the sub-area is calculated based on the comprehensive power distribution parameters, and the inspection management system is compared with the inspection management threshold, and the abnormal area is identified from the sub-area. After the domain is divided into sub-areas, the inspection route is planned, which realizes the inspection effect of breaking the inspection area into parts, reduces the amount of inspection data in each sub-area, and improves the intelligent inspection efficiency of the sub-area. At the same time, the inspection management coefficient of the sub-area can be calculated in combination with the comprehensive distribution parameters, so as to accurately calculate and estimate the distribution operation status of each sub-area. At the same time, the inspection area of the distribution network can be optimized and adjusted in a targeted manner according to the sequence characteristics of the abnormal area, so that the distribution network can be maintained in a normal and stable operating state, thereby providing a good foundation for the subsequent intelligent inspection operation of the distribution network, creating a safe and reliable inspection environment for the intelligent inspection of the distribution network, and enhancing the management efficiency of the power management department for the intelligent inspection of the distribution network.
[0212] Example 2: Please refer to Figure 2 As shown, the part not described in detail in this embodiment is described in the first embodiment, which provides a digital distribution network intelligent inspection management method, which is applied to the inspection management platform and is implemented based on a digital distribution network intelligent inspection management system, including:
[0213] S1: Mark critical points on the electronic map, draw regional boundaries based on the critical points, and generate inspection areas;
[0214] S2: Extract the sequence features of critical points, divide the inspection area into sub-areas according to the sequence features, and plan the inspection route. The sequence features include high-voltage distribution, medium-voltage distribution, low-voltage distribution, and load distribution.
[0215] S3: Collect the comprehensive power distribution parameters of the sub-area, and calculate the inspection management coefficient of the sub-area based on the comprehensive power distribution parameters, the comprehensive power distribution parameters include abnormal current frequency, over-limit power interval value and operating temperature rise rate;
[0216] S4: Compare the inspection management system with the inspection management threshold, identify the abnormal area from the sub-area, and control the sub-area to select the corresponding regional power distribution state according to the number of the abnormal area;
[0217] S5: Identify the adjustment parameters of the abnormal area and formulate inspection management instructions based on the adjustment parameters.
[0218] The above description is only a specific implementation mode of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A digital distribution network intelligent inspection management system, applied to the inspection management platform, characterized in that: include: The inspection area generation module is used to mark critical points on the electronic map and draw regional boundary lines based on the critical points to generate inspection areas; Inspection route planning module, which is used to extract the sequence features of critical points, divide the inspection area into sub-areas according to the sequence features, and plan the inspection route. The sequence features include high-voltage power distribution, medium-voltage power distribution, low-voltage power distribution and load power distribution; The management coefficient calculation module is used to collect the comprehensive power distribution parameters of the sub-area and calculate the inspection management coefficient of the sub-area based on the comprehensive power distribution parameters. The comprehensive power distribution parameters include abnormal current frequency, over-limit power interval value and operating temperature rise rate; The abnormal identification and selection module is used to compare the inspection management system with the inspection management threshold, identify the abnormal area from the sub-area, and control the sub-area to select the corresponding regional power distribution state according to the number of the abnormal area; The management instruction formulation module is used to identify the adjustment parameters of abnormal areas and formulate inspection management instructions based on the adjustment parameters.
2. A digital distribution network intelligent inspection and management system according to claim 1, characterized in that: The critical point marking method comprises: The geographical location of the distribution network to be inspected is inquired through the positioning system, and an electronic map matching the geographical location of the distribution network to be inspected is selected from the database; Mark the four boundaries of the electronic map one by one to obtain four map boundaries; Identify the attribute states of all the power distribution equipment and power distribution lines on the electronic map one by one, and record the power distribution equipment and power distribution lines whose attribute states are consistent with the attribute states of the distribution network to be inspected as target power distribution equipment and target power distribution lines; Mark the locations of the target power distribution equipment and the target power distribution lines to obtain i critical points; Methods for generating inspection areas include: The distances from i critical points to the four map boundaries are measured in sequence using a scale, and the critical point corresponding to the minimum value of the distance to the four map boundaries is recorded as the target critical point, thereby obtaining four target critical points; Combine the target critical point and the map boundary corresponding to the minimum distance into a set to obtain four point and line sets; Draw straight lines parallel to the map boundaries in the corresponding point-line set through the four target critical points respectively to obtain four area boundary lines; On the electronic map, the area outside the area enclosed by the four area dividing lines is eliminated, and the remaining area is recorded as the inspection area.
3. A digital distribution network intelligent inspection and management system according to claim 2, characterized in that: The sub-region segmentation method comprises: The data corresponding to the power distribution sequence of i critical points are queried one by one through the technical parameter table to obtain i sequence data; Identify the semantics contained in i sequence data through natural language processing technology to obtain i sequence semantics; The sequence data with sequence semantics of high voltage, medium voltage, low voltage and load are recorded as high voltage distribution, medium voltage distribution, low voltage distribution and load distribution; The critical points of the sequence characteristics of high voltage distribution, medium voltage distribution, low voltage distribution and load distribution are recorded as high voltage critical point, medium voltage critical point, low voltage critical point and load critical point respectively; Draw closed characteristic lines outside the high pressure critical point, the medium pressure critical point, the low pressure critical point and the load critical point respectively to obtain four characteristic lines; The inspection area is segmented based on the four characteristic lines to obtain four sub-areas.
4. A digital distribution network intelligent inspection and management system according to claim 3, characterized in that: The inspection route planning method includes: Mark the sequence characteristics of the four sub-areas one by one, and start numbering with 1, and number the sub-areas with sequence characteristics of high voltage distribution, medium voltage distribution, low voltage distribution and load distribution in ascending order; A blank route map is constructed, and four inspection stations are marked in the route map, which are respectively recorded as the first inspection station, the second inspection station, the third inspection station, and the fourth inspection station; According to the numbering from small to large, the four sub-areas are sequentially imported into the first inspection station, the second inspection station, the third inspection station and the fourth inspection station to generate an inspection route.
5. A digital distribution network intelligent inspection and management system according to claim 4, characterized in that: The method for obtaining the abnormal current frequency includes: Randomly select equal amounts of distribution equipment and distribution lines in s sub-areas as inspection points, s∈(1, 2, 3, 4), and obtain p inspection points; The current sensors are used to measure the real-time current values of p inspection points one by one to obtain p real-time current values; Record the time when p real-time current values are greater than the preset current lower limit value for the first time respectively, and obtain p starting time; After p starting moments, when the real-time current value no longer exceeds the preset current lower limit value within the preset current inspection time, the last time the real-time current value exceeds the preset current lower limit value is recorded to obtain p ending moments; The duration between the p starting moments and the p ending moments is recorded as the abnormal duration, and p abnormal durations are obtained; Count the number of times that the real-time current value is greater than the preset current lower limit value within p abnormal time lengths one by one to obtain p abnormal current values; Compare the p abnormal current values with the p abnormal durations in sequence to obtain p sub-frequencies; The expression of sub-frequency is: Where PL zsp is the sub-frequency of the p-th inspection point in the s-th sub-area, DL ycsp is the abnormal current value of the pth inspection point in the sth sub-area, SC ycsp is the abnormal duration of the pth inspection point in the sth sub-area; Remove the maximum and minimum values of the sub-frequencies, accumulate the remaining p-2 sub-frequencies and calculate the average to obtain s abnormal current frequencies; The expression of abnormal current frequency is: Where PL dls is the abnormal current frequency of the sth sub-region, PL zsa is the sub-frequency of the a-th inspection point in the s-th sub-area.
6. A digital distribution network intelligent inspection and management system according to claim 5, characterized in that: The method for obtaining the over-limit power interval value comprises: A1: Use power sensors to detect the real-time operating power of p inspection points and obtain p real-time power values; A2: Query the standard operating power value of the sub-area through the technical parameter table, and record the real-time power value that is greater than the standard operating power value as the over-limit power value; A3: Query the time when two consecutive over-limit power values appear in p inspection points through the timestamp, obtain the first time and the second time, and record the time between the first time and the second time as the over-limit time, and obtain p over-limit time; A4: Repeat step A3 w times to obtain w overtimes, and then add up the w overtimes and calculate the average to obtain p valid time periods. The expression of effective duration is: In the formula, SC yxsp is the effective duration of the pth inspection point in the sth sub-area, SC cxspb is the bth overlimit duration of the pth inspection point in the sth sub-area; A5: Accumulate the p effective durations and calculate the average to obtain s over-limit power interval values; The expression of the excess power interval value is: In the formula, JG cxs is the excess power interval value of the sth sub-area, SC yxsc is the effective duration of the cth inspection point in the sth sub-area.
7. A digital distribution network intelligent inspection and management system according to claim 6, characterized in that: The method for obtaining the operating temperature increase rate includes: The real-time working temperature of p inspection points is detected by the temperature sensor in real time to obtain p real-time temperature values; The moment when the p real-time temperature values first reach the preset temperature lower limit is recorded as the rising start moment, the moment when the p real-time temperature values first reach the preset temperature upper limit is recorded as the rising end moment, and the time from the rising start moment to the rising end moment is recorded as the rising duration, to obtain p rising durations; After subtracting the preset temperature upper limit value from the preset temperature lower limit value, the values are compared with the p rising time periods to obtain p sub-rising rates; The expression of the sub-rise rate is: In the formula, SG lsp is the sub-area rise rate of the p-th inspection point in the s-th sub-area, WD sx is the preset temperature upper limit, WD xx is the preset temperature lower limit, SC sgsp is the rising time of the pth inspection point in the sth sub-area; The p sub-increase rates are accumulated and averaged to obtain the standard increase rate, and the x sub-increase rates greater than the standard increase rate are accumulated and averaged to obtain the operating temperature increase rate; The expression of operating temperature rise rate is: In the formula, SG wds is the operating temperature rise rate of the sth sub-area, SG lsd is the sub-area rise rate of the d-th inspection point in the s-th sub-area.
8. A digital distribution network intelligent inspection and management system according to claim 7, characterized in that: The expression of the inspection management coefficient is: In the formula, GL xss is the inspection management coefficient of the s-th sub-area, σ1, σ2, σ3 are weight factors, and σ1, σ2, σ3 are all greater than 0; Methods for identifying abnormal areas include: The inspection management coefficient GL of the s sub-areas xss One by one with the preset inspection management threshold GL yz Compare; When GL xss Greater than or equal to GL yz When , no abnormal area is identified; When GL xss Smaller than GL yz When , the sth sub-region is identified as an abnormal region, and v abnormal regions are obtained; The regional power distribution status includes normal power distribution status and shutdown maintenance status; The selection methods for normal power distribution state and shutdown maintenance state include: Record the numbers of the v abnormal regions as abnormal numbers, obtain v abnormal numbers, and record the minimum value of the abnormal numbers as the target number; When the target number is 1, the sub-areas with control numbers 1, 2, 3, and 4 are all in shutdown maintenance state; When the target number is 2, the sub-area with the control number 1 selects the normal power distribution state, and the sub-areas with the control numbers 2, 3, and 4 all select the shutdown maintenance state; When the target number is 3, the sub-areas with control numbers 1 and 2 select the normal power distribution state, and the sub-areas with control numbers 3 and 4 both select the shutdown maintenance state; When the target number is 4, the sub-areas with control numbers 1, 2 and 3 select the normal power distribution state, and the sub-area with control number 4 selects the shutdown maintenance state.
9. A digital distribution network intelligent inspection and management system according to claim 8, characterized in that: The method for identifying the adjustment parameter includes: Comparing the abnormal current frequency in the abnormal area with a preset frequency safety value, and when the abnormal current frequency is greater than the preset frequency safety value, identifying the abnormal current frequency as an adjustment parameter; Comparing the over-limit power interval value in the abnormal area with a preset interval safety value, and identifying the over-limit power interval value as an adjustment parameter when the over-limit power interval value is less than the preset interval safety value; The operating temperature increase rate in the abnormal area is compared with a preset increase safety value, and when the operating temperature increase rate is greater than the preset increase safety value, the operating temperature increase rate is identified as an adjustment parameter.
10. A digital distribution network intelligent inspection and management system according to claim 9, characterized in that: The inspection management instructions include instructions for reducing abnormal current frequency, increasing over-limit power interval value, and reducing operating temperature rise rate: The method for formulating the abnormal current frequency reduction instruction, the over-limit power interval value increase instruction and the operating temperature rise rate reduction instruction includes: When the adjustment parameter is abnormal current frequency, an instruction to reduce the abnormal current frequency is formulated; When the adjustment parameter is an over-limit power interval value, an instruction to increase the over-limit power interval value is formulated; When the adjustment parameter is the operating temperature increase rate, an instruction to reduce the operating temperature increase rate is formulated.
Citation Information
Cited By
Fault detection system for power distribution equipment
CN119291362A
Power distribution automation detection method and detection system
CN119619671A
