Preparation process and preparation tool for double-metal cylinder body of continuous furnace and hydraulic cylinder

By using a heat insulation cover to separate the steel matrix and copper raw materials in a continuous furnace, the bottom to top solidification of the copper cladding is achieved, solving the problems of low production efficiency and defects of the copper steel cylinder block in a continuous furnace, and improving the production efficiency and Interface bonding power.

CN119016707AActive Publication Date: 2024-11-26WEICHAI POWER CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202410945629.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-15
Publication Date
2024-11-26
Estimated Expiration
2044-07-15

AI Technical Summary

Technical Problem

The prior art is difficult to achieve mass production of copper-steel bimetal cylinders in continuous furnaces, mainly due to the difficulty in separation of the temperature control of the steel matrix and the copper cladding, resulting in defects and early failure of the copper cladding during the cooling process.

Method used

The steel substrate and copper raw materials are separated by heat insulation. When heating, the copper raw materials are located outside the heat insulation. The steel substrate is kept at a low temperature. After dripping, the copper coating solidifies in the order from bottom to top, forming a High density copper cladding, suitable for continuous furnace production.

Benefits of technology

It realizes the formation of high-density copper cladding without human intervention in the continuous furnace, slows down the shrinkage trend at the copper-steel interface, improves production efficiency, meets the needs of mass production, and passes through temperature gradients The second phase Pb phase is uniformly dispersed, enhancing the interface bonding force.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119016707A_ABST
    Figure CN119016707A_ABST
Patent Text Reader

Abstract

The invention provides a preparation process and a preparation tool of a continuous furnace double-metal cylinder body and a hydraulic cylinder, relates to the field of hydraulic cylinder processing, and aims to solve the problem that an existing double-metal cylinder body preparation process is not suitable for continuous furnace production. The copper raw material is located outside the heat shield and can be rapidly heated to be melted, the temperature rise speed of the steel base body is low so that the temperature of the steel base body can be kept below the liquidus temperature of the copper material, after a copper-containing metal melt obtained after the copper raw material is melted drips to the steel base body, the temperature gradient can be formed under the action of the steel base body with the relatively low temperature, and therefore solidification is conducted according to the sequence from bottom to top; and a high-density copper coating is formed, manual intervention does not need to be additionally applied in the conveying process, and the requirement of a continuous furnace for producing the double-metal cylinder body is met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of hydraulic cylinder processing, and in particular to a preparation process, preparation tooling and a hydraulic cylinder of a bimetallic cylinder body in a continuous furnace. Background Art

[0002] The main part of the hydraulic cylinder is a bimetallic cylinder body, and its appearance is as follows Figure 1 As shown, it includes a copper coating made of copper alloy and a steel substrate made of iron alloy, and the copper coating covers the end surface of the steel substrate. The solid-liquid composite method is one of the commonly used methods for preparing copper-steel composite materials. It uses the fact that the melting point of copper is lower than that of steel. When the temperature reaches the melting point of copper, the copper melts and covers the surface of the steel to achieve the purpose of the composite of the two. Compared with the traditional sintering production method of solid-solid composite method, it has the advantages of high efficiency and high environmental friendliness.

[0003] A continuous mesh belt heating furnace is used to composite the copper coating and the steel substrate. The steel substrate and the copper block used to make the copper coating are placed in the heating furnace together for heating. During the insulation process, the steel substrate, as the base part of the cylinder body, is heated together with the copper block. When the copper block is completely melted, the steel substrate remains solid. Subsequently, the copper-containing metal melt flows and completely covers the upper end surface of the steel substrate. After heating is completed, the cylinder body enters the cooling section. However, due to the solid-liquid transformation of the copper alloy, defects are prone to occur during the solidification process of the copper-containing metal melt. Due to the large volume difference between the steel substrate and the copper cladding, and the better thermal conductivity of copper than steel, the surface layer of the copper-containing metal melt in contact with the cooling section environment will be cooled and solidified first, while the copper-containing metal melt in contact with the steel substrate still maintains the same temperature as the steel. A temperature gradient is formed in the copper-containing metal melt with the temperature gradually increasing from top to bottom, resulting in a top-down solidification direction when the copper-containing metal melt is cooled. The copper-containing metal melt at the contact interface between the copper-containing metal melt and the steel substrate becomes the last solidification area. There is a large shrinkage tendency at the copper-steel interface, resulting in early failure of the parts. A Chinese patent (publication number: CN114042918A) discloses a preparation process for a copper-steel bimetallic component, in which a steel substrate is fixed in a deposition working chamber, and then filled with a protective gas and preheated to a set temperature, the set temperature being lower than the solidus temperature of the steel material, and a copper-containing metal melt is deposited on the surface of the steel substrate to achieve preliminary compounding, and then preheated and kept warm after compounding; however, the steel substrate and the copper-containing metal melt need to be operated separately, which is not suitable for a continuous furnace. There is no space in the continuous furnace for separately operating the steel substrate and the copper-containing metal, which makes the current deposition of the copper-containing metal melt difficult to achieve, affecting its application in the continuous furnace and failing to meet the needs of large-scale production. Summary of the invention

[0004] The purpose of the present invention is to address the defects of the prior art and provide a preparation process, preparation tooling and hydraulic cylinder for a continuous furnace bimetallic cylinder body. A heat insulation cover is used to separate a steel substrate and a copper raw material. After entering the continuous furnace for heating, the copper raw material is located outside the heat insulation cover and can be quickly heated up and melted, while the steel substrate heats up at a slower rate so as to remain below the liquidus temperature of the copper material. After the copper raw material is melted, the copper-containing metal melt can form a temperature gradient under the action of the relatively low temperature steel substrate after dripping onto the steel substrate, thereby solidifying in a bottom-to-top order to form a high-density copper coating. No additional human intervention is required during the transportation process, thereby meeting the needs of continuous furnace production of bimetallic cylinder bodies.

[0005] The first object of the present invention is to provide a process for preparing a bimetallic cylinder in a continuous furnace, using the following scheme:

[0006] A continuous furnace bimetallic cylinder preparation process, comprising:

[0007] Making a steel matrix;

[0008] The steel substrate is placed on a continuous furnace conveyor belt and covered with a heat insulation cover, and a container is arranged on the heat insulation cover;

[0009] The copper raw materials for making the copper coating are placed in a container and sent into a continuous furnace for heating;

[0010] The copper raw material is heated to a temperature above the liquidus temperature of the copper material until the copper raw material melts to become a copper-containing metal melt, and the steel matrix is ​​heated and the temperature is maintained below the liquidus temperature of the copper material;

[0011] The copper-containing metal melt passes through the heat insulation cover and falls onto the steel substrate. The copper-containing metal melt solidifies on the steel substrate in a sequence from bottom to top to form a copper coating on the steel substrate.

[0012] The steel substrate and copper cladding are fed into the cooling section of a continuous furnace to obtain a cylinder body.

[0013] Furthermore, the heat shield is separated from the steel substrate, and the heat shield and the air between the heat shield and the steel substrate jointly block the continuous furnace from heating the steel substrate, so that the temperature of the steel substrate is maintained below the liquidus temperature of the copper material.

[0014] Furthermore, the steel substrate, the heat shield, the container and the copper raw material move together in the continuous furnace.

[0015] Furthermore, the container is funnel-shaped, with an opening at the top for placing the copper raw material and an opening formed after the bottom passes through the heat insulation cover to allow the copper-containing metal melt to fall onto the steel substrate.

[0016] Furthermore, after the temperature of all copper-containing metal melts falling onto the steel substrate is lower than the liquidus temperature of the copper material, they are sent to the cooling section of the continuous furnace.

[0017] Furthermore, after the copper-containing metal melt falls onto the steel substrate, the copper-containing metal melt in contact with the steel substrate solidifies first, forming a temperature gradient in which the temperature gradually increases from close to the steel substrate to away from the steel substrate.

[0018] The second object of the present invention is to provide a preparation tool for a bimetallic cylinder of a continuous furnace, which adopts the following scheme:

[0019] Used to implement the preparation process of the bimetallic cylinder body of the continuous furnace as in the first purpose, the preparation tooling of the bimetallic cylinder body of the continuous furnace comprises a continuous furnace, a heat insulation cover and a container;

[0020] The continuous furnace comprises a heating section, a heat preservation section and a cooling section which are sequentially distributed in the conveying direction;

[0021] A heat shield having a cavity for accommodating a steel substrate;

[0022] The container has a main body located outside the heat insulation cover and is used for placing copper raw materials for making copper cladding. The outlet of the container extends through the heat insulation cover to the cavity.

[0023] Furthermore, the heat insulation cover is a shell structure with a bottom opening and a top opening. The bottom opening of the heat insulation cover cooperates with the conveyor belt of the continuous furnace to form a cavity, and the top opening of the heat insulation cover is used for the outlet of the container to pass through.

[0024] Furthermore, the container is funnel-shaped, with a conical groove at one end and a drainage pipe at the other end. The groove area is located outside the heat insulation cover, one end of the drainage pipe is connected to the bottom of the groove, and the other end passes through the heat insulation cover to form an outlet of the container.

[0025] The third object of the present invention is to provide a hydraulic cylinder manufactured by the continuous furnace bimetallic cylinder body preparation process as described in the first object.

[0026] Compared with the prior art, the present invention has the following advantages and positive effects:

[0027] (1) In view of the problem that the current bimetallic cylinder preparation process is not suitable for continuous furnace production, a heat insulation cover is used to separate the steel substrate and the copper raw material. After entering the continuous furnace for heating, the copper raw material outside the heat insulation cover can be quickly heated up and melted, while the steel substrate heats up slowly and remains below the liquidus temperature of the copper material. After the copper raw material is melted, the copper-containing metal melt can form a temperature gradient under the action of the relatively low temperature steel substrate after dripping onto the steel substrate, thereby solidifying in a bottom-up order to form a high-density copper coating. No additional human intervention is required during the transportation process, thus meeting the needs of continuous furnace production of bimetallic cylinders.

[0028] (2) Since the copper raw material used in the present invention is a copper alloy raw material, when tin-lead bronze is used as the raw material for the copper coating, the second phase Pb phase tends to aggregate in the high-temperature area under the action of the temperature gradient. In this regard, the temperature gradient of the copper-containing metal melt in the present invention increases from bottom to top, so that the Pb phase can be evenly dispersed and the aggregation at the copper-steel composite interface can be slowed down. At the same time, since the upper temperature is higher, that is, the upper part is in liquid state and the copper-steel composite interface below is in semi-solid or solid state, under the action of surface tension, the Pb phase can aggregate in the liquid area, thereby achieving uniform dispersion and ensuring the interface bonding force. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.

[0030] Figure 1 Schematic diagram of the bimetallic cylinder in Examples 1-3 of the present invention.

[0031] Figure 2 Schematic diagram of the copper-containing metal melt dripping onto the steel substrate in the container in Examples 1 and 2 of the present invention.

[0032] Figure 3 The temperature variation curves of the steel substrate and the copper in the container in the continuous furnace in Examples 1 and 2 of the present invention are shown.

[0033] Figure 4 The metallographic diagram of the copper coating obtained by the preparation process of the bimetallic cylinder in the continuous furnace in Examples 1 and 2 of the present invention.

[0034] Figure 5 This is the metallographic image of the copper coating produced by conventional melting and casting process.

[0035] In the figure, 1. steel substrate, 2. copper coating, 3. container, 4. copper-containing metal melt, 5. heat shield. DETAILED DESCRIPTION

[0036] Example 1

[0037] In a typical embodiment of the present invention, Figure 1-Figure 5 As shown, a preparation process of a continuous furnace bimetallic cylinder is given.

[0038] At present, when preparing a bimetallic cylinder, it is necessary to control the temperature of the steel material and the copper material separately, and perform additional operations during deposition, resulting in low production efficiency and being unsuitable for continuous furnace applications. Continuous furnaces are difficult to provide operating space for depositing copper metal melts, resulting in difficulty in mass-producing copper-steel bimetallic cylinders. Based on this, the present embodiment provides a preparation process for a bimetallic cylinder in a continuous furnace, wherein a steel substrate 1 and a copper raw material for preparing a copper coating 2 are placed in a continuous furnace together, and a heat shield 5 is used to separate the steel substrate 1 and the copper raw material, thereby forming a differential heating, which is adapted to the production scenario of a continuous furnace. After the copper raw material is melted, it is introduced onto a steel substrate 1 at a lower temperature for deposition, so as to establish a deposition method of contact first, cooling first, and solidification first, thereby reducing the shrinkage tendency of the copper-steel interface and reducing defects in parts after deposition.

[0039] like Figure 1 As shown, a continuous furnace bimetallic cylinder preparation process comprises:

[0040] Manufacturing a steel substrate 1;

[0041] The steel substrate 1 is placed on a continuous furnace conveyor belt and covered with a heat insulation cover 5, and a container 3 is arranged on the heat insulation cover 5;

[0042] The copper raw materials for making the copper coating 2 are placed in a container 3 and sent into a continuous furnace for heating;

[0043] The copper raw material is heated to a temperature above the liquidus temperature of the copper material, until the copper raw material melts to form a copper-containing metal melt 4, and the steel substrate 1 is heated and maintained at a temperature below the liquidus temperature of the copper material;

[0044] The copper-containing metal melt 4 passes through the heat-insulating cover 5 and falls onto the steel substrate 1. The copper-containing metal melt 4 solidifies on the steel substrate 1 from bottom to top, forming a copper coating 2 on the steel substrate 1.

[0045] The steel substrate 1 and the copper cladding 2 are fed into a cooling section of a continuous furnace to obtain a cylinder body.

[0046] It should be pointed out that the sequential solidification from bottom to top indicated in this embodiment is due to the fact that the steel substrate 1 is located below the copper-containing metal melt 4, that is, along the thickness direction of the copper coating 2 formed by the copper-containing metal melt 4, the closer to the steel substrate 1, the earlier the solidification time, that is, the copper-steel junction is the position closest to the steel substrate 1, the copper-containing metal melt 4 at the copper-steel junction solidifies first, and the outer surface of the copper coating 2 solidifies later.

[0047] In this embodiment, Figure 2As shown, the heat shield 5 is separated from the steel substrate 1, and the heat shield 5 is made of heat insulation material. The thermal conductivity of the heat insulation material selected for the heat shield 5 is ≤ the thermal conductivity of the steel substrate 1, thereby slowing down the heating rate of the steel substrate 1. The heat insulation material can be ceramic aerogel material, nanofiber aerogel, aluminum silicate fiber wool, etc. For example, silica-alumina composite ceramic aerogel (FR-SACA) is achieved by rearranging silica aerogel particles and mullite ceramic fibers using a self-sacrificing polymer. It has high temperature resistance (1300-1600℃) and excellent thermal insulation properties, forming a cross-interlocking reinforcement structure similar to a bird's nest structure, and has excellent properties, including low density, low thermal conductivity and high reversible compressibility; nanofiber aerogel can be made of ZrO 2 –Al 2 O 3 Nanofiber aerogel (ZrAlNFAs), etc.

[0048] In conventional cylinder casting, the copper block is placed on the upper end surface of the steel substrate 1 of the cylinder, and the two are heated in a continuous furnace together. The thermal conductivity of the copper alloy is 398W / (m·K), and the thermal conductivity of the steel substrate 1 is 45W / (m·K). The specific heat capacities of the two are almost the same. During the heating process, the melting of the copper block is affected by the temperature of the steel substrate 1 in contact with it. The surface of the steel substrate 1 heats up faster, and the heating rate is greater than that of the copper block. The part where the copper block contacts the steel substrate 1 melts first, resulting in the copper liquid solidifying first on the side away from the steel substrate 1 during cooling, and solidifying later on the copper-steel interface side, resulting in a shrinkage trend and causing early failure.

[0049] Therefore, in this embodiment, the heat shield 5 and the air between the heat shield 5 and the steel substrate 1 jointly block the heating of the steel substrate 1 by the continuous furnace, so that the heating rate of the steel substrate 1 is lower than the heating rate of the copper raw material. Figure 3 As shown, the heat shield 5 can block the high temperature environment in the continuous furnace from heating the steel substrate 1, and slow down the heating rate of the steel substrate 1; at the same time, the air between the heat shield 5 and the steel substrate 1 can also isolate the hot atmosphere in the heating furnace from part of the steel substrate 1. The thermal conductivity of air is 0.023W / (m·K) and the specific heat capacity is 1030J / (Kg·K). It is also a very good heat insulation material. During the period when the copper raw material is heated and melted to be completely deposited on the steel substrate 1, the temperature of the steel substrate 1 is kept below the liquidus temperature of the copper material.

[0050] The steel substrate 1, the heat shield 5, the container 3 and the copper raw material move together in the continuous furnace to control the heating and insulation temperature in the continuous furnace and the moving speed of the continuous furnace. In this embodiment, the continuous furnace operates at a certain melting temperature T and moving speed r to perform corresponding heating, insulation and cooling.

[0051] like Figure 2As shown, the container 3 is funnel-shaped, with an opening at the top for placing the copper raw material, and an opening formed after the bottom passes through the heat insulation cover 5, so that the copper-containing metal melt 4 can fall onto the steel substrate 1. In this embodiment, Figure 1 As shown, the steel substrate 1 is cylindrical, and one end of the copper coating 2 to be deposited is provided with a circular groove. The copper raw material for preparing the copper coating 2 can be a cylindrical copper block.

[0052] After the copper-containing metal melt 4 falls onto the steel substrate 1, the copper-containing metal melt 4 in contact with the steel substrate 1 solidifies first, forming a temperature gradient with the temperature gradually increasing from close to the steel substrate 1 to far away from the steel substrate 1, thereby solidifying in a bottom-to-top order to form a high-density copper coating 2, without the need for additional human intervention during the transportation process, thereby meeting the needs of continuous furnace production of bimetallic cylinders.

[0053] In this embodiment, the liquidus temperature of the copper material refers to the melting temperature of the copper raw material. When the steel substrate 1 is maintained below the liquidus temperature of the copper material, the copper-containing metal melt 4 in contact with the steel substrate 1 can be cooled and tend to solidify, thereby establishing a trend in which the copper-containing metal melt 4 on the steel substrate 1 gradually solidifies from contact with the steel substrate 1 to a direction away from the steel substrate 1.

[0054] Through the heat insulation effect of the heat insulation cover 5, the heating rate of the surface of the steel substrate 1 is reduced, so that the temperature of the steel substrate 1 is always lower than the liquidus temperature of the copper block material, and by controlling the temperature of the heating furnace and the conveyor belt speed, the copper raw material is fully melted and flows to cover the upper end surface of the steel substrate 1. The copper-containing metal melt 4 flows to the upper end surface of the steel substrate 1 through the funnel-shaped container 3. At this time, the temperature of the steel substrate 1 is lower than the liquidus temperature of the copper-containing metal melt 4, forming a temperature gradient with a gradually decreasing temperature from top to bottom. The copper-containing metal melt 4 in contact with the steel substrate 1 solidifies first, forming a solidification sequence from bottom to top.

[0055] After the temperature of all copper-containing metal melts 4 falling onto the steel substrate 1 is lower than the liquidus temperature of the copper material, all copper-containing metal melts 4 that can form the copper coating 2 are completely covered on the steel substrate 1 to form the desired deposition state. The overall state has been fixed and is then sent to the cooling section of the continuous furnace for further cooling.

[0056] By wrapping the steel substrate 1 with a heat-insulating material, the heating rate of the steel substrate 1 during heating in a continuous furnace is significantly lower than the heating rate of the copper raw material. Finally, at the same ambient temperature, the copper raw material melts, while the temperature of the steel substrate 1 is always lower than the liquidus temperature of the copper material, thereby allowing the copper-containing metal melt 4 to solidify on the steel substrate 1 in a bottom-up solidification sequence.

[0057] The steel matrix 1 is made of alloy steel, the alloy steel is 42CrMoS4, the chemical composition is C 040-0.45%, Si≤0.40%, Mn060-0.90%, P≤0.025%, S 0.010-0.018%, Cr 0.90-1.20%, Mo 0.15-0.30%, Cu≤0.20%, Ni≤0.30%, and the metallographic structure is pearlite + ferrite; the melting and casting temperature in the continuous furnace is 1080℃≤T≤1120℃, and the moving speed of the conveyor belt of the continuous furnace is 80mm / min≤r≤115mm / min.

[0058] In this embodiment, the outer dimensions of the steel substrate 1 are Φ108*98mm, the number of copper blocks is 4, the size is Φ35*20, the insulation material is 45# steel, the size of the heat insulation cover 5 is Φ170*130mm, the melting temperature is T=1080℃, and the speed of the continuous furnace conveyor belt is r=85mm / min.

[0059] The temperature curve of the copper block and the temperature curve of the steel part near the copper layer during the casting process are as follows: Figure 3 As shown in the figure, it can be seen that when the temperature of the copper block reaches 1080°C, the temperature of the steel substrate 1 is only 790°C. No shrinkage defects were found in the copper coating 2 of the cylinder body after melting and casting. The density of the copper coating 2 is higher than that of conventional melting and casting. Figure 4 shown. Figure 5 This is the metallographic phase of the cylinder copper cladding 2 produced under conventional melting and casting process.

[0060] In addition, when the traditional method is used for melting and casting, a temperature gradient is formed in the copper-containing metal melt 4, and the temperature gradually increases from top to bottom, resulting in a top-down solidification direction of the copper-containing metal melt 4 when cooling. This will not only lead to a large shrinkage tendency at the copper-steel interface, but also when a copper coating 2 made of tin-lead bronze is used, under this solidification direction, the tin-lead bronze undergoes a solid-liquid transition, and the second phase Pb phase in the tin-lead bronze tends to aggregate at the copper-steel composite interface under the action of the temperature gradient and surface tension, which will further weaken the interfacial bonding force.

[0061] In this regard, in this embodiment, the copper alloy used as the copper raw material is tin-lead bronze, CuSn10Pb10, with chemical composition (mass percentage): Sn 7.25-7.85%, Pb 14.1-17.26%, Ni 1.24-1.86%, Zn 0.01-0.05%, P less than 0.1%, and the metallographic structure is α-Cu+spherical rod-shaped Pb.

[0062] The second phase Pb phase tends to gather in the high-temperature area under the action of the temperature gradient. In this regard, the temperature gradient of the copper-containing metal melt 4 in the present invention increases from bottom to top, so that the Pb phase can be evenly dispersed and the aggregation at the copper-steel composite interface can be slowed down. At the same time, since the upper temperature is higher, that is, the upper part is in liquid state and the copper-steel composite interface below is semi-solid or solid, under the action of surface tension, the Pb phase can gather in the liquid area, thereby achieving uniform dispersion and ensuring the interface bonding force.

[0063] Such as 4 and Figure 5 As shown, compared with the two, the Pb phase in the cast copper coating 2 of this embodiment is evenly distributed without a network distribution, which greatly reduces the influence of the Pb phase on the copper matrix and the interface strength.

[0064] Example 2

[0065] In another typical embodiment of the present invention, Figure 1-Figure 4 As shown, a preparation tool for a continuous bimetallic cylinder is provided.

[0066] The preparation tooling for the continuous furnace bimetallic cylinder body is used to implement the preparation process of the continuous furnace bimetallic cylinder body in Example 1, and includes a continuous furnace, a heat insulation cover 5 and a container 3.

[0067] The continuous furnace comprises a heating section, a heat preservation section and a cooling section which are sequentially distributed in the conveying direction. During melting and casting, the heating section and the heat preservation section can provide a melting and casting temperature of 1080°C≤T≤1120°C.

[0068] A cavity for accommodating the steel substrate 1 is provided inside the heat shield 5; the main body of the container 3 is located outside the heat shield 5 and is used to place copper raw materials for making the copper cladding 2, and the outlet of the container 3 extends through the heat shield 5 to the cavity.

[0069] In this embodiment, the heat shield 5 is a shell structure with an opening at the bottom and a hole at the top. The bottom opening of the heat shield 5 cooperates with the conveyor belt of the continuous furnace to form a cavity, and the top opening of the heat shield 5 is used for the outlet of the container 3 to pass through. The container 3 is funnel-shaped, with a conical groove at one end and a drainage pipe at the other end. The groove area is located outside the heat shield 5. One end of the drainage pipe is connected to the bottom of the groove, and the other end passes through the heat shield 5 to form the outlet of the container 3.

[0070] The heat insulation material used for the heat insulation cover 5 is 45# steel. The size of the heat insulation cover 5 is Φ170*130mm, and it can be buckled on the outside of the steel substrate 1. The outer size of the steel substrate 1 is Φ108*98mm. An annular groove for accommodating the copper-containing metal melt 4 is provided on the end face. The casting temperature provided by the continuous furnace is T=1080℃, and the speed of the continuous furnace conveyor belt is r=85mm / min.

[0071] Example 3

[0072] In another typical embodiment of the present invention, Figure 1 As shown, a hydraulic cylinder is provided.

[0073] In this embodiment, the cylinder body of the hydraulic cylinder is manufactured by the continuous furnace bimetallic cylinder body manufacturing process as in Example 1. Figure 1 As shown, after the cylinder body is manufactured, the corresponding hydraulic cylinder accessories are assembled to obtain the hydraulic cylinder.

[0074] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A process for preparing a bimetallic cylinder in a continuous furnace. It is characterized in that include: Making a steel matrix; The steel substrate is placed on a continuous furnace conveyor belt and covered with a heat insulation cover, and a container is arranged on the heat insulation cover; The copper raw materials for making the copper coating are placed in a container and sent into a continuous furnace for heating; The copper raw material is heated to a temperature above the liquidus temperature of the copper material until the copper raw material melts to become a copper-containing metal melt, and the steel matrix is ​​heated and the temperature is maintained below the liquidus temperature of the copper material; The copper-containing metal melt passes through the heat insulation cover and falls onto the steel substrate. The copper-containing metal melt solidifies on the steel substrate in a sequence from bottom to top to form a copper coating on the steel substrate. The steel substrate and copper cladding are fed into the cooling section of a continuous furnace to obtain a cylinder body.

2. The process for preparing a continuous furnace bimetallic cylinder according to claim 1, It is characterized in that The heat insulation cover is separated from the steel substrate, and the heat insulation cover and the air between the heat insulation cover and the steel substrate jointly block the heating of the steel substrate by the continuous furnace, so that the temperature of the steel substrate is maintained below the liquidus temperature of the copper material.

3. The process for preparing the continuous furnace bimetallic cylinder according to claim 2, It is characterized in that The steel substrate, the heat shield, the container and the copper raw material move together in the continuous furnace.

4. The process for preparing a continuous furnace bimetallic cylinder according to claim 1, It is characterized in that The container is in the shape of a funnel, with an opening at the top for placing the copper raw material and an opening formed after the bottom passes through the heat insulation cover for the copper-containing metal melt to fall onto the steel substrate.

5. The process for preparing a continuous furnace bimetallic cylinder according to claim 4, It is characterized in that After the temperature of all copper-containing metal melts falling onto the steel matrix is ​​lower than the liquidus temperature of the copper material, they are sent to the cooling section of the continuous furnace.

6. The process for preparing a continuous furnace bimetallic cylinder according to claim 1, It is characterized in that After the copper-containing metal melt falls onto the steel substrate, the copper-containing metal melt in contact with the steel substrate solidifies first, forming a temperature gradient in which the temperature gradually increases from close to the steel substrate to away from the steel substrate.

7. A preparation tool for a continuous furnace bimetallic cylinder. It is characterized in that Used to implement the preparation process of the continuous furnace bimetallic cylinder according to any one of claims 1 to 6, the preparation tooling of the continuous furnace bimetallic cylinder comprises a continuous furnace, a heat insulation cover and a container; the continuous furnace comprises a heating section, a heat preservation section and a cooling section distributed in sequence in the conveying direction; A heat shield having a cavity for accommodating a steel substrate; The container has a main body located outside the heat insulation cover and is used for placing copper raw materials for making copper cladding. The outlet of the container extends through the heat insulation cover to the cavity.

8. The preparation tool for the continuous furnace bimetallic cylinder according to claim 7, It is characterized in that The heat insulation cover is a shell structure with a bottom opening and a top opening. The bottom opening of the heat insulation cover cooperates with the conveyor belt of the continuous furnace to form a cavity, and the top opening of the heat insulation cover is used for the outlet of the container to pass through.

9. The preparation tool for the continuous furnace bimetallic cylinder according to claim 7, It is characterized in that The container is funnel-shaped, with a conical groove at one end and a drainage pipe at the other end. The groove area is located outside the heat insulation cover. One end of the drainage pipe is connected to the bottom of the groove, and the other end passes through the heat insulation cover to form an outlet of the container.

10. A hydraulic cylinder, It is characterized in that The bimetallic cylinder is manufactured by the continuous furnace preparation process as described in any one of claims 1 to 9.

Citation Information

Patent Citations

  • Heating and cooling method of steel-copper bimetal cylinder body casting

    CN110434315A

  • Preparation process and preparation tool of copper-steel bimetallic component, and cylinder body

    CN114042918A

  • Casting method of copper-steel bimetallic composite material for plunger pump cylinder body

    CN114749637A

  • Copper-steel double-metal composite material and induction heating casting compounding method

    CN115555547A